Prestressing and local corrosion test device and method for reinforced concrete specimens

By designing a device including a mold, a prestressing mechanism and a corrosion groove model, the existing problems of prestressing and local corrosion testing of reinforced concrete specimens are solved, and the structure is simple, easy to disassemble and assemble, and prestressing is achieved. The effectiveness ensures the corrosion groove formation of the specimen and the reliability of the test.

CN118258748BActive Publication Date: 2024-10-18QINGDAO UNIV OF TECH +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410359739.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-10-18
Estimated Expiration
2044-03-27

AI Technical Summary

Technical Problem

The existing prestressed device for reinforced concrete specimens cannot carry out concrete pouring and local corrosion testing of steel bars in prestressed concrete. It also has the problems of being bulky, requiring large construction operation space, and being inconvenient to disassemble and assemble.

Method used

A device including a mold, a prestressing mechanism and a corrosion groove model is designed. Prestressing is applied to the steel bars through a through-type jack and an anchoring mechanism, and a corrosion groove model is set up in the mold to conduct local corrosion tests. The structure is simple and easy to dismantle. Easy to install.

Benefits of technology

It effectively reduces the prestress loss caused by the bonding force between steel bars and concrete specimens, ensures the prestress application of reinforced concrete specimens and the formation of corrosion grooves, facilitates local corrosion testing, and makes the device structure safe and reliable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118258748B_ABST
    Figure CN118258748B_ABST
Patent Text Reader

Abstract

The invention discloses a device and method for applying prestress to reinforced concrete specimens and testing local corrosion, and belongs to the technical field of reinforced concrete specimen testing. The device comprises a mold, wherein the mold comprises two oppositely arranged side molds, the bottom of the side molds is fixedly connected to the bottom mold, a force transmission plate is arranged between the ends of the two side molds, a reaction force frame is arranged outside the two side molds, steel bars pass through the reaction force frame and the force transmission plate, and prestress is applied to the steel bars by a prestress applying mechanism; a corrosion groove model is fixedly arranged on the surface of the bottom mold.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of reinforced concrete specimen testing, and in particular relates to a reinforced concrete specimen prestressing and local corrosion testing device and method. Background Art

[0002] The statements herein merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] Prestressed high-strength concrete pipe piles (PHC pipe piles) are a kind of precast concrete components made by adopting the pre-stressed centrifugal forming process and undergoing steam curing at a certain pressure and temperature. Common PHC pipe piles are generally hollow cylindrical. Due to their superior mechanical properties, resource saving and easy production, they can be used in many fields.

[0004] Compared with ordinary concrete, PHC piles are made through special processes such as prestressing, centrifugation, and steam curing, which make them have the characteristics of high density, low permeability, and high strength. However, due to the unevenness of concrete materials, the discreteness of the thickness of the protective layer, and the complexity of the service environment, the steel corrosion process inside the concrete has a certain randomness. Therefore, with the occurrence and development of prestressed steel corrosion, the unevenness of the steel cross section increases, and the mechanical properties and variability increase, resulting in a significant increase in the failure probability of PHC piles.

[0005] The steel bar corrosion inside the PHC pipe pile is very different from that of ordinary concrete. Therefore, it is necessary to break the pipe pile specimens to remove the steel bars so as to study the mechanical properties and geometric characteristics of the rusted steel bars. Due to the high strength and other characteristics of the actual pipe piles themselves, there will be great resistance to the breaking process, and there are problems such as the pipe pile specimens cannot be placed on the pressure testing machine and the cross-sectional characteristics of the rusted steel bars are damaged.

[0006] To this end, Chinese patent application 201910740788.2 discloses a prestressing device and reinforcement method for near-surface reinforcement bars of reinforced concrete beams, including a prestressing anchor, a through-type jack, a positioning force transmission plate, a jack anchor and a pressure sensor. The prestressing anchor is fixed on the reinforcement bar to be installed, and the anchor plate is fixed at the bottom of the reinforced concrete beam to form a basic installation structure for the reinforcement bar to be installed. The above-disclosed prestressing device cannot be used for concrete pouring and local corrosion test of steel bars in prestressed concrete.

