Elevator regular maintenance management method and device

Through intelligent elevator maintenance and management methods and devices, automatic scheduling of maintenance plans and personnel solves the problem of low efficiency of existing elevator maintenance management and achieves efficient, safe, and reliable long-term operation of elevators.

CN118419716BActive Publication Date: 2024-10-22GUANGDONG KELING IND CONTROL TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410531436.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-29
Publication Date
2024-10-22
Estimated Expiration
2044-04-29

AI Technical Summary

Technical Problem

Existing elevator maintenance management lacks intelligence and relies on manual dispatch, which is inefficient and difficult to ensure the long-term safe and reliable operation of elevators.

Method used

An elevator regular maintenance management method and device is adopted to generate the first maintenance plan and the second maintenance plan by collecting maintenance information, automatically dispatch maintenance personnel and time nodes, and adjust the plan according to the maintenance progress to ensure timely replacement and maintenance of elevator parts.

Benefits of technology

Improve maintenance efficiency, rationally arrange maintenance personnel, avoid labor waste, ensure that elevators are maintained according to regulations, extend equipment life, reduce parts aging and accessory wear, and achieve traceability and optimization of maintenance management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118419716B_ABST
    Figure CN118419716B_ABST
Patent Text Reader

Abstract

The embodiment of the present invention discloses a method and device for regular maintenance management of elevators. The method comprises the following steps: firstly, collecting maintenance information to obtain information of elevators that need to be maintained in a target area, generating a first maintenance plan and a second maintenance plan according to the maintenance information, and reasonably arranging the number of maintenance personnel by counting the number of elevators that need to be maintained in different target areas, thereby ensuring the required number of personnel and avoiding labor waste; generating two different maintenance plans can arrange dedicated personnel to dedicated posts corresponding to people of different professional levels in a targeted manner; maintaining elevators according to the maintenance plan ensures that each elevator is maintained and managed in accordance with regulations, thereby avoiding aging of parts and wear of accessories during long-term use of the elevators and affecting normal operation; recording the progress of each maintenance, thereby helping to grasp the actual situation of elevator maintenance and tracing the maintenance management, and also scheduling and allocating subsequent maintenance time nodes and maintenance personnel, thereby helping to improve maintenance efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of elevator maintenance, and in particular to a method and device for regular elevator maintenance management. Background Art

[0002] At present, with the development of society, the current cities are already full of high-rise buildings, and the use of elevators is becoming more and more popular. Elevators have become an indispensable tool for people's daily life. The comfort, safety, and reliability of an elevator are closely related to the installation quality. In order to ensure that the elevator is safe and reliable enough in long-term continuous operation, it is necessary to maintain the elevator regularly. At present, the maintenance of elevators is manually scheduled and managed by maintenance personnel, which is not intelligent enough and inefficient. Summary of the invention

[0003] In view of the above-mentioned defects, an embodiment of the present invention discloses a method and device for regular maintenance management of elevators, which can automatically manage and plan the maintenance of elevators.

[0004] A first aspect of an embodiment of the present invention discloses a method for periodic maintenance and management of an elevator, comprising:

[0005] Collect maintenance information, including the number of elevators to be scheduled for maintenance in the target area, elevator location information, and information about maintenance personnel to be scheduled, including the name and professional level of the maintenance personnel;

[0006] Generate a first maintenance plan and a second maintenance plan for the target area according to the maintenance information, wherein the maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan; the first maintenance plan includes a first maintenance time node, a target elevator, a first maintenance item, and a first maintenance personnel; the second maintenance plan includes a second maintenance time node, a target elevator, a second maintenance item, and a second maintenance personnel;

[0007] The maintenance progress of the target elevator is recorded according to the second maintenance plan, and the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node are adjusted according to the maintenance progress.

[0008] As an optional implementation manner, in a first aspect of an embodiment of the present invention, generating a first maintenance plan and a second maintenance plan for a target area according to the maintenance information includes:

[0009] Divide the target area into several maintenance units;

[0010] Calculate the number of elevators corresponding to each maintenance unit according to the elevator location information, and match the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators in each maintenance unit;

[0011] Generate a first maintenance time node for each target elevator in the first maintenance unit, select the current first maintenance personnel to be scheduled that matches the first maintenance time node and the first maintenance item according to the information of the current first maintenance personnel to be scheduled, and screen the first maintenance personnel corresponding to each first maintenance unit from the current first maintenance personnel to be scheduled according to the required number of first maintenance personnel; and generate a second maintenance time node for each target elevator in the second maintenance unit, select the current second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the information of the current second maintenance personnel to be scheduled, and screen the second maintenance personnel corresponding to each second maintenance unit from the current second maintenance personnel to be scheduled according to the required number of second maintenance personnel.

