Test method, system and equipment for 5G MIMO frequency-shifted dual-path equipment

By using automated testing methods and systems, various components of 5G MIMO frequency-shifting dual-path equipment are tested, solving the problem of time-consuming and labor-intensive manual testing in existing technologies and achieving efficient automated testing.

CN118294780BActive Publication Date: 2024-11-19BEIJING WIDE TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410251362.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-05
Publication Date
2024-11-19
Estimated Expiration
2044-03-05

AI Technical Summary

Technical Problem

In the current technology, testing of 5G MIMO frequency-shifting dual-path equipment requires manual operation, which is time-consuming, labor-intensive, and inefficient.

Method used

An automated testing method and system are provided to test various components of a 5G MIMO frequency-shifting dual-path device through a preset testing strategy, including near-end and far-end PCB boards, combiners, external interface boards, power supply modules, and communication modules, and to perform automated testing using an auxiliary testing system.

Benefits of technology

It has enabled automated testing of 5G MIMO frequency-shifting dual-path equipment, saving manpower and time costs and improving testing efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118294780B_ABST
    Figure CN118294780B_ABST
Patent Text Reader

Abstract

The present invention discloses a testing method, system and device for 5G MIMO frequency-shifted two-way equipment, and relates to the technical field of equipment automated testing. The method comprises: presetting a plurality of test strategies for testing each preset component in the 5G MIMO frequency-shifted two-way equipment; based on the preset test strategies, testing the components to be tested in the 5G MIMO frequency-shifted two-way equipment to obtain test results. The present invention can realize automated testing of 5G MIMO frequency-shifted two-way equipment, saving manpower and time costs.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] Currently, 5G MIMO frequency-shifted dual-path devices are often tested manually, which is time-consuming and labor-intensive. Summary of the invention

[0003] The technical problem to be solved by the present invention is to address the deficiencies of the prior art and specifically provide a test method, system and device for 5G MIMO frequency-shifted dual-path equipment, as follows:

[0004] 1) In the first aspect, the present invention provides a test method for a 5G MIMO frequency-shifted dual-path device, and the specific technical solution is as follows:

[0005] Preset multiple test strategies for testing each preset component in a 5G MIMO frequency-shifted dual-path device;

[0006] Based on the preset test strategy, the components to be tested in the 5G MIMO frequency-shifted dual-path device to be tested are tested to obtain test results.

[0007] The beneficial effects of the testing method for a 5G MIMO frequency-shifted dual-path device provided by the present invention are as follows:

[0008] It can realize automated testing of 5G MIMO frequency-shifting dual-path equipment, saving manpower and time costs.

[0009] Based on the above scheme, a testing method for a 5G MIMO frequency-shifted dual-path device of the present invention can also be improved as follows.

[0010] Further, the components to be tested in the 5G MIMO frequency-shifted two-way device to be tested include: at least one of a proximal PCB board of a proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and a distal PCB board of a distal unit in the 5G MIMO frequency-shifted two-way device to be tested.

[0011] Further, based on the preset test strategy, the components to be tested in the 5G MIMO frequency-shifted dual-path device to be tested are tested, including:

[0012] By using the auxiliary test system and based on a preset test strategy, the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and / or the distal PCB board of the distal unit in the 5G MIMO frequency-shifted two-way device to be tested are tested.

[0013] Furthermore, it also includes: testing the communication link in the 5G MIMO frequency-shifting dual-path device to be tested.

[0014] 2) In the second aspect, the present invention also provides a test system for a 5G MIMO frequency-shifted dual-path device, and the specific technical solution is as follows:

[0015] Includes test strategy preset module and test module;

[0016] The test strategy preset module is used to: preset multiple test strategies for testing each preset component in the 5G MIMO frequency-shifted dual-path device;

[0017] The test module is used to: based on a preset test strategy, test the components to be tested in the 5G MIMO frequency-shifted dual-channel device to obtain test results.

[0018] Based on the above scheme, a test system for a 5G MIMO frequency-shifted dual-path device of the present invention can also be improved as follows.

[0019] Further, the components to be tested in the 5G MIMO frequency-shifted two-way device to be tested include: at least one of a proximal PCB board of a proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and a distal PCB board of a distal unit in the 5G MIMO frequency-shifted two-way device to be tested.

[0020] Furthermore, the test module is specifically used to:

[0021] By using the auxiliary test system and based on a preset test strategy, the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and / or the distal PCB board of the distal unit in the 5G MIMO frequency-shifted two-way device to be tested are tested.

[0022] Furthermore, the test module is also used to test the communication link in the 5G MIMO frequency-shifted dual-path device to be tested.

[0023] 3) In a third aspect, the present invention further provides a computer device, comprising a processor, the processor being coupled to a memory, the memory storing at least one computer program, and the at least one computer program being loaded and executed by the processor so that the computer device implements any of the above-mentioned testing methods for 5G MIMO frequency-shifted dual-path devices.

[0024] 4) In a fourth aspect, the present invention further provides a computer-readable storage medium, in which at least one computer program is stored, and at least one computer program is loaded and executed by a processor so that a computer implements any of the above-mentioned testing methods for 5G MIMO frequency-shifting dual-path devices.

