Management system and method based on intelligent safety inspection of new energy stations

By introducing an intelligent security patrol management system in new energy stations, using the data interaction between QR codes and management servers, the problem of difficulty in understanding leakage during patrols is solved, and effective management and security of patrol risks is achieved. promote.

CN118350803BActive Publication Date: 2024-11-22SHANDONG GUOHUA TIMES INVESTMENT DEV CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410522514.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-28
Publication Date
2024-11-22
Estimated Expiration
2044-04-28

AI Technical Summary

Technical Problem

There are leakage problems during the inspection of existing new energy stations, and it is difficult for inspection personnel to understand the leakage situation in a timely manner. The management system cannot effectively record and manage the inspection results, which increases personal danger and there are loopholes in the inspection management.

Method used

Adopt an intelligent security inspection management system based on new energy stations. By installing apps and management servers on mobile terminals, using QR codes to identify power equipment, inspectors scan and upload detection results, manage server records and provide historical data feedback. Predict the probability of leakage of undetected equipment and feedback it to the inspection personnel in real time.

Benefits of technology

It improves the safety of inspection personnel, promptly understands leakage situations, enhances the recording and management capabilities of the management system, reduces inspection risks, and ensures the accuracy and timeliness of inspection data.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118350803B_ABST
    Figure CN118350803B_ABST
Patent Text Reader

Abstract

The present invention discloses a management system and method based on intelligent safety inspection of new energy stations, wherein the system comprises an app feedback end and a management server installed on a mobile terminal; a two-dimensional code is set on each power equipment of the new energy station, and the two-dimensional code is used to identify the power equipment of the new energy station; the app feedback end installed on the mobile terminal is used to support inspection personnel to scan the two-dimensional code on the power equipment of the new energy station and upload the detection results of the power equipment of the new energy station to the management server; the management server is used to obtain the detection results of the power equipment of the new energy station uploaded by the inspection personnel and record them, and is also used to feed back the historical detection result data of the power equipment of the target new energy station to the app feedback end installed on the mobile terminal; the detection result of the power equipment of the new energy station includes the detection result of whether the shell of the power equipment of the new energy station is leaking.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of new energy technology, and specifically, relates to a management system and method based on intelligent safety inspection of new energy stations. Background Art

[0002] New energy stations are an important part of the new energy industry. New energy stations provide important infrastructure guarantees for the promotion and application of new energy. For example, new energy charging stations are necessary supporting facilities, photovoltaic power stations use solar energy to generate electricity, energy storage stations are used to store electricity, and wind power stations use wind energy to generate electricity. These stations can make positive contributions to energy conservation and emission reduction. In the prior art, when inspectors inspect new energy stations, some new energy stations have leakage problems, which poses a great threat to personal injury to inspectors. Before the inspection, inspectors often do not know that there is leakage, so sometimes they do not take protective measures during the inspection, which increases the risk factor. In addition, there are loopholes in the management of inspections. For example, early inspectors often fail to record the leakage of the inspection in time after the inspection, and the inspection management system cannot effectively record and manage the leakage of the inspection, and cannot inform the inspectors in time. Summary of the invention

[0003] In order to solve the problems in the background technology, the basic concept of the technical solution adopted by the present invention is:

[0004] A management system based on intelligent safety inspection of new energy stations, including an app feedback terminal installed on a mobile terminal and a management server; a QR code is set on each power equipment of a new energy station, and the QR code is used to identify the power equipment of the new energy station; the app feedback terminal installed on the mobile terminal is used to support inspection personnel to scan the QR code on the power equipment of the new energy station and upload the detection results of the power equipment of the new energy station to the management server;

[0005] The management server is used to obtain and record the inspection results of the power equipment at the new energy station uploaded by the inspection personnel, and is also used to feed back the historical inspection result data of the power equipment at the target new energy station to the app feedback end installed on the mobile terminal; the inspection results of the power equipment at the new energy station include the inspection results of whether the casing of the power equipment at the new energy station is leaking electricity.