[0007] Chinese patent application 202310169064.3 discloses a local corrosion test device and method for steel strands of a concrete T-beam, including a post-tensioned prestressed concrete T-beam, a simulated corrosion zone is opened at the lower triangle of the beam, a corrosion groove is provided in the simulated corrosion zone, and the corrosion groove is installed in the simulated corrosion zone through a fixed frame. The above-mentioned local corrosion test device adopts a prestressed concrete T-beam, and a corrosion groove is directly set in the lower triangle of the beam for local corrosion testing, which has the problems of being bulky, requiring a large construction operation space, and being inconvenient to disassemble and assemble.

[0008] In addition, currently available prestressed tensioning and anchoring devices generally use external and internal tensioning to reinforce components, and the tensioning and anchoring effect is difficult to ensure, and there are disadvantages such as single technical characteristics. Summary of the invention

[0009] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a device and method for applying prestress to reinforced concrete specimens and conducting local corrosion tests. The device is used to apply prestress to reinforced concrete specimens and conduct local corrosion tests on corrosion grooves.

[0010] In order to achieve the above object, the present invention is implemented through the following technical solutions:

[0011] In the first aspect, the present invention provides a device for applying prestress and testing local corrosion of reinforced concrete specimens, including a mold, wherein the mold includes two oppositely arranged side molds, the bottom of the side molds is fixedly connected to the bottom mold, a force transfer plate is arranged between the ends of the two side molds, and a reaction frame is arranged on the outer sides of the two side molds. The steel bars pass through the reaction frame and the force transfer plate, and the steel bars are prestressed by a prestressing mechanism; a corrosion groove model is fixedly arranged on the surface of the bottom mold.

[0012] As a further technical solution, the reaction frame is a C-shaped structure, and its C-shaped open end is fixedly connected to the side mold.

[0013] As a further technical solution, the side mold is a C-shaped structure, the C-shaped opening ends of the two side molds are arranged opposite to each other, and the force transmission plate is located inside the side plate of the C-shaped structure of the side mold.

[0014] As a further technical solution, the side molds, the bottom molds and the reaction frame are provided with retaining grooves corresponding to the side molds, the reaction frame is inserted into the retaining grooves of the side molds and the bottom molds, and is fixedly connected with the side molds and the bottom molds.

[0015] As a further technical solution, the corrosion groove model includes a corrosion cavity model, which is placed in the middle of the bottom mold, and embedded groove models are arranged on both sides of the corrosion cavity model; the corrosion cavity model and the embedded groove model are both block structures, and the size of the corrosion cavity model is larger than that of the embedded groove model.

[0016] As a further technical solution, the prestressing mechanism includes a through-type jack, which is arranged on one side of the mold. The through-type jack allows steel bars to pass through the center of the through-type jack. A pressure sensor is arranged at the through-type jack, and the pressure sensor is placed between the reaction frame and the through-type jack.

[0017] As a further technical solution, a limiting plate is provided on the side of the through-type jack away from the reaction frame, and the limiting plate allows steel bars to pass through. A limiting anchor is provided on the outer side of the limiting plate to anchor the steel bars.

[0018] As a further technical solution, anchoring devices are arranged outside the reaction frame to anchor the steel bars, and one of the anchoring devices is placed between the reaction frame and the through-type jack.

[0019] As a further technical solution, a pre-tightening force transmission anchor is arranged on the outer side of the force transmission plate for the steel bars to pass through to pre-tighten the steel bars, and the side mold is provided with a groove corresponding to the pre-tightening force transmission anchor, and the pre-tightening force transmission anchor is located in the grooves of the two side molds.