[0025] It should be noted that the beneficial effects achieved by the technical solution of the second aspect of the present invention and the corresponding possible implementation methods can be found in the above-mentioned technical effects of the first aspect and its corresponding possible implementation methods, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0027] Figure 1 A flowchart of a testing method for a 5G MIMO frequency-shifted dual-path device according to an embodiment of the present invention;

[0028] Figure 2 This is a schematic diagram of the structure of a 5G MIMO frequency-shifted dual-path device according to an embodiment of the present invention;

[0029] Figure 3 A schematic diagram of the structure of an auxiliary test system according to an embodiment of the present invention;

[0030] Figure 4 A schematic diagram of a flow chart of a test system for a 5G MIMO frequency-shifted dual-path device according to an embodiment of the present invention;

[0031] Figure 5 The present invention is a flowchart of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0032] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0033] like Figure 1 As shown, a testing method for a 5G MIMO frequency-shifted dual-path device according to an embodiment of the present invention includes the following steps:

[0034] S1. Preset multiple test strategies for testing each preset component in a 5G MIMO frequency-shifted dual-path device;

[0035] S2. Based on a preset test strategy, the components to be tested in the 5G MIMO frequency-shifted dual-path device to be tested are tested to obtain test results.

[0036] Among them, the 5G MIMO frequency-shifted dual-path equipment includes: a near-end unit and a far-end unit, such as Figure 2 As shown, specifically:

[0037] 1) The proximal unit is explained as follows:

[0038] The proximal unit includes: a proximal PCB board, a combiner, an external interface board, a power supply module and a communication module; the proximal PCB board is used to receive 5G signals and send the 5G signals to the combiner, the combiner is used to receive 2G signals, 3G signals or 4G signals, and combine them with the 5G signals sent by the proximal PCB board to generate a combined signal, and send the combined signal to the remote PCB board of the remote unit; the external interface board is used to connect: serial port interface and network port interface, etc., as well as the connection device operation indicator light; it is also used to connect the communication module, which can specifically be a communication modem module.

[0039] 2) The remote unit is explained as follows:

[0040] The remote unit includes: a remote PCB board and an antenna. The remote PCB board is used to receive the combined signal sent by the combiner of the near-end unit and send it through the antenna.

[0041] Optionally, in the above technical scheme, the components to be tested in the 5G MIMO frequency-shifting two-way device to be tested include: at least one of a proximal PCB board of a proximal unit in the 5G MIMO frequency-shifting two-way device to be tested and a distal PCB board of a distal unit in the 5G MIMO frequency-shifting two-way device to be tested.

[0042] Optionally, in S2, based on a preset test strategy, the components to be tested in the 5G MIMO frequency-shifted dual-path device to be tested are tested, including:

[0043] By using the auxiliary test system and based on a preset test strategy, the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and / or the distal PCB board of the distal unit in the 5G MIMO frequency-shifted two-way device to be tested are tested.

[0044] Among them, auxiliary test systems such as Figure 3 As shown, the test strategy for the near-end PCB board of the near-end unit in the 5G MIMO frequency-shifted dual-path device to be tested includes:

[0045] 1) Proximal registration test strategy: The monitoring / testing client sends a registration instruction to the proximal PCB board to be tested, and determines whether the proximal registration function is normal according to the response message of the proximal PCB board to be tested, wherein the proximal PCB board to be tested is the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted dual-channel device to be tested;

[0046] 2) Near-end upgrade test strategy: The monitoring / testing client sends a standard upgrade package to the near-end PCB board to be tested. After waiting for the upgrade to be completed, the monitoring / testing client sends a firmware version query instruction to the near-end PCB board to be tested, and determines whether the upgrade function is normal based on the firmware version response message of the near-end PCB board to be tested and the upgrade message of the near-end PCB board to be tested.

[0047] 3) Frequency shift path alarm test strategy: The monitoring / test client sends a signal to the near-end PCB board to be tested to enable the frequency shift path overpower / underpower alarm, and notifies the signal source control computer to send a signal source increase / lowering signal source command to the signal source. The monitoring / test client waits for the near-end PCB board to be tested to respond to the alarm message (if no response, the test fails). After responding to the alarm message, the monitoring / test client sends a frequency shift path sampling value command to the near-end PCB board to be tested, and the monitoring / test client sends a frequency point acquisition command to the spectrum analyzer, and compares the sampling value with the frequency point to determine the accuracy of the alarm.

[0048] 4) Power-off alarm test strategy: The monitoring / testing client sends a power-off alarm enable to the proximal PCB board to be tested. After waiting for a response, the monitoring / testing client sends a close / open command to the first power switch, waits for the proximal PCB board to be tested to respond to the power-off alarm reporting / recovery command, and determines whether the alarm reporting / recovery function is correct.

[0049] 5) Site opening report test strategy: The monitoring / test client sends a site opening report command to the near-end PCB board to be tested. After waiting for a response, the monitoring / test client requests a message from the OMC test center, and compares the response message with the message from the OMC test center to determine whether the site opening report function is correct.

[0050] 6) OMC test center frequency shift path alarm test strategy: OMC test center sends the frequency shift path overpower / underpower alarm enable to the near-end PCB board to be tested, and notifies the signal source control computer to send the signal source increase / lower source command to the signal source. OMC test center waits for the near-end PCB board to be tested to respond to the alarm message (no response, test failure). After responding to the alarm message, OMC test center notifies the monitoring / test client to request the OMC test center to compare the request message to determine whether the frequency shift path alarm is generated normally.