[0006] Furthermore, the management server is also used to obtain "data on whether several power devices that have been detected in the same new energy station have leaked electricity" and make a probability prediction on whether the next power device that has not been detected in the same new energy station has leaked electricity, and feed back the calculated probability value of the next power device that has not been detected in the same new energy station having leaked electricity to the app feedback terminal installed in the mobile terminal.

[0007] The management method based on intelligent safety inspection of new energy stations includes the following steps: the inspection personnel scan the QR code of the power equipment of the new energy station through the app feedback terminal installed on the mobile terminal and upload the inspection result to the management server;

[0008] Before uploading the test results to the management server, the management server will feed back the historical test result data of the target new energy station power equipment to the app feedback terminal installed on the mobile terminal, and then the inspection personnel can view the historical test result data of the target new energy station power equipment;

[0009] After uploading the test results to the management server, the management server obtains the test results of the new energy station power equipment uploaded by the inspection personnel and records them; the test results of the new energy station power equipment include the test results of whether the casing of the new energy station power equipment is leaking electricity.

[0010] Furthermore, before uploading the detection results to the management server, the management server also obtains "data on whether several power devices that have been detected in the same new energy station have leaked electricity" and makes a probability prediction on whether the next power device that has not been detected in the same new energy station has leaked electricity, and feeds back the calculated probability value of the next power device that has not been detected in the same new energy station having leaked electricity to the app feedback end installed in the mobile terminal.

[0011] Furthermore, the inspection personnel scan the QR code of the new energy station power equipment through the app feedback terminal installed on the mobile terminal and upload the test results to the management server. The data interaction steps are as follows: the inspection personnel open the app feedback terminal of the mobile terminal and use the camera to scan the QR code of the new energy station power equipment, identify the information in the QR code as text or numbers, and match it with the database on the management server; the app feedback terminal of the mobile terminal establishes a connection with the management server through the Internet, and the inspection personnel enter or select the test results on the app feedback terminal of the mobile terminal, and then clicks the upload button to send the data to the management server; the management server receives the test result data sent by the app feedback terminal of the mobile terminal and processes it, including parsing the data and storing it in the database; the management server generates feedback based on the processing results and sends it back to the app feedback terminal of the mobile terminal; after the data interaction is completed, the connection between the app feedback terminal of the mobile terminal and the management server is disconnected to release network resources.

[0012] Furthermore, when there is no wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station, the probability prediction of whether the next power device that has not been detected in the same new energy station has a leakage is specifically calculated as follows based on the "data on whether several power devices that have been detected in the same new energy station have a leakage":

[0013] From the data of several electric power equipment that have been tested for leakage in the same new energy station, determine the number n1 of electric power equipment with leakage and the number n2 of electric power equipment without leakage. Then the probability of the next electric power equipment that has not been tested in the same new energy station having leakage is (1*n1+0.5) / (n1+n2+1).

[0014] Furthermore, when there is a wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station, the probability prediction of whether the next power device that has not been detected in the same new energy station has a leakage is specifically calculated as follows based on the "data on whether several power devices that have been detected in the same new energy station have a leakage":

[0015] From the data of whether several power devices have been detected in the same new energy station to determine whether they have leakage, find the number of power devices with leakage n1 and the number of power devices without leakage n2, and obtain the physical distance l between the n1 power devices with leakage and "the next power device that has not been detected in the same new energy station" i , and obtain the physical distance l between the n2 power equipment without leakage and "the next power equipment that has not been detected in the same new energy station" j , l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", then the probability of leakage of the next power equipment that has not been detected in the same new energy station is:

[0016] Among them, l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l jThat is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", n1 is the number of power equipment with leakage, n2 is the number of power equipment without leakage, and k is a fixed parameter, which represents the degree of connection between power equipment in terms of leakage.

[0017] Furthermore, new energy stations include new energy charging stations, photovoltaic power stations, energy storage stations, and wind power stations.

