Monitoring method of frozen soil displacement on high slopes in cold regions
By setting up elastic inclinometer tubes and inclinometer probes on high slopes in cold areas, the frozen soil offset at each cross-section of the slope is monitored, and the state equation is used for prediction, which solves the problem of low monitoring efficiency and inability to obtain cross-section data in the existing technology. The issue of cross-section offset realizes efficient monitoring and early warning of frozen soil offset.
Patent Information
- Application Number
- CN202410529661.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-04-29
AI Technical Summary
The monitoring efficiency of frozen soil offset on high slopes in cold areas is low and the offset of each cross section of the slope cannot be obtained. The existing technology can only monitor the overall height of the slope and cannot provide early warning.
Displacement monitoring points are arranged in the area to be monitored, and elastic inclinometer tubes and inclinometer probes are used to obtain the frozen soil offset of each cross section of the slope by measuring the deformation of the elastic inclinometer tube, and a state equation that evolves over time is established for deflection. Movement prediction enables early warning.
It improves the efficiency of monitoring the offset of frozen soil on high slopes in cold areas, and can obtain the offset of each cross section of the slope in real time, provide reliable landslide warning, and reduce casualties and property losses.
Smart Images

Figure CN118442964B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for monitoring the displacement of frozen soil on a high slope in a cold region, and belongs to the technical field of monitoring the displacement of frozen soil. Background Art
[0002] In alpine areas, seasonal freeze-thaw occurs due to the temperature difference during the alternation of the four seasons, causing the frozen soil of the slope to frost heave and thaw. The seasonal freeze-thaw process can induce geological disasters such as landslides, collapses, and mudslides, which will threaten people's lives and property safety. Monitoring of the displacement of frozen soil can ensure the stability of high slopes in cold areas, improve the efficiency of landslide warnings, and provide a reliable basis for early warning, thereby reducing or even avoiding casualties and property losses. At present, for the monitoring of the displacement of frozen soil on high slopes in cold areas, fluorescent targets are usually set on the top of the slope. The coordinates of the fluorescent targets are collected by the monitoring instrument for monitoring. Monitoring personnel regularly go to the site to collect data. The method of issuing warnings based on the collected data is laborious and has extremely low monitoring efficiency. Moreover, this method can only monitor the displacement of the overall height of the slope, and cannot obtain the displacement of each cross-section of the frozen soil on the slope. Summary of the invention
[0003] A brief overview of the present invention is provided below in order to provide a basic understanding of certain aspects of the present invention. It should be understood that this overview is not an exhaustive overview of the present invention. It is not intended to identify key or important parts of the present invention, nor is it intended to limit the scope of the present invention. Its purpose is merely to present certain concepts in a simplified form as a prelude to a more detailed description discussed later.
[0004] In view of this, in order to solve the technical problems in the prior art of low efficiency in monitoring the offset of frozen soil on high slopes in cold regions and lack of effective monitoring means for the offset of each cross-section of the slope, the present invention provides a method for monitoring the offset of frozen soil on high slopes in cold regions.
[0005] Solution 1: Monitoring method of frozen soil displacement on high slopes in cold regions, including:
[0006] Displacement monitoring points are arranged in the area to be monitored, and inclinometer holes are opened on the displacement monitoring points. The inclinometer holes are arranged at the same section as the displacement monitoring points;
[0007] An elastic inclinometer tube for collecting offset data is arranged in the inclinometer hole;
[0008] The elastic inclinometer tube is provided with a groove matching the elastic roller of the inclinometer probe;
[0009] There are two grooves, which are arranged opposite to each other. The grooves are perpendicular to the displacement direction of the soil. The orientation of the grooves of the elastic inclinometer tube, the coordinates of the tube mouth of the elastic inclinometer tube and the elevation of the elastic inclinometer tube are measured as the benchmark data.
[0010] The inclinometer probe starts from the bottom of the elastic inclinometer tube and reads the data every 0.5m along the entire length of the groove from bottom to top as measured data; the measured data is subtracted from the reference data to obtain the offset, and the frozen soil monitoring of high slopes in cold regions is realized based on the offset;
[0011] By subtracting the measured data from the reference data, we can obtain the change in the inclination of the elastic inclinometer casing and the displacement offset caused by the change.
