A method and device for automatically installing a power tower with a double-rocker power pole
Through the automatic installation method and device of double rocker electric pole, three-dimensional modeling and automation technology are used to solve the problem of traditional power tower relying on manual operation, improving construction efficiency and safety, and reducing costs.
Patent Information
- Application Number
- CN202410928203.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-11
AI Technical Summary
The traditional power tower erecting method relies on manual operation, is inefficient and has a large safety risk. Small power poles require a lot of manpower and material resources when transitioning frequently, which increases project costs and time, and has high operation complexity, which limits its application scope. .
Using automatic installation methods and devices for double rocker arm power holders, the information and installation sequence of suspension parts are determined through three-dimensional modeling and automation technology, and the electromagnetic hook and rotating device are used to automatically fix the suspension parts within the maximum safety amplitude range to reduce manual labor participate.
It improves the construction efficiency of power tower installation, reduces safety risks, and reduces the additional costs caused by frequent transitions, and realizes the automatic installation of suspension parts.
Smart Images

Figure CN118461978B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of tower installation, and in particular to a method and device for automatically installing a power tower with a double-rocker arm power pole. Background Art
[0002] With the rapid development of the power industry, the demand for the construction of power towers is increasing. The traditional method of erecting power towers mainly relies on manual work, which is not only inefficient but also poses great safety risks. Especially in high-altitude operations, the safety of workers is difficult to be fully guaranteed, and once an accident occurs, the consequences are often very serious.
[0003] At present, small electric poles are widely used in the construction of power towers, but they are frequently transferred, and each transfer requires a lot of manpower and material resources, which increases the cost and time of the project. In addition, the operation of small electric poles is relatively complex and requires strict technical level of operators, which also limits their application in a wider range of fields. Summary of the invention
[0004] In view of this, the present application provides a method and device for automatic installation of power towers with double-arm power poles, which reduce manual participation in power tower installation through automation technology, improve construction efficiency, reduce safety risks, and reduce additional costs caused by frequent transfers.
[0005] The first aspect of the present application provides a method for automatically installing a power tower with a double-rocker power pole, the method comprising:
[0006] Determine an initial coordinate map of the power tower including hanger information, wherein the hanger information includes a hoisting sequence and a hoisting position of each hanger to be installed;
[0007] Move the electromagnetic hook of the power tower to the initial position determined according to the hoisting position, rotate the power pole to perform three-dimensional modeling with the ground position of the pole center as the origin, and determine the amplitude, rotation angle, and height of the power pole;
[0008] Determine the maximum safe amplitude range of the power pole according to the amplitude, rotation angle and height of the power pole, place each hanging component in the pre-installation position within the maximum safe amplitude range according to the hanging component information, and determine the coordinates of the lifting ring and the notch on each hanging component;
[0009] Determine the target hanging part through the hoisting sequence, and fix the target hanging part on the power tower according to the hanging ring coordinates and notch coordinates of the target hanging part;
[0010] After determining that the target hanging parts are fixed, the target hanging parts are re-determined according to the hoisting sequence, and the re-determined target hanging parts are fixed until all hanging parts are fixed.
[0011] Optionally, determining the initial coordinate map of the power tower including the hanger information includes:
[0012] Taking the ground position of the center of the power tower pole as the origin, three-dimensional modeling is performed on the camera and ranging radar installed on the double-jib power pole to generate an initial coordinate map of the power tower, and the hoisting order and hoisting position of the hanging parts to be installed are calibrated on the initial coordinate map.
[0013] Optionally, fixing the target hanging component on the power tower according to the hanging ring coordinates and the slot coordinates of the target hanging component includes:
[0014] Determine the coordinates of the center point of the lifting ring of the target hanging part, move the electromagnetic hook to the coordinates of the center point of the lifting ring through the controller of the power tower, control the motor of the rotating device to make the electromagnetic hook move to the coordinate position of the lifting ring of the target hanging part, lock the electromagnetic hook, and make the electromagnetic hook hook the lifting ring of the target hanging part;
[0015] The stopper corresponding to the target hanging part is moved to the slot coordinate position of the target hanging part, so that the stopper enters the slot.
