A new robust optimal dispatching method for power systems based on node carbon potential response

Through a new power system robust optimization dispatch method based on node carbon potential response, the problem of carbon emission distribution and flexible load utilization in the new power system is solved, the effective tracking and reduction of system carbon emissions is achieved, and the robustness of the dispatch plan is improved. and flexibility.

CN118313636BActive Publication Date: 2024-10-18STATE GRID JIANGXI ELECTRIC POWER CO LTD RES INST +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410742057.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-11
Publication Date
2024-10-18
Estimated Expiration
2044-06-11

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively describe the distribution of carbon emissions and carbon reduction potential in new power systems. Traditional power system carbon reduction methods have limitations and cannot achieve carbon emission tracking and full utilization of flexible loads in the system.

Method used

A new power system robust optimization scheduling method based on node carbon potential response is adopted. By calculating node carbon potential from a carbon perspective, different types of flexible load carbon emissions are modeled, and the Shapley value apportionment method is used to calculate the carbon emission responsibility of the load aggregation. It also combines the confidence gap decision theory to deal with the uncertainty of new energy units and develop a robust optimal dispatch plan.

Benefits of technology

It significantly improves the system's carbon emission tracking efficiency and flexible load response enthusiasm, achieves lower overall system carbon emissions, takes into account the robustness and flexibility of the dispatch plan, and provides an energy-saving and carbon reduction strategy from a new carbon perspective.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118313636B_ABST
    Figure CN118313636B_ABST
Patent Text Reader

Abstract

The present invention discloses a novel power system robust optimization scheduling method based on node carbon potential response, comprising the following steps: calculating the node carbon potential in the power system; using the node carbon potential as a key signal for carbon reduction in the new power system, and modeling the carbon emissions of different types of flexible loads in the new power system from a carbon perspective; calculating the carbon emission responsibility range of the load aggregate, and combining the node carbon potential with the demand response, and proposing a novel power system carbon reduction mechanism based on the node carbon potential response; establishing a carbon emission cost model for the power grid and the load aggregate, and fairly and reasonably allocating the carbon emission responsibility of the load aggregate; establishing a novel power system robust optimization scheduling model with the goal of minimizing the operating cost, and solving it to obtain an optimized scheduling plan; the present invention adopts the load aggregate node carbon potential response method, which has a more obvious carbon reduction effect than the traditional time-of-use electricity price response, and can better reduce the overall carbon emissions of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system optimization, and in particular to a novel power system robust optimization scheduling method based on node carbon potential response. Background Art

[0002] How to give full play to the advantages of source-load interaction and carbon trading mechanism of the new power system in energy conservation and carbon reduction, comprehensively consider the uncertainty of new energy output on the source side of the system and deeply explore the flexible adjustment capacity of the load, and formulate a robust new power system dispatching optimization plan, is the key to ensuring the realization of the "dual carbon" goals as scheduled.

[0003] In recent years, domestic and foreign scholars have conducted some research on the optimization and dispatching of new power systems. However, the existing research has the following shortcomings: On the one hand, most of the existing research on the optimization and dispatching of new power systems focuses on carbon emissions on the source side, and cannot clearly describe the distribution of carbon emission flows in the entire system and the carbon consumption mechanism, and fails to track and trace the carbon emissions in the system and fully tap the carbon reduction potential of flexible loads in new power systems. In addition, the research on the carbon reduction mechanism of power systems is often based on the "TV angle", with system security and economy as the optimization goals, and through relevant power signals such as electricity prices, around key links such as flow analysis, power market transactions, and planning and operation. In essence, it is still a traditional development model driven by "internal factors", while the new power system is gradually transforming into a new development model driven by the "carbon neutrality goal". The traditional "TV angle" has certain limitations in the carbon reduction method of the power system. The introduction of the carbon emission flow theory has opened up the intermediate link between the source side and the power consumption side of the power system, in which the node carbon potential reflects the overall carbon emission intensity of the power system, which can be used as a key signal in the new power system to guide the system to respond to carbon reduction strategies. Summary of the invention

[0004] In view of the deficiencies of the prior art, the present invention provides a novel robust optimization scheduling method for power systems based on node carbon potential response, which aims to solve the problems mentioned in the background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a novel robust optimization scheduling method for power system based on node carbon potential response, comprising the following steps:

[0006] Step S1: Calculate the node carbon potential in the new power system from a carbon perspective;

[0007] Step S2: Modeling the carbon emissions of different types of flexible loads in the new power system from a carbon perspective based on the node carbon potential; the different types of flexible loads include electric vehicle loads EV, curtailable loads CL and transferable loads TL;

[0008] Step S3: Calculate the carbon emission responsibility interval of the load aggregate based on the Shapley value allocation method, and combine the node carbon potential with the demand response to propose a new carbon reduction mechanism for the power system based on the node carbon potential response; Model the carbon emission costs of the power grid on the source side and the load aggregate on the load side of the new power system from a carbon perspective;

[0009] Step S4: With the goal of minimizing the operating costs of the power grid and the load aggregate respectively, a new type of power system robust optimization dispatching model is established, and the uncertainty of the source-side new energy units is processed based on the confidence gap decision theory to obtain an optimized dispatching plan; the established new power system robust optimization dispatching model includes an upper-level power grid robust optimization dispatching model and a lower-level load aggregate response model.

[0010] Furthermore, the specific process of calculating the node carbon potential in the new power system from the carbon perspective is as follows: the actual carbon emissions of the new power system from the carbon perspective are assumed to be in the form of a virtual carbon emission flow, which is attached to the active power flow and flows from the source side to the load side along with the active power flow;

[0011] In the new power system from the carbon perspective, Time Node The active trend It is expressed as:

[0012] (1);

[0013] In the formula, For branch Active power of Active power flow into the node The branch set of Access Node Active power output of traditional units;

[0014] node The nodal carbon potential is expressed as:

[0015] (2);

[0016] In the formula, For the Carbon emission intensity factor of traditional units; For branch carbon emission intensity; express Time Node The nodal carbon potential of

[0017] According to the carbon emission theory, Equal to the branch in value The node carbon potential at the head end combines equation (1) with equation (2) and rewrites equation (2) into a matrix form:

[0018] i , t = [ ( P t B ) T E t N + ( P t G ) T E G ] P t N ( or n R ) T (3);

[0019] In the formula, is the N-dimensional unit row vector; is the N-order diagonal branch power flow distribution matrix at time t; represents the branch active power between node i and node j at time t; is the unit output matrix; It represents the power generation of the nth traditional unit connected to node i at time t; is the N-dimensional node carbon potential vector; Represents a matrix transpose operation; Represents the carbon emission intensity factor matrix of traditional units; represents the node power matrix; Indicates the total number of generators in a conventional unit;

[0020] N-dimensional node carbon potential vector in new power system from carbon perspective Calculated by formula (4):

[0021] t N = [ P t N − ( P t B ) T ] − 1 ( P t G ) T E G (4).

[0022] Furthermore, the specific process of modeling carbon emissions of different types of flexible loads in the new power system from a carbon perspective based on the node carbon potential is as follows: the carbon emissions of the new power system from a carbon perspective are measured from the perspective of the load side, and the carbon emissions of various flexible loads in the new power system from a carbon perspective are modeled based on the node carbon potential; it is assumed that there are multiple load aggregates in the new power system from a carbon perspective, each load aggregate senses the carbon potential of the current access node, and calculates the carbon emissions generated during the electricity consumption of the flexible load based on the node carbon potential;

[0023] Constructing electric vehicle load carbon emission model;

[0024] The probability density function of the time when electric vehicle loads connect to and leave charging stations or charging piles It is expressed as:

[0025] f ( t al ) = 1 s al 2 π exp [ − ( t al − m al ) 2 2 s al 2 ] (5);

[0026] In the formula, The time when the electric vehicle load connects to or leaves the charging station or charging pile; and They are The expectation and standard deviation of

[0027] The amount of electricity in the process of charging and discharging the electric vehicle load is expressed as:

[0028] (6);

[0029] In the formula, Indicates the target power of the electric vehicle load; Indicates the starting power of the electric vehicle load; The power consumption per 100 kilometers for electric vehicle load; is the daily mileage of electric vehicle load, which obeys the log-normal distribution:

[0030] f ( x ) = 1 x s xs 2 π exp [ − ( ln x − m xs ) 2 2 s xs 2 ] (7);

[0031] In the formula, and They are The expectation and standard deviation of represents the probability density function of the daily mileage of electric vehicle load;

[0032] Electric vehicle loads are connected to the new power system node from a carbon perspective through the charging station or charging pile. The carbon emissions generated during the charging and discharging process are expressed as:

[0033] (8);

[0034] In the formula, represents the charging power of the nth electric vehicle load at time t; represents the discharge power of the nth electric vehicle load at time t; is the total amount of electric vehicle load; The node carbon potential of the new power system node at time t under the carbon perspective of electric vehicle load access; represents the total carbon emissions of electric vehicle load at time t;

[0035] Construct a load-reducible carbon emission model, expressed as:

[0036] (9);

[0037] In the formula, is the carbon emission that can be reduced at time t; is the node carbon potential of the load access node that can be reduced at time t; and are the start time and end time of the curtailable load reduction, respectively; represents the load reduction amount that can be reduced at time t;

[0038] Construct a transferable load carbon emission model, which is expressed as:

[0039] (10);

[0040] In the formula, is the carbon emission of the transferable load at time t; is the node carbon potential of the new power system node under the carbon perspective where the transferable load is connected at time t; and are the transfer-in load and transfer-out load of the transferable load at time t respectively; and are the load-in time and load-out time of the transferable load respectively;

[0041] When the new power system node i is connected to electric vehicle load, curtailable load and transferable load at the same time from the carbon perspective, the total carbon emission of the node i is expressed as:

[0042] (11);

[0043] In the formula, is the node carbon potential of node i at time t; is the normal load of node i at time t; represents the total carbon emissions of node i; represents the carbon emission of electric vehicle load in node i at time t; represents the carbon emission reduction of the load in node i at time t; represents the carbon emission of transferable load in node i at time t.