[0012] As an optional implementation manner, in the first aspect of the embodiment of the present invention, matching the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators of each maintenance unit includes:

[0013] Obtain the usage time of the target elevator in each maintenance unit;

[0014] Selecting a corresponding preset ratio according to the usage time, the preset ratio includes the ratio of the number of elevators to the number of first maintenance personnel and the ratio of the number of elevators to the number of second maintenance personnel;

[0015] The required number of first maintenance personnel and the required number of second maintenance personnel are matched according to the preset ratio and the number of elevators in each maintenance unit.

[0016] As an optional implementation manner, in the first aspect of the embodiment of the present invention, selecting the second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the information of the second maintenance personnel to be scheduled currently includes:

[0017] According to the information of the second maintenance personnel to be scheduled, statistics are collected on the specialty items, professional level and current shift tasks of the second maintenance personnel to be scheduled;

[0018] According to the specialty items and professional levels of the inspection personnel to be currently scheduled, the second maintenance items are matched, and at least one second maintenance personnel to be currently scheduled corresponding to each second maintenance time node is selected;

[0019] When the number of the screened second maintenance personnel currently to be scheduled is greater than one, the second maintenance personnel currently to be scheduled are matched according to the current shift scheduling tasks of the screened second maintenance personnel currently to be scheduled.

[0020] As an optional implementation manner, in the first aspect of the embodiment of the present invention, it also includes:

[0021] Record the usage time of each component in each target elevator, and calculate the next replacement time node of each component according to the usage time;

[0022] Obtain two second maintenance time nodes adjacent to the next replacement time node, and select the second maintenance time node in which the second maintenance item is not executed as the target second maintenance time node;

[0023] Generate component replacement information and send it to a second maintenance personnel corresponding to the target second maintenance time node, wherein the component replacement information includes components that need to be replaced at the target second maintenance time node.

[0024] As an optional implementation manner, in the first aspect of the embodiment of the present invention, adjusting the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress includes:

[0025] Determine whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node;

[0026] When the current maintenance progress is inconsistent with the second maintenance project corresponding to the current second maintenance time node, all the remaining unmaintained second maintenance projects in the second maintenance plan are rescheduled according to the remaining second maintenance time nodes, and it is determined whether the second maintenance personnel corresponding to each second maintenance time node match the rescheduled second maintenance project;

[0027] When the second maintenance personnel corresponding to any second maintenance time node does not match the rescheduled second maintenance item, the second maintenance personnel of the second maintenance time node is re-matched.

[0028] As an optional implementation manner, in the first aspect of the embodiment of the present invention, the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance schedule includes:

[0029] Determine whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node;

[0030] When the current maintenance schedule is consistent with the second maintenance item corresponding to the current second maintenance time node, determine whether the current maintenance schedule includes replacement of parts, and when the current maintenance schedule includes replacement of parts, obtain the time required to replace the parts;

[0031] When the required duration is greater than the duration threshold, each second maintenance time node after the current maintenance progress is regenerated.

[0032] A second aspect of an embodiment of the present invention discloses an elevator regular maintenance management device, comprising:

[0033] Information collection module: used to collect maintenance information, including the number of elevators to be scheduled for maintenance in the target area, elevator location information, and information about maintenance personnel to be scheduled, including the name and professional level of the maintenance personnel;

[0034] Plan generation module: used for generating a first maintenance plan and a second maintenance plan for a target area according to the maintenance information, wherein the maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan; the first maintenance plan includes a first maintenance time node, a target elevator, a first maintenance item, and a first maintenance personnel; the second maintenance plan includes a second maintenance time node, a target elevator, a second maintenance item, and a second maintenance personnel;

[0035] The progress generation module is used to record the maintenance progress of the target elevator according to the second maintenance plan, and adjust the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress.

[0036] As an optional implementation manner, in a second aspect of the embodiment of the present invention, generating a first maintenance plan and a second maintenance plan for the target area according to the maintenance information includes:

[0037] Divide the target area into several maintenance units;

[0038] Calculate the number of elevators corresponding to each maintenance unit according to the elevator location information, and match the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators in each maintenance unit;

[0039] Generate a first maintenance time node for each target elevator in the first maintenance unit, select the current first maintenance personnel to be scheduled that matches the first maintenance time node and the first maintenance item according to the information of the current first maintenance personnel to be scheduled, and screen the first maintenance personnel corresponding to each first maintenance unit from the current first maintenance personnel to be scheduled according to the required number of first maintenance personnel; and generate a second maintenance time node for each target elevator in the second maintenance unit, select the current second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the information of the current second maintenance personnel to be scheduled, and screen the second maintenance personnel corresponding to each second maintenance unit from the current second maintenance personnel to be scheduled according to the required number of second maintenance personnel.

[0040] As an optional implementation manner, in the second aspect of the embodiment of the present invention, matching the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators of each maintenance unit includes:

[0041] Obtain the usage time of the target elevator in each maintenance unit;

[0042] Selecting a corresponding preset ratio according to the usage time, the preset ratio includes the ratio of the number of elevators to the number of first maintenance personnel and the ratio of the number of elevators to the number of second maintenance personnel;

[0043] The required number of first maintenance personnel and the required number of second maintenance personnel are matched according to the preset ratio and the number of elevators in each maintenance unit.

