A construction device and method for Y-shaped steel castings at a station

By using climbers and balanced force-applying structures in the construction of tree-shaped steel structures, the problem of column offset caused by the tilt of the support rod assembly is solved, and construction accuracy and convenience are improved.

CN118327309BActive Publication Date: 2024-10-18CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410750209.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-12
Publication Date
2024-10-18
Estimated Expiration
2044-06-12

AI Technical Summary

Technical Problem

In the construction of tree-shaped steel structures, the heavier strut components exert tilt pressure on the docking steel castings due to their tilted state, causing the tops of the steel columns to shift, increasing subsequent assembly errors and construction difficulty.

Method used

Construction devices including climbers, temporary support columns and lifting equipment are used to apply reverse balancing pressure on the top of the column assembly through a balanced force-applying structure to offset the horizontal thrust of the support rod assembly and ensure the vertical state of the column assembly.

Benefits of technology

It effectively reduces the offset of the column components, improves the installation accuracy and construction convenience of the strut components, and reduces the difficulty of subsequent assembly and construction risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118327309B_ABST
    Figure CN118327309B_ABST
Patent Text Reader

Abstract

The present invention discloses a construction device and method for a station Y-shaped steel casting, which specifically relates to the technical field of building construction. The device includes a climber, a temporary support column and a lifting device. The climber is slidably arranged outside a column assembly. A climbing driver is arranged in the climber, and a positioning bracket is installed on the top of the climber. The climbing driver is used to drive the climber to move along the height direction of the column assembly. A balancing force structure is also arranged on the climber. The balancing force structure is rotated around the circumferential direction of the climber, and the balancing force structure is used to apply a balancing pressure to the top of the column assembly. The present invention controls the balancing force structure to move to the opposite direction of the offset direction of the column assembly, and applies a balancing force, so that the column assembly is restored to a precise vertical state, so as to facilitate the precise docking of the subsequent support rod assembly, which greatly improves the construction accuracy of the device and improves the convenience and stability of the subsequent assembly of the support rod assembly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and more specifically, to a construction device and a construction method for a Y-shaped steel casting of a station. Background Art

[0002] The tree-like structure is a type of spatial bionic structure and a relatively novel structural form. It has a reasonable force transmission path, high bearing capacity, and a wide support coverage range. It can use smaller rods to form a larger support space. Therefore, in large buildings such as high-speed railway stations, large steel structures such as tree-like columns will be used in large quantities.

[0003] The tree-like columns are mainly composed of steel columns, butt-jointed cast steel parts and support rod structures. After splicing, a tree-like supporting structure with main rods and support rods is formed, which is similar to a three-dimensional structure formed by a rotating array of multiple Y-shaped structures.

[0004] When constructing tree-like columns, it is necessary to connect and assemble multiple Y-shaped steel castings. Among them, the steel columns and the butt-jointed steel castings need to be welded and prefabricated in the factory before being shipped as a whole. They are then hoisted into place as a whole on site at one time, and then the support rods are hoisted and spliced ​​one by one to the butt-jointed steel castings to form the corresponding Y-shaped structure.

[0005] When hoisting and assembling the Y-shaped structure, it is necessary to first install the steel columns and the connecting steel castings on the corresponding concrete pedestals, and then hoist and assemble each support rod one by one. Since each support rod is extended outward and has a certain horizontal span, in order to facilitate assembly, it is also necessary to build corresponding temporary support columns (steel structure frames) around the steel columns, and use the top of the support column to assist in positioning and supporting the support rod. When splicing the support rods, since multiple adjustments and operations are required, the top of the support column does not need to fix the support rod, and only needs to provide vertical support for it.

[0006] In some architectural designs, in order to provide better support effects, the tree-like structure can be extended and improved into a "blooming" tree-like steel structure, that is, a reasonable extension and connection structure is set on each support structure to form a "petal"-like grid structure between each Y-shaped structure, thereby further improving the support effect while retaining the spatial effect.

[0007] Since the "blooming" tree-like steel structure improves the original support poles into petal-shaped support pole assemblies, the number of structural parts has increased, high-altitude construction is more difficult and the installation accuracy is difficult to control. Therefore, it is necessary to use a special tire frame to pre-assemble the "petal" support pole assembly on the ground. After the assembly is completed, each "petal" is hoisted separately.

