A modular design-based high-stability pipe support for nuclear power plants
By using modular design and quick-assembly components for pipe supports and hangers, the problem of inconvenient installation and disassembly of supports and hangers in existing technologies has been solved, enabling convenient installation and disassembly and improving the working efficiency of nuclear power plants.
Patent Information
- Application Number
- CN202410469359.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-04-18
AI Technical Summary
The existing nuclear power plant supports are fixed by expansion bolts, which makes disassembly and replacement inconvenient, increases the difficulty of operation, and reduces work efficiency.
The modular design of the pipe supports and hangers utilizes quick-assembly components, including connecting frames, support legs, mounting boxes, and threaded rods, to achieve convenient installation and disassembly of the supports and hangers through bolt-mounted installation and quick-assembly components.
It enables quick assembly and disassembly of supports and hangers, reduces the difficulty of operation for operators, and improves work efficiency.
Smart Images

Figure CN118257910B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of pipe support technology, specifically a high-stability pipe support for nuclear power plants based on modular design. Background Technology
[0002] A power plant that uses nuclear energy to generate electricity is called a nuclear power plant. A nuclear power plant is a power facility that uses the heat energy generated by one or more nuclear reactors to generate electricity, or to generate electricity and provide heat. Nuclear power plants have many pipes inside, which requires a large number of supports and hangers for installation. Supports and hangers are a collective term for brackets and hangers. They play a role in various construction stages by bearing the weight of various components and their media, restraining and limiting unreasonable displacement of building components, and controlling component vibration. They are extremely important for the safe operation of building facilities. Existing supports and hangers are usually fixed to the building with expansion bolts. Expansion bolts require drilling when fixing and are difficult to remove when disassembling, making it very inconvenient to disassemble and replace supports and hangers. This increases the difficulty of operation for operators and reduces work efficiency. Summary of the Invention
[0003] In view of the above situation and to overcome the defects of the prior art, the present invention provides a highly stable pipe support for nuclear power plants based on modular design, which effectively solves the problem that the existing supports are usually fixed to the building by expansion bolts, making it very inconvenient to disassemble and replace the supports.
[0004] To achieve the above objectives, the present invention provides the following technical solution: a high-stability pipeline support for nuclear power plants based on modular design, comprising a connecting frame, four support legs movably mounted on the top of the connecting frame by bolts, each of the four support legs having a connection hole on its top, an installation box inside the connecting frame, a connecting frame fitted on the surface of the connecting frame, an installation frame movably mounted on the bottom of the connecting frame by bolts, a quick-release assembly between the connecting frame and the installation box, first threaded sleeves fixedly mounted on both sides of the installation frame, each first threaded sleeve having a first threaded rod threadedly connected inside, a first handwheel fixedly mounted on the ends of the two first threaded rods that are far apart from each other, clamps rotatably mounted on the ends of the two first threaded rods that are far apart from each other, sliding rods fixedly mounted on both ends of the two clamps that are far apart from each other, sliding sleeves fitted on the surface of the sliding rods, and the sliding sleeves fixedly connected to the inner wall of the installation frame.
[0005] Preferably, slots are provided on both sides of the bottom of the connecting frame, and blocks are fixedly installed on both sides of the top of the connecting frame, with the two blocks matching the two slots.
[0006] Preferably, the quick-assembly assembly includes a mounting box and a second sprocket. The mounting box is fixedly mounted on the rear side of the mounting housing, and the second sprocket is rotatably mounted on the top of the mounting housing. A mounting block is fixedly mounted on the lower part of one side of the mounting box, and a worm gear is rotatably mounted on the top of the mounting block. A second handwheel is fixedly mounted on the top of the worm gear. A worm wheel is meshed with one side of the worm gear, and a first shaft is fixedly mounted on one side of the worm wheel. One end of the first shaft extends into the interior of the mounting box and is fixedly mounted with a first bevel gear. Second sliders are fixedly mounted on both sides of the mounting housing, and second grooves are provided on the inner walls of both sides of the connecting frame. Two second sliders are installed inside the two second grooves.
