Dynamically reconfigurable test load resource matching system and matching method
By dynamically reconstructing the test load resource matching system and optimizing the installation and power-on strategies of the test load, the problem of non-optimized resource utilization during on-orbit testing is solved and the test efficiency and effectiveness are improved.
Patent Information
- Application Number
- CN202410729674.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-06
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-06
AI Technical Summary
During the on-orbit test, resource requirements such as power supply, data transmission, heat dissipation and installation space of the test load lead to unoptimized resource utilization, resulting in low on-orbit test efficiency and inability to fully utilize the test benefits.
Propose a dynamically reconfigurable test load resource matching system and method. By planning demand factors and establishing priority order, build space and time models, optimize the installation and power-on strategy of test loads, and ensure that heat dissipation, installation and Maximize the number of test loads and test benefits under constraints such as space, power supply, and data transmission.
It is possible to complete more on-orbit tests in a shorter time, make full use of test cabinet resources, improve test efficiency and resource utilization, and maximize test benefits.
Smart Images

Figure CN118296407B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of space test technology, and in particular to a dynamically reconfigurable test payload resource matching system and matching method. Background Art
[0002] During space tests, test loads are usually installed in test cabinets in the form of "load drawers" and connected to cables inside the test cabinets, which provide power supply, information, heat dissipation and other channels for the load units. The resources required for on-orbit tests involve factors such as power supply, data transmission, heat dissipation, and installation space.
[0003] In terms of power supply, different test loads require different power supplies, and the power supply required for the same test load under different test conditions also changes dynamically. The total power that the test cabinet can provide to each test load and all test loads is limited.
[0004] In terms of data transmission, the test data generated by the test payload is transmitted to the ground through the space network. The transmission rate of the space network has certain limitations on the data bandwidth.
[0005] In terms of heat dissipation, the heat generated by the test load needs to be dissipated through heat dissipation means to ensure that the ambient temperature is not too high and the test load cannot work properly. Ordinary test loads can be cooled by air cooling provided by the test cabinet for each load installation space, and some test loads with large heat dissipation requirements can be cooled by liquid cooling arranged at the bottom of the test cabinet.
[0006] In terms of installation space, due to the different specifications of test loads and the fact that the common support equipment in the test cabinet may occupy part of the installation space, the number of test loads allowed to be installed in the test cabinet is limited. In addition, after a load experiment is completed, the test load needs to be dismantled to make room for the installation of new test loads on orbit, so the load installation space in the test cabinet also changes dynamically.
[0007] In summary, under the coupling conditions of multiple factors such as power supply power, data transmission, heat dissipation, and installation space, how to make full use of on-orbit test resources, maximize payload testing, and obtain fruitful test results requires comprehensive and coordinated sorting out of the test requirements of each test payload in order to find the optimal solution.
[0008] When planning on-orbit tests of payloads, they can usually be allocated to the test payloads in the order of the payload uplink time based on the support capacity of the test cabinet. Once the resources that the test cabinet can provide are exhausted or there is a gap in a certain resource, it is necessary to coordinate the test plans of subsequent test payloads, or wait for the test payloads already in orbit to complete the test before conducting new load tests. This results in low on-orbit test efficiency and unoptimized utilization and allocation of test resources.
[0009] Therefore, new research is needed on how to make full use of on-orbit test resources, improve on-orbit test efficiency, maximize on-orbit payload testing, and give full play to application benefits. Summary of the invention
[0010] In view of the above problems, the present invention proposes a dynamically reconfigurable test load resource matching system and matching method. When the test cabinet performs load experiment resource matching, it is necessary to seek the optimal strategy under the constraints of heat dissipation, installation space, power supply, data transmission, etc., to make full use of the installation space of the test cabinet to install more test loads, and to complete more on-orbit tests in a shorter time to obtain more test benefits.
[0011] The dynamically reconfigurable test load resource matching method provided by the present invention comprises the following steps:
[0012] S1: Plan demand factors and establish a priority order of demand factors; wherein demand factors include installation space factor, heat dissipation factor, power supply factor and data transmission factor; the installation space resource demand of the test load is used as the installation space factor, the heat dissipation resource demand of the test load is used as the heat dissipation factor, the data transmission resource demand of the test load is used as the data transmission factor, and the power supply resource demand of the test load is used as the power supply factor; the priority order of demand factors from large to small is installation space factor, heat dissipation factor, power supply factor, and data transmission factor;
[0013] S2: construct the spatial model S1 of the test load based on the installation space factor; wherein the maximum number of test loads of different specifications is calculated according to the total test load installation space supported by the test cabinet, and is used as the spatial model S1 of the test load;
[0014] S3: Reconstruct the spatial model S1 based on the heat dissipation factor to obtain the spatial model S2 of the test load; the process of reconstructing the spatial model S1 is as follows: determine whether there is a liquid-cooled test load; if not, ensure that the heat dissipation heat consumption of a single air-cooled test load required for the on-orbit test is not greater than the heat dissipation heat consumption of a single air-cooled test load supported by the test cabinet, and that the total heat dissipation heat consumption of all air-cooled test loads required for the on-orbit test is not greater than the total heat dissipation heat consumption of air-cooled test loads supported by the test cabinet; if it exists, determine whether the number of liquid-cooled test loads is greater than the number of test cabinets. Rated liquid cooling installation space; if it is larger than the rated liquid cooling installation space, reduce the number of liquid cooling test loads until it is no larger than the rated liquid cooling installation space F of the test cabinet; if it is no larger than the rated liquid cooling installation space F, install the liquid cooling test load at the bottom of the test cabinet, and at the same time ensure that the liquid cooling heat consumption required for the on-orbit test of a single liquid cooling test load is no larger than the liquid cooling heat consumption of a single liquid cooling test load supported by the test cabinet, and the total liquid cooling heat consumption required for the on-orbit test of all liquid cooling test loads is no larger than the total liquid cooling heat consumption supported by the test cabinet;
[0015] S4: Construct the time model T1 of the test load based on the power supply power factor; wherein, calculate the total power supply power required when all the test loads determined based on the space model S2 work simultaneously, and judge whether the total power supply power meets the maximum power supply power supported by the test cabinet; if so, all the test loads are powered on at the same time for on-orbit testing; if not, according to the power-on continuous working time of each test load within 24 hours, based on the principle of minimizing the test resource occupancy, form the power-on time sequence of each test load and the power-on duration period within 24 hours, so as to obtain the time model T1;
[0016] S5: Reconstruct the time model T1 based on the data transmission factor to obtain the time model T2 of the test load; wherein, calculate the total data transmission rate required when all test loads determined based on the space model S2 work simultaneously, and determine whether the total data transmission rate meets the maximum load data transmission rate supported by the test cabinet; if so, there is no need to reconstruct the time model T1, and all test loads are powered on at the same time to perform on-orbit tests and transmit the generated test data; if not, reconstruct the time model T1, and the process of reconstructing the time model T1 is as follows: on the basis of the time model T1, based on the principle of maximizing test benefits, form the power-on time sequence of each test load and the data transmission duration period within 24 hours;
[0017] S6: Construct the optimal matching strategy based on the spatial model S2 and the temporal model T2 to match the resources of the test load.
