By designing a control system in a liquid-cooled server, using multiple controllers and a two-wire serial bus interface to detect status information and generate power-off control signals, the problem of short circuits and data loss caused by leakage of liquid-cooled servers is solved, ensuring System stability and security.
Patent Information
- Application Number
- CN202410852914.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-28
AI Technical Summary
There is a risk of liquid leakage in liquid-cooled servers, which can cause short circuits on motherboard components, leading to malfunctions and safety accidents. Direct power off may result in data loss.
Design a control system that connects multiple controllers to a two-wire serial bus interface, detects status information and generates power-off control signals to ensure that leaking controllers are powered off to avoid short-circuit damage, and through complex programmable logic The control device and central processor monitor power supply abnormalities and back up data.
It effectively avoids the impact of leakage events on server hardware and data, ensures system stability and security, and prevents data loss.
Smart Images

Figure CN118394694B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a control system and a server. Background Art
[0002] With the development of science and technology, traditional air-cooled servers can no longer meet the heat dissipation needs of high-probability servers. Related technologies have begun to use liquid-cooled servers for heat dissipation. The use of liquid as a medium cannot avoid the risk of leakage. Once a serious leakage occurs, it will cause a short circuit in the motherboard components, which will cause the entire controller to fail, and even cause a serious safety accident. When a server leaks, in order to prevent the liquid from further damaging the hardware equipment or causing more serious safety problems, the device is usually powered off. However, directly powering off the entire server may not be able to save data to non-volatile media in time, resulting in data loss. Summary of the invention
[0003] In view of the above problems, embodiments of the present invention are proposed to provide a control system and a server that overcome the above problems or at least partially solve the above problems.
[0004] In order to solve the above problems, the present invention discloses a control system, which includes a plurality of controllers and a two-wire serial bus interface, wherein the plurality of controllers are respectively connected to the two-wire serial bus interface;
[0005] Any controller among the plurality of controllers is used to identify status information and send the status information to other controllers through the two-wire serial bus interface;
[0006] The other controller is used to determine whether the target controller has leakage according to the state information, and when it is determined that the target controller has leakage, send a power-off control signal for the target controller to the two-wire serial bus interface;
[0007] The two-wire serial bus interface is used to determine a target power-off control signal according to the power-off control signal, and send the target power-off control signal to a target controller to control the target controller to power off.
[0008] Optionally, the controller comprises a complex programmable logic control device, and the complex programmable logic control device is used to identify status information for the controller.
[0009] Optionally, the control system also includes an AC power supply module, and the controller also includes a central processing unit. The AC power supply module is used to power the controller, and the complex programmable logic device is used to monitor whether the AC power supply module is abnormal. When the AC power supply module is detected to be abnormal, an AC power supply abnormality signal is sent to the central processing unit, and the central processing unit is used to back up the cached data.
[0010] Optionally, the central processing unit is used to stop running the business according to the power abnormality signal, and cache the cached data to a non-volatile storage medium.
[0011] Optionally, the complex programmable logic device of the target controller is used to send a leakage signal to the central processing unit of the target controller when determining that the target controller is leaking. The central processing unit is used to stop business services based on the leakage signal and cache the cache data of the target controller to a non-volatile storage medium.
[0012] Optionally, the two-wire serial bus interface is used for performing an AND logic calculation on a plurality of power-off control signals to obtain the target power-off control signal when the power-off control signal includes a plurality of power-off control signals.
[0013] Optionally, the target controller includes a power module, and the power module is used to cut off power according to the target power-off control signal.
[0014] Optionally, the power module includes an enable control pin, the target power-off control signal is a low-level signal, and the enable control pin is used to close when receiving the target power-off control signal to control the power module to power off.
[0015] Optionally, the state information includes leakage information, and the leakage information is used to characterize the leakage situation in the controller, and the other controller is used to determine whether the target controller has leakage according to the leakage information.
