A DC direct-hung module testing system and method

By performing abnormal detection and duty cycle adjustment on the voltage change data of the current generator, the problem of voltage mismatch in the test of DC direct-mounted energy storage equipment is solved, and the accuracy of the test results and system stability are improved.

CN118409166BActive Publication Date: 2024-10-29STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410891361.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-29
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

The poor performance and accuracy of test results of DC direct-mounted energy storage equipment during the test is mainly due to voltage mismatch caused by aging power modules, inconsistent power characteristics or differences in control circuits, which affects the stability of current and voltage data.

Method used

By obtaining the initial overall voltage change data of the current generator, the abnormality degree is calculated. If abnormal, the adjustment program is entered to perform preliminary and secondary adjustments of the duty cycle to reduce the impact of the abnormal power supply on the overall output voltage and ensure the accuracy of the test data. sex.

Benefits of technology

The stability of the output current and voltage is improved, ensuring the accuracy of the test results. The impact of abnormal equipment on the overall output voltage is reduced through preliminary and secondary adjustments, and the stability and reliability of the system are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118409166B_ABST
    Figure CN118409166B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of electric variable testing technology, and specifically to a DC direct-hanging module testing system and method for a substation, the testing method comprising: obtaining the initial overall voltage change data of a current generator, and calculating the initial overall voltage abnormality based on the initial overall voltage change data; judging whether it is abnormal according to the initial overall voltage abnormality, and if it is abnormal, entering the adjustment program, and if it is normal, entering the test program; after completing the adjustment program, obtaining the adjusted overall voltage change data of the current generator, and calculating the adjusted overall voltage abnormality based on the adjusted overall voltage change data; judging whether it is abnormal according to the adjusted overall voltage abnormality, and ending if it is still abnormal, and entering the test program if it is normal. The present invention uses the change in the output voltage of the current generator to adjust each power supply to reduce the influence of some power supplies that may have abnormalities on the overall output voltage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric variable testing, and in particular to a system and method for testing a DC direct-hung module in an area. Background Art

[0002] In modern power systems, with the continuous access of new energy and distributed power sources, traditional AC power grids are facing more and more challenges. DC power supply technology has gradually become an important direction for the development of power systems due to its advantages in efficient transmission, stability and compatibility. As a key device, the DC direct-hung module realizes DC power supply at the substation level, which can effectively improve the quality of power, reduce transmission losses, and adapt to various forms of energy access. However, the complexity and technical requirements of the DC direct-hung module make its testing and verification in practical applications an important and challenging task.

[0003] In traditional DC direct-hung energy storage device testing, analog circuit technology is widely used to simulate various working conditions and load conditions. In order to simulate DC conditions at different voltages, a cascaded full-bridge structure is considered as a current generator; when generating the test current, pulse width modulation (PWM) controls the output voltage by adjusting the duty cycle of the switching signal in each switching cycle. However, due to the aging of each power module, inconsistent power characteristics, or differences in control circuits, some power supply abnormalities may occur, and then voltage mismatch may occur, affecting the stability of the generated current and voltage data, resulting in poor performance of the DC direct-hung energy storage device during the test and poor accuracy of the test results. Summary of the invention

[0004] In order to solve the technical problems of poor performance of direct current hanging energy storage equipment during the test process and poor accuracy of the test results, the purpose of the present invention is to provide a direct current hanging module test system and method for a substation, and the technical solutions adopted are as follows:

[0005] A method for testing a DC direct-hung module in a transformer substation, the method comprising:

[0006] Acquiring initial overall voltage change data of the current generator, and calculating an initial overall voltage abnormality degree based on the initial overall voltage change data;

[0007] Determine whether the initial overall voltage is abnormal according to the abnormal degree, if it is abnormal, enter the adjustment program, if it is normal, enter the test program;

[0008] After the adjustment procedure is completed, the adjusted overall voltage change data of the current generator is obtained, and the adjusted overall voltage abnormality degree is calculated based on the adjusted overall voltage change data;

[0009] Determine whether it is abnormal according to the abnormal degree of the adjusted overall voltage, if it is still abnormal, end the test, if it is normal, enter the test program;

[0010] The adjustment procedure includes:

[0011] Preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality degree;

[0012] Obtaining the overall voltage change data after preliminary adjustment;

[0013] Calculating the degree of abnormality of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment;

[0014] The duty cycle of each power supply is secondarily adjusted based on the abnormality degree of each power supply after the primary adjustment.