[0044] Furthermore, the carbon meter measures, records and stores the actual carbon emissions generated during the power generation process on the source side of the new power system from a carbon perspective and the indirect carbon emissions generated by the power load on the load side, and converts them into carbon emission flow information of the new power system from a carbon perspective, thus realizing the carbon emission measurement and tracking of the new power system from a carbon perspective.

[0045] The carbon trading platform transmits the initial carbon quota, i.e. the free carbon emission quota part and the node carbon potential information, to the power grid and load aggregates based on the carbon emission measurement and tracking results of the new power system from a carbon perspective. Specifically, the power grid calculates the carbon trading costs of the power generation of traditional units and the carbon trading platform. Under the condition of fixed electricity demand, it conducts low-carbon economic dispatch and adjusts the power generation plan of traditional units. At the same time, it transmits the time-of-use electricity price information to the load aggregate. The load aggregate calculates the total carbon emissions based on the node carbon potential information, i.e. the carbon emissions generated at the source end due to electricity demand at the node where the load aggregate is located. Then, the carbon emission responsibility is apportioned to all load aggregates. Finally, the power grid transmits the time-of-use electricity price to the load aggregate and signs incentive contracts with each load aggregate. The load aggregate adjusts the electricity consumption of flexible loads within the scope of the incentive contract to achieve carbon reduction from the load side.

[0046] Further, step S3.1: In the carbon trading platform, the excess carbon emissions generated by the unit’s power generation are expressed as:

[0047] (12);

[0048] In the formula, is the carbon emission quota of the g-th traditional unit; and They are coefficient and power generation capacity;

[0049] Set up a tiered carbon trading range. When the carbon emissions of traditional units are higher, the corresponding carbon trading unit price in the carbon trading platform will be higher, and the carbon emission responsibility will be higher;

[0050] Among them, the carbon trading cost of the power grid It is expressed as:

[0051] (13);

[0052] In the formula, is the length of the ladder carbon trading interval; Indicates the total number of generators in a conventional unit; The unit price of carbon trading is 0=σ0<σ1<σ2<σ3; , , as well as They represent the carbon trading costs of the power grid under different carbon emission levels; Expressed as the actual carbon emissions of the generators in the conventional units; represents the carbon emission quota of the g-th traditional unit;

[0053] Step S3.2: Introduce the Shapley value allocation method to allocate carbon emission responsibilities;

[0054] According to the Shapley value allocation method, each load aggregate in the new power system from a carbon perspective is regarded as a coalition member, represented by n N Alliance S is formed by random cooperation of alliance members. Let N LA ={1,2,…,n N} is the set in the alliance; the probability of the alliance occurring is expressed as:

[0055] (14);

[0056] In the formula, represents the probability of alliance S occurring; represents the number of alliances S;

[0057] The carbon emission responsibility allocated to each load aggregate is:

[0058] (15);

[0059] In the formula, is the carbon emission responsibility shared by the new alliance member m; S is the load alliance before the new alliance member m joins; The new load alliance is formed by adding the new alliance member m into S; It represents the marginal impact of the new member m on the alliance S after joining the alliance S. The carbon emission cost actually borne by each load aggregate depends on the incremental carbon emission cost brought to the alliance S by the load aggregate after joining the alliance S, that is, the marginal carbon emission cost;

[0060] The carbon emission responsibility assumed by the load alliance meets the following constraints:

[0061] (16);

[0062] In the formula, and They represent the minimum and maximum marginal effects of the new alliance member m respectively; is the Shapley value of alliance member m;

[0063] According to the marginal role of the carbon emission responsibility assumed by the load aggregate, the step-by-step carbon responsibility interval of the load aggregate is set. When the carbon emission of the new power system node from the perspective of carbon access of the flexible load in each load aggregate is higher, the carbon trading cost of the load aggregate participating in the step-by-step increase, and the carbon trading cost of the load aggregate increases. It is expressed as:

[0064] (17);

[0065] In the formula, The carbon emission responsibility allocated to the nth load aggregate; is the unit price of the ladder carbon trading of the nth load aggregate; , , and They represent the carbon trading costs of the load aggregate under different carbon emission conditions; x min (n), x max (n) and x ave (n) represents the minimum, maximum and Shapley value of the marginal effect of the nth load aggregate, respectively;

[0066] Step S3.3: Node carbon potential response means that the load aggregator adjusts the load power consumption plan based on the number of incentive contracts according to the carbon potential of the nodes of the new power system from a carbon perspective.

[0067] Furthermore, the node carbon potential response process is:

[0068] Step S3.31: Obtain relevant parameters; before the load aggregator performs a node carbon potential response, it shall clarify the relevant requirements to be followed in the response process, including the response time, response quantity limit and supplementary cost required by the incentive contract, and fully grasp the carbon emission flow status information of the new power system from the current carbon perspective;

[0069] Step S3.32: Calculate the carbon responsibility cost; according to the node carbon potential distribution of the new power system from the carbon perspective in the current state, the load aggregate calculates the carbon emissions, carbon trading costs and the average node carbon potential of the new power system from the carbon perspective at the current moment under the current electricity consumption plan;

[0070] Step S3.33: Flexible load adjustment; based on the incentive contract, the load aggregate transfers out load or reduces load during the period when the node carbon potential is higher than the specified value, and transfers in load during the period when the node carbon potential is lower than the specified value, and adjusts the charging and discharging power of the electric vehicle load, and changes the power consumption plan of the flexible load in each load aggregate;

[0071] Step S3.34: Obtain the state after the response; transmit the electricity demand after adjusting the flexible load to the power grid, and after the power grid dispatches the output of the traditional units, recalculate the carbon emission flow state and average node carbon potential of the new power system from a carbon perspective based on the carbon emission theory;

[0072] Step S3.35: Node carbon potential response judgment; judge whether the average node carbon potential ratio of the new power system from a carbon perspective before and after the flexible load adjustment is less than the carbon emission reduction rate at the current moment. If the requirement is not met, repeat steps S3.32 to S3.34 until the average node carbon potential ratio of the new power system from a carbon perspective is less than the carbon emission reduction rate at the current moment;

[0073] Step S3.36: The response is completed, and a new power system carbon reduction mechanism based on node carbon potential response is obtained.

[0074] Further, the specific process of step S4 is as follows: in the new power system robust optimization dispatching model, the upper power grid supplies power to the lower load aggregate while participating in the external carbon trading platform, and fully considers and handles the uncertainty of the new energy units while obtaining the power demand of the load aggregate and the external carbon quota, with the lowest total cost of the power grid as the optimization goal;

[0075] By solving the new power system robust optimization dispatch model based on confidence gap decision theory, adjusting the unit output and start-stop plan, a robust unit dispatch scheme is obtained. Then, based on the carbon emission flow theory, the node carbon potential and the carbon emission of each load are calculated, and the load carbon emission responsibility quota interval is obtained by adopting the Shapley value allocation method, and a ladder carbon price is formulated. Finally, the node carbon potential, time-of-use electricity price and ladder carbon price information are transmitted to the lower load aggregate in real time. After obtaining the node carbon potential of the new power system from the upper carbon perspective, the lower load aggregate participates in demand response and participates in the carbon trading platform. According to formula (17), it calculates and assumes the corresponding carbon emission responsibility. Finally, the power consumption strategy of the flexible power load under the jurisdiction of the load aggregate is adjusted with the goal of minimizing the total cost, and the power consumption strategy is fed back to the upper power grid to update the upper power flow state and the node carbon potential under this state. Steps S1 to S4 are repeated until the convergence condition of the new power system robust optimization dispatch model is reached to obtain the optimal dispatch scheme.