[0020] In a second aspect, the present invention further provides a method for using the device as described above, comprising the following steps:

[0021] Assemble the mold, pass the steel bars through the reaction frame and force transfer plate of the mold, fasten the steel bars with anchoring tools, and pre-tighten with pre-tightening force transfer anchors;

[0022] Apply prestress to the steel bars to a preset value through a through-type jack, apply prestress by a graded tensioning method, then tighten the anchoring device and the pre-tightening force transmission anchor, remove the through-type jack, the limit plate and the anchoring device, and then cast and maintain them in the mold;

[0023] After the curing is completed, the steel bars are cut at the reaction frame, and after the reaction frame, side formwork and bottom formwork are removed, the application and installation of the prestressed steel bars of the reinforced concrete specimen can be completed;

[0024] A corrosion solution is added into the corrosion cavity formed by the corrosion groove model in the middle of the specimen, and a local corrosion test is carried out on the specimen.

[0025] The beneficial effects of the present invention are as follows:

[0026] The reinforced concrete specimen prestressing and local corrosion testing device of the present invention tensions and locks the steel bars on a mold by using a through-type jack in conjunction with an anchor; concrete is poured through the mold, and a corrosion groove is formed on the specimen after the concrete is poured and formed by using a corrosion groove model preset on the mold, and a local corrosion test is performed. The device has a simple structure, is easy to disassemble and assemble, and is safe to use.

[0027] The reinforced concrete specimen prestressing and local corrosion testing device of the present invention transmits the reaction force generated by the anchor limiting the retraction of the steel bar to the force transfer plate to apply prestress to the specimen, effectively reducing the prestress loss caused by the bonding force between the steel bar and the concrete specimen.

[0028] The reinforced concrete specimen prestressing and local corrosion testing device of the present invention takes the center of the groove of the side form (consistent with the size of the anchor) as the axis, and arranges through holes that match the diameter of the steel bar on the reaction frame and the limit plate to ensure that the steel bar and the anchor are coaxially arranged, thereby avoiding deviation caused by prestressing.

[0029] The reinforced concrete specimen prestressing and local corrosion test device of the present invention can effectively maintain the application and anchoring of the prestressing of the steel bar through the manufactured assembly mold and the set anchoring system. The corrosion groove model set at the bottom of the mold can directly form a corrosion groove on the specimen after pouring concrete, which can effectively ensure that the reinforced concrete can be subjected to local corrosion test after pouring, steaming and demolding. Finally, the reinforced concrete specimen can also be broken to study the correlation between the mechanical properties of the corroded steel bar and its geometric characteristics. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.

[0031] Figure 1 It is a schematic structural diagram of a reinforced concrete specimen prestressing and local corrosion testing device of the present invention;

[0032] Figure 2 It is a schematic diagram of the side form in the prestressing and local corrosion test device for reinforced concrete specimens of the present invention;

[0033] Figure 3 It is a schematic diagram of the bottom mold in the prestressing and local corrosion test device for reinforced concrete specimens of the present invention;

[0034] Figure 4 It is a schematic diagram of a reaction force frame in a reinforced concrete specimen prestressing and local corrosion test device of the present invention;

[0035] Figure 5 This is a three-dimensional diagram of the reinforced concrete specimen after demoulding of the present invention;

[0036] In the figure: 1-rebar, 2-reaction frame, 3-side mold, 4-bottom mold, 5-through-type jack, 6-pressure sensor, 7-anchor mechanism, 8-force transmission plate, 9-limiting plate, 10-corrosion groove model, 11-bolt hole, 12-bolt hole, 13-groove;

[0037] 7-1 anchoring anchor, 7-2 pre-tightening force transmission anchor, 7-3 pre-tightening force transmission anchor, 7-4 anchoring anchor, 7-5 limit anchor;

[0038] 10-1 embedded groove model, 10-3 embedded groove model, 10-2 corrosion cavity model.