[0015] Preferably, the calculation of the overall voltage abnormality degree includes: dividing the initial overall voltage change data into periods according to preset time intervals; using the LOF abnormality detection algorithm to obtain the abnormality degree value of each period, and taking the average of the abnormality degree values ​​of multiple periods before the current moment as the overall voltage abnormality degree.

[0016] Preferably, the preliminary adjustment of the duty cycle of each power supply is to adjust the duty cycle of each power supply to different degrees.

[0017] Preferably, the step of preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality level includes: calculating a duty cycle adjustment coefficient based on the initial overall voltage abnormality level; confirming the upper and lower limits of the adjusted duty cycle of each power supply according to the duty cycle adjustment coefficient; and adjusting the duty cycle of each power supply to different degrees according to the confirmed upper and lower limits of the adjusted duty cycle of each power supply.

[0018] Preferably, the step of calculating the degree of abnormality of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment includes: obtaining the voltage change data vector after initial adjustment based on the overall voltage change data after preliminary adjustment; calculating the adjusted abnormality proportion based on the voltage change data vector after initial adjustment; and calculating the degree of abnormality of each power supply after preliminary adjustment based on the abnormality proportion.

[0019] Preferably, the secondary adjustment of the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment is to adjust each power supply according to the abnormality degree, and the higher the abnormality degree, the lower the adjusted duty cycle.

[0020] Preferably, the step of performing secondary adjustment on the duty cycle of each power supply based on the degree of abnormality of each power supply after the preliminary adjustment includes: calculating the duty cycle adjustment coefficient of each power supply based on the degree of abnormality of each power supply; confirming the upper and lower limits of the adjusted duty cycle of each power supply according to the duty cycle adjustment coefficient of each power supply; and adjusting the duty cycle of each power supply according to the confirmed upper and lower limits of the adjusted duty cycle of each power supply and the degree of abnormality of each power supply.

[0021] Preferably, the test procedure includes: adjusting the phase of each power supply; and performing a test according to the output voltage of the current generator.

[0022] A DC direct-hung module testing system for a transformer area, the testing system comprising:

[0023] A data acquisition module, used for acquiring overall voltage change data of the current generator, wherein the overall voltage change data includes initial overall voltage change data, preliminary adjusted overall voltage change data and adjusted overall voltage change data;

[0024] A data processing module, configured to calculate an initial overall voltage abnormality based on the initial overall voltage change data, and determine whether it is abnormal according to the initial overall voltage abnormality; and calculate an adjusted overall voltage abnormality based on the adjusted overall voltage change data, and determine whether it is abnormal according to the adjusted overall voltage abnormality;

[0025] A power supply adjustment module, configured to perform preliminary adjustment on the duty cycle of each power supply based on the initial overall voltage abnormality, calculate the abnormality degree of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment, and perform secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after preliminary adjustment;

[0026] The test module is used to perform a test when the data processing module determines that the data is normal.

[0027] Preferably, the testing module comprises a phase adjustment submodule and a testing submodule.

[0028] The present invention has the following beneficial effects: the DC direct-hanging module testing system and method proposed in the present invention utilizes the change of the output voltage of the current generator to adjust each power supply to reduce the influence of some power supplies that may have abnormalities on the overall output voltage, thereby improving the stability of the output current and voltage, thereby ensuring the accuracy of subsequent tests. In addition, the adjustment of each power supply in the present invention includes preliminary adjustment and secondary adjustment. After the preliminary adjustment, combined with the overall voltage change after the preliminary adjustment, the abnormal degree corresponding to each power supply is analyzed, and further adjustment is performed, which can well reduce the influence of the equipment that may have abnormalities on the stability of the overall output voltage and improve the accuracy of the test results. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0030] Figure 1 A schematic flow chart of a method for testing a DC direct-hung module in a transformer area provided by the first embodiment of the present invention;

