A power supply control system and method for a power distribution network

By using a data acquisition and analysis unit combined with Gauss-Newton method and heuristic algorithm in the distribution network to automatically generate and evaluate loop closing operation plans, it solves the problem of difficulty and low safety of manual weighing of loop closing strategies, and improves efficiency. Power grid stability and intelligent management.

CN118281871BActive Publication Date: 2024-10-01AEROSPACE HAIYING SAFETY TECH ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410676632.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-10-01
Estimated Expiration
2044-05-29

AI Technical Summary

Technical Problem

When manually weighing the distribution network loop closing strategy, it is difficult to balance multiple conflicting goals, and it is easy to focus on one and lose the other. Moreover, the loop closing operation may cause system oscillation, overvoltage or overcurrent and other problems, affecting the security of the power grid.

Method used

It uses a data collection and monitoring unit, a power grid data analysis unit, a loop closing strategy planning unit and an operation plan execution unit, combined with the Gauss-Newton method and heuristic algorithm, to collect and analyze power grid data in real time, generate and evaluate multiple loop closing operation plans, and automatically The optimal strategy is selected and executed semi-automatically, monitoring grid status to ensure stability.

Benefits of technology

It improves the efficiency and flexibility of loop closing strategy formulation, reduces the subjectivity and uncertainty of human judgment, enhances the intelligence level of power grid management, and ensures the stability and security of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118281871B_ABST
    Figure CN118281871B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of power supply control technology, and specifically, to a distribution network ring-closing power supply control system and method. It includes a data acquisition and monitoring unit, a power grid data analysis unit, a ring-closing strategy planning unit, and an operation plan execution unit; wherein the power grid data analysis unit includes a parameter estimation module, a flow analysis module, a calculation module, and a scheme evaluation module. In a distribution network ring-closing power supply control system and method, the ring-closing strategy planning unit combines the in-depth analysis of the power grid data analysis unit and uses a heuristic algorithm to automatically generate multiple ring-closing operation schemes, which not only improves the efficiency of strategy formulation, but also ensures the flexibility and optimality of the operation through multiple scheme comparisons. And through the comprehensive evaluation of multiple candidate schemes by the scheme evaluation module, the system can automatically select the optimal ring-closing strategy, reduce the subjectivity and uncertainty of human judgment, and promote the development of power grid management towards a higher level of intelligence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power supply control, and in particular to a power supply control system and method for a distribution network. Background Art

[0002] With the development of social economy and the improvement of people's living standards, the requirements for the continuity and stability of power supply are increasing. Especially in urban centers, important industrial areas and commercial areas, any interruption may cause huge economic losses and social impacts. The ring-closing power supply technology can perform line maintenance or fault isolation without power outages, which greatly improves the reliability of power supply. Under the framework of smart grid, it is an inevitable trend to improve the automation and intelligence level of distribution network. As an important part of distribution automation, the ring-closing power supply control can achieve fast fault response, optimize power flow distribution and improve power quality. It is one of the key technologies to achieve the goal of smart grid. However, the optimal ring-closing strategy needs to balance multiple conflicting goals, such as minimizing network losses, ensuring voltage stability, avoiding overload, improving power supply reliability and economy, etc. It is very difficult to balance these goals manually, and it is easy to lose sight of one thing while focusing on another. In addition, the ring-closing operation may cause system oscillation, overvoltage or overcurrent, and other problems, threatening the safety of the power grid. It is often difficult for human judgment to accurately assess all potential risks. Therefore, a distribution network ring-closing power supply control system and method are provided. Summary of the invention

[0003] The purpose of the present invention is to provide a distribution network ring-closing power supply control system and method to solve the problem that it is very difficult to manually balance multiple conflicting objectives of the optimal ring-closing strategy proposed in the above background technology, and it is easy to lose sight of one thing while focusing on another.

