An adaptive refrigeration control method and device based on ice storage system

Through the adaptive refrigeration control method, the cooling load prediction model is used to optimize the number of chillers and operating frequency of the ice storage system, realizing phased cooling mode switching, and solving the energy waste problem caused by the high-frequency operation of the ice storage system in the low load stage. Improves the long-term efficient operation capability of the system.

CN118347072BActive Publication Date: 2024-10-11GUANGZHOU LANJI ENERGY SAVING TECH DEV CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410622274.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-17
Publication Date
2024-10-11
Estimated Expiration
2044-05-17

AI Technical Summary

Technical Problem

The existing control method of the ice storage system can easily lead to high-frequency operation during the low load stage, resulting in energy waste and the lack of further optimization of the control logic of the ice storage system.

Method used

An adaptive refrigeration control method based on the ice storage system is adopted. By obtaining actual operating data and environmental parameters, the cooling load prediction model is used to calculate the cooling load prediction value, adjust the number and operating frequency of the chillers, optimize the control strategy, and carry out operation according to the cooling demand. The cooling mode is switched in stages to realize adaptive adjustment of the ice storage system.

Benefits of technology

It reduces the operating energy consumption of the ice storage system, improves control rationality and resource utilization, ensures long-term efficient operation of the system under different operating conditions, and reduces energy waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HDA0004847396220000011
    Figure HDA0004847396220000011
  • Figure HDA0004847396220000021
    Figure HDA0004847396220000021
  • Figure HDA0004847396220000031
    Figure HDA0004847396220000031
Patent Text Reader

Abstract

The present application relates to an adaptive refrigeration control method and device based on an ice storage system. The method obtains actual operation data and actual environmental parameters of the ice storage system, and calculates the cold load prediction value in combination with a pre-verified cold load prediction model, compares the cold load prediction value with the preset initial operation conditions, and adjusts and optimizes the ice storage quantity setting value, room temperature and other environmental parameter setting values ​​in real time according to the comparison results, comprehensively compares the cold machine operation quantity adjustment value and the cold machine operation power adjustment value with the preset operation control conditions, optimizes the control conditions of the current operation control strategy of the ice storage system according to the comparison results, automatically adjusts and optimizes the operation setting value of the ice storage system in combination with the stage cooling demand in different time periods, and then controls the ice storage system to switch the cooling mode for staged cooling processing. The present application has the effect of reducing the operating energy consumption of the ice storage system and improving the control rationality of the ice storage system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air-conditioning refrigeration control, and in particular to an adaptive refrigeration control method and device based on an ice storage system. Background Art

[0002] At present, according to statistics, air conditioning energy consumption accounts for 30%-50% of the total energy consumption of public buildings. Especially in summer, the sudden increase in electricity consumption for air conditioning to adjust indoor temperature often leads to the problem of insufficient peak power supply. Therefore, in order to reduce energy consumption and alleviate the contradiction between peak and valley power supply, energy-saving control of air conditioning through ice storage technology has become an important means of energy conservation in current public buildings.

[0003] The existing ice storage system control method is usually to set the ice storage amount so that the ice storage amount setting value maintains the same value during the cooling season to perform ice storage work. However, the ice storage method with a fixed value setting can easily cause the ice storage system to maintain high-frequency operation during some low-load stages, resulting in energy waste. There is room for further optimization of the control logic of the ice storage system. Summary of the invention

[0004] In order to reduce the operating energy consumption of the ice storage system and improve the control rationality of the ice storage system, the present application provides an adaptive refrigeration control method and device based on the ice storage system, so that the ice storage system can realize adaptive adjustment of key environmental parameters such as ice storage amount set value and room temperature according to actual cooling demand under different operating conditions, so that the ice storage system can maintain efficient operation for a long time and reduce the operating energy consumption of the ice storage system under different operating conditions.

[0005] In the first aspect, the above-mentioned invention objective of the present application is achieved through the following technical solutions:

[0006] An adaptive refrigeration control method based on an ice storage system, comprising:

[0007] Acquire actual operation data and actual environmental parameters of the ice storage system, input the actual operation data and the actual environmental parameters into a pre-trained cold load prediction model, and calculate a cold load prediction value;

[0008] Comparing the cooling load prediction value with the preset initial operating condition, and adjusting the actual number of operating chillers of the ice storage system and the corresponding chiller operating frequency according to the comparison result;

[0009] Comprehensively compare the chiller operation quantity adjustment value and the chiller operation power adjustment value with the preset operation control conditions, and optimize the control conditions of the current operation control strategy of the ice storage system according to the comparison results;

[0010] The cooling demand in different time periods is obtained, and according to the optimized control strategy and cooling demand, the ice storage system is controlled to switch the cooling mode for staged cooling processing.

[0011] In a preferred example, the present application may be further configured as follows: the actual operation data and the actual environmental parameters are input into a pre-trained cooling load prediction model to calculate the cooling load prediction value, specifically including:

[0012] The cooling load prediction value is calculated by formula (1), which is as follows:

[0013] Q τ =KF1(t τ-ξ -t n )+F2X g J wτ +1000(G1+G2)(H τ -H n )+n(q s +q l )+W τ (1)

[0014] Among them, Q τ represents the predicted value of cooling load, K is the heat transfer coefficient of the enclosure structure, F1 is the area of ​​the enclosure structure, t τ-ξ The temperature for calculating the cooling load when considering the temperature wave action, t n is the indoor temperature, F2 is the area of ​​the exterior window and glass curtain wall, X g is the structural correction factor of exterior windows and glass curtain walls, J wτ is the cooling load intensity of solar radiation through glass without sunshade facilities at the calculation time, G1 is the organized fresh air volume, G2 is the unorganized infiltration air volume, H τ is the outdoor air enthalpy at the time of calculation, H n is the indoor air enthalpy at the time of calculation, n is the number of people in the room, q s is the sensible heat output of personnel, q l is the latent heat generated by personnel, W τ It is the heat generated by the equipment, indicating the electrical energy consumed by all the equipment in the building.

