A power grid project review intelligent risk assessment system and method

Through the combination of K-means clustering method and weather influence coefficient, the risk index of power grid projects is calculated, which solves the problem of invalid parameters of risk assessment parameters of power grid projects, improves the accuracy of assessment and the effectiveness of risk warning, and ensures the safe operation of power grid.

CN118411037BActive Publication Date: 2024-10-01ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410879345.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-01
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

In existing power grid project risk assessment methods, after a power grid project experiences risk disasters, the previous assessment parameters lose their representativeness and comprehensiveness, resulting in inaccurate risk assessment.

Method used

The K-means clustering method is used to cluster the degree of damage in the subgrid area, calculate the impact coefficient and damage coverage coefficient, and combine the weather impact coefficient to calculate the risk index of the power grid project, and perform early warning and reinforcement processing decisions.

Benefits of technology

It improves the representativeness and comprehensiveness of the assessment parameters, enhances the accuracy of risk assessment of power grid projects, promptly discovers potential risks and takes preventive measures, reduces the probability of risk occurrence, and ensures the safe operation of the power grid and stable power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118411037B_ABST
    Figure CN118411037B_ABST
Patent Text Reader

Abstract

The invention relates to the field of distribution network management, and discloses an intelligent risk assessment system and method for power grid project review, which are used to solve the problem that when a power grid project has experienced a risk disaster, the selected assessment parameters are no longer representative and comprehensive. The method comprises: evenly dividing a power grid project area into n parts, recorded as sub-grid areas, collecting situation data of the sub-grid areas after the most recent typhoon disaster, analyzing the situation data to obtain an impact coefficient of the power grid project, a damage coverage coefficient, and a time interval from the repair time to the current time, collecting real-time weather data of the location of the power grid project, analyzing to obtain a weather impact coefficient, comprehensively evaluating to obtain a risk index of the power grid project, and issuing an early warning based on the power grid risk index to determine whether reinforcement of the power grid project is required, thereby effectively improving the representativeness and comprehensiveness of the selected assessment parameters and improving the accuracy of risk assessment of the power grid project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power distribution network management, and more specifically to an intelligent risk assessment system and method for power grid project review. Background Art

[0002] Grid projects refer to projects for the construction and operation of power systems, which aim to provide reliable, safe and efficient power supply. These projects involve the generation, transmission, distribution and utilization of electricity, including the construction, transformation and operation management of power plants, transmission lines, substations, distribution networks and other facilities.

[0003] Grid project risk assessment is a process of systematically analyzing and evaluating various risks that a grid project may face. Its purpose is to identify, evaluate and manage potential risks in the project to reduce uncertainty and ensure the smooth implementation and operation of the project to the greatest extent possible.

[0004] For example, a Chinese patent with publication number CN111260183B discloses a risk assessment system for the execution of investment plans for power grid infrastructure projects. The implementation steps are as follows: compare the project progress, project cost and investment progress data. If the deviation of any data exceeds the preset value, the data will be identified as a preliminary risk project; assess the level of project execution risk and calculate the project adjustment risk amount; include high-level risk projects in the investment plan adjustment list; and revise the project investment plan.

[0005] The above patent has the problem raised by the background technology: the existing technology of existing power grid project risk assessment is to obtain the risk situation of the power grid project by collecting and analyzing data on the risk factors that the power grid project may face, and take countermeasures according to the risk situation of the power grid project. However, this power grid project risk assessment method will lead to the problem that when the location of the power grid project has experienced risk disasters, the assessment parameters used before are no longer representative and comprehensive for the power grid project.

[0006] In view of the above problems, the present invention proposes a solution. Summary of the invention

[0007] In order to overcome the above-mentioned defects of the prior art, the present invention provides an intelligent risk assessment system and method for power grid project review, which improves the representativeness and comprehensiveness of the selected assessment parameters, thereby improving the accuracy of power grid project risk assessment.