[0018] Compared with the prior art, the present invention has the following beneficial effects:

[0019] The present application can, before uploading the test results to the management server, have the management server feed back the historical test result data of the target new energy station power equipment to the app feedback end installed on the mobile terminal. Then the inspection personnel can check the historical test result data of the target new energy station power equipment to predetermine whether the target new energy station power equipment has leakage. The management server also obtains "data on whether several power equipment that have been tested in the same new energy station have leakage" to make a probability prediction on whether the next power equipment that has not been tested in the same new energy station has leakage, and feeds back the calculated probability value of leakage of the next power equipment that has not been tested in the same new energy station to the app feedback end installed on the mobile terminal. That is, in the case where it is uncertain whether the target new energy station power equipment has leakage, the probability of leakage of the target new energy station power equipment can be fed back to the inspection personnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a block diagram of the management system based on intelligent safety inspection of new energy stations for this application;

[0021] Figure 2 This application is a flow chart of the management method based on intelligent safety inspection of new energy stations. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings and embodiments of the present invention. The following embodiments are used to illustrate the present invention.

[0023] This application discloses a management system based on intelligent safety inspection of new energy stations, such as Figure 1, including an app feedback terminal 1 and a management server 2 installed on a mobile terminal; first, the new energy station of the present application includes a new energy charging station, a photovoltaic power station, an energy storage station, and a wind power station; a QR code is set on each power equipment of the new energy station, and the QR code is used to identify the power equipment of the new energy station; the app feedback terminal 1 installed on the mobile terminal is used to support the inspection personnel to scan the QR code on the power equipment 3 of the new energy station and upload the detection results of the power equipment of the new energy station to the management server 2;

[0024] The process in which the inspection personnel scan the QR code of the power equipment of the new energy station through the app feedback terminal 1 installed on the mobile terminal and upload the test results to the management server, the data interaction steps are as follows: the inspection personnel open the app feedback terminal 1 of the mobile terminal and use the camera to scan the QR code of the power equipment of the new energy station, identify the information in the QR code as text or numbers, and match it with the database on the management server; the app feedback terminal 1 of the mobile terminal establishes a connection with the management server through the Internet, and the inspection personnel enter or select the test results on the app feedback terminal 1 of the mobile terminal, and then click the upload button to send the data to the management server; the management server receives the test result data sent by the app feedback terminal 1 of the mobile terminal and processes it, including parsing the data and storing it in the database; the management server generates feedback based on the processing results, which may be confirmation information, error messages or updated status information, and sends it back to the app feedback terminal 1 of the mobile terminal; after the data interaction is completed, the connection between the app feedback terminal 1 of the mobile terminal and the management server is disconnected to release network resources;

[0025] The management server 2 is used to obtain and record the test results of the power equipment of the new energy station uploaded by the inspection personnel, and is also used to feed back the historical test result data of the power equipment of the target new energy station to the app feedback terminal 1 installed on the mobile terminal;

[0026] The inspection results of the power equipment at the new energy station include the inspection results of whether the outer shell of the power equipment at the new energy station is leaking electricity; for the inspection personnel, when conducting the inspection, the inspection personnel first scan the QR code on the power equipment at the new energy station through the app feedback terminal 1 installed on the mobile terminal, and then view the historical inspection result data of the power equipment at the target new energy station, thereby knowing whether the power equipment at the target new energy station has leaked electricity before. If the power equipment at the target new energy station has leaked electricity before, protective measures need to be taken; after viewing the historical inspection result data of the power equipment at the target new energy station, the inspection personnel will inspect the power equipment at the target new energy station, and the inspection content includes detecting whether the power equipment at the target new energy station is leaking electricity, and then upload the inspection results of the power equipment at the new energy station through the app feedback terminal 1 installed on the mobile terminal, thereby updating the historical inspection result data of the power equipment at the target new energy station;

[0027] The management server 2 is also used to obtain "data on whether several power devices that have been detected in the same new energy station have leakage", and to make a probability prediction on whether the next power device that has not been detected in the same new energy station has leakage, and to feed back the calculated probability value of the next power device that has not been detected in the same new energy station has leakage to the app feedback terminal 1 installed in the mobile terminal;