[0018] Preferably, the principle of minimizing the test resource occupancy is: under the premise of meeting the maximum power supply supported by the test cabinet, multiple test loads with small power supply power and short power-on duration are powered on at the same time for on-orbit testing. After the test of a certain test load is completed, the remaining test loads that have not yet been powered on are powered on in the order of power supply power from small to large and power-on duration from small to large for on-orbit testing.
[0019] Preferably, the principle of maximizing the test benefit is: under the premise of meeting the maximum power supply power supported by the test cabinet and the maximum load data transmission rate supported by the test cabinet, multiple test loads with large data transmission rates are powered on at the same time for on-orbit testing. After the test of a certain test load is completed, the remaining test loads that have not yet been powered on are powered on in descending order of data transmission rate for on-orbit testing.
[0020] Preferably, when the principle of maximizing test benefits conflicts with the principle of minimizing test resource occupancy, on the basis of space model S2, more test loads are first powered on for on-orbit testing to ensure that the number of test loads for on-orbit testing is maximized; on the premise of ensuring that the number of test loads for on-orbit testing is maximized, the remaining test loads that have not yet been powered on are powered on in order of data transmission rate from large to small for on-orbit testing; at the same time, when the total data transmission rate generated by the test loads of the on-orbit test is greater than the maximum load data transmission rate supported by the test cabinet, the test loads that have not yet been powered on are no longer powered on; when the total data transmission rate generated by the test loads of the on-orbit test is less than the maximum load data transmission rate supported by the test cabinet, the remaining test loads that have not yet been powered on are powered on in order of data transmission rate from large to small for on-orbit testing.
[0021] The dynamically reconfigurable test load resource matching system provided by the present invention is used to implement the above-mentioned dynamically reconfigurable test load resource matching method, including:
[0022] The demand factor planning unit is used to plan the demand factors and establish the priority order of the demand factors; wherein the demand factors include installation space factor, heat dissipation factor, power supply factor and data transmission factor; the installation space resource demand of the test load is used as the installation space factor, the heat dissipation resource demand of the test load is used as the heat dissipation factor, the data transmission resource demand of the test load is used as the data transmission factor, and the power supply resource demand of the test load is used as the power supply factor; the priority order of the demand factors established by the demand factor planning unit is, from large to small, installation space factor, heat dissipation factor, power supply factor, and data transmission factor;
[0023] A space model building unit is used to build a space model S1 of the test load based on the installation space factor; wherein the space model building unit calculates the maximum value of the number of test loads of different specifications according to the total test load installation space supported by the test cabinet as the space model S1 of the test load;
[0024] The space model reconstruction unit is used to reconstruct the space model S1 based on the heat dissipation factor to obtain the space model S2 of the test load; wherein, the process of the space model reconstruction unit reconstructing the space model S1 is: determine whether there is a liquid cooling test load; if not, ensure that the air cooling heat consumption required for the on-orbit test of a single air cooling test load is not greater than the air cooling heat consumption of a single air cooling test load supported by the test cabinet, and the total air cooling heat consumption required for the on-orbit test of all air cooling test loads is not greater than the total air cooling heat consumption supported by the test cabinet; if it exists, determine the number of liquid cooling test loads Is it larger than the rated liquid cooling installation space of the test cabinet? If it is larger than the rated liquid cooling installation space, reduce the number of liquid cooling test loads until it is no larger than the rated liquid cooling installation space F of the test cabinet. If it is no larger than the rated liquid cooling installation space F, install the liquid cooling test load at the bottom of the test cabinet, and ensure that the liquid cooling heat consumption required for the on-orbit test of a single liquid cooling test load is no larger than the liquid cooling heat consumption of a single liquid cooling test load supported by the test cabinet, and that the total liquid cooling heat consumption required for the on-orbit test of all liquid cooling test loads is no larger than the total liquid cooling heat consumption supported by the test cabinet.
[0025] A time model building unit is used to build a time model T1 of the test load based on the power supply power factor; wherein the time model building unit calculates the total power supply power required when all the test loads determined based on the space model S2 work simultaneously, and determines whether the total power supply power meets the maximum power supply power supported by the test cabinet; if so, all the test loads are powered on at the same time for on-orbit testing; if not, according to the power-on continuous working time of each test load within 24 hours and based on the principle of minimizing the test resource occupancy, the power-on time sequence of each test load and the power-on duration period within 24 hours are formed, thereby obtaining the time model T1;
[0026] The time model reconstruction unit is used to reconstruct the time model T1 based on the data transmission factor to obtain the time model T2 of the test load; wherein the time model reconstruction unit calculates the total data transmission rate required when all the test loads determined based on the space model S2 work simultaneously, and determines whether the total data transmission rate meets the maximum load data transmission rate supported by the test cabinet; if so, there is no need to reconstruct the time model T1, and all the test loads are powered on at the same time to perform on-orbit tests and transmit the generated test data; if not, the time model T1 is reconstructed, and the process of reconstructing the time model T1 is: on the basis of the time model T1, based on the principle of maximizing the test benefit, the power-on time sequence of each test load and the data transmission duration period within 24 hours are formed;
[0027] The matching strategy construction unit is used to construct the optimal matching strategy based on the space model S2 and the time model T2 to match the resources of the test load.