[0039] In order to show the positions of various parts, the distances or sizes between them are exaggerated and the schematic diagram is for reference only. DETAILED DESCRIPTION

[0040] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0041] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof;

[0042] For the convenience of description, if the words "up", "down", "left" and "right" appear in the present invention, they only indicate that they are consistent with the up, down, left and right directions of the drawings themselves, and do not limit the structure. They are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it cannot be understood as a limitation on the present invention.

[0043] Terminology explanation section: If the terms "install", "connect", "connect", "fixed" and the like appear in the present invention, they should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be an internal connection between two elements, or an interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0044] In a typical embodiment of the present invention, Figure 1-Figure 4 As shown, a prestressing and local corrosion test device for reinforced concrete specimens is proposed, which includes a prestressing mechanism, an anchoring mechanism, a mold, a corrosion groove model, etc.; the corrosion groove model is placed in the mold, and the anchoring mechanism and the prestressing mechanism cooperate to anchor the steel bars and apply prestress.

[0045] Among them, the mold includes a reaction frame 2, a side mold 3, a bottom mold 4, and a force transmission plate 8. Two side molds 3 are provided, and the two side molds 3 are arranged opposite to each other. The bottom of the side mold 3 is fixedly connected to the bottom mold 4, and a force transmission plate 8 is arranged between the ends of the two side molds 3. The side mold 3, the bottom mold 4 and the force transmission plate 8 form a box-like structure with an open top.

[0046] A reaction frame 2 is fixedly arranged on the outer side of the two force transfer plates 8. The steel bar 1 passes through the reaction frame 2 and the force transfer plate 8. One end of the steel bar 1 is anchored, and the other end is prestressed by a prestress applying mechanism.

[0047] The force transfer plate 8 is provided with a hole slightly larger than the diameter of the steel bar so as to allow the steel bar to pass through and be coated with epoxy resin to isolate the steel bar from the metal mold, thereby preventing the force transfer plate and other metal parts from affecting the steel bar corrosion due to accelerated corrosion.

[0048] In this embodiment, the inside and outside are based on the mold, and the side closer to the center of the mold is the inner side, and the opposite side is the outer side.

[0049] In an optional implementation scheme, the reaction frame 2 is a C-shaped structure, and its C-shaped open end is fixedly connected to the side mold 3.

[0050] like Figure 2 As shown, the side form 3 is a C-shaped structure, the C-shaped opening ends of the two side forms are arranged opposite to each other, the lower parts of the side plates of the C-shaped structure of the two side forms are connected, and the force transfer plate 8 is located inside the side plates of the C-shaped structure of the side form. There is a gap in the middle of the side plates of the C-shaped structure of the two side forms, and the steel bar 1 passes through the force transfer plate through the gap between the side plates of the C-shaped structure of the two side forms.

[0051] The force transfer plate is taken out together with the specimen after the concrete pouring is completed. Figure 5 After the tensioning of the steel bars is completed, the pre-tightening force transmission anchors 7-2 and 7-3 apply stress to the poured reinforced concrete specimens, and not only the bonding force between the steel bars and the concrete (which will cause excessive stress loss) plays the role of prestressing. Therefore, the role of setting the force transmission plate is to make the stress on the reinforced concrete specimen not concentrated on one point of the anchor, but on the entire surface.

[0052] A clamping groove is set at the position corresponding to the side mold 3 and the reaction frame, and a clamping groove is also set at the position corresponding to the bottom mold 4 and the reaction frame. The reaction frame is inserted into the clamping grooves of the side mold and the bottom mold, and is fixedly connected with the side mold and the bottom mold by bolts. Specifically, bolt holes 11 are set in the side mold and the reaction frame, and bolts are inserted into the bolt holes 11 to fix the side mold and the reaction frame.

[0053] The side mold 3 and the bottom mold 4 are connected by clamping and fastened by bolts. Bolt holes 12 are designed on the bottom mold 4 and the side mold 3. Bolts are inserted into the bolt holes 12 to fasten the side mold 3 and the bottom mold 4. In this embodiment, bolt holes 12 are provided on the side plates of the side mold 3, and raised ear plates are provided on the sides of the bottom mold 4, and bolt holes 12 are provided on the ear plates.