[0004] To achieve the above objectives, on the one hand, the present invention provides a power distribution network ring-closing power supply control system, comprising:

[0005] Data acquisition and monitoring unit: used to collect key parameters and equipment status information in the power grid in real time, and provide a visual interface so that operators can monitor the operation status of the power grid in real time;

[0006] Power grid data analysis unit: used to estimate unknown parameters based on the Gauss-Newton iterative method, and combined with the data collected and monitored in the data acquisition and monitoring unit, predict the power grid state and system stability before and after the loop is closed. At the same time, it evaluates multiple candidate solutions generated by the loop strategy planning unit and selects the optimal loop operation solution;

[0007] Closing strategy planning unit: used to determine the closing objectives and safety constraints based on the analysis results of the power grid data analysis unit, and automatically search and generate multiple candidate closing operation plans using a heuristic algorithm;

[0008] Operation plan execution unit: used to formulate detailed steps for the selected optimal loop closing operation plan, and semi-automatically execute the loop closing operation while monitoring the status of the power grid;

[0009] Among them, the power grid data analysis unit includes a parameter estimation module, a power flow analysis module, a calculation module and a solution evaluation module.

[0010] As a further improvement of the technical solution, in the power grid data analysis unit,

[0011] The parameter estimation module is used to estimate the voltage amplitude and phase angle of the nodes in the power grid where the voltage measurement sensors are not directly installed based on the Gauss-Newton method iteration method using the collected data;

[0012] The power flow analysis module is used to calculate the static and dynamic power flow based on the voltage amplitude and phase angle of the calculation module combined with the parameter estimation module and the data collected and monitored by the data acquisition and monitoring unit, and the power grid status before closing the loop;

[0013] The calculation module is integrated with a stable algorithm model to calculate the key parameters that affect stability before and after the ring is closed;

[0014] The scheme evaluation module is used to evaluate the stability of multiple candidate schemes generated according to the calculation results of the power flow analysis module and based on the stable algorithm model of the calculation module, and select the optimal loop closing operation scheme.

[0015] As a further improvement of the technical solution, the calculation steps of the parameter estimation module are:

[0016] Compute the Jacobian matrix:

[0017] ;

[0018] in, For the The estimated value of the state vector at the iteration; is the number of iterations; For the The estimated value of the state vector at the iteration; is the state vector; is the measurement function;

[0019] Construct the increment equation:

[0020] ;

[0021] in, is the increment of the state vector; For the The residual vector of the iteration;

[0022] Solve for the increment:

[0023] ;

[0024] in, is the measurement error covariance moment; is the inverse matrix of the measurement error covariance matrix; is the damping coefficient; is the identity matrix;

[0025] Status Update:

[0026] ;

[0027] in, For the The estimated state for iteration .

[0028] As a further improvement of the technical solution, the static power flow calculation in the power flow analysis module includes a power balance equation and a voltage equation, and the expressions are as follows:

[0029] Power balance equation:

[0030] ;

[0031] in, For slave nodes Flow to Node Active power of For Node Load power; For Node The power generation capacity; For Node Flow to Node Active power of

[0032] Voltage equation:

[0033] ;

[0034] in, For the node The set of all directly connected nodes; For Node The voltage amplitude of For the node Adjacent nodes The voltage amplitude; is the set of all branches; For the slave node To Node The current in the branch; For branch The resistance of For branch Reactance; is an imaginary unit; For the node The set of all connected generators; For generator The electromotive force; For generator The internal potential angle of For Node The voltage phase angle; For the node The collection of all directly associated loads; For flow through and nodes Connected load The current; For load The resistance of For load reactance.

[0035] As a further improvement of the technical solution, the dynamic power flow calculation in the power flow analysis module includes a generator model, and the expression is as follows:

[0036] Generator model:

[0037] ;

[0038] in, For the engine The rotor angle offset; is the inertia constant; is the damping coefficient; is the electrical power; is the mechanical power.

[0039] As a further improvement of the technical solution, the safety constraints in the closed-loop strategy planning unit include phase consistency, voltage matching, frequency synchronization, stable power flow distribution, and appropriate and coordinated protection devices.

[0040] As a further improvement of the technical solution, the loop closing strategy planning unit uses a heuristic algorithm to automatically search and generate multiple candidate loop closing operation schemes, and the expression is:

[0041] The formula for updating particle position and velocity is:

[0042] ;

[0043] ;

[0044] in, It is The particle in The velocity in the dimension, in time step The value at time; is the inertia weight; For the The particle in The velocity in the dimension, in time step The value at time; , is the learning factor, , is a random number, For the Particles in all historical iterations The optimal position of individuals on the dimension; For the The particle in The current position in the dimension, in time step The value at time; The global optimal solution is Position in dimension; For the The particle in The current position in the dimension, in time step The value at time.

