A method for reinforcing and preventing seepage of surrounding rock of compressed gas energy storage reservoir in abandoned tunnel by grouting

By zoning grouting of the surrounding rock of the abandoned tunnel and grouting from deep to shallow, and using suitable grouting materials for reinforcement, the problem that the existing technology cannot meet the property requirements of the surrounding rock for compressed air energy storage is solved, and the surrounding rock is realized The effective anti-seepage and deformation recovery ensure the stable operation of compressed air energy storage.

CN118188029BActive Publication Date: 2024-10-11SHANDONG UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410384893.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-10-11
Estimated Expiration
2044-04-01

AI Technical Summary

Technical Problem

The existing grouting transformation technology cannot meet the requirements of compressed air energy storage for the properties of the surrounding rock, resulting in damage to the abandoned tunnel during the inflation and deflation cycle, making it impossible to effectively prevent seepage and restore deformation.

Method used

By performing zonal grouting on the surrounding rock of the abandoned tunnel, we select suitable grouting materials for different areas, and adopt a grouting method from deep to shallow, using ultra-fine cement + water glass + expansion agent, ordinary Portland cement + water glass + Ultra-fine fly ash and ordinary Portland cement + polyurethane and other materials are used for grouting to strengthen and improve the anti-seepage and deformation recovery capabilities of the surrounding rock.

Benefits of technology

It achieves effective reinforcement and anti-seepage of the surrounding rock, reduces costs, improves material utilization, ensures the stability and safety of the surrounding rock during the compressed air energy storage process, and avoids the problem of uneven grouting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118188029B_ABST
    Figure CN118188029B_ABST
Patent Text Reader

Abstract

The present invention provides a method for grouting reinforcement and anti-seepage of surrounding rocks of compressed gas energy storage reservoirs in abandoned tunnels, which belongs to the technical field of tunnel reinforcement and includes the following steps: Step 1: drilling holes to peek and find out the geological conditions; Step 2: zoning the grouting surrounding rocks and selecting corresponding grouting materials according to the characteristics of surrounding rocks in different regions; Step 3: selecting the hole position, determining the drilling depth, and driving grouting anchor rods into the surrounding rocks of each region respectively; Step 4: spraying concrete on the tunnel surface to form a retaining wall; Step 5: injecting corresponding grouting materials into the surrounding rocks of each region in turn from deep to shallow through grouting anchor rods. The present invention can perform grouting transformation on the surrounding rocks of abandoned mine tunnels, reinforce the surrounding rocks and make them anti-seepage and have a certain deformation recovery ability, so that the surrounding rocks meet the requirements of compressed gas energy storage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel reinforcement, and in particular relates to a method for reinforcing and preventing seepage of surrounding rocks of a compressed air energy storage reservoir in an abandoned tunnel by grouting. Background Art

[0002] Compressed gas energy storage technology is to use power from the grid or renewable energy such as solar and wind energy to power the motor to drive the compressor during the off-peak period of electricity consumption. The compressor driven by the motor continuously compresses the ambient gas into high-pressure gas and stores it in a specially designed gas storage reservoir. During peak electricity consumption, the high-pressure gas is released by controlling the vent valve. The released gas drives the generator through the turbine or engine to convert the internal energy of the gas into electrical energy output. The low-pressure gas after energy release can be recompressed by a compressor driven by an electric motor or gas engine, returning to a high-pressure state and stored as high-pressure gas again. This step can be repeated to achieve multiple cycles of charging and discharging. It can effectively solve the mismatch problem of energy supply and demand, regulate the power system and provide a balanced and stable power supply.

[0003] In compressed gas energy storage technology, abandoned mine tunnels are used as gas storage reservoirs. However, due to the long service life of abandoned tunnels, the support forms have been damaged to varying degrees and may not meet the requirements of compressed gas energy storage technology for surrounding rock bearing capacity and other properties. During the inflation process, the surrounding rock will deform due to the injection of high-pressure gas, and during the deflation process, the surrounding rock will recover the deformation caused by the gas pressure. During the inflation and deflation cycle, the surrounding rock will be damaged. Therefore, compressed gas energy storage has high requirements for the properties of the surrounding rock. Therefore, it is necessary to carry out grouting transformation of abandoned mine tunnels so that the surrounding rock meets the requirements of compressed gas energy storage for surrounding rock properties. Ensure the smooth development of compressed gas energy storage.