[0054] In a preferred embodiment, a hanging ring is also provided on the side of the bottom mold 4, which can facilitate the movement of the bottom mold by hand. At the same time, after the mold is assembled, the position of the mold can be moved by carrying or lifting the hanging ring.

[0055] The reaction frame 2 has an opening size that is larger than the diameter of the steel bar 1 to be tensioned and smaller than the anchor of the anchor mechanism.

[0056] Among them, the prestressing mechanism includes a through-type jack 5, a pressure sensor 6, and a limit plate 9. The through-type jack 5 is arranged on one side of the mold. The through-type jack 5 is located on the outside of one of the reaction frames 2. The through-type jack 5 can allow the steel bar 1 to pass through its center, and the steel bar 1 passes through the mold. Specifically, the steel bar is passed through one of the reaction frames 2 of the mold, one of the force transmission plates 8, another force transmission plate 8, and another reaction frame 2 in sequence.

[0057] A pressure sensor 6 is provided at the through-type jack 5 , and the pressure sensor 6 is placed between the reaction frame 2 and the through-type jack 5 to monitor the tensioning force.

[0058] The limit plate 9 allows the steel bar 1 to pass through, and the limit plate 9 is arranged on the side of the through-type jack 5 away from the reaction frame 2, that is, the limit plate 9 and the pressure sensor 6 are located on both sides of the through-type jack 5. Since the size of the top rod of the through-type jack 5 is slightly larger than the size of the selected anchor, the limit plate 9 can safely tension the steel bar under the lifting of the through-type jack 5. The limit plate 9 and the through-type jack 5 are arranged close to each other.

[0059] The limit plate 9 is provided with a hole size which is larger than the diameter of the steel bar to be tensioned and smaller than the anchor of the anchor mechanism.

[0060] Among them, the anchoring mechanism 7 includes an anchoring anchor 7-1, a pre-tightening force transmission anchor 7-2, a pre-tightening force transmission anchor 7-3, an anchoring anchor 7-4, and a limiting anchor 7-5, which respectively limit the tensioning and retraction of the steel bars.

[0061] The anchoring device 7-1 is placed at the end of the steel bar 1, and the steel bar 1 passes through the opening of the anchoring device 7-1. The anchoring device 7-1 is placed on the outer side of the reaction frame 2, and it and the through-type jack 5 are placed on both sides of the mold.

[0062] The pre-tightening force transmission anchors 7-2 and 7-3 are respectively placed on the outer sides of the two force transmission plates 8, and the steel bars 1 pass through the openings of the two plates. The side formwork 3 is provided with grooves 13 corresponding to the sizes of the pre-tightening force transmission anchors 7-2 and 7-3. The pre-tightening force transmission anchors 7-2 and 7-3 are located in the grooves 13 of the two side forms so that the side forms can be taken out after the reinforced concrete is poured and cured.

[0063] The anchoring anchor 7-4 is placed between the reaction frame 2 and the through-type jack 5. The anchoring anchor 7-4 can be a wedge-shaped single-hole anchor. The steel bar passes through the anchoring anchor 7-4. After the pressure sensor 6 is set, the anchoring anchor 7-4 is located between the pressure sensor and the reaction frame.

[0064] The limiting anchor 7-5 is placed on the outer side of the limiting plate 9, the steel bar 1 passes through the limiting anchor 7-5, the limiting plate 9 is lifted by the through-type jack 5 and is set close to the limiting anchor 7-5 that locks the steel bar 1 and the through-type jack 5; the anchor 7-5 is locked on the steel bar and is set close to the limiting plate, and the anchor 7-5 can extend the steel bar in the lifting direction under the lifting action of the through-type jack, thereby effectively limiting the retraction displacement of the steel bar.