[0044] As an optional implementation manner, in the second aspect of the embodiment of the present invention, selecting the second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the information of the second maintenance personnel to be scheduled currently includes:

[0045] According to the information of the second maintenance personnel to be scheduled, statistics are collected on the specialty items, professional level and current shift tasks of the second maintenance personnel to be scheduled;

[0046] According to the specialty items and professional levels of the inspection personnel to be currently scheduled, the second maintenance items are matched, and at least one second maintenance personnel to be currently scheduled corresponding to each second maintenance time node is selected;

[0047] When the number of the screened second maintenance personnel currently to be scheduled is greater than one, the second maintenance personnel currently to be scheduled are matched according to the current shift scheduling tasks of the screened second maintenance personnel currently to be scheduled.

[0048] As an optional implementation manner, in the second aspect of the embodiment of the present invention, it also includes:

[0049] Record the usage time of each component in each target elevator, and calculate the next replacement time node of each component according to the usage time;

[0050] Obtain two second maintenance time nodes adjacent to the next replacement time node, and select the second maintenance time node in which the second maintenance item is not executed as the target second maintenance time node;

[0051] Generate component replacement information and send it to a second maintenance personnel corresponding to the target second maintenance time node, wherein the component replacement information includes components that need to be replaced at the target second maintenance time node.

[0052] As an optional implementation, in the second aspect of the embodiment of the present invention, the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance schedule includes:

[0053] Determine whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node;

[0054] When the current maintenance progress is inconsistent with the second maintenance project corresponding to the current second maintenance time node, all the remaining unmaintained second maintenance projects in the second maintenance plan are rescheduled according to the remaining second maintenance time nodes, and it is determined whether the second maintenance personnel corresponding to each second maintenance time node match the rescheduled second maintenance project;

[0055] When the second maintenance personnel corresponding to any second maintenance time node does not match the rescheduled second maintenance item, the second maintenance personnel of the second maintenance time node is re-matched.

[0056] As an optional implementation manner, in the second aspect of the embodiment of the present invention, adjusting the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress includes:

[0057] Determine whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node;

[0058] When the current maintenance schedule is consistent with the second maintenance item corresponding to the current second maintenance time node, determine whether the current maintenance schedule includes replacement of parts, and when the current maintenance schedule includes replacement of parts, obtain the time required to replace the parts;

[0059] When the required duration is greater than the duration threshold, each second maintenance time node after the current maintenance progress is regenerated.

[0060] The third aspect of an embodiment of the present invention discloses an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the elevator regular maintenance management method disclosed in the first aspect of the embodiment of the present invention.

[0061] A fourth aspect of an embodiment of the present invention discloses a computer-readable storage medium storing a computer program, wherein the computer program enables a computer to execute the elevator periodic maintenance management method disclosed in the first aspect of an embodiment of the present invention.

[0062] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0063] In the embodiment of the present invention, maintenance information is first collected to obtain information about elevators that need to be maintained in the target area, and a first maintenance plan and a second maintenance plan are generated according to the maintenance information. The maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan, and the maintenance progress of the target elevator is recorded according to the second maintenance plan, and the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node are determined according to the maintenance progress; the embodiment reasonably arranges the number of maintenance personnel by counting the number of elevators that need to be maintained in different target areas, which can both ensure the required number of people and avoid labor waste; two different maintenance plans are generated according to different maintenance items and maintenance levels, and special personnel and posts can be arranged for people of different professional levels in a targeted manner, so that the profession is reflected and the time cost of too many professional talents is avoided in more conventional maintenance management; according to the maintenance plan, the elevator can be maintained in a planned rhythm to ensure that each elevator is maintained and managed according to the regulations, so as to avoid the aging of parts and wear of accessories of the elevator in long-term use and affect the normal operation; recording the progress of each maintenance is helpful to grasp the actual situation of elevator maintenance, and can trace the maintenance management, and can also schedule and allocate subsequent maintenance time nodes and maintenance personnel, which helps to improve maintenance efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0065] Figure 1 It is a flow chart of a method for regular elevator maintenance management disclosed in an embodiment of the present invention;

[0066] Figure 2 It is a structural schematic diagram of an elevator regular maintenance management device provided by an embodiment of the present invention;