[0004] Most of the existing grouting transformation technologies are used to support the surrounding rock through grouting during the initial excavation of the tunnel to prevent tunnel collapse. The purpose of the grouting transformation of the surrounding rock of the compressed gas energy storage reservoir is to make the surrounding rock properties meet the requirements of compressed gas energy storage through grouting. The existing grouting transformation technology cannot meet the requirements of making the surrounding rock properties meet the requirements of compressed gas energy storage. Summary of the invention

[0005] In view of the defects or shortcomings in the prior art, the present invention provides a method for grouting reinforcement and anti-seepage of the surrounding rock of an abandoned tunnel compressed gas energy storage reservoir, which can be used to transform the surrounding rock of abandoned mine tunnels by grouting, reinforce the surrounding rock and make it anti-seepage and have a certain deformation recovery ability, so that the surrounding rock meets the requirements of compressed gas energy storage.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] An embodiment of the present invention provides a method for grouting reinforcement and anti-seepage of surrounding rocks of a compressed gas energy storage reservoir in an abandoned tunnel, comprising the following steps:

[0008] Step 1: Drill holes to explore the geological conditions;

[0009] Step 2: Divide the surrounding rock for grouting and select corresponding grouting materials according to the characteristics of the surrounding rock in different areas;

[0010] Step 3: Select the hole location, determine the drilling depth, and drive grouting anchors into the surrounding rock in each area;

[0011] Step 4: Spray concrete on the tunnel surface to form a retaining wall;

[0012] Step 5: Inject corresponding grouting materials into the surrounding rock of each area from deep to shallow through grouting anchor rods.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] 1. The present invention divides the surrounding rock of the abandoned tunnel into zones and selects different grouting materials for grouting reinforcement according to the requirements for the properties of the surrounding rock in different areas of the abandoned tunnel. Unlike the traditional grouting process that uses the same grouting material, the present invention performs grouting reinforcement based on the characteristics of each surrounding rock area, thereby reducing costs and improving material utilization.

[0015] 2. The present invention adopts ultrafine cement + water glass + expansion agent as grouting material for the outer surrounding rock, thereby improving the structural strength and anti-seepage performance of the outer surrounding rock, adopts ordinary silicate cement + water glass + ultrafine fly ash as grouting material for the middle surrounding rock, thereby improving the bearing capacity of the middle surrounding rock, and adopts ordinary silicate cement + polyurethane as grouting material for the inner surrounding rock, so that the inner surrounding rock has a certain deformation recovery ability, so that each area of ​​the abandoned tunnel surrounding rock meets the requirements of the compressed gas energy storage technology for the gas storage reservoir, ensuring the smooth development of the compressed gas energy storage work.

[0016] 3. The present invention adopts a grouting method from deep to shallow, so that the deep slurry can be diffused to the inner layer as a sign of the end of grouting, avoiding uneven grouting, excessive grouting in some areas, and insufficient grouting in some areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a flow chart of the surrounding rock grouting reinforcement and anti-seepage method in an embodiment of the present invention;

[0018] Figure 2 It is a schematic diagram of the overall structure of the grouting process in an embodiment of the present invention;

[0019] Figure 3 Schematic diagram of the grouting anchor structure in an embodiment of the present invention;

[0020] Among them, 1. Anti-seepage protective layer grouting anchor rod; 2. Diffusion reinforcement layer grouting anchor rod; 3. Performance enhancement layer grouting anchor rod; 4. Performance enhancement layer; 5. Diffusion reinforcement layer; 6. Anti-seepage protective layer; 7. Ordinary grouting anchor rod; 8. Steel pipe. DETAILED DESCRIPTION

[0021] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0022] A typical implementation of the present invention is as follows Figure 1 As shown, a method for grouting reinforcement and anti-seepage of surrounding rocks of abandoned tunnel compressed gas energy storage reservoir comprises the following steps:

[0023] Step 1: Drill holes to explore the geological conditions and find out whether there are any adverse geological conditions such as faults and seepage.

[0024] Step 2: Divide the surrounding rock for grouting and select corresponding grouting materials according to the characteristics of the surrounding rock in different areas;

[0025] In order to meet the requirements of compressed gas energy storage for the bearing capacity of surrounding rocks, the surrounding rocks of abandoned tunnels are transformed by grouting to meet the bearing capacity requirements of compressed gas energy storage. At the same time, in order to reduce costs and make the best use of resources, the grouting area is divided into zones and different grouting materials are selected for grouting.

