Transmission curve optimization method and device for Shagohuang new energy base
By optimizing the transmission curve method of Shagohuang New Energy Base, combining wind and light output and power grid demand, the problem of insufficient matching of transmission demand in cross-regional power allocation of new energy bases has been solved, energy utilization efficiency and grid stability have been improved, and the Clean energy consumption.
Patent Information
- Application Number
- CN202410683313.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-30
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-05-30
AI Technical Summary
The existing technology failed to fully consider the time series volatility of new energy output and the specific process of the shortage of power at the end of the affected area in the cross-regional power allocation of new energy bases in the Shagohuang area, especially on the day when wind power and photovoltaics are the main ones. When the peak and valley structure changes, there is a problem of insufficient matching of transmission demand.
A method for optimizing the transmission curve of Shagohuang New Energy Base is proposed. By obtaining the wind and light output output data and the power grid requirements of the receiving end, a set of solutions containing different power supply configurations is established, and the power transmission curve optimization model is adjusted based on the objective function. , solve the optimized power transmission curve and power supply configuration to ensure the balance of supply and demand of the power grid and economical.
It improves energy utilization efficiency and economy, enhances grid stability and reliability, promotes the absorption of clean energy, has high flexibility and adaptability, and can quickly adjust strategies to deal with supply and demand fluctuations and market changes.
Smart Images

Figure CN118246718B_ABST
Abstract
Description
Background Art
[0002] Accelerating the construction of a new energy supply and consumption system with a focus on deserts, Gobi and wasteland (abbreviated as "Shagohuang") areas, relying on large-scale wind and solar power generation bases, coordinating with surrounding efficient and energy-saving clean coal power resources as a support system, and using ultra-high voltage transmission networks as a stable energy transmission carrier, is a key strategy to promote the high-quality development of the new energy industry and accelerate the construction of a new power system. In view of the unique renewable energy potential of the "Shagohuang" area, the construction of large-scale new energy bases and the application of ultra-high voltage direct current transmission projects are of great significance for the efficient allocation of regional resources, improving the new energy consumption capacity, increasing the proportion of non-fossil energy consumption and promoting the low-carbon transformation of the energy system.
[0003] In recent years, the scale of planning and construction of new energy bases with a capacity of tens of millions of kilowatts in the "Shagohuang" region has expanded rapidly, but cross-regional power allocation faces higher uncertainty challenges caused by the inherent randomness and volatility of new energy, the peak and valley characteristics of power load in receiving provinces, and the emerging time-of-use electricity price mechanism, which are significantly different from previous DC transmission methods. Therefore, developing a DC transmission strategy for new energy bases that takes into account both the "transmission and receiving ends" and designing a dynamic power transmission plan that can comprehensively consider the influence of the above complex factors is not only the cornerstone of new energy transmission channel planning, but also an important breakthrough point for improving channel efficiency, economic benefits and system stability.
[0004] Although existing research has made some progress in combining the characteristics of renewable energy and peak-shaving power sources, and in formulating or optimizing transmission curves by referring to the typical daily pattern of receiving-end load to a certain extent, and has mostly considered the goal of minimizing power abandonment to build optimization models, existing strategies fail to fully consider the time series volatility of renewable energy output, the specific process of power shortage at the receiving end, and the comprehensive effect of demand response based on the price mechanism under the new policy environment. In particular, there are obvious limitations in responding to the transmission demand brought about by the changes in the daytime peak and valley structure of the "Shagohuang" new energy base dominated by wind power and photovoltaic power. Summary of the invention
[0005] In order to overcome the problems existing in the related art, the present invention provides a method and device for optimizing the transmission curve of the Shagohuang new energy base.
[0006] According to a first aspect of an embodiment of the present invention, a method for optimizing a transmission curve of a Shagohuang new energy base is provided, and the method for optimizing a transmission curve of a Shagohuang new energy base comprises:
[0007] S1: Obtain wind and solar power output data in the sending area, supporting power resource characteristics and receiving grid requirements;
[0008] S2: establishing a set of solutions including different power configurations according to the wind and solar power output data of the sending-end area, the characteristics of supporting power resources and the needs of the receiving-end power grid;
[0009] S3: adjusting the objective function based on whether the current solution can obtain the power shortage process of the receiving-end power grid, and establishing a power transmission curve optimization model based on the objective function;
[0010] S4: solving the power transmission curve optimization model to obtain a solution of the current solution, wherein the solution of the current solution includes an optimized power transmission curve, power supply configuration, and operation economic indicators corresponding to the current solution;
[0011] S5: Repeat S3 and S4 until all solutions of the solution set are traversed to obtain a solution set of the solution set;
[0012] S6: Determine whether there is an optimal solution in the solution set, if so, output the optimal solution; otherwise, return to S2.
[0013] In some exemplary embodiments of the present invention, based on the above solution, S3 includes:
[0014] Determine whether the current solution can obtain the power shortage process of the receiving-end power grid;
[0015] If so, the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, maximize the amount of power delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power delivery curve and the electricity price and load changes of the receiving power grid;
[0016] Otherwise, the objective function is to minimize the amount of renewable energy curtailment and thermal power fuel costs, and maximize the matching degree between the transmission curve and the time-of-use electricity price and load changes of the receiving power grid;
[0017] A power transmission curve optimization model is established based on the objective function.
[0018] In some example embodiments of the present invention, based on the above scheme, when the objective function is to minimize the amount of abandoned electricity from renewable energy and the fuel cost of thermal power, maximize the amount of electricity delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power transmission curve and the electricity price and load change of the receiving power grid, the objective function is:
[0019]
[0020] in, for Time period, For the A thermal power station, For thermal power station exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power transmission during the period, The receiving-end power grid is short of electricity; The weight used to measure the matching degree between the transmission curve and the power shortage of the receiving power grid; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
[0021] In some example embodiments of the present invention, based on the above scheme, when the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, and maximize the matching degree between the power transmission curve and the time-of-use electricity price and load change of the receiving power grid, the objective function is:
[0022]
[0023] in, for Time period, For the A thermal power station, For thermal power station exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power delivered during the time period; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
[0024] In some exemplary embodiments of the present invention, based on the above solution, before S4, the Shagohuang new energy base transmission curve optimization method further includes:
[0025] A constraint model is established according to the power resource characteristics and the receiving-end power grid requirements.