[0016] Optionally, moving the electromagnetic hook to the coordinates of the center point of the lifting ring by the controller of the power tower includes:
[0017] Determine the coordinates of the center point of the target hanging component, and determine the rotation angle and the amplitude change distance of the electric pole through the coordinates of the center point of the lifting ring and the coordinates of the center point of the target hanging component;
[0018] The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the midpoint of the lifting ring.
[0019] Optionally, the step of moving a stopper corresponding to the target hanging component to a slot coordinate position of the target hanging component includes:
[0020] The target position to which the electromagnetic hook needs to rise is determined by the current highest point position of the power tower, the center point coordinates of the target hanging part are determined, and the rotation angle and the amplitude change distance of the power pole are determined by the center point coordinates of the lifting ring and the center point coordinates of the target hanging part;
[0021] The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the initial position;
[0022] The stopper corresponding to the target hanging component is moved to the slot coordinate position of the target hanging component according to the initial position.
[0023] A second aspect of the present application provides an automatic installation device for a power tower with a double-rocker power pole, the device comprising:
[0024] A map determination unit, configured to determine an initial coordinate map of the power tower including hanger information, wherein the hanger information includes a hoisting sequence and a hoisting position of each hanger to be installed;
[0025] A pole parameter determination unit, used to move the electromagnetic hook of the power tower to an initial position determined according to the hoisting position, rotate the power pole to perform three-dimensional modeling with the ground position of the pole center as the origin, and determine the amplitude, rotation angle, and height of the power pole;
[0026] A coordinate determination unit, used to determine the maximum safe amplitude range of the power pole according to the amplitude, rotation angle and height of the power pole, place each hanging component in the pre-installation position within the maximum safe amplitude range according to the hanging component information, and determine the coordinates of the lifting ring and the notch on each hanging component;
[0027] A hanging component fixing unit, used for determining a target hanging component through the hoisting sequence, and fixing the target hanging component on the power tower according to the hanging ring coordinates and notch coordinates of the target hanging component;
[0028] After determining that the target hanging parts are fixed, the target hanging parts are re-determined according to the hoisting sequence, and the re-determined target hanging parts are fixed until all hanging parts are fixed.
[0029] Optionally, determining the initial coordinate map of the power tower containing the hanger information in the map determination unit includes:
[0030] Taking the ground position of the center of the power tower pole as the origin, three-dimensional modeling is performed on the camera and ranging radar installed on the double-jib power pole to generate an initial coordinate map of the power tower, and the hoisting order and hoisting position of the hanging parts to be installed are calibrated on the initial coordinate map.
[0031] Optionally, the fixing of the target hanging component on the power tower according to the hanging ring coordinates and the slot coordinates of the target hanging component in the hanging component fixing unit includes:
[0032] Determine the coordinates of the center point of the lifting ring of the target hanging part, move the electromagnetic hook to the coordinates of the center point of the lifting ring through the controller of the power tower, control the motor of the rotating device to make the electromagnetic hook move to the coordinate position of the lifting ring of the target hanging part, lock the electromagnetic hook, and make the electromagnetic hook hook the lifting ring of the target hanging part;
[0033] The stopper corresponding to the target hanging part is moved to the slot coordinate position of the target hanging part, so that the stopper enters the slot.
[0034] Optionally, the step of moving the electromagnetic hook to the center coordinate of the lifting ring by means of a controller of the power tower in the hanging fixture fixing unit includes:
[0035] Determine the coordinates of the center point of the target hanging component, and determine the rotation angle and the amplitude change distance of the electric pole through the coordinates of the center point of the lifting ring and the coordinates of the center point of the target hanging component;
[0036] The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the midpoint of the lifting ring.
[0037] Optionally, the step of moving a stopper corresponding to the target hanging component to a notch coordinate position of the target hanging component in the hanging component fixing unit includes:
[0038] The target position to which the electromagnetic hook needs to rise is determined by the current highest point position of the power tower, the center point coordinates of the target hanging part are determined, and the rotation angle and the amplitude change distance of the power pole are determined by the center point coordinates of the lifting ring and the center point coordinates of the target hanging part;
[0039] The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the initial position;
[0040] The stopper corresponding to the target hanging component is moved to the slot coordinate position of the target hanging component according to the initial position.
