Automatic construction method of cementing operation scene based on digital twin technology

Digital twin technology is used to connect the on-site equipment data of cementing operations to realize the rapid and automated construction of cementing operation scenarios and the visualization of underground operation status. It solves the problem of insufficient timeliness of traditional three-dimensional modeling methods, reduces costs and provides a full range of services. visualization solutions.

CN118429594BActive Publication Date: 2024-10-11YANTAI JIERUI NETWORK TRADING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410888178.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-10-11
Estimated Expiration
2044-07-04

AI Technical Summary

Technical Problem

The traditional three-dimensional modeling method is not timely enough in cementing operation scenarios, is difficult to quickly reflect the real-time status of the operation, and lacks an intuitive display of the underground operation status, making it difficult for operators to fully grasp the progress of the operation.

Method used

Using an automated construction method based on digital twin technology, by connecting real-time data from field equipment, unified management and analysis, a three-dimensional model of the surface and underground scenes is built to achieve visualization of underground operating status and rapid automated construction.

Benefits of technology

It realizes the rapid automated construction of cementing operation scenarios and the visualization of underground operation status, reduces geological block modeling time and labor costs, breaks through the limitations of traditional modeling methods, and provides a comprehensive visualization solution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118429594B_ABST
    Figure CN118429594B_ABST
Patent Text Reader

Abstract

The present invention relates to an automated construction method for cementing operation scenes based on digital twin technology, and belongs to the field of virtual reality technology. It includes: creating a three-dimensional model library and a downhole geological material library; building a ground scene for cementing operations; building a borehole trajectory for an operating well; building a wellbore and determining the borehole trajectory line segment of the current wellbore geological layer; determining the geological layer of each well in the operating block; calculating the semi-variance between two groups of wells in the same geological layer; drawing the layout of the geological layer in three-dimensional space to complete the construction of the downhole scene part; superimposing and integrating the scene around the well site, the ground scene of the well site, and the downhole scene based on GPS data to complete the construction of the entire cementing operation scene. The present invention greatly reduces the time and labor costs required for geological modeling within the block by automatically generating geological blocks. It breaks through the limitations of traditional modeling methods and provides a comprehensive visualization solution for cementing operations.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of virtual reality technology, and in particular to a method for automatically building a cementing operation scene based on digital twin technology. Background Art

[0002] Digital twin technology makes full use of physical models, sensor updates, operation history and other data to complete mapping in virtual space, thereby reflecting the entire life cycle of the corresponding physical equipment. That is, real-time data collected at the cementing operation site is used to map the data-driven model on the constructed three-dimensional model of the cementing operation. Dynamic presentation.

[0003] Cementing operations are a key link in the oil industry, and their efficiency and quality directly affect the production cost and output of oil wells. However, the application of traditional 3D modeling methods in cementing operations is not timely enough, and it is difficult to build a cementing operation site visualization scene that can reflect the real-time status of the operation in a short period of time. In addition, conventional technical means lack an intuitive display of the downhole operation status, making it difficult for operators to fully grasp the progress of the operation. Summary of the invention

[0004] In response to the above problems, the present invention proposes a method for automatically building cementing operation scenes based on digital twin technology. This method connects to the real-time data of on-site equipment, uniformly manages and analyzes the data through digital twin technology, and then presents it in three dimensions in the built cementing operation scene, thereby realizing the rapid and automated construction of ground operation scenes and visualization of underground operation status during cementing engineering operations.

[0005] In order to achieve the above-mentioned object of the invention, the present invention adopts the following technical scheme:

[0006] A method for automatically building cementing operation scenarios based on digital twin technology includes the following steps:

[0007] Step 1: Create a ground scene 3D model library, a downhole tool 3D model library and a downhole geological material library for cementing operation scenes;

[0008] Step 2: Obtain the digital twin scene configuration information of the cementing operation site, and build the cementing operation ground scene based on the scene configuration information;

[0009] Step 3: Build the wellbore trajectory of the operating well by reading the well inclination parameters and wellhead coordinates of the operating well;