[0016] Optionally, the status information further includes a controller number, and the other controller is used to determine the target controller where the leakage occurs according to the controller number, and generate a power-off control signal including the target controller number.
[0017] Optionally, the other controller is used to obtain the presence information of the target controller after the target controller is powered off, and determine whether the target controller is in place based on the presence information; if the target controller is not in place, release the power-off control signal for the target controller and delete the status information for the target controller.
[0018] Optionally, the system further includes a power supply unit, the power module includes a first input end, the power supply unit is connected to the first input end, and the power supply unit is used to supply power to the power module.
[0019] Optionally, the system further includes an auxiliary power supply unit, the power module includes a second input terminal, the auxiliary power supply unit is connected to the second input terminal, and the auxiliary power supply unit is used to supply power to the power module when the power supply unit fails.
[0020] Optionally, the controller further includes a resistor, one end of which is connected to the auxiliary power supply unit and the second input end, and the other end of which is grounded.
[0021] The invention also discloses a server, which comprises the control system mentioned above.
[0022] The embodiments of the present invention include the following advantages:
[0023] The present invention discloses a control system. The present invention acquires status information through detection by any controller, and sends the status information to other controllers through a two-wire serial bus interface. The other controllers can determine whether a target controller is leaking according to the status information. When it is determined that the target controller is leaking, a power-off control signal for the target controller can be sent to the two-wire serial bus interface. The two-wire serial bus interface can determine the target power-off control signal according to the power-off control signal, thereby powering off the controller that has leaked. When the present invention detects that a liquid leak occurs, a non-leaking controller generates a power-off control signal to power off the leaking controller, thereby avoiding short-circuit damage to controller components. This can effectively avoid the impact of the liquid leak event on server hardware and data, and ensure the stability and security of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 is an architectural block diagram of a control system provided by an embodiment of the present invention;
[0025] Figure 2 is an architectural block diagram of another control system provided by an embodiment of the present invention;
[0026] Figure 3 is an architectural block diagram of another control system provided by an embodiment of the present invention;
[0027] Figure 4 This is a power-off control circuit diagram provided by an embodiment of the present invention;
[0028] Figure 5 The present invention provides a data backup process diagram. DETAILED DESCRIPTION
[0029] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0030] A liquid-cooled server is a server in which liquid is injected into the server to remove the heat from the server through heat exchange. From the physical form of the server, there are: cold plate liquid-cooled servers, fully immersed liquid-cooled servers, and immersed phase change liquid-cooled servers. In the immersion liquid phase change cooling system, the server motherboard, CPU, memory and other components with high heat generation are completely immersed in the refrigerant. Under working conditions, each heat-generating component will generate heat, causing the temperature of the refrigerant to rise. When the refrigerant temperature rises to the boiling point corresponding to the system pressure, the refrigerant fluid undergoes a phase change from liquid to gas, and heat is transferred by absorbing heat from vaporization. This technology of cooling by absorbing heat through the refrigerant is called phase change liquid cooling technology. Immersion phase change liquid cooling technology uses liquid phase change to directly remove heat, reducing the thermal resistance of the heat transfer process. Compared with cold plate liquid cooling, immersion liquid cooling technology has higher heat transfer efficiency and is the most energy-saving and efficient emerging refrigeration mode in liquid cooling.
[0031] Using liquid as a medium cannot avoid the risk of leakage. Once a serious leakage occurs, it will cause a short circuit in the motherboard components, which will cause the entire controller to fail, and even cause a serious safety accident. When a server leaks, in order to prevent the liquid from further damaging the hardware equipment or causing more serious safety problems, the device is usually powered off. Obviously, for storage servers, the entire server cannot be directly powered off, because the internal cached data may not be saved to the non-volatile medium in time, resulting in data loss. For customers, data loss may cause business interruption, which may lead to irreparable losses.