[0015] By adopting the above technical scheme, combining the actual operation data of the ice storage system, key data such as actual environmental parameters and the cooling load prediction model, the cooling load prediction value is accurately calculated, and the ice storage system is adaptively adjusted according to the cooling demand in different time periods. In combination with multiple preset operating conditions, the number of chillers and the operating frequency of chillers that meet the corresponding operating conditions are quickly adjusted. Further, according to whether the actual ice storage amount obtained after adjustment meets the preset operating control conditions, the current operating control strategy is further optimized, which helps to improve the rationality between the operating control strategy and the actual cooling demand. In combination with the cooling demand in different time periods, the cooling mode of the ice storage system is switched to perform phased cooling processing, thereby improving the rational use of resources, reducing energy waste, and achieving the purpose of adaptively maintaining efficient operation of the ice storage system.

[0016] In a preferred example, the present application can be further configured as follows: the adjustment value of the number of chillers in operation and the adjustment value of the chiller operating power are comprehensively compared with the preset operating control conditions, and the current operating control strategy of the ice storage system is optimized according to the comparison results, specifically including:

[0017] The cooling load prediction model is used to calculate the cooling load in different time periods, and the peak cooling load prediction value, peak cooling load prediction value, parity cooling load prediction value and stage cumulative cooling load prediction value are obtained;

[0018] Obtain the peak cooling load forecast value, peak cooling load forecast value and average cooling load forecast value of the set operation cycle, and calculate the ice storage capacity forecast value and cooling power of the corresponding cycle;

[0019] When the predicted value of ice storage reaches the initial chiller start-up condition, the corresponding number of chillers are controlled to provide cooling according to the initial chiller start-up condition, and when the next operation cycle arrives, the actual ice storage is counted and the cooling demand for the next operation cycle is analyzed;

[0020] If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, the preset ice melting cooling mode will be switched to perform cooling work;

[0021] If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value and the peak cooling load prediction value of the next operation cycle, the ice storage system will be alternately cooled according to the cooling time period based on the cooling demand analysis results.

[0022] In a preferred example, the present application can be further configured as follows: if the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, then switching to the preset ice melting cooling mode to perform cooling work, specifically including:

[0023] If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, the ice melting cooling mode of the ice storage system is controlled to start first;

[0024] During the operation of the ice melting cooling mode, the difference between the indoor and outdoor environmental parameters in the corresponding cooling time period is obtained, and according to the difference between the indoor and outdoor environmental parameters, it is determined whether the cooling capacity of the current ice melting cooling mode meets the cooling demand;

[0025] If not, the cooling reduction coefficient of the current ice melting cooling mode is calculated, and the base load refrigeration machine in the cooling mode of the base load refrigeration machine is controlled in direct proportion to the cooling reduction coefficient to perform supplementary cooling processing.

[0026] In a preferred example, the present application can be further configured as follows: the acquisition of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the set operation cycle, and the calculation of the ice storage capacity prediction value and the cooling power of the corresponding cycle specifically include:

[0027] The predicted value of ice storage is calculated by formula (2), which is as follows:

[0028] Q 蓄 =(Q 尖 +Q 高 +Q 平 )*δ 余 (2)

[0029] Among them, Q 蓄 represents the predicted value of ice storage, Q 尖 , Q 高 , Q 平 They represent the peak cooling load prediction value, peak cooling load prediction value, and average cooling load prediction value, respectively, and δ 余 Indicates the remaining ice storage capacity;

[0030] Analyze the valley-price period of electricity in the operation cycle, and control the ice storage system to perform ice storage according to the calculated ice storage amount prediction value during the valley-price period;

[0031] The cold storage power is calculated by formula (3), which is as follows:

[0032] P 蓄 =Q 蓄 / m (3)

[0033] Among them, the P 蓄 represents the cold storage power, and m represents the number of cold machines turned on under the cold storage condition.

[0034] By adopting the above technical scheme, the cold load prediction model is used to quickly and accurately calculate the cold load prediction values ​​in different time periods, and combined with various cold load prediction values ​​under the set operation cycle, the ice storage capacity and cold storage power of the corresponding cycle are calculated, which is helpful to reasonably predict the cooling demand of the next operation cycle, improve the prediction accuracy of the cooling demand of the next operation cycle and the rationality of the adjustment of the initial control strategy of the next operation cycle. When the actual ice storage capacity reaches the preset control condition, the ice storage system is controlled to perform cooling according to the corresponding control strategy, which is helpful to improve the orderliness of the cooling control of the ice storage system, reasonably allocate energy for different cooling demands, reduce energy waste, and maintain the long-term efficient operation of the ice storage system.

[0035] In a preferred example, the present application may be further configured as follows: before the actual operation data and the actual environmental parameters are input into a pre-trained cooling load prediction model and the cooling load prediction value is calculated, the method further includes:

[0036] The historical operation data of the ice storage system is divided into independent variables and dependent variables, and divided into a majority training set and a minority validation set in combination with the corresponding cooling time period;

[0037] Performing data fitting on the majority training set to obtain first fitting parameters, and substituting the first fitting parameters into the minority validation set to perform data validation to obtain second validation parameters;

[0038] The cooling load prediction model obtained by pre-training calculates historical operation data to obtain a cooling load calculation reference value, compares the second verification parameter with the cooling load calculation reference value, and performs model optimization processing according to the comparison result.

[0039] By adopting the above technical scheme, the physical concept model of the ice storage system is constructed in combination with the load calculation principle of HVAC, and the model training set is constructed in combination with the independent variable data and dependent variable data of the ice storage system. The calculation accuracy of the verification parameters of the ice storage system is improved by calculating the first fitting parameter and the second verification parameter, and the model accuracy is verified by comparing the second verification parameter with the model calculation result. Then, through the machine learning training of multiple verification parameters by the model, the model calculation accuracy is improved to achieve the purpose of model optimization.