[0028] Compared with the prior art, the present invention lists resource requirements such as power supply demand, data transmission demand, heat dissipation demand, and installation space demand as demand factors, and determines the space factor and time factor by analyzing the influence characteristics of different demand factors on the test load installation space and the test load power-on time. According to the constraints of each factor, the space model and time model of the test load in the test cabinet are given, and it can be dynamically reconstructed according to the constraints of other influencing factors under the corresponding model to seek the optimal strategy, make full use of the test cabinet installation space to install more test loads, and complete more on-orbit tests in a shorter time to obtain more test benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a flowchart of a dynamically reconfigurable test load resource matching method provided according to an embodiment of the present invention;
[0030] Figure 2 is a schematic diagram of the installation space of the test load in the test cabinet provided according to a specific embodiment of the present invention;
[0031] Figure 3 is a schematic diagram of a space model S1 provided according to a specific embodiment of the present invention;
[0032] Figure 4 is a schematic diagram of a space model S2 provided according to a specific embodiment of the present invention;
[0033] Figure 5 is a schematic diagram of a time model T1 provided according to a specific embodiment of the present invention;
[0034] Figure 6 It is a schematic diagram of a time model T2 provided according to a specific embodiment of the present invention. DETAILED DESCRIPTION
[0035] Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the following description, the same modules are represented by the same reference numerals. In the case of the same reference numerals, their names and functions are also the same. Therefore, the detailed description thereof will not be repeated.
[0036] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and do not constitute a limitation of the present invention.
[0037] The overall idea of the present invention is to list resource requirements such as power supply power demand, data transmission demand, heat dissipation demand, and installation space demand as demand factors, and according to the characteristics of each demand factor, the demand factor is divided into space factor and time factor. The space factor is divided into heat dissipation factor and installation space factor. The time factor is divided into power supply factor and data transmission factor. The space factor, time factor, heat dissipation factor, and installation space factor are all influencing factors.
[0038] For a certain test load, according to the demand characteristics of the test load for different influencing factors, the influencing factors required by the test load are sorted by priority. Combined with whether the influencing factors can be adjusted, the on-orbit test plan of the test load is designed in the order of installation space, heat dissipation, power supply, and data transmission. A comprehensive on-orbit test plan for dynamically reconfigurable multiple test loads is proposed.
[0039] When matching test load resources based on the test cabinet, it is necessary to seek the optimal strategy under the constraints of heat dissipation, installation space, power supply, data transmission, etc., to make full use of the installation space of the test cabinet to install more test loads, complete more on-orbit tests in a shorter time, and obtain more test benefits.
[0040] The priority order of influencing factors is: installation space factor > heat dissipation factor > power supply factor > data transmission factor. The resources of the test load are matched according to this priority order.
[0041] 1. Power factor (K_power)
[0042] For example: the test cabinet can provide a 100V power supply interface for each load device. The test cabinet can provide different gears of power supply current, for example, it can be divided into three gears (1A, 3A, 5A) and adjustable. Then the test load can set the on-track current of 1A, 3A or 5A as needed, and the power that can be provided is 100W, 300W and 500W. At the same time, the total power supply that the test cabinet can provide is also limited. The total power supply power required for all test loads working simultaneously on the track should not be greater than the maximum power supply power that the test cabinet can provide. The power supply power factor affects the continuous power-on time of the load device on the track, so the power supply power factor K_power is set as the time factor.
[0043] Therefore, when designing the power factor, the load device should meet the following requirements:
[0044] f_power <f_K_power(1);
[0045] (2);
[0046] Where: f_power is the power required for an on-orbit test of a certain load device, f_K_power is the maximum power that the test cabinet can provide for the power level selected for the test load, is the total power required when n on-orbit payloads work simultaneously, It is the total power supply that the test cabinet can provide.
[0047] 2. Installation space factor (K_spare)
[0048] The test cabinet can provide installation space for no less than several type I load units for the test device, taking the smallest type I load unit as a basic load unit, adapting to the installation of multiple types of load units in different forms, and realizing free matching of load units on the track. This installation space factor affects the installation position of the load device in the test cabinet, so the installation space factor K_spare is set as the space factor.
[0049] Therefore, when designing the installation space factor, the load device should meet the following requirements:
[0050] f_spare f_K_spare(3);
[0051] (4);
[0052] Where: f_spare is the load unit specification required for an on-orbit test of a certain load device, f_K_spare is the maximum load unit specification that the test cabinet can provide, The number of load unit installation spaces required for n load devices on track, The maximum amount of load unit installation space that the test cabinet can provide.
[0053] 3. Data transmission factor (K_data)
[0054] The test cabinet can generally provide a data communication network to transmit the test data generated by the test device, but the data bandwidth is limited. The data transmission factor affects the transmission time of the test data, so the data transmission factor K_data is set as the time factor. The data transmission rate that the entire test cabinet can provide is a fixed value.
[0055] Therefore, when designing the data transmission factor, the load device should meet the following requirements:
[0056] f_K_data(5);
[0057] f_K_data(6);
[0058] Where: f_data is the data transmission rate required for an on-orbit test of a certain payload device, is the total data transmission rate that n payload devices on track need to transmit simultaneously, and f_K_data is the maximum payload data transmission rate that the test cabinet can provide;
[0059] 4. Heat dissipation factor (K_thermal)
[0060] The test cabinet can provide two heat dissipation methods. Ordinary test loads can be cooled by air cooling provided by the test cabinet for each test load installation space. The heat dissipation capacity is small and limited. Some test loads with large heat dissipation requirements can be cooled by liquid cooling. The heat dissipation capacity of liquid cooling is large and limited. However, most ordinary test loads use air cooling to dissipate heat. Only a few test loads that generate more heat on track require liquid cooling. Therefore, the test cabinet is equipped with liquid cooling equipment at the bottom of the cabinet to provide liquid cooling for test loads with large heat consumption requirements. The heat dissipation factor affects the installation position of the load device in the test cabinet, so the heat dissipation factor K_thermal is set as the space factor.