[0026] In some exemplary embodiments of the present invention, based on the above scheme, the constraint model includes a base power output sub-model,
[0027] The base power output sub-model includes:
[0028] System constraints, used to ensure that system supply and demand are balanced;
[0029] Plant constraints, which are used to ensure that the plant operates within physical and technical limits;
[0030] Wind and PV plant constraints to ensure that wind and PV plant output forecasts match actual generation potential; and
[0031] Pumped storage power station constraints are used to ensure the water balance, energy conversion efficiency and mutual exclusion of operation modes of pumped storage power stations.
[0032] In some exemplary embodiments of the present invention, based on the above solution, the constraint model further includes a DC transmission operation sub-model.
[0033] The DC transmission operation sub-model includes:
[0034] DC constant operation time constraint is used to ensure the stability and economy of DC system operation;
[0035] DC ramp constraint, used to limit the adjustment speed of DC power transmission;
[0036] The DC transmission channel capacity limit is used to ensure that the DC transmission power exceeds the design capacity of the DC channel in any period of time;
[0037] The minimum utilization hours constraint of DC channels is used to ensure the economic benefits of DC transmission facility investment;
[0038] Renewable energy power generation ratio constraint, used to ensure that the total power generation ratio of renewable energy power generation is not less than the preset ratio; and
[0039] The maximum allowable power shortage rate constraint is used to limit the power shortage ratio of the base relative to the power transmission curve.
[0040] According to a second aspect of an embodiment of the present invention, a device for optimizing a transmission curve of a Shagohuang new energy base is provided, wherein the device for optimizing a transmission curve of a Shagohuang new energy base comprises:
[0041] A data acquisition module, which is used to obtain wind and solar power output data in the sending area, supporting power resource characteristics and receiving end power grid requirements;
[0042] A scheme establishment module, the scheme establishment module is used to establish a scheme set including different power supply configurations according to the wind and solar power output data of the sending end area, the supporting power supply resource characteristics and the receiving end power grid demand;
[0043] A model building module, the model building module is used to adjust the objective function based on whether the current solution can obtain the power shortage process of the receiving-end power grid, and establish a power transmission curve optimization model based on the objective function;
[0044] A model solving module, the model solving module is used to solve all the power transmission curve optimization models in the scheme set to obtain a solution set of the scheme set, wherein the solution set of the scheme set includes solutions of all current schemes in the scheme set, and the solution of the current scheme includes the optimized power transmission curve, power supply configuration and operation economic indicators corresponding to the current scheme;
[0045] A judgment module is used to judge whether there is an optimal solution in the solution set.
[0046] According to a third aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a processor; and a memory, wherein the memory stores computer-readable instructions, and when the computer-readable instructions are executed by the processor, the method for optimizing the delivery curve of the Shagohuang new energy base in the first aspect is implemented.
[0047] According to a fourth aspect of an embodiment of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for optimizing the transmission curve of the Shagohuang new energy base in the first aspect is implemented.
[0048] The technical solution provided by the embodiments of the present invention may have the following beneficial effects:
[0049] 1. Improve energy utilization efficiency and economy: On the one hand, the present invention can more accurately match supply and demand by carefully analyzing the output characteristics of wind and solar energy at the sending end and the actual needs of the receiving end power grid, reduce excess or shortage phenomena, and thus improve the overall energy utilization efficiency; on the other hand, the introduction of the power transmission curve optimization model takes into account the operating economic indicators, ensuring that the transmission strategy not only meets the power supply security, but also pursues the maximization of cost-effectiveness, and promotes the economic benefits of the new energy base;
[0050] 2. Enhance the stability and reliability of the power grid: By establishing and optimizing the power transmission curve, the present invention can ensure that the power shortage demand of the receiving power grid is met in different time periods, and can effectively dispatch various power configurations to smooth the output, enhance the stability and reliability of the power grid, and reduce the impact of the intermittent nature of renewable energy on the power grid;
[0051] 3. Promote clean energy consumption: The present invention takes into account the efficient delivery of wind and solar energy, thus helping to solve the problem of clean energy utilization in the Shagohuang area due to limited local consumption, and accelerate the clean transformation of the energy structure;
[0052] 4. Flexibility and adaptability: The present invention has a high degree of flexibility and adaptability by establishing a set of solutions that include multiple power supply configurations and performing iterative optimization. Therefore, whether facing short-term supply and demand fluctuations or long-term energy planning, strategies can be quickly adjusted to adapt to changing market and technical conditions.
[0053] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.
[0055] Figure 1 A schematic diagram showing a system architecture of an exemplary application environment of a method and device for optimizing a delivery curve of a Shagohuang new energy base to which an embodiment of the present invention can be applied;
[0056] Figure 2 A schematic diagram of a flow chart of a method for optimizing a transmission curve of a Shagohuang new energy base according to some embodiments of the present invention is shown;
[0057] Figure 3 Schematically showing a schematic diagram of a transmission curve optimization device for a Shagohuang new energy base according to some embodiments of the present invention;
[0058] Figure 4 A schematic diagram schematically shows a structure of a computer system of an electronic device according to some embodiments of the present invention;
[0059] Figure 5 A schematic diagram of a computer-readable storage medium according to some embodiments of the present invention is schematically shown. DETAILED DESCRIPTION
[0060] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the present invention as detailed in the appended claims.
[0061] The terms used in the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The singular forms "a", "the" and "the" used in the present invention and the appended claims are also intended to include plural forms unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0062] It should be understood that although the terms first, second, third, etc. may be used in the present invention to describe various information, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0063] Figure 1 A schematic diagram of the system architecture of an exemplary application environment of a Shagohuang new energy base delivery curve optimization method and device to which an embodiment of the present invention can be applied is shown.
[0064] like Figure 1 As shown, the system architecture 100 may include one or more terminal devices such as a desktop computer 101, a portable computer 102, a smart phone 103, a network 104 and a server 105. The network 104 is used to provide a medium for a communication link between the terminal device and the server 105. The network 104 may include various connection types, such as wired or wireless communication links or optical fiber cables, etc. The terminal device may be various electronic devices with data processing functions, and the electronic device has a display screen, which is used to display target structural feature points or optimized power transmission curves, power supply configurations and operating economic indicators to the user, including but not limited to the above-mentioned desktop computers, portable computers, smart phones, etc. It should be understood that Figure 1 The number of terminal devices, networks and servers in the embodiment is only for illustration. According to the implementation requirements, there may be any number of terminal devices, networks and servers. For example, the server 105 may be a sub-server cluster composed of multiple sub-servers.