[0031] Figure 2 A schematic flow chart of an adjustment procedure in a method for testing a DC direct-hung module in a transformer substation provided by the first embodiment of the present invention;

[0032] Figure 3 A schematic diagram of a sub-flow chart of step T1 in a method for testing a DC direct-hung module in a transformer substation provided by the first embodiment of the present invention;

[0033] Figure 4 A schematic diagram of a sub-flow chart of step T4 in a method for testing a DC direct-hung module in a transformer substation provided by the first embodiment of the present invention;

[0034] Figure 5 A schematic flow chart of a method for testing a DC direct-hung module in a transformer substation provided in a specific implementation manner in the first embodiment of the present invention;

[0035] Figure 6 This is a functional module diagram of a DC direct-hung module testing system for an area provided by the second embodiment of the present invention. DETAILED DESCRIPTION

[0036] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the following is a detailed description of the specific implementation method, structure, features and effects of a DC direct-mounted module testing system and method proposed by the present invention in combination with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.

[0037] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0038] The specific scheme of a DC direct-mounted module testing system and method provided by the present invention is described in detail below with reference to the accompanying drawings.

[0039] First embodiment

[0040] See also Figure 1 , which shows a method flow chart of a method for testing a DC direct-hung module in a substation provided by an embodiment of the present invention, the testing method comprising:

[0041] Step S1: acquiring initial overall voltage change data of the current generator, and calculating an initial overall voltage abnormality degree based on the initial overall voltage change data;

[0042] Step S2: judging whether the initial overall voltage is abnormal according to the abnormal degree, if it is abnormal, entering the adjustment procedure, if it is normal, entering the test procedure;

[0043] Step S3: after the adjustment procedure is completed, the adjusted overall voltage change data of the current generator is obtained, and the adjusted overall voltage abnormality degree is calculated based on the adjusted overall voltage change data;

[0044] Step S4: judging whether it is abnormal according to the abnormal degree of the adjusted overall voltage, if it is still abnormal, then ending, if it is normal, then entering the test program.

[0045] It can be understood that if the initial overall voltage abnormality level is normal, there is no need to perform steps S3 and S4.

[0046] like Figure 2 As shown, the adjustment procedure includes:

[0047] Step T1: preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality level;

[0048] Step T2: Obtaining the overall voltage change data after preliminary adjustment;

[0049] Step T3: calculating the abnormality degree of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment;

[0050] Step T4: performing a secondary adjustment on the duty cycle of each power source based on the abnormality degree of each power source after the preliminary adjustment.

[0051] The test method uses the change of the output voltage of the current generator to adjust each power supply to reduce the influence of some power supplies that may have abnormalities on the overall output voltage, thereby improving the stability of the output current and voltage, thereby ensuring the accuracy of subsequent tests. In addition, the adjustment of each power supply in the present invention includes preliminary adjustment and secondary adjustment. After the preliminary adjustment, combined with the overall voltage change after the preliminary adjustment, the abnormality degree corresponding to each power supply is analyzed, and further adjustment is performed, which can well reduce the influence of the equipment that may have abnormalities on the stability of the overall output voltage and improve the accuracy of the test results.

[0052] It should be noted here that the scenario targeted by the present invention is: in a cascade full-bridge structure, the outputs of each H-bridge unit are connected in series, and each H-bridge unit is composed of an independent DC power supply and four switches. When testing the DC direct-hung module, the output voltages of multiple H-bridge units are connected in series to form a higher voltage output, and the total output voltage is the superposition of the output voltages of each H-bridge unit. The main purpose of the present invention is: by assigning different duty cycles to different power supplies in the cascade full-bridge structure, the output voltage of the output current generator can be detected in real time, and the probability of abnormalities of different power supplies can be analyzed. This method not only helps to ensure the stability and reliability of the system, but also can promptly discover and deal with potential problems.