[0010] Step 4: construct a wellbore based on the constructed wellbore trajectory and cementing engineering design parameters, and determine the wellbore trajectory segment of the current wellbore geological layer;

[0011] Step 5: Determine the geological formation of each well in the operating block;

[0012] Step 6: Calculate the semi-variance between two groups of wells in the same geological formation;

[0013] Step 7: Draw the distribution of geological layers in three-dimensional space based on the calculation results, generate a downhole tool string model through data matching, and complete the construction of the downhole scene;

[0014] Step 8: Based on the GPS data, the scenes around the well site, the ground scene of the well site and the underground scene are superimposed and integrated to complete the construction of the entire cementing operation scene.

[0015] Furthermore, in step 1, the ground scene three-dimensional model library is built based on the actual size and specifications of the supporting equipment of the operating well site; the downhole tool three-dimensional model library is built based on the real downhole operating tools; and the downhole geological material library is built according to the core database sample of the current cementing operation block.

[0016] Furthermore, step 2 specifically includes: obtaining the digital twin scene configuration information of the cementing operation site by connecting to the GPS signal of the well site equipment, restoring the relative position of each device by comparison based on the GPS elevation parameters, and using modular modeling technology to quickly build the equipment scene of the cementing operation site to complete the construction of the ground scene of the cementing operation.

[0017] Furthermore, the step 3 specifically includes: obtaining the current block information based on the wellhead GPS positioning information, and extracting key data such as well inclination parameters and wellhead coordinates from the drilling records, generating the basic path of the wellbore based on the three-dimensional point drawing, and then using a smooth curve for fine adjustment to realize the construction of the wellbore trajectory of the operating well.

[0018] Furthermore, step 4 specifically includes: based on the wellbore trajectory, reading the cementing engineering design parameters to realize the three-dimensional construction of the wellbore; by comparing the corresponding lithological characteristic samples in the downhole geological material library, determining the top boundary depth and bottom boundary depth parameters, and drawing the wellbore trajectory segment of the current wellbore geological layer.

[0019] Furthermore, the specific process of determining the geological stratum of each well in the operating block in step 5 is: automatically drawing wellbore trajectory segments connecting different geological strata in space through smooth curves to form a three-dimensional area, automatically retrieving geological stratum data, and realizing the inter-layer interconnection relationship between different wells through the stratum division relationship in the logging interpretation result table, and realizing the geological stratum of each well in the block through three-dimensional drawing.

[0020] Furthermore, the algorithm formula for calculating the semi-variance between two groups of wells in the same geological layer in step 6 is as follows:

[0021]

[0022] Where: Z(x) is the lithology parameter at position x; N(h) is the number of all sample point pairs with a distance h; h is the distance vector between two positions, and i represents the well depth.

[0023] Furthermore, step 7 specifically includes: based on the obtained semi-variance, judging the formation attenuation distance and edge through interpolation method and attenuation index, judging the location of geological faults using base value, and realizing three-dimensional presentation of geological strata distribution in the current block through digital twin technology; quickly constructing a three-dimensional model of the tool string in the wellbore through wellbore tool parameters to complete the construction of the downhole scene part.

[0024] Furthermore, step 8 specifically includes: connecting to the GIS system to obtain a three-dimensional model of the scene around the well site, automatically superimposing the ground part and the wellhead coordinates according to the GPS elevation data and GPS point information based on the digital twin technology, and completing the rapid and automated construction of the cementing operation scene based on the digital twin technology.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] 1. Automated and intelligent modeling technology: Through automated geological block generation, the time and labor costs required for geological modeling within the block are greatly reduced.

[0027] 2. Integrated modeling of underground and surface scenes: This invention realizes the integrated rapid modeling of underground and surface scenes for the first time, breaking through the limitations of traditional modeling methods and providing a comprehensive visualization solution for cementing operations. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a flow chart of a method for visualizing downhole cementing operation progress based on digital twin technology according to the first embodiment of the present invention. DETAILED DESCRIPTION

[0029] In order to clearly illustrate the technical features of the present invention, the present invention will be described in detail below through specific implementation methods and in conjunction with the accompanying drawings. The disclosure below provides many different embodiments for realizing different structures of the present invention. In order to simplify the disclosure of the present invention, the components and settings of specific examples are described below. In addition, the present invention may repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplicity and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed. It should be noted that the components illustrated in the accompanying drawings are not necessarily drawn to scale. The present invention omits the description of known components and processing techniques and processes to avoid unnecessary limitations on the present invention.