[0065] The method for optimizing the transmission curve of the Shagohuang new energy base provided in the embodiment of the present invention can generally be executed by a terminal device, and accordingly, the device for optimizing the transmission curve of the Shagohuang new energy base is generally set in the terminal device. However, it is easy for those skilled in the art to understand that the method for optimizing the transmission curve of the Shagohuang new energy base provided in the embodiment of the present invention can also be executed by the server 105, and accordingly, the device for optimizing the transmission curve of the Shagohuang new energy base can also be set in the server 105, which is not particularly limited in this exemplary embodiment.
[0066] In addition, it should be understood that the Shagohuang new energy base transmission curve optimization method of the embodiment of the present invention can be configured as a software module. In some implementation scenarios, the Shagohuang new energy base transmission curve optimization scheme of the present invention can be deployed separately to achieve the construction and generation of optimized power transmission curves, power supply configurations, and operating economic indicators. In other implementation scenarios, the Shagohuang new energy base transmission curve optimization scheme of the present invention can be deployed in other software as a functional module of the software, such as deployed in the optimization analysis software of the Shagohuang new energy base transmission curve. The present invention does not place any special restrictions on the application of the Shagohuang new energy base transmission curve optimization method.
[0067] Next, the embodiments of the present invention are described in detail.
[0068] like Figure 1 As shown, Figure 1 is a flow chart of a method according to an exemplary embodiment of the present invention, comprising:
[0069] S1: Obtain wind and solar power output data in the sending area, supporting power resource characteristics and receiving grid requirements;
[0070] S2: establishing a set of solutions including different power configurations according to the wind and solar power output data of the sending-end area, the characteristics of supporting power resources and the needs of the receiving-end power grid;
[0071] S3: adjusting the objective function based on whether the current solution can obtain the power shortage process of the receiving-end power grid, and establishing a power transmission curve optimization model based on the objective function;
[0072] S4: solving the power transmission curve optimization model to obtain a solution of the current solution, wherein the solution of the current solution includes an optimized power transmission curve, power supply configuration, and operation economic indicators corresponding to the current solution;
[0073] S5: Repeat S3 and S4 until all solutions of the solution set are traversed to obtain a solution set of the solution set;
[0074] S6: Determine whether there is an optimal solution in the solution set, if so, output the optimal solution; otherwise, return to S2.
[0075] The technical solution provided by the embodiments of the present invention may have the following beneficial effects:
[0076] 1. Improve energy utilization efficiency and economy: On the one hand, the present invention can more accurately match supply and demand by carefully analyzing the output characteristics of wind and solar energy at the sending end and the actual needs of the receiving end power grid, reduce excess or shortage phenomena, and thus improve the overall energy utilization efficiency; on the other hand, the introduction of the power transmission curve optimization model takes into account the operating economic indicators, ensuring that the transmission strategy not only meets the power supply security, but also pursues the maximization of cost-effectiveness, and promotes the economic benefits of the new energy base;
[0077] 2. Enhance the stability and reliability of the power grid: By establishing and optimizing the power transmission curve, the present invention can ensure that the power shortage demand of the receiving power grid is met in different time periods, and can effectively dispatch various power configurations to smooth the output, enhance the stability and reliability of the power grid, and reduce the impact of the intermittent nature of renewable energy on the power grid;
[0078] 3. Promote clean energy consumption: The present invention takes into account the efficient delivery of wind and solar energy, thus helping to solve the problem of clean energy utilization in the Shagohuang area due to limited local consumption, and accelerate the clean transformation of the energy structure;
[0079] 4. Flexibility and adaptability: The present invention has a high degree of flexibility and adaptability by establishing a set of solutions that include multiple power supply configurations and performing iterative optimization. Therefore, whether facing short-term supply and demand fluctuations or long-term energy planning, strategies can be quickly adjusted to adapt to changing market and technical conditions.
[0080] In S1, the wind and solar power output data of the sending end region can be obtained in years, months or seasons, which is not specifically limited in the present invention. In some embodiments, it can be designed to convert the year, month or season into time units, for example, converting the wind and solar power output data of the sending end region for one year into the wind and solar power output data of the sending end region for 8760 hours.
[0081] In addition, the output data of wind and solar energy includes the wind power output of wind farms and the photovoltaic output of photovoltaic power stations. On the one hand, since wind power output is affected by various meteorological factors such as wind speed and wind direction, it has obvious randomness and intermittency. Therefore, by collecting 8760 hours of measured or predicted output data of wind farms in the sending area, the time series of wind power output can be depicted, revealing the seasonality, daily changes in output, and performance under extreme weather conditions. On the other hand, since photovoltaic output mainly depends on the intensity of solar radiation, it is closely related to sunshine time and weather conditions (such as cloud cover). Therefore, by obtaining 8760 hours of data, the daily cycle and seasonal changes of photovoltaic output can be fully demonstrated.
[0082] As for the analysis method of supporting power resource characteristics and receiving-end power grid demand, the present invention does not make specific restrictions. Those skilled in the art can analyze the supporting power resource characteristics and the receiving-end power grid demand separately, or use comprehensive evaluation means, combined with the wind and solar power output data in the sending-end area, to analyze the power resource characteristics and the receiving-end power grid demand at the same time. The means of analyzing the power resource characteristics separately include power resource testing, including external characteristic testing, efficiency testing, transient response testing, etc.; the means of analyzing the receiving-end power grid demand separately include load forecasting, voltage stability analysis, dynamic reactive power demand analysis, power balance analysis, etc.; the comprehensive evaluation means can be scenario analysis, linear programming / nonlinear programming, Monte Carlo simulation, etc.
[0083] In S2, due to the existence of the scheme set, the stability and reliability of energy supply can be improved, while promoting the effective use of renewable resources.
[0084] The schemes in the scheme set can be basic renewable energy ratio schemes, diversified clean energy + auxiliary thermal power schemes, large-scale energy storage integration schemes, smart microgrids + distributed energy schemes, cross-regional ultra-high voltage transmission + multi-energy complementary schemes, etc. The present invention does not make specific restrictions.