[0053] In step S1, the real-time voltage change data of the current generator can be obtained in real time through the voltage sensor. It can be understood that the overall voltage change data obtained at a certain moment includes the voltage data at the current moment and the moment before. Specifically, during the test of the DC direct-hung module, the real-time voltage change data of the current generator is obtained in real time according to the voltage sensor; for DC direct-hung energy storage devices with medium accuracy requirements and large power, the frequency of its switching signal The recommended value is 4kHz. In order to improve the detection accuracy of the output current of the DC direct-hung energy storage device, the recommended sampling frequency for testing the voltage change data is , that is 80kHz. Of course, it can be further adjusted according to actual conditions.

[0054] Preferably, the calculation of the overall voltage abnormality includes: dividing the initial overall voltage change data into periods according to a preset time interval; using the LOF abnormality detection algorithm to obtain the abnormality value of each period, and taking the average of the abnormality values ​​of multiple periods before the current moment as the overall voltage abnormality. It can be understood that the initial overall voltage abnormality in step S1 and the adjusted overall voltage abnormality in step S3 are both calculated using the overall voltage abnormality calculation method.

[0055] Specifically, calculate the abnormality of the overall voltage data:

[0056] According to the obtained voltage change data, record the overall voltage change data cycle size for:

[0057]

[0058] in, Indicates the frequency of the switching signal of each power supply;

[0059] Since the output voltage data of each power supply changes with time, the period is The periodic function of , and in the original pulse width modulation, the carrier signal corresponding to each power supply is set to be consistent, that is, the switching signal frequency, so the overall output voltage is also a period of However, as the current generator is running, when used for a long time, the internal power supplies may be affected by load changes, temperature changes or component aging, which may cause a certain difference between the output voltage of some power supplies and the normal voltage. This influence will affect the overall output voltage under fixed pulse width modulation. Therefore, after obtaining the voltage change data corresponding to the overall output current, is the time interval, and the voltage change data in multiple cycles within the history of 1s is divided into time periods; then the Voltage variation data vector within a cycle for:

[0060]

[0061] in, Indicates In the cycle Voltage change data at each moment.

[0062] The distance measure between the overall voltage change data vectors in two different cycles is , is the Euclidean distance between the voltage change data vectors within two cycles; according to the traditional LOF anomaly detection algorithm, for the voltage change data vectors corresponding to multiple voltage change cycles within 0.2s from the current moment, the above distance metric is used to obtain the abnormal degree of each voltage change cycle. , and considering that there may be power surges at some times, the current time As the origin, select the mean of the abnormality corresponding to the previous 30 cycles, recorded as , as the abnormality degree of the overall voltage data at the current moment.

[0063] The judgment standard in step S2 is the same as that in step S4. Specifically, it can be a preset threshold. If the abnormality of the overall voltage data is greater than the preset threshold, it is judged to be abnormal. If the abnormality of the overall voltage data is less than or equal to the preset threshold, it is judged to be normal. In some specific embodiments, the preset threshold is 1.1. It can be understood that if there is no abnormality in the initial state or the adjusted state, subsequent tests can be performed. If the initial state is abnormal, adjustment is required. If it is still abnormal after adjustment, it means that the current generator may be faulty and the power supply needs to be checked and replaced.

[0064] Next, the adjustment procedure is described in detail. The adjustment procedure is to adjust the duty cycle of each power supply according to the abnormality of the overall output voltage data, so as to reduce the influence of the abnormal power supply on the overall output voltage.

[0065] In step T1, i.e., the preliminary adjustment, it is preferred to adjust the duty cycle of each power supply to different degrees. In this way, the abnormal voltage conditions of each power supply can be distinguished so that they can be observed from the overall voltage change. Furthermore, if Figure 3 As shown, the step T1 includes:

[0066] Step T11: calculating a duty cycle adjustment coefficient based on the initial overall voltage abnormality degree;

[0067] Step T12: confirming the upper and lower limits of the duty cycle of each power supply according to the duty cycle adjustment coefficient;

[0068] Step T13: adjusting the duty cycle of each power source to different degrees according to the confirmed upper and lower limits of the duty cycle of each power source.