[0032] One of the core concepts of the embodiments of the present invention is that the present invention obtains status information through detection by any controller, and sends the status information to other controllers through a two-wire serial bus interface. The other controllers can determine whether the target controller is leaking based on the status information. When it is determined that the target controller is leaking, a power-off control signal for the target controller can be sent to the two-wire serial bus interface. The two-wire serial bus interface can determine the target power-off control signal based on the power-off control signal, thereby powering off the leaking controller. The present invention can effectively avoid the impact of leakage events on server hardware and data by generating a power-off control signal to power off the leaking controller when leakage is detected, thereby avoiding short-circuit damage to controller components. The stability and security of the system can be ensured.
[0033] Reference Figure 1, shows a structural block diagram of a control system 10 provided in an embodiment of the present invention, the control system includes a plurality of controllers 101 and a two-wire serial bus interface 102, and the plurality of controllers are respectively connected to the two-wire serial bus interface 102;
[0034] In the embodiment of the present invention, in terms of hardware, the I2C bus only needs two wires, one data line and one clock line. The bus interface has been integrated inside the chip, and no special interface circuit is required. Moreover, the filter of the on-chip interface circuit can filter out the burrs on the bus data. Therefore, the I2C bus simplifies the hardware circuit PCB wiring, reduces the system cost, and improves the system reliability. Because the I2C chip has no more wires connected to the system except these two wires and a small number of interrupt lines, the I2C commonly used by users can be easily standardized and modularized, which is convenient for reuse; the I2C bus is a true multi-host bus. If two or more hosts initialize data transmission at the same time, data corruption can be prevented through conflict detection and arbitration. Each device connected to the bus has a unique address. Any device can be used as both a host and a slave, but only one host is allowed at the same time. Data transmission and address setting are set by software, which is very flexible. The addition and deletion of devices on the bus does not affect the normal operation of other devices.
[0035] Any controller among the multiple controllers is used to identify the status information and send the status information to other controllers through the two-wire serial bus interface.
[0036] A controller is a main command device that changes the wiring of the main circuit or control circuit and the resistance value in the circuit in a predetermined order to control the starting, speed regulation, braking and reversing of the motor. It consists of a program counter, an instruction register, an instruction decoder, a timing generator and an operation controller. It is the "decision-making body" that issues commands, that is, it coordinates and directs the operation of the entire computer system.
[0037] Each controller includes a refrigerant liquid cooling circuit, and each controller can identify status information for the refrigerant liquid cooling circuit.
[0038] In the embodiment of the present invention, the multiple controllers may include 1011, 1012, 1013, 101 n , controllers 1011, 1012, 1013, 101 n The status information of the refrigerant liquid cooling circuit can be identified separately, and then the status information can be sent to the two-wire serial bus interface 102, so that each controller can synchronize the status information of other controllers; for example, when the controller 1011 detects a liquid leakage in the liquid cooling circuit, the status information containing the controller 1011 can be generated, and then the status information containing the controller 1011 can be sent to the two-wire serial bus interface 102.
[0039] The other controller is used to determine whether the target controller has leakage according to the state information, and when it is determined that the target controller has leakage, send a power-off control signal for the target controller to the two-wire serial bus interface;
[0040] In an embodiment of the present invention, after other controllers receive status information for the target controller sent by the two-wire serial bus interface 102, they can determine whether the target controller is leaking based on the status information of the target controller. When it is determined that the target controller is leaking, a power-off control signal for the target controller can be sent to the two-wire serial bus interface.
[0041] The two-wire serial bus interface is used to determine a target power-off control signal according to the power-off control signal, and send the target power-off control signal to the target controller to control the target controller to power off.