[0045] As a further improvement of the present technical solution, the solution evaluation module can transmit the data of multiple candidate solutions to the stable algorithm model, and the stable algorithm model obtains the stability of each candidate solution and selects the optimal closing-loop operation solution according to the stability ranking.

[0046] As a further improvement of the technical solution, the specific steps of the operation plan execution unit are as follows:

[0047] S41: converting the selected optimal closing operation plan into a specific operation instruction sequence, and before execution, rechecking whether there are any unforeseen safety risks or operation conflicts;

[0048] S42: Start the execution phase, continuously monitor the key parameters of the power grid, and if any deviation from the expected situation is detected, take immediate measures to adjust the operation rhythm or sequence, and suspend the operation if necessary;

[0049] S43: After the ring closing operation is completed, the operation status of the power grid before and after the operation is compared to evaluate the operation effect;

[0050] S44: Feedback the operation results into the system and continuously iterate and improve the operation strategy and execution process.

[0051] On the other hand, the present invention provides a distribution network ring-closing power supply control method, which is used in the above-mentioned distribution network ring-closing power supply control system, comprising the following steps:

[0052] S1, real-time collection of key parameters in the power grid and status information of equipment;

[0053] S2, estimate unknown parameters based on the Gauss-Newton method iteration method, and combine the data collected and monitored in the data acquisition and monitoring unit to predict the power grid state and system stability before and after the loop is closed;

[0054] S3. According to the analysis results of the power grid data analysis unit, the closing target and safety constraints are determined, and a heuristic algorithm is used to automatically search and generate multiple candidate closing operation plans;

[0055] S4, evaluating multiple candidate solutions generated by the loop closing strategy planning unit, and selecting the optimal loop closing operation solution;

[0056] S5. Develop detailed steps for the selected optimal closing operation plan, and semi-automatically perform the closing operation while monitoring the status of the power grid.

[0057] Compared with the prior art, the present invention has the following beneficial effects:

[0058] In a distribution network ring-closing power supply control system and method, the ring-closing strategy planning unit combines the in-depth analysis of the power grid data analysis unit and uses a heuristic algorithm to automatically generate multiple ring-closing operation plans, which not only improves the efficiency of strategy formulation, but also ensures the flexibility and optimality of operation through multiple plan comparisons. And through the comprehensive evaluation of multiple candidate plans by the plan evaluation module, the system can automatically select the optimal ring-closing strategy, reduce the subjectivity and uncertainty of human judgment, and promote the development of power grid management towards a higher level of intelligence. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 It is a flowchart of the whole process of the present invention;

[0060] Figure 2 is a system block diagram of a power grid data analysis unit in the present invention;

[0061] Figure 3 A flow chart of the overall method of the present invention;

[0062] The meaning of each number in the figure is:

[0063] 1. Data acquisition and monitoring unit; 2. Power grid data analysis unit; 21. Parameter estimation module; 22. Power flow analysis module; 221. Calculation module; 23. Scheme evaluation module; 3. Loop strategy planning unit; 4. Operation plan execution unit. DETAILED DESCRIPTION

[0064] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0065] Embodiment 1:

[0066] See also Figure 1-Figure 2 As shown, a distribution network ring-closing power supply control system, the power grid ring-closing operation refers to the operation mode of connecting the originally separately operated electrical networks through closed switches or circuit breakers in the power system to form a closed loop. This operation is usually performed in a ring network or a distribution network that can transmit electric energy through different paths. The purpose of the ring-closing is to optimize the operation of the power grid, such as balancing loads, transferring loads, isolating faults, repairing equipment, etc., without interrupting the power supply service to users. The system includes:

[0067] Data acquisition and monitoring unit 1: used to collect key parameters and equipment status information in the power grid in real time, including voltage, current, power injection and extraction, line impedance, transformer ratio, etc. at each node; equipment status information includes the position status of switches and circuit breakers, equipment capacity limitations, and whether the equipment is available, etc. At the same time, a visual interface is provided so that operators can monitor the operation status of the power grid in real time;

[0068] The power grid data analysis unit 2 is used to estimate unknown parameters based on the Gauss-Newton iterative method, and to predict the power grid state and system stability before and after the loop closing in combination with the data collected and monitored by the data acquisition and monitoring unit 1. At the same time, multiple candidate solutions generated by the loop closing strategy planning unit 3 are evaluated to select the optimal loop closing operation solution;

[0069] The power grid data analysis unit 2 includes a parameter estimation module 21 , a power flow analysis module 22 , a calculation module 221 and a solution evaluation module 23 .

