A method and system for optimizing the production schedule of building modules

By reading and analyzing production task information in real time on the building module production line, identifying complexity and approximation, and designing and optimizing production task plans, the debugging problem of the production line when switching specification parameters is solved, and production efficiency and progress are improved.

CN118333793BActive Publication Date: 2024-10-25JIANGSU INSPIRE INTERNET OF THINGS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410378041.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-10-25
Estimated Expiration
2044-03-29

AI Technical Summary

Technical Problem

When switching specification parameters in the building module production line, it is necessary to frequently debug the operating parameters, which affects production efficiency and progress.

Method used

By reading production task information in real time on the building module production line, identifying complexity and approximation, designing and optimizing production task plans, reducing the range of debugging switching of operating parameters, and achieving stable operation of the system.

Benefits of technology

It effectively saves the time for debugging and switching of production line operating parameters, and improves the overall efficiency and production progress of the building module production line.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118333793B_ABST
    Figure CN118333793B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of building modules, and in particular to a method and system for optimizing the production schedule of building modules, comprising: a control terminal, which is the main control end of the system and is used to issue an execution command; a reading module, which is used to read production task information executed on a building module production line; and an identification module, which is used to obtain the production task information read in the reading module, and to identify the complexity and similarity of each production task information. Based on the complexity and similarity analysis results of the building modules, the present invention debugs the corresponding production tasks of various building modules to be produced by the building module production line, ensuring that when building modules with different specifications and parameters are continuously produced based on the building module production line, the production line has a smaller range of debugging and switching of operating parameters for building modules with different specifications and parameters, thereby greatly saving the time consumed by debugging and switching the operating parameters of the production line, improving the overall efficiency of building module production, and ensuring the production schedule of the building modules.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building modules, and in particular to a method and system for optimizing the production schedule of building modules. Background Art

[0002] Building modules refer to the process of breaking down a building into standardized modules with specific functions and sizes in building design and construction. These modules can be prefabricated in a factory and then transported to the construction site for assembly. Building modules have a wide range of applications, including residential, commercial, office and public buildings. They can be used to construct an entire building or specific components such as wall panels, floor slabs, roofs, etc.

[0003] Different types of building modules may have different features and designs to meet different building needs and project requirements. For example, some modules may be modular residential units that can be quickly assembled into large residential areas; others may be energy-saving wall panels for building exteriors, providing better insulation and heat preservation.

[0004] However, in the production process of building modules, the specification parameters of the building modules are often uploaded and the production is completed in an automated manner according to the specification parameters of the building modules. During the production process, the building module production line will produce the building modules in sequence according to the uploaded specification parameters of the building modules. After completing the production of one type of building modules, it will switch to the specification parameters of the next type of building modules for production. In the continuous production process of building modules, due to the switching of the types of production building modules, the production line needs to debug the operating parameters of each production station. The debugging process varies with the differences between the building modules, and the time consumed for debugging is also different. Therefore, when there are large differences in the specification parameters of the building modules produced continuously, the time consumed for debugging the production line operating parameters is not optimal, which affects the overall production efficiency and production progress of the building module production line. Summary of the invention

[0005] In view of the above-mentioned shortcomings of the prior art, the present invention provides a method and system for optimizing the production schedule of building modules, which solves the technical problems raised in the above-mentioned background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] In a first aspect, a system for optimizing the production schedule of a building module comprises:

[0008] The control terminal is the main control end of the system and is used to issue execution commands; the reading module is used to read the production task information executed on the building module production line; the identification module is used to obtain the production task information read in the reading module and identify the complexity and similarity of each production task information; the coordination module is used to receive the complexity and similarity identification results of each production task information in the identification module, and design the production task plan for the building module production line based on the complexity and similarity identification results of each production task information; the interaction module is used to receive the production task plan designed in the coordination module and transmit the designed production task plan to the building module production line; the monitoring module is used to monitor the operating status of the building module production line and control the system to refresh and run based on the monitoring results of the operating status of the building module production line;

[0009] The control terminal is interactively connected to a reading module via a local area network, the reading module is interactively connected to a recording unit and a duplicate checking unit via a local area network, the reading module is interactively connected to an identification module via a local area network, the identification module is electrically connected to a retrieval unit via a medium, the retrieval unit is interactively connected to the duplicate checking unit via a local area network, the identification module is interactively connected to a coordination module, an interaction module and a monitoring module via a local area network, and the monitoring module is interactively connected to the reading module via a local area network.