[0007] Preferably, a first bushing is rotatably mounted on the surface of the first shaft, and the surface of the first bushing is fixedly mounted on one side of the mounting box. A second shaft is fixedly mounted on one side of the first bevel gear, and a second bushing is rotatably mounted on the surface of the second shaft. The surface of the second bushing is fixedly mounted on the rear side of the mounting box. One end of the second shaft extends into the interior of the mounting box and is fixedly mounted with a pusher wheel. One side of the pusher wheel is rotatably connected to the inner wall of the mounting box via a rotating shaft.
[0008] Preferably, the lower part of the pushing wheel is closely attached to the pad, the bottom of the pad is fixedly installed with a connecting plate, both sides of the connecting plate are fixedly installed with fixing rods, the ends of the two fixing rods that are far apart from each other are fixedly installed with positioning sleeves, both sides of the inner wall of the mounting box are provided with mounting grooves, the inside of the mounting grooves are fixedly installed with positioning rods, the two positioning sleeves are fitted on the surface of the two positioning rods, the surface of the positioning rods is provided with springs, the top and bottom of the springs are fixedly connected to the positioning sleeves and the bottom wall of the mounting grooves respectively.
[0009] Preferably, a connecting block is fixedly installed at the bottom of the connecting plate, a transmission rod is rotatably installed on both sides of the connecting block, a limit block is rotatably installed at the bottom of the transmission rod, a first slider is fixedly installed at the bottom of the limit block, and two first sliding grooves are opened on the bottom wall of the mounting box, and two first sliders are installed inside the two first sliding grooves.
[0010] Preferably, the upper side of the first bevel gear is meshed with a second bevel gear, the top of the second bevel gear is fixedly mounted with a third shaft, the lower part of the surface of the third shaft is rotatably mounted with a third bushing, and the third bushing is fixedly mounted on the top of the mounting box.
[0011] Preferably, a fourth bushing is rotatably mounted on the upper part of the surface of the third shaft, a connecting rod is fixedly mounted on the surface of the fourth bushing, one end of the connecting rod is fixedly connected to the mounting box, and a first sprocket is fixedly mounted on the top of the third shaft.
[0012] Preferably, a chain is meshed between the first sprocket and the second sprocket, a second threaded rod is fixedly installed on the top of the second sprocket, a second threaded sleeve is threadedly connected to the surface of the second threaded rod, and the second threaded sleeve is fixedly installed on the top of the connecting frame.
[0013] Compared with the prior art, the beneficial effects of the present invention are:
[0014] (1) Before use, the operator fixes the support leg to the building by using the expansion bolts and connecting holes, so that the connecting frame can be fixed to the building. When installing the mounting frame, the operator puts the connecting frame on the surface of the mounting box, and then the operator rotates the second handwheel in the forward direction to drive the worm gear to rotate. When the worm gear rotates, it drives the first shaft to rotate along the inside of the first shaft sleeve through the worm wheel. When the first shaft rotates, it drives the second shaft to rotate along the inside of the second shaft sleeve through the first bevel gear. When the second shaft rotates, it drives the pusher wheel to rotate and pushes the pad block to move down.
[0015] When the pad moves downward, it drives the two positioning sleeves to slide along the surfaces of the two positioning rods via the connecting plate and two fixing rods, and simultaneously compresses the spring. When the connecting plate moves downward, it drives the connecting block to move downward. When the connecting block moves downward, it pushes the two limiting blocks to move backward through the two transmission rods. When the two limiting blocks move, they slide along the inside of the first slide groove via the first slider, which increases the stability of the two limiting blocks when they move. When the two limiting blocks move backward, they will move to the outside of the mounting box, thereby limiting the connecting frame.