[0067] Figure 3 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0068] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0069] It should be noted that the terms "first", "second", "third", "fourth", etc. in the specification and claims of the present invention are used to distinguish different objects rather than to describe a specific order. The terms "including" and "having" in the embodiments of the present invention and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0070] The embodiment of the present invention discloses a method, device, electronic device and storage medium for regular maintenance management of elevators. In the embodiment, maintenance information is first collected to obtain information of elevators that need to be arranged for maintenance in a target area, and a first maintenance plan and a second maintenance plan are generated according to the maintenance information. The maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan, and the maintenance progress of the target elevator is recorded according to the second maintenance plan, and the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node are recorded according to the maintenance progress; the embodiment reasonably arranges the number of maintenance personnel by counting the number of elevators that need to be maintained in different target areas, which can both ensure the required number of people and avoid labor waste; Two different maintenance plans are generated according to different maintenance items and maintenance levels. Specific personnel can be assigned to specific posts corresponding to different professional levels to reflect professionalism and avoid wasting too much time cost of professional talents on more conventional maintenance management. Elevators can be maintained at a planned rhythm according to the maintenance plan to ensure that each elevator is maintained and managed in accordance with regulations to avoid aging of parts and wear of accessories during long-term use, which may affect normal operation. Recording the progress of each maintenance helps to grasp the actual situation of elevator maintenance, trace the maintenance management, and schedule and allocate subsequent maintenance time nodes and maintenance personnel, which helps to improve maintenance efficiency.

[0071] Embodiment 1

[0072] See also Figure 1 , Figure 1It is a flow chart of a method for periodic maintenance and management of elevators disclosed in an embodiment of the present invention. Among them, the execution subject of the method described in the embodiment of the present invention is an execution subject composed of software and / or hardware, and the execution subject can receive relevant information by wired or / and wireless means, and can send certain instructions. Of course, it can also have certain processing functions and storage functions. The execution subject can control multiple devices, such as a remote physical server or cloud server and related software, or it can be a local host or server and related software that performs related operations on a device placed somewhere. In some scenarios, multiple storage devices can also be controlled, and the storage devices can be placed in the same place or in a different place as the device. For example Figure 1 As shown, the elevator regular maintenance management method includes the following steps:

[0073] 101. Collect maintenance information, where the maintenance information includes the number of elevators to be scheduled for maintenance in a target area, elevator location information, and information about maintenance personnel currently to be scheduled, where the information about maintenance personnel currently to be scheduled includes the name and professional level of the maintenance personnel.

[0074] The maintenance information of the embodiment is stored in the system database, where the target area is artificially divided according to the geographical location, which can be a community, a residential area, a village, etc. Since the embodiment has limited the target area to a smaller range, the elevator location information is required to be more precise at this time, for example, accurate to which elevator in a certain building in a specific residential area. The current maintenance personnel information to be dispatched refers to the personnel who are currently eligible for maintenance and management of the elevators and can continue to receive work tasks. By collecting maintenance information, the embodiment understands the total number of elevators that need maintenance. The geographical location of the elevator can help arrange the routes of the inspection personnel, and the inspection personnel are appropriately arranged according to the principle of proximity, reducing the movement time and cost of maintenance personnel.

[0075] 102. Generate a first maintenance plan and a second maintenance plan for the target area according to the maintenance information, wherein the maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan; the first maintenance plan includes a first maintenance time node, a target elevator, a first maintenance item and a first maintenance personnel; the second maintenance plan includes a second maintenance time node, a target elevator, a second maintenance item and a second maintenance personnel.

[0076] In the elevator maintenance management, different maintenance items are involved, including basic daily cleaning management, including elevator disinfection, cleaning, regular ceiling cleaning, monitoring operation inspection, elevator button sensitivity inspection, elevator emergency call button operation inspection, etc., and also includes professional inspection and maintenance of the actual components of the elevator's ascent and descent operation. Therefore, the embodiment is divided into two types, including a first maintenance plan and a second maintenance plan, wherein the maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan. The maintenance items corresponding to the first maintenance plan are usually corresponding to the daily management of the elevator, including disinfection, cleaning, etc., while the second maintenance plan involves more professional maintenance, such as daily inspection and maintenance of elevator parts.

[0077] In addition, the maintenance content of each embodiment may be different, so it is reasonably divided according to the time nodes, for example, the first time node is maintenance project a, and the second time node is maintenance project b. The maintenance time node means that each target elevator in the corresponding entire detection process involves several maintenance time nodes, and each maintenance time node corresponds to a corresponding maintenance project and the maintenance personnel responsible for executing the maintenance project.

[0078] Specifically, generating a first maintenance plan and a second maintenance plan for a target area according to the maintenance information includes: dividing the target area into a plurality of maintenance units; calculating the number of elevators corresponding to each maintenance unit according to the elevator position information, and matching the required number of first maintenance personnel and second maintenance personnel according to the number of elevators in each maintenance unit; generating a first maintenance time node for each target elevator in the first maintenance unit, selecting the current first maintenance personnel to be scheduled that matches the first maintenance time node and the first maintenance item according to the current information of the first maintenance personnel to be scheduled, and screening the number of first maintenance personnel corresponding to each first maintenance unit from the current first maintenance personnel to be scheduled according to the required number of first maintenance personnel; and generating a second maintenance time node for each target elevator in the second maintenance unit, selecting the current second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the current information of the second maintenance personnel to be scheduled, and screening the number of second maintenance personnel corresponding to each second maintenance unit from the current second maintenance personnel to be scheduled according to the required number of second maintenance personnel.

