A smart meter safety detection device
Through the multi-station design and load switch testing function of the smart meter safety detection device, the problems of single functions and high energy consumption of existing equipment are solved, and an efficient and automated detection process is realized, reducing power consumption and space occupation.
Patent Information
- Application Number
- CN202410327393.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-21
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2044-03-21
AI Technical Summary
The existing power meter detection equipment has a single function, which leads to cumbersome detection process and high energy consumption, occupying too much space, making it difficult to optimize the investment and use of power equipment.
Design a smart meter safety detection device, combining airtightness detection and load switch testing, adopts a multi-station working method, and achieves simultaneous inspection through a combined platform, track machine, metering mold and reversing power assembly, and passes through a fixture mechanism Use negative pressure tanks to reduce energy consumption.
It realizes the simultaneous airtightness and load switch testing, shortens the inspection process, saves space and power, and improves the degree of automation of equipment and the efficiency of power equipment use.
Smart Images

Figure CN118191721B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of quality inspection equipment, and in particular relates to a safety detection device for a smart electric meter. Background Art
[0002] The abbreviation of electric energy meter is an instrument used to measure electric energy, also known as watt-hour meter, fire meter, energy meter, kilowatt-hour meter, which refers to instruments for measuring various electrical quantities. The electric energy meter detection device is specially designed for the power system to test the operation error and fault detection of electric energy meters, so that operators can quickly, safely and reliably measure the meter errors and wiring errors, providing an effective basis for the power system metering personnel to correctly measure and make up the electricity.
[0003] Problems with existing technologies:
[0004] The existing electric energy meter detection equipment generally has the following shortcomings:
[0005] The testing function is single. Most testing equipment can only complete a single test item. The finished product needs to be constantly transferred between various equipment to complete the corresponding test. This will lead to a too long quality inspection process, and multiple equipment and transportation lines will take up too much space;
[0006] The equipment has high energy consumption. In an entire test production line, the investment in test equipment and the operation of transportation equipment will generate huge electricity consumption. The products will be driven by corresponding power equipment during transportation, loading and unloading, and testing, resulting in excessive investment in power equipment. Due to the singleness and independence of the test equipment functions, the entire optimization of the power equipment investment plan becomes more difficult. Summary of the invention
[0007] The purpose of the present invention is to provide a smart meter safety detection device, which provides a device for detecting air tightness and switch load, both of which adopt a multi-station working mode. The two works can be carried out simultaneously and can be smoothly connected. The replacement work of the double-position meter mold can be repeated, thereby minimizing the investment in power equipment and reducing the consumption of electric energy.
[0008] The technical solution adopted by the present invention is as follows:
[0009] A smart meter safety detection device comprises an airtightness detection body for detecting the airtightness of the meter and a meter placement mold for placing the meter, wherein a joint platform is integrally assembled at the bottom of the airtightness detection body, a load switch test rack for testing the load switch of the meter is fixedly assembled above the end of the joint platform, a crawler machine is equidistantly assembled on one side of the joint platform close to the airtightness detection body, and a plurality of groups of secondary crawlers are equidistantly assembled on one side of the joint platform away from the airtightness detection body, a discharging inclined guide frame and a transposition guide frame are fixedly installed on the surface of the joint platform and on both sides of each group of secondary crawlers, a transposition power assembly for controlling the movement of the meter placement mold in two detection areas is equidistantly arranged on one side of the joint platform close to the load switch test rack, a gantry track for assembling a track machine is arranged above the joint platform, a clamp mechanism for carrying the meter is lifted and assembled below the track machine, and a finished product belt machine, an airtight defective belt machine and a load defective belt machine are sequentially arranged on one side of the joint platform;
[0010] Start the second cylinder on the corresponding station, so that the sprocket and the second screw on the same axis are in a state of co-rotation, and the corresponding load test body will eventually contact the power terminal of the meter to perform the load switch test;
[0011] After the two meter placement molds carry the meters and complete different testing tasks together, they will be swapped and each and simultaneously enter the preparation for the corresponding other testing task;
[0012] When one of the meter placement molds moves toward the load test station, the guide rod will enter the inclined guide frame at the same time, and the inner L-shaped frame rod will carry the internal meter up one end to expose the power connection point of the meter;
[0013] When the corresponding table-setting mold moves to the upper and lower material loading and unloading area to the extreme position, the outer bevel gear 1 separates from the inner bevel gear 1, and then the solenoid is reset and the secondary crawler does not operate. When the solenoid is reset to the extreme position, the outer bevel gear 1 and the inner bevel gear 1 resume meshing, ensuring that the replacement work of the double table-setting mold can be carried out continuously.
[0014] Testing rooms are equidistantly provided inside the air tightness testing body, and a mold cover plate is assembled in a lifting manner inside the testing room through a cylinder installed above it. Pressure gauges are equidistantly installed on the outer wall of the top of the air tightness testing body. Anti-slip rails are provided on the surface of the combined platform and on both sides of the crawler machine, and the anti-slip rails are integrally connected with straight rails close to the secondary crawler, and the connection between the anti-slip rail and the straight rail is set as a loading and unloading area.
[0015] Guide roller 1 is assembled at both ends of the crawler machine, the number of secondary crawlers in a group is set to two, and the two secondary crawlers in a group are placed on both sides of the corresponding end of the crawler machine, guide roller 2 is assembled at both ends of a group of secondary crawlers, and bevel gear 1 is fixedly assembled on the inner side of the guide roller 2 close to the load switch test frame.
[0016] Both ends of the inner walls on both sides of the meter setting mold are embedded with L-shaped frame rods for sliding assembly, both ends of the outer walls on both sides of the meter setting mold are provided with vertical guide grooves, and magnetic blocks are slidably assembled through the vertical guide grooves, the two magnetic blocks on the same side are connected by a connecting plate, and the outer wall in the middle of the connecting plate is fixedly connected to a guide rod, the middle of the outer walls on both sides of the bottom of the meter setting mold are fixedly connected with rectangular guide blocks, and the side walls of the inner half of the rectangular guide blocks are integrally provided with side triangular guide blocks; both sides of the lower surface of the meter setting mold are provided with rail grooves for sliding assembly with anti-slip rails and straight rails, the anti-slip rails and the rail grooves form a snap-on sliding assembly, and the straight slide rails and the rail grooves form a detachable sliding assembly; the lower surface of the meter setting mold is provided with cone grooves in an array, and the cone grooves match the stripes on the surface of the crawler machine and the secondary crawler track, and the length of the cone grooves is greater than the sum of the widths of the crawler machine and the two secondary crawlers.
[0017] The guide rod 1 movably passes through the corresponding discharging inclined guide frame, the width dimension of the discharging inclined guide frame is slightly larger than the diameter dimension of the guide rod 1, and the middle part is oriented to be inclined upward, and a port for the guide rod 1 to leave the inside of the discharging inclined guide frame is opened above the end of the discharging inclined guide frame.