[0069] In this way, the adjustment coefficient is determined by the degree of abnormality, and the upper and lower limits of the adjustment are further confirmed, and then adjustments of different degrees are made. This can better assign different duty cycles to different power supplies, better distinguish the abnormal conditions of each power supply, and facilitate subsequent secondary adjustments.

[0070] The duty cycle is the ratio between the effective time within each cycle and the total duration of each cycle after PWM modulation of each power supply. The larger the value, the larger the output voltage corresponding to the power supply. In order to reduce the harmonic content of the output voltage of the current generator, the current generator can adjust the phase of the switching signal corresponding to each different power supply by means of carrier phase shifting, so as to achieve a more stable voltage after the superposition of different power supplies; however, this method does not take into account the abnormal conditions that may occur in some power supplies, and in the case of a fixed power supply duty cycle, it is not possible to detect each power supply in a timely manner based only on the overall current changes. Therefore, it is considered to adjust the duty cycle of each power supply, and give a lower duty cycle to the power supply with a higher degree of abnormality, so as to reduce the impact of abnormal power supplies on the overall output voltage.

[0071] Specifically, record the voltage abnormality at time t The corresponding duty cycle modulation coefficient for:

[0072]

[0073] Wherein, exp represents the exponential function; Indicates time The abnormality of the overall voltage data; 1.1 represents the threshold value of the LOF abnormality, which is a recommended value. Calculate the corresponding duty cycle modulation coefficient ;when When the corresponding duty cycle modulation coefficient .

[0074] It can be understood that when the overall output voltage data is highly abnormal, the difference in duty cycle of each power supply should be maximized, and the upper limit of the duty cycle after adjustment should be With lower limit The calculation formula is:

[0075]

[0076]

[0077] in, Indicates the duty cycle of each power supply at time t; Represents the voltage duty cycle modulation coefficient at time t.

[0078] After obtaining the upper and lower limits of the duty cycle corresponding to each moment, if the upper limit Equal to the lower limit Equal to initial value At this time, the stability of the corresponding overall voltage is better. Under the same overall output voltage, there is no need to adjust the duty cycle corresponding to each power supply. Otherwise, it is adjusted according to the duty cycle corresponding to different power supplies.

[0079] It can be understood that after confirming the upper and lower limits of the duty cycle of each power supply, random values ​​can be assigned as long as the adjustment degree of each power supply is different. The power supply devices are sorted, which can be sorted according to the series order, and then the power supplies are adjusted according to the sorting order. The duty cycle of a power supply Adjusted to:

[0080]

[0081] in, and Respectively represent the upper and lower limits of the duty cycle.

[0082] Sort by series order and build duty cycle Of course, in other implementations, it can also be randomly sorted, that is, It still represents the order, but the ordering is random. Specifically, it can be to extract power supplies in sequence by random sampling and sort them in the order of extraction; or it can be randomly assigned, that is, The randomly assigned constant value only needs to ensure that the constant value assigned to each power supply is different, and specifically, a random number generation algorithm may be used.

[0083] As for step T2, reference can be made to step S1, and it can be understood that before judging that the current power generator is normal, the real-time voltage change data of the current generator is being obtained.

[0084] In step T3, specifically, according to the duty cycle of each power supply after adjustment, the overall voltage change data within 30 cycles is obtained, and the average operation is performed on the voltage change data vector after the initial adjustment, and the voltage change mean vector is recorded as ; Record the mean vector of voltage change data in multiple cycles with an abnormal degree less than 1.1 (that is, the preset threshold) in the historical data (within 0.2s) , based on the two vectors obtained, calculate the mean vector Each element and The absolute value of the ratio of the standard deviation of the voltage data is recorded as the abnormal vector. ; then record the adjusted abnormal proportion for:

[0085]

[0086] in, Represents an exception vector The element is greater than The number of elements of ; Represents the length of a vector.