[0042] In the embodiment of the present invention, after receiving the status information of the target controller, the two-wire serial bus interface 102 can forward the status information of the target controller to other controllers. For example, the two-wire serial bus interface 102 can forward the status information of the controller 1011 to 1012, 1013, 1014, 1015, 1016, 1017, 1018, 1019, 1020, 1021, 1022, 1023, 1024, 1025, 1026, 1027, 1028, 1029, 1030, 1031, 1032, 1033, 1034, 1035, 1036, 1037, 1038, 1039, 1040, 1041, 104 n , 1012, 1013, 101 n When the controller 1011 is determined to be leaking according to the state information, a power-off control signal for the target controller 1011 can be generated respectively, and then the power-off control signal is sent to the two-wire serial bus interface 102. The two-wire serial bus interface can be configured according to 1012, 1013, 101 n The power-off control signal sent to the target controller 1011 generates a target power-off control signal, thereby sending the target power-off control signal to the target controller 1011, so that the target controller 1011 can be powered off according to the target power-off control signal.
[0043] The present invention discloses a control system. The present invention acquires status information through detection by any controller, and sends the status information to other controllers through a two-wire serial bus interface. The other controllers can determine whether a target controller is leaking according to the status information. When it is determined that the target controller is leaking, a power-off control signal for the target controller can be sent to the two-wire serial bus interface. The two-wire serial bus interface can determine the target power-off control signal according to the power-off control signal, thereby powering off the controller that has leaked. When the present invention detects that a liquid leak occurs, a non-leaking controller generates a power-off control signal to power off the leaking controller, thereby avoiding short-circuit damage to controller components. This can effectively avoid the impact of the liquid leak event on server hardware and data, and ensure the stability and security of the system.
[0044] In one embodiment of the present invention, the controller includes a complex programmable logic control device, and the complex programmable logic control device is used to identify status information for the controller.
[0045] CPLD (Complex Programmable Logic Device) is an integrated circuit that allows users to implement specific logic functions through programming. CPLD consists of multiple programmable logic blocks and programmable interconnection matrices, which can be configured through programming to implement the required logic circuits. CPLDs are usually used to implement control logic, state machines, interface conversion, signal processing and other applications. They are widely used in embedded systems, communication equipment, industrial control, automotive electronics and other fields.
[0046] In the embodiment of the present invention, Figure 2 , showing a schematic diagram of multiple controllers interacting with each other provided by an embodiment of the present invention, the multiple controllers may include controller 1, controller 2, controller 3, and controller 4, controller 1 may include complex programmable logic device 1, controller 2 may include complex programmable logic device 2, controller 3 may include complex programmable logic device 3, controller 4 may include complex programmable logic device 4, complex programmable logic device 1, complex programmable logic device 2, complex programmable logic device 3, and complex programmable logic device 4 may respectively identify status information for their respective controllers.
[0047] In one embodiment of the present invention, the control system also includes an AC power module, and the controller also includes a central processing unit. The AC power module is used to power the controller. The complex programmable logic device is used to monitor whether the AC power module is abnormal. When an abnormality is detected in the AC power module, an AC power abnormality signal is sent to the central processing unit. The central processing unit is used to back up the cached data.
[0048] In the embodiment of the present invention, the control system may further include an AC power supply module, and the controller may include a CPU (Central Processing Unit). Figure 2 , the controller 1 may include a CPU1 and a CPLD1, the AC power module may supply power to the controller, the complex programmable logic device CPLD1 may monitor whether the AC power module is abnormal, and when the AC power module is detected to be abnormal, an AC power abnormality signal may be sent to the central processor CPU1, and the central processor CPU1 is used to back up cached data. The present invention may detect whether the AC power module is abnormal through a complex programmable logic device, and when an abnormality occurs, a backup process may be started through the central processor to avoid data loss, thereby providing convenience for users.
[0049] In one embodiment of the present invention, the central processing unit is used to stop running the service according to the abnormal AC power supply signal, and cache the cached data to a non-volatile storage medium.