[0030] Embodiment 1

[0031] This embodiment provides a method for visualizing the progress of cementing operations downhole based on digital twin technology. Figure 1 As shown, the 3D engine used is Unity3D, and the method includes the following steps:

[0032] Step 1: Use modeling software to build a high-precision 3D model library that comprehensively covers the surface equipment and downhole tools of the cementing operation well site based on the actual sizes and specifications of the actual cementing cement trucks, cement tanks, various manifolds and other supporting equipment in the operation well site; create models, maps, textures and other materials of different lithologies such as mudstone and sandstone based on the core database samples of the current cementing operation block to form a downhole geological material library;

[0033] Step 2: By connecting to the GPS signal of the well site equipment, obtain a list of all equipment within the approximate range of the same well site. Use the unique equipment code corresponding to the equipment GPS signal to find the corresponding equipment model and basic information, analyze the digital twin scene configuration information (equipment quantity, equipment model) of the cementing operation site, and restore the positions of various equipment at the cementing operation site by comparison based on the GPS elevation parameters. Use the above basic equipment information to find the corresponding equipment 3D model in the ground scene 3D model library, and place it in the corresponding position of the cementing operation 3D scene, so as to quickly build and assemble the ground scene of the cementing operation site;

[0034] Step 3: Design an automated reading mechanism, extract the well inclination parameters and wellhead coordinates from the drilling records based on the wellhead GPS positioning information, and use 3D drawing to draw the discontinuous path of the wellbore trajectory, that is, calculate the 3D spatial coordinates of each wellbore trajectory point through "depth measurement", "well inclination angle" and "azimuth angle", and then use smooth curve series connection and fine adjustment to realize the construction of the wellbore trajectory of the operating well;

[0035] Step 4: Based on the wellbore trajectory, read the wellbore parameters, casing parameters and other contents in the cementing engineering design parameters to realize the construction of the wellbore of the current operating well in the three-dimensional scene; by comparing the corresponding lithological characteristic samples in the downhole geological material library, obtain the rock interpretation results and rock type information of the current layer, determine the top boundary depth and bottom boundary depth parameters, and determine the top boundary depth 3D coordinates and bottom boundary depth 3D coordinates of each geological layer of the current well in combination with the wellhead coordinates and well inclination parameters, and draw the wellbore trajectory line segment of the current wellbore geological layer based on the wellbore trajectory, that is, from the wellhead to the bottom of the well, draw the wellbore trajectory line segment with the starting point as the top boundary depth 3D coordinates and the end point as the bottom boundary depth 3D coordinates;

[0036] Step 5: Divide the geological stratum relationship through the logging interpretation results table and the sand body layer table information, and automatically draw the borehole trajectory line segments connecting different geological strata in space through smooth curves, that is, find the top boundary depth coordinates and bottom boundary depth coordinates of different operating wells in the region in the same geological stratum through screening, and connect all the top boundary depth coordinates through smooth segments to form the top triangular surface of the current geological stratum, and then connect all the bottom boundary depth coordinates through smooth segments to form the bottom triangular surface of the current geological stratum, and then connect the top boundary depth coordinates and bottom boundary depth coordinates at the edge position to form a three-dimensional area, and realize the digital twin presentation of different geological levels in the well through the lithology division in the logging interpretation results table and the samples of different lithologies in the underground geological material library, and then realize the interlayer interconnection relationship between different wells, and finally realize the automatic generation and construction of the geological stratum of each well in the operating block through the same method;

[0037] Step 6: Calculate the continuity relationship between the two groups of wells in the same geological layer through semivariance;

[0038]

[0039] Where: Z(x) is the lithology parameter at position x; N(h) is the number of all sample point pairs with a distance h; h is the distance vector between two positions, and i represents the well depth.