[0016] When the first bevel gear rotates, it drives the third shaft to rotate along the inside of the third and fourth bushings via the second bevel gear. The rotation of the third shaft drives the first sprocket to rotate, which in turn drives the second sprocket to rotate via a chain. The rotation of the second sprocket drives the second threaded rod to rotate inside the second threaded sleeve, thereby moving the mounting box upwards. As the mounting box moves, it drives the second slider to slide along the inside of the second groove, increasing the stability of the mounting box during movement. Because the thread pitch of the second threaded rod is small, the movement speed of the second threaded sleeve is slow, which allows the two limit blocks to move faster than the mounting box. When the mounting box moves upwards, the two limit blocks can squeeze the connecting frame tightly against the bottom of the connecting frame, and at the same time drive the two locking blocks to engage with the inside of the two locking slots for limiting; thus, the installation is completed quickly.
[0017] (2) When disassembling, the operator rotates the second handwheel in the opposite direction to lower the mounting box and loosen the connecting frame, so that the two clamps exit the two slots and the two limit blocks are retracted into the mounting box, thereby quickly releasing the limit and completing the disassembly, which makes it easier for the operator to disassemble and assemble the mounting frame; when installing the pipe, the operator inserts the pipe into the mounting frame, and then the operator rotates the two first handwheels to move the two first threaded rods along the inside of the two first threaded sleeves into the mounting frame. When the two first threaded rods move, they drive the clamps to move into the mounting frame. When the clamps move, they drive the sliding rods to slide along the inside of the sliding sleeve, which increases the stability of the clamps when they move. When the clamps move into the mounting frame, they clamp and fix the pipe, thereby quickly completing the installation of the pipe;
[0018] (3) This makes it very convenient to disassemble and replace this hanger, thereby reducing the difficulty of operation for operators and improving work efficiency. Attached Figure Description
[0019] The accompanying drawings are provided to further illustrate the invention and form part of the specification. They are used together with the embodiments of the invention to explain the invention and do not constitute a limitation thereof.
[0020] In the attached diagram:
[0021] Figure 1 This is a front view schematic diagram of the high-stability pipeline support and hanger for nuclear power plants based on modular design, as per the present invention.
[0022] Figure 2 This is a cross-sectional view of the high-stability pipeline support and hanger for nuclear power plants based on the modular design of the present invention.
[0023] Figure 3 For the present invention Figure 2 Schematic diagram of the enlarged local structure Figure 1 ;
[0024] Figure 4 This is a side sectional view of the mounting box of the present invention;
[0025] Figure 5 For the present invention Figure 2 Schematic diagram of the enlarged local structure Figure 2 ;
[0026] Figure 6 For the present invention Figure 5 A partially enlarged structural diagram;
[0027] Figure 7 For the present invention Figure 6 A schematic diagram of the cross-sectional structure;
[0028] In the diagram: 1. Connecting frame; 2. Support leg; 3. Connecting hole; 4. Connecting bracket; 5. Mounting frame; 6. First threaded sleeve; 7. First threaded rod; 8. First handwheel; 9. Sliding sleeve; 10. Clamp; 11. Sliding rod; 12. Clamping block; 13. Mounting box; 14. Mounting housing; 15. Mounting block; 16. Worm gear; 17. Second handwheel; 18. Worm gear; 19. First shaft; 20. First bushing; 21. First bevel gear; 22. Second shaft; 23. Second bushing; 24. Pushing wheel; 25. Transmission rod; 26. 1. Pad; 27. Connecting plate; 28. Fixing rod; 29. Positioning sleeve; 30. Positioning rod; 31. Spring; 32. Mounting groove; 33. Connecting block; 34. First slider; 35. Limiting block; 36. First slide groove; 37. Slot; 38. Second slider; 39. Second slide groove; 40. Third shaft; 41. Third bushing; 42. Fourth bushing; 43. Connecting rod; 44. First sprocket; 45. Second sprocket; 46. Chain; 47. Second threaded rod; 48. Second threaded sleeve; 49. Second bevel gear. Detailed Implementation
[0029] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without creative effort are within the scope of protection of the present invention.