[0040] In the second aspect, the above invention objective of the present application is achieved through the following technical solutions:

[0041] A data calculation module, used for obtaining actual operation data and actual environmental parameters of the ice storage system, inputting the actual operation data and the actual environmental parameters into a pre-trained cold load prediction model, and calculating a cold load prediction value;

[0042] A data comparison module, used to compare the cooling load prediction value with the preset initial operating conditions, and adjust the actual number of operating chillers and the corresponding chiller operating frequency of the ice storage system according to the comparison result;

[0043] A cooling control module is used to comprehensively compare the chiller operation quantity adjustment value and the chiller operation power adjustment value with the preset operation control conditions, and optimize the control conditions of the current operation control strategy of the ice storage system according to the comparison results;

[0044] The mode switching module is used to obtain the stage cooling demand in different time periods, and control the ice storage system to switch the cooling mode to perform stage cooling processing according to the optimized optimization control strategy and stage cooling demand.

[0045] By adopting the above technical scheme, combining the actual operation data of the ice storage system, key data such as actual environmental parameters and the cooling load prediction model, the cooling load prediction value is accurately calculated, and the ice storage system is adaptively adjusted according to the cooling demand in different time periods. In combination with multiple preset operating conditions, the number of chillers and the operating frequency of chillers that meet the corresponding operating conditions are quickly adjusted. Further, according to whether the actual ice storage amount obtained after adjustment meets the preset operating control conditions, the current operating control strategy is further optimized, which helps to improve the rationality between the operating control strategy and the actual cooling demand. In combination with the cooling demand in different time periods, the cooling mode of the ice storage system is switched to perform phased cooling processing, thereby improving the rational use of resources, reducing energy waste, and achieving the purpose of adaptively maintaining efficient operation of the ice storage system.

[0046] On the third aspect, the above-mentioned purpose of the present application is achieved through the following technical solutions:

[0047] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned adaptive refrigeration control method based on an ice storage system when executing the computer program.

[0048] Fourthly, the above-mentioned purpose of the present application is achieved through the following technical solutions:

[0049] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned adaptive refrigeration control method based on an ice thermal storage system.

[0050] In summary, the present application includes at least one of the following beneficial technical effects:

[0051] 1. By monitoring the actual operating status of the ice storage system, especially key environmental parameters such as ice storage capacity and terminal room temperature. Adjust and reset the ice storage capacity set value, room temperature and other key environmental parameter set values ​​of the ice storage system according to the actual operating parameters. Then adjust the number and frequency of running chillers to make the actual ice storage capacity reach the set value, and adjust the capacity of the chiller to make the room temperature and other key environmental parameters reach the set value. Through the functions of automatic monitoring, automatic identification, automatic setting and automatic control, the ice storage system can achieve real-time and automatic adjustment of the ice storage capacity set value and room temperature and other key environmental parameter set values ​​according to the changing cooling demand under different operating conditions during the cooling season, so that the ice storage system can maintain efficient operation for a long time and reduce the system operation energy consumption. In this way, the problem that the method of setting the ice storage capacity set value and the room temperature and other key environmental parameter set values ​​causes the ice storage system to maintain high-frequency operation in the partial load stage, resulting in energy waste and difficulty in maintaining long-term and real-time efficient operation is solved;

[0052] 2. Combine the actual operation data of the ice storage system, key data such as actual environmental parameters and the cold load prediction model to accurately calculate the cold load prediction value, and adaptively adjust the ice storage system according to the cooling demand in different time periods. Combine multiple preset operating conditions to quickly adjust the number of chillers and the operating frequency of chillers that meet the corresponding operating conditions. Further, according to whether the actual ice storage amount obtained after adjustment meets the preset operating control conditions, the current operating control strategy is further optimized, which helps to improve the rationality between the operating control strategy and the actual cooling demand. Combine the cooling demand in different time periods, switch the cooling mode of the ice storage system to perform phased cooling processing, improve the rational use of resources, reduce energy waste, and achieve the purpose of adaptively maintaining efficient operation of the ice storage system.

[0053] 3. The cold load prediction model is used to quickly and accurately calculate the cold load prediction values ​​in different time periods, and combined with the various cold load prediction values ​​under the set operation cycle, the ice storage capacity and cold storage power of the corresponding cycle are calculated, which is helpful to reasonably predict the cooling demand of the next operation cycle, improve the prediction accuracy of the cooling demand of the next operation cycle and the rationality of the adjustment of the initial control strategy of the next operation cycle. When the actual ice storage capacity reaches the preset control condition, the ice storage system is controlled to perform cooling according to the corresponding control strategy, which is helpful to improve the orderliness of the cooling control of the ice storage system, reasonably allocate energy for different cooling demands, reduce energy waste, and maintain the long-term efficient operation of the ice storage system. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 This is an overall summary logic diagram of an adaptive refrigeration control method based on an ice storage system in this embodiment.

[0055] Figure 2This is a flow chart of an implementation of an adaptive refrigeration control method based on an ice storage system in this embodiment.

[0056] Figure 3 This is a flowchart for implementing step S30 of an adaptive refrigeration control method based on an ice storage system in this embodiment.

[0057] Figure 4 This is a flowchart for implementing step S204 of an adaptive refrigeration control method based on an ice storage system in this embodiment.

[0058] Figure 5 This is a flow chart for implementing model verification of the adaptive refrigeration control method based on the ice storage system in this embodiment.

[0059] Figure 6 Schematic diagram of the structure of the ice storage system of this embodiment.

[0060] Figure 7 This is a structural block diagram of an adaptive refrigeration control device based on an ice storage system in this embodiment.

[0061] Figure 8 It is a schematic diagram of the internal structure of a computer device for implementing an adaptive refrigeration control method based on an ice storage system. DETAILED DESCRIPTION

[0062] The present application is further described in detail below in conjunction with the accompanying drawings.