[0041] In the embodiment provided in the present application, the hoisting order and hoisting position of the hanging parts are first determined on the coordinate map of the power tower. When a transfer is required later, the electromagnetic hook of the power tower is moved to the initial position determined according to the lifting position for three-dimensional modeling. After determining the maximum safe amplitude range of the power pole, each hanging part to be installed is placed in the pre-installation position and the lifting ring coordinates and slot coordinates on each hanging part are recorded. Then, by controlling the rotation angle and amplitude change distance of the power pole, the electromagnetic hook is moved to the lifting ring coordinates and the slot coordinates to fix the hanging parts. This realizes the automatic installation of the power tower hanging parts, solves the problem that the existing power tower erection requires more manpower, and reduces manual participation through automation technology, improves construction efficiency, reduces safety risks, and reduces the additional costs caused by frequent transfers. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 A flow chart of the method provided in the embodiment of the present application;
[0043] Figure 2 A structural diagram of the hanging member provided in the embodiment of the present application
[0044] Figure 3This is a diagram of the device structure provided in an embodiment of the present application. DETAILED DESCRIPTION
[0045] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The implementations described in the following exemplary embodiments do not represent all implementations consistent with the present application. Instead, they are merely examples of devices and methods consistent with some aspects of the present application as detailed in the appended claims.
[0046] The terms used in this application are for the purpose of describing specific embodiments only and are not intended to limit this application. The singular forms of "a", "said" and "the" used in this application and the appended claims are also intended to include plural forms unless the context clearly indicates other meanings. It should also be understood that the term "and / or" used herein refers to and includes any or all possible combinations of one or more associated listed items.
[0047] It should be understood that although the terms first, second, third, etc. may be used in the present application to describe various information, these information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Depending on the context, the word "if" as used herein may be interpreted as "at the time of" or "when" or "in response to determining".
[0048] The present application provides a method and device for automatically installing a power tower with a double-rocker power pole, so as to provide a method for automatically installing a power tower.
[0049] The technical solution of the present application is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.
[0050] like Figure 1 As shown, it is a flow chart of a method for automatic installation of a power tower with a double-rocker power pole provided by the present application, and the process may include the following steps:
[0051] Step S101, determining an initial coordinate map of the power tower including hanger information, wherein the hanger information includes a hoisting sequence and a hoisting position of each hanger to be installed.
[0052] In this embodiment, the hoisting sequence and hoisting position can be calibrated when the power tower just leaves the factory. After the double-rocker power pole is installed in the factory, select a suitable 3D modeling software, such as AutoCAD, SolidWorks, Revit or professional power engineering software for 3D modeling. The origin can be set to the center ground position of the pole. Establish X, Y, and Z axes as needed to determine various directions in space. After determining the initial coordinate map of the power tower, the coordinates of the hoisting positions where the hoisting parts need to be installed and the corresponding hoisting sequence are determined on the initial coordinate map according to the calibrated hoisting sequence and hoisting position.
[0053] Step S102, moving the electromagnetic hook of the power tower to an initial position determined according to the hoisting position, rotating the power pole to perform three-dimensional modeling with the ground position of the pole center as the origin, and determining the amplitude, rotation angle, and height of the power pole.
[0054] In this embodiment, when the power tower needs to be relocated and rebuilt, after reaching the target site, the electromagnetic hook is first moved to the initial position, which needs to be higher than the hoisting position of each hanging part. When the electromagnetic hook reaches the initial position, the power pole is rotated and the ground position of the pole center is used as the origin for three-dimensional modeling.
[0055] In this embodiment, the height of the hoist is the height from the ground. The amplitude is the maximum extension distance of the boom on the horizontal plane. The amplitude can be simulated by rotating the boom or its components, and its maximum extension length can be measured. For example, for the horizontal calibration of the inclination value, when the current inclination value is θ, the distance between the center point of the sling and the rotation center is XL, and the amplitude = COSθ*XL. By rotating the boom to continuously adjust the inclination value, the maximum value of the amplitude can be determined. The rotation angle is the rotation range of the boom on the vertical plane. The rotation axis of the boom can be set, and the boom can be rotated to determine its maximum and minimum rotation angles.