[0070] The parameter estimation module 21 is used to estimate the voltage amplitude and phase angle of the nodes in the power grid where the voltage measurement sensors are not directly installed based on the Gauss-Newton method iteration method using the collected data; the Gauss-Newton method is a nonlinear least squares optimization method;

[0071] Because the measurement data in the power system may be affected by various factors, such as measurement errors, communication interference, equipment failure, etc., resulting in inaccurate or erroneous data. The parameter estimation module 21 can process these erroneous measurement values ​​through mathematical optimization algorithms, eliminate or correct bad data, thereby improving the accuracy and reliability of the overall data; and in actual power systems, it is impossible to directly measure the electrical parameters of each node. Parameter estimation can use existing measured information and power grid models to estimate the state of node parameters that are not directly measured, thereby enhancing the observability of the system;

[0072] The calculation steps are:

[0073] In the At the iteration, the state estimate is , the goal is to find the residual vector Minimized ;

[0074] Compute the Jacobian matrix:

[0075] ;

[0076] in, For the The estimated value of the state vector at the iteration; is the number of iterations; For the The estimated value of the state vector at the iteration; is the state vector; is the measurement function;

[0077] Construct the increment equation:

[0078] ;

[0079] in, is the increment of the state vector, that is, the change from the current estimated value to the next iterative estimated value; For the The residual vector of the iteration;

[0080] Solve for the increment:

[0081] ;

[0082] in, is the measurement error covariance matrix, which describes the correlation and size between measurement errors and is used to measure the reliability of measurement data; is the inverse matrix of the measurement error covariance matrix; is the damping coefficient, which is used to adjust the iteration step size and enhance the convergence of the algorithm; is the identity matrix;

[0083] The role is to Adding a diagonal element to the matrix is The matrix can be regarded as the regularization or damping of the system equation, which helps to improve the matrix condition number and promote the stability and convergence of the iterative process. The value of can effectively balance the transition between gradient descent and Gauss-Newton method, thereby solving the local minimum trap and convergence speed problems in nonlinear least squares problems;

[0084] Status Update:

[0085] ;

[0086] in, For the The estimated state of the iteration;

[0087] Check the convergence criteria, such as whether the reduction of the residual or the change of the state variable is lower than the predetermined threshold. If not, return to the first step to continue the iteration;

[0088] The calculation module 221 is integrated with a stable algorithm model for calculating the key parameters that affect stability before and after the loop is closed; the power flow analysis module 22 is used to calculate the static and dynamic power flow based on the calculation module 221 and in combination with the voltage amplitude and phase angle of the parameter estimation module 21 and the data collected and monitored by the data acquisition and monitoring unit 1, and the power grid state before the loop is closed;

[0089] Among them, static power flow calculation is based on the calculation under the steady-state operation conditions of the power system. It assumes that the system parameters are constant and ignores the dynamic characteristics and transient processes of the system. The main purpose of static power flow calculation is to determine the steady-state operation parameters such as the voltage amplitude of each node of the power system, the power flow direction of each branch, and the total power loss of the system under given operating conditions. It is crucial for power grid planning, operation mode arrangement, relay protection setting, economic operation analysis, etc., and is the basis for evaluating whether the operation status of the power grid is reasonable, reliable and economical. Static power flow calculation includes power balance equation and voltage equation, and the expressions are as follows:

[0090] Power balance equation:

[0091] ;

[0092] in, For slave nodes Flow to Node Active power of For Node Load power; For Node The power generation capacity; For Node Flow to Node Active power of

[0093] The power balance equation is used to ensure that the power supply and demand of each node in the power grid remain balanced before and after the ring is closed. This includes active power balance and reactive power balance, and is the key to determining whether the ring will cause overload, voltage deviation or power reverse transmission.