[0063] In one embodiment, if Figure 1 As shown, the present application discloses an overall summary logic diagram of an adaptive refrigeration control method based on an ice storage system, such as Figure 2 As shown, an adaptive refrigeration control method based on an ice storage system specifically includes the following steps:

[0064] S10: Acquire actual operation data and actual environmental parameters of the ice storage system, input the actual operation data and actual environmental parameters into a pre-trained cooling load prediction model, and calculate a cooling load prediction value.

[0065] Specifically, the real-time operation data and actual environmental parameters of the ice storage system are collected in real time through a preset sensor device, wherein the actual environmental parameters include real-time indoor and outdoor temperatures, hourly changes in outdoor solar radiation, hourly indoor and outdoor humidity, summer air infiltration volume, average wind speed in the most outdoor wind direction, and the real-time number of employees in the room; the actual operation data include hourly changes in equipment power consumption, fresh air unit startup records, and real-time cooling and ice storage data, etc. The collected data are input into a pre-trained cooling load prediction model to calculate the cooling load prediction value.

[0066] The cooling load in this embodiment includes the cooling load formed by the heat transmitted through the enclosing structure, the cooling load formed by the solar radiation heat entering through the external windows and glass curtain walls, the cooling load formed by the heat brought in by organized fresh air and unorganized infiltration air, the cooling load formed by the heat dissipation of the human body, and the cooling load formed by the heat generated by various electrical equipment.

[0067] Specifically, the calculation of the cooling load prediction value includes:

[0068] In this embodiment, the cooling load prediction value is calculated by combining the functional characteristics of the ice storage system and the enclosure structure characteristics of the application site through formula (1), and the formula (1) is as follows:

[0069] Q τ =KF1(t τ-ξ -t n )+F2X g J wτ +1000(G1+G2)(H τ -H n )+n(q s +q l )+W τ (1)

[0070] Among them, Q τ represents the predicted value of cooling load, K is the heat transfer coefficient of the enclosure structure, W / ㎡ / K; F1 is the area of ​​the enclosure structure, ㎡; t τ-ξ The temperature for calculating the cooling load when considering the temperature wave action, °C; t n is the indoor temperature, ℃; F2 is the area of ​​the exterior window and glass curtain wall, m2; X g J is the structural correction factor of exterior windows and glass curtain walls; wτ is the cooling load intensity of solar radiation through glass without sunshade facilities at the calculation time, W / ㎡; G1 is the organized fresh air volume, kg / s; G2 is the unorganized infiltration air volume, kg / s; H τ is the outdoor air enthalpy at the time of calculation, kJ / kg; H n is the indoor air enthalpy value at the time of calculation, kJ / kg; n is the number of people in the room; q s is the sensible heat output of personnel, W; for light labor, the sensible heat output per person is 58 W according to the table in this embodiment; q l is the latent heat output of personnel, W; light labor, in this embodiment, the latent heat output per person is 123W; W τ The electrical energy consumed by all equipment in a building is the heat generated by the equipment.

[0071] S20: Compare the cooling load prediction value with the preset initial operating condition, and adjust the actual number of operating chillers and the corresponding chiller operating frequency of the ice storage system according to the comparison result.

[0072] Specifically, the ice storage capacity corresponding to the cold load prediction value calculated in real time is compared with the preset ice storage capacity, preset room temperature and other environmental parameter setting values, and whether the ice storage system in the current operating state meets the first preset operating condition is determined according to the comparison result. If it meets the first preset operating condition, the corresponding number of chillers to be started is started according to the first preset operating condition, and the corresponding chiller operating frequency is adjusted accordingly.

[0073] S30: comprehensively comparing the chiller operation quantity adjustment value and the chiller operation power adjustment value with the preset operation control conditions, and optimizing the control conditions of the current operation control strategy of the ice storage system according to the comparison result.

[0074] Specifically, Figure 3 As shown, step S30 specifically includes:

[0075] S201: Calculate the cooling loads in different time periods using a cooling load prediction model to obtain a peak cooling load prediction value, a peak cooling load prediction value, a parity cooling load prediction value, and a stage cumulative cooling load prediction value.

[0076] Specifically, by combining formula (1) and the actual operation data and environmental change parameters of each cooling time period, the cooling load prediction value of the corresponding time period is calculated, and the corresponding cooling load prediction values ​​are calculated according to the difference between the peak and valley power consumption to obtain the peak cooling load prediction value, the peak cooling load prediction value, the parity cooling load prediction value and the stage cumulative cooling load prediction value. Among them, the stage cumulative cooling load prediction value of this embodiment is the cumulative cooling load prediction value from 8:00 to 19:00 every day in the cooling season.

[0077] S202: Obtain the peak cooling load prediction value, peak cooling load prediction value and average cooling load prediction value of the set operation cycle, and calculate the ice storage capacity prediction value and cooling power of the corresponding cycle.

[0078] Specifically, the operation cycle can be set according to actual needs, and can be daily, weekly, monthly, etc. In this embodiment, the ice storage system is operated for 24 hours as a cycle, and the peak cooling load prediction value, peak cooling load prediction value and average cooling load prediction value of the previous day are calculated during the electricity price valley period (0:00-8:00), and the corresponding ice storage capacity prediction value and cooling power are calculated in combination with formula (2) and formula (3), which specifically include:

[0079] S2021: Calculate the predicted value of ice storage by formula (2), which is as follows:

[0080] Q 蓄 =(Q尖 +Q 高 +Q 平 )*δ 余 (2)

[0081] Among them, Q 蓄 represents the predicted value of ice storage, Q 尖 , Q 高 , Q 平 They represent the peak cooling load prediction value, peak cooling load prediction value, and average cooling load prediction value, respectively, and δ 余 Indicates the remaining ice storage capacity. In this embodiment, δ 余 =1.1.

[0082] S2022: Analyze the off-peak electricity price period of the operation cycle, and control the ice storage system to store ice according to the calculated ice storage amount forecast value during the off-peak electricity price period.