[0010] Furthermore, the reading module is connected to the building module production line through a local area network to read the production task information executed on the building module production line in real time. The reading module is provided with submodules including:

[0011] A recording unit, used to obtain the production task information read by the reading module, and record and store the production task information;

[0012] A duplicate checking unit is used to traverse the production task information recorded and stored in the recording unit to check the duplicate of the production task information;

[0013] Among them, the production task information executed on the building module production line read by the reading module includes: building module specification parameters, building module production quantity. When the recording unit records and stores the production task information, based on the specification parameters and production quantity corresponding to the same building module in the production task information, each group of building module specification parameters and building module production quantity are distinguished and stored. When the duplicate checking unit finds the same production task information, it selects any group of the same production task information for deletion, so that the production task information recorded and stored in the recording unit is different.

[0014] Furthermore, the duplication checking logic for the production task information in the duplication checking unit is expressed as:

[0015]

[0016] Where: SIMM(A,B) is the consistency between production task information A and production task information B; n is the observation angle set of the building module; s i-A , g i-A 、p i-A The number of surfaces, corners, and holes of the building module corresponding to the production task information A based on the observation angle i; s i-B , g i-B 、p i-B V is the number of surfaces, corners, and holes of the building module corresponding to the production task information B based on the observation angle i; A 、V B S is the volume of the building modules corresponding to the production task information A and the production task information B; B , S A The areas of the building modules corresponding to the production task information A and the production task information B;

[0017] Among them, the closer the value of SIMM(A,B) is to 1, the more similar the two sets of production task information are. Conversely, the greater the difference between the two sets of production task information is. When the value of SIMM(A,B) is equal to 1, it means that the two sets of production task information are consistent.

[0018] Furthermore, the observation angles of the building module include: directly above, directly below, directly left, directly right, directly in front, and directly behind.

[0019] Furthermore, the identification module is internally provided with submodules including:

[0020] The retrieval unit is used to retrieve the consistency of each group of production task information obtained during the operation of the duplicate checking unit, and feed back the consistency results of each group of production task information to the recognition module;

[0021] The result of obtaining the consistency of each group of production task information fed back by the calling unit to the recognition module is, that is, the recognition result of the recognition module on the similarity of each production task information.

[0022] Furthermore, the complexity recognition logic for the production task information in the recognition module is expressed as:

[0023]

[0024] Where: θ is the complexity of production task information; s max The maximum number of surfaces of the building module corresponding to the production task information in each observation angle; s minis the minimum number of observation angles of the building module corresponding to the production task information based on each observation angle; m is the total number of observation angles; n is the observation angle set of the building module corresponding to the production task information; s i is the number of building module surfaces under the i-th observation angle; g i is the number of edges and corners of the building module under the i-th observation angle; p i is the number of holes in the building module under the i-th observation perspective; is the total surface area of ​​the building modules of the i-th group of observation angles;

[0025] Among them, the greater the value of the complexity θ of the production task information, the longer the production time of the corresponding building module of the production task information is, and the lower the efficiency is. Conversely, the shorter the production time of the corresponding building module of the production task information is, the higher the efficiency is.

[0026] Furthermore, the content of the production task plan design for the building module production line in the coordination module is:

[0027] Obtain the production task information executed on the building module production line, and its corresponding complexity and similarity identification results, give priority to the production of building modules belonging to production task information with high complexity, and give priority to the production of building modules belonging to production task information with high complexity and similar to that of building modules.

[0028] Furthermore, after the interactive module transmits the production task plan to the building module production line, the building module production line operates based on the production task plan to produce the building modules;

[0029] The operating status of the building module production line monitored in the monitoring module is: whether the reading module has newly read the production task information executed on the building module production line. If the monitoring result is yes, the control system refreshes and runs, otherwise, the monitoring module refreshes and runs.

[0030] In a second aspect, a method for optimizing the production schedule of a building module comprises the following steps:

[0031] Step 1: Read the production task information executed on the building module production line in real time and store the read production task information;

[0032] Step 2: traverse the stored production task information, check for duplicates in the production task information, and delete the duplicate production task information found;

[0033] Step 3: Identify the complexity and similarity of each group of production task information;

[0034] Step 4: Obtain the complexity and similarity recognition results of each group of production task information, and coordinate the production tasks performed by the building module production line based on the complexity and similarity recognition results;

[0035] Step 5: Feedback the coordination results to the building module production line, and control the building module production line to operate based on the production task coordination results;

[0036] Step 6: Monitor in real time whether there is any new production task information loaded on the building module production line. If the monitoring result is yes, jump to step 2 for execution.