[0012] Preferably, the depth of the inclinometer hole is deeper than the depth of the elastic inclinometer casing, and the depth of the inclinometer hole is 0.5 m deeper than the depth of the elastic inclinometer casing.
[0013] Preferably, there are four grooves arranged in a cross shape.
[0014] Preferably, the inclinometer probe is fixed at one position each time it performs measurement.
[0015] Scheme 2: A method for predicting the displacement of frozen soil on high slopes in cold regions, including the following steps:
[0016] S1. Collect time series data and corresponding offset data based on the method described in Scheme 1;
[0017] S2. Establish a state equation that evolves over time and a prediction equation that obtains a predicted value from a state variable, and use the state equation to predict the offset at the next time;
[0018] Equation of state: x t =Ax t-1 +Bu t +w t , where x t is the state vector at time t, A is the state transfer matrix, x t is the state vector at time t-1, B is the control input matrix, u t is the control input, w t is the process noise;
[0019] Prediction equation: y t =Cx t +v t , where y t is the predicted value at time t, C is the prediction matrix, v t is the prediction noise;
[0020]
[0021] P t|t-1 =AP t-1|t-1 A T +Q
[0022] in, is the current moment predicted state based on the previous moment state estimate; P t|t-1 is the covariance matrix of the prediction error, Q is the process noise covariance matrix;
[0023] S3. Correct the state variables through the Kalman gain and update the covariance matrix.
[0024] Preferably, the method further includes S4 verifying the accuracy of the offset prediction, which specifically includes the following steps:
[0025] S41. Collect time series data and corresponding offset data based on the method described in Scheme 1 and establish a database;
[0026] S42. Normalize the time series data and preprocess the offset data;
[0027] The method for preprocessing the offset data comprises the following steps:
[0028] S421. binning the offset data into equal frequency bins;
[0029] S422. Select the number of bins according to the number of offset data;
[0030] S423. discretize the continuous offset data according to the equal frequency binning strategy and the number of bins;
[0031] S424. In the process of binning, outliers and missing values are deleted;
[0032] S425. Divide the discretized data into intervals;
[0033] S426. Create a two-dimensional encoding matrix based on the division results, where each column in the two-dimensional encoding matrix corresponds to a specific offset, and each row corresponds to a sample. If the offset of a sample is within a certain interval, it is 0, and if not, it is 1;
[0034] S427. Traverse all offset data to obtain encoding vectors of all offset data;
[0035] S43. Establishing a time and offset prediction model, and outputting a predicted offset based on the time and offset prediction model;
[0036]
[0037] In the formula, represents the predicted value at time t, l t =S(x)(W s ·[h m-1 ,t]+b s ) represents the activation vector at time t, where S(x) represents the sigmoid activation function, and Ws represents the forget gate weight matrix, h m-1 The previous hidden state, b s Bias term; z t The encoding vector representing the offset data at time t, l t Indicates that the current offset is missing or exists. t =0 or 1, X t Represents the belief of the sample value before the time interval between the current time and the last measurement time, that is, X t =e -Δt / τ , τ is the time window parameter, Δt represents the time interval between the last measurement time and the current time t; z last Indicates the offset of the last time point, z l Indicates whether the current offset continues to the predicted value based on the reliability of the last time point. If l t = 0, directly output the offset of the last time point as the predicted value. t =1, calculate X t , when X t If the value is greater than the threshold, the predicted value is z last Assignment, when X t When the value is less than the threshold, the average value of each eigenvalue is used for assignment;
[0038] S44. Compare the output result with the predicted state. If it is within the verification threshold, it means that the prediction is accurate, thereby verifying that the prediction result is accurate.
[0039] Solution three, an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the steps of the method for monitoring the offset of frozen soil on high slopes in cold regions described in Solution one are implemented.
[0040] Solution 4: A computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for monitoring the offset of frozen soil on high slopes in cold regions as described in Solution 1.