[0056] Step S103, determining the maximum safe amplitude range of the power pole according to the amplitude, rotation angle, and height of the power pole, placing each hanging component in a pre-installation position within the maximum safe amplitude range according to the hanging component information, and determining the coordinates of the lifting ring and the notch on each hanging component.
[0057] In this embodiment, the pre-installation position can be determined at a fixed height Z directly above the hoisting position. After the maximum safe range is determined by the amplitude, rotation angle, and height of the power pole through 3D modeling software, the corresponding hanging parts are placed on the pre-installation position within the range, and the coordinates of the lifting rings and the notches on each hanging part are determined, such as Figure 2 shown.
[0058] Step S104, determining the target hanging component through the hoisting sequence, and fixing the target hanging component on the power tower according to the lifting ring coordinates and the slot coordinates of the target hanging component; after determining that the target hanging component is fixed, re-determine the target hanging component through the hoisting sequence, and fix the re-determined target hanging component until all hanging components are fixed.
[0059] In this embodiment, after determining the target hanging part to be hoisted this time, the coordinates of the center point of the hoist ring are first determined by the coordinates of the hoist ring on the target hanging part. For example, the coordinates of the hoist ring of the target hanging part are (X1, Y1, Z1), (X2, Y2, Z2), and the determined coordinates of the center point of the hoist ring are {(X1+X2) / 2, (Y1+Y2) / 2, (Z1+Z2) / 2}. Then, the electromagnetic hook is moved to the coordinates of the center point of the hoist ring by the controller, and the motor of the rotating device is controlled to make the electromagnetic hook run to the coordinates (X1, Y1, Z1), (X2, Y2, Z2), respectively, and the electromagnetic hook is locked in automatic mode or manual mode, so that the two electromagnetic hooks are respectively hung on the two hoist rings.
[0060] After the lifting ring is fixed, the position of the target hanging part needs to be adjusted back to the pre-installation position, and then the notch is fixed. The specific method is as follows:
[0061] The controller identifies the highest position of the current power tower and determines the target height Z that the electromagnetic hook needs to rise slightly higher than the highest point. max .
[0062] Then lift the electric pole to Z max -(Z1+Z2) / 2. Determine the coordinates of the center point of the spreader at this time as {X3, Y3, Z max -(Z1+Z2) / 2}. Then, the angle θ1 that needs to be rotated is determined by the center coordinates of the pre-installed position {(X1+X2) / 2, (Y1+Y2) / 2, (Z1+Z2) / 2}. COSθ1=(b^2+c^2-a^2) / 2bc, where positive and negative are the rotation directions, b=current amplitude, a=square root {[(X1+X2) / 2-X3]^2+[(Y1+Y2) / 2-Y3]^2}, c=(X1+X2) / 2. Determine the angle θ1 that the electric pole needs to rotate.
[0063] Then determine the amplitude change distance of the power pole = X3-(X1+X2) / 2, and the determined value is the regular amplitude change inward.
[0064] After determining the rotation angle and amplitude change distance, adjust the power pole so that its X and Y coordinates are consistent with the pre-installation position, that is, the adjusted power pole is directly above the pre-installation position. Then control the rotation device motor to make the shape of the slot consistent with the block, and then control the electromagnetic hook on the power pole to slowly descend so that the block enters the slot of the hanging part to be installed to fix the target hanging part. After the fixation is completed, the controller of the power tower controls the electromagnetic hook to release the target hanging part and run it to the Zmax height to avoid collision. At this point, the installation of the target hanging part is completed.
[0065] The controller then re-determines the target hanging parts from the above hanging sequence, and repeats the above steps until all hanging parts are installed, and the power tower is installed.
[0066] So far, completed Figure 1 The process shown.