[0037] Compared with the known public technology, the technical solution provided by the present invention has the following beneficial effects:

[0038] The present invention provides a building module production schedule optimization system. During operation, the system acquires production task information of a building module production line, performs complexity and similarity analysis on building modules produced by the building module production line, and then debugs the corresponding production tasks of various building modules to be produced by the building module production line based on the complexity and similarity analysis results of the building modules, so as to ensure that when building modules with different specifications and parameters are continuously produced based on the building module production line, the production line should have a smaller range of debugging and switching of operating parameters for building modules with different specifications and parameters, thereby greatly saving the time consumed by debugging and switching of operating parameters of the building module production line, thereby achieving the goal of improving the overall efficiency of the building module production line in producing building modules and ensuring the production schedule of the building modules;

[0039] A method for optimizing the production schedule of building modules is configured for system operation, which provides further operation logic support for the system, ensures stable operation of the system, and brings real-time optimization to the production of the building module production line. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0041] Figure 1 It is a structural schematic diagram of a building module production progress optimization system;

[0042] Figure 2 A schematic diagram of a method for optimizing the production schedule of building modules;

[0043] The numbers in the figure represent: 1. Control terminal; 2. Reading module; 21. Recording unit; 22. Duplication checking unit; 3. Identification module; 31. Retrieval unit; 4. Coordination module; 5. Interaction module; 6. Monitoring module. DETAILED DESCRIPTION

[0044] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] The present invention will be further described below in conjunction with the embodiments.

[0046] Embodiment 1:

[0047] A building module production schedule optimization system of this embodiment, such as Figure 1 As shown, including:

[0048] Control terminal 1 is the main control terminal of the system and is used to issue execution commands;

[0049] Reading module 2, used to read the production task information executed on the building module production line;

[0050] The reading module 2 is connected to the building module production line through the local area network, and reads the production task information executed on the building module production line in real time;

[0051] The reading module 2 is provided with submodules including:

[0052] The recording unit 21 is used to obtain the production task information read by the reading module 2, and record and store the production task information;

[0053] The duplicate checking unit 22 is used to traverse the production task information recorded and stored in the recording unit 21 and check the duplicate of the production task information;

[0054] The production task information executed on the building module production line read by the reading module 2 includes: building module specification parameters and building module production quantity. When the recording unit 21 records and stores the production task information, based on the specification parameters and production quantity corresponding to the same building module in the production task information, each group of building module specification parameters and building module production quantity is distinguished and stored. When the duplicate checking unit 22 finds the same production task information, it selects any group of the same production task information for deletion, so that the production task information recorded and stored in the recording unit 21 is different.

[0055] The identification module 3 is used to obtain the production task information read by the reading module 2, and identify the complexity and similarity of each production task information;

[0056] The identification module 3 is internally provided with submodules including:

[0057] The retrieving unit 31 is used to retrieve the consistency of each group of production task information obtained during the operation of the duplicate checking unit 22, and feed back the consistency of each group of production task information to the recognition module 3;

[0058] The result of obtaining the consistency of each group of production task information fed back by the calling unit 31 to the identification module 3 is the identification result of the similarity of each production task information by the identification module 3;

[0059] The coordination module 4 is used to receive the complexity and similarity recognition results of each production task information in the recognition module 3, and design a production task plan for the building module production line based on the complexity and similarity recognition results of each production task information;

[0060] Interaction module 5, used to receive the production task plan designed in coordination module 4, and transmit the designed production task plan to the building module production line;

[0061] Monitoring module 6, used to monitor the operation status of the building module production line, and based on the monitoring results of the operation status of the building module production line, control system refresh operation;

[0062] The control terminal 1 is interactively connected to the reading module 2 through a local area network, the reading module 2 is interactively connected to the recording unit 21 and the duplicate checking unit 22 through the local area network, the reading module 2 is interactively connected to the identification module 3 through the local area network, the identification module 3 is electrically connected to the retrieval unit 31 through a medium, the retrieval unit 31 is interactively connected to the duplicate checking unit 22 through the local area network, the identification module 3 is interactively connected to the coordination module 4, the interaction module 5 and the monitoring module 6 through the local area network, and the monitoring module 6 is interactively connected to the reading module 2 through the local area network.