[0030] Example 1, by Figures 1 to 7The present invention includes a connecting frame 1, with four support legs 2 movably mounted on the top of the connecting frame 1 via bolts. The connecting frame 1 and the four support legs 2 are divided into different modules, which can be separated by bolts for easy transportation. Each of the four support legs 2 has a connecting hole 3 on its top. An installation box 13 is provided inside the connecting frame 1. A connecting frame 4 is fitted onto the surface of the connecting frame 1. An installation frame 5 is movably mounted on the bottom of the connecting frame 4 via bolts. The connecting frame 4 and the installation frame 5 are divided into different modules, which can be separated by bolts for easy transportation. A connection is provided between the connecting frame 1 and the installation box 13. The mounting frame 5 has a quick-assembly and disassembly assembly. First threaded sleeves 6 are fixedly installed on both sides of the mounting frame 5. First threaded rods 7 are threadedly connected to the inside of each first threaded sleeve 6. First handwheels 8 are fixedly installed at the ends of the two first threaded rods 7 that are far apart from each other. Clamps 10 are rotatably installed at the ends of the two clamps 10 that are far apart from each other. Slide rods 11 are fixedly installed at both ends of the two clamps 10 that are far apart from each other. Slide sleeves 9 are fitted onto the surface of each slide rod 11. Slide sleeves 9 are fixedly connected to the inner wall of the mounting frame 5. Slots 37 are opened on both sides of the bottom of the connecting frame 1. Blocks 12 are fixedly installed on both sides of the top of the connecting bracket 4. The two blocks 12 match the two slots 37.
[0031] Before use, the operator uses expansion bolts and connecting holes 3 to fix the support leg 2 to the building, thus fixing the connecting frame 1 to the building. When installing the mounting frame 5, the operator places the connecting bracket 4 onto the surface of the mounting box 13. Then, the operator adjusts the quick-release assembly in the forward direction. When the quick-release assembly rotates in the forward direction, it limits the connecting bracket 4. After the connecting bracket 4 is limited, the continuous operation of the quick-release assembly will drive the mounting box 13 to move upward. When the mounting box 13 moves upward, it squeezes the connecting bracket 4 tightly against the bottom of the connecting frame 1, and at the same time, it drives the two locking blocks 12 to engage with the two locking slots 37 for limiting. Thus, the installation is completed quickly. When disassembling, the operator adjusts the quick-release assembly in the reverse direction. When the quick-release assembly rotates in the reverse direction, it drives the mounting box 13 to move downward and release the connecting bracket 4, so that the two locking blocks 12 can engage with the two locking slots 37 for limiting. The two slots 37 are removed from the interior, and the limiting of the connecting bracket 4 is released, thereby quickly releasing the limiting and completing the disassembly, which facilitates the operator's disassembly and assembly of the mounting frame 5. When installing the pipe, the operator inserts the pipe into the mounting frame 5, and then the operator turns the two first handwheels 8 to move the two first threaded rods 7 along the inside of the two first threaded sleeves 6 into the mounting frame 5. When the two first threaded rods 7 move, they drive the clamps 10 to move into the mounting frame 5. When the clamps 10 move, they drive the sliding rods 11 to slide along the inside of the sliding sleeves 9, which increases the stability of the clamps 10 when they move. When the clamps 10 move into the mounting frame 5, they clamp and fix the pipe, thereby quickly completing the pipe installation. This makes the disassembly and replacement of this hanger very convenient, thereby reducing the difficulty of operation for the operator and improving work efficiency.