[0067] In an embodiment of the present application, the hoisting order and hoisting position of the hanging parts are first determined on the coordinate map of the power tower. When a transfer is required later, the electromagnetic hook of the power tower is moved to the initial position determined according to the lifting position for three-dimensional modeling. After determining the maximum safe amplitude range of the power pole, each hanging part to be installed is placed in the pre-installation position and the lifting ring coordinates and slot coordinates on each hanging part are recorded. Then, by controlling the rotation angle and amplitude change distance of the power pole, the electromagnetic hook is moved to the lifting ring coordinates and the slot coordinates to fix the hanging parts. This realizes the automatic installation of the power tower hanging parts, solves the problem that the existing power tower erection requires more manpower, and reduces manual participation through automation technology, improves construction efficiency, reduces safety risks, and reduces the additional costs caused by frequent transfers.
[0068] like Figure 3 As shown, the present application also provides an automatic installation device for a power tower with a double-rocker power pole, the device comprising:
[0069] A map determination unit 301 is used to determine an initial coordinate map of the power tower including hanger information, wherein the hanger information includes a hoisting sequence and a hoisting position of each hanger to be installed;
[0070] A pole parameter determination unit 302 is used to move the electromagnetic hook of the power tower to an initial position determined according to the hoisting position, rotate the power pole to perform three-dimensional modeling with the ground position of the pole center as the origin, and determine the amplitude, rotation angle, and height of the power pole;
[0071] A coordinate determination unit 303 is used to determine the maximum safe amplitude range of the power pole according to the amplitude, rotation angle, and height of the power pole, place each hanging component in the pre-installation position within the maximum safe amplitude range according to the hanging component information, and determine the coordinates of the lifting ring and the notch on each hanging component;
[0072] A hanging component fixing unit 304 is used to determine a target hanging component according to the hanging sequence, and fix the target hanging component on the power tower according to the hanging ring coordinates and slot coordinates of the target hanging component;
[0073] After determining that the target hanging parts are fixed, the target hanging parts are re-determined according to the hoisting sequence, and the re-determined target hanging parts are fixed until all hanging parts are fixed.
[0074] In another embodiment, determining the initial coordinate map of the power tower including the hanger information in the map determination unit includes:
[0075] Taking the ground position of the center of the power tower pole as the origin, three-dimensional modeling is performed on the camera and ranging radar installed on the double-jib power pole to generate an initial coordinate map of the power tower, and the hoisting order and hoisting position of the hanging parts to be installed are calibrated on the initial coordinate map.
[0076] In another embodiment, the fixing unit of the target hanging component includes fixing the target hanging component on the power tower according to the hanging ring coordinates and the slot coordinates of the target hanging component:
[0077] Determine the coordinates of the center point of the lifting ring of the target hanging part, move the electromagnetic hook to the coordinates of the center point of the lifting ring through the controller of the power tower, control the motor of the rotating device to make the electromagnetic hook move to the coordinate position of the lifting ring of the target hanging part, lock the electromagnetic hook, and make the electromagnetic hook hook the lifting ring of the target hanging part;
[0078] The stopper corresponding to the target hanging part is moved to the slot coordinate position of the target hanging part, so that the stopper enters the slot.
[0079] In another embodiment, the controller of the power tower in the hanging fixture fixing unit moves the electromagnetic hook to the coordinates of the center point of the hanging ring, including:
[0080] Determine the coordinates of the center point of the target hanging component, and determine the rotation angle and the amplitude change distance of the electric pole through the coordinates of the center point of the lifting ring and the coordinates of the center point of the target hanging component;
[0081] The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the midpoint of the lifting ring.
[0082] In another embodiment, the step of moving the stopper corresponding to the target hanging component to the notch coordinate position of the target hanging component in the hanging component fixing unit includes:
[0083] The target position to which the electromagnetic hook needs to rise is determined by the current highest point position of the power tower, the center point coordinates of the target hanging part are determined, and the rotation angle and the amplitude change distance of the power pole are determined by the center point coordinates of the lifting ring and the center point coordinates of the target hanging part;
[0084] The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the initial position;
[0085] The stopper corresponding to the target hanging component is moved to the slot coordinate position of the target hanging component according to the initial position.