[0063] In this embodiment, the control terminal 1 controls the reading module 2 to run and read the production task information executed on the building module production line, the recording unit 21 synchronously obtains the production task information read in the reading module 2, and records and stores the production task information, the duplicate checking unit 22 traverses the production task information recorded and stored in the recording unit 21 in real time, and checks the production task information, the identification module 3 is post-operated to obtain the production task information read in the reading module 2, and the complexity and similarity of each production task information are identified, the retrieval unit 31 synchronously runs to retrieve the duplicate checking unit 22 during the operation, and obtains the consistency of each group of production task information, and feeds back the consistency of each group of production task information to the identification module 3, and then the coordination module 4 receives the complexity and similarity identification results of each production task information in the identification module 3, and designs the production task plan for the building module production line based on the complexity and similarity identification results of each production task information, the interaction module 5 further receives the production task plan designed in the coordination module 4, and transmits the designed production task plan to the building module production line, and finally the monitoring module 6 monitors the operation status of the building module production line, and the system refreshes and runs based on the monitoring result of the operation status of the building module production line.

[0064] Through the operation of the above system, the production of the building module production line is optimized and debugged, which makes the production efficiency of the building module production line better and brings production progress guarantee for the production of building modules of the building module production line.

[0065] Embodiment 2:

[0066] In terms of specific implementation, based on Example 1, this example refers to Figure 1 The construction module production schedule optimization system in Example 1 is further described in detail:

[0067] The logic of checking duplicate information of the production task information in the checking duplicate unit 22 is expressed as follows:

[0068]

[0069] Where: SIMM(A,B) is the consistency between production task information A and production task information B; n is the observation angle set of the building module; s i-A , g i-A 、p i-A The number of surfaces, corners, and holes of the building module corresponding to the production task information A based on the observation angle i; s i-B , g i-B 、p i-B V is the number of surfaces, corners, and holes of the building module corresponding to the production task information B based on the observation angle i; A 、V BS is the volume of the building modules corresponding to the production task information A and the production task information B; B , S A The areas of the building modules corresponding to the production task information A and the production task information B;

[0070] The closer the value of SIMM(A,B) is to 1, the more similar the two sets of production task information are. Conversely, the greater the difference between the two sets of production task information is. When the value of SIMM(A,B) is equal to 1, it means that the two sets of production task information are consistent.

[0071] The observation angles of the building module include: directly above, directly below, directly to the left, directly to the right, directly in front, and directly behind.

[0072] Through the setting of the above-mentioned production task information duplicate checking logic, the production task information executed by the building module production line read in the reading module 2 is checked for duplicate processing, providing further operation data support for the operation of subsequent modules in the system;

[0073] It should be noted that the observation perspective of the building module is the observation perspective determined according to the x, y, and z axes in the three-dimensional space where the three-dimensional model of the building module is located after the three-dimensional model of the building module is constructed in the three-dimensional mapping software based on the specification parameters of the building module.

[0074] like Figure 1 As shown, the complexity recognition logic for production task information in recognition module 3 is expressed as:

[0075]

[0076] Where: θ is the complexity of production task information; s max The maximum number of surfaces of the building module corresponding to the production task information in each observation angle; s min is the minimum number of observation angles of the building module corresponding to the production task information based on each observation angle; m is the total number of observation angles; n is the observation angle set of the building module corresponding to the production task information; s i is the number of building module surfaces under the i-th observation angle; g i is the number of edges and corners of the building module under the i-th observation angle; p i is the number of holes in the building module under the i-th observation perspective; is the total surface area of ​​the building modules of the i-th group of observation angles;

[0077] Among them, the greater the value of the complexity θ of the production task information, the longer the production time of the corresponding building module of the production task information is, and the lower the efficiency is. Conversely, the shorter the production time of the corresponding building module of the production task information is, the higher the efficiency is.

[0078] Through the above logic formula, the complexity of production task information is further limited by the identification method.