[0061] Heat dissipation is divided into air cooling and liquid cooling , the heat dissipation required for each test load should not be greater than the heat dissipation that can be provided by air cooling and liquid cooling.
[0062] Therefore, when designing the heat dissipation factor, the load device should meet the following requirements:
[0063] f_K_ (7);
[0064] f_K_ (8);
[0065] f_sum_ (9);
[0066] f_sum_ (10);
[0067] Where: The heat dissipation required for air cooling of a certain payload device during on-orbit testing. is the heat dissipation required for liquid cooling of a certain load device during on-orbit testing, f_K_ To test the air cooling capacity that the cabinet can provide to a single load unit, f_K_ To test the liquid cooling capacity that the cabinet can provide to a single load unit, is the total liquid cooling heat dissipation required for all payload devices during on-orbit testing, is the total air cooling heat dissipation required for all payload devices during on-orbit testing, f_sum_ To test the maximum air cooling capacity that the cabinet can provide, f_sum_ To test the maximum liquid cooling capacity that the cabinet can provide.
[0068] Figure 1 The flowchart of the dynamically reconfigurable test load resource matching method provided according to an embodiment of the present invention is shown.
[0069] like Figure 1 As shown, the dynamically reconfigurable test load resource matching method provided by the embodiment of the present invention includes the following steps:
[0070] S1: Plan demand factors and establish their priority order; wherein, demand factors include installation space factor, heat dissipation factor, power supply factor and data transmission factor; the installation space resource demand of the test load is taken as the installation space factor, the heat dissipation resource demand of the test load is taken as the heat dissipation factor, the data transmission resource demand of the test load is taken as the data transmission factor, and the power supply resource demand of the test load is taken as the power supply factor; the priority order of demand factors is from large to small: installation space factor, heat dissipation factor, power supply factor, data transmission factor.
[0071] S2: Construct a spatial model S1 of the test load based on the installation space factor; wherein the maximum number of test loads of different specifications is calculated according to the total test load installation space supported by the test cabinet as the spatial model S1 of the test load.
[0072] Assume that the number of type I load units is x1, the number of type II load units is y1, and the number of type III load units is z1, among which type I load units occupy 1 basic space, type II load units occupy 2 basic spaces, and type III load units occupy 3 basic spaces.
[0073] The following conditions must be met:
[0074] x1+2y1+3z1≤k1, solve for k sum = max(x1+y1+z1);
[0075] Among them, x1, y1, z1 are all integers, k1 is the number of type I test load installation spaces in the same column of the test cabinet, that is, the maximum installation space that each column of the test cabinet can support, k sum is the maximum value of x1+y1+z1 found.
[0076] When there are multiple solutions for the maximum value of the sum of x1, y1, and z1, the priority principle is to optimize the utilization of space resources and fill the installation space of the test cabinet as much as possible to fully utilize the installation space of the test cabinet to achieve full load.
[0077] According to different test requirements, the specifications of load units for the same batch of on-orbit tests are generally not a single specification, and Type I load units, Type II load units, and Type III load units all need to be considered.
[0078] Therefore, the construction of the spatial model S1 for the test load based on the installation space factor is completed.
[0079] S3: Reconstruct the spatial model S1 based on the heat dissipation factor to obtain the spatial model S2 of the test load; the process of reconstructing the spatial model S1 is as follows: determine whether there is a liquid-cooled test load; if not, ensure that the heat dissipation heat consumption of a single air-cooled test load required for the on-orbit test is not greater than the heat dissipation heat consumption of a single air-cooled test load supported by the test cabinet, and that the total heat dissipation heat consumption of all air-cooled test loads required for the on-orbit test is not greater than the total heat dissipation heat consumption of air-cooled test loads supported by the test cabinet; if it exists, determine whether the number of liquid-cooled test loads is greater than the number of test cabinets. rated liquid cooling installation space; if it is larger than the rated liquid cooling installation space, reduce the number of liquid cooling test loads until it is no larger than the rated liquid cooling installation space F of the test cabinet; if it is no larger than the rated liquid cooling installation space F, install the liquid cooling test load at the bottom of the test cabinet, and at the same time ensure that the liquid cooling heat consumption required for the on-orbit test of a single liquid cooling test load is no larger than the liquid cooling heat consumption of a single liquid cooling test load supported by the test cabinet, and the total liquid cooling heat consumption required for the on-orbit test of all liquid cooling test loads is no larger than the total liquid cooling heat consumption supported by the test cabinet.
[0080] Usually, the liquid cooling device installed at the bottom of the test cabinet supports at most two test loads that require liquid cooling.
[0081] If all the test loads installed on the test cabinet are air-cooled, the installation positions of the test loads can be freely matched. The heat dissipation required for air cooling of a single load device in the on-track test must not be greater than the heat dissipation that the test cabinet can provide for a single load unit, and the total heat dissipation required for air cooling of all load devices in the on-track test must not be greater than the total heat dissipation that the test cabinet can provide (i.e., the maximum heat dissipation).
[0082] That is, the heat dissipation of the test load for air cooling meets the following conditions:
[0083] f_K_ (7);
[0084] f_sum_ (9).
[0085] If the test loads installed on the test cabinet require liquid cooling, it is necessary to determine whether the number of test loads requiring liquid cooling is greater than 2. If it is less than 2, the load units requiring liquid cooling will be installed in the installation space at the bottom of the test cabinet. If it is greater than 2, the heat dissipation factor does not match, and the number of test loads requiring liquid cooling needs to be reduced.
[0086] Determine whether the heat dissipation of each test load requiring liquid cooling meets the liquid cooling heat dissipation that the test cabinet can provide to a single load unit, and whether the total heat dissipation of the two test loads requiring liquid cooling meets the total heat dissipation of the liquid cooling provided by the test cabinet.
[0087] That is, the heat dissipation of the test load of liquid cooling meets the following conditions:
[0088] f_K_ (8);
[0089] f_sum_ (10).