[0083] Among them, the electricity consumption during the operation cycle is obtained, and the corresponding electricity price valley period and electricity price peak period are analyzed according to the difference in electricity use. In this embodiment, the electricity price valley period (0:00-8:00) is used as the operation cycle dividing point. In the electricity price valley period, the dual-condition chiller (ice melting cooling condition, base load chiller condition) is turned on according to the calculated ice storage capacity prediction value to perform ice storage work until 7:30 of the next operation cycle, and the actual ice storage capacity is counted and the cooling demand for the next operation cycle is predicted.

[0084] S2023: Calculate the cold storage power by using formula (3), which is as follows:

[0085] P 蓄 =Q 蓄 / m (3)

[0086] Among them, P 蓄 represents the cold storage power, and m represents the number of cold machines turned on under the cold storage condition.

[0087] S203: When the ice storage capacity reaches the initial refrigeration machine start-up condition, a corresponding number of refrigeration machines are controlled to perform cooling work according to the initial refrigeration machine start-up condition, and when the next operation cycle arrives, the actual ice storage capacity is counted and the cooling demand of the next operation cycle is analyzed.

[0088] Specifically, when the ice storage amount reaches the initial refrigerator start-up condition, the initial refrigerator start-up condition in this embodiment is that the ice storage amount reaches the preset value and the cold storage power reaches the preset value, and the corresponding number of refrigerators are controlled to perform cooling work according to the set parameters in the initial refrigerator start-up condition, and when the next operating cycle arrives, such as 8:00 the next day, half an hour of refrigeration buffer time is reserved in this embodiment, and the actual ice storage amount is counted from 7:30 the next day, and the cooling demand for the next day is analyzed based on the comparison result between the actual ice storage amount statistical result and the actual ice storage amount usage of the previous day.

[0089] S204: If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, switch to the preset ice melting cooling mode to perform cooling work.

[0090] Specifically, Figure 4 As shown, step S204 specifically includes:

[0091] S2041: If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, the ice melting cooling mode of the ice storage system is controlled to start first.

[0092] Specifically, the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the previous day is calculated and compared with the actual ice storage capacity. If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, the priority value of the ice melting cooling mode of the ice storage system is adjusted to the optimal level, and the ice storage system is controlled to perform cooling work according to the optimal cooling mode, that is, the ice melting cooling mode of the ice storage system is turned on to perform cooling work, and the base load chiller is kept dormant.

[0093] S2042: During the operation of the ice melting cooling mode, the difference between the indoor and outdoor environmental parameters in the corresponding cooling time period is obtained, and whether the cooling capacity of the current ice melting cooling mode meets the cooling demand is determined according to the difference between the indoor and outdoor environmental parameters.

[0094] Specifically, during the operation of the ice melting cooling mode, the difference between indoor and outdoor environmental parameters in the corresponding cooling time period, such as hourly or stage by stage, is obtained, and whether the cooling capacity of the current ice melting cooling mode meets the cooling demand is judged according to the change of the indoor and outdoor environmental difference. If the indoor and outdoor temperature differences are close to the same, it means that the current cooling capacity cannot meet the cooling demand. If the indoor and outdoor temperature differences remain relatively stable under changes in the external environment, it means that the current cooling capacity can meet the cooling demand.

[0095] S2043: If not, calculate the cooling reduction coefficient of the current ice melting cooling mode, and control the base load refrigeration machine in the cooling mode of the base load refrigeration machine in direct proportion to the cooling reduction coefficient to perform supplementary cooling processing.

[0096] Specifically, if the cooling capacity of the current ice melting cooling mode gradually decreases to the point where there is no cooling capacity, it means that the current cooling capacity cannot meet the cooling demand. The cooling reduction coefficient is calculated by calculating the hourly indoor and outdoor temperature difference change under the current ice melting cooling mode. The base load chiller mode is started in direct proportion to the cooling reduction coefficient, and the base load chiller is gradually turned on for supplementary cooling to keep the indoor and outdoor temperature difference relatively stable.

[0097] S205: If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value and the peak cooling load prediction value of the next operation cycle, the ice storage system is subjected to alternate cooling processing according to the cooling time period based on the cooling demand analysis result.

[0098] Specifically, if the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value and the peak cooling load prediction value of the next day, in this embodiment, the peak cooling load prediction value and the peak cooling load prediction value of the previous day are used as the initial setting value of the next day, and then according to the cooling demand analysis result, alternating cooling is performed according to different cooling time periods, specifically including:

[0099] If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load forecast value and the peak cooling load forecast value of the next day, the ice melting cooling mode will be started at 8-12 o'clock on the next day, and switched to the base load chiller cooling mode at 12-14 o'clock, and switched to the ice melting cooling mode at 14-19 o'clock. The ice melting cooling mode will be maintained until there is no cooling capacity, and the base load chiller mode will be gradually turned on.

[0100] If the actual ice storage capacity is less than the sum of the peak cooling load forecast value and the peak cooling load forecast value of the next day, the base load chiller cooling mode will be turned on from 8:00 to 10:00 on the next day, switched to the ice melting cooling mode from 10:00 to 12:00, switched to the base load chiller cooling mode from 12:00 to 14:00, switched to the ice melting cooling mode from 14:00 to 19:00, and the ice melting cooling mode will be maintained until there is no cooling capacity, and then the base load chiller mode will be gradually turned on.

[0101] The cooling mode is switched according to the cooling demand in different time periods to improve the efficient operation of the ice storage system. The example of this application realizes the joint adjustment of key environmental parameters such as ice storage capacity and room temperature by monitoring key environmental parameters such as ice storage capacity and terminal room temperature. When the terminal cooling load is lower than the ice storage capacity, ice melting refrigeration is turned on first. When the terminal cooling load is higher than the ice storage capacity, the base load refrigeration mechanism is turned on first. In this way, the adjustment of ice storage capacity is effectively combined with the adjustment of key environmental parameters such as room temperature, realizing more automated operation control.