[0032] In Example 2, based on Example 1, the quick-assembly assembly includes a mounting box 14 and a second sprocket 45. The mounting box 14 is fixedly mounted on the rear side of the mounting housing 13. The second sprocket 45 is rotatably mounted on the top of the mounting housing 13. A mounting block 15 is fixedly mounted on the lower part of one side of the mounting box 14. A worm gear 16 is rotatably mounted on the top of the mounting block 15. A second handwheel 17 is fixedly mounted on the top of the worm gear 16. A worm wheel 18 is meshed with one side of the worm gear 16. A first shaft 19 is fixedly mounted on one side of the worm wheel 18. One end of the first shaft 19 extends to the mounting box 14. The first bevel gear 21 is fixedly installed inside the mounting box 13. Second sliders 38 are fixedly installed on both sides of the mounting box 13. Second grooves 39 are formed on the inner walls of both sides of the connecting frame 1, and the two second sliders 38 are installed inside the two second grooves 39. A first bushing 20 is rotatably mounted on the surface of the first shaft 19, and the surface of the first bushing 20 is fixedly mounted on one side of the mounting box 14. A second shaft 22 is fixedly mounted on one side of the first bevel gear 21, and a second bushing 23 is rotatably mounted on the surface of the second shaft 22. The surface of the second bushing 23 is fixedly mounted on the mounting box 13. On the rear side, one end of the second shaft 22 extends into the interior of the mounting box 13 and is fixedly mounted with a pushing wheel 24. One side of the pushing wheel 24 is rotatably connected to the inner wall of the mounting box 13 via a rotating shaft. The lower part of the pushing wheel 24 is in close contact with a pad 26. A connecting plate 27 is fixedly mounted on the bottom of the pad 26. Fixing rods 28 are fixedly mounted on both sides of the connecting plate 27. Positioning sleeves 29 are fixedly mounted on the ends of the two fixing rods 28 that are far apart from each other. Mounting grooves 32 are opened on both sides of the inner wall of the mounting box 13. Positioning rods 30 are fixedly mounted inside the mounting grooves 32. The two positioning sleeves 29 are fixedly mounted on the inner walls of the mounting box 13. Nine sleeves are fitted on the surfaces of two positioning rods 30. Each positioning rod 30 is provided with a spring 31. The top and bottom of the spring 31 are respectively fixedly connected to the positioning sleeve 29 and the bottom wall of the mounting groove 32. A connecting block 33 is fixedly installed on the bottom of the connecting plate 27. A transmission rod 25 is rotatably installed on both sides of the connecting block 33. A limit block 35 is rotatably installed on the bottom of the transmission rod 25. A first slider 34 is fixedly installed on the bottom of the limit block 35. Two first sliding grooves 36 are opened on the bottom wall of the mounting box 13. The two first sliders 34 are installed inside the two first sliding grooves 36.
[0033] A second bevel gear 49 is meshed with the upper side of the first bevel gear 21. A third shaft 40 is fixedly installed on the top of the second bevel gear 49. A third bushing 41 is rotatably installed on the lower part of the surface of the third shaft 40. The third bushing 41 is fixedly installed on the top of the mounting box 14. A fourth bushing 42 is rotatably installed on the upper part of the surface of the third shaft 40. A connecting rod 43 is fixedly installed on the surface of the fourth bushing 42. One end of the connecting rod 43 is fixedly connected to the mounting box 13. A first sprocket 44 is fixedly installed on the top of the third shaft 40. A chain 46 meshes between the first sprocket 44 and the second sprocket 45. A second threaded rod 47 is fixedly installed on the top of the second sprocket 45. A second threaded sleeve 48 is threadedly connected to the surface of the second threaded rod 47. The second threaded sleeve 48 is fixedly installed on the top of the connecting frame 1.