[0041] The beneficial effects of the present invention are as follows: The present invention sets displacement monitoring points in the area to be monitored and uses the deformation generated by the elastic inclinometer tube to measure the frozen soil offset of each cross section of the slope. This solves the technical problems in the prior art of low efficiency in monitoring the frozen soil offset of high slopes in cold regions and lack of effective monitoring means for the offset of each cross section of the slope. The present invention also establishes a state equation that evolves over time and a prediction equation that obtains a predicted value from a state variable, and uses the state equation to predict the offset at the next time, thereby achieving early warning of the frozen soil offset. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0043] Figure 1 This is a flow chart of the method for monitoring the displacement of frozen soil on high slopes in cold regions;
[0044] Figure 2 This is a flow chart of the method for predicting the displacement of frozen soil on high slopes in cold regions;
[0045] Figure 3 Schematic diagram of the process to verify the accuracy of offset prediction. DETAILED DESCRIPTION
[0046] In order to make the technical solutions and advantages of the embodiments of the present invention more clearly understood, the exemplary embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.
[0047] Example 1: Reference Figure 1 The present embodiment describes a method for monitoring the displacement of frozen soil on high slopes in cold regions, comprising the following steps:
[0048] Displacement monitoring points are arranged in the area to be monitored, and inclinometer holes are opened on the displacement monitoring points. The inclinometer holes are arranged at the same section as the displacement monitoring points;
[0049] An elastic inclinometer tube for collecting offset data is arranged in the inclinometer hole;
[0050] The elastic inclinometer tube is provided with a groove matching the elastic roller of the inclinometer probe;
[0051] There are two grooves, which are arranged opposite to each other. The grooves are perpendicular to the displacement direction of the soil. The orientation of the grooves of the elastic inclinometer tube, the coordinates of the tube mouth of the elastic inclinometer tube and the elevation of the elastic inclinometer tube are measured as the benchmark data.
[0052] The inclinometer probe starts from the bottom of the elastic inclinometer tube and reads the data every 0.5m along the entire length of the groove from bottom to top as measured data; the measured data is subtracted from the reference data to obtain the offset, and the frozen soil monitoring of high slopes in cold regions is realized based on the offset;
[0053] By subtracting the measured data from the reference data, we can obtain the change in the inclination of the elastic inclinometer casing and the displacement offset caused by the change.
[0054] The depth of the inclinometer hole is deeper than that of the elastic inclinometer casing, and the depth of the inclinometer hole is 0.5m deeper than that of the elastic inclinometer casing.
[0055] There are four grooves arranged in a cross shape.
[0056] The inclinometer probe is fixed in one position each time it is measured.
[0057] The elastic inclinometer tube and the elastic roller of the inclinometer probe are made of elastic material.
[0058] When arranging displacement monitoring points in the area to be monitored, select the position with the largest calculated value of plane perturbation in the area to be monitored;
[0059] When the area to be monitored is larger than 30m, a displacement monitoring point is set up every 30m; when the area to be monitored is smaller than 30m, a displacement monitoring point is set up at the midpoint of the area to be monitored;
[0060] Inclinometer holes are drilled using a drilling machine, and the drill bit is usually φ108mm;
[0061] In order to make the installation of the elastic inclinometer tube more stable, after the borehole reaches the predetermined position, pour clean water into the hole to turn the muddy water into clear mixed water, and then install the elastic inclinometer tube after lifting the drill. When the hole depth is greater than the elastic inclinometer tube, the elastic inclinometer tube can be connected section by section, and the grooves are aligned when connecting to avoid the grooves being blocked. When installing the elastic inclinometer tube, in order to reduce the buoyancy, clean water can be filled into the tube, and water can be filled while installing until it can be put in place smoothly. After the elastic inclinometer tube is in place, it must be filled with clean water to reduce the mud from entering the tube. After the elastic inclinometer tube is installed in place, the direction must be adjusted before backfilling. The requirement for adjusting the direction is to rotate the elastic inclinometer tube so that the pair of grooves in the tube are adjusted to be perpendicular to the displacement direction of the soil. Before rotating, the elastic inclinometer tube can be lifted up and then rotated and aligned, and then the elastic inclinometer tube can be pressed into place. Finally, cover the tube cover and start backfilling. The space between the elastic inclinometer tube and the borehole wall can be filled densely with coarse sand. After backfilling, rinse the elastic inclinometer tube with clean water. After burying the elastic inclinometer tube, it is necessary to measure the orientation, pipe mouth coordinates and elevation of the elastic inclinometer tube guide groove, and timely carry out protection work, such as installing metal casing protection on the outside of the elastic inclinometer tube, building a manhole at the pipe mouth of the elastic inclinometer tube, and covering it.