[0018] A group of transposition guide frames consists of an inner guide frame and an outer guide frame, and the outer guide frame is arranged on the outside of the inner guide frame, the inner guide frame is arranged as an open trapezoidal trough body, and the outer guide frame is arranged as a closed trapezoidal trough body; the rectangular guide block includes a part of the side triangular guide block that moves through the corresponding inner guide frame, one end of the inner guide frame is provided with an entrance for guiding the side triangular guide block to enter, and the other end is provided with an exit for exporting the side triangular guide block, and the horizontal height of the entrance is lower than that of the exit; a one-way baffle is rotatably installed at the position of the outer guide frame corresponding to the exit.
[0019] The transposition power assembly includes a screw rod 1 located on both sides of the secondary crawler and a motor 1 located at one end of the secondary crawler, one end of the two screw rods 1 are threaded with a screw tube, and one side of the screw tube is slidably assembled with a slide rod through an integrated slide tube 1, a rectangular block support is fixedly provided on the top of the slide rod, and a guide rod 2 is fixedly connected to the outer wall of the rectangular block support, and the end of the rectangular guide block can be detachably inserted into the interior of the rectangular block support, and the guide rod 2 movably passes through the corresponding outer guide frame, a spring is connected between the slide tube 1 and the rectangular block support, and the bottom of the screw tube is fixedly connected to a support frame, and the output end of the motor 1 is fixedly connected to an inner bevel gear 1, and the inner bevel gear 1 and the screw rods 1 on both sides are connected through a sleeved chain 1 for transmission.
[0020] A transmission shaft is rotatably assembled inside the combined platform and near the motor 1, a bevel gear 2 meshing with the corresponding bevel gear 1 is fixedly installed on one end of the transmission shaft, a slide tube 2 is slidably assembled on the other end of the transmission shaft, an outer bevel gear 1 is fixedly arranged on one end of the slide tube 2, and the outer bevel gear 1 is detachably meshed with the inner bevel gear 1;
[0021] A gear lever for controlling the sliding of the sliding tube 2 is rotatably connected to the inside of the combined platform through a bracket, a rotating rod is rotatably assembled at the bottom of the guide roller 1 near the secondary crawler, both ends of the rotating rod are fixedly connected to a pry bar 1, one end of the pry bar 1 is rotatably connected to a connecting rod, the ends of two adjacent connecting rods are commonly connected to a shift rod 1, and the shift rod 1 movably passes through the bottom end of the gear lever; rotating rods are rotatably connected to the inside of the combined platform and on both sides of the bracket, the tops of two adjacent rotating rods are commonly connected to a shift rod 2, and the shift rod 2 is movably connected to the upper half of the gear lever, and the horizontal height of the support frame is flush with the lower half of the pry bar 1 and the part of the rotating rod near the transition.
[0022] The outer wall of the load switch test frame is provided with a warning light corresponding to each workstation, the load switch test frame is fixedly installed with a second motor inside, the load switch test frame is equidistantly rotatably installed with a sprocket inside, and the output end of the second motor is connected to all the sprockets through a second chain transmission, one side of the sprocket is slidably assembled with a second outer bevel gear, the load switch test frame is equidistantly installed with a second cylinder for pushing the second outer bevel gear, the load switch test frame is equidistantly arranged with a straight guide frame inside, and the straight guide frame is rotatably assembled with a second screw inside, one end of the second screw is fixedly installed with a second inner bevel gear, and the second outer bevel gear is detachably meshed with the second inner bevel gear;
[0023] A threaded slider is threaded on the outer surface of the second screw rod, and the threaded slider is slidably installed inside the straight guide frame. The bottom of the threaded slider is rotatably connected to a push rod. The inside of the load switch test frame is equidistantly rotatably connected to a rotating arm, and the end of the push rod is rotatably connected to the corresponding rotating arm. The end of the rotating arm is installed with a load test body for contact testing with the electrical terminal of the meter.
[0024] The clamp mechanism includes a climbing machine assembled with the track mechanism in a lifting manner, and a chuck is fixedly installed on the bottom of the climbing machine, suction cups are arranged at four corners of the lower surface of the chuck, and suction pipes are connected to the positions of the suction cups on the surface of the chuck, and the ends of all the suction pipes are commonly connected to a main pipe, one end of the main pipe is fixedly installed with a valve, and one end of the valve is installed with a push-type switch for controlling the dredging of the pipeline; one side of the suction cup is slidably assembled with a push rod frame for separating the electric meter from the chuck, one side of the chuck surface is rotatably installed with a pry bar 2, and one end of the pry bar 2 is connected to the rod body in the middle of the push rod frame, one side of the climbing machine is fixedly installed with a cylinder 3 through an integrated back frame, and the end of the telescopic output end of the cylinder 3 is connected to the other end of the pry bar 2, and the side wall of the telescopic output rod of the cylinder 3 is fixedly provided with a block for squeezing the push-type switch;
[0025] A negative pressure tank and an air pump are arranged on one side of the bottom of the air tightness detection body, and the output port of the negative pressure tank is connected to the end of the main pipe, and the input port of the negative pressure tank is connected to the air pump through a pipeline.
[0026] The technical effects achieved by the present invention are:
[0027] The present invention integrates the relevant mechanisms of air tightness detection and load switch testing, and provides a device that can detect air tightness and switch load. The two detection tasks can be performed simultaneously. Compared with the traditional single safety detection device, the device has more detection functions, occupies less space, eliminates the process of the product to be tested flowing between different devices, and shortens the safety monitoring process.
[0028] In the present invention, the load switch test rack also adopts a multi-station working mode, can test multiple products at the same time, and the load test bodies on all stations are controlled and moved by a motor, which optimizes the energy-saving capability and saves internal space.
[0029] The present invention can enable the meter-setting mold that has completed the air-tightness test to eventually move to the load test station, and the meter-setting mold that has completed the load test will be transported to the loading and unloading area at one end of the crawler machine, so that the two meters can be switched and each can prepare for another test after completing a single test together. Among them, the setting of the side triangular guide block can ensure that the meter-setting mold is in a horizontal state during its movement along the inner guide frame, and the combination of the rectangular guide block and the square block support can prevent the meter-setting mold from overturning.
[0030] The present invention ensures that the load test work and the air tightness test work are smoothly connected, ensures the automatic alignment of the electric meter and the contact test of the load test body, makes the double test work both reasonable and practical, and further improves the automation effect of the entire equipment.