[0079] like Figure 1 As shown, the production task plan design content for the building module production line in the coordination module 4 is:

[0080] Obtain the production task information executed on the building module production line, and its corresponding complexity and similarity identification results, give priority to the production of building modules belonging to production task information with high complexity, and give priority to the production of building modules belonging to production task information with high complexity and similar to that of building modules.

[0081] Through the above settings, the content of the production task plan design of the building module production line in the coordination module 4 is further limited.

[0082] like Figure 1 As shown, after the interactive module 5 transmits the production task plan to the building module production line, the building module production line operates based on the production task plan to produce the building modules;

[0083] The operating status of the building module production line monitored in the monitoring module 6 is: whether the reading module 2 newly reads the production task information executed on the building module production line. If the monitoring result is yes, the control system refreshes and runs, otherwise, the monitoring module 6 refreshes and runs.

[0084] Through the above settings, the operation logic of the monitoring module 6 is further limited, so that the system operation logic forms a closed loop, thereby bringing a continuous production progress optimization effect to the building module production line.

[0085] Embodiment 3:

[0086] In terms of specific implementation, based on Example 1, this example refers to Figure 2 The construction module production schedule optimization system in Example 1 is further described in detail:

[0087] A method for optimizing the production schedule of building modules comprises the following steps:

[0088] Step 1: Read the production task information executed on the building module production line in real time and store the read production task information;

[0089] Step 2: traverse the stored production task information, check for duplicates in the production task information, and delete the duplicate production task information found;

[0090] Step 3: Identify the complexity and similarity of each group of production task information;

[0091] Step 4: Obtain the complexity and similarity recognition results of each group of production task information, and coordinate the production tasks performed by the building module production line based on the complexity and similarity recognition results;

[0092] Step 5: Feedback the coordination results to the building module production line, and control the building module production line to operate based on the production task coordination results;

[0093] Step 6: Monitor in real time whether there is any new production task information loaded on the building module production line. If the monitoring result is yes, jump to step 2 for execution.

[0094] In summary, during the application process, the technical solution in the above-mentioned embodiment obtains the production task information of the building module production line, performs complexity and similarity analysis on the building modules produced by the building module production line, and then debugs the corresponding production tasks of various building modules to be produced by the building module production line based on the complexity and similarity analysis results of the building modules, to ensure that when building modules with different specifications and parameters are continuously produced based on the building module production line, the production line has a smaller debugging and switching range for the operating parameters of the building modules with different specifications and parameters, thereby saving the time consumed in the debugging and switching of the operating parameters of the building module production line to the greatest extent, thereby achieving the improvement of the overall efficiency of the building module production line in producing building modules and ensuring the production progress of the building modules.

[0095] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A building module production schedule optimization system, It is characterized in that include: The control terminal (1) is the main control terminal of the system and is used to issue execution commands; A reading module (2), used for reading production task information executed on the building module production line; The identification module (3) is used to obtain the production task information read by the reading module (2) and identify the complexity and similarity of each production task information; The coordination module (4) is used to receive the complexity and similarity identification results of each production task information in the identification module (3), and design a production task plan for the building module production line based on the complexity and similarity identification results of each production task information; The interaction module (5) is used to receive the production task plan designed in the coordination module (4) and transmit the designed production task plan to the building module production line; A monitoring module (6) is used to monitor the operating status of the building module production line and control the system to refresh the operation based on the monitoring result of the operating status of the building module production line; The reading module (2) is connected to the building module production line via a local area network, and reads the production task information executed on the building module production line in real time. The reading module (2) is provided with submodules at the lower level, including: A recording unit (21) is used to obtain the production task information read by the reading module (2) and record and store the production task information; A duplicate checking unit (22) is used to traverse the production task information recorded and stored in the recording unit (21) and check the production task information for duplicates; The production task information executed on the building module production line read by the reading module (2) includes: building module specification parameters and building module production quantity. When the recording unit (21) records and stores the production task information, based on the specification parameters and production quantity corresponding to the same building module in the production task information, each group of building module specification parameters and building module production quantity is distinguished and stored. When the duplicate checking unit (22) finds the same production task information, it selects any group of the same production task information for deletion, so that the production task information recorded and stored in the recording unit (21) is different. The logic of checking the duplicate information of the production task information in the duplication checking unit (22) is expressed as follows: Where: SIMM(A,B) is the consistency between production task information A and production task information B; n is the observation angle set of the building module; s i-A , g i-A 、p i-A The number of surfaces, corners, and holes of the building module corresponding to the production task information A based on the observation angle i; s i-B , g i-B 、p i-B V is the number of surfaces, corners, and holes of the building module corresponding to the production task information B based on the observation angle i; A 、V B S is the volume of the building modules corresponding to the production task information A and the production task information B; B , S A The areas of the building modules corresponding to the production task information A and the production task information B; The closer the value of SIMM(A,B) is to 1, the more similar the two sets of production task information are. Conversely, the greater the difference between the two sets of production task information is. When the value of SIMM(A,B) is equal to 1, it means that the two sets of production task information are consistent. The logic for identifying the complexity of production task information in the identification module (3) is expressed as follows: Where: θ is the complexity of production task information; s max The maximum number of surfaces of the building module corresponding to the production task information in each observation angle; s min is the minimum number of observation angles of the building module corresponding to the production task information based on each observation angle; m is the total number of observation angles; n is the observation angle set of the building module corresponding to the production task information; s i is the number of building module surfaces under the i-th observation angle; g i is the number of edges and corners of the building module under the i-th observation angle; p i is the number of holes in the building module under the i-th observation perspective; is the total surface area of ​​the building modules of the i-th group of observation angles; Among them, the greater the value of the complexity θ of the production task information, the longer the production time of the corresponding building module of the production task information is, and the lower the efficiency is. Conversely, the shorter the production time of the corresponding building module of the production task information is, the higher the efficiency is.