[0034] During installation, the operator rotates the second handwheel 17 clockwise, causing the worm gear 16 to rotate. The rotation of the worm gear 16, via the worm wheel 18, causes the first shaft 19 to rotate along the inside of the first bushing 20. The rotation of the first shaft 19, via the first bevel gear 21, causes the second shaft 22 to rotate along the inside of the second bushing 23. The rotation of the second shaft 22 causes the pushing wheel 24 to rotate, pushing the pad 26 downwards. As the pad 26 moves downwards, it causes the two positioning sleeves 29 to slide along the surfaces of the two positioning rods 30 via the connecting plate 27 and the two fixing rods 28, simultaneously compressing the spring 31. As the connecting plate 27 moves downwards, it causes the connecting block 33 to move downwards. As the connecting block 33 moves downwards, it pushes the two limiting blocks 35 backwards via the two transmission rods 25. Both limiting blocks 35 slide along the inside of the first slide groove 36 via the first slider 34, increasing the stability of the two limiting blocks 35 during movement. When the two limiting blocks 35 move backwards, they will move to... The mounting box 13 is positioned outside to limit the connecting frame 4. When the first bevel gear 21 rotates, it drives the third shaft 40 to rotate along the inside of the third bushing 41 and the fourth bushing 42 via the second bevel gear 49. When the third shaft 40 rotates, it drives the first sprocket 44 to rotate. The first sprocket 44 drives the second sprocket 45 to rotate via the chain 46. When the second sprocket 45 rotates, it drives the second threaded rod 47 to rotate inside the second threaded sleeve 48. This can drive the mounting box 13 to move upward. When the mounting box 13 moves, it drives the second slider 38 to slide along the inside of the second slide groove 39, which increases the stability of the mounting box 13 when it moves. Because the thread pitch of the second threaded rod 47 is small, the movement speed of the second threaded sleeve 48 is slow. This allows the two limiting blocks 35 to move faster than the mounting box 13. When the mounting box 13 moves upward, the connecting frame 4 can be squeezed tightly to the bottom of the connecting frame 1 by the driving of the two limiting blocks 35.
[0035] During disassembly, the operator rotates the second handwheel 17 in the opposite direction, causing the mounting box 13 to move down. As the mounting box 13 moves down, it causes the two limit blocks 35 to move down and release the connecting frame 4. The two limit blocks 35 are then retracted into the interior of the mounting box 13, thereby quickly releasing the limit and completing the disassembly, making it easier for the operator to disassemble and assemble the mounting frame 5.
[0036] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0037] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A high-stability pipe support for nuclear power plants based on modular design, comprising a connecting frame (1), characterized in that: The top of the connecting frame (1) is movably mounted with four support legs (2) by bolts. Each of the four support legs (2) has a connecting hole (3) at its top. The connecting frame (1) has an installation box (13) inside. The surface of the connecting frame (1) is fitted with a connecting frame (4). The bottom of the connecting frame (4) is movably mounted with an installation frame (5) by bolts. A quick disassembly assembly is provided between the interior of the connecting frame (1) and the installation box (13). Both sides of the installation frame (5) are fixedly mounted with first threaded sleeves (6). The interior of each first threaded sleeve (6) is threadedly connected with a first threaded rod (7). The ends of the two first threaded rods (7) that are far apart from each other are fixedly mounted with first handwheels (8). The ends of the two first threaded rods (7) that are close to each other are rotatably mounted with clamps (10). The bottom of the connecting frame (1) is provided with slots (37) on both sides, and the top of the connecting frame (4) is fixedly installed with blocks (12) on both sides, and the blocks (12) match the slots (37). The quick-release assembly includes a mounting box (14) and a second sprocket (45). The mounting box (14) is fixedly mounted on the rear side of the mounting box (13). The second sprocket (45) is rotatably mounted on the top of the mounting box (13). A mounting block (15) is fixedly mounted on the lower part of one side of the mounting box (14). A worm gear (16) is rotatably mounted on the top of the mounting block (15). A second handwheel (17) is fixedly mounted on the top of the worm