[0102] S40: obtaining the stage cooling demand in different time periods, and controlling the ice storage system to switch the cooling mode to perform stage cooling processing according to the optimized optimization control strategy and the stage cooling demand.

[0103] Specifically, the control parameters of the next operating cycle are set according to the actual cooling situation of the previous operating cycle, and the stage cooling demand in different time periods is obtained. In combination with the optimized optimization control strategy and the corresponding stage cooling demand, the updated optimization values ​​of key environmental parameters such as ice storage capacity and room temperature are sent to the corresponding control system, and the number of chillers turned on and the operating frequency of the ice storage system are adjusted until the actual value of the ice storage capacity reaches the set value and the room temperature environmental parameters reach the set value. After the preset cooling mode switching conditions are met, the cooling mode of the ice storage system is switched in time and the ice storage system is controlled to execute the control strategy of the corresponding mode.

[0104] In this embodiment, Figure 5 As shown, before the actual operation data and the actual environmental parameters are input into the pre-trained cooling load prediction model and the cooling load prediction value is calculated, the following steps are also included:

[0105] S101: dividing the historical operation data of the ice storage system into independent variables and dependent variables, and dividing them into a majority training set and a minority validation set in combination with the corresponding cooling time period.

[0106] Specifically, the operating parameters in the historical operating data that are actively changed due to the execution of the control strategy are set as independent variables, including the amount of ice storage, the cooling parameter setting data during the mode switching process, the number of chillers turned on and off, the chiller operating power, etc. The data corresponding to the changes in environmental parameters caused by the change in the control strategy parameters are taken as dependent variables, such as changes in indoor and outdoor temperature differences, changes in equipment power consumption, changes in cooling loads corresponding to different control strategies, etc. Combined with the corresponding cooling time periods such as cooling peak and cooling low peak, the historical operating data are randomly divided into training sets, the majority of the data sets are used as training sets, and the minority of the data sets are used as validation sets.

[0107] S102: performing data fitting on the majority training set to obtain first fitting parameters, and substituting the first fitting parameters into the minority validation set to perform data verification to obtain second verification parameters.

[0108] Specifically, a data regression operation is performed using the majority of training sets, and the data obtained by the operation are fitted to obtain a first fitting parameter. In this embodiment, based on the heat transfer physical model, a regression analysis method is used to perform a regression operation on the actual ice storage capacity continuous test and dosage training set data, and the first fitting parameter in the model is obtained by regression. The first fitting parameter is substituted into a minority of verification sets for data verification, and a second verification parameter is obtained according to the verification result.

[0109] S103: Calculate historical operation data using the pre-trained cooling load prediction model to obtain a cooling load calculation reference value, compare the second verification parameter with the cooling load calculation reference value, and perform model optimization processing according to the comparison result.

[0110] Specifically, the cooling load prediction model obtained through pre-training calculates the cooling load calculation reference value corresponding to the historical operation data, and compares the second verification parameter with the cooling load calculation reference value. The accuracy of the cooling load prediction model is verified according to the comparison result. The second verification parameter obtained through the historical operation data calculation is self-learned in the cooling load prediction model, thereby optimizing the cooling load prediction result of the model and improving the calculation accuracy of the model.

[0111] In this embodiment, a physical concept model of air conditioning load calculation is constructed by using the HVAC load calculation principle to obtain an initial cooling load prediction model. The initial cooling load prediction model is continuously verified and optimized in combination with the historical operation data of the ice storage system to obtain a final cooling load prediction model.

[0112] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0113] In one embodiment, an adaptive refrigeration control device based on an ice storage system is provided. Figure 6 The adaptive refrigeration control device based on the ice storage system corresponds to the adaptive refrigeration control method based on the ice storage system in the above embodiment. Figure 7 As shown, the adaptive refrigeration control device based on the ice storage system includes a data calculation module, a data comparison module, a cooling control module and a mode switching module. The functional modules are described in detail as follows:

[0114] The data calculation module is used to obtain the actual operation data and actual environmental parameters of the ice storage system, input the actual operation data and actual environmental parameters into a pre-trained cold load prediction model, and calculate the cold load prediction value.

[0115] The data comparison module is used to compare the cooling load prediction value with the preset initial operating conditions, and adjust the actual number of operating chillers and the corresponding chiller operating frequency of the ice storage system according to the comparison results.

[0116] The cooling control module is used to comprehensively compare the cooling machine operation quantity adjustment value and the cooling machine operation power adjustment value with the preset operation control conditions, and optimize the control conditions of the current operation control strategy of the ice storage system according to the comparison results.

[0117] The mode switching module is used to obtain the stage cooling demand in different time periods, and control the ice storage system to switch the cooling mode to perform stage cooling processing according to the optimized optimization control strategy and stage cooling demand.

[0118] Preferably, the data calculation module specifically includes:

[0119] The cooling load prediction value is calculated by formula (1), which is as follows:

[0120] Q τ =KF1(t τ-ξ -t n )+F2X g J wτ +1000(G1+G2)(H τ -H n )+n(q s +q l )+W τ (1)

[0121] Among them, Q τ represents the predicted value of cooling load, K is the heat transfer coefficient of the enclosure structure, F1 is the area of ​​the enclosure structure, t τ-ξ The temperature for calculating the cooling load when considering the temperature wave action, t n is the indoor temperature, F2 is the area of ​​the exterior window and glass curtain wall, X g is the structural correction factor of exterior windows and glass curtain walls, J wτ is the cooling load intensity of solar radiation through glass without sunshade facilities at the calculation time, G1 is the organized fresh air volume, G2 is the unorganized infiltration air volume, H τ is the outdoor air enthalpy at the time of calculation, H n is the indoor air enthalpy at the time of calculation, n is the number of people in the room, q s is the sensible heat output of personnel, q l is the latent heat generated by personnel, W τ It is the heat generated by the equipment, indicating the electrical energy consumed by all the equipment in the building.