[0087] The above abnormal proportion rate represents the average abnormal time of the voltage change data after the voltage of each power supply is superimposed in one cycle when some power supplies are abnormal. If the time ratio is close to the corresponding duty cycle of a certain power supply, the probability of abnormality of the power supply is high, then the first The abnormality level of each power supply for:

[0088]

[0089] in, represents the exponential function; Indicates The duty cycle of the first adjustment of a power supply device; Represents the abnormal proportion after the initial adjustment.

[0090] In step T4, i.e., in the secondary adjustment, it is preferred that each power supply is adjusted according to the degree of abnormality. The higher the degree of abnormality, the lower the duty cycle after adjustment. Figure 4 As shown, step T4 includes:

[0091] Step T41: Calculating the duty cycle adjustment coefficient of each power source based on the abnormality degree of each power source;

[0092] Step T42: determining the upper and lower limits of the duty cycle adjustment of each power supply according to the duty cycle adjustment coefficient of each power supply;

[0093] Step T43: adjusting the duty cycle of each power source according to the confirmed upper and lower limits of the duty cycle of each power source and the abnormality degree of each power source.

[0094] In this step, you can refer to step T2. There are two differences from step T2, and the rest are the same, which will not be repeated here. First, the duty cycle modulation coefficient In the calculation formula, Replace with Second, according to the degree of abnormality Sort from high to low.

[0095] According to the abnormal degree of each power supply device, the ranking of each power supply device is adjusted from high to low according to the abnormal degree, and then according to the abnormal degree of each power supply, the ranking of each power supply device is adjusted from high to low according to the abnormal degree of each power supply. The calculation formula is used to readjust the duty cycle of each power supply, that is, to assign a lower duty cycle to the power supply equipment with a higher degree of abnormality, so as to reduce its contribution to the overall voltage data.

[0096] Steps S3 and S4 can refer to steps S1 and S2, that is, reacquire data and make judgments after adjustment. It can be understood that after the adjustment procedure, for the power supply with a higher degree of abnormality, its corresponding duty cycle is relatively low, and the power supply is idle for a long time. At this time, when the total voltage is superimposed by the voltages of each power supply, the total voltage is minimally affected by the abnormal power supply. If the voltage of the abnormal power supply has a small impact, after lowering its duty cycle, the overall voltage can also achieve stable output. On the contrary, when two or more power supplies are abnormal, it is still impossible to obtain a stable output voltage just by controlling the duty cycle of each power supply. Therefore, after the duty cycle of each power supply is adjusted twice, the abnormality of the overall voltage is calculated again. When the abnormality is still high ( ), at this time, a warning should be issued in time and the power supply should be checked and replaced.

[0097] Preferably, the test procedure includes: adjusting the phase of each power supply; and performing a test according to the output voltage of the current generator.

[0098] The purpose of adjusting the phase of each power supply is to obtain a stable output voltage. Specifically, according to the duty cycle of each power supply after the improvement, the phase of each power supply is adjusted by reusing the carrier phase shift method (existing method) to reduce the impact of the added harmonics.

[0099] Connect to the test loop for testing, that is, test the DC direct-hung module in the substation. Specifically, according to the output voltage of the improved current generator, connect the DC direct-hung module to the test loop to ensure correct connection, avoid short circuit and other connection errors, and use the current controller to regulate the current generator, and then adjust the test current and set the appropriate load (such as electronic load, resistive load); then observe and record the working status of the DC direct-hung module under various load conditions, including voltage and current waveforms, in simulation conditions such as no load conditions, gradual increase of load, and load mutation tests, to ensure stability and reliability, and then compare the test results with expected indicators to evaluate whether the module meets the design requirements and specifications.

[0100] In summary, in some specific embodiments, Figure 5As shown, the test method is to obtain the overall voltage change, calculate the abnormality of the overall voltage change, and determine whether the abnormality is greater than 1.1. If not, no adjustment is required and a stable output voltage is obtained. If so, a preliminary adjustment is made to the duty cycle of each power supply, the abnormality of each power supply is calculated, the duty cycle of each power supply is readjusted, and the overall voltage abnormality is recalculated to determine whether the abnormality is greater than 1.1 at this time. If not, a stable output voltage is obtained. If so, an early warning is performed to adjust the current generator equipment.