[0031] According to the present invention, the setting of the transposition power assembly enables the secondary crawler to drive the movement of the table setting mold and the movement of the other table setting mold to the upper and lower material loading areas to be controlled by one motor, thereby further optimizing the power equipment usage plan of the entire device, minimizing the investment in power equipment and reducing the consumption of electric energy; in addition, the movement of the solenoid is synchronized with the operation of the secondary crawler, while the resetting of the solenoid is not related to the secondary crawler. Under the premise of ensuring that the transposition work of the double table setting molds can be carried out continuously, it will not affect the load test work. The structure is compact and flexible, and the operation is more automated.
[0032] In the present invention, the process of the clamp mechanism taking the finished product utilizes the original negative pressure in the negative pressure tank as power, and lowering the finished product is completed by closing the valve and moving the push rod rack downward, and the closing of the valve and the downward movement of the push rod rack are both controlled by a cylinder. The entire process of taking and lowering does not require frequent operation of traditional pump power equipment, and only the negative pressure in the negative pressure tank needs to be regularly supplemented by an air pump, thereby further reducing the energy consumption of the entire device. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a main view assembly schematic diagram of a detection device provided by an embodiment of the present invention;
[0034] Figure 2 is a rear view assembly schematic diagram of a detection device provided by an embodiment of the present invention;
[0035] Figure 3 is a structural diagram of an airtightness detection body provided by an embodiment of the present invention;
[0036] Figure 4 is an integrated schematic diagram of a joint platform surface structure provided by an embodiment of the present invention;
[0037] Figure 5 It is a main structural diagram of the table setting mold provided by an embodiment of the present invention;
[0038] Figure 6 It is a bottom view of the structure of the table setting mold provided by an embodiment of the present invention;
[0039] Figure 7 It is a schematic diagram of the combination of the discharging inclined guide frame, the transposition guide frame and the transposition power assembly provided in an embodiment of the present invention;
[0040] Figure 8It is a combined exploded view of a discharging inclined guide frame, a transposition guide frame and a transposition power assembly provided in an embodiment of the present invention;
[0041] Fig. 9 is a structural disassembly diagram of a transposition power assembly provided by an embodiment of the present invention;
[0042] Fig.10 yes Fig. 9 A local enlarged schematic diagram of the middle A;
[0043] Fig.11 is a schematic diagram of the internal structure of a load switch test rack provided by an embodiment of the present invention;
[0044] Fig.12 yes Fig.11 A partial enlarged schematic diagram of point B in the middle;
[0045] Fig.13 It is a schematic diagram of the combination of the clamp mechanism and each belt machine provided in an embodiment of the present invention;
[0046] Fig.14 It is a structural disassembly diagram of the clamp mechanism provided in an embodiment of the present invention.
[0047] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0048] 1. Air tightness test body; 101. Test chamber; 102. Cylinder 1; 103. Mold cover; 104. Air pressure gauge; 105. Joint platform; 106. Anti-slip rail; 107. Straight rail; 2. Crawler; 201. Guide roller 1; 3. Table setting mold; 301. L-shaped frame rod; 302. Vertical guide groove; 303. Magnetic block; 304. Connecting plate; 305. Guide rod 1; 306. Side triangle guide block; 307. Rectangular guide block; 308. Rail groove; 309. Cone groove; 4. Secondary crawler; 401. Guide roller 2 ; 402, helical gear 1; 5, discharging oblique guide frame; 501, port; 6, transposition guide frame; 61, inner guide frame; 611, entrance; 612, exit; 62, outer guide frame; 621, one-way baffle; 7, transposition power assembly; 701, screw rod 1; 702, screw tube; 703, slide tube 1; 704, slide rod; 705, square block support; 706, guide rod 2; 707, spring; 708, support frame; 709, motor 1; 710, inner bevel gear 1; 711, transmission shaft; 712, helical gear 2; 713, slide tube 2 ; 714, outer bevel gear 1; 715, chain 1; 716, bracket; 717, gear lever; 718, rotating rod; 719, pry bar 1; 720, connecting rod; 721, lever 1; 722, rotating rod; 723, lever 2; 8, load switch test rack; 801, warning light; 802, motor 2; 803, sprocket; 804, chain 2; 805, outer bevel gear 2; 806, cylinder 2; 807, screw 2; 808, inner bevel gear 2; 809, straight guide frame; 810, threaded slider; 811, stop rod; 812, rotating arm; 813, load test body; 9, gantry track; 901, track machine; 10, clamp mechanism; 1001, climbing machine; 1002, chuck; 1003, suction pipe; 1004, main pipe; 1005, valve; 1006, push switch; 1007, back frame; 1008, cylinder three; 1009, pry bar two; 1010, push rod frame; 1011, block; 11, negative pressure tank; 12, air pump; 13, finished product belt machine; 14, air tightness defective belt machine; 15, load defective belt machine. DETAILED DESCRIPTION
[0049] In order to make the purpose and advantages of the present invention more clearly understood, the present invention is specifically described below in conjunction with embodiments. It should be understood that the following text is only used to describe one or several specific embodiments of the present invention, and does not strictly limit the scope of protection of the specific claims of the present invention.
[0050] like Figure 1-14As shown, a smart meter safety detection device includes an airtightness detection body 1 for detecting the airtightness of the meter and a meter placement mold 3 for placing the meter, the bottom of the airtightness detection body 1 is integrally assembled with a joint platform 105, the upper end of the joint platform 105 is fixedly assembled with a load switch test rack 8 for testing the load switch of the meter, a crawler 2 is equidistantly assembled on one side of the joint platform 105 close to the airtightness detection body 1, and a plurality of groups of secondary crawlers 4 are equidistantly assembled on one side of the joint platform 105 away from the airtightness detection body 1, and the surface of the joint platform 105 is fixed with a load switch test rack 8 for testing the load switch of the meter. The discharging inclined guide frame 5 and the shifting guide frame 6 are fixedly installed on the surface and on both sides of each group of secondary crawlers 4. The shifting power components 7 for controlling the movement of the meter setting mold 3 in the two detection areas are equidistantly arranged on one side of the joint platform 105 close to the load switch test frame 8. A gantry track 9 for assembling the track machine 901 is arranged above the joint platform 105, and a lifting clamp mechanism 10 for carrying the electric meter is assembled below the track machine 901. A finished product belt machine 13, an airtight defective belt machine 14 and a load defective belt machine 15 are arranged in sequence on one side of the joint platform 105.
[0051] According to the above structure, the working process of the electric meter safety detection device is to use the clamp mechanism 10 to place the electric meter inside the corresponding meter placement mold 3, and send it into the airtightness detection body 1 by the crawler machine 2 for airtightness detection, and then send it to the bottom of the load switch test frame 8 by the secondary crawler 4 for load switch test. According to the test results, the corresponding electric meter is placed on the finished product belt machine 13, the airtight defective belt machine 14 or the load defective belt machine 15 through the clamp mechanism 10. For detailed processes, please refer to the embodiments below.