[0076] Furthermore, a robust optimization dispatch model for the upper power grid is constructed;

[0077] Step S4.11: objective function;

[0078] The grid takes the lowest total operating cost of different units as the optimization goal. The total operating cost of different units includes the power generation cost of traditional units, the start-up and shutdown cost of traditional units, new energy units, including wind turbines and photovoltaic generators, the cost of wind and solar power abandonment, and the grid carbon trading cost, which is expressed as:

[0079] (18);

[0080] (19);

[0081] In the formula, Indicates the scheduling time; Indicates quantity; represents the power generation of the traditional unit at time t; represents minimizing the total operating cost of the power grid; represents the power generated by the wind turbine at time t; W and V represent the total number of wind turbines and photovoltaic generators respectively; It represents the power generated by the photovoltaic generator at time t; The cost of electricity generation for traditional units; and They are the start-up and shutdown costs of traditional units; The cost of generating electricity from new energy units; Cost of abandoning wind and solar power for new energy units; and is the cost coefficient of the g-th unit; and They represent the start and stop state coefficients of the g-th unit in period t respectively; and They are the start-up and shutdown costs of new energy units; and are the cost coefficients of wind power generation and photovoltaic power generation, respectively; and are the wind and solar power abandonment penalty coefficient and the amount of wind and solar power abandonment respectively;

[0082] Step S4.12: Uncertainty handling based on confidence gap decision theory;

[0083] The Gaussian mixture model is used to fit the probability distribution of the prediction error of the new energy unit, which is expressed as:

[0084] G M ( u ) = ∑ h = 1 H [ l h ⋅ f G ( u ∣ m h , d h 2 ) ] (20);

[0085] In the formula, is the probability density function of the Gaussian mixture model; is the Gaussian component weight coefficient, satisfying and ; is the probability density function of the g-th Gaussian component; and They are The expectation and variance of represents the independent variable;

[0086] Based on the confidence gap decision theory, the fluctuation range of wind power generation and photovoltaic power generation prediction errors is described, and the confidence interval of the uncertainty variable is maximized by maximizing the uncertainty confidence level;

[0087] Under the premise of a given confidence level, the fluctuation range of the forecast error of wind power generation and photovoltaic power generation is expressed as:

[0088] (twenty one);

[0089] (twenty two);

[0090] In the formula, is the prediction error of wind power output; is the prediction error of photovoltaic power output; is the forecast error expectation of wind power output; is the expected prediction error of photovoltaic power output; and are the upper and lower limits of the confidence interval of the wind power output prediction error respectively; and are the upper and lower limits of the confidence interval of the prediction error of photovoltaic power generation output; The expected value of the forecast error of wind power output is The confidence uncertainty interval under ; The expected value of the prediction error of photovoltaic power generation is The confidence uncertainty interval under ;

[0091] Based on the confidence gap decision theory, the upper power grid robust optimization dispatch model is obtained:

[0092] (twenty three);

[0093] In the formula, is the probability value; is the coefficient of deviation; Indicates the confidence level of the uncertainty variable; is the confidence level of the objective function value; is the set of decision variables; The optimal solution for optimizing grid cost under a new robust optimization dispatch model for power systems based on node carbon potential response without considering wind power generation and photovoltaic power generation; The decision plan that represents the maximum confidence level of the uncertain variable;

[0094] Define the inverse cumulative distribution function of wind power output and the inverse cumulative distribution function of photovoltaic power output , using the uncertain variable operation rule, transform equation (23) into an upper power grid robust optimization dispatch model that is easy to solve:

[0095] (twenty four);

[0096] In the formula, Represents a function;

[0097] Step S4.13: Constraints;

[0098] New energy unit upper and lower output constraints:

[0099] (25);

[0100] In the formula, and are the upper and lower limits of the active output of the g-th unit;

[0101] Unit climbing constraints:

[0102] (26);

[0103] In the formula, and They are the upper and lower limits of the active output ramp of the g-th unit respectively; Represents new energy units;

[0104] Constraints on start and stop of new energy units:

[0105] (27);

[0106] In the formula, and They represent the continuous start-up time and stop time of the g-th unit at time t-1 respectively; and They represent the minimum start time and stop time of the g-th unit respectively;

[0107] Node power balance constraints:

[0108] (28);

[0109] In the formula, For Node The predicted load value of the unit; and represents the power value flowing into or out of line l connected to node i; L i is the set of lines connected to node i; Access Node Active power output of traditional units;

[0110] Line power flow upper and lower limit constraints:

[0111] (29);

[0112] In the formula, and are the upper and lower limits of power transmission of line l respectively; Represents the power transfer value of line l.

[0113] Furthermore, the lower load aggregate response model is constructed;

[0114] Step S4.21: objective function;

[0115] The load aggregation takes the lowest cost as the optimization goal. The cost includes the upper-level power purchase cost, the load demand response cost and the load aggregation carbon trading cost, which is expressed as:

[0116] (30);

[0117] In the formula, represents the minimum cost of load aggregate; , , , and F L They represent the electricity purchase cost of the load aggregate from the grid, the demand response cost of the reducible load, the demand response cost of the transferable load, the electric vehicle load discharge subsidy cost and the carbon trading cost of the load aggregate, respectively, and are calculated by formula (31):

[0118] (31);

[0119] In the formula, , , and They represent the time-of-use electricity purchase price, the curtailable load demand response cost coefficient, the transferable load in-cost coefficient, and the transferable load out-cost coefficient respectively; is the carbon trading cost of the ith load aggregate per unit time; Indicates the amount of electricity purchased; It indicates that the amount of demand response can be reduced; Indicates the transferable load transfer amount; It indicates the transferable load outflow; Indicates the load discharge of electric vehicles;

[0120] Step S4.22: Constraints;

[0121] Reducible load constraints:

[0122] (32);

[0123] In the formula, A 0-1 status parameter in response to a reduction command; The maximum reduction in load that can be reduced; To set the reduction period; Indicates the amount of load reduction that can be reduced;

[0124] The maximum load reduction duration limit is expressed as:

[0125] (33);

[0126] In the formula, Reduce the duration for maximum load;

[0127] The transferable load constraints include the transferable load balance constraint (34) and the transferable load state constraint (35):

[0128] (34);

[0129] (35);

[0130] (36);

[0131] In the formula, and They are the transferable load transfer-in and transfer-out 0-1 state parameters respectively; is the time set of the transferable load when transferring the load; and are the load transfer amount and the maximum value of the transfer amount of the transferable load respectively; Indicates the load transfer amount of the transferable load; Indicates the load transfer amount of the transferable load;

[0132] Electric vehicle load charging and discharging constraints:

[0133] (37);

[0134] In the formula, and are the charging state and discharging state of the nth electric vehicle load at time t, respectively. When the value is 1, it means In charging state, when When it is 1, it means In a state of discharge; and are the maximum charging and discharging power of electric vehicle load respectively; represents the charging power of the nth electric vehicle load at time t;

[0135] Power balance constraints:

[0136] (38);

[0137] In the formula, represents the amount of electricity purchased at time t; represents the load at time t; Indicates power reduction at time t; Indicates the power transferred in at time t; Indicates the output power at time t; Indicates the load discharge of electric vehicles.

[0138] Furthermore, the load differential evolution algorithm is used to solve the new power system robust optimization dispatch model based on node carbon potential response. The specific process is as follows:

[0139] Step 1: Parameter preparation; input unit parameters, line parameters, wind and solar power forecast output, and load aggregate original power consumption plan; set the target significance level ρ, set the population size, maximum number of iterations, and population split ratio algorithm parameters; initialize the population;

[0140] The second step is parameter preprocessing. Without considering the uncertainty of wind power generation and photovoltaic power generation, the new power system robust optimization dispatching model based on node carbon potential response is solved to obtain the optimal solution f0 of the grid cost under the new power system robust optimization dispatching model based on node carbon potential response. According to the historical forecast data of wind turbines and photovoltaics in each period, the probability density of wind turbine photovoltaic forecast errors is fitted based on the Gaussian mixture model to obtain the probability model of wind turbine and photovoltaic output forecast errors in each period.

[0141] The third step is to solve the upper model. Under all load alliance conditions, the upper power grid robust optimization dispatch model is solved based on the composite differential evolution algorithm to obtain the optimal dispatch plan for the units under all load alliances.

[0142] Step 4: Prepare carbon flow data. According to the carbon emission flow theory, calculate and record the carbon potential information of all load nodes under the alliance, calculate the carbon emissions of each load aggregate alliance based on the new power system carbon emission model, and pass the node carbon potential information to the lower load aggregates.

[0143] Step 5: Determine the carbon trading cost of the load aggregate; according to the carbon emissions of each load aggregate alliance, the total carbon emission responsibility of the load aggregate is allocated based on the Shapley value method, and the carbon trading cost of each load aggregate is calculated by determining the step carbon responsibility range of each load aggregate;

[0144] Step 6: Solve the lower model. Solve the node carbon potential response model of the lower load aggregate based on the composite differential evolution algorithm. Each load aggregate uses the node carbon potential as an incentive signal to participate in the node carbon potential response and adjust the power consumption strategy of the load aggregate.

[0145] Step 7: Model iterative update; the load aggregate will re-substitute the optimized power demand into the upper-level power grid robust optimization dispatch model, and then proceed to the solution of the third step, recording the load power demand before and after the iterative update. and ;

[0146] Step 8: Convergence judgment; judgment of the discriminant Is it established, among which, Represents the convergence judgment value. If it holds, the iteration is terminated. If it does not hold, it goes to the third step.

[0147] Compared with the existing technology, the present invention has the following beneficial effects:

[0148] (1) Compared with the traditional time-of-use electricity price response, the carbon reduction effect of the present invention by adopting the load aggregate node carbon potential response method is more obvious, and the overall carbon emissions of the system can be better reduced; by adopting the Shapley value allocation method to allocate the carbon emission responsibility of the load aggregate, the enthusiasm of the carbon potential response of each load aggregate node is significantly improved, which can effectively improve the efficiency and low-carbon nature of the system.

[0149] (2) The present invention deals with the uncertainty of wind and solar power based on the confidence gap decision theory, describes the randomness and volatility of the output of wind and solar power units, and can avoid the risks and impacts of new energy uncertainty on system scheduling to the greatest extent by setting a reasonable significance level, while taking into account the robustness and flexibility of the system scheduling plan.