[0079] In the above, the target area is disassembled and divided into multiple second maintenance units, so that different inspection personnel are responsible for smaller areas, and maintenance information can be better traced. The number of inspection personnel is matched according to the number of elevators in different maintenance units, and personnel are reasonably allocated to avoid waste of manpower. For each target elevator, a corresponding inspection time node is generated, and then the appropriate current inspection personnel to be scheduled are matched.

[0080] Furthermore, matching the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators in each maintenance unit includes: obtaining the usage time of the target elevator in each maintenance unit; selecting a corresponding preset ratio according to the usage time, the preset ratio including the ratio of the number of elevators to the number of first maintenance personnel and the ratio of the number of elevators to the number of second maintenance personnel; matching the required number of first maintenance personnel and the second maintenance personnel according to the preset ratio and the number of elevators in each maintenance unit.

[0081] In the above, the embodiment sets the number of inspection personnel for elevators with different usage times. For aging elevators, there are often more problems, and more frequent inspections are required to ensure safe operation. At the same time, the aging and wear of more parts also require a relatively large number of maintenance personnel to perform maintenance at the same time in order to complete the inspection more efficiently and with high quality within the specified time. On this basis, the embodiment also considers arranging the number of maintenance personnel according to the number of elevators in different maintenance units. Generally, more elevators mean more maintenance personnel are required. The preset ratio of the embodiment is based on actual conditions and historical experience. The preset ratio is a numerical value representing the ratio of the number of elevators to the number of maintenance personnel.

[0082] The second maintenance personnel to be scheduled who matches the second maintenance time node and the second maintenance project is selected according to the information of the second maintenance personnel to be scheduled, including: counting the specialty projects, professional levels and current scheduling tasks of the second maintenance personnel to be scheduled according to the information of the second maintenance personnel to be scheduled; matching the specialty projects and professional levels of the inspection personnel to be scheduled with the second maintenance projects, and screening at least one second maintenance personnel to be scheduled corresponding to each second maintenance time node; when the number of the screened second maintenance personnel to be scheduled is greater than one, matching the second maintenance personnel to be scheduled according to the current scheduling tasks of the screened second maintenance personnel to be scheduled.

[0083] In the above, the second maintenance project is allocated according to the professional situation of the second maintenance personnel. Some maintenance projects are highly professional and need to be allocated to personnel with sufficient professional qualities. At the same time, some, such as the management of elevator authority settings, may require inspection personnel with higher professional levels to operate.

[0084] 103. Record the maintenance progress of the target elevator according to the second maintenance plan, and adjust the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress.

[0085] In this step, the recorded maintenance progress is, for example, if projects a1 and a2 are maintained at a second maintenance time node a, then the second maintenance projects a1 and a2 and the corresponding second maintenance time node a are recorded and saved. For example, the second maintenance project a2 was originally planned to be performed at the next second maintenance time node b. Since maintenance has been performed at this second maintenance time node, the maintenance projects corresponding to the subsequent second maintenance time nodes that have not yet been executed are moved back in sequence and replanned.

[0086] Specifically, adjusting the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress includes: judging whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node; when the current maintenance progress is inconsistent with the second maintenance item corresponding to the current second maintenance time node, rescheduling all the remaining unmaintained second maintenance items in the second maintenance plan according to the remaining second maintenance time nodes, and judging whether the second maintenance personnel corresponding to each second maintenance time node matches the rescheduled second maintenance items; when the second maintenance personnel corresponding to any second maintenance time node does not match the rescheduled second maintenance item, re-matching the second maintenance personnel of the second maintenance time node.

[0087] In the above, exemplarily, the current maintenance progress is the second maintenance project a1 and the second maintenance project a2, and the second maintenance project corresponding to the current second maintenance time node is a1, which means that the two are inconsistent. The next second maintenance time node should originally correspond to the second maintenance project a2. Since a2 has been completed at this second maintenance time node, there is no need to repeat the test next time. At this time, consider that all the test items corresponding to the second maintenance time nodes in the future need to be pushed forward. For example, the next second maintenance time node should originally be the second maintenance project a2, then it needs to be adjusted to the test project a3. At this time, it is necessary to consider whether the test personnel originally corresponding to the next second maintenance time node meet the requirements of the second maintenance project a3. If they do not match, the second maintenance personnel will also be re-matched. For example, the second maintenance time node b originally corresponds to the second maintenance project b1 and the corresponding second maintenance personnel b2. Since the second maintenance project b1 has been completed at the current maintenance time node, the subsequent second maintenance projects are pushed forward as a whole, and the second maintenance project c1 originally corresponding to the second maintenance time node c is moved forward to correspond to the second maintenance time node b. At this time, it is necessary to determine whether the second maintenance personnel b2 matches the second maintenance project c1. If not, the second maintenance personnel of the second maintenance time node b needs to be re-matched.