[0051] 7) OMC test center upgrade test strategy:

[0052] The OMC test center sends a standard upgrade package to the near-end PCB board to be tested, and sends an upgrade test notification to the monitoring / test client. After waiting for the upgrade to be completed, the OMC test center sends an upgrade completion notification to the monitoring / test client. The monitoring / test client sends a firmware version query instruction to the near-end PCB board to be tested, and requests an upgrade message from the OMC test center. The upgrade function is determined to be normal based on the firmware version response message of the near-end PCB board to be tested and the upgrade message of the near-end PCB board to be tested compared with the upgrade message of the OMC test center.

[0053] And so on: the network management queries and sets parameters, opens / clears the station opening status (after clearing the alarm status, the OMC test center will not be able to receive the heartbeat message of the near-end PCB board to be tested, and will not be able to query the device parameters).

[0054] Among them, the test strategy for the remote PCB board of the remote unit in the 5G MIMO frequency-shifted dual-path device to be tested includes:

[0055] 1) Remote batch registration test strategy: After the monitoring / testing client sends a registration command to the standard proximal unit and successfully responds, the monitoring / testing client sends a remote batch registration to the standard proximal unit, and determines whether all remote batch registrations are returned based on the response message. Determine whether the batch registration response function of the remote PCB board to be tested is normal based on the returned standard remote unit message and the remote message to be tested. Among them, the remote PCB board to be tested is the remote PCB board of the remote unit in the 5G MIMO frequency-shifted dual-channel device to be tested.

[0056] 2) Remote registration test strategy: The monitoring / test client sends a command to delete the remote PCB board to be tested and a standard remote unit command to the standard proximal unit. After waiting for a response, the monitoring / test client sends a single registration command to the remote PCB board to be tested and a standard remote unit command to the standard proximal unit. The remote deletion function to be tested and the remote single registration function to be tested are determined based on the response message of the remote PCB board to be tested and the response message of the standard remote unit. Whether they are normal.

[0057] 3) Remote upgrade test strategy: The monitoring / testing client sends a standard upgrade package to the remote PCB board to be tested. After the upgrade is completed, the monitoring / testing client sends a firmware version query instruction to the remote PCB board to be tested.

[0058] Determine whether the upgrade function is normal based on the firmware version response message of the remote PCB board to be tested, the firmware version response message of the standard remote unit test PCB, the upgrade message of the remote PCB board to be tested, and the upgrade message of the standard remote unit test PCB board.

[0059] And so on: remote single loop upgrade, remote batch serial upgrade, remote batch parallel upgrade, remote / parameter query-setting.

[0060] 4) Frequency shift path alarm test strategy:

[0061] The monitoring / test client sends the enable signal of frequency shifting overpower / underpower alarm to the remote PCB board to be tested and the standard remote unit, and notifies the signal source control computer to send the signal source increase / lowering signal source command to the signal source. The monitoring / test client waits for the remote PCB board to be tested and the standard remote unit to respond to the alarm message (if no response, the test fails). After responding to the alarm message, the monitoring / test client sends the frequency shifting sampling value command to the remote PCB board to be tested and the standard remote unit, and sends the frequency acquisition command to the spectrum analyzer, and compares the sampling value of the remote PCB board to be tested and the standard remote unit with the frequency point to determine the accuracy of the alarm.

[0062] 5) Power-off alarm strategy: The monitoring / test client sends a power-off alarm enable to the remote PCB board to be tested and the standard remote unit. After waiting for a response, the monitoring / test client sends a close / open command to the second power supply switch, waiting for the remote PCB board to be tested and the standard remote unit to respond to the power-off alarm reporting / recovery command, and determines whether the alarm reporting / recovery function is correct.

[0063] If the tested remote PCB does not respond correctly, the monitoring / test client sends an open command to the second power supply switch, and the monitoring / test client sends a close command to close the third power supply switch, waiting for the standard remote unit to respond to the power-off alarm. If it responds correctly, it is determined that the remote PCB board to be tested is malfunctioning.

[0064] 6) Site launch and reporting test strategy:

[0065] The monitoring / test client sends a site opening report instruction to the remote PCB board to be tested and the standard remote unit. After waiting for a response, the monitoring / test client requests a message from the OMC test center, and compares the response message of the test remote PCB and the standard remote unit with the message of the OMC test center to determine whether the site opening report function is correct.

[0066] 7) OMC test center frequency shift path alarm test strategy:

[0067] The OMC test center sends the enable signal for the overpower / underpower alarm of the frequency shift path to the remote PCB board to be tested and the standard remote unit, and notifies the signal source control computer to send the signal source increase / lowering signal source command to the signal source. The OMC test center waits for the remote PCB board to be tested and the standard remote unit module to respond to the alarm message (if no response, the test fails). Respond to the alarm message and compare it with the remote PCB board to be tested and the standard remote unit. Then notify the monitoring / test client to request the OMC test center to compare the message line to determine whether the frequency shift path alarm is generated normally.

[0068] 8) OMC test center upgrade: OMC test center sends a standard upgrade package to the remote PCB board to be tested, and sends an upgrade test notification to the monitoring / test client. After waiting for the upgrade to be completed, OMC test center sends an upgrade completion notification to the monitoring / test client. The monitoring / test client sends a firmware version query instruction to the remote PCB board to be tested, and requests an upgrade message from the OMC test center.