[0050] In an embodiment of the present invention, the complex programmable logic device CPLD1 can send an AC power abnormality signal to the central processing unit CPU1. The central processing unit CPU1 can start a backup process based on the AC power abnormality signal, that is, it can stop the current business and store the cached data in a non-volatile storage medium. The cached data can be restored from the non-volatile storage medium after the next power-on. Through this step, it can be ensured that no data loss problem will occur.
[0051] In one embodiment of the present invention, the complex programmable logic device of the target controller is used to determine that when a leakage occurs in the target controller, a leakage signal is sent to the central processing unit of the target controller. The central processing unit is used to stop business services based on the leakage signal and cache the cache data of the target controller to a non-volatile storage medium.
[0052] In an embodiment of the present invention, for example, when the complex programmable logic device of the target controller 1011 determines that the target controller is leaking, it can send a leakage signal to the central processing unit of the target controller 1011, so that the central processing unit of the target controller 1011 can perform data backup according to the leakage signal, that is, it can stop the business service of the current controller and cache the cached data to a non-volatile storage medium. When the data storage is completed, the shutdown process is started and the entire backup process ends.
[0053] In one embodiment of the present invention, when a target controller leaks, a controller that does not leak can control a battery backup unit to back up data to avoid data loss. Figure 3 , showing a structural block diagram of a control system provided by an embodiment of the present invention, the system may also include a battery backup unit 103, the controller may include 1011, 1012, 1013, 1014, when the controller 1011, 1013, 1014 leaks, after 1012 receives the leakage signal of 1011, 1013, 1014, it can control the battery backup unit to store the cached data in a non-volatile storage medium, which can ensure that the storage server does not lose data when leakage occurs.
[0054] In one embodiment of the present invention, the two-wire serial bus interface is used to perform AND logic calculation on the multiple power-off control signals to obtain a target power-off control signal when the power-off control signal includes multiple power-off control signals.
[0055] In an embodiment of the present invention, when the power-off control signal includes multiple controllers, for example, the controller includes five controllers, namely controller 1, controller 2, controller 3, controller 4, and controller 5, when leakage occurs in controller 1, controller 2, controller 3, controller 4, and controller 5 receive the status information of controller 1 forwarded by the two-wire serial bus interface, thereby respectively generating power-off control signals and sending them to the two-wire serial bus interface. The two-wire serial bus interface can receive four power-off control signals for controller 1, and perform AND logic calculation on the four power-off control signals to obtain the target power-off control signal. That is, as long as one controller sends a power-off control signal, the controller that sends the leakage can be powered off. By having multiple controllers participate in the generation of the power-off control signal, the system increases redundancy. Even if a controller fails, other controllers can still ensure the generation of the power-off control signal, thereby improving the reliability of the system.
[0056] In an embodiment of the present invention, the controller includes a power module, and the power module is used to cut off power according to a target power-off control signal.
[0057] In the embodiment of the present invention, Figure 4 , shows a power-off control circuit diagram provided by an embodiment of the present invention, in which a controller 1 includes a power module. After the power module receives a target power-off control signal, it can cut off power according to the target power-off control signal.
[0058] In one embodiment of the present invention, the power module includes an enable control pin, the target power-off control signal is a low-level signal, and the enable control pin is used to close when receiving the target power-off control signal to control the power module to power off.
[0059] like Figure 4 The power module may further include an enable control pin, which is closed when receiving a low-level signal. After closing, the power module can be disconnected, thereby controlling the power module to be powered off, thereby achieving power off when the controller 1 leaks.
[0060] In one embodiment of the present invention, the status information includes leakage information, and the leakage information is used to characterize the leakage situation in the controller. Other controllers are used to determine whether the target controller has leakage according to the leakage information.
[0061] In the embodiment of the present invention, the status information may include leakage information. For example, if the status information of the controller 1 includes: leakage occurs, then other controllers may determine that the controller 1 has leakage after receiving the status information. If the status information includes: no leakage occurs, then other controllers may determine that the controller 1 has not leakage after receiving the status information.