[0122] Preferably, the cooling control module specifically includes:

[0123] The stage data calculation submodule is used to calculate the cooling load in different time periods through the cooling load prediction model to obtain the peak cooling load prediction value, the peak cooling load prediction value, the parity cooling load prediction value and the stage cumulative cooling load prediction value;

[0124] The cold storage data calculation submodule is used to obtain the peak cooling load prediction value, peak cooling load prediction value and average cooling load prediction value of the set operation cycle, and calculate the ice storage capacity prediction value and cold storage power of the corresponding cycle.

[0125] The demand analysis submodule is used to control the corresponding number of chillers to provide cooling when the ice storage capacity reaches the initial chiller start-up conditions, and to perform actual ice storage capacity statistics and analyze the cooling demand for the next operating cycle when the next operating cycle arrives.

[0126] The mode starter module is used to switch to the preset ice melting cooling mode for cooling work if the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle.

[0127] The mode switching submodule is used to perform alternate cooling processing on the ice storage system according to the cooling demand analysis result and the cooling time period if the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value and the peak cooling load prediction value of the next operation cycle.

[0128] Preferably, the mode promoter module specifically includes:

[0129] The control unit is started to control the ice melting cooling mode of the ice storage system to start first if the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operating cycle.

[0130] The demand analysis unit is used to obtain the difference between indoor and outdoor environmental parameters in the corresponding cooling time period during the operation of the ice melting cooling mode, and judge whether the cooling capacity of the current ice melting cooling mode meets the cooling demand according to the difference between indoor and outdoor environmental parameters.

[0131] The cooling supplement unit is used to calculate the cooling reduction coefficient of the current ice melting cooling mode, and control the base load refrigeration machine in the cooling mode of the base load refrigeration machine in direct proportion to the cooling reduction coefficient to perform supplementary cooling processing.

[0132] Preferably, the cold storage data calculation submodule specifically includes:

[0133] The ice storage calculation unit is used to calculate the predicted value of ice storage by formula (2). Formula (2) is as follows:

[0134] Q 蓄 =(Q 尖 +Q 高 +Q 平 )*δ 余 (2)

[0135] Among them, Q 蓄 represents the predicted value of ice storage, Q 尖 , Q 高 , Q 平 They represent the peak cooling load prediction value, peak cooling load prediction value, and average cooling load prediction value, respectively, and δ 余Indicates the remaining ice storage capacity.

[0136] The ice storage analysis unit is used to analyze the off-peak electricity price period of the operation cycle, and control the ice storage system to perform ice storage according to the calculated ice storage amount prediction value during the off-peak electricity price period.

[0137] The power calculation unit is used to calculate the cold storage power by formula (3). Formula (3) is as follows:

[0138] P 蓄 =Q 蓄 / m (3)

[0139] Among them, P 蓄 represents the cold storage power, and m represents the number of cold machines turned on under the cold storage condition.

[0140] Preferably, before the data calculation module, it also includes:

[0141] The data set division submodule is used to divide the historical operation data of the ice storage system into independent variables and dependent variables, and divide them into a majority training set and a minority validation set in combination with the corresponding cooling time period.

[0142] The data processing submodule is used to perform data fitting on the majority of training sets to obtain first fitting parameters, and substitute the first fitting parameters into a minority of validation sets for data verification to obtain second verification parameters.

[0143] The model optimization submodule is used to calculate the historical operation data through the pre-trained cooling load prediction model to obtain a cooling load calculation reference value, compare the second verification parameter with the cooling load calculation reference value, and perform model optimization processing according to the comparison result.

[0144] For the specific definition of the adaptive refrigeration control device based on the ice storage system, please refer to the definition of the adaptive refrigeration control method based on the ice storage system above, which will not be repeated here. Each module in the above-mentioned adaptive refrigeration control device based on the ice storage system can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0145] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 8As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store control data of the ice storage system in time-sharing refrigeration control. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, an adaptive refrigeration control method based on an ice storage system is implemented.

[0146] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of an adaptive refrigeration control method based on an ice storage system are implemented.

[0147] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0148] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0149] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. An adaptive refrigeration control method based on ice storage system, It is characterized in that include: Acquire actual operation data and actual environmental parameters of the ice storage system, input the actual operation data and the actual environmental parameters into a pre-trained cold load prediction model, and calculate a cold load prediction value; Comparing the cooling load prediction value with the preset initial operating condition, and adjusting the actual number of operating chillers of the ice storage system and the corresponding chiller operating frequency according to the comparison result; Comprehensively compare the chiller operation quantity adjustment value and the chiller operation power adjustment value with the preset operation control conditions, and optimize the control conditions of the current operation control strategy of the ice storage system according to the comparison results; Obtain the cooling demand in different time periods, and control the ice storage system to switch the cooling mode to perform staged cooling processing according to the optimized control strategy and stage cooling demand; The step of inputting the actual operation data and the actual environmental parameters into a pre-trained cooling load prediction model to calculate the cooling load prediction value specifically includes: The cooling load prediction value is calculated by formula (1), which is as follows: (1) in, represents the predicted value of cooling load, K is the heat transfer coefficient of the enclosure structure, is the area of ​​the enclosure structure, To calculate the temperature of the cooling load considering the temperature wave action, is the indoor temperature, is the area of ​​exterior windows and glass curtain walls, is the structural correction factor for exterior windows and glass curtain walls, To calculate the cooling load intensity of solar radiation through glass without sunshade facilities at the time, For organized fresh air volume, is the unorganized infiltration air volume, is the outdoor air enthalpy at the time of calculation, is the indoor air enthalpy value at the time of calculation, n is the number of people in the room, The sensible heat output of personnel. The latent heat generated by personnel. It is the heat generated by the equipment, indicating the electrical energy consumed by all the equipment in the building.