[0085] For the basic renewable energy ratio plan, its core structure is the integration of energy storage systems such as wind power, photovoltaics and pumped storage, supplemented by a small amount of thermal power or hydropower peak regulation; its characteristic is to directly store wind and photovoltaic energy through the energy storage of pumped storage power stations, realize peak shifting and valley filling of electricity, improve the utilization rate of renewable energy, and reduce dependence on fossil fuels; it is suitable for market environments where energy storage costs are gradually decreasing, technologies are mature, and the sending end areas have strong energy storage facility construction capabilities.
[0086] For the diversified clean energy + auxiliary gas-fired power solution, its core structure is wind power, photovoltaic, and biomass power generation combined with a small number of flexibly adjustable natural gas combined cycle power plants; the characteristic is that the natural gas power plant acts as a peak-shaving power source, which quickly responds to changes in grid demand and ensures grid stability. At the same time, biomass energy increases energy diversity and reduces carbon emissions; it is suitable for situations where the receiving grid has high requirements for power supply continuity and stability, and where natural gas resources are available.
[0087] For large-scale energy storage integration solutions, the core components are the integration of wind power, photovoltaics and large-scale battery energy storage systems, supplemented by a small amount of thermal power or hydropower peak regulation; the characteristic is that wind and photovoltaic energy is directly stored through large-scale battery energy storage to achieve peak shifting and valley filling of electricity time, improve the utilization rate of renewable energy, and reduce dependence on fossil fuels; it is suitable for the market environment where the cost of battery energy storage is gradually decreasing, the technology is mature, and the sending end area has a strong ability to build energy storage facilities.
[0088] For the smart microgrid + distributed energy solution, its core structure is to build a smart microgrid in the receiving area, integrate rooftop photovoltaics, small wind power generation, fuel cells and user-side energy storage, and interact with the main grid; its characteristics are to improve the self-sufficiency of local power grids, optimize energy configuration, and enhance system resilience, especially to provide backup power supply in extreme weather or main grid failures; it is suitable for densely populated urban areas or remote areas with high electricity self-sufficiency needs.
[0089] For the cross-regional UHV transmission + multi-energy complementary solution, its core structure is to use UHV technology to achieve long-distance transmission, transmit the surplus renewable energy at the sending end to the receiving end, and at the same time connect the receiving end to local hydropower, nuclear power and other stable power sources; the characteristic is to achieve the optimal allocation of energy resources across the country or a large region, alleviate local supply and demand contradictions, and improve the flexibility and reliability of the overall energy system; it is suitable for countries or regions with uneven geographical distribution of sending and receiving ends and separation of energy resources and load centers.
[0090] As an implementation mode, the present invention also provides a scheme of using new energy + auxiliary thermal power, the core structure of which is the integration of wind power, photovoltaic, thermal power and pumped storage system. It is characterized by strong complementarity and stability, and is environmentally friendly. While meeting the growing demand for electricity, it achieves the optimization of energy structure and sustainable development of the environment. It is suitable for occasions that pursue the win-win goals of energy supply reliability and environmental sustainability.
[0091] In S3, in order to ensure the effective distribution of energy, reduce power shortages, and improve the stability and economy of the system, each solution in the solution set is first evaluated as an independent solution, that is, the power shortage risk of the current solution is evaluated to provide a basis for subsequent optimization. Then, the objective function is adjusted based on the evaluation results to seek the best balance point between multiple objectives. Then, based on the adjusted objective function, a power transmission curve optimization model is constructed.
[0092] As an implementation method, the entire process of S3 can be expressed as:
[0093] Determine whether the current solution can obtain the power shortage process of the receiving-end power grid;
[0094] If so, the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, maximize the amount of power delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power delivery curve and the electricity price and load changes of the receiving power grid;
[0095] Otherwise, the objective function is to minimize the amount of renewable energy curtailment and thermal power fuel costs, and maximize the matching degree between the transmission curve and the time-of-use electricity price and load changes of the receiving power grid;
[0096] A power transmission curve optimization model is established based on the objective function.
[0097] Therefore, by minimizing the amount of abandoned electricity from renewable energy, we can reduce the situation where renewable energy such as wind power and solar power are forced to abandon due to the inability to be connected to the grid in time or the limited acceptance capacity of the grid, make full use of natural resources and improve energy efficiency; by minimizing the fuel cost of thermal power, we can optimize the timing and scale of thermal power use, thereby avoiding excessive reliance on thermal power when renewable energy is sufficient, reducing unnecessary fuel consumption, reducing costs, and improving the economy of the entire system; by maximizing the amount of power transmission to meet the power shortage of the receiving power grid, we can ensure the stability and reliability of the power supply of the power grid and avoid the social and economic impacts caused by tight power supply; by maximizing the degree of matching between the power transmission curve and the electricity price and load changes of the receiving power grid, we can increase the power transmission during high electricity price periods and reduce the power transmission during low load periods to obtain higher economic benefits while reducing the operating pressure of the power grid.
[0098] In addition, flexible adjustment of optimization targets according to the actual demand status of the receiving power grid (whether there is a power shortage) can reflect the high flexibility and adaptability of the dispatching strategy, thereby effectively responding to various complex situations in power grid operation.
[0099] On this basis, the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, maximize the amount of power delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power transmission curve and the electricity price and load changes of the receiving power grid. The objective function is:
[0100]
[0101] in, for Time period, For the A thermal power station, For thermal power station exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power transmission during the period, The receiving-end power grid is short of electricity; The weight used to measure the matching degree between the transmission curve and the power shortage of the receiving power grid; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
[0102] When the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power and maximize the matching degree between the transmission curve and the time-of-use electricity price and load changes of the receiving power grid, the objective function is:
[0103]
[0104] in, for Time period, For the A thermal power station, For thermal power plants exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power transmission during the period; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
[0105] Based on the above technical solution, before establishing the power transmission curve optimization model in S3, a series of constraints can be set for the objective function to ensure the feasibility of establishing the power transmission curve optimization model.
[0106] The setting of specific constraint conditions is not limited, and those skilled in the art can set them according to actual conditions. As an implementation method, the constraint model can be set by a combination of one or more of physical constraints, economic constraints, environmental and policy constraints, system stability and safety constraints, or time series constraints, and the constraint model can also be established in a structured system manner.
[0107] For example, in some embodiments, by structuring the system into a thermal power plant, a wind farm, a photovoltaic power plant, a pumped storage power plant, etc., on this basis, a constraint model can be designed to include a base power output sub-model, or the constraint model can be set to include a DC transmission operation sub-model, or the constraint model can be set to include both sub-models.