[0090] At this point, the reconstruction of the space module S1 according to the heat dissipation factor is completed, and the space model S2 is obtained.
[0091] S4: Construct the time model T1 of the test load based on the power supply power factor; wherein, calculate the total power supply power required when all the test loads determined based on the space model S2 work simultaneously, and judge whether the total power supply power meets the maximum power supply power supported by the test cabinet; if so, all the test loads are powered on at the same time for on-orbit testing; if not, according to the continuous working time of each test load within 24 hours, based on the principle of minimizing the occupancy of test resources, form the power-on time sequence of each test load and the power-on duration period within 24 hours, so as to obtain the time model T1.
[0092] Calculate the total power supply required when all test loads work simultaneously, and determine whether the total power supply meets the maximum power supply that the test cabinet can provide; if it does, each load unit can work simultaneously; if not, each load unit cannot work simultaneously and needs to work in time.
[0093] For the situation that each load unit cannot work at the same time and needs to work in different time periods, the continuous working time after power-on within 24 hours according to the test load Based on the principle of minimizing test resource occupancy, test loads with lower power and shorter power-on duration are given priority, and then test loads with higher power and longer power duration are arranged.
[0094] For example, there are 6 test loads in total. First, arrange the 3 test loads with smaller power and shorter power-on duration to carry out the test. After the test of one load is completed, immediately power on the remaining 3 test loads with the smallest power and shortest power-on duration. And so on. Give the power-on time sequence of each load and the power-on duration period in 24 hours a day.
[0095] The principle of minimizing test resource usage is as follows: when the number of test loads in the test cabinet has been determined, the total power supply power of each test load should be as small as possible.
[0096] When each load unit works in time-sharing mode, the power supply should meet the following conditions:
[0097] (2).
[0098] The optimal solution is converted into the minimum energy consumed by each test load within 24 hours.
[0099] That is: MinQ1= .
[0100] Among them, t i1 , t i2 , ti2 represents the power-on time of a certain test load, Indicates the power-off time of a certain test load, All are integers.
[0101] S5: Reconstruct the time model T1 based on the data transmission factor to obtain the time model T2 of the test load; wherein, calculate the total data transmission rate required when all the test loads determined based on the space model S2 work simultaneously, and determine whether the total data transmission rate meets the maximum load data transmission rate supported by the test cabinet; if so, there is no need to reconstruct the time model T1, and all the test loads are powered on at the same time to perform on-orbit tests and transmit the generated test data; if not, reconstruct the time model T1, and the process of reconstructing the time model T1 is as follows: on the basis of the time model T1, based on the principle of maximizing the test benefit, form the power-on time sequence of each test load and the data transmission duration period within 24 hours.
[0102] After the load device is powered on, test data will be generated. The data volume required when all test loads work simultaneously is calculated to see whether it meets the maximum load data transmission rate that the entire cabinet can support. If so, each load unit can work simultaneously and the time model T1 does not need to be reconstructed. If not, each load unit cannot work simultaneously and needs to work in time.
[0103] When the load device works in time-sharing mode, it shall meet the following requirements:
[0104] f_K_data(5);
[0105] f_K_data(6).
[0106] On the basis of time model T1 and based on the principle of maximizing test benefits, the test loads with high data transmission rate are prioritized to be powered on first for testing, and then the test loads with the second highest data transmission rate are powered on for testing. After the test of a certain test load is completed, the test loads with the highest data transmission rate that have not yet been powered on are immediately powered on, and so on. The power-on time sequence of each test load and the data transmission duration period within 24 hours are given.
[0107] If there is a conflict with the time model T1 during this sorting process (that is, when the principle of maximizing test benefits conflicts with the principle of minimizing test resource usage), the time model T1 needs to be reconstructed. Based on the principle of maximizing test benefits, priority is given to ensuring that more test loads are powered on to carry out tests. Secondly, according to the data transmission rate, test loads with large data transmission rates are preferably arranged to carry out tests. When the total data transmission rate generated by multiple test loads at the same time is greater than the maximum load data transmission rate that the test cabinet can support, the test loads that have not yet been powered on will no longer be powered on. When the total data transmission rate is less than the maximum load data transmission rate that the test cabinet can support again, that is When f_K_data is reached, the remaining test payloads with the next largest data transmission rate that have not yet been powered on will continue to be arranged for testing until all test payloads have completed the on-orbit test.
[0108] When the number of test loads in the test cabinet has been determined, the principle of maximizing test benefits is to start powering on as many test loads as possible as early as possible to obtain as much test data as possible.
[0109] At this point, the reconstruction of the time model T1 according to the data transmission factor is completed, and the time model T2 is obtained.
[0110] S6: Construct the optimal matching strategy based on the spatial model S2 and the temporal model T2 to match the resources of the test load.
[0111] The present invention is combined with Figure 2-Figure 6 The dynamically reconfigurable test load resource matching method provided by the present invention is described with a specific embodiment.
[0112] Assume that the test cabinet's test support capabilities are as follows:
[0113] Table 1 Example of test cabinet support capabilities
[0114]
[0115] Assuming that the following load devices are currently available, the resource requirements of each test load are shown in the following table:
[0116] Table 2 Load device requirements
[0117]
[0118] The steps of the dynamically reconfigurable test load resource matching method are as follows:
[0119] Step 1: Construct the spatial model S1.
[0120] Installation space factor: Calculate the maximum number of load units of different specifications based on the total load unit space that the test cabinet can provide.
[0121] Left column of the cabinet: Let the number of type I load units be x1, the number of type II load units be y1, and the number of type III load units be z1.
[0122] x1, y1, z1 must satisfy x1+2y1+3z1≤7, solve for k sum =max(x1+y1+z1).
[0123] Among them, x1, y1, z1 are all integers, solve x 1+ y 1+ The maximum value of z1.