[0008] According to one aspect of the present application, there is provided an intelligent risk assessment method for power grid project review, comprising the following steps: dividing the power grid project into regions, recorded as subgrid regions, collecting damaged line data in the subgrid regions, and calculating the degree of damage in the subgrid regions; taking the degree of damage of all subgrid regions as a data set, taking the degree of damage of each subgrid region as a data point, clustering the data set using the K-means clustering method, and obtaining a power grid project impact coefficient based on the clustering results; collecting data on the affected area of ​​the power grid project, and calculating a damage coverage coefficient; collecting weather data in the power grid project area, and calculating a weather impact coefficient based on the weather data; calculating a power grid project risk index based on the power grid project impact coefficient, damage coverage coefficient and weather impact coefficient, and issuing an early warning based on the power grid risk index.

[0009] According to another aspect of the present application, there is provided an intelligent risk assessment system for power grid project review, comprising: a regional division module, used to divide the power grid project into regions, recorded as sub-grid regions, collect damaged line data in the sub-grid regions, and calculate the degree of damage in the sub-grid regions; a cluster analysis module, used to take the degree of damage of all sub-grid regions as a data set, the degree of damage of each sub-grid region as a data point, cluster the data set using the K-means clustering method, and obtain the power grid project affected coefficient based on the clustering result; a first calculation module, used to collect data on the affected area of ​​the power grid project, and calculate the damage coverage coefficient; a second calculation module, used to collect weather data in the power grid project area, and calculate the weather impact coefficient based on the weather data; a risk warning module, used to calculate the risk index of the power grid project based on the power grid project affected coefficient, the damage coverage coefficient and the weather impact coefficient, and issue a warning based on the power grid risk index.

[0010] Compared with the prior art, the intelligent risk assessment system and method for power grid project review according to the embodiment of the present application first divides the power grid project area evenly into n parts, recorded as sub-grid areas, collects situation data of the sub-grid areas after the most recent typhoon disaster, and analyzes the situation data to obtain the power grid project's impact coefficient, damage coverage coefficient, and the time interval from the repair time to the current time, collects real-time weather data of the power grid project's location, analyzes the weather impact coefficient, and comprehensively evaluates to obtain the power grid project risk index. Based on the power grid risk index, an early warning is issued to determine whether the power grid project needs to be reinforced, which effectively improves the representativeness and comprehensiveness of the selected evaluation parameters, while improving the accuracy of the power grid project risk assessment. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is the overall flow chart of the present invention. DETAILED DESCRIPTION

[0012] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention. In addition, the forms of the various structures recorded in the following embodiments are merely illustrative. The intelligent risk assessment system and method for power grid project review involved in the present invention are not limited to the various structures recorded in the following embodiments. All other implementations obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the present invention.

[0013] The present invention provides a method for intelligent risk assessment of power grid project review, comprising the following steps:

[0014] The power grid project area is evenly divided into n parts, recorded as sub-grid areas, and the damaged line data of the sub-grid area after the most recent typhoon disaster is collected to calculate the damage extent of the sub-grid area;

[0015] The degree of damage of all sub-grid areas is taken as a data set, that is, the total number of data sets is n, and the degree of damage of each sub-grid area is taken as a data point. The data set is clustered using the K-means clustering method, and the impact coefficient of the power grid project is obtained based on the clustering results. The K-means clustering method is a commonly used unsupervised learning method for dividing a data set into K categories. The basic idea is to assign data points to K cluster centers through iterative optimization so that the distance between each data point and its cluster center is minimized. This process can be vividly described as dividing the data points into clusters represented by the K center points closest to them;

[0016] Collect information about the affected areas of the power grid project and calculate the damage coverage factor;

[0017] Collect the time interval from the last typhoon disaster that occurred in the power grid project to the current time. The shorter the time interval for power grid project repair, the newer the replacement facilities of the power grid project are, and the more capable they are of resisting disasters.