[0008] However, when the improved tree-like structure is actually assembled, the "petal" support rod assembly is larger than the original single support rod structure. When hoisting one by one, after the support rod assembly and the docking steel casting are installed, the other end of the support rod assembly is supported by a temporary support column (not fixed). Since the support rod assembly is inclined, under the action of its own gravity, it will form an inclined pressure on the docking steel casting. After decomposition, there is also a horizontal component force. This horizontal component force will form a thrust on the top of the rod formed by the docking steel casting and the steel column, which can easily cause the top of the steel column to offset and deform, which will affect the actual position of the docking steel casting, causing subsequent assembly errors, increasing the difficulty of hoisting adjustment and construction, and affecting the project progress and construction quality. Summary of the invention

[0009] The invention provides a Y-shaped steel casting construction device and method for a station, and aims to solve the following problem: after the existing heavier support rod assembly is installed with the butt-jointed steel casting, due to its inclined shape, an inclined pressure is formed on the butt-jointed steel casting, which easily causes the top end of the steel column to be offset and deformed, resulting in a technical problem of subsequent assembly errors.

[0010] To achieve the above-mentioned object, the present invention provides the following technical solutions: a station Y-shaped steel casting construction device, comprising a climber, a temporary support column and a lifting device, wherein the climber is slidably arranged outside the column assembly;

[0011] A climbing drive is provided in the climber, a positioning bracket is installed on the top of the climber, and the climbing drive is used to drive the climber to move along the height direction of the column assembly;

[0012] The climber is also provided with a fastener, which is used to fix the climber to a corresponding position on the column assembly;

[0013] The climber is also provided with a balancing force structure, which is arranged to rotate around the circumferential direction of the climber. The balancing force structure is used to apply a balancing pressure to the top of the column assembly. The balancing pressure is set in the opposite direction to the horizontal thrust generated by the gravity of the installed support rod assembly on the top of the steel column, and is used to balance the horizontal thrust.

[0014] In a preferred embodiment, the balanced force structure includes a cable assembly, which also includes a movable frame, which is rotatably arranged on the outside of the climber, the top end of the cable assembly is fixedly connected to the movable frame, and the bottom end of the cable assembly is connected to a winch, which is fixedly installed on the ground.

[0015] In a preferred embodiment, the balanced force structure includes a cantilever structure, a counterweight structure is slidably arranged on the cantilever structure, an annular guide rail is arranged on the climber, a movable seat is arranged at one end of the cantilever structure close to the climber, the movable seat is slidably matched with the annular guide rail, and the cantilever structure is tilted downward at one end away from the climber.

[0016] In a preferred embodiment, a traveling mechanism is provided on the moving seat, and the traveling mechanism includes a driving motor arranged on the moving seat, a gear is arranged on the output shaft of the driving motor, an annular rack structure arranged around the annular guide rail is arranged on the annular guide rail, the gear is meshed with the annular rack structure, a screw structure is arranged in the cantilever structure, and the rotation of the screw is controlled by the motor, and the counterweight structure cooperates with the screw.

[0017] In a preferred embodiment, the climbing drive is a track assembly which is movably mounted in the climber. A hydraulic drive is provided in the climber for driving the climbing drive to move inside the climber. The fastener includes a fixed clamping plate which is connected to the climber via a hydraulic cylinder which is fixedly mounted on the climber and the fixed clamping plate is fixedly mounted on the output end of the hydraulic cylinder.

[0018] In a preferred embodiment, the fastener also includes a fastener, which is fixedly mounted on the climber, and a pressure chamber is provided in the fastener, a flexible layer is provided on the side of the pressure chamber close to the steel column, the flexible layer is fixedly connected to the fastener, a pressure strip is embedded in the flexible layer, a vertical protrusion structure is formed at the position where the pressure strip protrudes from the surface of the flexible layer, a guide rod is fixedly connected to the pressure strip, a guide structure for guiding the guide rod is provided in the fastener, and a pressure input pipe is connected to the pressure chamber.

[0019] In a preferred embodiment, a cooling chamber is also provided in the tightener. The cooling chamber is arranged adjacent to the pressure chamber. The cooling chamber is connected with an input pipe and an output pipe. The input pipe is used to transport water to the cooling chamber and discharge the water through the output pipe. A meander-shaped heat dissipation pipe is also provided in the climber, and the meander-shaped heat dissipation pipe is connected to the output pipe.

[0020] In a preferred embodiment, the counterweight structure is a hollow barrel structure, and liquid is stored inside the counterweight structure. A liquid inlet pipe and a liquid outlet pipe are also provided on the counterweight structure. The liquid inlet pipe is used to transport liquid into the counterweight structure, and the liquid outlet pipe is used to discharge the liquid in the counterweight structure. The liquid inlet pipe is connected to the output port of the meandering heat dissipation pipe through a hose, and a drain control valve is provided on the liquid outlet pipe. The input pipe is connected to a pump, and the pump transports water to the cooling chamber through the input pipe.