[0052] See attached Figure 3 and Figure 7 , the inside of the air tightness detection body 1 is equidistantly provided with detection chambers 101, the inside of the detection chamber 101 is lifted and assembled with a mold cover plate 103 through a cylinder 102 installed above it, and a pressure gauge 104 is equidistantly installed on the outer wall of the top of the air tightness detection body 1, and anti-slip rails 106 are arranged on the surface of the joint platform 105 and on both sides of the crawler machine 2, and the anti-slip rails 106 are integrally connected with straight rails 107 near the secondary crawler 4, and the connection between the anti-slip rails 106 and the straight rails 107 is set as a loading and unloading area.
[0053] According to the above structure, the meter-setting mold 3 carrying the electric meter is sent into the interior of the inspection chamber 101 by the crawler machine 2, and the cylinder 102 works to combine the mold cover 103 with the meter-setting mold 3 to form a closed space. Then, the electric meter in the space is tested for air tightness. The pressure gauge 104 can monitor the changes in air pressure in the space to determine the quality of the air tightness of the electric meter. This process is all existing technology and will not be described in detail here. Embodiment 1:
[0054] See attached Fig. 9 , guide rollers 201 are assembled at both ends of the crawler machine 2, the number of secondary crawlers 4 in a group is set to two, and the two secondary crawlers 4 in a group are placed on both sides of the corresponding end of the crawler machine 2, and guide rollers 401 are assembled at both ends of a group of secondary crawlers 4, and a bevel gear 402 is fixedly assembled on the inner side of the guide roller 401 close to the load switch test frame 8.
[0055] See attached Figure 6 Both sides of the lower surface of the table setting mold 3 are provided with rail grooves 308 that form a sliding assembly with the anti-slip slide rail 106 and the straight slide rail 107. The anti-slip slide rail 106 and the rail groove 308 form a snap-fit sliding assembly, and the straight slide rail 107 and the rail groove 308 form a detachable sliding assembly; the lower surface of the table setting mold 3 is provided with an array of cone grooves 309, and the cone grooves 309 are matched with the stripes on the surface of the crawler machine 2 and the secondary crawler 4, and the length of the cone grooves 309 is greater than the sum of the widths of the crawler machine 2 and the two secondary crawlers 4.
[0056] According to the above structure, after the air tightness test is completed, the surface setting mold 3 is moved to the loading and unloading area by the crawler machine 2 again. The crawler machine 2 continues to operate and transfers the surface setting mold 3 to the surface of the secondary crawler 4.
[0057] See attached Figure 1 , Fig.11 and Fig.12 , a warning light 801 is provided on the outer wall of the load switch test frame 8 corresponding to each workstation, a motor 802 is fixedly installed inside the load switch test frame 8, a sprocket 803 is equidistantly installed inside the load switch test frame 8, and the output end of the motor 802 is connected to all the sprockets 803 through a chain 804, and one side of the sprocket 803 is slidably assembled with an outer bevel gear 805, and a cylinder 806 for pushing the outer bevel gear 805 is equidistantly installed inside the load switch test frame 8, and a straight guide frame 809 is equidistantly arranged inside the load switch test frame 8, and a screw 807 is rotatably assembled inside the straight guide frame 809, and an inner bevel gear 808 is fixedly installed on one end of the screw 807, and the outer bevel gear 805 and the inner bevel gear 808 are detachably meshed;
[0058] See attached Fig.11 A threaded slider 810 is screwed on the outer surface of the screw rod 807, and the threaded slider 810 is slidably installed inside the straight guide frame 809. The bottom of the threaded slider 810 is rotatably connected to a support rod 811. The inside of the load switch test frame 8 is equidistantly rotatably connected to a rotating arm 812, and the end of the support rod 811 is rotatably connected to the corresponding rotating arm 812. The end of the rotating arm 812 is installed with a load test body 813 for contact testing with the electrical terminal of the meter.
[0059] According to the above structure, the secondary crawler 4 transports the meter mold 3 to the bottom of the load switch test frame 8 through the operation of the transposition power assembly 7, and then the motor 2 802 is started, and the corresponding sprocket 803 is driven to rotate through the chain 2 804, and then the cylinder 2 806 on the corresponding station is started, which will push the outer bevel gear 2 805 to mesh with the inner bevel gear 2 808, so that the sprocket 803 and the screw 2 807 on the same axis are in a state of common rotation, and then the threaded slider 810 will be driven to move in a straight line along the direction of the straight guide frame 809, and then the rotating arm 812 is rotated through the push rod 811, and the rotating arm 812 immediately rotates downward and the load test body 813 below, and the load test body 813 will eventually contact the power connection end of the meter, and finally the load switch test work is carried out;
[0060] The above process integrates the relevant mechanisms of air tightness detection and load switch testing, and provides a device that can detect air tightness and switch load. The two detection tasks can be carried out simultaneously. Compared with the traditional single safety detection device, the device has more detection functions and occupies less space, eliminating the process of the product to be tested flowing between different equipment, shortening the safety monitoring process; in addition, the load switch test rack 8 also adopts a multi-station working mode, which can test multiple products at the same time, and the load test body 813 on all stations is controlled to move by a motor 2 802, which optimizes the energy-saving capability and saves internal space.
[0061] The working principle of the present invention is as follows: the meter placement mold 3 carrying the electric meter is sent into the interior of the detection chamber 101 by the crawler machine 2. After completing the airtightness detection work, the meter placement mold 3 is moved to the loading and unloading area by the crawler machine 2 again. The crawler machine 2 continues to operate and transfers the meter placement mold 3 to the surface of the secondary crawler 4. Then, the secondary crawler 4 transports the meter placement mold 3 to the bottom of the load switch test frame 8 through the operation of the transposition power component 7, and then the motor 2 802 is started, and the corresponding sprocket 803 is driven to rotate through the chain 2 804, and then Start the cylinder 806 on the corresponding workstation, which will push the outer bevel gear 805 to mesh with the inner bevel gear 808, causing the sprocket 803 and the screw 807 on the same axis to rotate together. Then, the threaded slider 810 will be driven to move in a straight line along the direction of the straight guide frame 809, and then the rotating arm 812 will rotate through the support rod 811. The rotating arm 812 will then rotate downward and the load test body 813 below will eventually come into contact with the power supply end of the meter, and finally the load switch test will be carried out. Embodiment 2:
[0062] See attached Figure 5Both ends of the inner walls on both sides of the meter setting mold 3 are embedded and slidably assembled with L-shaped frame rods 301, both ends of the outer walls on both sides of the meter setting mold 3 are opened with vertical guide grooves 302, and magnetic blocks 303 are slidably assembled through the vertical guide grooves 302, the two magnetic blocks 303 located on the same side are connected by a connecting plate 304, and the outer wall in the middle of the connecting plate 304 is fixedly connected with a guide rod 305, the middle of the outer walls on both sides of the bottom of the meter setting mold 3 are fixedly connected with rectangular guide blocks 307, and the side walls of the inner half of the rectangular guide blocks 307 are integrally provided with side triangular guide blocks 306.