[0069] Determine whether the upgrade function is normal by comparing the firmware version response message of the remote PCB board to be tested, the firmware version response message of the standard remote unit test PCB, the upgrade message of the remote PCB board to be tested, the upgrade message of the standard remote unit test PCB, the upgrade message fed back to the OMC test center by the remote PCB board to be tested, and the upgrade message fed back to the OMC test center by the PCB board of the standard remote unit.

[0070] And so on: direct channel alarm, network management query / setting parameters, opening / clearing the station opening status (after closing the station opening status, the query will not respond).

[0071] Optionally, the above technical solution also includes: testing the communication link in the 5G MIMO frequency-shifting dual-path device to be tested.

[0072] 1) Proximal link verification strategy:

[0073] ① Install the PCB board of the standard proximal unit on the proximal PCB test socket, check whether the indicator light of the proximal PCB board is on, and determine whether the proximal PCB test socket is normal.

[0074] ② The signal source control computer sends adjustment instructions to the signal source, checks the output frequency of the spectrum analyzer, determines whether the signal source control computer controls the signal source normally, and determines whether the line connection from the signal source to the spectrum analyzer is normal.

[0075] ③ The monitoring test client sends the command to register the near-end unit to be tested and the command to register the standard remote unit to determine whether the serial port connection between the monitoring test client and the near-end PCB board to be tested is normal.

[0076] ④ The monitoring test client sends a command to query the direct path sampling value of the near-end PCB board to be tested, and the monitoring test client sends a command to obtain the frequency point value of the spectrum analyzer and compare it with the sampling value to determine whether the link connection from the spectrum analyzer to the near-end PCB board to be tested is normal.

[0077] ⑤ The monitoring test client sends a command to query the direct path sampling value and the frequency shift path sampling value of the standard remote unit. The monitoring test client sends a command to obtain the spectrum analyzer frequency point and compare it with the sampling value to determine whether the connection line from the near end to be tested to the standard remote unit is normal.

[0078] ⑥ The monitoring test client sends a command to the OMC test center to report the near-end and standard remote units to be tested, waits for the device to respond to the message, and then requests the OMC test center to compare the message log file to confirm that the network from the monitoring test client to the OMC test center is normal, and that the near-end communication modem module is normal to the OMC test center network is normal.

[0079] ⑦ The monitoring test client sends a command to turn off / on the first power supply switch, and checks whether the proximal PCB indicator light is off / on to determine whether the proximal control switch is normal.

[0080] 2) Remote link verification strategy:

[0081] ① Install the standard remote unit on the remote PCB test socket, check whether the remote indicator light is on, and determine whether the remote PCB test socket is normal.

[0082] ② The signal source control computer sends adjustment instructions to the signal source, checks the output frequency of the spectrum analyzer, determines whether the signal source control computer controls the signal source normally, and determines whether the line connection from the signal source to the spectrum analyzer is normal.

[0083] ③ The monitoring test client sends the registration standard proximal unit, the registration standard remote unit, and the registration remote command to be tested to determine whether the serial port connection between the monitoring test client and the standard proximal unit PCB module is normal.

[0084] ④ The monitoring and testing client sends a command to query the sampling value of the direct path of the near-end unit PCB to be standardized. The monitoring and testing client sends a command to obtain the frequency point value of the spectrum analyzer and compare it with the sampling value to determine whether the link connection from the spectrum analyzer to the near-end unit PCB to be standardized is normal.

[0085] ⑤ The monitoring test client sends a command to query the sampling value of the direct path and the frequency shift path of the remote module to be tested and the standard remote unit. The monitoring test client sends a command to obtain the frequency point of the spectrum analyzer and compares it with the sampling value to determine whether the connection line from the near end to be tested to the standard remote unit is normal.

[0086] ⑥ The monitoring test client sends the command of reporting the standard proximal unit, standard remote unit and remote module to be tested to the OMC test center, waits for the device to respond to the message and then requests the OMC test center to compare the message log file to confirm that the network from the monitoring test client to the OMC test center is normal, and that the standard proximal unit communication modem module is normal to the OMC test center network is normal.

[0087] ⑦ The monitoring test client sends a command to turn off / on the second power supply switch, and checks whether the indicator light of the remote PCB board to be tested is off / on to determine whether the remote power supply switch is normal.

[0088] ⑧ The monitoring test client sends a command to turn off / on the third power supply switch, check whether the indicator light of the standard remote unit PCB module is off / on, and determine whether the third power supply switch is normal.

[0089] In the above embodiments, although the steps are numbered S1, S2, etc., these are only specific embodiments given by the present invention. Those skilled in the art may adjust the execution order of S1, S2, etc. according to actual conditions, which is also within the protection scope of the present invention. It can be understood that in some embodiments, some or all of the above embodiments may be included.

[0090] like Figure 4 As shown, a test system for a 5G MIMO frequency-shifted dual-path device according to an embodiment of the present invention includes a test strategy preset module 201 and a test module 202;

[0091] The test strategy preset module 201 is used to: preset a plurality of test strategies for testing each preset component in the 5G MIMO frequency-shifted dual-path device;

[0092] The test module 202 is used to: based on a preset test strategy, test the components to be tested in the 5G MIMO frequency-shifted dual-path device to obtain test results.

[0093] Optionally, in the above technical scheme, the components to be tested in the 5G MIMO frequency-shifting two-way device to be tested include: at least one of a proximal PCB board of a proximal unit in the 5G MIMO frequency-shifting two-way device to be tested and a distal PCB board of a distal unit in the 5G MIMO frequency-shifting two-way device to be tested.