[0026] The present invention is different from the traditional grouting process from shallow to deep. The present invention prioritizes grouting the outer layer of surrounding rock, and then sequentially grouts the inner layer of surrounding rock. The traditional grouting process is to perform grouting when the surrounding rock is not supported or simply supported. At this time, the bearing capacity of the surrounding rock is low, and it is necessary to prioritize grouting the inner layer of surrounding rock to ensure the bearing capacity of the surrounding rock. The present invention is used for grouting transformation of the surrounding rock of abandoned tunnels to meet the requirements of compressed gas energy storage technology for gas storage reservoirs. At this time, the tunnel has been supported by grouting support and other support methods during excavation. Although the support may be damaged, it has not failed, meets the bearing capacity requirements, and will not collapse. Therefore, a grouting method from deep to shallow can be used.

[0027] The traditional grouting process requires too much slurry from shallow to deep. The slurry diffuses from the inner surrounding rock to the outer surrounding rock, and the slurry diffusion situation cannot be known. The change of grouting volume and grouting pressure is used as the sign of the end of grouting, which will result in uneven grouting, excessive grouting in some areas, and insufficient grouting in some areas. Therefore, in order to facilitate zoning grouting, the grouting method from deep to shallow is selected. The advantage of this grouting method is that the deep slurry can be diffused to the inner layer as a sign of the end of grouting, saving materials and reducing costs.

[0028] In compressed gas energy storage technology, abandoned tunnels as gas storage should meet the following requirements:

[0029] The surrounding rock should be waterproof to prevent seepage into the tunnel and affect the conversion rate of compressed gas energy storage.

[0030] The surrounding rock near the tunnel should have a certain elastic deformation recovery ability so that the surrounding rock will not crack or be damaged during the process of compressed gas energy storage inflation and deflation.

[0031] The surrounding rock should be dense and have few cracks, requiring the grouting material to have good diffusion effect and strong injectability.

[0032] Therefore, in order to meet the requirements of compressed gas energy storage technology for abandoned tunnels as gas storage, the surrounding rock near the abandoned tunnels is divided into zones to meet the requirements.

[0033] like Figure 2 As shown in the figure, for the outer surrounding rock of the abandoned roadway, as the outermost layer and the surrounding rock for the first grouting, the surrounding rock should have the property of water seepage prevention after grouting to prevent water from entering the inner surrounding rock and the abandoned roadway and affecting the inner surrounding rock and the abandoned roadway. The grouting material of the outermost surrounding rock should also have the characteristics of fast coagulation and high early strength of the surrounding rock slurry stone body, which can provide good early strength for the surrounding rock and ensure the subsequent grouting work. In addition, since the cracks in the outer surrounding rock are relatively small, the grouting material is required to have good injectability. According to the design requirements of the outermost surrounding rock, it is named as the anti-seepage protective layer 6. The area where the anti-seepage protective layer 6 is located is 5 to 8 meters away from the top and both sides of the roadway and 3 to 5 meters away from the bottom of the roadway.

[0034] For the middle layer surrounding rock of the abandoned roadway, as the main stress-bearing area, the outer and inner layers of the surrounding rock grouting materials may have areas that are not fully grouted due to uneven slurry diffusion and poor diffusion and penetration of the grouting materials. At this time, the middle layer surrounding rock grouting materials are needed to fill them, and after the slurry solidifies, it should have good bearing capacity. This requires that the middle layer surrounding rock grouting materials should have good fluidity, strong injectability, and high strength after solidification. According to the design requirements of the middle layer surrounding rock, it is named diffusion reinforcement layer 5. The area where the diffusion reinforcement layer 5 is located is 2 to 5 meters away from the top and both sides of the roadway, and 2 to 3 meters away from the bottom of the roadway.

[0035] For the inner surrounding rock, as the surrounding rock area directly in contact with the abandoned roadway lining, the inner surrounding rock should have the ability to withstand the impact of the compressed gas energy storage inflation and deflation process, and have a certain elastic deformation recovery ability during the compressed gas energy storage inflation and deflation process, without generating cracks and damage. According to the design requirements of the inner surrounding rock, it is named performance enhancement layer 4, and the area where the performance enhancement layer 4 is located is 0 to 2 meters away from the top and both sides of the roadway, and 0 to 2 meters away from the bottom of the roadway.