2. The adaptive refrigeration control method based on the ice storage system according to claim 1, It is characterized in that The step of comprehensively comparing the chiller operation quantity adjustment value and the chiller operation power adjustment value with the preset operation control conditions and optimizing the control conditions of the current operation control strategy of the ice storage system according to the comparison results specifically includes: The cooling load prediction model is used to calculate the cooling load in different time periods, and the peak cooling load prediction value, peak cooling load prediction value, parity cooling load prediction value and stage cumulative cooling load prediction value are obtained; Obtain the peak cooling load forecast value, peak cooling load forecast value and average cooling load forecast value of the set operation cycle, and calculate the ice storage capacity forecast value and cooling power of the corresponding cycle; When the ice storage capacity reaches the initial chiller start-up conditions, the corresponding number of chillers are controlled to provide cooling according to the initial chiller start-up conditions, and when the next operation cycle arrives, the actual ice storage capacity is counted and the cooling demand for the next operation cycle is analyzed; If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, the preset ice melting cooling mode will be switched to perform cooling work; If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value and the peak cooling load prediction value of the next operation cycle, the ice storage system will be alternately cooled according to the cooling time period based on the cooling demand analysis results.

3. The adaptive refrigeration control method based on the ice storage system according to claim 2, It is characterized in that If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, then switching to the preset ice melting cooling mode to perform cooling work specifically includes: If the actual ice storage capacity is greater than or equal to the sum of the peak cooling load prediction value, the peak cooling load prediction value and the average cooling load prediction value of the next operation cycle, the ice melting cooling mode of the ice storage system is controlled to start first; During the operation of the ice melting cooling mode, the difference between the indoor and outdoor environmental parameters in the corresponding cooling time period is obtained, and according to the difference between the indoor and outdoor environmental parameters, it is determined whether the cooling capacity of the current ice melting cooling mode meets the cooling demand; If not, the cooling reduction coefficient of the current ice melting cooling mode is calculated, and the base load refrigeration machine in the cooling mode of the base load refrigeration machine is controlled in direct proportion to the cooling reduction coefficient to perform supplementary cooling processing.

4. The adaptive refrigeration control method based on the ice storage system according to claim 2, It is characterized in that The step of obtaining the peak cooling load prediction value, the peak cooling load prediction value, and the average cooling load prediction value of the set operation cycle, and calculating the ice storage capacity prediction value and the cooling power of the corresponding cycle specifically includes: The predicted value of ice storage is calculated by formula (2), which is as follows: (2) in, represents the predicted value of ice storage, , , They represent the peak cooling load prediction value, peak cooling load prediction value, and average cooling load prediction value, respectively. Indicates the remaining ice storage capacity; Analyze the valley-price period of electricity in the operation cycle, and control the ice storage system to perform ice storage according to the calculated ice storage amount prediction value during the valley-price period; The cold storage power is calculated by formula (3), which is as follows: (3) Among them, the Indicates the cooling power. Indicates the number of chillers turned on under cold storage conditions.

5. The adaptive refrigeration control method based on ice storage system according to claim 1, It is characterized in that Before inputting the actual operation data and the actual environmental parameters into a pre-trained cooling load prediction model and calculating the cooling load prediction value, the method further includes: The historical operation data of the ice storage system is divided into independent variables and dependent variables, and divided into a majority training set and a minority validation set in combination with the corresponding cooling time period; Performing data fitting on the majority training set to obtain first fitting parameters, and substituting the first fitting parameters into the minority validation set to perform data validation to obtain second validation parameters; The cooling load prediction model obtained by pre-training calculates historical operation data to obtain a cooling load calculation reference value, compares the second verification parameter with the cooling load calculation reference value, and performs model optimization processing according to the comparison result.

6. An adaptive refrigeration control device based on ice storage system, It is characterized in that include: A data calculation module, used for obtaining actual operation data and actual environmental parameters of the ice storage system, inputting the actual operation data and the actual environmental parameters into a pre-trained cold load prediction model, and calculating a cold load prediction value; A data comparison module, used to compare the cooling load prediction value with the preset initial operating conditions, and adjust the actual number of operating chillers and the corresponding chiller operating frequency of the ice storage system according to the comparison result; A cooling control module is used to comprehensively compare the chiller operation quantity adjustment value and the chiller operation power adjustment value with the preset operation control conditions, and optimize the control conditions of the current operation control strategy of the ice storage system according to the comparison results; The mode switching module is used to obtain the cooling demand in different time periods, and control the ice storage system to switch the cooling mode to perform staged cooling processing according to the optimized optimization control strategy and stage cooling demand; The data calculation module specifically includes: The cooling load prediction value is calculated by formula (1), which is as follows: (1) in, represents the predicted value of cooling load, K is the heat transfer coefficient of the enclosure structure, is the area of ​​the enclosure structure, To calculate the temperature of the cooling load considering the temperature wave action, is the indoor temperature, is the area of ​​exterior windows and glass curtain walls, is the structural correction factor for exterior windows and glass curtain walls, To calculate the cooling load intensity of solar radiation through glass without sunshade facilities at the time, For organized fresh air volume, is the unorganized infiltration air volume, is the outdoor air enthalpy at the time of calculation, is the indoor air enthalpy value at the time of calculation, n is the number of people in the room, The sensible heat output of personnel. The latent heat generated by personnel. It is the heat generated by the equipment, indicating the electrical energy consumed by all the equipment in the building.

7. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the adaptive refrigeration control method based on the ice storage system as claimed in any one of claims 1 to 5 are implemented.

8. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the steps of the adaptive refrigeration control method based on an ice storage system according to any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Peak load shifting control method for central air conditioner ice storage

    CN102519113A

  • Cooling load prediction based optimal control method of ice-storage system

    CN103574845A

  • Data processing method and device of ice storage air conditioning system and electronic equipment

    CN114322209A

  • Economic and responsive dual-objective optimization model predictive control method for ice storage air-conditioning system

    CN116624984A

  • System for integrated multi-energy scheduling control in a micro-grid

    US20160172854A1