[0124] Taking the number of type I load units as the exhaustive mode, the combinations of various types of load units that can be installed in the left column of the test cabinet are:
[0125] 1) Type I load unit: 0; Type II load unit: 0; Type III load unit: 2;
[0126] Or 1 type II load cell and 1 type III load cell;
[0127] or 2 Type II load cells and 1 Type III load cell;
[0128] or 3 type II load cells and 0 type III load cells;
[0129] 2) Type I load cell: 1; Type II load cell 0; Type III load cell 2;
[0130] Or 1 type II load cell and 1 type III load cell;
[0131] or 2 type II load cells and 0 type III load cells;
[0132] or 3 type II load cells and 0 type III load cells;
[0133] 3) Type I load unit: 2: Type II load unit 0, Type III load unit 1; (According to Table 2, there is only 1 Type I load unit, so this situation does not exist)
[0134] Or 1 type II load cell and 1 type III load cell;
[0135] or 2 type II load cells and 0 type III load cells;
[0136] 4) Type I load units: 3: 0 type II load units, 1 type III load unit (according to Table 2, there is only 1 type I load unit, so this situation does not exist);
[0137] or 1 type II load unit and 0 type III load units;
[0138] or 2 type II load cells and 0 type III load cells;
[0139] 5) Type I load unit: 4: 0 Type II load unit, 1 Type III load unit (according to Table 2, there is only 1 Type I load unit, so this situation does not exist).
[0140] For the left row of test cabinets, according to the principle of maximum test benefit and the load device specifications in Table 2, in order to make the load unit installation space loading rate 100% and the maximum number of load devices that can be installed, the load unit combination in the above exhaustive list should be: Type I: 1, Type II: 3, Type III: 0, at this time, 4 test loads are installed in the left row of cabinets. According to the power consumption, 01, 02, 03, and 04 test loads are initially selected and installed in the left row of cabinets.
[0141] When the number of test loads in the test cabinet has not yet been determined, the principle of maximum test efficiency is to increase the loading rate of the load unit installation space as much as possible and to maximize the number of load devices that can be installed (regardless of the type and specification of the load unit. Of course, when the test cabinet is filled with Type I load units, the number of load devices is the largest, but they are often not all Type I load units. Therefore, the space model needs to be determined based on the actual test load situation).
[0142] For the right row of cabinets, in order to make the load unit installation space loading rate 100% and the maximum number of load devices that can be installed, the load unit combination in the above exhaustive list should be: Type I: 0, Type II: 2, Type III: 1. At this time, 3 test loads are installed in the right row of cabinets, and the load unit installation space loading rate is 100%. According to the power supply power, 05, 06, and 07 test loads are initially selected and installed in the right row of cabinets.
[0143] Thus, we get Figure 3 The spatial model S1 is shown.
[0144] Step 2: Reconstruct the spatial model S1.
[0145] Heat dissipation factor: There is 1 test load that requires liquid cooling, and the number is not more than 2. Therefore, the load unit with liquid cooling is installed at the bottom of the test cabinet.
[0146] Air Cooling:
[0147] f_K_ =40W;
[0148] f_K_ =80W;
[0149] f_K_ =80W;
[0150] f_K_ =80W;
[0151] f_K_ =80W;
[0152] f_K_ =80W.
[0153] The air-cooling heat consumption of each test load satisfies the air-cooling heat consumption provided by the test cabinet to a single load unit.
[0154] Liquid Cooling:
[0155] f_K_ =400W.
[0156] The heat dissipation of the liquid-cooled test load (load device 05) satisfies the liquid-cooled heat dissipation provided by the test cabinet to a single load unit.
[0157] Therefore, we get Figure 4 The spatial model S2 is shown.
[0158] Step 3: Construct time model T1.
[0159] Power supply factor: Calculate whether the power supply required when all test loads work simultaneously (based on the load unit numbers determined by the space model S2, which are 01, 02, 03, 04, 05, 06, and 07) meets the maximum power supply that the test cabinet can provide, that is:
[0160] ;
[0161] Therefore, each load unit needs to work in different time periods. Under the premise of meeting the maximum power supply that the entire cabinet can support, test loads 01, 02, 03, 04, 06, and 07 are powered on first, and a total of 6 test loads are powered on at the same time. At this time, the total power is 680W.
[0162] At this time, according to the principle of maximizing test benefits, try to arrange more test loads to be powered on. Test loads 01, 02, 03, 04, 06, and 07 should be powered on first. If test load 05 is powered on first, its power is 400W. Under the premise of meeting the maximum power that the test can support, only 5 test loads can be powered on at the same time. Therefore, test load 05 should be powered on last.
[0163] Thus, we can get Figure 5 The time model T1 shown:
[0164] Step 4: Reconstruct the time model T1.
[0165] Data transmission factor: Calculate whether the amount of data required when all test loads work simultaneously meets the maximum load data transmission rate that the test cabinet can support, that is:
[0166] f_K_data=40Mbps.
[0167] Therefore, the time model T1 needs to be reconstructed. Under the premise of meeting the maximum power that the test cabinet can support and the maximum load data transmission rate that the test cabinet can support, based on the principle of maximizing test benefits, the test load with a large data transmission rate is preferentially powered on for testing, and then the load with a large data transmission rate is preferentially arranged for testing according to the data transmission rate. The power-on order is:
[0168] First, power on test loads 01, 02, 03, 05, 06, and 07; at this time, the total data transmission rate requirement is 40Mbps, which meets the maximum load data transmission rate of 40Mbps that the test cabinet can support; then 8 hours later, that is, after the test load 07 test is completed, power on test load 04. At this time, the total data transmission rate requirement is 30Mbps, which meets the maximum load data transmission rate of 40Mbps that the entire cabinet can support.
[0169] Thus, we get Figure 6 Time model T2 is shown.
[0170] Finally, the optimal matching strategy based on the spatial model S2 and the temporal model T2 is obtained to match the resources of the test load.
[0171] The above content describes in detail the dynamically reconfigurable test load resource matching method provided by an embodiment of the present invention. An embodiment of the present invention also provides a dynamically reconfigurable test load resource matching system for implementing the dynamically reconfigurable test load resource matching method, which specifically includes a demand factor planning unit, a spatial model building unit, a spatial model reconstruction unit, a time model building unit, a time model reconstruction unit and a matching strategy building unit.