[0062] When the inclinometer probe measures the data in the elastic inclinometer tube, insert the inclinometer probe into the elastic inclinometer tube, make the roller stuck on the guide groove, slowly guide it down to the bottom of the hole, and measure from the bottom of the hole. Read it every 0.5m along the entire length of the guide groove from bottom to top. During each measurement, the probe should be stabilized in a certain position. After the measurement is completed, rotate the probe 180° and insert it into the same pair of guide grooves, and repeat the measurement according to the above method. The measuring points of the two measurements should be at the same position. At this time, the two readings of each measuring point should be close in value and opposite in sign. If there is any doubt about the measured data, it should be re-measured in time.
[0063] Surface displacement measuring points are arranged at the orifice of the elastic inclinometer tube so that the deep displacement of the retaining structure can be corrected according to the displacement of the orifice when necessary.
[0064] Example 1: Reference Figure 2-Figure 3 The present embodiment describes a method for predicting the displacement of frozen soil on high slopes in cold regions, comprising the following steps:
[0065] S1. Collect time series data and corresponding offset data; obtain the real permafrost offset information at each moment according to the time series data and the corresponding offset data. The real offset data can provide accurate data for permafrost offset prediction and improve the accuracy of offset prediction;
[0066] S2. Establish a state equation that evolves over time and a prediction equation that obtains a predicted value from a state variable, and use the state equation to predict the offset at the next time;
[0067] Equation of state: x t =Ax t-1 +Bu t +w t , where x t is the state vector at time t, A is the state transfer matrix, x t is the state vector at time t-1, B is the control input matrix, u t is the control input, w t is the process noise;
[0068] Prediction equation: y t =Cx t +v t , where y t is the predicted value at time t, C is the prediction matrix, v t is the prediction noise;
[0069]
[0070] P t|t-1 =AP t-1|t-1 A T +Q
[0071] in, is the current moment predicted state based on the previous moment state estimate; P t|t-1 is the covariance matrix of the forecast errors, and Q is the process noise covariance matrix.
[0072] S3. Correct the state variables by Kalman gain and update the covariance matrix;
[0073] Kalman gain:
[0074] K t =P t|t-1 CT (CP t|t-1 C T +R) -1
[0075] Corrected state estimate:
[0076]
[0077] Update the covariance matrix:
[0078] P t|t =(IK t C)P t-1|t-1
[0079] Among them, K t is the Kalman gain, y t is the actual measurement value, and R is the observation noise covariance matrix.
[0080] S4 also includes verifying the accuracy of the offset prediction, which specifically includes the following steps:
[0081] S41. Collect time series data and corresponding offset data and establish a database;
[0082] S42. Normalize the time series data and preprocess the offset data; the method for preprocessing the offset data is: comprising the following steps:
[0083] S421. Divide the offset data into equal-frequency bins.
[0084] S422. Select the number of bins according to the number of offset data;
[0085] S423. discretize the continuous offset data according to the equal frequency binning strategy and the number of bins;
[0086] S424. In the process of binning, outliers and missing values are deleted;
[0087] S425. Divide the discretized data into intervals;
[0088] S426. Create a two-dimensional encoding matrix based on the division results, where each column in the two-dimensional encoding matrix corresponds to a specific offset, and each row corresponds to a sample. If the offset of a sample is within a certain interval, it is 0, and if not, it is 1;
[0089] S427. Traverse all offset data to obtain encoding vectors of all offset data;
[0090] Normalize the time series data to eliminate the impact of dimensions: The original time series data may have different dimensions and units. Normalization can convert the data to a dimensionless state so that different features can be compared and analyzed at the same scale. There may be some outliers or outliers in the time series data, which may have an adverse effect on the analysis results. Normalization can reduce the impact of outliers and make the analysis results more stable and reliable. Improve model performance. Normalization can accelerate the convergence speed of the model and improve the prediction accuracy of the model. At the same time, it is convenient for comparison and evaluation: the normalized data can be compared and evaluated at the same scale, which helps to better understand the differences and similarities between different time series.