[0028] It is important to make a probability prediction of whether the power equipment in the new energy station is leaking electricity, because in practice, the time point recorded by the historical test result data of the power equipment in the target new energy station is often far away from the current test time point, that is, for the current inspection personnel, it is often a long time before the inspection that no one else has conducted a test on whether the power equipment in the target new energy station is leaking electricity, so the historical test result data of the power equipment in the target new energy station is not very useful for reference, that is, in this case, the server cannot inform the risk of leakage electricity based on long-term historical records, and it is difficult for the current inspection personnel to know whether the next power equipment in the target new energy station to be tested is leaking electricity. However, whether several power equipment in the same new energy station are leaking electricity is generally consistent, especially when there are wires connecting several power equipment in the same new energy station, if one of them leaks electricity, several other power equipment may also leak electricity. However, according to the "data on whether several power equipment that have been detected in the same new energy station are leaking electricity", it is necessary to calculate the probability prediction of whether the next power equipment that has not been detected in the same new energy station is leaking electricity;

[0029] First, when there is no wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station (that is, whether several power devices that have been detected in the same new energy station have leakage and whether the next power device that has not been detected in the same new energy station has leakage are independent events), the probability prediction of whether the next power device that has not been detected in the same new energy station has leakage is made based on the "data on whether several power devices that have been detected in the same new energy station have leakage". The specific calculation is as follows: from the data on whether several power devices that have been detected in the same new energy station have leakage, the number of power devices with leakage n1 and the number of power devices without leakage n2 are found, then the probability of leakage of the next power device that has not been detected in the same new energy station is (1*n1+0.5) / (n1+n2+1) It should be noted that the probability of power equipment leakage calculated by this method is based on the experience of events that have occurred (whether several power equipment that have been detected have leakage). It predicts events that have not occurred (whether the next power equipment that has not been detected has leakage). For example, from the data of whether several power equipment that have been detected have leakage in the same new energy station, the number of power equipment with leakage is 5 and the number of power equipment without leakage is 6. Then the probability of the next power equipment that has not been detected in the same new energy station having leakage is (1*n1+0.5) / (n1+n2+1)=(1*5+0.5) / (12)≈0.46. The probability calculated by this method is not necessarily an exact mathematical probability, but it is very close to the exact mathematical probability. In particular, the larger the number of n1+n2 samples, the more accurate it is. Therefore, it can represent the probability of the next power equipment that has not been detected in the same new energy station having leakage.

[0030] In addition, when there is a wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station (that is, whether the several power devices that have been detected in the same new energy station have leakage and whether the next power device that has not been detected in the same new energy station has leakage are not independent events), the probability prediction of whether the next power device that has not been detected in the same new energy station has leakage is made based on the "data on whether the several power devices that have been detected in the same new energy station have leakage". The specific calculation is as follows: from the data on whether the several power devices that have been detected in the same new energy station have leakage, find the number of power devices with leakage n1 and the number of power devices without leakage n2,

[0031] And obtain the physical distance l between the n1 power equipment with leakage and "the next power equipment that has not been detected in the same new energy station" i(The data here are stored in advance), and the physical distance l between the n2 power equipment without leakage and "the next power equipment that has not been detected in the same new energy station" is obtained j (The data here is stored in advance), l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", and then set a fixed parameter k to represent the closeness of the connection between these non-independent events of leakage (in fact, the closeness of the connection between non-independent events of leakage is related to the age of the equipment in the specific new energy station, the design structure, etc., which is actually very complicated and the fixed parameter k cannot be fully determined. Therefore, the fixed parameter k is only an empirical value, which can also be determined by data regression test based on actual data). Then the probability of leakage of the next power equipment that has not been detected in the same new energy station is:

[0032] Among them, l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", n1 is the number of power equipment with leakage, n2 is the number of power equipment without leakage, k is a fixed parameter, k represents the closeness of the connection between power equipment with leakage, for example, k = 2, the unit of the fixed parameter k is the same as the distance unit, for example, meter; for example, from the data of whether several power equipment have been detected in the same new energy station, find the number of power equipment with leakage is 5, the physical distances from the power equipment with leakage to "the next power equipment that has not been detected in the same new energy station" are 1, 2, 6, 7, and 9 meters respectively. The number of power equipment that does not have leakage is determined from the data of several power equipment that have been detected in the same new energy station. The number is 6. The physical distances from the power equipment without leakage to "the next power equipment that has not been detected in the same new energy station" are 3, 4, 5, 8, 10, and 11 meters respectively. k = 2, and the unit of k is the same as the distance unit, which is meter. Then is approximately equal to 2.198, so the probability of the next power equipment leakage that has not been detected in the same new energy station is:

[0033]

[0034] It can be seen that before uploading the test results to the management server, the present application can have the management server feed back the historical test result data of the target new energy station power equipment to the app feedback end installed on the mobile terminal. Then the inspection personnel can check the historical test result data of the target new energy station power equipment to predetermine whether the target new energy station power equipment has leakage. The management server also obtains "data on whether several power equipment that have been tested in the same new energy station have leakage" to make a probability prediction on whether the next power equipment that has not been tested in the same new energy station has leakage, and feeds back the calculated probability value of leakage of the next power equipment that has not been tested in the same new energy station to the app feedback end installed on the mobile terminal. That is, in the case where it is uncertain whether the target new energy station power equipment has leakage, the probability of leakage of the target new energy station power equipment can also be fed back to the inspection personnel.

[0035] The embodiments that require protection in this application include:

[0036] A management system based on intelligent safety inspection of new energy stations, including an app feedback terminal installed on a mobile terminal and a management server;

[0037] A QR code is set on each power equipment of a new energy station, which is used to identify the power equipment of the new energy station; the app feedback end installed on the mobile terminal is used to support the inspection personnel to scan the QR code on the power equipment of the new energy station and upload the inspection results of the power equipment of the new energy station to the management server;

[0038] The management server is used to obtain and record the inspection results of the power equipment at the new energy station uploaded by the inspection personnel, and is also used to feed back the historical inspection result data of the power equipment at the target new energy station to the app feedback end installed on the mobile terminal; the inspection results of the power equipment at the new energy station include the inspection results of whether the casing of the power equipment at the new energy station is leaking electricity.

[0039] Preferably, the management server is also used to obtain "data on whether several power devices that have been detected in the same new energy station have leakage", make a probability prediction on whether the next power device that has not been detected in the same new energy station has leakage, and feed back the calculated probability value of the next power device that has not been detected in the same new energy station has leakage to the app feedback terminal installed in the mobile terminal.

[0040] Management methods based on intelligent safety inspection of new energy stations, such as Figure 2, including the steps of: the inspection personnel scan the QR code of the power equipment of the new energy station through the app feedback terminal installed on the mobile terminal and upload the detection results to the management server; before uploading the detection results to the management server, the management server feeds back the historical detection result data of the power equipment of the target new energy station to the app feedback terminal installed on the mobile terminal, and then the inspection personnel view the historical detection result data of the power equipment of the target new energy station;

[0041] After uploading the test results to the management server, the management server obtains the test results of the new energy station power equipment uploaded by the inspection personnel and records them; the test results of the new energy station power equipment include the test results of whether the casing of the new energy station power equipment is leaking electricity.

[0042] Preferably, before uploading the detection results to the management server, the management server also obtains "data on whether several power devices that have been detected in the same new energy station have leaked electricity" and makes a probability prediction on whether the next power device that has not been detected in the same new energy station has leaked electricity, and feeds back the calculated probability value of the next power device that has not been detected in the same new energy station having leaked electricity to the app feedback terminal installed on the mobile terminal.