[0150] (3) The present invention provides a new idea for the study of energy-saving and carbon-reduction strategies for new power systems from a "carbon perspective" through a new type of robust optimization scheduling of power systems based on node carbon potential response. BRIEF DESCRIPTION OF THE DRAWINGS

[0151] Figure 1 The present invention is a flow chart of the method. DETAILED DESCRIPTION

[0152] like Figure 1 As shown, the present invention provides a technical solution: a new robust optimization scheduling method for power system based on node carbon potential response, comprising the following steps:

[0153] Step S1: Calculate the node carbon potential in the new power system from a carbon perspective based on the carbon emission flow theory;

[0154] Step S2: Modeling different types of flexible load carbon emissions in the new power system from a carbon perspective based on the node carbon potential; the different types of flexible load carbon emissions include electric vehicle load (EV), curtailable load (CL) and transferable load (TL);

[0155] Step S3: Calculate the carbon emission responsibility interval of the load aggregate based on the Shapley value allocation method, combine the node carbon potential with the demand response, propose a new carbon reduction mechanism for the power system based on the node carbon potential response, and improve the new power system from a carbon perspective based on the node carbon potential; Model the carbon emission costs of the power grid on the source side and the load aggregate on the load side of the new power system from a carbon perspective;

[0156] Step S4: Taking the lowest operating cost of the power grid and load aggregate as the goal respectively, a new robust optimization dispatching model for the power system is established, and the uncertainty of the source-side wind and solar units is processed based on the confidence gap decision theory (CGDT) to obtain a robust optimization dispatching scheme.

[0157] Among them, the specific process of calculating the node carbon potential in the new power system from a carbon perspective is as follows: the carbon emissions from power generation generated by traditional fossil fuel units due to the electricity demand on the load side are the main source of carbon emissions in the new power system from a carbon perspective; in order to track and trace this part of carbon emissions, the actual carbon emissions can be imagined as a virtual "carbon emission flow" and attached to the active power flow, flowing from the source side to the load side with the active power flow;

[0158] In the new power system from the carbon perspective, Time Node The active trend It can be expressed as:

[0159] (1);

[0160] In the formula, For branch Active power of Active power flow into the node The branch set of Access Node The traditional units have active output.

[0161] The energy consumption per unit time of each branch or node relative to the carbon emission on the source side can be measured by the branch carbon potential or node carbon potential. The nodal carbon potential is expressed as:

[0162] (2);

[0163] In the formula, For generator Carbon emission intensity factor; For branch carbon emission intensity; express Time Node The nodal carbon potential.

[0164] According to the carbon emission theory, Equal to the branch in value The node carbon potential at the head end combines equation (1) with equation (2) and rewrites equation (2) into a matrix form:

[0165] i , t = [ ( P t B ) T E t N + ( P t G ) T E G ] P t N ( or n R ) T (3);

[0166] In the formula, is an N-dimensional unit row vector, whose nth element is 1; is the N-order diagonal branch power flow distribution matrix at time t; represents the branch active power between network node i and node j at time t; is the unit output matrix; It represents the power generation of the nth generator set connected to node i at time t; is the N-dimensional node carbon potential vector; Represents a matrix transpose operation; represents the generator carbon emission intensity factor matrix; represents the node power matrix; Represents the total number of conventional generators.

[0167] N-dimensional node carbon potential vector in new power system from carbon perspective Calculated by formula (4):

[0168] t N = [ P t N − ( P t B ) T ] − 1 ( P t G ) T E G (4).

[0169] Among them, the specific process of modeling the carbon emissions of different types of flexible loads in the new power system from a carbon perspective based on the node carbon potential is as follows: in order to fully tap the carbon reduction potential of the load side of the new power system from a carbon perspective, the present invention measures the carbon emissions of the new power system from the perspective of the load side, and models the carbon emissions of various flexible loads in the new power system from a carbon perspective based on the node carbon potential; assuming that there are multiple load aggregates (Load Aggregator, LA) in the new power system from a carbon perspective, each load aggregate can sense the carbon potential of the current access node in real time, and calculate the carbon emissions generated by the flexible load during the power consumption process based on the node carbon potential;

[0170] Constructing electric vehicle load carbon emission model;

[0171] First, the time when electric vehicle loads connect to and leave charging stations or charging piles can be approximately normal distributed, and its probability density function can be expressed as:

[0172] f ( t al ) = 1 s al 2 π exp [ − ( t al − m al ) 2 2 s al 2 ] (5);

[0173] In the formula, The time when the electric vehicle load connects to or leaves the charging station or charging pile; and They are Expectation and standard deviation; The probability density function representing the time when the electric vehicle load is connected to or leaves the charging pile;

[0174] The amount of electricity in the process of charging and discharging electric vehicle load is related to the daily mileage, which can be expressed as:

[0175] (6);

[0176] In the formula, Indicates the target power of the electric vehicle load; Indicates the starting power of the electric vehicle load; The power consumption per 100 kilometers for electric vehicle load; is the daily mileage of the electric vehicle load, which obeys the log-normal distribution:

[0177] f ( x ) = 1 x s xs 2 π exp [ − ( ln x − m xs ) 2 2 s xs 2 ] (7);

[0178] In the formula, and They are The expectation and standard deviation of represents the probability density function of the daily mileage of electric vehicle load;

[0179] Electric vehicle loads are connected to the new power system node from a carbon perspective through charging stations or charging piles. The carbon emissions generated during the charging and discharging process can be expressed as:

[0180] (8);

[0181] In the formula, represents the charging power of the nth electric vehicle load at time t; represents the discharge power of the nth electric vehicle load at time t; is the total amount of electric vehicle load; is the node carbon potential of the electric vehicle load connected to the grid node at time t; Represents the total carbon emissions of electric vehicle load at time t.

[0182] Construct a model that can reduce carbon emissions from loads;

[0183] Reducible load refers to the type of load that can alleviate peak power supply pressure by reducing power consumption during special power consumption periods such as peak power consumption. The carbon emission model of reducible load can be expressed as:

[0184] (9);

[0185] In the formula, is the carbon emission that can be reduced at time t; is the node carbon potential of the load access node that can be reduced at time t; and are the start time and end time of the curtailable load reduction, respectively; Indicates the load reduction amount that can be reduced at time t.

[0186] Constructing a transferable load carbon emission model;

[0187] Transferable load refers to the type of load that can be transferred from one period to another, such as washing machines, air conditioners and other loads. The transferable load carbon emission model can be expressed as:

[0188] (10);

[0189] In the formula, is the carbon emission of the transferable load at time t; is the node carbon potential of the node where the transferable load is connected at time t; and are the transfer-in load and transfer-out load of the transferable load at time t respectively; and They are the load-in time and load-out time of the transferable load respectively.

[0190] When grid node i is connected to electric vehicle load, curtailable load and transferable load at the same time, the total carbon emission of node i can be expressed as:

[0191] (11);

[0192] In the formula, is the node carbon potential of node i at time t; is the normal load of node i at time t; represents the total carbon emissions of node i; represents the carbon emission of electric vehicle load in node i at time t; represents the carbon emission reduction of the load in node i at time t; represents the carbon emission of transferable load in node i at time t.

[0193] The specific process of step S3 is: measuring, recording and saving the actual carbon emissions generated in the source-side power generation process of the new power system under the carbon perspective after the new power system carbon reduction mechanism based on the node carbon potential response is improved and the indirect carbon emissions generated by the load-side power load through the carbon table, and converting them into the carbon emission flow information of the new power system under the improved carbon perspective, so as to realize the carbon emission measurement and tracking of the new power system under the improved carbon perspective;

[0194] Based on the carbon emission measurement and tracking results of the new power system under the improved carbon perspective, the carbon trading platform can transmit the initial carbon quota, i.e. the free carbon emission quota part and the node carbon potential information, to the power grid and load aggregate respectively, so as to fully tap the carbon reduction potential on the source side and the load side; specifically, the power grid calculates the carbon trading costs of the power generation of traditional units and the carbon trading platform, and conducts low-carbon economic scheduling under the condition of fixed electricity demand, adjusts the power generation plan of traditional units, and realizes carbon reduction from the source side. At the same time, it transmits price information such as time-of-use electricity prices to load aggregates, and the load aggregates calculate the total carbon emissions (negative carbon emissions) based on the node carbon potential information. The grid then allocates the carbon emission responsibilities to all load aggregates to ensure that each load aggregate can bear the corresponding carbon emission responsibilities more fairly. Finally, the grid transmits the time-of-use electricity price to the load aggregates and signs incentive contracts with each load aggregate (the contract is used to stipulate the response time period, upper and lower limits of each load aggregate to adjust the various flexible loads under its jurisdiction, and the fees to be paid for the corresponding load adjustment). The load aggregates adjust the electricity consumption of flexible loads within the scope of the incentive contract to achieve carbon reduction from the load side.

[0195] Step S3.1: In the carbon trading platform, the excess carbon emissions generated by the unit's power generation need to be borne by purchasing carbon emission quotas. The carbon emission quota corresponding to the excess carbon emissions generated by the unit's power generation is related to the power generated by the unit, which can be expressed as:

[0196] (12);

[0197] In the formula, is the carbon emission quota of the g-th traditional unit; and They are coefficient and power generation capacity;

[0198] In order to effectively suppress the carbon emissions from the source side of the new power system under the improved carbon perspective, the present invention sets a stepped carbon trading range. When the carbon emissions of traditional units are higher, the corresponding carbon trading unit price in the carbon trading platform is higher, and the carbon emission responsibility is higher;

[0199] Among them, the carbon trading cost of the power grid It can be expressed as:

[0200] (13);

[0201] In the formula, is the length of the ladder carbon trading interval; Indicates the total number of generators in a conventional unit; is the unit price of carbon trading (0=σ0<σ1<σ2<σ3); , , as well as They represent the carbon trading costs of the power grid under different carbon emission levels; Expressed as the actual carbon emissions of conventional generators; Represents the carbon emission quota of the g-th traditional unit.