gear (16). A worm wheel (18) is meshed on one side of the worm gear (16). A first shaft (19) is fixedly mounted on one side of the worm wheel (18). The other end of the first shaft (19) extends into the interior of the mounting box (14) and is fixedly mounted with a first bevel gear (21). A first bushing (20) is rotatably mounted on the surface of the first shaft (19). The surface of the first bushing (20) is fixedly mounted on one side of the mounting box (14). A second shaft (22) is fixedly mounted on the other side of the first bevel gear (21). A second bushing (23) is rotatably mounted on the surface of the second shaft (22). The surface of the second bushing (23) is fixedly mounted on the rear side of the mounting box (13). The other end of the second shaft (22) extends into the interior of the mounting box (13) and is fixedly mounted with a pusher wheel (24). The other side of the pusher wheel (24) is rotatably connected to the inner wall of the mounting box (13) through a rotating shaft. The lower part of the pusher (24) is closely attached to the pad (26), and the bottom of the pad (26) is fixedly installed with a connecting plate (27). A connecting block (33) is fixedly installed at the bottom of the connecting plate (27). A transmission rod (25) is rotatably installed on both sides of the connecting block (33). A limit block (35) is rotatably installed at the bottom of the transmission rod (25). A first slider (34) is fixedly installed at the bottom of the limit block (35). Two first grooves (36) are opened on the bottom wall of the mounting box (13). Two first sliders (34) are installed inside the two first grooves (36). When the two limit blocks (35) move to the outside of the mounting box (13), they limit the connecting frame (4). The upper side of the first bevel gear (21) is meshed with the second bevel gear (49), the top of the second bevel gear (49) is fixedly mounted with the third shaft (40), the lower part of the surface of the third shaft (40) is rotatably mounted with the third bushing (41), and the third bushing (41) is fixedly mounted on the top of the mounting box (14). The first sprocket (44) is fixedly installed on the top of the third shaft (40); A chain (46) is meshed between the first sprocket (44) and the second sprocket (45). A second threaded rod (47) is fixedly installed on the top of the second sprocket (45). A second threaded sleeve (48) is threadedly connected to the surface of the second threaded rod (47). The second threaded sleeve (48) is fixedly installed on the top of the connecting frame (1).
2. The high-stability pipe support for nuclear power plants based on modular design according to claim 1, characterized in that: Two clamps (10) are fixedly installed with slide rods (11) at both ends on opposite sides. Slide sleeves (9) are fitted on the surface of the slide rods (11) and are fixedly connected to the inner wall of the mounting frame (5).
3. The high-stability pipe support for nuclear power plants based on modular design according to claim 1, characterized in that: The mounting box (13) is fixedly installed with second sliders (38) on both sides, and the inner walls of both sides of the connecting frame (1) are provided with second slide grooves (39). The two second sliders (38) are installed inside the two second slide grooves (39).
4. A high-stability pipe support for nuclear power plants based on modular design according to claim 1, characterized in that: Fixing rods (28) are fixedly installed on both sides of the connecting plate (27). Positioning sleeves (29) are fixedly installed at the ends of the two fixing rods (28) that are far apart from each other. Mounting grooves (32) are opened on both sides of the inner wall of the mounting box (13). Positioning rods (30) are fixedly installed inside the mounting grooves (32). Two positioning sleeves (29) are fitted on the surface of the two positioning rods (30). Springs (31) are provided on the surface of the positioning rods (30). The top and bottom of the springs (31) are fixedly connected to the positioning sleeves (29) and the bottom wall of the mounting grooves (32), respectively.
5. A high-stability pipe support for nuclear power plants based on modular design according to claim 1, characterized in that: A fourth bushing (42) is rotatably mounted on the upper part of the surface of the third shaft (40), and a connecting rod (43) is fixedly mounted on the surface of the fourth bushing (42). One end of the connecting rod (43) is fixedly connected to the mounting box (13).
Citation Information
Patent Citations
Module design-based lightweight support hanger for industrial plant
CN117537178A
A high-stability constant force support for nuclear power systems
CN215215052U