[0043] Specifically, the inspection personnel scan the QR code of the power equipment of the new energy station through the app feedback terminal installed on the mobile terminal and upload the test results to the management server. The data interaction steps are as follows: the inspection personnel open the app feedback terminal of the mobile terminal and use the camera to scan the QR code of the power equipment of the new energy station, identify the information in the QR code as text or numbers, and match it with the database on the management server; the app feedback terminal of the mobile terminal establishes a connection with the management server through the Internet, and the inspection personnel enter or select the test results on the app feedback terminal of the mobile terminal, and then clicks the upload button to send the data to the management server; the management server receives the test result data sent by the app feedback terminal of the mobile terminal and processes it, including parsing the data and storing it in the database; the management server generates feedback based on the processing results and sends it back to the app feedback terminal of the mobile terminal; after the data interaction is completed, the connection between the app feedback terminal of the mobile terminal and the management server is disconnected to release network resources.

[0044] Preferably, when there is no wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station, the probability prediction of whether the next power device that has not been detected in the same new energy station has a leakage is specifically calculated as follows based on the "data on whether several power devices that have been detected in the same new energy station have a leakage":

[0045] From the data of several electric power equipment that have been tested for leakage in the same new energy station, determine the number n1 of electric power equipment with leakage and the number n2 of electric power equipment without leakage. Then the probability of the next electric power equipment that has not been tested in the same new energy station having leakage is (1*n1+0.5) / (n1+n2+1).

[0046] Preferably, when there is a wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station, the probability prediction of whether the next power device that has not been detected in the same new energy station has a leakage is specifically calculated as follows based on the "data on whether several power devices that have been detected in the same new energy station have a leakage":

[0047] From the data of whether several power devices have been detected in the same new energy station to determine whether they have leakage, find the number of power devices with leakage n1 and the number of power devices without leakage n2, and obtain the physical distance l between the n1 power devices with leakage and "the next power device that has not been detected in the same new energy station" i , and obtain the physical distance l between the n2 power equipment without leakage and "the next power equipment that has not been detected in the same new energy station" j , l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", then the probability of leakage of the next power equipment that has not been detected in the same new energy station is:

[0048] Among them, l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", n1 is the number of power equipment with leakage, n2 is the number of power equipment without leakage, and k is a fixed parameter, which represents the degree of connection between power equipment in terms of leakage.

[0049] Specifically, new energy stations include new energy charging stations, photovoltaic power stations, energy storage stations, and wind power stations.

[0050] In addition, an embodiment of the present application further provides a storage medium, which is used to store a computer program, and the computer program is used to execute the management method based on intelligent safety inspection of new energy stations provided in the above embodiment.

[0051] An embodiment of the present application also provides a computer program product including instructions, which, when executed on a computer, enables the computer to execute the management method based on intelligent safety inspection of new energy stations provided in the above embodiment.

[0052] A person of ordinary skill in the art can understand that all or part of the steps of the above-mentioned management method embodiment based on intelligent safety inspection of new energy stations can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, it executes the steps of the above-mentioned method embodiment; and the aforementioned storage medium can be at least one of the following media: read-only memory (English: Read-only Memory, abbreviated: ROM), RAM, magnetic disk or optical disk, etc. Various media that can store program codes.