[0018] The weather data of the power grid project area is collected in real time through the meteorological model. The weather data includes the typhoon intensity and the affected area. The weather impact coefficient is calculated based on the weather data. The calculation formula is: in It is represented by the weather influence coefficient, QD is represented by the typhoon intensity, It is expressed as the impact range, which is the range affected by the power grid project. The meteorological model is a mathematical model used to simulate and predict weather phenomena in the atmosphere and on the earth's surface. These models are based on the principles of physics and meteorological knowledge, and describe the physical processes of the atmosphere and earth system such as movement, heat, water vapor, radiation, etc. through a set of mathematical equations, so as to simulate and predict the weather conditions in the future;

[0019] The impact coefficient, damage coverage coefficient, time interval from repair time to current time, and weather impact coefficient of the power grid project are normalized, and a comprehensive evaluation is performed to obtain the power grid project risk index, which is calculated as follows: ,in Expressed as the grid project risk index, It is expressed as the impact coefficient of the power grid project. An increase in the impact coefficient means that the power grid facilities were more affected during the last disaster and the facilities were more damaged, thereby increasing the overall risk of the power grid project. An increase in the impact coefficient may increase the risk of power supply interruption of the power grid project, affect the normal power consumption of users, and may lead to more serious consequences, thereby increasing the risk of the power grid project. Expressed as the damage coverage factor, an increase in the damage coverage factor means that more power grid facilities have been damaged or destroyed by previous disasters, which will lead to an increase in the degree of damage to the facilities, thereby increasing the risk index of the power grid project. It is expressed as the time interval from the repair time to the current time. The newly repaired power grid project facilities are relatively new and have a greater degree of resistance to disasters. Therefore, the longer the time interval, the greater the risk index of the power grid project. It is expressed as the weather impact coefficient. The larger the weather impact coefficient is, the worse the weather environment of the power grid project is, and the higher the risk index of the power grid project is. a1, a2, a3, and a4 are expressed as the impact coefficient of the power grid project, the damage coverage coefficient, the time interval from the repair time to the current time, and the weight coefficient of the weather impact coefficient. In this embodiment, the specific values ​​of a1, a2, a3, and a4 are not specifically calculated.

[0020] Issue early warning based on the power grid risk index to determine whether the power grid project needs to be reinforced.

[0021] Through risk warning, potential risk factors and possible risk events can be discovered in time, and preventive measures can be taken to reduce the probability of risk occurrence. Timely risk warning can help power grid managers prepare before risks occur and reduce losses and impacts. Risk warning can provide timely warning information and warning signals to help power grid managers prepare for emergency response and disposal. When risk events occur, corresponding measures can be taken quickly to ensure the safe operation of the power grid and stable power supply. Through risk warning, possible risk events can be analyzed and evaluated, thereby optimizing resource allocation and scheduling arrangements. In areas and periods with higher risks, resource investment and scheduling arrangements can be strengthened to cope with possible risk impacts and improve the safety and reliability of power grid operation.

[0022] In this embodiment, it should be specifically explained that the steps for calculating the damage degree of the sub-grid area are as follows:

[0023] The number of transmission lines affected in the subgrid area is obtained through map analysis, which is the process of processing, analyzing and visualizing map data using geographic information technology (GIS). GIS is a system used to collect, store, process, analyze and display geospatial data;

[0024] Obtain the total number of transmission lines in the sub-grid area through data statistics from relevant departments;

[0025] The damage degree of the sub-grid area is obtained by dividing the number of affected transmission lines by the total number of transmission lines. The calculation formula is: ,in Expressed as the degree of damage to the subgrid area, Expressed as the total number of transmission lines, Expressed as the number of transmission lines affected.

[0026] In this embodiment, it should be specifically explained that the steps of clustering the data set using the K-means clustering method are as follows:

[0027] Step 1: Use the elbow method to determine the optimal number of clusters for the data set. The elbow method is a commonly used method to help determine the optimal number of clusters (i.e., the optimal K value) in K-means clustering. This method makes a judgment by observing the relationship between the number of clusters K and the performance indicator of the corresponding clustering model (usually the sum of squares within the cluster);

[0028] Step 2: Randomly select a corresponding number of data points as the initial clusters according to the optimal number of clusters. The cluster refers to a set of similar data points formed in cluster analysis. In the context of unsupervised learning, the clustering algorithm groups the data points in the data set according to their similarities, and each group is a cluster;