[0021] In a preferred embodiment, the top of the positioning bracket is set as a V-shaped structure, and a guide wheel is set at the bottom of the V-shaped structure of the positioning bracket. The guide wheel is rotatably installed in the positioning bracket, and the surface of the guide wheel is provided with a groove structure for adapting to the end of the support rod assembly.

[0022] A construction method for a station Y-shaped steel casting construction device comprises the following steps:

[0023] Step 1: Structural modeling: Use BIM information technology to model tree-like composite steel columns with different elevations and special-shaped sections. Use the family nesting method to load parameters into the model, perform collision tests on component installation, deepen the design model construction, and then process each component.

[0024] Step 2: splicing the support rod components on the ground, setting up an assembly frame on the ground, and assembling the support rod components on the ground using the assembly frame;

[0025] Step 3: Hoisting of column assemblies: pre-welding of steel columns and butt cast steel parts in the factory to form column assemblies, transporting them to the construction site, and hoisting them with hoisting equipment;

[0026] Step 4: Assemble temporary support columns. According to the number and position of support rod assemblies, build temporary support columns around the column assemblies.

[0027] Step 5: Hoisting the support rod assembly, install the climber on the column assembly, drive it to the top of the column assembly and fix it, and hoist the first support rod assembly by the lifting equipment;

[0028] Step 6: Balance adjustment: Use a total station to measure the position of the top of the column assembly. If the top of the column assembly is offset, control the balance force structure to move to the opposite direction of the offset to apply a balance force until the column assembly returns to vertical.

[0029] The beneficial effect of the present invention is that when it is found that the column assembly is offset due to the influence of the support rod assembly, the present invention can control the balance force structure to move to the opposite direction of the offset direction of the column assembly, and apply a balance force to restore the column assembly to a precise vertical state, so as to facilitate the precise docking of the subsequent support rod assembly, thereby greatly improving the construction accuracy of the device and improving the convenience and stability of the subsequent assembly of the support rod assembly. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the construction process of the present invention.

[0031] Figure 2 This is a schematic diagram of the overall structure of the tree-like column before improvement of the present invention.

[0032] Figure 3 This is a schematic diagram of the construction process of the tree-like column before the improvement of the present invention.

[0033] Figure 4 A top view of the improved "petal" support rod assembly of the present invention.

[0034] Figure 5 This is a force analysis diagram of the improved single "petal" support rod assembly on the column assembly after assembly.

[0035] Figure 6 It is a structural schematic diagram of one of the balanced force-applying structures of the present invention.

[0036] Figure 7 It is a schematic diagram of the overall structure of the climber of the present invention.

[0037] Figure 8 It is a schematic diagram of the internal structure of the climber of the present invention.

[0038] Fig. 9 It is a schematic diagram of the composition structure of the fastener of the present invention.

[0039] Fig.10 It is a bottom view of the internal structure of the fastener of the present invention.

[0040] Fig.11 For the present invention Fig.10 A-section structure enlarged view.

[0041] Fig.12 It is a side view of the positioning bracket of the present invention.

[0042] Fig.13 It is a flow chart of the construction method of the present invention.

[0043] The accompanying drawings are marked as follows: 1. climber; 11. positioning bracket; 111. guide wheel; 12. annular guide rail; 13. climbing drive; 2. tree column assembly; 21. column assembly; 211. steel column; 212. butt-jointed steel casting; 22. support rod; 221. support rod assembly; 3. temporary support column; 4. lifting equipment; 5. balanced force structure; 51. cantilever structure; 511. moving seat; 52. counterweight structure; 521. liquid inlet pipe; 522. liquid outlet pipe; 53. cable assembly; 6. fastener; 61. fixing splint; 62. fastener; 63. pressure chamber; 631. pressure input pipe; 64. flexible layer; 65. pressure strip; 651. guide rod; 66. cooling chamber; 661. input pipe; 662. output pipe; 663. circular heat dissipation pipe. DETAILED DESCRIPTION

[0044] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content.

[0045] Refer to the instruction manual Figures 1 to 12A construction device and method for a Y-shaped steel casting of a station, comprising a climber 1, a temporary support column 3 and a lifting device 4. During construction, the climber 1 is slidably arranged outside the column assembly 21, and the lifting device 4 lifts the corresponding support rod assembly 221. The temporary support column 3 is built around the column assembly 21, and one end of the support rod assembly 221 during construction is supported by the top of the temporary support column 3, so that the other end falls on the docking steel casting 212 for docking installation. After each support rod assembly 221 is assembled with the column assembly 21, it is a tree-like column assembly 2;

[0046] The climber 1 is provided with a climbing drive 13, and a positioning bracket 11 is installed on the top of the climber 1. During construction, the climber 1 is driven by the climbing drive 13 to reach the top of the column assembly 21. At this time, the positioning bracket 11 is set corresponding to the corresponding docking point. In the process of hoisting the support rod assembly 221, the end of the support rod assembly 221 is guided and positioned by means of the positioning bracket 11, so that it can be quickly docked and installed with the docking point on the docking steel casting 212;