[0108] For the base power output sub-model, it includes:
[0109] The system constraint, used to ensure the balance between system supply and demand, especially considering the dual role of pumped storage power plants, can be expressed as:
[0110]
[0111] in, for Time period, For the A thermal power station, For thermal power plants exist The output of the time period, k is the kth wind farm, k is the wind farm The grid-connected output of the time period; m is the mth photovoltaic power station, For photovoltaic power station m Grid-connected output during the time period; , , Pumped storage power station The power generation and pumping output in period t; for The power shortage in the power transmission curve cannot be met during the period.
[0112] The above formula indicates that the system is in the period The total output needs to take into account the power generation output and pumping output of the pumped-storage power station, as well as the power shortage of the system during that period, in order to maintain the real-time balance of power supply and demand.
[0113] Thermal power plant constraints are used to ensure that the operation of thermal power plants complies with physical and technical limitations. They can be expressed as:
[0114]
[0115]
[0116]
[0117] in, It means that the output of thermal power plants shall not exceed the operating capacity. Indicates the output ramp and load reduction rate limit constraints of thermal power units; It represents the operating range constraints defined according to the number of operating units, single unit capacity and total installed capacity of the thermal power station; For thermal power plants exist Output during the period, For thermal power plants exist The number of machines in operation during the time period; For thermal power plants The capacity of a single machine; , For thermal power plants Output climbing and load shedding rates; is the time interval, For thermal power plants exist +1 output during the period, For thermal power plants The number of installed units.
[0118] Wind power plant and photovoltaic power plant constraints are used to ensure that the output forecast of wind power and photovoltaic power plants meets the actual power generation potential, which can be expressed as:
[0119]
[0120]
[0121] in, k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Here, the main concern is that the upper limit of output is determined by natural conditions, ensuring that the output forecasts of wind power and photovoltaic power stations in the model are consistent with the actual power generation potential.
[0122] The constraints of the pumped storage power station are used to ensure the water balance, energy conversion efficiency and mutual exclusion of operation modes of the pumped storage power station, which can be expressed as:
[0123]
[0124]
[0125]
[0126]
[0127]
[0128]
[0129]
[0130] in, and are the storage capacities of the upper and lower reservoirs of the pumped storage power station l at time t+1, and are the storage capacities of the upper and lower reservoirs of the pumped storage power station l in period t respectively; , , and are the pumping flow, power generation flow, pumping output and power generation output of pumped storage power station l in period t respectively; is the time interval, and are the pumping and power generation efficiencies, respectively; and is the pumping head and generating head of the pumped storage power station l in period t; and is a variable of 0 or 1. The pumping output of pumped storage power station n in period t, The power generation output of pumped storage power station l in period t; The installed capacity of pumped storage power stations, is the number of pumped storage power stations, 8760h; and It is the water balance constraint of the upper and lower reservoirs; and For the hydropower conversion relationship; , and Restrictions: Pumped-storage power stations cannot pump water and generate electricity at the same time.
[0131] For the DC transmission operation sub-model, it includes:
[0132] The DC constant operation time constraint is used to ensure the stability and economy of the DC system operation and can be expressed as:
[0133]
[0134] The DC ramp constraint is used to limit the adjustment speed of DC power transmission and can be expressed as:
[0135]
[0136] The DC transmission channel capacity limit is used to ensure that the DC transmission power exceeds the design capacity of the DC channel in any period of time, which can be expressed as:
[0137]
[0138] The minimum utilization hours constraint of the DC channel is used to ensure the economic benefits of the investment in DC transmission facilities and can be expressed as:
[0139]
[0140] The renewable energy power ratio constraint is used to ensure that the total power generation ratio of renewable energy is not less than the preset ratio, which can be expressed as:
[0141]
[0142] The maximum allowable power shortage rate constraint is used to limit the power shortage ratio of the base relative to the power transmission curve, which can be expressed as:
[0143]
[0144] in, is a variable of 0 or 1. The DC power transmission power is adjusted in the period t; It is the minimum constant operation time of DC power transmission; and They are the maximum upward / downward ramp rates of DC power transmission respectively; for The power transmission during the period, for -1 period of power transmission, is the maximum capacity of the DC channel; is the minimum channel utilization hours; k is the wind farm The grid-connected output during the period, For photovoltaic power station m The grid-connected output during the period, for The power shortage during the period cannot meet the power transmission curve. The proportion of wind power and photovoltaic new energy; is the maximum allowable power failure rate.
[0145] In S4, the present invention does not specifically limit the solution method for solving the power transmission curve optimization model, and the solution can be obtained by some mathematical methods or software and platforms with mathematical methods, for example, by some software with linear programming, nonlinear programming, genetic algorithms, machine learning and artificial intelligence methods. As an implementation method, the present invention uses Cplex12.6 solver to solve the power transmission curve optimization model with multi-time scale nesting according to the idea of daily-monthly-hourly throughout the year.
[0146] In S5, by repeatedly executing S3 and S4, each solution in the solution set is systematically examined to ensure that each potential power configuration and operation strategy is fully evaluated. After each solution is solved, a solution is obtained, and these solutions together form a solution set. The solution set contains the optimal performance of all solutions under the current optimization criteria, providing a comprehensive data basis for subsequent decision-making.
[0147] Each solution in the solution set represents a possible power transmission strategy. By comparing these solutions, we can determine whether there is a solution that is particularly outstanding, that is, the optimal solution. The optimal solution means that the objective function is maximized or minimized while satisfying all constraints.
[0148] Therefore, on the one hand, it can ensure the exhaustive exploration of all possible solutions, avoiding the possibility of missing out on better solutions due to considering only a few solutions; on the other hand, the ability to dynamically adjust the objective function enables the model to respond quickly to different grid demands and resource conditions, improving the adaptability and practicality of the strategy.
[0149] In S6, the relationship between the preset conditions and all solutions can be compared to determine whether there is an optimal solution in the solution set. As for the preset conditions, those skilled in the art can set them according to actual conditions. For example, the number of loops can reach a preset value, or other conditions for jumping out of the loop can be set. The present invention does not make specific limitations.