[0101] Second embodiment

[0102] The present invention also provides a DC direct-hung module testing system for a substation, which can implement the DC direct-hung module testing method for a substation described in the first embodiment.

[0103] like Figure 6 As shown, the test system comprises:

[0104] A data acquisition module 10, for acquiring overall voltage change data of the current generator, wherein the overall voltage change data includes initial overall voltage change data, preliminary adjusted overall voltage change data, and adjusted overall voltage change data;

[0105] The data processing module 20 is used to calculate the initial overall voltage abnormality based on the initial overall voltage change data, and determine whether it is abnormal according to the initial overall voltage abnormality; and calculate the adjusted overall voltage abnormality based on the adjusted overall voltage change data, and determine whether it is abnormal according to the adjusted overall voltage abnormality;

[0106] A power supply adjustment module 30, configured to perform preliminary adjustment on the duty cycle of each power supply based on the initial overall voltage abnormality, calculate the abnormality degree of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment, and perform secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after preliminary adjustment;

[0107] The testing module 40 is used to perform a test when the data processing module determines that the data processing module is normal.

[0108] Preferably, the test module comprises a phase adjustment submodule and a test submodule. The phase adjustment submodule is used to adjust the phase of each power supply, and the test submodule is used to perform a test according to the output voltage of the current generator.

[0109] Preferably, the test module further comprises a warning module for executing a preset warning operation when the data processing module determines that the overall voltage abnormality degree after the adjustment is abnormal.

[0110] In the embodiment of the DC direct-hung module testing system of the substation of the present invention, all the technical features of the above-mentioned DC direct-hung module testing method embodiments are included, and the description and explanation content are basically the same as those of the above-mentioned reservoir intelligent monitoring method embodiments, and will not be repeated here.

[0111] It should be noted that the sequence of the above embodiments of the present invention is only for description and does not represent the advantages and disadvantages of the embodiments. The processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0112] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

Claims

1. A method for testing a DC direct-hung module in a substation, characterized in that: The test method includes: Acquiring initial overall voltage change data of the current generator, and calculating an initial overall voltage abnormality degree based on the initial overall voltage change data; Determine whether the initial overall voltage is abnormal according to the abnormal degree, if it is abnormal, enter the adjustment program, if it is normal, enter the test program; After the adjustment procedure is completed, the adjusted overall voltage change data of the current generator is obtained, and the adjusted overall voltage abnormality degree is calculated based on the adjusted overall voltage change data; Determine whether it is abnormal according to the abnormal degree of the adjusted overall voltage, if it is still abnormal, end the test, if it is normal, enter the test program; The calculation of the overall voltage abnormality degree includes: Dividing the initial overall voltage change data into periods according to preset time intervals; The LOF anomaly detection algorithm is used to obtain the anomaly degree value of each cycle, and the average of the anomaly degree values ​​of multiple cycles before the current moment is taken as the overall voltage anomaly degree; The adjustment procedure includes: Preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality degree; Obtaining the overall voltage change data after preliminary adjustment; Calculating the degree of abnormality of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment; Performing a secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment; The preliminary adjustment of the duty cycle of each power source is to adjust the duty cycle of each power source to different degrees; The step of preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality degree comprises: Calculating a duty cycle adjustment coefficient based on the initial overall voltage abnormality degree; Determining the upper and lower limits of the duty cycle adjustment of each power supply according to the duty cycle adjustment coefficient; Adjusting the duty cycle of each power supply to different degrees according to the upper and lower limits of the duty cycle of each power supply that are confirmed; The second adjustment of the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment is to adjust each power supply according to the abnormality degree, and the higher the abnormality degree, the lower the adjusted duty cycle; The step of performing secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment comprises: Calculating the duty cycle adjustment coefficient of each power supply based on the abnormality degree of each power supply; Determining upper and lower limits of the duty cycle adjustment of each power supply according to the duty cycle adjustment coefficient of each power supply; The duty cycle of each power supply is adjusted according to the confirmed upper and lower limits of the duty cycle of each power supply and the abnormality degree of each power supply.