[0202] Step S3.2: The carbon trading cost of the load aggregate is not only related to its total carbon emissions, but also affected by the node location and energy consumption of the new power system from the perspective of carbon access of the load aggregate's flexible load; the present invention introduces the Shapley value allocation method to fairly and reasonably allocate carbon emission responsibilities;

[0203] According to the idea of ​​Shapley value allocation method, each load aggregate in the new power system under the improved carbon perspective can be regarded as a coalition member, composed of n N Alliance S is formed by random cooperation of alliance members. Let N LA ={1,2,…,n N} is the set in the alliance; the probability of the alliance occurring can be expressed as:

[0204] (14);

[0205] In the formula, represents the probability of alliance S occurring; represents the number of alliances S;

[0206] The carbon emission responsibility actually borne by each load aggregate can be measured by the weighted average of the marginal contribution of the sub-alliance to the alliance, that is, the carbon emission responsibility allocated to each load aggregate is:

[0207] (15);

[0208] In the formula, is the carbon emission responsibility shared by the new alliance member m; S is the load alliance before the new alliance member m joins; The new load alliance is formed by adding the new alliance member m into S; It represents the marginal impact of the new member m on the alliance S after joining the alliance S. The carbon emission cost actually borne by each load aggregate depends on the incremental carbon emission cost brought to the alliance S by the load aggregate after joining the alliance S, that is, the marginal carbon emission cost;

[0209] Among them, the carbon emission responsibility undertaken by the load alliance meets the following constraints:

[0210] (16);

[0211] In the formula, and They represent the minimum and maximum marginal effects of the new alliance member m respectively; is the Shapley value of alliance member m.

[0212] According to the marginal effects of the carbon emission responsibility undertaken by the load aggregate, the step-by-step carbon responsibility interval of the load aggregate is set. The higher the carbon emission of the new power system node from the perspective of carbon access of the flexible load in each load aggregate, the carbon trading cost of the load aggregate will increase step by step. It can be expressed as:

[0213] (17);

[0214] In the formula, The carbon emission responsibility allocated to the nth load aggregate; is the unit price of the ladder carbon trading of the nth load aggregate; , , and They represent the carbon trading costs of the load aggregate under different carbon emission conditions; x min (n), x max (n) and x ave (n) represent the minimum, maximum and Shapley value of the marginal effect of the nth load aggregate respectively.

[0215] Step S3.3: Node carbon potential response refers to the process in which the load aggregate adjusts the load power consumption plan based on the number of incentive contracts according to the node carbon potential of the new power system under the improved carbon perspective, so as to reduce its own carbon emissions and the carbon emission responsibilities and carbon trading costs it bears. The node carbon potential response process is:

[0216] Step S3.31: Obtain relevant parameters; before the load aggregate responds to the node carbon potential, it is necessary to clarify the relevant requirements that should be followed in the response process, such as the response time, response quantity limit and supplementary cost required by the incentive contract, and fully grasp the information such as the carbon emission flow state of the new power system under the improved carbon perspective in the current state, so as to make a correct and reasonable response to the changes in the node carbon potential in a standardized manner;

[0217] Step S3.32: Calculate the carbon responsibility cost; according to the node carbon potential distribution of the new power system under the improved carbon perspective in the current state, the load aggregator can calculate the carbon emissions, carbon trading costs and the average node carbon potential of the new power system under the improved carbon perspective at the current moment under the current electricity consumption plan;

[0218] Step S3.33: Flexible load adjustment; based on the incentive contract, the load aggregate transfers out load or reduces load during the period of higher carbon potential at the node, and transfers in load during the period of lower carbon potential at the node, and at the same time adjusts the charging and discharging power of the electric vehicle load, and changes the power consumption plan of the flexible load in each load aggregate;

[0219] Step S3.34: Obtain the state after the response; transmit the electricity demand after adjusting the flexible load to the power grid, and after the power grid dispatches the output of the traditional units, recalculate the carbon emission flow state and average node carbon potential of the new power system under the improved carbon perspective based on the carbon emission theory;

[0220] Step S3.35: Node carbon potential response judgment; judge whether the average node carbon potential ratio of the new power system under the improved carbon perspective before and after the flexible load adjustment is less than the carbon emission reduction rate at the current moment. If the requirement is not met, repeat steps S3.32 to S3.34 until the average node carbon potential ratio of the new power system under the improved carbon perspective is less than the carbon emission reduction rate at the current moment;

[0221] Step S3.36: The response is completed, and a new power system carbon reduction mechanism based on node carbon potential response is obtained.

[0222] The specific process of step S4 is as follows: in the new robust optimization model of the power system of the present invention, the upper power grid supplies power to the lower load aggregate while participating in the external carbon trading platform. When obtaining the power demand of the load aggregate and the external carbon quota, the uncertainty of the new energy units is fully considered and processed, and the minimum total cost of the power grid is taken as the optimization goal. By solving the robust optimization scheduling model based on the confidence gap decision theory, the unit output and start-stop plan are adjusted to obtain a robust unit scheduling plan. Subsequently, the node carbon potential and the carbon emissions of each load are calculated based on the carbon emission flow theory, and the Shapley value allocation method is adopted to obtain To the load carbon emission responsibility quota range, so as to formulate a reasonable ladder carbon price, and finally transmit the node carbon potential, time-of-use electricity price and ladder carbon price and other information to the lower layer in real time; the lower load aggregate participates in demand response after obtaining the upper power grid node carbon potential and other information, and participates in the carbon trading platform at the same time, and assumes the corresponding carbon emission responsibility according to the ladder carbon trading platform model, and finally adjusts the power consumption strategy of the flexible power load with the goal of minimizing the total cost, and feeds back the new power consumption plan to the upper layer to update the upper layer's power flow state and the node carbon potential under this state, and repeats the steps until the model convergence conditions are met to obtain the optimal scheduling plan.

[0223] Construct a robust optimization dispatch model for the upper power grid;

[0224] Step S4.11: objective function;

[0225] The power grid takes the lowest total operating cost of different units as the optimization goal. The total operating cost of different units includes the power generation cost of traditional units, the start-up and shutdown cost of traditional units, the cost of abandoning wind and light of new energy units (wind turbines and photovoltaic generators), and the carbon trading cost of the power grid, which can be expressed as:

[0226] (18);

[0227] (19);

[0228] In the formula, Indicates the scheduling time; Indicates quantity; represents the power generation of the traditional unit at time t; represents minimizing the total operating cost of the power grid; represents the power generated by the wind turbine at time t; W and V represent the total number of wind turbines and photovoltaic generators respectively; It represents the power generated by the photovoltaic generator at time t; The cost of electricity generation for traditional units; and They are the start-up and shutdown costs of traditional units; The cost of generating electricity from new energy units; Cost of abandoning wind and solar power for new energy units; and is the cost coefficient of the g-th unit; and They represent the start and stop state coefficients of the g-th unit in period t respectively; and They are the start-up and shutdown costs of new energy units; and are the cost coefficients of wind power generation and photovoltaic power generation, respectively; and are the wind and solar power abandonment penalty coefficient and the amount of wind and solar power abandonment respectively;

[0229] Step S4.12: Uncertainty handling based on confidence gap decision theory;

[0230] Affected by the external environment, wind power generation and photovoltaic power generation in the new power system from a carbon perspective are accompanied by greater randomness and intermittency, resulting in deviations between the predicted and actual values ​​of wind power generation and photovoltaic power generation. In order to accurately describe the uncertainty of the prediction errors of wind power generation and photovoltaic power generation, the Gaussian Mixture Model (GMM) is used to fit the probability distribution of the prediction errors of new energy units, which can be expressed as:

[0231] G M ( u ) = ∑ h = 1 H [ l h ⋅ f G ( u ∣ m h , d h 2 ) ] (20);

[0232] In the formula, is the probability density function of the Gaussian mixture model; is the Gaussian component weight coefficient, satisfying and ; is the probability density function of the g-th Gaussian component; and They are The expectation and variance of represents the independent variable;

[0233] In order to make the dispatching scheme of the new power system from the carbon perspective of a large number of uncertain new energy units more robust, this paper studies the fluctuation range of the prediction error of wind power generation and photovoltaic power generation based on the confidence gap decision theory (Confidence Gap Decision Theory, CGDT), and maximizes the confidence interval of the uncertainty variable by maximizing the uncertainty confidence level, so as to avoid the risk of the uncertainty of wind power generation and photovoltaic power generation output to the dispatching of the new power system from the carbon perspective to the greatest extent;

[0234] Under the premise of a given confidence level, the fluctuation range of the forecast error of wind power generation and photovoltaic power generation can be expressed as:

[0235] (twenty one);

[0236] (twenty two);

[0237] In the formula, is the prediction error of wind power output; is the prediction error of photovoltaic power output; is the forecast error expectation of wind power output; is the expected prediction error of photovoltaic power output; and are the upper and lower limits of the confidence interval of the wind power output prediction error respectively; and are the upper and lower limits of the confidence interval of the prediction error of photovoltaic power generation output; The expected value of the forecast error of wind power output is The confidence uncertainty interval under ; The expected value of the prediction error of photovoltaic power generation is The confidence uncertainty interval below .