[0150] According to a second aspect of an embodiment of the present invention, a transmission curve optimization device for a Shagohuang new energy base is also provided, referring to Figure 3As shown, the transmission curve optimization device of the Shagohuang new energy base includes:
[0151] A data acquisition module 310, which is used to obtain wind and solar power output data in the sending end area, supporting power resource characteristics and receiving end power grid requirements;
[0152] A scheme establishing module 320, wherein the scheme establishing module 320 is used to establish a scheme set including different power supply configurations according to the wind and solar power output data of the sending end area, the characteristics of the supporting power supply resources and the needs of the receiving end power grid;
[0153] A model building module 330, the model building module 330 is used to adjust the objective function based on whether the current solution can obtain the power shortage process of the receiving-end power grid, and establish a power transmission curve optimization model based on the objective function;
[0154] A model solving module 340, the model solving module 340 is used to solve all the power transmission curve optimization models in the scheme set to obtain a solution set of the scheme set, wherein the solution set of the scheme set includes solutions of all current schemes in the scheme set, and the solution of the current scheme includes the optimized power transmission curve, power supply configuration and operation economic indicators corresponding to the current scheme;
[0155] The judgment module 350 is used to judge whether there is an optimal solution in the solution set.
[0156] In an exemplary embodiment of the present invention, based on the above solution, the model building module 330 can be further used to:
[0157] Determine whether the current solution can obtain the power shortage process of the receiving-end power grid;
[0158] If so, the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, maximize the amount of power delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power delivery curve and the electricity price and load changes of the receiving power grid;
[0159] Otherwise, the objective function is to minimize the amount of renewable energy curtailment and thermal power fuel costs, and maximize the matching degree between the transmission curve and the time-of-use electricity price and load changes of the receiving power grid;
[0160] A power transmission curve optimization model is established based on the objective function.
[0161] In an exemplary embodiment of the present invention, based on the above scheme, when the model building module 330 is used to minimize the amount of abandoned electricity of renewable energy and the fuel cost of thermal power, maximize the amount of power transmission to meet the power shortage of the receiving power grid, and maximize the matching degree of the power transmission curve with the electricity price and load change of the receiving power grid as the objective function, the objective function is:
[0162]
[0163] in, for Time period, For the A thermal power station, For thermal power station exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power transmission during the period, The receiving-end power grid is short of electricity; The weight used to measure the matching degree between the transmission curve and the power shortage of the receiving power grid; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
[0164] In an exemplary embodiment of the present invention, based on the above scheme, when the model building module 330 is used to minimize the amount of abandoned electricity from renewable energy and the fuel cost of thermal power generation and maximize the matching degree between the transmission curve and the time-of-use electricity price and load change of the receiving power grid as the objective function, the objective function is:
[0165]
[0166] in, for Time period, For the A thermal power station, For thermal power station exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power delivered during the time period; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
[0167] In an exemplary embodiment of the present invention, based on the above scheme, the Shagohuang new energy base delivery curve optimization device also includes a constraint model building module, which can be a submodule of the model building module 330 or an independent module. The constraint model building module is used to establish a constraint model of the objective function.
[0168] In an exemplary embodiment of the present invention, based on the above-mentioned scheme, the constraint model can be designed to include a base power output sub-model, the constraint model can be set to include a DC transmission operation sub-model, and the constraint model can also be set to include both sub-models.
[0169] For the base power output sub-model, it includes:
[0170] The system constraint, used to ensure the balance between system supply and demand, especially considering the dual role of pumped storage power plants, can be expressed as:
[0171]
[0172] in, for Time period, For the Railway stations, For thermal power station exist The output of the time period, k is the kth wind farm, k is the wind farm The grid-connected output of the time period; m is the mth photovoltaic power station, For photovoltaic power station m Grid-connected output during the time period; , , Pumped storage power station The power generation and pumping output in period t; for The power shortage in the power transmission curve cannot be met during the period.
[0173] The above formula indicates that the system is in the period The total output needs to take into account the power generation output and pumping output of the pumped-storage power station, as well as the power shortage of the system during that period, in order to maintain the real-time balance of power supply and demand.
[0174] Thermal power plant constraints are used to ensure that the operation of thermal power plants complies with physical and technical limitations. They can be expressed as:
[0175]
[0176]
[0177]
[0178] in, It means that the output of thermal power plants shall not exceed the operating capacity. Indicates the output ramp and load reduction rate limit constraints of thermal power units; It represents the operating range constraints defined according to the number of operating units, single unit capacity and total installed capacity of the thermal power station; For thermal power plants exist Output during the period, For thermal power plants exist The number of machines in operation during the time period; For thermal power plants The capacity of a single machine; , For thermal power plants Output climbing and load shedding rates; is the time interval, For thermal power plants exist +1 output during the period, For thermal power plants The number of installed units.
[0179] Wind power plant and photovoltaic power plant constraints are used to ensure that the output forecast of wind power and photovoltaic power plants meets the actual power generation potential, which can be expressed as:
[0180]
[0181]
[0182] in, k is the wind farm Grid-connected output during the time period; For photovoltaic power station m Grid-connected output during the time period; k is the wind farm Power generation output during the time period; For photovoltaic power station m Here, the main concern is that the upper limit of output is determined by natural conditions, ensuring that the output forecasts of wind power and photovoltaic power stations in the model are consistent with the actual power generation potential.
[0183] The constraints of the pumped storage power station are used to ensure the water balance, energy conversion efficiency and mutual exclusion of operation modes of the pumped storage power station, which can be expressed as:
[0184]
[0185]
[0186]
[0187]
[0188]
[0189]
[0190]
[0191] in, and are the storage capacities of the upper and lower reservoirs of the pumped storage power station l at time t+1, and are the storage capacities of the upper and lower reservoirs of the pumped storage power station l in period t respectively; , , and are the pumping flow, power generation flow, pumping output and power generation output of pumped storage power station l in period t respectively; is the time interval, and are the pumping and power generation efficiencies, respectively; and is the pumping head and generating head of the pumped storage power station l in period t; and is a variable of 0 or 1. The pumping output of pumped storage power station n in period t, The power generation output of pumped storage power station l in period t; The installed capacity of pumped storage power stations, is the number of pumped storage power stations, 8760h; and It is the water balance constraint of the upper and lower reservoirs; and For the hydropower conversion relationship; , and Restrictions: Pumped-storage power stations cannot pump water and generate electricity at the same time.