[0094] Optionally, in the above technical solution, the testing module 202 is specifically used for:

[0095] By using the auxiliary test system and based on a preset test strategy, the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and / or the distal PCB board of the distal unit in the 5G MIMO frequency-shifted two-way device to be tested are tested.

[0096] Optionally, in the above technical solution, the test module 202 is also used to test the communication link in the 5G MIMO frequency-shifted dual-path device to be tested.

[0097] It should be noted that the beneficial effects of the test system 200 for any 5G MIMO frequency-shifted dual-path device provided in the above embodiments are the same as the beneficial effects of the test method for any 5G MIMO frequency-shifted dual-path device provided in the above embodiments, and will not be described in detail here. In addition, when the system provided in the above embodiments implements its functions, only the division of the above-mentioned functional modules is used as an example. In actual applications, the above-mentioned functions can be assigned to different functional modules as needed, that is, the system can be divided into different functional modules according to actual conditions to complete all or part of the functions described above. In addition, the system and method embodiments provided in the above embodiments belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be described here.

[0098] like Figure 5 As shown, a computer device 300 of an embodiment of the present invention includes a processor 320, the processor 320 is coupled to a memory 310, and the memory 310 stores at least one computer program 330, and the at least one computer program 330 is loaded and executed by the processor 320, so that the computer device 300 implements any of the above-mentioned 5G MIMO frequency-shifted dual-path device test methods, specifically:

[0099] The computer device 300 may have relatively large differences due to different configurations or performances, and may include one or more processors 320 (Central Processing Units, CPU) and one or more memories 310, wherein the one or more memories 310 store at least one computer program 330, and the at least one computer program 330 is loaded and executed by the one or more processors 320, so that the computer device 300 implements any of the 5G MIMO frequency-shifted dual-path device test methods provided in the above embodiments. Of course, the computer device 300 may also have components such as a wired or wireless network interface, a keyboard, and an input and output interface for input and output, and the computer device 300 may also include other components for implementing device functions, which will not be described in detail here.

[0100] A computer-readable storage medium according to an embodiment of the present invention stores at least one computer program, and the at least one computer program is loaded and executed by a processor so that the computer implements any one of the above-mentioned testing methods for 5G MIMO frequency-shifting dual-path devices.

[0101] Optionally, the computer-readable storage medium may be a read-only memory (ROM), a random access memory (RAM), a compact disc (CD-ROM), a magnetic tape, a floppy disk, an optical data storage device, and the like.

[0102] In an exemplary embodiment, a computer program product or a computer program is also provided, the computer program product or the computer program comprising computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device performs any of the above-mentioned methods for testing a 5G MIMO frequency-shifted dual-path device.

[0103] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects and represent the definition of a specific order or sequence. The order of use of similar objects can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than the order shown or described.

[0104] Those skilled in the art know that the present invention can be implemented as a system, method or computer program product. Therefore, the present invention can be specifically implemented in the following forms, namely: it can be complete hardware, it can be complete software (including firmware, resident software, microcode, etc.), or it can be a combination of hardware and software, which is generally referred to as "circuit", "module" or "system" herein. In addition, in some embodiments, the present invention can also be implemented in the form of a computer program product in one or more computer-readable media, and the computer-readable medium contains computer-readable program code.

[0105] Any combination of one or more computer-readable media can be used. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media (a non-exhaustive list) include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it.