[0238] Based on the confidence gap decision theory, the upper power grid robust optimization dispatch model is obtained:

[0239] (twenty three);

[0240] In the formula, is the probability value; is the coefficient of deviation; Indicates the confidence level of the uncertainty variable; is the confidence level of the objective function value; is the set of decision variables; The optimal solution for optimizing grid cost under a new robust optimization dispatch model for power systems based on node carbon potential response without considering wind power generation and photovoltaic power generation; The decision plan that represents the maximum confidence level of the uncertain variable.

[0241] Define the inverse cumulative distribution function of wind power output and the inverse cumulative distribution function of photovoltaic power output , using the uncertain variable operation rule, transform equation (23) into an upper power grid robust optimization dispatch model that is easy to solve:

[0242] (twenty four);

[0243] In the formula, Represents a function;

[0244] Step S4.13: Constraints;

[0245] New energy unit upper and lower output constraints:

[0246] (25);

[0247] In the formula, and are the upper and lower limits of the active output of the g-th unit;

[0248] Unit climbing constraints:

[0249] (26);

[0250] In the formula, and They are the upper and lower limits of the active output ramp of the g-th unit respectively; Represents new energy units;

[0251] Constraints on start and stop of new energy units:

[0252] (27);

[0253] In the formula, and They represent the continuous start-up time and stop time of the g-th unit at time t-1 respectively; and They represent the minimum start time and stop time of the g-th unit respectively;

[0254] Node power balance constraints:

[0255] (28);

[0256] In the formula, For Node The predicted load value of the unit; and represents the power value flowing into or out of line l connected to node i; L i is the set of lines connected to node i; Access Node Active power output of traditional units;

[0257] Line power flow upper and lower limit constraints:

[0258] (29);

[0259] In the formula, and are the upper and lower limits of power transmission of line l respectively; Represents the power transfer value of line l.

[0260] Constructing the lower load aggregate response model;

[0261] Step S4.21: objective function;

[0262] The load aggregation takes the lowest cost as the optimization goal. The cost includes the upper-level power purchase cost, the load demand response cost and the load aggregation carbon trading cost, which is expressed as:

[0263] (30);

[0264] In the formula, represents the minimum cost of load aggregate; , , , and F L They represent the electricity purchase cost of the load aggregate from the grid, the demand response cost of the reducible load, the demand response cost of the transferable load, the electric vehicle load discharge subsidy cost and the carbon trading cost of the load aggregate, respectively, and are calculated by formula (31):

[0265] (31);

[0266] In the formula, , , and They represent the time-of-use electricity purchase price, the curtailable load demand response cost coefficient, the transferable load in-cost coefficient, and the transferable load out-cost coefficient respectively; is the carbon trading cost of the ith load aggregate per unit time; Indicates the amount of electricity purchased; It indicates that the amount of demand response can be reduced; Indicates the transferable load transfer amount; It indicates the transferable load outflow; Indicates the load discharge of electric vehicles;

[0267] Step S4.22: Constraints;

[0268] Reducible load constraints:

[0269] (32);

[0270] In the formula, A 0-1 status parameter in response to a reduction command; The maximum reduction in load that can be reduced; To set the reduction period; Indicates the amount of load reduction that can be reduced;

[0271] The maximum load reduction duration limit is expressed as:

[0272] (33);

[0273] In the formula, Reduce the duration for maximum load;

[0274] The transferable load constraints include the transferable load balance constraint (34) and the transferable load state constraint (35):

[0275] (34);

[0276] (35);

[0277] (36);

[0278] In the formula, and They are the transferable load transfer-in and transfer-out 0-1 state parameters respectively; is the time set of the transferable load when transferring the load; and are the load transfer amount and the maximum value of the transfer amount of the transferable load respectively; Indicates the load transfer amount of the transferable load; Indicates the load transfer amount of the transferable load;

[0279] Electric vehicle load charging and discharging constraints:

[0280] (37);

[0281] In the formula, and are the charging state and discharging state of the nth electric vehicle load at time t, respectively. When the value is 1, it means In charging state, when When it is 1, it means In a state of discharge; and are the maximum charging and discharging power of electric vehicle load respectively; represents the charging power of the nth electric vehicle load at time t;

[0282] Power balance constraints:

[0283] (38);

[0284] In the formula, represents the amount of electricity purchased at time t; represents the load at time t; Indicates power reduction at time t; Indicates the power transferred in at time t; Indicates the output power at time t; Indicates the load discharge of electric vehicles.

[0285] The load differential evolution algorithm is used to solve the new power system robust optimization dispatch model based on node carbon potential response. The specific process is as follows:

[0286] Step 1: Parameter preparation; input unit parameters, line parameters, wind and solar power forecast output, and load aggregate original power consumption plan; set the target significance level ρ, set the population size, maximum number of iterations, and population split ratio algorithm parameters; initialize the population;

[0287] The second step is parameter preprocessing. Without considering the uncertainty of wind power generation and photovoltaic power generation, the new power system robust optimization dispatching model based on the node carbon potential response is solved to obtain the optimal solution f0 of the power grid under the deterministic model. According to the historical forecast data of wind turbines and photovoltaics in each period, the probability density of wind turbine photovoltaic forecast errors is fitted based on the Gaussian mixture model to obtain the probability model of wind turbine and photovoltaic output forecast errors in each period.

[0288] The third step is to solve the upper model. Under all load alliance conditions, the upper power grid robust optimization dispatch model is solved based on the composite differential evolution algorithm to obtain the optimal dispatch plan for the units under all load alliances.

[0289] Step 4: Prepare carbon flow data. According to the carbon emission flow theory, calculate and record the carbon potential information of all load nodes under the alliance, calculate the carbon emissions of each load aggregate alliance based on the new power system carbon emission model, and pass the node carbon potential information to the lower load aggregates.

[0290] Step 5: Determine the carbon trading cost of the load aggregate; according to the carbon emissions of each load aggregate alliance, the total carbon emission responsibility of the load aggregate is allocated based on the Shapley value method, and the carbon trading cost of each load aggregate is calculated by determining the step carbon responsibility range of each load aggregate;

[0291] Step 6: Solve the lower model. Solve the node carbon potential response model of the lower load aggregate based on the composite differential evolution algorithm. Each load aggregate uses the node carbon potential as an incentive signal to participate in the node carbon potential response and adjust the power consumption strategy of the load aggregate.

[0292] Step 7: Model iterative update; the load aggregate will re-substitute the optimized power demand into the upper-level power grid robust optimization dispatch model, and then proceed to the solution of the third step, recording the load power demand before and after the iterative update. and ;

[0293] Step 8: Convergence judgment; judgment of the discriminant Is it true? If it is true, the iteration ends. If it is not true, turn to the third step, where Indicates the convergence judgment value, which is 0.05MW and is used for output scheduling result analysis.