2. A building module production schedule optimization system according to claim 1, It is characterized in that The observation angles of the building module include: directly above, directly below, directly to the left, directly to the right, directly in front, and directly behind.

3. A building module production schedule optimization system according to claim 1, It is characterized in that The identification module (3) is internally provided with submodules including: A retrieval unit (31) is used to retrieve the consistency of each group of production task information obtained during the operation of the duplicate checking unit (22), and feed back the consistency of each group of production task information to the recognition module (3); The result of obtaining the consistency of each group of production task information fed back by the calling unit (31) to the identification module (3) is, that is, the identification result of the identification module (3) on the similarity of each production task information.

4. A building module production schedule optimization system according to claim 1, It is characterized in that The content of the production task plan design for the building module production line in the coordination module (4) is: Obtain the production task information executed on the building module production line, and its corresponding complexity and similarity identification results, give priority to the production of building modules belonging to production task information with high complexity, and give priority to the production of building modules belonging to production task information with high complexity and similar to that of building modules.

5. A building module production schedule optimization system according to claim 1, It is characterized in that After the interactive module (5) transmits the production task plan to the building module production line, the building module production line operates based on the production task plan to produce the building modules; The operating status of the building module production line monitored in the monitoring module (6) is: whether the reading module (2) has newly read the production task information executed on the building module production line. If the monitoring result is yes, the control system is refreshed and operated; otherwise, the monitoring module (6) is refreshed and operated.

6. A building module production schedule optimization system according to claim 1, It is characterized in that The control terminal (1) is interactively connected to a reading module (2) via a local area network; the reading module (2) is interactively connected to a recording unit (21) and a duplicate checking unit (22) via a local area network; the reading module (2) is interactively connected to an identification module (3) via a local area network; the identification module (3) is electrically connected to a retrieval unit (31) via a medium; the retrieval unit (31) is interactively connected to the duplicate checking unit (22) via a local area network; the identification module (3) is interactively connected to a coordination module (4), an interaction module (5) and a monitoring module (6) via a local area network; the monitoring module (6) is interactively connected to the reading module (2) via a local area network.

7. A method for optimizing the production schedule of a building module, the method being an implementation method of a system for optimizing the production schedule of a building module as claimed in any one of claims 1 to 6, It is characterized in that The following steps are involved: Step 1: Read the production task information executed on the building module production line in real time and store the read production task information; Step 2: traverse the stored production task information, check for duplicates in the production task information, and delete the duplicate production task information found; Step 3: Identify the complexity and similarity of each group of production task information; Step 4: Obtain the complexity and similarity recognition results of each group of production task information, and coordinate the production tasks performed by the building module production line based on the complexity and similarity recognition results; Step 5: Feedback the coordination results to the building module production line, and control the building module production line to operate based on the production task coordination results; Step 6: Monitor in real time whether there is any new production task information loaded on the building module production line. If the monitoring result is yes, jump to step 2 for execution.