[0088] In another example, adjusting the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance schedule may also specifically include: determining whether the current maintenance schedule is consistent with the second maintenance item corresponding to the current second maintenance time node; when the current maintenance schedule is consistent with the second maintenance item corresponding to the current second maintenance time node, determining whether the current maintenance schedule includes the replacement of parts, and when the current maintenance schedule includes the replacement of parts, obtaining the time required for better replacement of the parts; when the required time is greater than the time threshold, regenerating each second maintenance time node after the current maintenance schedule. In this example, the embodiment takes into account whether there are major changes in parts that require an extension of the maintenance time in each maintenance. When this happens, since the maintenance has been extended, the second maintenance time nodes that have not been executed in the second maintenance plan will also be postponed.

[0089] In addition, the embodiment also includes recording the usage time of each component in each target elevator, calculating the next replacement time node of each component based on the usage time; obtaining two second maintenance time nodes adjacent to the next replacement time node, and selecting the second maintenance time node in which the second maintenance project is not executed as the target second maintenance time node; generating component replacement information and sending it to the second maintenance personnel corresponding to the target second maintenance time node, wherein the component replacement information includes the components that need to be replaced at the target second maintenance time node.

[0090] In the above, it is intelligently monitored in advance which parts of the elevator need to be replaced and when. For parts that do not need to be replaced urgently, a nearby second maintenance time node where the second maintenance project has not been carried out is selected as the target time node to notify the corresponding second maintenance personnel to replace it, so as to avoid the situation where the second maintenance personnel at the target time node has already arrived at the site at the target time node and found that the part needs to be replaced, but wasted time because he did not prepare the replacement parts in advance.

[0091] Embodiment 2

[0092] See also Figure 2 , Figure 2 Schematic diagram of the structure of an elevator regular maintenance management device disclosed in an embodiment of the present invention. Figure 2As shown, the elevator periodic maintenance management device may include: an information collection module 201, a plan generation module 202 and a progress generation module 203, wherein the information collection module 201 is used to collect maintenance information, the maintenance information includes the number of elevators to be scheduled for maintenance in the target area, the elevator location information and the current maintenance personnel information to be scheduled, the current maintenance personnel information to be scheduled includes the name and professional level of the maintenance personnel; the plan generation module 202 is used to generate a first maintenance plan and a second maintenance plan for the target area according to the maintenance information, the maintenance level of the first maintenance plan is lower than the maintenance level of the second maintenance plan; the first maintenance plan includes a first maintenance time node, a target elevator, a first maintenance item and a first maintenance personnel; the second maintenance plan includes a second maintenance time node, a target elevator, a second maintenance item and a second maintenance personnel; the progress generation module 203 is used to record the maintenance progress of the target elevator according to the second maintenance plan, and adjust the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress.

[0093] In the plan generation module 202, a first maintenance plan and a second maintenance plan for the target area are generated according to the maintenance information, including: splitting the target area into a number of maintenance units; calculating the number of elevators corresponding to each maintenance unit according to the elevator position information, and matching the required number of first maintenance personnel and second maintenance personnel according to the number of elevators in each maintenance unit; generating a first maintenance time node for each target elevator in the first maintenance unit, selecting the current first maintenance personnel to be scheduled that matches the first maintenance time node and the first maintenance item according to the current information of the first maintenance personnel to be scheduled, and screening the number of first maintenance personnel corresponding to each first maintenance unit from the current first maintenance personnel to be scheduled according to the required number of first maintenance personnel; and generating a second maintenance time node for each target elevator in the second maintenance unit, selecting the current second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the current information of the second maintenance personnel to be scheduled, and screening the number of second maintenance personnel corresponding to each second maintenance unit from the current second maintenance personnel to be scheduled according to the required number of second maintenance personnel.

[0094] The above-mentioned matching of the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators in each maintenance unit includes: obtaining the usage time of the target elevator in each maintenance unit; selecting a corresponding preset ratio according to the usage time, the preset ratio including the ratio of the number of elevators to the number of first maintenance personnel and the ratio of the number of elevators to the number of second maintenance personnel; matching the required number of first maintenance personnel and the second maintenance personnel according to the preset ratio and the number of elevators in each maintenance unit.

[0095] And selecting the current second maintenance personnel to be scheduled who matches the second maintenance time node and the second maintenance project according to the information of the current second maintenance personnel to be scheduled, including: counting the specialty projects, professional levels and current scheduling tasks of the current second maintenance personnel to be scheduled according to the information of the current second maintenance personnel to be scheduled; matching the specialty projects and professional levels of the current inspection personnel to be scheduled with the second maintenance projects, and screening at least one current second maintenance personnel to be scheduled corresponding to each second maintenance time node; when the number of the screened current second maintenance personnel to be scheduled is greater than one, matching the current second maintenance personnel to be scheduled according to the current scheduling tasks of the screened current second maintenance personnel to be scheduled.