[0047] The climber 1 is also provided with a fastener 6, which is used to fix the climber 1 to a corresponding position on the column assembly 21;

[0048] A balancing force structure 5 is also provided on the climber 1. The balancing force structure 5 is rotatably arranged around the circumferential direction of the climber 1. The balancing force structure 5 is used to apply a balancing pressure to the top of the column assembly 21. The balancing pressure is set in the opposite direction to the horizontal thrust generated by the gravity of the installed support rod assembly 221 on the top of the steel column 211, and is used to balance the horizontal thrust, so that the force on the top of the column assembly 21 is balanced, the offset is reduced, and the installation accuracy and convenience of the remaining support rod assemblies 221 are improved.

[0049] It should be noted that the climber 1 in the present embodiment is composed of two groups of semicircular frames, which can be spliced ​​and arranged. In actual use, the two groups of semicircular frames are first assembled on the ground to the outside of the steel column 211. After assembly, the climbing driver 13 contacts the steel column 211. At this time, the climber 1 can be driven to rise to the top with the help of the climbing driver 13. After rising to the corresponding position, the climber 1 is fixed to the column assembly 21 by the fixing device. At this time, the positioning bracket 11 is in the corresponding position to guide the hoisted support rod assembly 221.

[0050] In the above scheme, the column assembly 21 can also be tested with a total station or other testing equipment. When it is found that the column assembly 21 is offset due to the influence of the support rod assembly 221 (see the attached manual), Figure 5), the balancing force structure 5 can be controlled to move to the opposite direction of the offset direction of the column assembly 21, and a balancing force can be applied to restore the column assembly 21 to a precise vertical state, so as to facilitate the subsequent precise docking of the support rod assembly 221.

[0051] For details, please refer to the attached manual. Figure 6 The balanced force structure 5 can use a cable assembly 53, that is, the balanced force structure 5 includes a movable frame, which is rotatably arranged on the outside of the climber 1, the top of the cable assembly 53 is fixedly connected to the movable frame, and the bottom of the cable assembly 53 is connected to a winch, which is fixedly installed on the ground. When the column assembly 21 is offset, the winch can be set in the opposite direction of the offset direction of the column assembly 21, and then the winch is driven to rotate to reel in the cable assembly 53. With the help of the cable assembly 53, a pulling force is provided to the climber 1, so that the pulling force is decomposed in the horizontal direction to balance the horizontal thrust caused by the support rod assembly 221 on the end of the column assembly 21, so that the column assembly 21 can maintain a stable vertical state.

[0052] In the above scheme, the winch needs to be installed on the ground, but due to the large number of support rod assemblies 221, the force direction and magnitude of the top of the column assembly 21 will change during the actual assembly construction, so it is necessary to constantly adjust the balancing force structure 5. At this time, it is troublesome to repeatedly disassemble the winch. Therefore, this embodiment also provides another solution for the balancing force structure 5. For details, refer to the attached manual. Figure 1 and attached Figure 7 The balanced force-applying structure 5 includes a cantilever structure 51 on which a counterweight structure 52 is slidably arranged. An annular guide rail 12 is arranged on the climber 1. A movable seat 511 is arranged at one end of the cantilever structure 51 close to the climber 1, and the movable seat 511 is slidably matched with the annular guide rail 12.

[0053] A counterweight structure 52 is suspended on the cantilever structure 51. Under the gravity of the counterweight structure 52 and the force arm support of the cantilever structure 51, a horizontal pulling force can be formed on the top of the column assembly 21. In order to improve the efficiency of the component force conversion, the cantilever structure 51 is tilted, and the end of the cantilever structure 51 away from the climber 1 is tilted downward. Then, under the tilted support of the cantilever structure 51, the gravity of the counterweight structure 52 can be decomposed into a more effective horizontal component force, thereby effectively balancing the top of the column assembly 21. Since there are many factors changing during the construction process, in order to facilitate the azimuth adjustment of the cantilever structure 51, a walking mechanism can be set on the moving seat 511. For example, a driving motor is set on the moving seat 511. A gear is provided on the output shaft of the driving motor, and an annular rack structure arranged around the annular guide rail 12 is provided on the annular guide rail 12 (the annular guide rail 12 and the annular rack are designed as an assembled structure like the climber 1). The gear is meshed with the annular rack structure, and then the cantilever structure 51 can be driven to move by the driving motor, thereby changing the direction of application of the balancing force. At the same time, the counterweight structure 52 is slidably arranged on the cantilever structure 51, and a screw rod structure can be arranged in the cantilever structure 51, and the motor controls the rotation of the screw rod to make the counterweight structure 52 cooperate with the screw rod, and then the position of the counterweight structure 52 on the cantilever structure 51 can be adjusted, thereby adjusting the size of the force arm and changing the force application effect. The screw rod has good self-locking performance and can maintain high operating stability.