[0106] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A test method for 5G MIMO frequency-shifted dual-path equipment, characterized in that: include: Preset multiple test strategies for testing each preset component in a 5G MIMO frequency-shifted dual-path device; Based on the preset test strategy, the components to be tested in the 5G MIMO frequency-shifted dual-path device to be tested are tested to obtain the test results; The components to be tested in the 5G MIMO frequency-shifted two-way device to be tested include: at least one of a proximal PCB board of a proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and a distal PCB board of a distal unit in the 5G MIMO frequency-shifted two-way device to be tested; Based on the preset test strategy, the components to be tested in the 5G MIMO frequency-shifted dual-path device to be tested are tested, including: Using the auxiliary test system and based on a preset test strategy, testing the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and / or the distal PCB board of the distal unit in the 5G MIMO frequency-shifted two-way device to be tested; The test strategy for the near-end PCB board of the near-end unit in the 5G MIMO frequency-shifted two-way device to be tested includes: 1) Proximal registration test strategy: The monitoring / testing client sends a registration instruction to the proximal PCB board to be tested, and determines whether the proximal registration function is normal according to the response message of the proximal PCB board to be tested, wherein the proximal PCB board to be tested is the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted dual-channel device to be tested; 2) Near-end upgrade test strategy: The monitoring / testing client sends a standard upgrade package to the near-end PCB board to be tested. After the upgrade is completed, the monitoring / testing client sends a firmware version query instruction to the near-end PCB board to be tested, and determines whether the upgrade function is normal based on the firmware version response message of the near-end PCB board to be tested and the upgrade message of the near-end PCB board to be tested; 3) Frequency shift path alarm test strategy: The monitoring / test client sends a signal to the near-end PCB board to be tested to enable the frequency shift path overpower / underpower alarm, and notifies the signal source control computer to send a signal source increase / lowering signal source command to the signal source. The monitoring / test client waits for the near-end PCB board to be tested to respond to the alarm message. After responding to the alarm message, the monitoring / test client sends a frequency shift path sampling value command to the near-end PCB board to be tested. The monitoring / test client sends a frequency point acquisition command to the spectrum analyzer, and compares the sampling value with the frequency point to determine the accuracy of the alarm. 4) Power-off alarm test strategy: The monitoring / test client sends a power-off alarm enable to the near-end PCB board to be tested. After waiting for a response, the monitoring / test client sends a close / open command to the first power switch, waits for the near-end PCB board to be tested to respond to the power-off alarm reporting / recovery command, and determines whether the alarm reporting / recovery function is correct; 5) Site opening report test strategy: The monitoring / test client sends a site opening report command to the near-end PCB board to be tested. After waiting for a response, the monitoring / test client requests a message from the OMC test center, and compares the response message with the message from the OMC test center to determine whether the site opening report function is correct; 6) OMC test center frequency shift path alarm test strategy: OMC test center sends the frequency shift path overpower / underpower alarm enable to the near-end PCB board to be tested, and notifies the signal source control computer to send the signal source increase / lower source command to the signal source. OMC test center waits for the near-end PCB board to be tested to respond to the alarm message; after responding to the alarm message, OMC test center notifies the monitoring / test client to request the OMC test center to compare the request message to determine whether the frequency shift path alarm is generated normally; 7) OMC test center upgrade test strategy: OMC test center sends a standard upgrade package to the near-end PCB board to be tested, and sends an upgrade test notification to the monitoring / test client. After waiting for the upgrade to be completed, OMC test center sends an upgrade completion notification to the monitoring / test client. The monitoring / test client sends a firmware version query instruction to the near-end PCB board to be tested, and requests an upgrade message from the OMC test center. According to the firmware version response message of the near-end PCB board to be tested and the upgrade message of the near-end PCB board to be tested, the upgrade function is determined to be normal according to the comparison result between the upgrade message of the OMC test center and the upgrade message of the OMC test center. The test strategy for the remote PCB board of the remote unit in the 5G MIMO frequency-shifted two-way device to be tested includes: 1) Remote batch registration test strategy: After the monitoring / test client sends a registration command to the standard proximal unit and successfully responds, the monitoring / test client sends a remote batch registration to the standard proximal unit, determines whether all remote batch registrations are returned based on the response message, and determines whether the batch registration response function of the remote PCB board to be tested is normal based on the returned standard remote unit message and the remote message to be tested. The remote PCB board to be tested is the remote PCB board of the remote unit in the 5G MIMO frequency-shifted dual-channel device to be tested; 2) Remote registration test strategy: The monitoring / test client sends a command to delete the remote PCB board to be tested and a command to the standard near-end unit. After waiting for a response, the monitoring / test client sends a single registration command to the remote PCB board to be tested and a command to the standard near-end unit. The remote deletion function to be tested and the remote single registration function to be tested are determined based on the response message of the remote PCB board to be tested and the response message of the standard remote unit. Whether it is normal; 3) Remote upgrade test strategy: The monitoring / testing client sends a standard upgrade package to the remote PCB board to be tested. After the upgrade is completed, the monitoring / testing client sends a firmware version query instruction to the remote PCB board to be tested; Determine whether the upgrade function is normal according to the firmware version response message of the remote PCB board to be tested, the firmware version response message of the standard remote unit test PCB, and the upgrade message of the remote PCB board to be tested, and the upgrade message of the standard remote unit test PCB board; 4) Frequency shift path alarm test strategy: the monitoring / test client sends a signal to enable the frequency shift path overpower / underpower alarm to the remote PCB board to be tested and the standard remote unit, and notifies the signal source control computer to send a signal source increase / lowering signal source command to the signal source, and the monitoring / test client waits for the remote PCB board to be tested and the standard remote unit to respond to the alarm message; after responding to the alarm message, the monitoring / test client sends a frequency shift path sampling value command to the remote PCB board to be tested and the standard remote unit, and the monitoring / test client sends a frequency point acquisition command to the spectrum analyzer, and compares the sampling value of the remote PCB board to be tested and the standard remote unit with the frequency point to determine the accuracy of the alarm; 5) Power-off alarm strategy: The monitoring / test client sends a power-off alarm enable to the remote PCB board to be tested and the standard remote unit. After waiting for a response, the monitoring / test client sends a close / open command to the second power supply switch, waits for the remote PCB board to be tested and the standard remote unit to respond to the power-off alarm reporting / restoration command, and determines whether the alarm reporting / restoration function is correct; If the tested remote PCB does not respond correctly, the monitoring / testing client sends an opening command to the second power switch, and the monitoring / testing client sends a closing command to close the third power switch, waiting for the standard remote unit to respond to the power-off alarm. If the response is correct, it is determined that the function of the remote PCB to be tested is abnormal; 6) Station opening report test strategy: The monitoring / test client sends a station opening report instruction to the remote PCB board to be tested and the standard remote unit. After waiting for a response, the monitoring / test client requests a message from the OMC test center, and compares the response message of the test remote PCB and the standard remote unit with the message of the OMC test center to determine whether the station opening report function is correct; 7) OMC test center frequency shift path alarm test strategy: OMC test center sends the frequency shift path overpower / underpower alarm enable to the remote PCB board to be tested and the standard remote unit, and notifies the signal source control computer to send the signal source increase / lower source command to the signal source. OMC test center waits for the remote PCB board to be tested and the standard remote unit module to respond to the alarm message; responds to the alarm message and compares the remote PCB board to be tested and the standard remote unit; then notifies the monitoring / test client to request the OMC test center to compare the message line to determine whether the frequency shift path alarm is generated normally; 8) OMC test center upgrade: The OMC test center sends a standard upgrade package to the remote PCB board to be tested, and sends an upgrade test notification to the monitoring / test client. After the upgrade is completed, the OMC test center sends an upgrade completion notification to the monitoring / test client; the monitoring / test client sends a firmware version query instruction to the remote PCB board to be tested, and requests an upgrade message from the OMC test center; Determine whether the upgrade function is normal by comparing the firmware version response message of the remote PCB board to be tested, the firmware version response message of the standard remote unit test PCB, the upgrade message of the remote PCB board to be tested, the upgrade message of the standard remote unit test PCB, the upgrade message fed back to the OMC test center by the remote PCB board to be tested, and the upgrade message fed back to the OMC test center by the PCB board of the standard remote unit.