[0096] In the progress generation module 203, the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node are adjusted according to the maintenance progress, including: judging whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node; when the current maintenance progress is inconsistent with the second maintenance item corresponding to the current second maintenance time node, all the remaining unmaintained second maintenance items in the second maintenance plan are rescheduled according to the remaining second maintenance time nodes, and judging whether the second maintenance personnel corresponding to each second maintenance time node matches the rescheduled second maintenance items; when the second maintenance personnel corresponding to any second maintenance time node does not match the rescheduled second maintenance item, rematching the second maintenance personnel of the second maintenance time node.

[0097] In another example, adjusting the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress includes: determining whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node; when the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node, determining whether the current maintenance progress includes replacement of parts, and when the current maintenance progress includes replacement of parts, obtaining the time required for better replacement of the parts; when the required time is greater than the time threshold, regenerating each second maintenance time node after the current maintenance progress.

[0098] The embodiment also includes an automatic adjustment node module: used to record the usage time of each component in each target elevator, and calculate the next replacement time node of each component according to the usage time; obtain two second maintenance time nodes adjacent to the next replacement time node, and select the second maintenance time node in which the second maintenance project is not executed as the target second maintenance time node; generate component replacement information and send it to the second maintenance personnel corresponding to the target second maintenance time node, wherein the component replacement information includes the components that need to be replaced at the target second maintenance time node.

[0099] Embodiment 3

[0100] See also Figure 3 , Figure 3 Schematic diagram of the structure of an electronic device disclosed in an embodiment of the present invention. The electronic device may be a computer, a server, etc. Of course, in certain circumstances, it may also be a smart device such as a mobile phone, a tablet computer, a monitoring terminal, and an image acquisition device with processing functions. Figure 3 As shown, the electronic device may include:

[0101] A memory 301 storing executable program codes;

[0102] a processor 302 coupled to the memory 301;

[0103] The processor 302 calls the executable program code stored in the memory 301 to execute part or all of the steps in the elevator regular maintenance management method in the first embodiment.

[0104] An embodiment of the present invention discloses a computer-readable storage medium storing a computer program, wherein the computer program enables a computer to execute part or all of the steps in the elevator periodic maintenance management method in the first embodiment.

[0105] The embodiment of the present invention further discloses a computer program product, wherein when the computer program product is run on a computer, the computer is enabled to execute part or all of the steps in the elevator regular maintenance management method in the first embodiment.

[0106] An embodiment of the present invention further discloses an application publishing platform, wherein the application publishing platform is used to publish a computer program product, wherein when the computer program product runs on a computer, the computer executes some or all of the steps in the elevator regular maintenance management method in embodiment one.

[0107] In various embodiments of the present invention, it should be understood that the size of the serial numbers of the processes does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0108] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, i.e., they may be located in one place or distributed over multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0109] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0110] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-accessible memory. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product, which is stored in a memory and includes several requests for a computer device (which can be a personal computer, a server or a network device, etc., specifically a processor in a computer device) to perform some or all of the steps of the method described in each embodiment of the present invention.

[0111] In the embodiments provided by the present invention, it should be understood that "B corresponding to A" means that B is associated with A, and B can be determined according to A. However, it should also be understood that determining B according to A does not mean determining B only according to A, and B can also be determined according to A and / or other information.

[0112] A person of ordinary skill in the art can understand that some or all of the steps in the various methods of the embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0113] The above is a detailed introduction to the elevator periodic maintenance management method, device, electronic device and storage medium disclosed in the embodiments of the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for a person skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A method for regular elevator maintenance management, characterized in that: include: Collect maintenance information, including the number of elevators to be scheduled for maintenance in the target area, elevator location information, and information about maintenance personnel to be scheduled, including the name and professional level of the maintenance personnel; generating a first maintenance plan and a second maintenance plan for the target area according to the maintenance information, wherein a maintenance level of the first maintenance plan is lower than a maintenance level of the second maintenance plan; The first maintenance plan includes a first maintenance time node, a target elevator, a first maintenance item, and a first maintenance personnel; the second maintenance plan includes a second maintenance time node, a target elevator, a second maintenance item, and a second maintenance personnel; Recording the maintenance progress of the target elevator according to the second maintenance plan, and adjusting the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress; Record the usage time of each component in each target elevator, and calculate the next replacement time node of each component according to the usage time; Obtain two second maintenance time nodes adjacent to the next replacement time node, and select the second maintenance time node in which the second maintenance item is not executed as the target second maintenance time node; Generate component replacement information and send it to a second maintenance personnel corresponding to the target second maintenance time node, wherein the component replacement information includes components that need to be replaced at the target second maintenance time node.