[0091] Preprocessing the offset data and converting continuous numerical data into discrete categorical data can help simplify the data structure. By removing outliers and missing values, the accuracy of the data can be improved. The sensitivity of the model to individual data points can be reduced, thereby improving the stability of the model and making the data easier to understand and interpret.
[0092] S43. Establishing a time and offset prediction model, and outputting a predicted offset based on the time and offset prediction model;
[0093]
[0094] In the formula, represents the predicted value at time t, l t =S(x)(W s ·[h m-1 ,t]+b s ) represents the activation vector at time t, where S(x) represents the sigmoid activation function, and W s represents the forget gate weight matrix, h m-1 The previous hidden state, b s Bias term; z t The encoding vector representing the offset data at time t, l t Indicates that the current offset is missing or exists. t =0 or 1, X t Represents the belief of the sample value before the time interval between the current time and the last measurement time, that is, X t =e -Δt / τ , τ is the time window parameter, Δt represents the time interval between the last measurement time and the current time t; z last Indicates the offset of the last time point, z l Indicates whether the current offset continues to the predicted value based on the reliability of the last time point. If l t= 0, directly output the offset of the last time point as the predicted value. t =1, calculate X t , when X t If the value is greater than the threshold, the predicted value is z last Assignment, when X t When the value is less than the threshold, the average value of each feature value is used to assign a value.
[0095] The threshold is set according to the actual situation.
[0096] S44. Compare the output result with the predicted state. If it is within the verification threshold, it means that the prediction is accurate, thereby verifying that the prediction result is accurate. The verification threshold is set according to the actual accuracy requirements of the user.
[0097] Embodiment 3: The computer device of the present invention may be a device including a processor and a memory, such as a single chip microcomputer including a central processing unit, etc. Moreover, the processor is used to implement the steps of the above-mentioned method for monitoring the displacement of frozen soil on high slopes in cold regions when executing the computer program stored in the memory.
[0098] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0099] The memory may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0100] Embodiment 4: Computer readable storage medium embodiment.
[0101] The computer-readable storage medium of the present invention can be any form of storage medium that can be read by a processor of a computer device, including but not limited to non-volatile memory, volatile memory, ferroelectric memory, etc. A computer program is stored on the computer-readable storage medium. When the processor of the computer device reads and executes the computer program stored in the memory, the steps of the above-mentioned method for monitoring the offset of frozen soil on high slopes in cold regions can be implemented.
[0102] The computer program includes computer program code, which may be in source code form, object code form, executable file or some intermediate form, etc. The computer readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer readable medium may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer readable media do not include electric carrier signals and telecommunication signals.
[0103] Although the present invention has been described according to a limited number of embodiments, it will be apparent to those skilled in the art, with the benefit of the above description, that other embodiments may be envisioned within the scope of the invention thus described. In addition, it should be noted that the language used in this specification is selected primarily for readability and teaching purposes, rather than for explaining or defining the subject matter of the present invention. Therefore, many modifications and variations will be apparent to those skilled in the art without departing from the scope and spirit of the appended claims. The disclosure of the present invention is illustrative, not restrictive, with respect to the scope of the present invention, which is defined by the appended claims.