2. A test method for a 5G MIMO frequency-shifted dual-path device according to claim 1, characterized in that: Also includes: The communication link in the 5G MIMO frequency-shifted dual-path device to be tested is tested.

3. A test system for 5G MIMO frequency-shifted dual-path equipment, characterized in that: Includes test strategy preset module and test module; The test strategy preset module is used to: preset multiple test strategies for testing each preset component in the 5G MIMO frequency-shifted dual-path device; The test module is used to: test the components to be tested in the 5G MIMO frequency-shifted dual-channel device to be tested based on a preset test strategy to obtain test results; The components to be tested in the 5G MIMO frequency-shifted two-way device to be tested include: at least one of a proximal PCB board of a proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and a distal PCB board of a distal unit in the 5G MIMO frequency-shifted two-way device to be tested; The test module is specifically used for: Using the auxiliary test system and based on a preset test strategy, testing the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted two-way device to be tested and / or the distal PCB board of the distal unit in the 5G MIMO frequency-shifted two-way device to be tested; The test strategy for the near-end PCB board of the near-end unit in the 5G MIMO frequency-shifted two-way device to be tested includes: 1) Proximal registration test strategy: The monitoring / testing client sends a registration instruction to the proximal PCB board to be tested, and determines whether the proximal registration function is normal according to the response message of the proximal PCB board to be tested, wherein the proximal PCB board to be tested is the proximal PCB board of the proximal unit in the 5G MIMO frequency-shifted dual-channel device to be tested; 2) Near-end upgrade test strategy: The monitoring / testing client sends a standard upgrade package to the near-end PCB board to be tested. After the upgrade is completed, the monitoring / testing client sends a firmware version query instruction to the near-end PCB board to be tested, and determines whether the upgrade function is normal based on the firmware version response message of the near-end PCB board to be tested and the upgrade message of the near-end PCB board to be tested; 3) Frequency shift path alarm test strategy: The monitoring / test client sends a signal to the near-end PCB board to be tested to enable the frequency shift path overpower / underpower alarm, and notifies the signal source control computer to send a signal source increase / lowering signal source command to the signal source. The monitoring / test client waits for the near-end PCB board to be tested to respond to the alarm message. After responding to the alarm message, the monitoring / test client sends a frequency shift path sampling value command to the near-end PCB board to be tested. The monitoring / test client sends a frequency point acquisition command to the spectrum analyzer, and compares the sampling value with the frequency point to determine the accuracy of the alarm. 4) Power-off alarm test strategy: The monitoring / test client sends a power-off alarm enable to the near-end PCB board to be tested. After waiting for a response, the monitoring / test client sends a close / open command to the first power switch, waits for the near-end PCB board to be tested to respond to the power-off alarm reporting / recovery command, and determines whether the alarm reporting / recovery function is correct; 5) Site opening report test strategy: The monitoring / test client sends a site opening report command to the near-end PCB board to be tested. After waiting for a response, the monitoring / test client requests a message from the OMC test center, and compares the response message with the message from the OMC test center to determine whether the site opening report function is correct; 6) OMC test center frequency shift path alarm test strategy: OMC test center sends the frequency shift path overpower / underpower alarm enable to the near-end PCB board to be tested, and notifies the signal source control computer to send the signal source increase / lower source command to the signal source. OMC test center waits for the near-end PCB board to be tested to respond to the alarm message; after responding to the alarm message, OMC test center notifies the monitoring / test client to request the OMC test center to compare the request message to determine whether the frequency shift path alarm is generated normally; 7) OMC test center upgrade test strategy: OMC test center sends a standard upgrade package to the near-end PCB board to be tested, and sends an upgrade test notification to the monitoring / test client. After waiting for the upgrade to be completed, OMC test center sends an upgrade completion notification to the monitoring / test client. The monitoring / test client sends a firmware version query instruction to the near-end PCB board to be tested, and requests an upgrade message from the OMC test center. According to the firmware version response message of the near-end PCB board to be tested and the upgrade message of the near-end PCB board to be tested, the upgrade function is determined to be normal according to the comparison result between the upgrade message of the OMC test center and the upgrade message of the OMC test center. The test strategy for the remote PCB board of the remote unit in the 5G MIMO frequency-shifted two-way device to be tested includes: 1) Remote batch registration test strategy: After the monitoring / test client sends a registration command to the standard proximal unit and successfully responds, the monitoring / test client sends a remote batch registration to the standard proximal unit, determines whether all remote batch registrations are returned based on the response message, and determines whether the batch registration response function of the remote PCB board to be tested is normal based on the returned standard remote unit message and the remote message to be tested. The remote PCB board to be tested is the remote PCB board of the remote unit in the 5G MIMO frequency-shifted dual-channel device to be tested; 2) Remote registration test strategy: The monitoring / test client sends a command to delete the remote PCB board to be tested and a command to the standard near-end unit. After waiting