2. The elevator regular maintenance management method according to claim 1, characterized in that: Generating a first maintenance plan and a second maintenance plan for the target area according to the maintenance information includes: Divide the target area into several maintenance units; Calculate the number of elevators corresponding to each maintenance unit according to the elevator location information, and match the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators in each maintenance unit; Generate a first maintenance time node for each target elevator in the first maintenance unit, select the current first maintenance personnel to be scheduled that matches the first maintenance time node and the first maintenance item according to the information of the current first maintenance personnel to be scheduled, and screen the first maintenance personnel corresponding to each first maintenance unit from the current first maintenance personnel to be scheduled according to the required number of first maintenance personnel; and generate a second maintenance time node for each target elevator in the second maintenance unit, select the current second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the information of the current second maintenance personnel to be scheduled, and screen the second maintenance personnel corresponding to each second maintenance unit from the current second maintenance personnel to be scheduled according to the required number of second maintenance personnel.

3. The elevator regular maintenance management method according to claim 2, characterized in that: Matching the required number of first maintenance personnel and the required number of second maintenance personnel according to the number of elevators in each maintenance unit includes: Obtain the usage time of the target elevator in each maintenance unit; Selecting a corresponding preset ratio according to the usage time, the preset ratio includes the ratio of the number of elevators to the number of first maintenance personnel and the ratio of the number of elevators to the number of second maintenance personnel; The required number of first maintenance personnel and the required number of second maintenance personnel are matched according to the preset ratio and the number of elevators in each maintenance unit.

4. The elevator regular maintenance management method according to claim 2, characterized in that: Selecting the second maintenance personnel to be scheduled that matches the second maintenance time node and the second maintenance item according to the information of the second maintenance personnel to be scheduled includes: According to the information of the second maintenance personnel to be scheduled, statistics are collected on the specialty items, professional level and current shift tasks of the second maintenance personnel to be scheduled; According to the specialty items and professional levels of the inspection personnel to be currently scheduled, the second maintenance items are matched, and at least one second maintenance personnel to be currently scheduled corresponding to each second maintenance time node is selected; When the number of the screened second maintenance personnel currently to be scheduled is greater than one, the second maintenance personnel currently to be scheduled are matched according to the current shift scheduling tasks of the screened second maintenance personnel currently to be scheduled.

5. The elevator regular maintenance management method according to claim 1, characterized in that: Adjusting the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress includes: Determine whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node; When the current maintenance progress is inconsistent with the second maintenance project corresponding to the current second maintenance time node, all the remaining unmaintained second maintenance projects in the second maintenance plan are rescheduled according to the remaining second maintenance time nodes, and it is determined whether the second maintenance personnel corresponding to each second maintenance time node match the rescheduled second maintenance project; When the second maintenance personnel corresponding to any second maintenance time node does not match the rescheduled second maintenance item, the second maintenance personnel of the second maintenance time node is re-matched.

6. The elevator regular maintenance management method according to claim 1, characterized in that: Adjusting the second maintenance item corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress includes: Determine whether the current maintenance progress is consistent with the second maintenance item corresponding to the current second maintenance time node; When the current maintenance schedule is consistent with the second maintenance item corresponding to the current second maintenance time node, determine whether the current maintenance schedule includes replacement of parts, and when the current maintenance schedule includes replacement of parts, obtain the time required to replace the parts; When the required duration is greater than the duration threshold, each second maintenance time node after the current maintenance progress is regenerated.

7. An elevator regular maintenance management device, characterized in that: include: Information collection module: used to collect maintenance information, including the number of elevators to be scheduled for maintenance in the target area, elevator location information, and information about maintenance personnel to be scheduled, including the name and professional level of the maintenance personnel; A plan generating module: used for generating a first maintenance plan and a second maintenance plan for a target area according to the maintenance information, wherein a maintenance level of the first maintenance plan is lower than a maintenance level of the second maintenance plan; The first maintenance plan includes a first maintenance time node, a target elevator, a first maintenance item, and a first maintenance personnel; the second maintenance plan includes a second maintenance time node, a target elevator, a second maintenance item, and a second maintenance personnel; A progress generation module: used to record the maintenance progress of the target elevator according to the second maintenance plan, and adjust the second maintenance items corresponding to each second maintenance time node of the target elevator after the current second maintenance time node according to the maintenance progress; Automatic adjustment node module: used to record the usage time of each component in each target elevator, and calculate the next replacement time node of each component according to the usage time; obtain two second maintenance time nodes adjacent to the next replacement time node, and select the second maintenance time node in which the second maintenance project is not executed as the target second maintenance time node; generate component replacement information and send it to the second maintenance personnel corresponding to the target second maintenance time node, and the component replacement information includes the components that need to be replaced at the target second maintenance time node.

8. An electronic device, characterized in that: include: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the elevator regular maintenance management method according to any one of claims 1 to 6.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program enables a computer to execute the elevator periodic maintenance management method according to any one of claims 1 to 6.

Citation Information

Patent Citations

  • Health management method and health management device for elevator based on information physical system

    CN113526286A

  • Elevator maintenance travel planning method

    CN114936673A

  • Maintenance plan generation method and device and electronic equipment

    CN115660638A

  • Planned maintenance safety production management system and method, and electronic equipment

    CN116757661A

  • Elevator maintenance plan generation method and device, electronic equipment and storage medium

    CN117077941A