[0094] For the entire network, the voltage equation is established based on the relationship between node voltage and branch current, and is expressed using the node voltage method and loop current method. In the node voltage method, for each node, except the reference node, an equation can be listed to express the relationship between the node voltage and other node voltages and the branch current passing through the node. The voltage equation is:

[0095] ;

[0096] in, For the node The set of all directly connected nodes; For Node The voltage amplitude; For the node Adjacent nodes The voltage amplitude; is the set of all branches; For the slave node To Node The current in the branch; For branch The resistance of For branch Reactance; is an imaginary unit; For the node The set of all connected generators; For generator The electromotive force; For generator The internal potential angle of For Node The voltage phase angle; For the node The collection of all directly associated loads; For flow through and nodes Connected load The current; For load The resistance of For load reactance.

[0097] Dynamic power flow calculation further considers the dynamic characteristics of the system on the basis of static power flow calculation, that is, it considers factors that change over time, such as load changes, generator output adjustments, system frequency fluctuations, etc. It not only considers the steady-state behavior of the system, but also considers the system response caused by external disturbances. In dynamic power flow calculation, generator model factors are involved in order to more accurately simulate the working state of the actual power system under dynamic conditions. Dynamic power flow calculation is particularly critical for analyzing the dynamic stability of the power system, formulating reasonable control strategies, and evaluating the system's ability to recover after disturbances. Dynamic power flow calculation includes the generator model, and the expression is as follows:

[0098] Generator model:

[0099] ;

[0100] in, For the engine The rotor angle offset; is the inertia constant; is the damping coefficient; is the electrical power; is the mechanical power.

[0101] Generator models are used in loop closing strategy planning to simulate the behavior of generators, including active and reactive power output capabilities, as well as stability and response characteristics under different operating conditions. This is very important for evaluating the impact of loop closing on system stability.

[0102] The scheme evaluation module 23 is used to evaluate the stability of the generated multiple candidate schemes according to the calculation results of the power flow analysis module 22 and based on the stable algorithm model of the calculation module 221, and select the optimal closed-loop operation scheme. Specifically, the data of multiple candidate schemes can be transmitted to the stable algorithm model, and the stable algorithm model obtains the stability of each candidate scheme, and selects the optimal closed-loop operation scheme according to the order of stability.

[0103] Closing strategy planning unit 3: It is used to determine the closing target and safety constraints according to the analysis results of the power grid data analysis unit 2. The safety constraints include phase consistency, voltage matching, frequency synchronization, stable power flow distribution, and appropriate and coordinated protection devices. Among them, phase consistency ensures that the voltage phases of the power sources participating in the closing are the same to avoid impact current and system oscillation caused by phase difference; voltage matching requires that the voltage difference at the closing point should be within the allowable range, and usually requires that the voltage difference should not exceed 20% to prevent excessive circulating current and equipment damage; frequency synchronization requires that the power frequencies of the power sources participating in the closing be similar to ensure the stable operation of the system; power flow control requires that the power flow distribution of the power grid before and after the closing should not cause any part to be overloaded, and the system stability performance must be maintained; protection coordination requires that the relevant relay protection devices need to be properly configured and coordinated to prevent the closing operation from causing protection malfunction or refusal to operate.

[0104] A heuristic algorithm is used to automatically search and generate multiple candidate ring closing operation schemes. The expressions involved are as follows:

[0105] The formula for updating particle position and velocity is:

[0106] ;

[0107] ;

[0108] in, It is The particle in The velocity in the dimension, in time step The value at time; Inertia weight, used to control the speed inheritance degree of particles, that is, the influence of the previous moment's speed on the current speed; For the The particle in The velocity in the dimension, in time step The value at time; , are learning factors, representing the learning ability of particles for individual optimal solutions and global optimal solutions or the balance between exploration and utilization; , is a random number, usually in [0,1] The value between is used to introduce randomness, helping particles to jump out of the local optimum and conduct a wider search. For the Particles in all historical iterations The individual optimal position in the dimension, that is, the best position the particle has ever reached; For the The particle in The current position in the dimension, in time step The value at time; The global optimal solution is The position in a dimension is the optimal position of all particles in that dimension; For the The particle in The current position in the dimension, in time step The value at time;

[0109] It embodies the particle swarm optimization algorithm, which simulates the foraging behavior of bird flocks to find the optimal solution to the problem. Each particle represents a potential solution, and by continuously updating its position and speed, it tries to approach and eventually find the optimal solution to the problem. Each particle is designed to represent a closed loop path or operation sequence. By continuously updating the position of the particle (that is, the configuration of the solution), the particle swarm optimization algorithm can simultaneously explore multiple different areas in the solution space, thereby generating multiple different candidate closed loop operation solutions;