[0053] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. Management method based on intelligent safety inspection of new energy stations, It is characterized in that The steps include: the inspection personnel scan the QR code of the power equipment in the new energy station through the app feedback terminal installed on the mobile terminal and upload the test results to the management server; Before uploading the test results to the management server, the management server will feed back the historical test result data of the target new energy station power equipment to the app feedback terminal installed on the mobile terminal, and then the inspection personnel can view the historical test result data of the target new energy station power equipment; After uploading the test results to the management server, the management server obtains the test results of the power equipment of the new energy station uploaded by the inspection personnel and records them; The test results of the power equipment of the new energy station include the test results of whether the shell of the power equipment of the new energy station has leakage; Before uploading the test results to the management server, the management server also obtains "data on whether several power equipment that have been tested in the same new energy station have leakage" to make a probability prediction on whether the next power equipment that has not been tested in the same new energy station has leakage, and feeds back the calculated probability value of leakage of the next power equipment that has not been tested in the same new energy station to the app feedback terminal installed in the mobile terminal; The inspection personnel scan the QR code of the power equipment of the new energy station through the app feedback terminal installed on the mobile terminal and upload the test results to the management server. The data interaction steps are as follows: The inspection personnel open the app feedback terminal of the mobile terminal and use the camera to scan the QR code of the power equipment of the new energy station, recognize the information in the QR code as text or numbers, and match it with the database on the management server; the app feedback terminal of the mobile terminal establishes a connection with the management server through the Internet, and the inspection personnel enter or select the test results on the app feedback terminal of the mobile terminal, and then click the upload button to send the data to the management server; The management server receives the test result data sent by the mobile terminal app feedback terminal and processes it, including parsing the data and storing it in the database; the management server generates feedback based on the processing results and sends it back to the mobile terminal app feedback terminal; After the data interaction is completed, the connection between the mobile terminal's app feedback end and the management server is disconnected to release network resources; When there is no wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station, the probability prediction of whether the next power device that has not been detected in the same new energy station has leakage is calculated as follows based on the "data on whether several power devices that have been detected in the same new energy station have leakage": From the data of whether several power equipments have leakage that have been detected in the same new energy station, find the number of power equipments with leakage n1 and the number of power equipments without leakage n2, then the probability of the next power equipment that has not been detected in the same new energy station having leakage is (1*n1+0.5) / (n1+n2+1); When there is a wire connection between several power devices that have been detected in the same new energy station and the next power device that has not been detected in the same new energy station, the probability prediction of whether the next power device that has not been detected in the same new energy station has a leakage is calculated as follows based on the "data on whether several power devices that have been detected in the same new energy station have leakage": From the data of whether several power devices have been detected in the same new energy station to determine whether they have leakage, find the number of power devices with leakage n1 and the number of power devices without leakage n2, and obtain the physical distance l between the n1 power devices with leakage and "the next power device that has not been detected in the same new energy station" i , and obtain the physical distance l between the n2 power equipment without leakage and "the next power equipment that has not been detected in the same new energy station" j , l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", then the probability of leakage of the next power equipment that has not been detected in the same new energy station is: , where l i That is, the physical distance between the ith power equipment with leakage and the next power equipment that has not been detected in the same new energy station, l j That is, the physical distance between the jth power equipment without leakage and "the next power equipment that has not been detected in the same new energy station", n1 is the number of power equipment with leakage, n2 is the number of power equipment without leakage, and k is a fixed parameter, which represents the closeness of the connection between power equipment in terms of leakage; A system using a management method based on intelligent safety inspection of new energy stations includes an app feedback terminal installed on a mobile terminal and a management server; a QR code is set on each power equipment of a new energy station, and the QR code is used to identify the power equipment of the new energy station; The app feedback terminal installed on the mobile terminal is used to support the inspection personnel to scan the QR code on the power equipment of the new energy station and upload the inspection results of the power equipment of the new energy station to the management server; The management server is used to obtain and record the test results of the power equipment of the new energy station uploaded by the inspection personnel, and is also used to feed back the historical test result data of the power equipment of the target new energy station to the app feedback terminal installed on the mobile terminal; the test results of the power equipment of the new energy station include the test results of whether the shell of the power equipment of the new energy station is leaking; The management server is also used to obtain "data on whether several power devices that have been detected in the same new energy station have leakage" and make a probability prediction on whether the next power device that has not been detected in the same new energy station has leakage, and feed back the calculated probability value of the next power device that has not been detected in the same new energy station having leakage to the app feedback terminal installed in the mobile terminal.

2. According to the management method based on intelligent safety inspection of new energy stations according to claim 1, It is characterized in that New energy stations include new energy charging stations, photovoltaic power stations, energy storage stations, and wind power stations.

Citation Information

Patent Citations

  • Intelligent power plant equipment inspection system and method based on data analysis

    CN111754020A

  • New energy station non-inductive intelligent inspection management system and method

    CN115273269A

  • Equipment information management system and method for realizing station global state supervision

    CN117076241A

  • Visual intelligent inspection method and device based on digital twinborn digital-analog separation

    CN117763362A

  • Fire detection and early response system using rechargeable mobile robot

    WO2023054813A1