[0172] The demand factor planning unit is used to plan the demand factors and establish the priority order of the demand factors; wherein the demand factors include installation space factor, heat dissipation factor, power supply factor and data transmission factor; the installation space resource demand of the test load is used as the installation space factor, the heat dissipation resource demand of the test load is used as the heat dissipation factor, the data transmission resource demand of the test load is used as the data transmission factor, and the power supply resource demand of the test load is used as the power supply factor; the priority order of the demand factors established by the demand factor planning unit is, from large to small, installation space factor, heat dissipation factor, power supply factor and data transmission factor.
[0173] The space model building unit is used to build the space model S1 of the test load based on the installation space factor; wherein the space model building unit calculates the maximum number of test loads of different specifications according to the total test load installation space supported by the test cabinet as the space model S1 of the test load.
[0174] The space model reconstruction unit is used to reconstruct the space model S1 based on the heat dissipation factor to obtain the space model S2 of the test load; wherein, the process of the space model reconstruction unit reconstructing the space model S1 is: determine whether there is a liquid cooling test load; if not, ensure that the air cooling heat consumption required for the on-orbit test of a single air cooling test load is not greater than the air cooling heat consumption of a single air cooling test load supported by the test cabinet, and the total air cooling heat consumption required for the on-orbit test of all air cooling test loads is not greater than the total air cooling heat consumption supported by the test cabinet; if it exists, determine the number of liquid cooling test loads Is it larger than the rated liquid cooling installation space of the test cabinet? If it is larger than the rated liquid cooling installation space, reduce the number of liquid cooling test loads until it is no larger than the rated liquid cooling installation space F of the test cabinet. If it is no larger than the rated liquid cooling installation space F, install the liquid cooling test load at the bottom of the test cabinet, and at the same time ensure that the liquid cooling heat consumption required for the on-orbit test of a single liquid cooling test load is no larger than the liquid cooling heat consumption of a single liquid cooling test load supported by the test cabinet, and the total liquid cooling heat consumption required for the on-orbit test of all liquid cooling test loads is no larger than the total liquid cooling heat consumption supported by the test cabinet.
[0175] The time model construction unit is used to construct the time model T1 of the test load based on the power supply power factor; wherein, the time model construction unit calculates the total power supply power required when all the test loads determined based on the space model S2 work simultaneously, and determines whether the total power supply power meets the maximum power supply power supported by the test cabinet; if so, all the test loads are powered on at the same time for on-orbit testing; if not, according to the power-on continuous working time of each test load within 24 hours and based on the principle of minimizing the test resource occupancy, the power-on time sequence of each test load and the power-on duration period within 24 hours are formed to obtain the time model T1.
[0176] The time model reconstruction unit is used to reconstruct the time model T1 based on the data transmission factor to obtain the time model T2 of the test load; wherein the time model reconstruction unit calculates the total data transmission rate required when all the test loads determined based on the space model S2 work simultaneously, and determines whether the total data transmission rate meets the maximum load data transmission rate supported by the test cabinet; if so, there is no need to reconstruct the time model T1, and all the test loads are powered on at the same time to perform on-orbit tests and transmit the generated test data; if not, the time model T1 is reconstructed, and the process of reconstructing the time model T1 is: on the basis of the time model T1, based on the principle of maximizing the test benefit, the power-on time sequence of each test load and the data transmission duration period within 24 hours are formed.
[0177] The matching strategy construction unit is used to construct the optimal matching strategy based on the space model S2 and the time model T2 to match the resources of the test load.
[0178] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the disclosure of the present invention can be performed in parallel, sequentially or in different orders, as long as the desired results of the technical solution disclosed in the present invention can be achieved, and this document does not limit this.
[0179] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A dynamically reconfigurable test load resource matching method, characterized in that: The steps include: S1: Plan demand factors and establish a priority order of demand factors; wherein demand factors include installation space factor, heat dissipation factor, power supply factor and data transmission factor; the installation space resource demand of the test load is used as the installation space factor, the heat dissipation resource demand of the test load is used as the heat dissipation factor, the data transmission resource demand of the test load is used as the data transmission factor, and the power supply resource demand of the test load is used as the power supply factor; the priority order of demand factors from large to small is installation space factor, heat dissipation factor, power supply factor, and data transmission factor; S2: construct the spatial model S1 of the test load based on the installation space factor; wherein the maximum number of test loads of different specifications is calculated according to the total test load installation space supported by the test cabinet, and is used as the spatial model S1 of the test load; S3: Reconstruct the spatial model S1 based on the heat dissipation factor to obtain the spatial model S2 of the test load; the process of reconstructing the spatial model S1 is as follows: determine whether there is a liquid-cooled test load; if not, ensure that the heat dissipation heat consumption of a single air-cooled test load required for the on-orbit test is not greater than the heat dissipation heat consumption of a single air-cooled test load supported by the test cabinet, and that the total heat dissipation heat consumption of all air-cooled test loads required for the on-orbit test is not greater than the total heat dissipation heat consumption of air-cooled test loads supported by the test cabinet; if it exists, determine whether the number of liquid-cooled test loads is greater than the number of test cabinets. Rated liquid cooling installation space; if it is larger than the rated liquid cooling installation space, reduce the number of liquid cooling test loads until it is no larger than the rated liquid cooling installation space F of the test cabinet; if it is no larger than the rated liquid cooling installation space F, install the liquid cooling test load at the bottom of the test cabinet, and at the same time ensure that the liquid cooling heat consumption required for the on-orbit test of a single liquid cooling test load is no larger than the liquid cooling heat consumption of a single liquid cooling test load supported by the test cabinet, and the total liquid cooling heat consumption required for the on-orbit test of all liquid cooling test loads is no larger than the total liquid cooling heat consumption supported by the test cabinet; S4: Construct the time model T1 of the test load based on the power supply power factor; wherein, calculate the total power supply power required when all the test loads determined based on the space model S2 work simultaneously, and judge whether the total power supply power meets the maximum power supply power supported by the test cabinet; if so, all the test loads are powered on at the same time for on-orbit testing; if not, according to the power-on continuous working time of each test load within 24 hours, based on the principle of minimizing the test resource occupancy, form the power-on time sequence of each test load and the power-on duration period within 24 hours, so as to obtain the time model T1; S5: Reconstruct the time model T1 based on the data transmission factor to obtain the time model T2 of the test load; wherein, calculate the total data transmission rate required when all test loads determined based on the space model S2 work simultaneously, and determine whether the total data transmission rate meets the maximum load data transmission rate supported by the test cabinet; if so, there is no need to reconstruct the time model T1, and all test loads are powered on at the same time to perform on-orbit tests and transmit the generated test data; if not, reconstruct the time model T1, and the process of reconstructing the time model T1 is as follows: on the basis of the time model T1, based on the principle of maximizing test benefits, form the power-on time sequence of each test load and the data transmission duration period within 24 hours; S6: Construct the optimal matching strategy based on the spatial model S2 and the temporal model T2 to match the resources of the test load.