[0054] In the above process, although the force effect can be adjusted by adjusting the position of the counterweight structure 52 to change the force arm, a too long force arm will also cause an impact in the construction environment. Therefore, this embodiment also provides another force adjustment method. For details, refer to the attached manual. Figure 8 The counterweight structure 52 is a hollow barrel structure, and liquid is stored inside the counterweight structure 52. A liquid inlet pipe 521 and a liquid outlet pipe 522 are also provided on the counterweight structure 52. The liquid inlet pipe 521 is used to transport liquid into the counterweight structure 52, and the liquid outlet pipe 522 is used to discharge the liquid in the counterweight structure 52. The liquid inlet pipe 521 is connected to a high-pressure pump to supply water, and a control valve is provided on the liquid outlet pipe 522. By controlling the liquid inlet pipe 521 and the liquid outlet pipe 522 to adjust the amount of liquid inside the counterweight structure 52, the actual weight of the counterweight structure 52 can be adjusted, thereby also changing the force application situation.

[0055] It should be noted that since the orientation of the balancing force structure 5 needs to be continuously adjusted during the construction process, in order to avoid the influence of inertia during the rotation of the balancing force structure 5, the amount of liquid in the counterweight structure 52 can be reduced during the adjustment process, and the counterweight structure 52 can be driven closer to the climber 1 to reduce the lever arm, thereby reducing the influence of inertia during the rotation of the balancing force structure 5.

[0056] Further, in this embodiment, the climbing drive 13 is a crawler assembly, see the attached Figure 8 The crawler assembly is movably installed in the climber 1. The climber 1 is provided with a hydraulic driver for driving the climbing driver 13 to move inside the climber 1. After the climber 1 is assembled, the climbing driver 13 can be driven by the hydraulic driver to fit the steel column 211, so that the climber 1 can be raised under the drive of the crawler. The crawler assembly is used as the climbing driver 13. When in use, the contact surface with the steel column 211 is larger, the adhesion is higher, the rising stability is stronger, and after rising, a certain fixing force can be formed on the climber 1 with the help of the stopped crawler assembly.

[0057] It should be noted that the scheme of moving the hydraulically driven equipment is a widely used technical means. For example, the track assembly can be directly installed on the output end of the hydraulic cylinder, or a parallelogram mechanism, a wedge block mechanism, etc. can be set in the climber 1 to connect the climbing drive 13 with the hydraulic cylinder, and the climbing drive 13 can also be driven to move. Therefore, the specific structure of the climbing drive 13 and the hydraulically driven equipment is not further described in this embodiment.

[0058] For further information, please refer to the attached manual. Figure 7 The present embodiment provides a fastener 6, which is a fixed clamping plate 61. The fixed clamping plate 61 is connected to the climber 1 through a hydraulic cylinder. The hydraulic cylinder is fixedly mounted on the climber 1, and the fixed clamping plate 61 is fixedly mounted on the output end of the hydraulic cylinder. When fixing is required, the hydraulic cylinder drives the fixed clamping plate 61 to move and contact the surface of the steel column 211 to form extrusion, so that the climber 1 can be fixed. The number of fixed clamping plates 61 can be set in multiple groups according to actual conditions to improve the fixing effect.

[0059] In the above embodiment, when assembling the support rod assembly 221, it is inevitable that the support rod assembly 221 will collide with the positioning bracket 11, thereby forming a rotational impact force on the climber 1. At this time, if the fixing effect of the climber 1 and the column assembly 21 is not good enough, the climber 1 may produce a rotational deviation, which will lead to errors in the support of the positioning bracket 11 and the balance of the balancing force structure 5. Therefore, this embodiment also provides the following technical solutions to strengthen the fixing effect of the climber 1 and the steel column 211 in the circumferential direction. For details, refer to the attached manual Figures 8 to 10The fastener 6 also includes a fastener 62, which is fixedly mounted on the climber 1. A pressure chamber 63 is provided in the fastener 62. A flexible layer 64 is provided on one side of the pressure chamber 63 close to the steel column 211. The flexible layer 64 is fixedly connected to the fastener 62. A pressure strip 65 is embedded in the flexible layer 64. The pressure strip 65 protrudes from the surface of the flexible layer 64 to form a vertical protrusion structure. A guide rod 651 is fixedly connected to the pressure strip 65. A guide structure for guiding the guide rod 651 is provided in the fastener 62. The pressure chamber 63 is connected to a pressure input pipe 631.