[0065] The corrosion groove model 10 includes a corrosion cavity model 10-2, an embedded groove model 10-1, and an embedded groove model 10-3. The corrosion groove model is fixed to the surface of the bottom mold, such as by connecting the bottom mold and the corrosion groove model with bolts.

[0066] The corrosion cavity model 10-2 is placed in the middle of the bottom mold, and the embedded groove model 10-1 and the embedded groove model 10-3 are respectively placed on both sides of the corrosion cavity model 10-2 and spaced from the corrosion cavity model 10-2; the corrosion cavity model 10-2, the embedded groove model 10-1, and the embedded groove model 10-3 are all block structures, and the size of the corrosion cavity model 10-2 is larger than that of the embedded groove model. After pouring concrete in the mold, a specimen corrosion cavity is formed at the position of the corrosion cavity model 10-2 for adding a corrosion solution; embedded grooves are formed at the positions of the embedded groove models 10-1 and the embedded groove models 10-3, which are the positions for pre-embedded wires on the steel bars before pouring the specimens.

[0067] In another typical embodiment of the present invention, a method for using the above device is provided, which comprises the following steps:

[0068] When the mold is assembled, steel bars are passed through the mold, and the steel bars are fastened with anchoring devices, and pre-tightened with pre-tightening force transmission anchors;

[0069] Apply prestress to the steel bars to a preset value through a through-type jack, then tighten the anchors set on the steel bars, remove the through-type jacks, limit plates and anchors, and then cast and maintain the specimens;

[0070] After the maintenance is completed, an angle grinder is used to cut the steel bars at the reaction frame; after removing the reaction frame, side formwork and bottom formwork, the application and installation of the prestressed steel bars of the reinforced concrete specimen can be completed.

[0071] The specific operation process is as follows:

[0072] (1) Pretreatment of steel bars to be tensioned;

[0073] The selected steel bars to be tensioned are prestressed steel bars used in the actual production of PHC piles, with a tensile strength of not less than 1420MPa and 35-grade ductility low-relaxation prestressed concrete spiral groove steel bars;

[0074] Before tensioning, the steel bars are first rust-removed and passivated. They are pickled with 12% hydrochloric acid solution, rinsed with clean water, neutralized with lime water, rinsed with clean water, wiped dry and placed in a desiccator for at least 4 hours to prepare for the next test.

[0075] (2) Mold processing and assembly;

[0076] In this method, about 130kN needs to be applied to the steel bar, and the mold needs to withstand a pressure of nearly 13t. Therefore, for safety reasons, unless otherwise specified, the mold thickness is basically 15mm; Figure 2 As shown, the thickness of the side mold is set to about 30mm, and the two side molds are spliced ​​with the bottom mold to form an embedded space of 100*100*300mm. A semi-arc groove for placing the pre-tightening force transmission anchor is set at the joint of the two side molds to facilitate the removal of the specimen after curing and molding;

[0077] like Figure 3 As shown, the bottom mold is provided with a small side wall to limit the sliding of the side mold, a bolt hole, and a groove for embedding the reaction frame. A corrosion groove model for local corrosion test is provided at the bottom. The embedded groove model is the position of the embedded wire, which is about 40mm long, and the corrosion cavity model is the position of the corrosion cavity formation, which is about 150mm long. The corrosion groove model is placed on the bottom mold by bolts, and can be disassembled at any time to change the corrosion groove of the test piece after molding. Figure 4 As shown, the reaction frame can be inserted into the pre-designed embedded grooves on the bottom mold and the side mold, and fastened with bolts.

[0078] like Figure 1 As shown, the side mold 3 is limited by the limiting side wall of the bottom mold 4 and is fixed by inserting bolts into the bolt holes 12; the reaction frame 2 is limited by the reserved positioning grooves set on the side mold 3 and the bottom mold 4 and is fixed by inserting bolts into the bolt holes 11.

[0079] (3) Installation of prestressing mechanism and anchoring mechanism;

[0080] Each anchor adopts a specification corresponding to the diameter of the steel bar.