[0063] See attached Figure 8 The guide rod 305 movably passes through the corresponding discharging inclined guide frame 5, the width dimension of the discharging inclined guide frame 5 is slightly larger than the diameter dimension of the guide rod 305, and the middle part is oriented to be inclined upward, and a port 501 for the guide rod 305 to leave the inside of the discharging inclined guide frame 5 is opened above the end of the discharging inclined guide frame 5.
[0064] See attached Figure 8 A set of transposition guide frames 6 is composed of an inner guide frame 61 and an outer guide frame 62, and the outer guide frame 62 is arranged on the outside of the inner guide frame 61, the inner guide frame 61 is arranged as an open trapezoidal trough, and the outer guide frame 62 is arranged as a closed trapezoidal trough; the rectangular guide block 307 including the side triangular guide block 306 partially moves through the corresponding inner guide frame 61, one end of the inner guide frame 61 is provided with an entrance 611 for guiding the side triangular guide block 306 to enter, and the other end is provided with an exit 612 for exporting the side triangular guide block 306, and the horizontal height of the entrance 611 is lower than that of the exit 612; a one-way baffle 621 is rotatably installed at the position of the outer guide frame 62 corresponding to the exit 612.
[0065] See attached Figure 7 , Figure 8 and Fig. 9 , the transposition power assembly 7 includes a screw rod 701 located on both sides of the secondary crawler 4 and a motor 709 located at one end of the secondary crawler 4, one end of the two screw rods 701 are both screwed with a screw tube 702, and one side of the screw tube 702 is slidably assembled with a slide rod 704 through an integrated slide tube 703, a rectangular block support 705 is fixedly provided on the top of the slide rod 704, and a guide rod 2 706 is fixedly connected to the outer wall of the rectangular block support 705, and the end of the rectangular guide block 307 can be detachably pressed into the interior of the rectangular block support 705, and the guide rod 2 706 is movable through the corresponding outer guide frame 62, a spring 707 is connected between the slide tube 703 and the rectangular block support 705, and a support frame 708 is fixedly connected to the bottom of the screw tube 702, and an inner bevel gear 710 is fixedly connected to the output end of the motor 709, and the inner bevel gear 710 is connected to the screw rods 701 on both sides thereof through a sleeved chain 715 for transmission;
[0066] See attached Fig. 9 and Fig.10A transmission shaft 711 is rotatably assembled inside the joint platform 105 and near the motor 1 709. A bevel gear 2 712 meshing with the corresponding bevel gear 1 402 is fixedly installed at one end of the transmission shaft 711. A slide tube 2 713 is slidably assembled at the other end of the transmission shaft 711. An outer bevel gear 1 714 is fixedly arranged at one end of the slide tube 2 713. The outer bevel gear 1 714 is detachably meshed with the inner bevel gear 1 710.
[0067] See attached Fig. 9 and Fig.10 , a gear lever 717 for controlling the sliding of the slide tube 2 713 is rotatably connected inside the joint platform 105 through a bracket 716, a rotating rod 718 is rotatably assembled at the bottom of the guide roller 1 201 near the secondary crawler 4, both ends of the rotating rod 718 are fixedly connected to a pry bar 1 719, one end of the pry bar 1 719 is rotatably connected to a connecting rod 720, the ends of two adjacent connecting rods 720 are commonly connected to a lever 1 721, and the lever 1 721 movably passes through the bottom end of the gear lever 717; a rotating rod 722 is rotatably connected inside the joint platform 105 and located on both sides of the bracket 716, the tops of two adjacent rotating rods 722 are commonly connected to a lever 2 723, and the lever 2 723 is movably connected to the upper half of the gear lever 717, and the horizontal height of the support 708 is flush with the lower half of the pry bar 1 719 and the part of the rotating rod 722 near the transition.
[0068] According to the above structure, firstly, two metering molds 3 are equipped on a detection line to carry out two detection tasks simultaneously. After the airtightness detection work is completed, the metering mold 3 is transferred to the surface of the secondary crawler 4 through the crawler machine 2 and waits. When the load test work is completed, the motor 709 is started. Since the outer bevel gear 714 is meshed with the inner bevel gear 710 at this time, the motor 709 can simultaneously drive the transmission shaft 711 and the two screws 701 to rotate. The transmission shaft 711 can drive the secondary crawler 4 to operate and move the metering mold 3 of the starting section to the load test station; and since the screw 701 is screwed with the screw tube 702, and the rectangular guide block 307 is placed inside the rectangular block support 705, the metering mold 3 on the original load test station is driven by the rectangular block supports 705 on both sides to move in the opposite direction. According to the shape of the inner guide frame 61 and the outer guide frame 62, it is elastic. Under the elastic force of the spring 707, the side triangular guide block 306 directly enters the interior of the inner guide frame 61 from the entrance 611, and the meter setting mold 3 will also directly detach from the secondary crawler 4 and move obliquely upward. After the side triangular guide block 306 is led out from the exit 612, the two meter setting molds 3 can complete the position change; the above process can enable the meter setting mold 3 that has completed the air tightness test to finally move to the load test station, and the meter setting mold 3 that has completed the load test will be transported to the loading and unloading area at one end of the crawler machine 2, so that the two meters can be replaced after completing different detection tasks together and each and simultaneously enter the preparation for the corresponding other detection task, wherein the setting of the side triangular guide block 306 can ensure that the meter setting mold 3 is in a horizontal state during its movement along the inner guide frame 61, and cooperate with the combination of the rectangular guide block 307 and the rectangular block support 705 to prevent the meter setting mold 3 from overturning;
[0069] Furthermore, during the process of one of the meter placement molds 3 moving toward the load test station, the guide rod 1 305 will simultaneously enter the inclined guide frame 5. During the process, the magnetic blocks 303 on both sides of the meter placement mold 3 will simultaneously slide upward along the vertical guide grooves 302. Under the magnetic force between the magnetic blocks 303 and the L-shaped frame rod 301, the inner L-shaped frame rod 301 will carry the internal electric meter and move up one end distance, so that the electric meter exposes the power connection point, which is convenient for subsequent contact with the load test body 813. The above process can smoothly connect the load test work with the air tightness test work, ensure the automatic alignment of the electric meter and the contact test with the load test body 813, make the dual test work both reasonable and practical, and further improve the automation effect of the entire equipment.