[0192] For the DC transmission operation sub-model, it includes:
[0193] The DC constant operation time constraint is used to ensure the stability and economy of the DC system operation and can be expressed as:
[0194]
[0195] The DC ramp constraint is used to limit the adjustment speed of DC power transmission and can be expressed as:
[0196]
[0197] The DC transmission channel capacity limit is used to ensure that the DC transmission power exceeds the design capacity of the DC channel in any period of time, which can be expressed as:
[0198]
[0199] The minimum utilization hours constraint of the DC channel is used to ensure the economic benefits of the investment in DC transmission facilities and can be expressed as:
[0200]
[0201] The renewable energy power ratio constraint is used to ensure that the total power generation ratio of renewable energy is not less than the preset ratio, which can be expressed as:
[0202]
[0203] The maximum allowable power shortage rate constraint is used to limit the power shortage ratio of the base relative to the power transmission curve, which can be expressed as:
[0204]
[0205] in, is a variable of 0 or 1. The DC power transmission power is adjusted in the period t; It is the minimum constant operation time of DC power transmission; and They are the maximum upward / downward ramp rates of DC power transmission respectively; for The power transmission during the period, for -1 period of power transmission, is the maximum capacity of the DC channel; is the minimum channel utilization hours; k is the wind farm The grid-connected output during the period, For photovoltaic power station m The grid-connected output during the period, for The power shortage during the period cannot meet the power transmission curve. The proportion of wind power and photovoltaic new energy; is the maximum allowable power failure rate.
[0206] It should be noted that although several modules and submodules of the transmission curve optimization device of the Shagohuang new energy base are mentioned in the above detailed description, this division is not mandatory. In fact, according to an embodiment of the present invention, the features and functions of two or more modules or submodules described above can be embodied in one module or unit. Conversely, the features and functions of one module or submodule described above can be further divided into multiple modules or submodules to be embodied.
[0207] In addition, in an exemplary embodiment of the present invention, an electronic device capable of implementing the above-mentioned Shagohuang new energy base transmission curve optimization method is also provided.
[0208] Those skilled in the art will appreciate that various aspects of the present invention may be implemented as systems, methods or program products. Therefore, various aspects of the present invention may be specifically implemented in the following forms, namely: complete hardware embodiments, complete software embodiments (including firmware, microcode, etc.), or embodiments combining hardware and software aspects, which may be collectively referred to herein as "circuits", "modules" or "systems".
[0209] Refer to the following Figure 4 An electronic device 400 according to such an embodiment of the present invention is described. Figure 4 The electronic device 400 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.
[0210] like Figure 4 As shown, the electronic device 400 is in the form of a general computing device. The components of the electronic device 400 may include but are not limited to: the at least one processing unit 410, the at least one storage unit 420, a bus 430 connecting different system components (including the storage unit 420 and the processing unit 410), and a display unit 440.
[0211] The storage unit stores program codes, which can be executed by the processing unit 410, so that the processing unit 410 performs the steps of various exemplary embodiments of the present invention described in the above “Exemplary Method” section. For example, the processing unit 410 can perform the following steps: Figure 2 S1 shown in the text analyzes the supporting power resource characteristics and the receiving-end power grid demand based on the wind and solar power output data in the sending-end area; S2 establishes a set of schemes containing different power configurations according to the power resource characteristics and the receiving-end power grid demand; S3 adjusts the objective function based on whether the current scheme can obtain the power shortage process of the receiving-end power grid, and establishes a power transmission curve optimization model based on the objective function; S4 solves the power transmission curve optimization model to obtain the solution of the current scheme, wherein the solution of the current scheme includes the optimized power transmission curve, power configuration and operating economic indicators corresponding to the current scheme; S5 repeats S3 and S4 until all schemes in the scheme set are traversed to obtain the solution set of the scheme set; S6 determines whether there is an optimal solution in the solution set, and if so, outputs the optimal solution; otherwise, returns to S2.
[0212] The storage unit 420 may include a readable medium in the form of a volatile storage unit, such as a random access memory unit (RAM) 421 and / or a cache memory unit 422 , and may further include a read-only memory unit (ROM) 423 .
[0213] The storage unit 420 may also include a program / utility 424 having a set (at least one) of program modules 425, such program modules 425 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.
[0214] Bus 430 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.
[0215] The electronic device 400 may also communicate with one or more external devices 470 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 400, and / or communicate with any device that enables the electronic device 400 to communicate with one or more other computing devices (e.g., routers, modems, etc.). This communication may be performed through an input / output (I / O) interface 450. In addition, the electronic device 400 may also communicate with one or more networks (e.g., local area networks (LANs), wide area networks (WANs), and / or public networks, such as the Internet) through a network adapter 460. As shown, the network adapter 460 communicates with other modules of the electronic device 400 through a bus 430. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 400, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems, etc.
[0216] Through the description of the above embodiments, it is easy for those skilled in the art to understand that the exemplary embodiments described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the embodiment of the present invention can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a terminal device, or a network device, etc.) to execute the method according to the embodiment of the present invention.
[0217] In an exemplary embodiment of the present invention, a computer-readable storage medium is also provided, on which a program product capable of implementing the above method of the present invention is stored. In some possible embodiments, various aspects of the present invention can also be implemented in the form of a program product, which includes a program code, and when the program product is run on a terminal device, the program code is used to enable the terminal device to perform the steps of various exemplary embodiments of the present invention described in the above "Exemplary Method" section of the present invention.
[0218] refer to Figure 5 As shown, a program product 500 for implementing the above-mentioned underground pipeline detection method according to an embodiment of the present invention is described, which can adopt a portable compact disk read-only memory (CD-ROM) and include program code, and can be run on a terminal device, such as a personal computer. However, the program product of the present invention is not limited thereto. In the present invention, the readable storage medium can be any tangible medium containing or storing a program, which can be used by or in combination with an instruction execution system, an apparatus or a device.
[0219] The program product may use any combination of one or more readable storage media. The readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples of readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof.
[0220] Program code for performing the operations of the present invention may be written in any combination of one or more programming languages, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In the case of a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., via the Internet using an Internet service provider).
[0221] In addition, the above-mentioned figures are only schematic illustrations of the processes included in the method according to an exemplary embodiment of the present invention, and are not intended to be limiting. It is easy to understand that the processes shown in the above-mentioned figures do not indicate or limit the time sequence of these processes. In addition, it is also easy to understand that these processes can be performed synchronously or asynchronously, for example, in multiple modules.