[0029] Step 3: For each data point, use the Euclidean distance algorithm to calculate the distance between the data point and each initial cluster center. and cluster centers , and the Euclidean distance calculation formula is: ,in Represents data points The value in the kth cluster, Represents the cluster center The value of the kth cluster, n represents the data point and cluster centers The number of features is calculated, and the data points are assigned to the clusters to which the nearest cluster center belongs. After traversing all the data points, the initial clusters are obtained. The Euclidean distance algorithm is a commonly used distance measurement method for calculating the distance between two points in a vector space. In the K-means clustering algorithm, the Euclidean distance is often used to calculate the distance between a data point and a cluster center, thereby determining the cluster to which the data point belongs.

[0030] Step 4: For each initial cluster, calculate the average value of all data points and use the average value as the new cluster center;

[0031] Step 5: Repeat steps 3 and 4 until the cluster center no longer changes, and obtain the final cluster and the final cluster center.

[0032] In this embodiment, it should be specifically explained that the step of obtaining the impact coefficient of the power grid project according to the clustering result is:

[0033] Count the number of data points in each final cluster, calculate the ratio of the number of data points in each final cluster to the total number of data sets, and get the weight coefficient of each final cluster. The calculation formula is: ,in Expressed as the weight coefficient of the kth final cluster, It is represented as the number of data points in the kth final cluster, and n is represented as the total number of data sets;

[0034] The product of the weight coefficient of each final cluster and the final cluster center is summed to obtain the impact coefficient of the power grid project, and its calculation formula is: ,in Expressed as the impact coefficient of the power grid project, Expressed as the weight coefficient of the kth final cluster, Represented as the cluster center of the kth final cluster.

[0035] By clustering the degree of damage to power grid projects, the power grid area can be divided into different categories and the areas with different degrees of impact can be identified. This helps power grid managers to better understand the damage to various parts of the power grid and formulate targeted emergency repair and restoration plans. Based on the clustering results, the center point or representative point of each cluster can be calculated. Using these center points as a reference, the degree of impact of the power grid project can be quantified to form a digital evaluation result. This helps power grid managers to make an objective and accurate assessment of the degree of impact. Based on the calculation results of the impact coefficient of the power grid project, decision support can be provided for power grid managers. According to the degree of impact in different areas, emergency repair and maintenance resources can be prioritized, manpower and material resources can be reasonably allocated, and the efficiency of emergency repair and restoration can be improved.

[0036] In this embodiment, it should be specifically explained that the damage coverage factor calculation steps are:

[0037] Collect the impact range of damaged facilities, integrate the damaged range, and determine the boundaries of the impact area;

[0038] Use geographic information technology (GIS) to delineate the boundaries of the damaged area and calculate the area of ​​the damaged area. Geographic information technology is a technology and tool for collecting, storing, processing, analyzing and displaying geospatial data. It combines knowledge and methods from multiple disciplines such as geography, cartography, computer science, statistics, etc., based on geographic space, converts geographic information into digital data, and manages and processes it through computer systems;

[0039] Also using geographic information technology, the total area of ​​the power grid project area is calculated by delineating the project boundaries;

[0040] The area of ​​the damaged area is divided by the total area of ​​the entire project area to obtain the damage coverage factor, which represents the proportion of the damaged area to the entire project area. The calculation formula is: ,in Expressed as the damage coverage factor, Expressed as the total area of ​​the grid project area, Expressed as the area of ​​the damaged region.

[0041] In this embodiment, it should be specifically explained that the steps of calculating the area of ​​the damaged area by delineating the boundaries of the damaged area using geographic information technology (GIS) are as follows:

[0042] Obtain GIS data of the damaged area through satellite remote sensing images, including geographic coordinate data or vector data of the damaged area. The satellite remote sensing images are image data obtained by observing and photographing the earth's surface using satellite payloads. These satellites carry various sensor devices, such as optical cameras, infrared cameras, radars, etc., to obtain information on the earth's surface, including surface coverage, topography, vegetation distribution, water conditions, meteorological information, etc.;

[0043] Load the damaged area data in the GIS software, usually by importing geographic coordinate data or vector data into the GIS software;

[0044] Use the drawing tools of the GIS software and the automatic delineation function provided by the software to delineate the boundaries of the damaged area. After completing the boundary delineation, calculate the area of ​​the damaged area through the area calculation function of the GIS software.