[0070] Furthermore, when the corresponding table mold 3 moves to the limit position in the upward unloading area, the support frame 708 at the bottom of the screw tube 702 will be squeezed with the lower half of the pry bar 1 719 to rotate the pry bar 1 719, and the pry bar 1 719 will make the lever 1 721 move the bottom end of the gear lever 717 through the connecting rod 720. At this time, the top of the gear lever 717 will move the slide tube 2 713 to separate the outer bevel gear 1 714 from the inner bevel gear 1 710. Then, the control motor 1 709 is reversed. At this time, the motor 1 709 only drives the screw rods 1 701 on both sides to reverse, and then the two screw tubes 702 will be reset and the secondary crawler 4 will not operate. Finally, when the two screw tubes 702 are reset to the limit position, the support frame 708 will be squeezed with the rotating rod 722 again, and the rotating rod 722 will then pass through the lever 2 72 3 reversely toggle the shift lever 717 and make the outer bevel gear 1 714 and the inner bevel gear 1 710 resume meshing, so as to facilitate the next process of transposing the two table molds 3; in the above process, the setting of the transposition power assembly 7 enables the secondary crawler 4 to drive the table mold 3 to move, and the other table mold 3 to move to the upper and lower material area, which can be controlled by a motor 1 709, further optimizing the use of power equipment of the entire device, reducing the investment in power equipment and reducing the consumption of electric energy as much as possible, in addition, the movement of the solenoid 702 is synchronized with the operation of the secondary crawler 4 and in a different direction, while the resetting of the solenoid 702 is not related to the secondary crawler 4, under the premise of ensuring that the transposition work of the double table mold 3 can be carried out continuously, it will not affect the progress of the load test work, the structure is compact and flexible, and the operation is more automated.
[0071] The working principle of the present invention is: Figure 7 As shown, two metering molds 3 are equipped on one inspection line to perform two inspections simultaneously. After the airtightness inspection is completed, the metering mold 3 is transferred to the surface of the secondary crawler 4 through the crawler machine 2 and waits. After the load test is completed, the motor 709 is started. Since the outer bevel gear 714 is meshed with the inner bevel gear 710 at this time, the motor 709 can simultaneously drive the transmission shaft 711 and the screws 701 on both sides thereof to rotate together. The transmission shaft 711 can drive the secondary crawler 4 to operate through the meshing of the bevel gear 1 402 and the bevel gear 2 712, thereby moving the metering mold 3 of the starting section to the load test station;
[0072] Since the screw rod 701 is screwed with the screw tube 702 and the rectangular guide block 307 is placed inside the rectangular block support 705, the table setting mold 3 originally in the load test station is driven by the rectangular block supports 705 on both sides to move in the opposite direction. According to the shapes of the inner guide frame 61 and the outer guide frame 62, and under the elastic force of the spring 707, the side triangular guide block 306 directly enters the inner guide frame 61 from the entrance 611, and the table setting mold 3 will also directly detach from the secondary crawler 4 and move obliquely upward, waiting for the side triangular guide block 3 06 After being led out from the outlet 612, the two table setting molds 3 can be replaced, and the table setting mold 3 that has completed the air tightness test is finally moved to the load test station, and the table setting mold 3 that has completed the load test is transported to the loading and unloading area at one end of the crawler machine 2, wherein the setting of the side triangular guide block 306 can ensure that the table setting mold 3 is in a horizontal state during its movement along the inner guide frame 61, and cooperates with the combination of the rectangular guide block 307 and the rectangular block support 705 to prevent the table setting mold 3 from overturning;
[0073] During the movement of the meter placement mold 3 toward the load test station, the guide rod 1 305 will simultaneously enter the inclined guide frame 5. During the process, the magnetic blocks 303 on both sides of the meter placement mold 3 will simultaneously slide upward along the vertical guide grooves 302. Under the magnetic force between the magnetic blocks 303 and the L-shaped frame rod 301, the inner L-shaped frame rod 301 will carry the internal electric meter and move up a distance, so that the electric meter exposes the power connection point, which is convenient for subsequent contact with the load test body 813.
[0074] Finally, when the two screw tubes 702 cooperate with the corresponding surface mold 3 to move to the upper feeding area to the limit position, the support frame 708 at the bottom of the screw tube 702 will squeeze the lower half of the pry bar 1 719 to rotate the pry bar 1 719, and the other end of the pry bar 1 719 will make the lever 1 721 move the bottom end of the gear lever 717 through the connecting rod 720, and at this time, the top of the gear lever 717 will move the slide tube 2 713 to separate the outer bevel gear 1 714 from the inner bevel gear 1 710, and then the control motor 1 7 09 reverses, at this time, the motor 709 only drives the screw rods 701 on both sides to reverse through the chain 715, and then the two screw tubes 702 will be reset and the secondary crawler 4 will not operate. Finally, when the two screw tubes 702 are reset to the limit position, the support frame 708 will be squeezed with the rotating rod 722 again, and the rotating rod 722 will then reversely shift the gear lever 717 through the shift lever 723 to make the outer bevel gear 714 and the inner bevel gear 710 resume meshing, so as to facilitate the next process of the two-position table mold 3 replacement. Embodiment three:
[0075] See attached Fig.13 and Fig.14The clamp mechanism 10 includes a climbing machine 1001 which is assembled with the track machine 901 in a lifting manner, and a clamping disc 1002 is fixedly installed at the bottom of the climbing machine 1001, and suction cups are arranged at the four corners of the lower surface of the clamping disc 1002, and suction pipes 1003 are connected to the positions of the suction cups on the surface of the clamping disc 1002, and the ends of all the suction pipes 1003 are commonly connected to a main pipe 1004, and a valve 1005 is fixedly installed at one end of the main pipe 1004, and a push-type switch 1006 for controlling the dredging of the pipeline is installed at one end of the valve 1005; a push rod frame 1010 for separating the electric meter from the clamping disc 1002 is slidably assembled on one side of the suction cup, and the surface of the clamping disc 1002 is A pry bar 1009 is rotatably installed on one side, and one end of the pry bar 1009 is connected to the rod body in the middle of the push rod frame 1010; a cylinder 3 1008 is fixedly installed on one side of the climbing machine 1001 through an integrated back frame 1007, and the end of the telescopic output end of the cylinder 3 1008 is connected to the other end of the pry bar 1009, and a block 1011 for squeezing the push switch 1006 is fixedly provided on the side wall of the telescopic output rod of the cylinder 3 1008; a negative pressure tank 11 and an air pump 12 are provided on one side of the bottom of the airtightness detection body 1, and the output port of the negative pressure tank 11 is connected to the end of the main pipe 1004, and the input port of the negative pressure tank 11 is connected to the air pump 12 through a pipeline.