[0222] Through the description of the above embodiments, it is easy for those skilled in the art to understand that the exemplary embodiments described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the embodiment of the present invention can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a touch terminal, or a network device, etc.) to execute the method according to the embodiment of the present invention.
[0223] Other embodiments of the invention will readily occur to those skilled in the art after considering the specification and practicing the invention disclosed herein. The invention is intended to cover any variations, uses, or adaptations of the invention that follow the general principles of the invention and include common knowledge or customary techniques in the art not disclosed herein. The specification and examples are to be considered exemplary only, and the true scope and spirit of the invention are indicated by the claims.
[0224] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.
Claims
1. A method for optimizing the delivery curve of the Shagohuang new energy base, characterized in that: The method for optimizing the transmission curve of the Shagohuang new energy base includes: S1: Obtain wind and solar power output data in the sending area, supporting power resource characteristics and receiving grid requirements; S2: establishing a set of solutions including different power configurations according to the wind and solar power output data of the sending-end area, the characteristics of supporting power resources and the needs of the receiving-end power grid; S3: adjusting the objective function based on whether the current solution can obtain the power shortage process of the receiving-end power grid, and establishing a power transmission curve optimization model based on the objective function; S4: solving the power transmission curve optimization model to obtain a solution of the current solution, wherein the solution of the current solution includes an optimized power transmission curve, power supply configuration, and operation economic indicators corresponding to the current solution; S5: Repeat S3 and S4 until all solutions of the solution set are traversed to obtain a solution set of the solution set; S6: Determine whether there is an optimal solution in the solution set, if so, output the optimal solution; otherwise, return to S2; Before establishing the transmission curve optimization model, the transmission curve optimization method of the Shagohuang new energy base further includes: Establishing a constraint model of the objective function; The constraint model includes a base power output sub-model, The base power output sub-model includes: System constraints, used to ensure that system supply and demand are balanced; Plant constraints, which are used to ensure that the plant operates within physical and technical limits; Wind and PV plant constraints to ensure that wind and PV plant output forecasts match actual generation potential; and Pumped storage power plant constraints, which are used to ensure the water balance, energy conversion efficiency, and mutual exclusion of operation modes of the pumped storage power plant; The constraint model also includes a DC transmission operation sub-model. The DC transmission operation sub-model includes: DC constant operation time constraint is used to ensure the stability and economy of DC system operation; DC ramp constraint, used to limit the adjustment speed of DC power transmission; The DC transmission channel capacity limit is used to ensure that the DC transmission power does not exceed the design capacity of the DC channel in any period of time; The minimum utilization hours constraint of DC channels is used to ensure the economic benefits of DC transmission facility investment; Renewable energy power generation ratio constraint, used to ensure that the total power generation ratio of renewable energy power generation is not less than the preset ratio; and The maximum allowable power shortage rate constraint is used to limit the power shortage ratio of the base relative to the power transmission curve; S3 includes: Determine whether the current solution can obtain the power shortage process of the receiving-end power grid; If so, the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, maximize the amount of power delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power delivery curve and the electricity price and load changes of the receiving power grid; Otherwise, the objective function is to minimize the amount of renewable energy curtailment and thermal power fuel costs, and maximize the matching degree between the transmission curve and the time-of-use electricity price and load changes of the receiving power grid; A power transmission curve optimization model is established based on the objective function.
2. The method for optimizing the delivery curve of the Shagohuang new energy base according to claim 1 is characterized in that: When the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power, maximize the amount of power delivered to meet the power shortage of the receiving power grid, and maximize the matching degree between the power delivery curve and the electricity price and load changes of the receiving power grid, the objective function is: in, for Time period, For the A thermal power station, For thermal power plants exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; For wind farms k exist Grid-connected output during the time period; For photovoltaic power plants m exist Grid-connected output during the time period; For wind farms k exist Power generation output during the time period; For photovoltaic power plants m exist Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power transmission during the period, The receiving-end power grid is short of electricity; The weight used to measure the matching degree between the transmission curve and the power shortage of the receiving power grid; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
3. The method for optimizing the delivery curve of the Shagohuang new energy base according to claim 1 is characterized in that: When the objective function is to minimize the amount of abandoned renewable energy and the fuel cost of thermal power and maximize the matching degree between the transmission curve and the time-of-use electricity price and load change of the receiving power grid, the objective function is: in, for Time period, For the A thermal power station, For thermal power plants exist Output during the time period; The unit fuel cost and carbon reduction cost; The unit cost of abandoned electricity from renewable energy; For wind farms k exist Grid-connected output during the time period; For photovoltaic power plants m exist Grid-connected output during the time period; For wind farms k exist Power generation output during the time period; For photovoltaic power plants m exist Power generation output during the time period; for The power shortage during the period cannot meet the power transmission curve. for The weight parameter of for The power delivered during the time period; The weight is used to measure the matching degree between the transmission curve and the electricity price of the receiving grid and the typical daily load change trend. for -1 period of power transmission.
4. A device based on the method for optimizing the transmission curve of the Shagohuang new energy base according to any one of claims 1 to 3, characterized in that: The device comprises: A data acquisition module, which is used to obtain wind and solar power output data in the sending area, supporting power resource characteristics and receiving end power grid requirements; A scheme establishment module, the scheme establishment module is used to establish a set of schemes including different power supply configurations according to the power supply resource characteristics and the receiving end power grid requirements; A model building module, the model building module is used to adjust the objective function based on whether the current solution can obtain the power shortage process of the receiving-end power grid, and establish a power transmission curve optimization model based on the objective function; A model solving module, the model solving module is used to solve all the power transmission curve optimization models in the scheme set to obtain a solution set of the scheme set, wherein the solution set of the scheme set includes solutions of all current schemes in the scheme set, and the solution of the current scheme includes the optimized power transmission curve, power supply configuration and operation economic indicators corresponding to the current scheme; A judgment module is used to judge whether there is an optimal solution in the solution set.
5. An electronic device, comprising: processor; as well as A memory having computer-readable instructions stored thereon, wherein the computer-readable instructions, when executed by the processor, implement the method for optimizing the delivery curve of the Shagohuang new energy base as described in any one of claims 1 to 3.
6. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for optimizing the transmission curve of the Shagohuang new energy base as described in any one of claims 1 to 3 is implemented.