[0045] In this embodiment, it should be specifically explained that the step of collecting weather data of the power grid project area in real time through the meteorological model is:

[0046] Choose a suitable meteorological model. Common meteorological models include numerical weather forecast models (such as WRF, GFS, etc.) and typhoon models (such as HWRF, GFDL, etc.). These models can simulate and predict typhoon path, intensity, wind speed, wind field, rainfall and other parameters;

[0047] Using the selected meteorological model, obtaining meteorological data around the power grid project area, the data generally including real-time meteorological observation data, forecast data output by the model, etc.;

[0048] Extract and analyze typhoon-related information from the acquired meteorological data, including typhoon path, intensity, wind speed and other parameters. The analysis can be performed by parsing the data files output by the model or using relevant meteorological data processing software;

[0049] Determine the impact of the typhoon on the power grid project area based on the typhoon's path and intensity. This can be achieved by simulating the typhoon's wind field, rainfall distribution, etc.

[0050] Continuously monitor and update typhoon information, and timely adjust and update the impact forecast of typhoons on the power grid project area. Real-time meteorological observation data and real-time forecast data output by the model can be used for monitoring and updating.

[0051] In the present embodiment, it should be specifically explained that the step of issuing an early warning based on the power grid risk index and determining whether the power grid project needs to be reinforced is to compare the power grid risk index with a preset threshold value. If the power grid risk index is greater than the preset threshold value, it is determined that the power grid project does not need to be reinforced at present. If the power grid risk index is less than the preset threshold value, it is determined that the power grid project may be greatly affected in the future, and the power grid project is reinforced.

[0052] In the present embodiment, it is necessary to specifically explain that an intelligent risk assessment system for power grid project review includes: a regional division module, which is used to divide the power grid project into regions, recorded as sub-grid regions, collect damaged line data in the sub-grid regions, and calculate the degree of damage in the sub-grid regions; a clustering analysis module, which is used to take the degree of damage of all sub-grid regions as a data set, and the degree of damage of each sub-grid region as a data point, cluster the data set using the K-means clustering method, and obtain the power grid project affected coefficient based on the clustering result; a first calculation module, which is used to collect data on the affected area of ​​the power grid project and calculate the damage coverage coefficient; a second calculation module, which is used to collect weather data in the power grid project area, and calculate the weather impact coefficient based on the weather data; a risk warning module, which is used to calculate the risk index of the power grid project based on the power grid project affected coefficient, the damage coverage coefficient and the weather impact coefficient, and issue a warning based on the power grid risk index.