[0062] In an embodiment of the present invention, the status information also includes a controller number, and other controllers are used to determine a target controller where leakage occurs according to the controller number, and generate a power-off control signal including the target controller number.
[0063] In an embodiment of the present invention, the status information may also include the number of the controller where the leakage occurs, for example, controller 1 is numbered 10001, controller 2 is numbered 10010, controller 3 is numbered 10011, and controller 4 is numbered 10100. When one of the controllers leaks, the other controllers can obtain its status information, and the other controllers can determine which controller has leaked based on the number information. When leakage occurs, the two-wire serial bus interface will synchronize the status information to other non-leaking controllers. When other non-leaking controllers detect that a controller with a certain number has leaked, the non-leaking controller will send a power-off control signal through the two-wire serial bus interface to control the leaking controller to power off, and the non-leaking controller will automatically trigger the backup process. Any controller has a control signal from other controllers. The power-off control signal of the controller is logically ANDed and sent to the enable switch. The mainboard enable switch performs the corresponding power-off or power-on action according to the logical state of the power-off control signal.
[0064] In one embodiment of the present invention, other controllers are used to obtain the target controller's presence information after the target controller is powered off, and determine whether the target controller is in place based on the presence information; if the target controller is not in place, a power-off control signal for the target controller is released, and status information for the target controller is deleted.
[0065] In the embodiment of the present invention, other controllers can also detect whether the leaking controller is in place, that is, whether it is unplugged, after the leaking controller is powered off. If it is detected that the leaking controller is not in place, the other controllers can determine that the leaking controller is unplugged, for example Figure 3 As shown in , when controller 1012 detects that a leakage has occurred, it can detect whether controller 1012 is in place, that is, whether it has been unplugged, after 1012 is powered off. If it has not been unplugged, there is no need to notify controllers 1011, 1013, and 1014. If controller 1012 has been unplugged, controllers 1011, 1013, and 1014 can release a power-off control signal for the target controller and delete the status information for the target controller to avoid sending control instructions to a controller that is not in place all the time and to avoid wasting resources, so as to ensure that the next time a new controller is replaced, it can be powered on normally. The status information can be updated in time after the new controller is inserted to avoid information confusion.
[0066] In one embodiment of the present invention, when multiple controllers detect leakage, the multiple controllers can send status information to the two-wire serial bus interface, wherein the status information respectively includes the number and leakage information of each controller. For example, the controllers include controller 1, controller 2, controller 3, and controller 4. When controller 1, controller 2, and controller 3 detect leakage, they can send first status information, second status information, and third status information to the two-wire serial bus interface, wherein the first leakage signal may include the number of controller 1 and leakage occurring in controller 1, the second leakage signal may include the number of controller 2 and leakage occurring in controller 2, and the third leakage signal may include the number of controller 3 and leakage occurring in controller 3. The two-wire serial bus interface can forward the first status information, the second status information, and the third status information to controller 4 where no leakage has occurred, and controller 4 can detect leakage occurring based on the first status information. , the second state information, and the third state information generate the first power-off control signal, the second power-off control signal, and the third power-off control signal, wherein the first power-off control signal is used to indicate that the controller 1 is powered off, the second power-off control signal is used to indicate that the controller 2 is powered off, and the third power-off control signal is used to indicate that the controller 3 is powered off. The controller 4 can send the first power-off control signal, the second power-off control signal, and the third power-off control signal to the two-wire serial bus interface. Since the first power-off control signal, the second power-off control signal, and the third power-off control signal are not the same, the generated target power-off control signal is the first power-off control signal, the second power-off control signal, and the third power-off control signal, and then according to the controller number carried by the first power-off control signal, the second power-off control signal, and the third power-off control signal, they are respectively sent to the corresponding controllers, so that the corresponding controllers are powered off, and the controller 4 can perform data backup to avoid data loss. The present invention can ensure that in the event of an emergency in which multiple controllers detect a leak, the system can take prompt action to minimize damage to hardware and data, and ensure the stability and security of the system. At the same time, it ensures that even if only one controller works normally, the entire system can be effectively managed to avoid data loss. It also ensures that data loss will not occur if a leak occurs.