2. The method for testing a DC direct-mounted module in a substation according to claim 1, characterized in that: The step of calculating the abnormality degree of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment comprises: obtaining a first adjusted voltage change data vector based on the initially adjusted overall voltage change data; Calculate the adjusted abnormality ratio based on the voltage change data vector after the initial adjustment; The abnormality degree of each power supply after preliminary adjustment is calculated based on the abnormality proportion.

3. The method for testing a DC direct-hung module in a transformer substation according to any one of claims 1 to 2, characterized in that: The test procedure includes: Adjust the phase of each power supply; The test is performed based on the output voltage of the current generator.

4. A DC direct-hung module testing system in an area, characterized in that: The test system comprises: A data acquisition module, used for acquiring overall voltage change data of the current generator, wherein the overall voltage change data includes initial overall voltage change data, preliminary adjusted overall voltage change data and adjusted overall voltage change data; A data processing module, configured to calculate an initial overall voltage abnormality based on the initial overall voltage change data, and determine whether it is abnormal according to the initial overall voltage abnormality; and calculate an adjusted overall voltage abnormality based on the adjusted overall voltage change data, and determine whether it is abnormal according to the adjusted overall voltage abnormality; A power supply adjustment module, configured to perform preliminary adjustment on the duty cycle of each power supply based on the initial overall voltage abnormality, calculate the abnormality degree of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment, and perform secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after preliminary adjustment; A testing module, used for performing a test when the data processing module determines that the data processing module is normal; The calculation of the overall voltage abnormality degree includes: Dividing the initial overall voltage change data into periods according to preset time intervals; The LOF anomaly detection algorithm is used to obtain the anomaly degree value of each cycle, and the average of the anomaly degree values ​​of multiple cycles before the current moment is taken as the overall voltage anomaly degree; The adjustment process includes: Preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality degree; Obtaining the overall voltage change data after preliminary adjustment; Calculating the degree of abnormality of each power supply after preliminary adjustment based on the overall voltage change data after preliminary adjustment; Performing a secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment; The preliminary adjustment of the duty cycle of each power source is to adjust the duty cycle of each power source to different degrees; The step of preliminarily adjusting the duty cycle of each power supply based on the initial overall voltage abnormality degree comprises: Calculating a duty cycle adjustment coefficient based on the initial overall voltage abnormality degree; Determining the upper and lower limits of the duty cycle adjustment of each power supply according to the duty cycle adjustment coefficient; Adjusting the duty cycle of each power supply to different degrees according to the upper and lower limits of the duty cycle of each power supply that are confirmed; The second adjustment of the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment is to adjust each power supply according to the abnormality degree, and the higher the abnormality degree, the lower the adjusted duty cycle; The step of performing secondary adjustment on the duty cycle of each power supply based on the abnormality degree of each power supply after the preliminary adjustment comprises: Calculating the duty cycle adjustment coefficient of each power supply based on the abnormality degree of each power supply; Determining upper and lower limits of the duty cycle adjustment of each power supply according to the duty cycle adjustment coefficient of each power supply; The duty cycle of each power supply is adjusted according to the confirmed upper and lower limits of the duty cycle of each power supply and the abnormality degree of each power supply.

5. The DC direct-mounted module testing system for a substation as claimed in claim 4, characterized in that: The testing module includes a phase adjustment submodule and a testing submodule.

Citation Information

Patent Citations

  • Transformer fault diagnosis method based on LOF algorithm and hybrid sampling

    CN114528921A

  • Embedded power supply anomaly detection method and system

    CN115436834A

  • Fault detection method and device for charging module of direct-current power supply system

    CN115469241A

  • Method and circuit for adaptively changing PWM (Pulse Width Modulation) duty ratio and motor driving system

    CN116073706A

  • Transformer operation abnormity monitoring method and system

    CN116955895A