for a response, the monitoring / test client sends a single registration command to the remote PCB board to be tested and a command to the standard near-end unit. The remote deletion function to be tested and the remote single registration function to be tested are determined based on the response message of the remote PCB board to be tested and the response message of the standard remote unit. Whether it is normal; 3) Remote upgrade test strategy: The monitoring / testing client sends a standard upgrade package to the remote PCB board to be tested. After the upgrade is completed, the monitoring / testing client sends a firmware version query instruction to the remote PCB board to be tested; Determine whether the upgrade function is normal according to the firmware version response message of the remote PCB board to be tested, the firmware version response message of the standard remote unit test PCB, and the upgrade message of the remote PCB board to be tested, and the upgrade message of the standard remote unit test PCB board; 4) Frequency shift path alarm test strategy: the monitoring / test client sends a signal to enable the frequency shift path overpower / underpower alarm to the remote PCB board to be tested and the standard remote unit, and notifies the signal source control computer to send a signal source increase / lowering signal source command to the signal source, and the monitoring / test client waits for the remote PCB board to be tested and the standard remote unit to respond to the alarm message; after responding to the alarm message, the monitoring / test client sends a frequency shift path sampling value command to the remote PCB board to be tested and the standard remote unit, and the monitoring / test client sends a frequency point acquisition command to the spectrum analyzer, and compares the sampling value of the remote PCB board to be tested and the standard remote unit with the frequency point to determine the accuracy of the alarm; 5) Power-off alarm strategy: The monitoring / test client sends a power-off alarm enable to the remote PCB board to be tested and the standard remote unit. After waiting for a response, the monitoring / test client sends a close / open command to the second power supply switch, waits for the remote PCB board to be tested and the standard remote unit to respond to the power-off alarm reporting / restoration command, and determines whether the alarm reporting / restoration function is correct; If the tested remote PCB does not respond correctly, the monitoring / testing client sends an opening command to the second power switch, and the monitoring / testing client sends a closing command to close the third power switch, waiting for the standard remote unit to respond to the power-off alarm. If the response is correct, it is determined that the function of the remote PCB to be tested is abnormal; 6) Station opening report test strategy: The monitoring / test client sends a station opening report instruction to the remote PCB board to be tested and the standard remote unit. After waiting for a response, the monitoring / test client requests a message from the OMC test center, and compares the response message of the test remote PCB and the standard remote unit with the message of the OMC test center to determine whether the station opening report function is correct; 7) OMC test center frequency shift path alarm test strategy: OMC test center sends the frequency shift path overpower / underpower alarm enable to the remote PCB board to be tested and the standard remote unit, and notifies the signal source control computer to send the signal source increase / lower source command to the signal source. OMC test center waits for the remote PCB board to be tested and the standard remote unit module to respond to the alarm message; responds to the alarm message and compares the remote PCB board to be tested and the standard remote unit; then notifies the monitoring / test client to request the OMC test center to compare the message line to determine whether the frequency shift path alarm is generated normally; 8) OMC test center upgrade: The OMC test center sends a standard upgrade package to the remote PCB board to be tested, and sends an upgrade test notification to the monitoring / test client. After the upgrade is completed, the OMC test center sends an upgrade completion notification to the monitoring / test client; the monitoring / test client sends a firmware version query instruction to the remote PCB board to be tested, and requests an upgrade message from the OMC test center; Determine whether the upgrade function is normal by comparing the firmware version response message of the remote PCB board to be tested, the firmware version response message of the standard remote unit test PCB, the upgrade message of the remote PCB board to be tested, the upgrade message of the standard remote unit test PCB, the upgrade message fed back to the OMC test center by the remote PCB board to be tested, and the upgrade message fed back to the OMC test center by the PCB board of the standard remote unit.

4. A test system for a 5G MIMO frequency-shifted dual-path device according to claim 3, characterized in that: The test module is also used to test the communication link in the 5G MIMO frequency-shifting dual-path device to be tested.

5. A computer device, characterized in that: The computer device includes a processor, the processor is coupled to a memory, at least one computer program is stored in the memory, and the at least one computer program is loaded and executed by the processor so that the computer device implements a testing method for a 5G MIMO frequency-shifting dual-path device as described in claim 1 or 2.

6. A computer-readable storage medium, characterized in that: At least one computer program is stored in the computer-readable storage medium, and the at least one computer program is loaded and executed by the processor so that the computer implements a testing method for a 5G MIMO frequency-shifting dual-path device as described in claim 1 or 2.

Citation Information

Patent Citations

  • Terminal radio frequency multi-mode multi-system comprehensive test method and system

    CN106549718A

  • Operation monitoring method and system of 5G MIMO frequency shift two-way system

    CN117336766A

  • Height integrates DPD digital fiber repeater

    CN205829633U

  • Novel 5G indoor distribution system

    CN209692750U

  • KR20220134217A