Claims
1. A method for predicting the displacement of frozen soil on high slopes in cold regions, characterized by: The following steps are involved: S1. Displacement monitoring points are arranged in the area to be monitored, and inclinometer holes are opened on the displacement monitoring points, and the inclinometer holes are arranged on the same section as the displacement monitoring points; An elastic inclinometer tube for collecting offset data is arranged in the inclinometer hole; The elastic inclinometer tube is provided with a groove matching the elastic roller of the inclinometer probe; There are two grooves, which are arranged opposite to each other. The grooves are perpendicular to the displacement direction of the soil. The orientation of the grooves of the elastic inclinometer tube, the coordinates of the tube mouth of the elastic inclinometer tube and the elevation of the elastic inclinometer tube are measured as the benchmark data. The inclinometer probe starts from the bottom of the elastic inclinometer tube and reads the data every 0.5m along the entire length of the groove from bottom to top as measured data; the measured data is subtracted from the reference data to obtain the offset, and the frozen soil monitoring of high slopes in cold regions is realized based on the offset; The measured data is subtracted from the reference data to obtain the inclination of the elastic inclinometer casing, that is, the displacement offset; Establish a database based on the collected time series data and the corresponding offset data; S2. Establish a state equation that evolves over time and a prediction equation that obtains a predicted value from a state variable, and use the state equation to predict the offset at the next time; Equation of state: x t =Ax t-1 +Bu t +w t , where x t is the state vector at time t, A is the state transfer matrix, x t-1 is the state vector at time t-1, B is the control input matrix, u t is the control input, w t is the process noise; Prediction equation: y t =Cx t +v t , where y t is the predicted value at time t, C is the prediction matrix, v t is the prediction noise; P t|t-1 =AP t-1|t-1 From T +Q in, is the current moment predicted state based on the previous moment state estimate; P t|t-1 is the covariance matrix of the prediction error, Q is the process noise covariance matrix; S3. Correct the state variables by Kalman gain and update the covariance matrix; S4. Verify the accuracy of the offset prediction, specifically including the following steps: S41. Establish a database based on the collected time series data and the corresponding offset data; S42. Normalize the time series data and preprocess the offset data; The method for preprocessing the offset data comprises the following steps: S421. binning the offset data into equal frequency bins; S422. Select the number of bins according to the number of offset data; S423. discretize the continuous offset data according to the equal frequency binning strategy and the number of bins; S424. In the process of binning, outliers and missing values are deleted; S425. Divide the discretized data into intervals; S426. Create a two-dimensional encoding matrix based on the division results, where each column in the two-dimensional encoding matrix corresponds to a specific offset, and each row corresponds to a sample. If the offset of a sample is within a certain interval, it is 0, and if not, it is 1; S427. Traverse all offset data to obtain encoding vectors of all offset data; S43. Establishing a time and offset prediction model, and outputting a predicted offset based on the time and offset prediction model; In the formula, represents the predicted value at time t, l t =S(x)(W s ·[h m-1 ,t]+b s ) represents the activation vector at time t, where S(x) represents the sigmoid activation function, and W s represents the forget gate weight matrix, h m-1 The previous hidden state, b s Bias term; z t The encoding vector representing the offset data at time t, l t Indicates that the current offset is missing or exists. t =0 or 1, X t Indicates the time interval between the current time and the last measurement time to calculate the sample value before, that is, X t =e -△t / τ , τ is the time window parameter, △t represents the time interval between the last measurement time and the current time t; z last Indicates the offset of the last time point, z l Indicates whether the current offset continues to the predicted value based on the reliability of the last time point. If l t = 0, directly output the offset of the last time point as the predicted value. t =1, calculate X t , when X t If the value is greater than the threshold, the predicted value is z last Assignment, when X t When the value is less than the threshold, the average value of each eigenvalue is used for assignment; S44. Compare the output result with the predicted state. If it is within the verification threshold, it means that the prediction is accurate, thereby verifying that the prediction result is accurate.
2. An electronic device, characterized in that: The method comprises a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method for monitoring the offset of frozen soil on high slopes in cold regions as claimed in claim 1 when executing the computer program.
3. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for monitoring the displacement of frozen soil on high slopes in cold regions as described in claim 1 is implemented.
Citation Information
Patent Citations
Stability monitoring method for cold high-altitude steep slope
CN107067333A
Method for monitoring stable state of natural gas hydrate formation in frozen earth area
CN107269270A
BIM three-dimensional visualization deep foundation pit deformation prediction system based on genetic algorithm
CN111486814A
Landslide displacement multilinear prediction method based on ST-SEEP segmentation method and space-time ARMA model
CN113065702A
Landslide deformation monitoring system and method based on Kalman filtering
CN115112060A