[0067] In an embodiment of the present invention, the system further includes a power supply unit, the power module includes a first input terminal, the power supply unit is connected to the first input terminal, and the power supply unit is used to supply power to the power module.
[0068] In the embodiment of the present invention, Figure 4 The system may further include a power supply unit, which may be connected to the first input terminal of the power module, and the power supply unit may supply power to the power module.
[0069] In one embodiment of the present invention, the system also includes an auxiliary power supply unit, the power module includes a second input terminal, the auxiliary power supply unit is connected to the second input terminal, and the auxiliary power supply unit is used to power the power module when the power supply unit fails.
[0070] In the embodiment of the present invention, Figure 4 The power supply unit may further include an auxiliary power supply unit, which is connected to the second input terminal of the power module, and is used to supply power to the power module when the power supply unit is abnormal, thereby avoiding the power supply unit being unable to supply power when the power supply unit is abnormal.
[0071] In one embodiment of the present invention, the controller also includes a resistor, one end of which is connected to the auxiliary power supply unit and the second input end, and the other end of the resistor is connected to the ground. The resistor can play a role in protecting the circuit, and the specific value can be set according to user needs.
[0072] In the embodiment of the present invention, Figure 4 The controller 1 may further include a resistor R, one end of which is connected to the auxiliary power supply unit and the second input end, and the other end of which is grounded. The size of the resistor may be set according to user requirements, thereby achieving the function of protecting the circuit.
[0073] like Figure 4 When controller 1 is normal, MOS1-MOS3 are turned off, diodes D2-D4 are in a non-conducting state, MOS4 is turned on, MOS5 is turned off, the enable pin of the power module is at a high level, and the mainboard is powered on normally. If controller 1 leaks, it will send leakage signals to controllers 2, 3, and 4 through the two-wire serial bus interface. Controllers 2, 3, and 4 will pull up MOS1, MOS2, and MOS3 respectively. At this time, diodes D2, D3, and D4 are turned on, and the GS voltage of MOS4 is clamped to the conduction voltage of the diode. MOS4 is turned off, MOS5 is turned on, the enable pin of the power module is at a low level, the power module is turned off, and then the power is turned off. The target power-off control signal of controller 1 is controlled after the logic of controller 2, controller 3, and controller 4. Therefore, if any controller 2, controller 3, or controller 4 outputs the power-off control signal first, it will trigger the power-off of controller 1. The entire control logic supports the situation where three controllers leak at the same time. When three controllers leak at the same time, the only non-leaking controller can control the three leaking controllers to power off at the same time, and the non-leaking controller itself starts the data backup process.
[0074] like Figure 5, showing a schematic diagram of a data backup process provided by an embodiment of the present invention. After the device is powered on, it first detects whether the AC power supply is normal. When the monitoring AC power supply is normal, it detects whether there is node leakage. If no leakage occurs, the surface device is working normally. If leakage occurs, a leakage signal is triggered. The non-leaking controller can control the battery backup unit to cache data to a non-volatile storage medium. After the data is stored on the disk, the device shutdown process is started.
[0075] When an AC power abnormality is detected, an AC power failure signal can be triggered, and the AC power failure signal can be sent to the central processor, so that the central processor can control the battery backup unit to cache data in a non-volatile storage medium, and start the device shutdown process after the data is stored on the disk.