[0036] Appropriate grouting materials and admixtures should be selected according to the design requirements of each partition. For the anti-seepage protective layer 6, the material of ultrafine cement + water glass + expansion agent is adopted. Ultrafine cement has high strength, which can effectively enhance the bearing capacity of the structure. Due to its small particle size, it can fill and seal the cracks and gaps in the components, improve the sealing of the structure, and prevent the penetration of water and other harmful substances. It also has good durability and can resist the influence of adverse factors such as humid and hot environment and chemical erosion, prolong the service life of the structure, and meet our requirements for grouting materials. Therefore, ultrafine cement is selected as the main material of the grouting material. Water glass can promote the coagulation of the grouting material and enhance the early strength. The expansion agent makes the stone body tight and crack-free, and enhances the anti-seepage ability of the stone body. The grouting pressure of the anti-seepage protective layer 6 is 4-5MPa.

[0037] For the diffusion reinforcement layer 5, ordinary Portland cement + water glass + ultrafine fly ash are selected as grouting materials. The cost of ordinary Portland cement is lower than that of ultrafine cement, and the stone body has high compressive and shear strength, but the fluidity is relatively poor and the initial setting time is long. Therefore, ultrafine fly ash is added to increase the fluidity of the grouting material and ensure the diffusivity of the grouting material so that it can fully fill the cracks in the surrounding rock, ensure complete grouting, give full play to the mechanical properties of the grouting material, and promote the coagulation of the grouting material by adding water glass. The grouting pressure of the diffusion reinforcement layer 5 is 3-4MPa.

[0038] For the performance enhancement layer 4, ordinary silicate cement + polyurethane grouting material is selected. Polyurethane can improve the fluidity of the material, allowing it to flow to the part that needs to be repaired or reinforced, filling it densely to ensure the tightness of the grouting stone body. Polyurethane can also improve the mechanical properties of the grouting material, giving it a certain deformation recovery ability. The grouting pressure of the performance enhancement layer 4 is 2 to 3 MPa.

[0039] Step 3: Select the hole location, determine the drilling depth, and drive grouting anchor rods into the surrounding rock in each area.

[0040] like Figure 3 As shown, the outer side of the anchor rod is a common grouting anchor rod 7, and the inner side is a steel pipe 8 that can slide freely along the grouting anchor rod. The outer grouting anchor rod supports the surrounding rock, preventing the hole collapse caused by bad geological conditions or the hole collapse caused by the surrounding rock being disturbed by the slurry during the grouting process, and the grouting range can be freely adjusted by sliding the inner steel pipe 8, which is convenient for zoning grouting.

[0041] Grouting anchors are driven into the surrounding rocks of each area, with a hole bottom distance of 1m. That is, the drilling depth is 1m from the outer boundary of the grouting area and 1m from the inner boundary of the grouting area. The purpose of setting the hole bottom distance is to fill the rock mass within the hole bottom distance range through the diffusion of slurry, prevent the actual grouting area from exceeding the grouting area, reduce costs, and prevent excessive support.

[0042] Step 4: Spray concrete on the tunnel surface to form a retaining wall.

[0043] Ordinary Portland cement + water glass slurry is sprayed onto the tunnel surface to form a retaining wall on the tunnel surface to prevent the slurry from flowing into the tunnel and causing waste of slurry.

[0044] Step 5: Inject corresponding grouting materials into the surrounding rock of each area from deep to shallow through grouting anchor rods.

[0045] First grouting: grouting the anti-seepage protective layer 6.

[0046] The grouting material of ultrafine cement + water glass + expansion agent is selected, and the grouting pressure is 4-5MPa. Grouting is performed on the anti-seepage protective layer 6 through the anti-seepage protective layer grouting anchor rod 1. The grouting pump injects the slurry into the anti-seepage protective layer 6 and diffuses it around. The grouting volume and grouting pressure are observed. When the slurry flows out from the diffusion reinforcement layer grouting anchor rod 2, the grouting is completed, the grouting pump is turned off, the grouting is stopped, and 24 hours are waited for the slurry to solidify.

[0047] Second grouting: grouting is performed on the diffusion reinforcement layer 5.