[0110] Operation plan execution unit 4: used to formulate detailed steps for the selected optimal loop closing operation plan, and semi-automatically execute the loop closing operation while monitoring the state of the power grid; the specific steps are as follows:

[0111] S41: Convert the selected optimal closing operation plan into a specific operation instruction sequence, including but not limited to the opening and closing sequence of the switchgear, time arrangement, specific path and rate of load transfer, etc. Before execution, check again whether there are any unforeseen safety risks or operation conflicts. Ensure the feasibility of the plan through simulation software or real-time data analysis. Generate a specific operation instruction set based on the detailed operation steps, including control commands, timestamps, expected effects, etc.;

[0112] For low-risk, standardized operations, the automation system is used to directly execute them, such as remote control of switchgear and automatic adjustment of generator output. For high-risk operations, the system generates operation suggestions, but they can only be executed after being reviewed and confirmed by the dispatcher, ensuring human intervention in key decisions.

[0113] S42: Start the execution phase, continuously monitor the key parameters of the power grid to ensure that they are consistent with expectations. If deviations from expectations are detected, take immediate measures to adjust the operation rhythm or sequence, and suspend operations when necessary to avoid adverse effects on the power grid;

[0114] S43: After the ring closing operation is completed, the operation status of the power grid before and after the operation is compared to evaluate the operation effect;

[0115] S44: Feedback the operation results into the system and continuously iterate and improve the operation strategy and execution process.

[0116] Embodiment 2:

[0117] The difference between Example 2 of the present invention and Example 1 is that this example introduces a static mechanical performance collection and analysis method used in a distribution network ring-closing power supply control system.

[0118] See also Figure 3 As shown, a distribution network ring-closing power supply control method is used for the above distribution network ring-closing power supply control system, comprising the following steps:

[0119] S1, real-time collection of key parameters in the power grid and status information of equipment;

[0120] S2, estimating unknown parameters based on the Gauss-Newton method iteration method, and combining the data collected and monitored in the data acquisition and monitoring unit 1 to predict the grid state and system stability before and after the loop is closed;

[0121] S3, according to the analysis results of the power grid data analysis unit 2, determine the loop closing target and safety constraints, and use the heuristic algorithm to automatically search and generate multiple candidate loop closing operation plans;

[0122] S4, evaluating multiple candidate solutions generated by the loop closing strategy planning unit 3, and selecting the optimal loop closing operation solution;

[0123] S5. Develop detailed steps for the selected optimal closing operation plan, and semi-automatically perform the closing operation while monitoring the status of the power grid.