[0040] Step 7: Based on the obtained semi-variance, the formation attenuation distance and edge are determined by interpolation method and attenuation index, the sill value is used to determine the location of the geological fault, and the digital twin technology is used to realize the three-dimensional presentation of the geological stratum distribution in the current block; the specific calculation process involved is as follows:

[0041] 1. Determine the distance interval: Based on the distribution density of data points and the spatial scale of interest, select an appropriate distance interval ∆h.

[0042] 2. Obtain the point set data (x, y, z) of the first layer of all wells in the block through the 3D area determined in the previous step, and find all point pairs within this distance range.

[0043] 3. For each point pair, calculate the square of the attribute value difference, that is, the square of the elevation value difference of each point pair, calculate the semi-variance of the distance between each point pair, and integrate the above content into a simulation curve. Then, calculate the approximate semi-variance value at any position distance in the current geological layer three-dimensional space according to the fitting method, and then select suitable points through the standard point pair distance.

[0044] 4. Sum the squares of the differences of all point pairs, then divide by the number of point pairs to obtain the function value on the distance interval and construct the standard point pair distance semivariance data matrix.

[0045] 5. The inverse matrix of the standard point-pair distance semivariance data matrix is ​​calculated, and the attribute values ​​of all points in the three-dimensional area of ​​the current geological layer are finally obtained by multiplication. The spatial coordinates of all points can be calculated through the above attribute values, i.e., point elevation data.

[0046] 6. Use linear regression fitting techniques to fit the calculated variogram values.

[0047] 7. By setting the nugget effect and base value base in the area, it is possible to distinguish whether the relationship between geological layers is connected.

[0048] 8. Automatically determine the edge position of the geological layer by the length of the short variable range, and realize the three-dimensional presentation of the geological layer distribution in the current block through digital twin technology.

[0049] Finally, the wellbore tool parameters are used to automatically match the downhole tools, casing, cement slurry and other materials in the downhole tool 3D model library, and the tool string engineering design parameters are automatically obtained through the cementing engineering design parameters. The wellbore and tool string are quickly constructed to complete the construction of the downhole scene.

[0050] Step 8: Connect to the GIS system to obtain a three-dimensional model of the scene around the well site. Based on the digital twin technology, the ground part and the wellhead coordinates are automatically superimposed according to the GPS elevation data and GPS point information to complete the rapid and automated construction of the cementing operation scene based on the digital twin technology.