[0048] After the slurry of the anti-seepage protective layer 6 solidifies, the second grouting is carried out. Ordinary silicate cement + water glass + ultra-fine fly ash grouting materials are selected, and the grouting pressure is 3-4MPa. The diffusion reinforcement layer 5 is grouted through the diffusion reinforcement layer grouting anchor 2. The grouting pump injects the slurry into the diffusion reinforcement layer 5 and diffuses it around. The grouting amount and grouting pressure are observed. When the slurry flows out of the performance enhancement layer grouting anchor 3, the grouting is completed, the grouting pump is turned off, the grouting is stopped, and 24 hours are waited for the slurry to solidify.

[0049] The third grouting: grouting the performance enhancement layer 4.

[0050] After the slurry of the diffusion reinforcement layer 5 solidifies, the third grouting is carried out. Ordinary silicate cement + polyurethane grouting material is selected, and the grouting pressure is 2-3MPa. The performance enhancement layer 4 is grouted through the performance enhancement layer grouting anchor 3. The grouting pump injects the slurry into the performance enhancement layer 4 and diffuses it around. The grouting volume and grouting pressure are observed. When the grouting pressure changes significantly or the slurry injection slows to stop, the grouting is completed, the grouting pump is turned off, the grouting is stopped, and the grouting is waited for 24 hours until the slurry solidifies.

[0051] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for grouting reinforcement and anti-seepage of surrounding rock of abandoned tunnel compressed gas energy storage reservoir, characterized in that: The following steps are involved: Step 1: Drill holes to explore the geological conditions; Step 2: Divide the surrounding rock for grouting and select corresponding grouting materials according to the characteristics of the surrounding rock in different areas; Step 3: Select the hole location, determine the drilling depth, and drive grouting anchors into the surrounding rock in each area; Step 4: Spray concrete on the tunnel surface to form a retaining wall; Step 5: Inject corresponding grouting materials into the surrounding rocks of each area from deep to shallow through grouting anchor rods; In the step 2, the grouting surrounding rock is divided into an anti-seepage protective layer, a diffusion reinforcement layer and a performance enhancement layer from deep to shallow. For the anti-seepage protective layer, the material of ultrafine cement + water glass + expansion agent is adopted. For the diffusion reinforcement layer, ordinary Portland cement + water glass + ultrafine fly ash is selected as the grouting material. For the performance enhancement layer, ordinary Portland cement + polyurethane is selected as the grouting material.

2. A method for reinforcing and preventing seepage in surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 1, characterized in that: In the step 1, a hole is drilled into the surrounding rock to determine whether there is an unfavorable geological condition.

3. A method for grouting reinforcement and anti-seepage of surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 1, characterized in that: The anti-seepage protection layer is located at 5~8m from the top and both sides of the tunnel, and 3~5m from the bottom of the tunnel; the diffusion reinforcement layer is located at 2~5m from the top and both sides of the tunnel, and 2~3m from the bottom of the tunnel; the performance enhancement layer is located at 0~2m from the top and both sides of the tunnel, and 0~2m from the bottom of the tunnel.

4. A method for reinforcing and preventing seepage in surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 1, characterized in that: The outer side of the grouting anchor rod in the step three is a common grouting anchor rod, and the inner side is a steel pipe that slides freely along the grouting anchor rod.

5. A method for reinforcing and preventing seepage in surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 4, characterized in that: The depth of the grouting anchor holes is 1 m from the outer boundary of the grouting area and 1 m from the inner boundary of the grouting area.

6. A method for reinforcing and preventing seepage in surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 1, characterized in that: In the step 4, ordinary silicate cement + water glass slurry is sprayed onto the tunnel surface to form a retaining wall on the tunnel surface.

7. A method for reinforcing and preventing seepage in surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 1, characterized in that: In the step 5, the anti-seepage protection layer is grouted for the first time, the diffusion reinforcement layer is grouted for the second time, and the performance enhancement layer is grouted for the third time.

8. A method for reinforcing and preventing seepage in surrounding rock of abandoned tunnel compressed gas energy storage reservoir as claimed in claim 7, characterized in that: The grouting pressure for the anti-seepage protective layer is 4~5MPa, the grouting pressure for the anti-seepage protective layer is 3~4MPa, and the grouting pressure for the performance enhancement layer is 2~3MPa.