[0124] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A power supply control system for a distribution network, characterized in that: include: Data acquisition and monitoring unit (1): used to collect key parameters and equipment status information in the power grid in real time, and provide a visual interface so that operators can monitor the operation status of the power grid in real time; The power grid data analysis unit (2) is used to estimate unknown parameters based on the Gauss-Newton method iteration method, and to predict the power grid state and system stability before and after the loop closing in combination with the data collected and monitored in the data acquisition and monitoring unit (1). At the same time, it evaluates multiple candidate solutions generated by the loop closing strategy planning unit (3) and selects the optimal loop closing operation solution; The loop closing strategy planning unit (3) is used to determine the loop closing target and safety constraint conditions according to the analysis results of the power grid data analysis unit (2), and automatically search and generate multiple candidate loop closing operation plans by using a heuristic algorithm; Operation plan execution unit (4): used to formulate detailed steps for the selected optimal loop closing operation plan, and semi-automatically execute the loop closing operation while monitoring the status of the power grid; The power grid data analysis unit (2) includes a parameter estimation module (21), a power flow analysis module (22), a calculation module (221) and a scheme evaluation module (23); In the power grid data analysis unit (2): The parameter estimation module (21) is used to estimate the voltage amplitude and phase angle of the node in the power grid where the voltage measurement sensor is not directly installed based on the Gauss-Newton method iteration method using the collected data; The power flow analysis module (22) is used to calculate the state of the power grid before closing the loop based on the voltage amplitude and phase angle of the parameter estimation module (21) and the data collected and monitored by the data collection and monitoring unit (1) and the calculation module (221); The calculation module (221) is integrated with a stable algorithm model for calculating key parameters affecting stability before and after ring closing; The scheme evaluation module (23) is used to evaluate the stability of the generated multiple candidate schemes according to the calculation results of the power flow analysis module (22) and based on the stable algorithm model of the calculation module (221), and select the optimal loop closing operation scheme; The calculation steps of the parameter estimation module (21) are: Compute the Jacobian matrix: ; in, For the The estimated value of the state vector at the iteration; is the number of iterations; For the The estimated value of the state vector at the iteration; is the state vector; is the measurement function; Construct the increment equation: ; in, is the increment of the state vector; For the The residual vector of the iteration; Solve for the increment: ; in, is the measurement error covariance moment; is the inverse matrix of the measurement error covariance matrix; is the damping coefficient; is the identity matrix; Status Update: ; in, For the The estimated state of the iteration; The static power flow calculation in the power flow analysis module (22) includes a power balance equation and a voltage equation, and the expressions are as follows: Power balance equation: ; in, For slave nodes Flow to Node Active power of For Node Load power; For Node The power generation capacity; For Node Flow to Node Active power of Voltage equation: ; in, For the node The set of all directly connected nodes; For Node The voltage amplitude of For the node Adjacent nodes The voltage amplitude of is the set of all branches; For the slave node To Node The current in the branch; For branch The resistance of For branch Reactance; is an imaginary unit; For the node The set of all connected generators; For generator The electromotive force; For generator The internal potential angle of For Node The voltage phase angle; For the node The collection of all directly associated loads; For flow through and nodes Connected load The current; For load The resistance of For load Reactance; The dynamic power flow calculation in the power flow analysis module (22) includes a generator model, and the expression is as follows: Generator model: ; in, For the engine The rotor angle offset; is the inertia constant; is the damping coefficient; is the electrical power; is the mechanical power; The safety constraints in the closed-loop strategy planning unit (3) include phase consistency, voltage matching, frequency synchronization, stable power flow distribution, and appropriate and coordinated protection devices; The loop closing strategy planning unit (3) uses a heuristic algorithm to automatically search and generate multiple candidate loop closing operation schemes, and the expression is: The formula for updating particle position and velocity is: ; ; in, It is The particle in The velocity in the dimension is in time step The value at time; is the inertia weight; For the The particle in The velocity in the dimension is in time step The value at time; , is the learning factor, , is a random number, For the The particle in all historical iterations The optimal position of individuals on the dimension; For the The particle in The current position in the dimension at time step The value at time; The global optimal solution is Position in dimension; For the The particle in The current position in the dimension at time step The value at time; The scheme evaluation module (23) is capable of transmitting data of multiple candidate schemes to a stable algorithm model, and the stable algorithm model obtains the stability of each candidate scheme and selects the optimal loop closing operation scheme according to the ranking of the stability; The specific steps of the operation plan execution unit (4) are as follows: S41: converting the selected optimal closing operation plan into a specific operation instruction sequence, and before execution, rechecking whether there are any unforeseen safety risks or operation conflicts; S42: Start the execution phase, continuously monitor the key parameters of the power grid, and if any deviation from the expected situation is detected, take immediate measures to adjust the operation rhythm or sequence, and suspend the operation if necessary; S43: After the ring closing operation is completed, the operation status of the power grid before and after the operation is compared to evaluate the operation effect; S44: Feedback the operation results into the system and continuously iterate and improve the operation strategy and execution process.

2. A distribution network ring-closing power supply control method, used for the distribution network ring-closing power supply control system as claimed in claim 1, characterized in that: The steps include: S1, real-time collection of key parameters in the power grid and status information of equipment; S2, estimating unknown parameters based on the Gauss-Newton method iteration method, and combining the data collected and monitored in the data acquisition and monitoring unit (1), predicting the grid state and system stability before and after the loop is closed; S3, determining the closing target and safety constraint conditions according to the analysis results of the power grid data analysis unit (2), and automatically searching and generating multiple candidate closing operation plans by using a heuristic algorithm; S4, evaluating multiple candidate solutions generated by the loop closing strategy planning unit (3) and selecting the optimal loop closing operation solution; S5. Develop detailed steps for the selected optimal closing operation plan, and semi-automatically perform the closing operation while monitoring the status of the power grid.