[0076] According to the above structure, when the chuck 1002 is close to and is about to pick up the corresponding electric meter, the cylinder three 1008 is controlled to extend, and the push rod frame 1010 is moved up through the lever movement of the pry bar two 1009 to prevent it from affecting the operation of the suction cup. At the same time, the stop block 1011 is away from the push switch 1006, and the valve 1005 is opened. Under the negative pressure of the negative pressure tank 11, each suction tube 1003 will generate suction, and the electric meter will be adsorbed by the suction cup under the action of the suction force. Subsequently, the electric meter is controlled to move to the corresponding position and lowered. Next, the cylinder three 1008 is controlled to contract, and the stop block 1011 will squeeze the push switch 1006 and The valve 1005 is closed, and the suction force on the electric meter disappears. At the same time, the push rod frame 1010 will move downward and assist the electric meter to separate from the suction cup. In the above process, the clamp mechanism 10 takes the finished product by utilizing the original negative pressure in the negative pressure tank 11 as the power, and the lowering of the finished product is completed by closing the valve 1005 and moving down the push rod frame 1010. The closing of the valve 1005 and the downward movement of the push rod frame 1010 are both controlled by a cylinder 1008. The entire process of taking and lowering does not require the frequent operation of traditional pump power equipment. It is only necessary to regularly replenish the negative pressure in the negative pressure tank 11 through the air pump 12, which further reduces the energy consumption of the entire device.
[0077] The working principle of the present invention is as follows: the track machine 901 and the climbing machine 1001 are used to control the chuck 1002 to move toward the meter placement mold 3 on the corresponding loading and unloading area. When the chuck 1002 is close to and about to take the corresponding electric meter, the cylinder 3 1008 is controlled to extend and move, and the push rod frame 1010 is moved up by the lever movement of the pry bar 2 1009 to avoid affecting the work of the suction cup. At the same time, the block 1011 is away from the push switch 1006, and the valve 1005 is opened, and the negative pressure tank 1 1, each suction tube 1003 will generate suction, and the electric meter will be adsorbed by the suction cup under the action of the suction, and then the electric meter will be controlled to move to the corresponding finished product belt machine 13, airtight defective belt machine 14 or load defective belt machine 15, and then the cylinder three 1008 will be controlled to contract, the block 1011 will squeeze the push switch 1006 and close the valve 1005, and the suction on the electric meter will disappear. At the same time, the push rod frame 1010 will move downward and assist the electric meter to separate from the suction cup.
[0078] The above is only a preferred embodiment of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the art unless otherwise specified and limited.
Claims
1. A smart meter safety detection device, comprising an airtightness detection body (1) for detecting the airtightness of the meter and a meter placement mold (3) for placing the meter, characterized in that: The bottom of the air tightness detection body (1) is integrally assembled with a joint platform (105); a load switch test frame (8) for testing the load switch of an electric meter is fixedly assembled above the end of the joint platform (105); a crawler (2) is equidistantly assembled on the side of the joint platform (105) close to the air tightness detection body (1); a plurality of groups of secondary crawlers (4) are equidistantly assembled on the side of the joint platform (105) away from the air tightness detection body (1); and a discharge inclined guide frame (5) is fixedly mounted on the surface of the joint platform (105) and on both sides of each group of secondary crawlers (4). and a transposition guide frame (6); a transposition power assembly (7) for controlling the movement of the meter placement mold (3) in two detection areas is equidistantly arranged on one side of the combined platform (105) close to the load switch test frame (8); a gantry track (9) for assembling a track machine (901) is arranged above the combined platform (105); a clamp mechanism (10) for carrying an electric meter is assembled in a lifting manner below the track machine (901); and a finished product belt machine (13), an airtight defective belt machine (14), and a load defective belt machine (15) are sequentially arranged on one side of the combined platform (105); Both ends of the crawler machine (2) are assembled with guide rollers 1 (201), the number of secondary crawlers (4) in a group is set to two, and the two secondary crawlers (4) in a group are placed on both sides of the end of the corresponding crawler machine (2), and both ends of the secondary crawlers (4) in a group are assembled with guide rollers 2 (401), and the inner side of the guide rollers 2 (401) close to the load switch test frame (8) is fixedly assembled with a bevel gear 1 (402); Both ends of the inner walls on both sides of the meter placement mold (3) are embedded and slidably assembled with L-shaped rack rods (301); both ends of the outer walls on both sides of the meter placement mold (3) are provided with vertical guide grooves (302), and magnetic blocks (303) are slidably assembled through the vertical guide grooves (302); the two magnetic blocks (303) located on the same side are connected by a connecting plate (304), and the outer wall in the middle of the connecting plate (304) is fixedly connected with a guide rod 1 (305); the middle of the outer walls on both sides of the bottom of the meter placement mold (3) are fixedly connected with rectangular guide blocks (307), and the side walls of the inner half of the rectangular guide blocks (307) are integrally provided with side triangular guide blocks (306) ); Both sides of the lower surface of the table setting mold (3) are provided with rail grooves (308) that form a sliding assembly with the anti-slip rail (106) and the straight rail (107); the anti-slip rail (106) and the rail groove (308) form a snap-fit sliding assembly, and the straight rail (107) and the rail groove (308) form a detachable sliding assembly; the lower surface of the table setting mold (3) is provided with cone grooves (309) in an array, and the cone grooves (309) match the stripes on the surface of the crawler (2) and the secondary crawler (4); the length of the cone groove (309) is greater than the sum of the widths of the crawler (2) and the two secondary crawlers (4); The guide rod one (305) movably passes through the corresponding discharging inclined guide frame (5); the width dimension of the discharging inclined guide frame (5) is slightly larger than the diameter dimension of the guide rod one (305), and the middle portion is oriented to be inclined upward; a port (501) for allowing the guide rod one (305) to leave the interior of the discharging inclined guide frame (5) is provided above the end of the discharging inclined guide frame (5); A group of the transposition guide frames (6) is composed of an inner guide frame (61) and an outer guide frame (62), wherein the outer guide frame (62) is arranged outside the inner guide frame (61), the inner guide frame (61) is arranged as an open trapezoidal slot body, and the outer guide frame (62) is arranged as a closed trapezoidal slot body; the rectangular guide block (307) including the side triangular guide block (306) partially moves through the corresponding inner guide frame (61), one end of the inner guide frame (61) is provided with an inlet (611) for guiding the side triangular guide block (306) to enter, and the other end is provided with an outlet (612) for guiding the side triangular guide block (306) to exit, and the horizontal height of the inlet (611) is lower than that of the outlet (612); a one-way baffle (621) is rotatably installed at a position of the outer guide frame (62) corresponding to the outlet (612); The transposition power assembly (7) comprises screw rods (701) located on both sides of the secondary crawler (4) and a motor (709) located at one end of the