[0076] The present invention discloses a controller. The present invention obtains status information through detection by any controller, and sends the status information to other controllers through a two-wire serial bus interface. The other controllers can determine whether a target controller is leaking according to the status information. When it is determined that the target controller is leaking, a power-off control signal for the target controller can be sent to the two-wire serial bus interface. The two-wire serial bus interface can determine the target power-off control signal according to the power-off control signal, thereby powering off the controller that has leaked. When the present invention detects that a liquid leakage occurs, a non-leaking controller generates a power-off control signal to power off the leaking controller, thereby avoiding short-circuit damage to controller components, and can effectively avoid the influence of the liquid leakage event on server hardware and data, thereby ensuring the stability and security of the system.
[0077] The invention also discloses a server, which includes the control system as described above.
Claims
1. A control system, It is characterized in that The control system comprises a plurality of controllers and a two-wire serial bus interface, wherein the plurality of controllers are respectively connected to the two-wire serial bus interface; Any controller among the plurality of controllers is used to identify status information and send the status information to other controllers through the two-wire serial bus interface; The other controller is used to determine whether the target controller has leakage according to the state information, and when it is determined that the target controller has leakage, send a power-off control signal for the target controller to the two-wire serial bus interface; The two-wire serial bus interface is used to determine a target power-off control signal according to the power-off control signal, and send the target power-off control signal to a target controller to control the target controller to power off; The two-wire serial bus interface is used for performing an AND logic calculation on a plurality of power-off control signals to obtain the target power-off control signal when the power-off control signal includes a plurality of power-off control signals.
2. The system according to claim 1, It is characterized in that The controller includes a complex programmable logic control device for identifying status information for the controller.
3. The system according to claim 2, It is characterized in that The control system also includes an AC power supply module, and the controller also includes a central processing unit. The AC power supply module is used to power the controller. The complex programmable logic control device is used to monitor whether the AC power supply module is abnormal. When the AC power supply module is detected to be abnormal, an AC power supply abnormality signal is sent to the central processing unit. The central processing unit is used to back up the cached data.
4. The system according to claim 3, It is characterized in that The central processing unit is used to stop running the business according to the abnormal AC power supply signal, and cache the cached data to a non-volatile storage medium.
5. The system according to claim 3, It is characterized in that The complex programmable logic control device of the target controller is used to determine that when the target controller leaks, it sends a leakage signal to the central processing unit of the target controller. The central processing unit is used to stop business services based on the leakage signal and cache the cache data of the target controller to a non-volatile storage medium.
6. The system according to claim 1, It is characterized in that The target controller includes a power module, and the power module is used to cut off power according to the target power-off control signal.
7. The system according to claim 6, It is characterized in that The power module includes an enable control pin, the target power-off control signal is a low level signal, and the enable control pin is used to close when receiving the target power-off control signal to control the power module to power off.
8. The system according to claim 1, It is characterized in that The state information includes leakage information, and the leakage information is used to characterize the leakage situation in the controller. The other controllers are used to determine whether the target controller has leakage according to the leakage information.
9. The system according to claim 8, It is characterized in that The state information also includes a controller number, and the other controller is used to determine the target controller where the leakage occurs according to the controller number, and generate a power-off control signal including the target controller number.
10. The system according to claim 1, It is characterized in that The other controller is used to obtain the in-place information of the target controller after the target controller is powered off, and determine whether the target controller is in place based on the in-place information; if the target controller is not in place, release the power-off control signal for the target controller and delete the status information for the target controller.
11. The system according to claim 6, It is characterized in that The system further includes a power supply unit, the power module includes a first input terminal, the power supply unit is connected to the first input terminal, and the power supply unit is used to supply power to the power module.
12. The system according to claim 11, It is characterized in that The system further comprises an auxiliary power supply unit, the power module comprises a second input terminal, the auxiliary power supply unit is connected to the second input terminal, and the auxiliary power supply unit is used to supply power to the power module when the power supply unit fails.
13. The system according to claim 12, It is characterized in that The controller further includes a resistor, one end of which is connected to the auxiliary power supply unit and the second input end, and the other end of which is grounded.
14. A server, It is characterized in that The server comprises a control system as described in any one of claims 1-13.