2. The dynamically reconfigurable test load resource matching method according to claim 1, characterized in that: The principle of minimizing the test resource occupancy is: under the premise of meeting the maximum power supply supported by the test cabinet, multiple test loads with small power supply power and short power-on duration are powered on at the same time for on-orbit testing. After the test of a certain test load is completed, the remaining test loads that have not yet been powered on are powered on in the order of power supply power from small to large and power-on duration from small to large for on-orbit testing.
3. The dynamically reconfigurable test load resource matching method according to claim 2, characterized in that: The principle of maximizing the test benefit is: under the premise of meeting the maximum power supply power supported by the test cabinet and the maximum load data transmission rate supported by the test cabinet, multiple test loads with large data transmission rates are powered on at the same time for on-orbit testing. After the test of a certain test load is completed, the remaining test loads that have not yet been powered on are powered on in descending order of data transmission rate for on-orbit testing.
4. The dynamically reconfigurable test load resource matching method according to claim 3, characterized in that: When the principle of maximizing test benefits conflicts with the principle of minimizing test resource occupancy, on the basis of space model S2, more test loads are first powered on for on-orbit testing to ensure that the number of test loads for on-orbit testing is maximized. On the premise of ensuring that the number of test loads for on-orbit testing is maximized, the remaining test loads that have not yet been powered on are powered on in order of data transmission rate from large to small for on-orbit testing. At the same time, when the total data transmission rate generated by the test loads of the on-orbit test is greater than the maximum load data transmission rate supported by the test cabinet, the test loads that have not yet been powered on are no longer powered on. When the total data transmission rate generated by the test loads of the on-orbit test is less than the maximum load data transmission rate supported by the test cabinet, the remaining test loads that have not yet been powered on are powered on in order of data transmission rate from large to small for on-orbit testing.
5. A dynamically reconfigurable test load resource matching system, used to implement the dynamically reconfigurable test load resource matching method according to any one of claims 1 to 4, characterized in that: include: The demand factor planning unit is used to plan the demand factors and establish the priority order of the demand factors; wherein the demand factors include installation space factor, heat dissipation factor, power supply factor and data transmission factor; the installation space resource demand of the test load is used as the installation space factor, the heat dissipation resource demand of the test load is used as the heat dissipation factor, the data transmission resource demand of the test load is used as the data transmission factor, and the power supply resource demand of the test load is used as the power supply factor; the priority order of the demand factors established by the demand factor planning unit is, from large to small, installation space factor, heat dissipation factor, power supply factor, and data transmission factor; A space model building unit is used to build a space model S1 of the test load based on the installation space factor; wherein the space model building unit calculates the maximum value of the number of test loads of different specifications according to the total test load installation space supported by the test cabinet as the space model S1 of the test load; The space model reconstruction unit is used to reconstruct the space model S1 based on the heat dissipation factor to obtain the space model S2 of the test load; wherein, the process of the space model reconstruction unit reconstructing the space model S1 is: determine whether there is a liquid cooling test load; if not, ensure that the air cooling heat consumption required for the on-orbit test of a single air cooling test load is not greater than the air cooling heat consumption of a single air cooling test load supported by the test cabinet, and the total air cooling heat consumption required for the on-orbit test of all air cooling test loads is not greater than the total air cooling heat consumption supported by the test cabinet; if it exists, determine the number of liquid cooling test loads Is it larger than the rated liquid cooling installation space of the test cabinet? If it is larger than the rated liquid cooling installation space, reduce the number of liquid cooling test loads until it is no larger than the rated liquid cooling installation space F of the test cabinet. If it is no larger than the rated liquid cooling installation space F, install the liquid cooling test load at the bottom of the test cabinet, and ensure that the liquid cooling heat consumption required for the on-orbit test of a single liquid cooling test load is no larger than the liquid cooling heat consumption of a single liquid cooling test load supported by the test cabinet, and that the total liquid cooling heat consumption required for the on-orbit test of all liquid cooling test loads is no larger than the total liquid cooling heat consumption supported by the test cabinet. A time model building unit is used to build a time model T1 of the test load based on the power supply power factor; wherein the time model building unit calculates the total power supply power required when all the test loads determined based on the space model S2 work simultaneously, and determines whether the total power supply power meets the maximum power supply power supported by the test cabinet; if so, all the test loads are powered on at the same time for on-orbit testing; if not, according to the power-on continuous working time of each test load within 24 hours and based on the principle of minimizing the test resource occupancy, the power-on time sequence of each test load and the power-on duration period within 24 hours are formed, thereby obtaining the time model T1; The time model reconstruction unit is used to reconstruct the time model T1 based on the data transmission factor to obtain the time model T2 of the test load; wherein the time model reconstruction unit calculates the total data transmission rate required when all the test loads determined based on the space model S2 work simultaneously, and determines whether the total data transmission rate meets the maximum load data transmission rate supported by the test cabinet; if so, there is no need to reconstruct the time model T1, and all the test loads are powered on at the same time to perform on-orbit tests and transmit the generated test data; if not, the time model T1 is reconstructed, and the process of reconstructing the time model T1 is: on the basis of the time model T1, based on the principle of maximizing the test benefit, the power-on time sequence of each test load and the data transmission duration period within 24 hours are formed; The matching strategy construction unit is used to construct the optimal matching strategy based on the space model S2 and the time model T2 to match the resources of the test load.