secondary crawler (4), one end of each of the two screw rods (701) being screwed with a screw tube (702), and one side of the screw tube (702) being slidably assembled with a slide rod (704) through an integrated slide tube (703), a rectangular block support (705) being fixedly provided at the top end of the slide rod (704), a guide rod (706) being fixedly connected to the outer wall of the rectangular block support (705), and the rectangular guide block ( The end of the guide rod 307 can be detachably pressed into the interior of the moment block support (705), the guide rod 2 (706) is movably inserted into the corresponding outer guide frame (62), a spring (707) is connected between the slide tube 1 (703) and the moment block support (705), the bottom of the screw tube (702) is fixedly connected to a support frame (708), the output end of the motor 1 (709) is fixedly connected to an inner bevel gear 1 (710), and the inner bevel gear 1 (710) and the screw rod 1 (701) on both sides thereof are transmission-connected via a sleeved chain 1 (715); A transmission shaft (711) is rotatably assembled inside the combined platform (105) and located near the motor 1 (709); a bevel gear 2 (712) meshing with the corresponding bevel gear 1 (402) is fixedly mounted on one end of the transmission shaft (711); a slide tube 2 (713) is slidably assembled on the other end of the transmission shaft (711); an outer bevel gear 1 (714) is fixedly arranged on one end of the slide tube 2 (713); and the outer bevel gear 1 (714) is detachably meshed with the inner bevel gear 1 (710); A gear lever (717) for controlling the sliding of the second slide tube (713) is rotatably connected inside the combined platform (105) through a bracket (716); a rotating rod (718) is rotatably assembled at the bottom of the guide roller (201) near the secondary crawler (4); both ends of the rotating rod (718) are fixedly connected to a pry bar (719); one end of the pry bar (719) is rotatably connected to a connecting rod (720); and the ends of two adjacent connecting rods (720) are commonly connected to a shifting rod (721). ), and the shift rod 1 (721) movably penetrates the bottom end of the gear lever (717); the joint platform (105) is internally located on both sides of the bracket (716) and is rotatably connected with a rotating rod (722), the top ends of two adjacent rotating rods (722) are commonly connected with a shift rod 2 (723), and the shift rod 2 (723) is movably connected to the upper half of the gear lever (717), and the horizontal height of the support frame (708) is flush with the lower half of the pry rod 1 (719) and the portion of the rotating rod (722) near the transition point; The outer wall of the load switch test frame (8) is provided with a warning light (801) corresponding to each workstation, a second motor (802) is fixedly installed inside the load switch test frame (8), a sprocket (803) is equidistantly installed inside the load switch test frame (8), and the output end of the second motor (802) is connected to all the sprockets (803) through a second chain (804), and one side of the sprocket (803) is slidably assembled with a second external bevel gear (805). , the interior of the load switch test frame (8) is equidistantly installed with cylinders (806) for pushing the outer bevel gear (805) two, the interior of the load switch test frame (8) is equidistantly arranged with straight guide frames (809), and the interior of the straight guide frames (809) is rotatably assembled with screws (807), one end of the screws (807) is fixedly installed with inner bevel gears (808), and the outer bevel gears (805) and the inner bevel gears (808) are detachably meshed; The outer surface of the second screw rod (807) is threaded with a threaded slider (810), and the threaded slider (810) is slidably mounted inside the straight guide frame (809), the bottom of the threaded slider (810) is rotatably connected to a support rod (811), the inside of the load switch test frame (8) is equidistantly rotatably connected to a rotating arm (812), and the end of the support rod (811) is rotatably connected to the corresponding rotating arm (812), and the end of the rotating arm (812) is mounted with a load test body (813) for contact testing with the electric terminal of the electric meter; Start the second cylinder (806) on the corresponding workstation, so that the sprocket (803) and the second screw (807) on the same axis are in a state of co-rotation, and the corresponding load test body (813) will eventually contact the power connection terminal of the electric meter to perform the load switch test; After the two meter placement molds (3) carry the electric meters and complete different testing tasks together, they are swapped and each simultaneously enters the preparation for another testing task; When one of the meter placement molds (3) moves toward the load test station, the guide rod 1 (305) will simultaneously enter the inclined guide frame (5), and the inner L-shaped frame rod (301) will carry the internal electric meter upward by one end distance, so that the electric meter exposes the power connection point; When the corresponding table-setting mold (3) moves to the upper and lower material loading area to the extreme position, the outer bevel gear 1 (714) and the inner bevel gear 1 (710) are separated, and then the screw tube (702) is reset and the secondary crawler (4) does not operate. When the screw tube (702) is reset to the extreme position, the outer bevel gear 1 (714) and the inner bevel gear 1 (710) resume meshing, ensuring that the replacement work of the double table-setting mold (3) can be carried out continuously.
2. A smart meter safety detection device according to claim 1, characterized in that: The air tightness detection body (1) has detection chambers (101) equidistantly formed inside, and a mold cover plate (103) is assembled in a lifting manner inside the detection chamber (101) through a cylinder 1 (102) installed above the detection chamber. A pressure gauge (104) is equidistantly installed on the outer wall of the top of the air tightness detection body (1). Anti-slip rails (106) are provided on the surface of the combined platform (105) and on both sides of the crawler machine (2). The anti-slip rails (106) are integrally connected to straight rails (107) near the secondary crawler (4), and the connection between the anti-slip rails (106) and the straight rails (107) is provided as a loading and unloading area.
3. The smart meter safety detection device according to claim 1, characterized in that: The clamp mechanism (10) comprises a climbing machine (1001) which is assembled with the track machine (901) in a lifting manner, and a clamping disc (1002) is fixedly installed at the bottom of the climbing machine (1001), and suction cups are arranged at four corners of the lower surface of the clamping disc (1002), and suction pipes (1003) are connected to the positions of the surface of the clamping disc (1002) corresponding to the suction cups, and the ends of all the suction pipes (1003) are commonly connected to a main pipe (1004), and a valve (1005) is fixedly installed at one end of the main pipe (1004), and a push-type switch (1006) for controlling the dredging of the pipeline is installed at one end of the valve (1005); one side of the suction cup is slidable The movable assembly is provided with a push rod frame (1010) for separating the electric meter from the clamping plate (1002), a pry rod 2 (1009) is rotatably mounted on one side of the surface of the clamping plate (1002), and one end of the pry rod 2 (1009) is connected to the rod body in the middle of the push rod frame (1010), a cylinder 3 (1008) is fixedly mounted on one side of the climbing machine (1001) through an integrated back frame (1007), and the end of the telescopic output end of the cylinder 3 (1008) is connected to the other end of the pry rod 2 (1009), and a stop block (1011) for squeezing the push switch (1006) is fixedly provided on the side wall of the telescopic output rod of the cylinder 3 (1008); A negative pressure tank (11) and an air pump (12) are provided on one side of the bottom of the air tightness detection body (1), and the output port of the negative pressure tank (11) is connected to the end of the main pipe (1004), and the input port of the negative pressure tank (11) is connected to the air pump (12) via a pipeline.