[0051] The above embodiments are only technical solutions of the present invention rather than limitations thereof. It should be pointed out that, for those skilled in the art, the specific implementation modes of the present invention may be modified or replaced by equivalents without departing from the technical principles of the present invention. Any modification or equivalent replacement without departing from the spirit and scope of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for automatically building cementing operation scenarios based on digital twin technology. It is characterized in that The following steps are involved: Step 1: Create a ground scene 3D model library, a downhole tool 3D model library and a downhole geological material library for cementing operation scenes; Step 2: Obtain the digital twin scene configuration information of the cementing operation site, and build the cementing operation ground scene based on the scene configuration information; Step 3: Build the wellbore trajectory of the operating well by reading the well inclination parameters and wellhead coordinates of the operating well; Step 4: construct a wellbore based on the constructed wellbore trajectory and cementing engineering design parameters, and determine the wellbore trajectory segment of the current wellbore geological layer; Step 5: Determine the geological formation of each well in the operating block; Step 6: Calculate the semi-variance between two groups of wells in the same geological formation; Step 7: Draw the distribution of geological layers in three-dimensional space based on the calculation results, generate a downhole tool string model through data matching, and complete the construction of the downhole scene; Step 8: Based on GPS data, the scene around the well site, the ground scene of the well site and the underground scene are superimposed and integrated to complete the construction of the entire cementing operation scene; The step 7 specifically comprises determining the formation attenuation distance and edge through interpolation method and attenuation index based on the obtained semi-variance, determining the location of the geological fault using the base value, and realizing the three-dimensional presentation of the geological stratum distribution in the current block through the digital twin technology; The following calculations are involved: 7.1: Determine the distance interval: Based on the distribution density of data points and the spatial scale of interest, select an appropriate distance interval ∆h; 7.2: Obtain the point set data (x, y, z) of all wells in the block in the first layer through the 3D area determined in the previous step, and find all point pairs within this distance range; 7.3: For each point pair, calculate the square of the attribute value difference, that is, the square of the elevation value difference of each point pair, calculate the semi-variance of the distance between each point pair, and integrate the semi-variance of the distance between each point pair into a simulation curve, and then calculate the approximate semi-variance value at any position distance in the current geological layer three-dimensional space according to the fitting method, and then select suitable points by the standard point pair distance; 7.4: Sum the squares of the differences of all point pairs, then divide by the number of point pairs to obtain the function value on the distance interval, and construct the standard point pair distance semivariance data matrix; 7.5: The inverse matrix of the standard point pair distance semi-variance data matrix is ​​calculated, and the attribute values ​​of all points in the three-dimensional area of ​​the current geological layer are finally obtained by multiplication. The spatial coordinates of all points are calculated by the above attribute values, i.e., point elevation data; 7.6: Use linear regression fitting techniques to fit the calculated variogram values; 7.7: By setting the nugget effect and the base value of the base in the area, it is possible to distinguish whether the relationship between geological layers is connected; 7.8: Automatically determine the edge position of the geological layer through the short variable length, and realize the three-dimensional presentation of the geological layer distribution in the current block through digital twin technology; finally, automatically match the downhole tools, casing, cement slurry and other materials in the downhole tool 3D model library through the wellbore tool parameters, automatically obtain the tool string engineering design parameters through the cementing engineering design parameters, quickly build the wellbore and tool string, and complete the construction of the downhole scene part.

2. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that In step 1, the ground scene three-dimensional model library is built based on the actual size and specifications of the supporting equipment of the operating well site; the downhole tool three-dimensional model library is built based on the real downhole operating tools; and the downhole geological material library is built according to the core database sample of the current cementing operation block.

3. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that The step 2 specifically includes: obtaining the digital twin scene configuration information of the cementing operation site by connecting to the GPS signal of the well site equipment, restoring the relative position of each device by comparison based on the GPS elevation parameters, and using modular modeling technology to quickly build the equipment scene of the cementing operation site to complete the construction of the ground scene of the cementing operation.

4. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that The step 3 specifically includes: obtaining the current block information based on the wellhead GPS positioning information, extracting the well inclination parameters and wellhead coordinates from the drilling records, generating the basic path of the wellbore based on the three-dimensional point drawing, and then using a smooth curve for fine adjustment to realize the construction of the wellbore trajectory of the operating well.

5. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that The step 4 specifically includes: based on the wellbore trajectory, reading the cementing engineering design parameters to realize the three-dimensional construction of the wellbore; by comparing the corresponding lithological characteristic samples in the downhole geological material library, determining the top boundary depth and bottom boundary depth parameters, and drawing the wellbore trajectory segment of the current wellbore geological layer.

6. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that The specific process of determining the geological stratum of each well in the operating block in step 5 is as follows: automatically drawing wellbore trajectory segments connecting different geological strata in space through smooth curves to form a three-dimensional area, automatically retrieving geological stratum data, realizing the inter-layer interconnection relationship between different wells through the stratum division relationship in the logging interpretation result table, and realizing the geological stratum of each well in the block through three-dimensional drawing.

7. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that The algorithm formula for calculating the semi-variance between two groups of wells in the same geological layer in step 6 is as follows: Where: Z(x) is the lithology parameter at position x; N(h) is the number of all sample point pairs with a distance h; h is the distance vector between two positions, and i represents the well depth.

8. The method for automatically building a cementing operation scene based on digital twin technology according to claim 1, It is characterized in that The step 8 specifically includes: connecting to the GIS system to obtain a three-dimensional model of the scene around the well site, automatically superimposing the ground part and the wellhead coordinates according to the GPS elevation data and GPS point information based on the digital twin technology, and completing the rapid and automated construction of the cementing operation scene based on the digital twin technology.