[0081] The steel bar 1 is passed through the holes on the reaction frame 2, the force transmission plate 8, the pressure sensor 6, the through-type jack 5, and the limit plate 9 in sequence, and the steel bar is tightened by the anchoring anchor 7-1, the anchoring anchor 7-4, and the limit anchor 7-5, and pre-tightened by the pre-tightening force transmission anchor 7-2 and the pre-tightening force transmission anchor 7-3. During the tightening and pre-tightening process, the anchor and the lock are locked on the steel bar by hammering. The anchoring anchor 7-1 and the limit anchor 7-5 are directly locked to prevent the jack from lifting and causing the anchor to slide on the steel bar. The anchoring anchor 7-4 is locked by hammering before tensioning and is tightened on the steel bar by the reverse thrust of the jack during the tensioning process. Similarly, the pre-tightening force transmission anchor 7-2 and the pre-tightening force transmission anchor 7-3 are locked before tensioning, and are locked step by step by adopting the graded tensioning method during the tensioning process.

[0082] (4) Application of prestress;

[0083] The prestress is applied by graded tensioning method to reduce the prestress loss. The prestress is applied to the steel bar by a through-type jack, and a pressure sensor 6 is placed between the tail of the through-type jack 5 and the anchor 7-4 to control the tension stress. First, load at a uniform speed, observe the stress value of the pressure sensor 6, tension to 40% of the controlled prestress, hold the load for 2 minutes, and re-tighten the anchors at various parts; then load at a uniform speed to 80% of the controlled prestress, hold the load for 2 minutes, and re-tighten the anchors at various parts; finally, load at a uniform speed to 100% of the controlled prestress, hold the load for 2 minutes, and re-tighten the anchors at various parts.

[0084] During the tensioning test, concrete is not poured first. By sticking strain gauges on the surface of the steel bars and connecting stress-strain collectors to form a comparison with the intelligent handheld digital display of the pressure sensor, the prestress loss during and after the tensioning of the steel bars can be jointly monitored, and finally the application of prestress can be adjusted and controlled.

[0085] (5) Casting, molding, and local corrosion test;

[0086] After the mold is assembled, apply mold release oil inside the mold, do anti-rust work at the contact position between the steel bar 1 and the force transfer plate 8 and the pre-tightening force transfer anchor 7-2 and pre-tightening force transfer anchor 7-3, and bond the wire at the position of the embedded groove model 10-1 or the embedded groove model 10-3 and pass it through the small groove set on the force transfer plate 8 to prevent the wire from being damaged by the anchor and the force transfer plate due to the application of prestress. After the tensioning is completed, the jack retracts, and the limit anchor 7-5, limit plate, through-type jack, and pressure sensor are removed in turn. Then, the same raw materials as the PHC pile are used for casting and vibration, and the remaining parts are moved to the steam curing box and cured under the same steam curing system as the pile.

[0087] After the curing is completed, the specimen can reach the corresponding strength. Then, an angle grinder is used to cut the steel bars at the reaction frame 2, and the reaction frame 2, side mold 3, and bottom mold 4 are removed in sequence to complete the specimen molding. Figure 5 As shown, it is a test piece after curing is completed and the formwork is removed. The middle part of the test piece is poured concrete, and the two sides of the concrete are force transfer plates 8. Pre-tightened force transfer anchors are arranged on the outer side of the force transfer plates.

[0088] Through the corrosion groove model designed in advance, the corrosion cavity and embedded groove are formed in the middle of the specimen by the corrosion groove model. The specimen is subjected to a local corrosion test, and the corrosion solution is added into the corrosion cavity formed by the specimen. The corrosion cavity and the steel bar are not in contact, and there is a concrete protective layer between the corrosion cavity and the steel bar. The thickness of the protective layer can be controlled according to the test requirements by setting the size of the mold axis.