[0294] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A new robust optimization dispatching method for power systems based on node carbon potential response, characterized in that: The steps include: Step S1: Calculate the node carbon potential in the new power system from a carbon perspective; Step S2: Modeling the carbon emissions of different types of flexible loads in the new power system from a carbon perspective based on the node carbon potential; the different types of flexible loads include electric vehicle loads EV, curtailable loads CL and transferable loads TL; Step S3: Calculate the carbon emission responsibility interval of the load aggregate based on the Shapley value allocation method, and combine the node carbon potential with the demand response to propose a new carbon reduction mechanism for the power system based on the node carbon potential response; Model the carbon emission costs of the power grid on the source side and the load aggregate on the load side of the new power system from a carbon perspective; Step S4: With the lowest operation cost of the power grid and the load aggregate as the goal respectively, a new type of power system robust optimization dispatching model is established, and the uncertainty of the source-side new energy units is processed based on the confidence gap decision theory to obtain an optimized dispatching scheme; the established new type of power system robust optimization dispatching model includes an upper-layer power grid robust optimization dispatching model and a lower-layer load aggregate response model; The specific process of calculating the node carbon potential in the new power system from a carbon perspective is as follows: the actual carbon emissions of the new power system from a carbon perspective are assumed to be in the form of a virtual carbon emission flow, which is attached to the active power flow and flows from the source side to the load side along with the active power flow; In the new power system from the carbon perspective, Time Node The active trend It is expressed as: (1); In the formula, For branch Active power of Active power flow into the node The branch set of Access Node Active power output of traditional units; node The nodal carbon potential is expressed as: (2); In the formula, For the Carbon emission intensity factor of traditional units; For branch carbon emission intensity; express Time Node The nodal carbon potential of According to the carbon emission theory, Equal to the branch in value The node carbon potential at the head end combines equation (1) with equation (2) and rewrites equation (2) into a matrix form: (3); In the formula, is the N-dimensional unit row vector; is the N-order diagonal branch power flow distribution matrix at time t; represents the branch active power between node i and node j at time t; is the unit output matrix; represents the power generation power of the nth traditional unit at node i at time t; is the N-dimensional node carbon potential vector; Represents a matrix transpose operation; Represents the carbon emission intensity factor matrix of traditional units; represents the node power matrix; Indicates the total number of generators in a conventional unit; N-dimensional node carbon potential vector in new power system from carbon perspective Calculated by formula (4): (4); The specific process of modeling carbon emissions of different types of flexible loads in the new power system from a carbon perspective based on node carbon potential is as follows: measuring carbon emissions of the new power system from a carbon perspective from the perspective of the load side, and modeling carbon emissions of various flexible loads in the new power system from a carbon perspective based on node carbon potential; Assume that there are multiple load aggregates in the new power system from a carbon perspective. Each load aggregate senses the carbon potential of the current access node and calculates the carbon emissions generated during the electricity consumption of the flexible load based on the node carbon potential. Constructing electric vehicle load carbon emission model; The probability density function of the time when electric vehicle loads connect to and leave charging stations or charging piles It is expressed as: (5); In the formula, The time when the electric vehicle load connects to or leaves the charging station or charging pile; and They are The expectation and standard deviation of The amount of electricity in the process of charging and discharging the electric vehicle load is expressed as: (6); In the formula, Indicates the target power of the electric vehicle load; Indicates the starting power of the electric vehicle load; The power consumption per 100 kilometers for electric vehicle load; is the daily mileage of the electric vehicle load, which obeys the log-normal distribution: (7); In the formula, and They are The expectation and standard deviation of represents the probability density function of the daily mileage of electric vehicle load; Electric vehicle loads are connected to the new power system node from a carbon perspective through the charging station or charging pile. The carbon emissions generated during the charging and discharging process are expressed as: (8); In the formula, represents the charging power of the nth electric vehicle load at time t; represents the discharge power of the nth electric vehicle load at time t; is the total amount of electric vehicle load; The node carbon potential of the new power system node at time t under the carbon perspective of electric vehicle load access; represents the total carbon emissions of electric vehicle load at time t; Construct a load-reducible carbon emission model, expressed as: (9); In the formula, is the carbon emission that can be reduced at time t; is the node carbon potential of the load access node that can be reduced at time t; and are the start time and end time of the curtailable load reduction, respectively; represents the load reduction amount that can be reduced at time t; Construct a transferable load carbon emission model, which is expressed as: (10); In the formula, is the carbon emission of the transferable load at time t; is the node carbon potential of the new power system node under the carbon perspective of the transferable load access at time t; and are the transfer-in load and transfer-out load of the transferable load at time t respectively; and are the load-in time and load-out time of the transferable load respectively; When the new power system node i is connected to electric vehicle load, curtailable load and transferable load at the same time from the carbon perspective, the total carbon emission of the node i is expressed as: (11); In the formula, is the node carbon potential of node i at time t; is the normal load of node i at time t; represents the total carbon emissions of node i; represents the carbon emission of electric vehicle load in node i at time t; represents the carbon emission reduction of the load in node i at time t; represents the carbon emission of transferable load in node i at time t; The carbon meter measures, records and stores the actual carbon emissions generated in the power generation process on the source side and the indirect carbon emissions generated by the load side electricity consumption of the new power system from a carbon perspective, and converts them into carbon emission flow information of the new power system from a carbon perspective, thus realizing the carbon emission measurement and tracking of the new power system from a carbon perspective. The carbon trading platform transmits the initial carbon quota, i.e., the free carbon emission quota part and the node carbon potential information, to the power grid and load aggregates based on the carbon emission measurement and tracking results of the new power system from a carbon perspective; the power grid calculates the carbon trading costs of the power generation of traditional units and the carbon trading platform, and conducts low-carbon economic dispatch under the condition of fixed electricity demand, adjusts the power generation plan of traditional units, and transmits the time-of-use electricity price information to the load aggregates. The load aggregates calculate the total carbon emissions, i.e., the carbon emissions generated at the source end due to electricity demand at the node where the load aggregates are located, based on the node carbon potential information, and then apportion the carbon emission responsibilities to all load aggregates. Finally, the power grid transmits the time-of-use electricity price to the load aggregates, and signs incentive contracts with each load aggregate. The load aggregates adjust the electricity consumption of flexible loads within the scope of the incentive contract to achieve carbon reduction from the load side. Step S3.1: In the carbon trading platform, the excess carbon emissions generated by the unit’s power generation are expressed as: (12); In the formula, is the carbon emission quota of the g-th traditional unit; and They are coefficient and power generation capacity; Set up a tiered carbon trading range. When the carbon emissions of traditional units are higher, the corresponding carbon trading unit price in the carbon trading platform will be higher, and the carbon emission responsibility will be higher; Among them, the carbon trading cost of the power grid It is expressed as: (13); In the formula, is the length of the ladder carbon trading interval; Indicates the total number of generators in a conventional unit; The unit price of carbon trading is 0=σ0<σ1<σ2<σ3; , , as well as They represent the carbon trading costs of the power grid under different carbon emission levels; Expressed as the actual carbon emissions of the generators in the conventional units; represents the carbon emission quota of the g-th traditional unit; Step S3.2: Introduce the Shapley value allocation method to allocate carbon emission responsibilities; According to the Shapley value allocation method, each load aggregate in the new power system from a carbon perspective is regarded as a coalition member, represented by n N Alliance S is formed by random cooperation of alliance members. Let N LA ={1,2,…,n N } is the set in the alliance; the probability of the alliance occurring is expressed as: (14); In the formula, represents the probability of alliance S occurring; represents the number of alliances S; The carbon emission responsibility allocated to each load aggregate is: (15); In the formula, is the carbon emission responsibility shared by the new alliance member m; S is the load alliance before the new alliance member m joins; The new load alliance is formed by adding the new alliance member m into S; It represents the marginal impact of the new member m on the alliance S after joining the alliance S. The carbon emission cost actually borne by each load aggregate depends on the incremental carbon emission cost brought to the alliance S by the load aggregate after joining the alliance S, that is, the marginal carbon emission cost; The carbon emission responsibility assumed by the load alliance meets the following constraints: (16); In the formula, and They represent the minimum and maximum marginal effects of the new alliance member m respectively; is the Shapley value of alliance member m; According to the marginal role of the carbon emission responsibility assumed by the load aggregate, the step-by-step carbon responsibility interval of the load aggregate is set. When the carbon emission of the new power system node from the perspective of carbon access of the flexible load in each load aggregate is higher, the carbon trading cost of the load aggregate participating in the step-by-step increase, and the carbon trading cost of the load aggregate increases. It is expressed as: (17); In the formula, The carbon emission responsibility allocated to the nth load aggregate; is the unit price of the ladder carbon trading of the nth load aggregate; , , and They represent the carbon trading costs of the load aggregate under different carbon emission conditions; x min (n), x max (n) and x ave (n) represents the minimum, maximum and Shapley value of the marginal effect of the nth load aggregate, respectively; Step S3.3: Response based on node carbon potential means that the load aggregator adjusts the load power consumption plan based on the incentive contract according to the carbon potential of the new power system nodes from a carbon perspective; The node carbon potential response process is: Step S3.31: Obtain relevant parameters; before the load aggregator performs a node carbon potential response, it shall clarify the relevant requirements to be followed in the response process, including the response time, response quantity limit and supplementary cost required by the incentive contract, and fully grasp the carbon emission flow status information of the new power system from the current carbon perspective; Step S3.32: Calculate the carbon responsibility cost; according to the node carbon potential distribution of the new power system from the carbon perspective in the current state, the load aggregate calculates the carbon emissions, carbon trading costs and the average node carbon potential of the new power system from the carbon perspective at the current moment under the current electricity consumption plan; Step S3.33: Flexible load adjustment; based on the incentive contract, the load aggregate transfers out load or reduces load during the period when the node carbon potential is higher than the specified value, and transfers in load during the period when the node carbon potential is lower than the specified value, and adjusts the charging and discharging power of the electric vehicle load, and changes the power consumption plan of the flexible load in each load aggregate; Step S3.34: Obtain the state after the response; transmit the electricity demand after adjusting the flexible load to the power grid, and after the power grid dispatches the output of the traditional units, recalculate the carbon emission flow state and average node carbon potential of the new power system from a carbon perspective based on the carbon emission theory; Step S3.35: Node carbon potential response judgment; judge whether the average node carbon potential ratio of the new power system from a carbon perspective before and after the flexible load adjustment is less than the carbon emission reduction rate at the current moment. If the requirement is not met, repeat steps S3.32 to S3.34 until the average node carbon potential ratio of the new power system from a carbon perspective is less than the carbon emission reduction rate at the current moment; Step S3.36: The response is completed, and a new power system carbon reduction mechanism based on the node carbon potential response is obtained; The specific process of step S4 is as follows: in the new power system robust optimization dispatching model, the upper power grid supplies power to the lower load aggregate while participating in the external carbon trading platform. While obtaining the power demand of the load aggregate and the external carbon quota, the uncertainty of the new energy units is fully considered and processed, and the minimum total cost of the power grid is taken as the optimization goal; By solving the new power system robust optimization dispatch model based on the confidence gap decision theory, adjusting the unit output and start-stop plan, a robust unit dispatch plan is obtained, then the node carbon potential and each load carbon emission are calculated based on the carbon emission flow theory, and the load carbon emission responsibility quota interval is obtained by adopting the Shapley value allocation method, and a ladder carbon price is formulated. Finally, the node carbon potential, time-of-use electricity price and ladder carbon price information are transmitted to the lower load aggregate in real time; after obtaining the node carbon potential of the new power system from the upper carbon perspective, the lower load aggregate participates in demand response and participates in the carbon trading platform at the same time, and calculates and assumes the corresponding carbon emission responsibility according to formula (17). Finally, the power consumption strategy of the flexible power load under the jurisdiction of the load aggregate is adjusted with the goal of minimizing the total cost, and the power consumption strategy is fed back to the upper power grid to update the upper power flow state and the node carbon potential under this state. Steps S1 to S4 are repeated until the convergence condition of the new power system robust optimization dispatch model is reached to obtain the optimal dispatch plan; Construct a robust optimization dispatch model for the upper power grid; Step S4.11: objective function; The grid takes the lowest total operating cost of different units as the optimization goal. The total operating cost of different units includes the power generation cost of traditional units, the start-up and shutdown cost of traditional units, new energy units, including wind turbines and photovoltaic generators, the cost of wind and solar power abandonment, and the grid carbon trading cost, which is expressed as: (18); (19); In the formula, Indicates the scheduling time; Indicates quantity; represents the power generation of the traditional unit at time t; represents minimizing the total operating cost of the power grid; represents the power generated by the wind turbine at time t; W and V represent the total number of wind turbines and photovoltaic generators respectively; It represents the power generated by the photovoltaic generator at time t; The cost of electricity generation for traditional units; and They are the start-up and shutdown costs of traditional units; The cost of generating electricity from new energy units; Cost of abandoning wind and solar power for new energy units; and is the cost coefficient of the g-th unit; and They represent the start and stop state coefficients of the g-th unit in period t respectively; and They are the start-up and shutdown costs of new energy units; and are the cost coefficients of wind power generation and photovoltaic power generation, respectively; and are the wind and solar power abandonment penalty coefficient and the amount of wind and solar power abandonment respectively; Step S4.12: Uncertainty handling based on confidence gap decision theory; The Gaussian mixture model is used to fit the probability distribution of the prediction error of the new energy unit, which is expressed as: (20); In the formula, is the probability density function of the Gaussian mixture model; is the Gaussian component weight coefficient, satisfying and ; is the probability density function of the g-th Gaussian component; and They are The expectation and variance of represents the independent variable; Based on the confidence gap decision theory, the fluctuation range of wind power generation and photovoltaic power generation prediction errors is described, and the confidence interval of the uncertainty variable is maximized by maximizing the uncertainty confidence level; Under the premise of a given confidence level, the fluctuation range of the forecast error of wind power generation and photovoltaic power generation is expressed as: (21); (22); In the formula, is the prediction error of wind power output; is the prediction error of photovoltaic power output; is the forecast error expectation of wind power output; is the expected prediction error of photovoltaic power output; and are the upper and lower limits of the confidence interval of the wind power output prediction error respectively; and are the upper and lower limits of the confidence interval of the prediction error of photovoltaic power generation output; The expected value of the forecast error of wind power output is The confidence uncertainty interval under ; The expected value of the prediction error of photovoltaic power generation is The confidence uncertainty interval under ; Based on the confidence gap decision theory, the upper power grid robust optimization dispatch model is obtained: (23); In the formula, is the probability value; is the coefficient of deviation; Indicates the confidence level of the uncertainty variable; is the confidence of the objective function value; is the set of decision variables; The optimal solution for optimizing grid cost under a new robust optimization dispatch model for power systems based on node carbon potential response without considering wind power generation and photovoltaic power generation; The decision plan that represents the maximum confidence level of the uncertain variable; Define the inverse cumulative distribution function of wind power output and the inverse cumulative distribution function of photovoltaic power output , using the uncertain variable operation rule, transform equation (23) into an upper power grid robust optimization dispatch model that is easy to solve: (24); In the formula, Represents a function; Step S4.13: Constraints; New energy unit upper and lower output constraints: (25); In the formula, and are the upper and lower limits of the active output of the g-th unit; Unit climbing constraints: (26); In the formula, and They are the upper and lower limits of the active output ramp of the g-th unit respectively; Represents new energy units; Constraints on start and stop of new energy units: (27); In the formula, and They represent the continuous start-up time and stop time of the g-th unit at time t-1 respectively; and They represent the minimum start time and stop time of the g-th unit respectively; Node power balance constraints: (28); In the formula, For Node The predicted load value of the unit; and represents the power value flowing into or out of line l connected to node i; L i is the set of lines connected to node i; Access Node Active power output of traditional units; Line power flow upper and lower limit constraints: (29); In the formula, and are the upper and lower limits of power transmission of line l respectively; Represents the power transfer value of line l.