[0060] It should be noted that a seal is provided between the flexible layer 64 and the pressure chamber 63. The flexible layer 64 can be a thick-bottomed rubber structure or a rubber structure with a metal mesh in the middle. The pressure input pipe 631 is connected to the hydraulic oil pump. When the climber 1 needs to be fixed, the hydraulic oil is pumped into the pressure chamber 63 by the hydraulic oil pump to provide pressure to the flexible layer 64, so that the flexible layer 64 expands toward the steel column 211 and then clings to the surface of the steel column 211. At the same time, each layer 65 is pressed against the surface of the steel column 211. The flexible layer 64 and the layer 65 can be arranged in multiple groups in the circumferential direction. While the friction is increased by pressing the multiple groups of flexible layers 64 against the steel column 211, the layer 65 can also form a tiny indentation on the surface of the steel column 211. The layer 65 is guided by the guide rod 651, so that the climber 1 can be limited in the circumferential direction, which greatly improves the stability of the climber 1 when it is fixed, especially when the steel column 211 is a structure composed of multiple square tubes. Refer to the attached manual. Fig.10 and Fig.11 Part of the layering strips 65 will be directly stuck on the edge of a single square tube, further improving the limiting strength and ensuring the stability of the equipment during construction operation.

[0061] In the above construction method, the docking of the support rod assembly 221 will also involve some welding operations. Since the steel column 211 has many structures, if the welding operation time is long, the heat conduction will cause high temperature to be generated in the climber 1 close to the support rod assembly 221, especially the above-mentioned flexible layer 64 directly in contact with the steel column 211 and the crawler in the crawler structure of the climbing drive 13, which are also easily affected by high temperature and cause problems. Therefore, this embodiment also provides the following technical solutions, specifically, refer to the attached manual Fig. 9A cooling chamber 66 is also provided in the tightener 62. The cooling chamber 66 is arranged adjacent to the pressure chamber 63. The cooling chamber 66 is connected with an input pipe 661 and an output pipe 662. The input pipe 661 is used to transport water to the cooling chamber 66, and the water is discharged through the output pipe 662. Flowing water is formed in the cooling chamber 66, which can effectively cool the flexible layer 64. At the same time, a meandering heat dissipation pipe 663 is also provided in the climber 1. The meandering heat dissipation pipe 663 is connected to the output pipe 662, so that a water flow is also formed in the meandering heat dissipation pipe 663, so as to cool the steel column 211 in the climber 1 area.

[0062] It should be noted that multiple groups of fasteners 62 can be provided, depending on the space of the climber 1, and the meandering heat dissipation pipes 663 are connected in series in the connecting pipes of the cooling chambers 66 in each group of fasteners 62 to form an overall liquid flow.

[0063] Furthermore, the liquid inlet pipe 521 is connected to the output port of the meandering heat dissipation pipe 663 through a hose, a drainage control valve is provided on the liquid outlet pipe 522, and the input pipe 661 is connected to the pump, which transports water to the cooling chamber 66 through the input pipe 661. At this time, the liquid inlet pipe 521 can directly supply water through the pump connected to the cooling chamber 66, so that while supplying water to the counterweight structure 52 to adjust the weight, the flowing liquid can also be used to cool the area inside the climber 1 to a certain extent, thereby greatly improving the practicability of the equipment.

[0064] Refer to the instruction manual Fig.12 The top of the positioning bracket 11 is set as a V-shaped structure, and the bottom of the V-shaped structure of the positioning bracket 11 is provided with a guide wheel 111, which is rotatably installed in the positioning bracket 11, and the surface of the guide wheel 111 is provided with a groove structure for adapting to the end of the support rod assembly 221, so that when the climber 1 is fixed on the top of the column assembly 21, when the support rod assembly 221 is hoisted for assembly, the end of the support rod assembly 221 can be positioned to the specified position more quickly, thereby improving the construction efficiency.

[0065] It should be noted that, in addition to the assembly of the improved support rod assembly 221 , this embodiment is also applicable to the assembly of the traditional simple support rod 22 .

[0066] Refer to the instruction manual Fig.13 The present invention also provides a station Y-shaped steel casting construction device and construction method, comprising the following steps:

[0067] Step 1: Structural modeling: Use BIM information technology to model tree-like composite steel columns with different elevations and special-shaped sections. Use the family nesting method to load parameters into the model, perform collision tests on component installation, deepen the design model construction, and then process each component.