[0053] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

[0054] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. A method for intelligent risk assessment of power grid project review, characterized in that: The following steps are involved: Divide the power grid project into regions, record them as sub-grid regions, collect data on damaged lines in the sub-grid regions after the most recent typhoon disaster, and calculate the extent of damage in the sub-grid regions; The damage degree of all sub-grid areas is taken as a data set, and the damage degree of each sub-grid area is taken as a data point. The data set is clustered using the K-means clustering method, and the impact coefficient of the power grid project is obtained based on the clustering results; Collect data on the affected areas of the power grid project, calculate the damage coverage factor, and collect the time interval from the repair time after the last typhoon disaster to the current time; Collect weather data in the power grid project area and calculate the weather impact coefficient based on the weather data; Calculate the risk index of the power grid project based on the power grid project impact factor, damage coverage factor, time interval from the repair time to the current time, and weather impact factor, and issue an early warning based on the power grid risk index; The steps for calculating the damage degree of the sub-grid area are as follows: Obtain the number of transmission lines affected and the total number of transmission lines in the power grid area; According to the number of affected transmission lines and the total number of transmission lines, the damage degree of the sub-grid area is calculated, and the calculation formula is: , where Indicates the degree of damage to the subgrid area, represents the total number of transmission lines, Indicates the number of transmission lines affected; The steps to cluster the data set using the K-means clustering method are: (1) Determine the optimal number of clusters for the data set, and randomly select a corresponding number of data points as initial clusters based on the optimal number of clusters; (2) For each data point, use the Euclidean distance algorithm to calculate the distance between the data point and each initial cluster center, and assign the data point to the cluster to which the nearest cluster center belongs. Traverse all data points to obtain the initial cluster cluster. (3) For each initial cluster, calculate the average value of all data points and use the average value as the new cluster center; (4) Repeat steps (2) and (3) until the cluster center no longer changes, and obtain the final cluster and the final cluster center; The specific steps of obtaining the influence coefficient of the power grid project according to the clustering results are as follows: Count the number of data points in each final cluster, calculate the ratio of the number of data points in each final cluster to the total number of data sets, and obtain the weight coefficient of each final cluster; The product of the weight coefficient of each final cluster and the final cluster center is summed up to obtain the impact coefficient of the power grid project; The calculation method of the damage coverage factor is: Collect the impact range of damaged facilities, integrate the impact range, and determine the boundaries of the damaged area; The area of ​​the damaged area is calculated by outlining the boundaries of the damaged area; Calculate the total area of ​​the power grid project area by outlining the project boundaries; According to the area of ​​the damaged area and the total area of ​​the entire project area, a damage coverage factor is obtained, wherein the damage coverage factor is used to indicate the proportion of the damaged area to the entire project area; The weather influence coefficient is calculated as follows: ,in It is represented by the weather influence coefficient, QD is represented by the typhoon intensity, Indicated as the scope of the power grid project affected.

2. The intelligent risk assessment method for power grid project review according to claim 1 is characterized by: The method of calculating the area of ​​the damaged area by outlining the boundary of the damaged area is specifically as follows: Acquire GIS data of the damaged area through satellite remote sensing images, wherein the GIS data includes geographic coordinate data of the damaged area; Import geographic coordinate data into GIS software; Use the drawing tools of the GIS software and the automatic delineation function provided by the software to delineate the boundaries of the damaged area. After completing the boundary delineation, calculate the area of ​​the damaged area through the GIS software.

3. The intelligent risk assessment method for power grid project review according to claim 1 is characterized by: The specific steps of collecting weather data in the power grid project area are as follows: Use the HWRF typhoon model to obtain meteorological data around the power grid project area, the data including real-time meteorological observation data and forecast data output by the model; Use meteorological data processing software to extract and analyze typhoon-related information from the acquired meteorological data, including the typhoon's path, intensity, and wind speed parameters; Based on the typhoon's path and intensity information, the typhoon's impact on the power grid project area is determined by simulating the typhoon's wind field, and the typhoon information is continuously monitored and updated.

4. The intelligent risk assessment method for power grid project review according to claim 1 is characterized by: The early warning according to the power grid risk index is specifically as follows: The grid risk index is compared with the preset threshold. If the grid risk index is greater than the preset threshold, the grid project will not be processed. If the grid risk index is less than the preset threshold, a risk warning will be issued.

5. A system using a power grid project review intelligent risk assessment method as claimed in any one of claims 1 to 4, characterized in that: include: The regional division module divides the power grid project into regions, records them as sub-grid regions, collects damaged line data in the sub-grid region after the most recent typhoon disaster, and calculates the degree of damage in the sub-grid region; The cluster analysis module is used to take the damage degree of all sub-grid areas as a data set, take the damage degree of each sub-grid area as a data point, cluster the data set using the K-means clustering method, and obtain the impact coefficient of the power grid project based on the clustering results; The first calculation module is used to collect data on the affected area of ​​the power grid project and calculate the damage coverage coefficient. The second calculation module collects the time interval from the repair time after the last typhoon disaster of the power grid project to the current time; The third calculation module is used to collect weather data in the power grid project area and calculate the weather impact coefficient based on the weather data; The risk warning module is used to calculate the risk index of the power grid project based on the impact coefficient of the power grid project, the damage coverage coefficient, the time interval from the repair time to the current time and the weather impact coefficient, and to issue an early warning based on the power grid risk index.