2. The novel robust optimization scheduling method for power system based on node carbon potential response according to claim 1 is characterized in that: Constructing the lower load aggregate response model; Step S4.21: objective function; The load aggregation takes the lowest cost as the optimization goal. The cost includes the upper-level power purchase cost, the load demand response cost and the load aggregation carbon trading cost, which is expressed as: (30); In the formula, represents the minimum cost of load aggregate; , , , and F L They represent the electricity purchase cost of the load aggregate from the grid, the demand response cost of the reducible load, the demand response cost of the transferable load, the electric vehicle load discharge subsidy cost and the carbon trading cost of the load aggregate, respectively, and are calculated by formula (31): (31); In the formula, , , and They represent the time-of-use electricity purchase price, the curtailable load demand response cost coefficient, the transferable load in-cost coefficient, and the transferable load out-cost coefficient respectively; is the carbon trading cost of the ith load aggregate per unit time; Indicates the amount of electricity purchased; It indicates that the amount of demand response can be reduced; Indicates the transferable load transfer amount; It indicates the transferable load outflow; Indicates the load discharge of electric vehicles; Step S4.22: Constraints; Reducible load constraints: (32); In the formula, A 0-1 status parameter in response to a reduction command; The maximum reduction in load that can be reduced; To set the reduction period; Indicates the amount of load reduction that can be reduced; The maximum load reduction duration limit is expressed as: (33); In the formula, Reduce the duration for maximum load; The transferable load constraints include the transferable load balance constraint (34) and the transferable load state constraint (35): (34); (35); (36); In the formula, and They are the transferable load transfer-in and transfer-out 0-1 state parameters respectively; is the time set of the transferable load when transferring the load; and are the load transfer amount and the maximum value of the transfer amount of the transferable load respectively; Indicates the load transfer amount of the transferable load; Indicates the load transfer amount of the transferable load; Electric vehicle load charging and discharging constraints: (37); In the formula, and are the charging state and discharging state of the nth electric vehicle load at time t, respectively. When the value is 1, it means In charging state, when When it is 1, it means In a state of discharge; and are the maximum charging and discharging power of electric vehicle load respectively; represents the charging power of the nth electric vehicle load at time t; Power balance constraints: (38); In the formula, represents the amount of electricity purchased at time t; represents the load at time t; Indicates power reduction at time t; Indicates the power transferred in at time t; Indicates the output power at time t; Indicates the load discharge of electric vehicles.

3. The novel robust optimization scheduling method for power system based on node carbon potential response according to claim 2 is characterized in that: The composite differential evolution algorithm is used to solve the new power system robust optimization dispatch model based on node carbon potential response. The specific process is as follows: Step 1: Parameter preparation; input unit parameters, line parameters, wind and solar forecast output, and the original power consumption plan of the load aggregate; set the target significance level ρ, set the population size, maximum number of iterations, and population split ratio algorithm parameters; initialize the population; The second step is parameter preprocessing. Without considering the uncertainty of wind power generation and photovoltaic power generation, the new power system robust optimization dispatching model based on node carbon potential response is solved to obtain the optimal solution f0 of the grid cost under the new power system robust optimization dispatching model based on node carbon potential response. According to the historical forecast data of wind turbines and photovoltaics in each period, the probability density of wind turbine photovoltaic forecast errors is fitted based on the Gaussian mixture model to obtain the probability model of wind turbine and photovoltaic output forecast errors in each period. The third step is to solve the upper model. Under all load alliance conditions, the upper power grid robust optimization dispatch model is solved based on the composite differential evolution algorithm to obtain the optimal dispatch plan for the units under all load alliances. Step 4: Prepare carbon flow data. According to the carbon emission flow theory, calculate and record the carbon potential information of all load nodes under the alliance, calculate the carbon emissions of each load aggregate alliance based on the new power system carbon emission model, and pass the node carbon potential information to the lower load aggregates. Step 5: Determine the carbon trading cost of the load aggregate; according to the carbon emissions of each load aggregate alliance, the total carbon emission responsibility of the load aggregate is allocated based on the Shapley value method, and the carbon trading cost of each load aggregate is calculated by determining the step carbon responsibility range of each load aggregate; Step 6: Solve the lower model: Solve the node carbon potential response model of the lower load aggregate based on the composite differential evolution algorithm. Each load aggregate uses the node carbon potential as an incentive signal to participate in the node carbon potential response and adjust the power consumption strategy of the load aggregate. Step 7: Model iterative update; the load aggregate will re-substitute the optimized power demand into the upper-level power grid robust optimization dispatch model, and then proceed to the solution of the third step, recording the load power demand before and after the iterative update. and ; Step 8: Convergence judgment; judgment of the discriminant If it is true, the iteration is terminated. If it is not true, it goes to the third step, where Indicates the convergence judgment value.

Citation Information

Patent Citations

  • Low-carbon control method for power system containing gas-coal-wind turbine generator

    CN111277006A

  • Multi-objective confidence gap decision-making robust optimization scheduling method for integrated energy system

    CN111815081A

  • Multi-scene confidence gap decision-based wind-solar-energy storage combined planning method

    CN113343167A

  • Electric power system double-layer optimization strategy for guiding demand response based on node carbon intensity and time-of-use electricity price

    CN116488144A

  • Active power distribution network robust scheduling method and system based on carbon emission flow

    CN116565831A