[0068] Step 2: The support rod assembly 221 is spliced ​​on the ground, and a solution of ground modular assembly and unit hoisting is adopted to complete a large amount of assembly welding and precision retesting work involved in the support rod assembly 221 on the ground. Specifically, an assembly cradle is set up on the ground, and the assembly time of the components is moved forward. The ground assembly work of the steel structure is started during the concrete structure construction stage, so that the main concrete structure and the steel structure are constructed simultaneously, which greatly saves construction time;

[0069] At the same time, BIM technology is used to divide each tree crown into 6 leaves, i.e. 6 support rod assemblies 221, through structural analysis and force calculation. The leaves are assembled on the ground in advance, and each leaf is hoisted separately after assembly.

[0070] Step 3: Hoisting the column assembly 21: Pre-welding the steel column 211 and the butt cast steel part 212 in the factory to form the column assembly 21. After transporting it to the construction site, hoisting it by the hoisting equipment 4, and fixing the bottom of the column assembly 21 on the concrete cap. After fixing, concrete grouting is performed on the column foot;

[0071] Step 4: Assemble the temporary support column 3. According to the number and position of the support rod assembly 221, build the temporary support column 3 around the column assembly 21. Set the embedded parts at the bottom of the temporary support column 3. According to the relative relationship between the embedded parts and the axis, establish the control axis network with the actual measurement on site. According to the embedded parts coordinates derived from CAD, locate the embedded parts, and hoist them through the hoisting equipment 4. Assemble and weld the temporary support column 3 and the embedded parts. The temporary support column 3 cannot fall directly on the floor slab, but needs to be converted to the top of the beam or column. The specification of the conversion beam is not less than HN400*200*8*13.

[0072] Step 5: Hoisting the support rod assembly 221, installing the climber 1 on the column assembly 21, driving it to move to the top of the column assembly 21 and fixing it, using the lifting equipment 4 to hoist the first support rod assembly 221, guiding with the positioning bracket 11, docking the support rod assembly 221 with the docking steel casting 212, and assembling the assembly;

[0073] Step six, balance adjustment, use a total station on the ground to measure the orientation of the top of the column assembly 21. If the top of the column assembly 21 is offset, control the balance force structure 5 to move to a position in the opposite direction of the offset to apply a balance force until the column assembly 21 is restored to vertical. When assembling the second support rod assembly 221, give priority to assembling the support rod assembly 221 at a position opposite to the first support rod assembly 221 to form a stable Y-shaped structure for easy construction until all the support rod assemblies 221 are assembled.

[0074] The construction method of this embodiment studies the construction technology of "flowering" tree-like composite steel columns with large special-shaped cross-sections, uses a three-dimensional model to decompose the components of the complex tree-like steel structure, improves the processing accuracy, derives the three-dimensional coordinate parameter lofting, realizes the virtual assembly of steel components, and designs a special tire frame on the ground for the "petal" part to assemble and hoist the unit, ensuring high-precision positioning of the installation. For unfavorable working conditions or unreachable locations, BIM technology is used to simulate and assist in the analysis of the optimal hoisting path and installation process.

[0075] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.

Claims

1. A station Y-shaped steel casting construction device, characterized in that: It comprises a climber (1), a temporary support column (3) and a lifting device (4), wherein the climber (1) is slidably arranged outside the column assembly (21); The climber (1) is provided with a climbing drive (13), a positioning bracket (11) is installed on the top of the climber (1), and the climbing drive (13) is used to drive the climber (1) to move along the height direction of the column assembly (21); The climber (1) is also provided with a fastener (6), and the fastener (6) is used to fix the climber (1) to a corresponding position on the column assembly (21); The climber (1) is also provided with a balancing force structure (5), the balancing force structure (5) being arranged to rotate around the circumferential direction of the climber (1), and the balancing force structure (5) being used to apply a balancing pressure to the top of the column assembly (21), the balancing pressure being arranged in the opposite direction to the horizontal thrust generated by the top of the steel column (211) under the influence of the gravity of the installed support rod assembly (221), and being used to balance the horizontal thrust; The balanced force-applying structure (5) comprises a cantilever structure (51), a counterweight structure (52) is slidably arranged on the cantilever structure (51), an annular guide rail (12) is arranged on the climber (1), a movable seat (511) is arranged at one end of the cantilever structure (51) close to the climber (1), the movable seat (511) is slidably matched with the annular guide rail (12), and an end of the cantilever structure (51) away from the climber (1) is arranged to be tilted downward.

2. A station Y-shaped steel casting construction device according to claim 1, characterized in that: The movable seat (511) is provided with a walking mechanism, the walking mechanism comprising a driving motor arranged on the movable seat (511), a gear being arranged on the output shaft of the driving motor, an annular rack structure arranged around the annular guide rail (12) being arranged on the annular guide rail (12), the gear being meshed with the annular rack structure, a screw rod structure being arranged in the cantilever structure (51), the rotation of the screw rod being controlled by the motor, and the counterweight structure (52) being matched with the screw rod.