[0089] In this embodiment, the corrosive solution is seawater, and a DC power supply is externally connected. The voltage stabilization method is used to record the current change on the DC power supply meter until cracks appear on the surface of the specimen, and an electrochemical workstation is used regularly to monitor the corrosion of the prestressed steel bars. The steady current method is also used to set the corresponding corrosion rate and use an electrochemical workstation to quantitatively characterize the uneven corrosion of the steel bars.

[0090] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for using a reinforced concrete specimen prestressing and local corrosion test device, characterized in that: The following steps are involved: Assemble the mold, the mold includes two oppositely arranged side molds, the bottom of the side mold is fixedly connected to the bottom mold, a force transmission plate is arranged between the ends of the two side molds, a pre-tightening force transmission anchor is arranged on the outer side of the force transmission plate for the steel bar to pass through to pre-tighten the steel bar, the side mold is provided with a groove corresponding to the pre-tightening force transmission anchor, the pre-tightening force transmission anchor is located in the groove of the two side molds, a reaction frame is arranged on the outer side of the two side molds, the steel bar passes through the reaction frame and the force transmission plate, and the steel bar is prestressed by a prestress applying mechanism; the prestress applying mechanism includes a through-type jack, the through-type jack is arranged on one side of the mold, the through-type jack allows the steel bar to pass through its center, a pressure sensor is arranged at the through-type jack, and the pressure sensor is placed between the reaction frame and the through-type jack The bottom mold is provided with a corrosion groove model on the surface of the bottom mold; the corrosion groove model includes a corrosion cavity model, the corrosion cavity model is placed in the middle of the bottom mold, and embedded groove models are arranged on both sides of the corrosion cavity model; the corrosion cavity model and the embedded groove model are both block structures, the size of the corrosion cavity model is larger than the size of the embedded groove model, the wire is bonded at the position of the embedded groove model and passes through the small groove arranged on the force transmission plate; Pass the steel bars through the reaction frame and force transfer plate of the mold, fasten the steel bars with anchoring devices, and pre-tighten with pre-tightening force transfer anchors; Apply prestress to the steel bars to a preset value through a through-type jack, apply prestress by a graded tensioning method, then tighten the anchoring device and the pre-tightening force transmission anchor, remove the through-type jack, the limit plate and the anchoring device, and then cast and maintain them in the mold; After the curing is completed, the steel bars are cut at the reaction frame, and after the reaction frame, side formwork and bottom formwork are removed, the application and installation of the prestressed steel bars of the reinforced concrete specimen can be completed; A corrosion solution is added into the corrosion cavity formed by the corrosion groove model in the middle of the specimen, and a local corrosion test is carried out on the specimen.

2. The method for using the reinforced concrete specimen prestressing and local corrosion testing device as claimed in claim 1, characterized in that: The reaction frame is a C-shaped structure, and its C-shaped opening end is fixedly connected to the side mold.

3. The method for using the reinforced concrete specimen prestressing and local corrosion testing device as claimed in claim 1, characterized in that: The side mold is a C-shaped structure, the C-shaped opening ends of the two side molds are arranged opposite to each other, and the force transmission plate is located inside the side plate of the C-shaped structure of the side mold.

4. The method for using the reinforced concrete specimen prestressing and local corrosion testing device as claimed in claim 1, characterized in that: Positions of the side mold, the bottom mold and the reaction frame are provided with clamping grooves, and the reaction frame is inserted into the clamping grooves of the side mold and the bottom mold and is fixedly connected with the side mold and the bottom mold.

Citation Information

Patent Citations

  • Prestressing device and reinforcement method for near-surface reinforcement bars of reinforced concrete beams

    CN110453930B

  • Device and method for testing local corrosion of steel strand of concrete T-shaped beam

    CN116165130A

  • Exosmosis electric acceleration steel bar corrosion testing device and building method

    CN111595768A

  • Prestressed steel wire corrosion test device in tensile stress state and operation method

    CN116678815A

  • Tensioning counter-force device for manufacturing prestressed beam through pre-tensioning method

    CN217292809U