3. A station Y-shaped steel casting construction device according to claim 2, characterized in that: The climbing drive (13) is a crawler assembly, the crawler assembly being movably mounted in the climber (1), the climber (1) being provided with a hydraulic drive, the hydraulic drive being used to drive the climbing drive (13) to move inside the climber (1), the fastener (6) comprising a fixed clamping plate (61), the fixed clamping plate (61) being connected to the climber (1) via a hydraulic cylinder, the hydraulic cylinder being fixedly mounted on the climber (1), and the fixed clamping plate (61) being fixedly mounted on an output end of the hydraulic cylinder.

4. A station Y-shaped steel casting construction device according to claim 3, characterized in that: The fastener (6) further comprises a fastener (62), wherein the fastener (62) is fixedly mounted on the climber (1), wherein a pressure chamber (63) is arranged in the fastener (62), wherein a flexible layer (64) is arranged on a side of the pressure chamber (63) close to the steel column (211), wherein the flexible layer (64) is fixedly connected to the fastener (62), wherein a pressure strip (65) is embedded in the flexible layer (64), wherein a vertical protrusion structure is formed at a position where the pressure strip (65) protrudes from the surface of the flexible layer (64), wherein a guide rod (651) is fixedly connected to the pressure strip (65), wherein a guide structure for guiding the guide rod (651) is arranged in the fastener (62), and wherein a pressure input pipe (631) is connected to the pressure chamber (63).

5. A station Y-shaped steel casting construction device according to claim 4, characterized in that: The tightener (62) is further provided with a cooling chamber (66), the cooling chamber (66) being arranged adjacent to the pressure chamber (63), the cooling chamber (66) being connected to an input pipe (661) and an output pipe (662), the input pipe (661) being used to transport water to the cooling chamber (66) and discharge the water through the output pipe (662), and the climber (1) is further provided with a meandering heat dissipation pipe (663), the meandering heat dissipation pipe (663) being connected to the output pipe (662).

6. A station Y-shaped steel casting construction device according to claim 5, characterized in that: The counterweight structure (52) is a hollow barrel structure. Liquid is stored inside the counterweight structure (52). The counterweight structure (52) is also provided with a liquid inlet pipe (521) and a liquid outlet pipe (522). The liquid inlet pipe (521) is used to transport liquid into the counterweight structure (52). The liquid outlet pipe (522) is used to discharge liquid in the counterweight structure (52). The liquid inlet pipe (521) is connected to an output port of a meandering heat dissipation pipe (663) via a hose. A drainage control valve is provided on the liquid outlet pipe (522). The input pipe (661) is connected to a pump. The pump transports water to the cooling chamber (66) via the input pipe (661).

7. A station Y-shaped steel casting construction device according to claim 6, characterized in that: The top of the positioning bracket (11) is arranged as a V-shaped structure, the bottom of the V-shaped structure of the positioning bracket (11) is provided with a guide wheel (111), the guide wheel (111) is rotatably mounted in the positioning bracket (11), and the surface of the guide wheel (111) is provided with a groove structure for matching with the end of the support rod assembly (221).

8. A construction method for the station Y-shaped steel casting construction device as claimed in claim 1, characterized in that: The following steps are involved: Step 1: Structural modeling: Use BIM information technology to model tree-like composite steel columns with different elevations and special-shaped sections. Use the family nesting method to load parameters into the model, perform collision tests on component installation, deepen the design model construction, and then process each component. Step 2: splicing the support rod assembly (221) on the ground, setting up an assembly frame on the ground, and assembling the support rod assembly (221) on the ground using the assembly frame; Step 3: hoisting the column assembly (21), pre-welding the steel column (211) and the butt cast steel part (212) in the factory to form the column assembly (21), transporting it to the construction site, and hoisting it by means of a hoisting device (4); Step 4: assembling temporary support columns (3): constructing temporary support columns (3) around the column assemblies (21) according to the number and positions of the support rod assemblies (221); Step 5: hoisting the support rod assembly (221), installing the climber (1) on the column assembly (21), driving it to move to the top of the column assembly (21) and fixing it, and hoisting the first support rod assembly (221) by the lifting device (4); Step 6: Balance adjustment: Use a total station to measure the top position of the column assembly (21). If the top of the column assembly (21) is offset, control the balance force application structure (5) to move to a position in the opposite direction of the offset to apply a balance force until the column assembly (21) is restored to vertical.

Citation Information

Patent Citations

  • Method for installing and constructing special-shaped large-tonnage steel castings

    CN104631837A

  • Construction equipment and construction method for constructing integrated steel structure tree-shaped column

    CN118087894A