[0086] The above embodiment of the present invention provides a method for automatic installation of a power tower with a double-arm power pole, and based on this method, provides a device for automatic installation of a power tower with a double-arm power pole. Through the above method and device, it is achieved by reducing manual participation in the installation of power towers through automation technology, improving construction efficiency, reducing safety risks, and reducing the additional costs caused by frequent transfers.
[0087] This embodiment also discloses a computer device, which includes a processor and a memory, wherein the memory stores at least one instruction, and the at least one instruction is loaded and executed by the processor to implement any of the above-mentioned methods for automatically installing a power tower with a double-arm electric pole.
[0088] In addition, in the implementation manner of the automatic installation device for power towers with double-arm electric poles in the above-mentioned example, the logical division of each program module is only an example. In actual applications, the above-mentioned functions can be assigned to different program modules as needed, for example, for the convenience of corresponding hardware configuration requirements or software implementation. That is, the internal structure of the automatic installation device for power towers with double-arm electric poles is divided into different program modules to complete all or part of the functions described above.
[0089] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application shall be included in the scope of protection of the present application.
Claims
1. A method for automatically installing a power tower with a double-rocker power pole, characterized in that: The method comprises: Determine an initial coordinate map of the power tower including hanger information, wherein the hanger information includes a hoisting sequence and a hoisting position of each hanger to be installed; Move the electromagnetic hook of the power tower to the initial position determined according to the hoisting position, rotate the power pole to perform three-dimensional modeling with the ground position of the pole center as the origin, and determine the amplitude, rotation angle, and height of the power pole; Determine the maximum safe amplitude range of the power pole according to the amplitude, rotation angle and height of the power pole, place each hanging component in the pre-installation position within the maximum safe amplitude range according to the hanging component information, and determine the coordinates of the lifting ring and the notch on each hanging component; Determine the target hanging part through the hoisting sequence, determine the coordinates of the center point of the lifting ring of the target hanging part, move the electromagnetic hook to the coordinates of the center point of the lifting ring through the controller of the power tower, control the motor of the rotating device to make the electromagnetic hook move to the coordinate position of the lifting ring of the target hanging part, lock the electromagnetic hook, and make the electromagnetic hook hook the lifting ring of the target hanging part; The target position to which the electromagnetic hook needs to rise is determined by the current highest point position of the power tower, the center point coordinates of the target hanging part are determined, the rotation angle and the amplitude change distance of the power pole are determined by the center point coordinates of the lifting ring and the center point coordinates of the target hanging part, and the target hanging part is moved to a fixed height directly above the lifting position; The electric pole is adjusted by the rotation angle and the amplitude change distance so that the coordinates of the electric pole in the X and Y directions are consistent with the hoisting position, and the electromagnetic hook is controlled to descend to the initial position; According to the initial position, the stopper corresponding to the target hanging part is moved to the slot coordinate position of the target hanging part, and the electromagnetic hook is controlled to descend so that the stopper enters the slot; After determining that the target hanging parts are fixed, the target hanging parts are re-determined according to the hoisting sequence, and the re-determined target hanging parts are fixed until all hanging parts are fixed.
2. The method according to claim 1, characterized in that Determining the initial coordinate map of the power tower including the hanger information includes: Taking the ground position of the center of the power tower pole as the origin, three-dimensional modeling is performed on the camera and ranging radar installed on the double-jib power pole to generate an initial coordinate map of the power tower, and the hoisting order and hoisting position of the hanging parts to be installed are calibrated on the initial coordinate map.
3. The method according to claim 1, characterized in that The moving the electromagnetic hook to the center coordinate of the lifting ring by the controller of the power tower comprises: Determine the coordinates of the center point of the target hanging component, and determine the rotation angle and the amplitude change distance of the electric pole through the coordinates of the center point of the lifting ring and the coordinates of the center point of the target hanging component; The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the midpoint of the lifting ring.
4. An automatic installation device for a power tower with a double rocker arm power pole, characterized in that: The device comprises: A map determination unit, configured to determine an initial coordinate map of the power tower including hanger information, wherein the hanger information includes a hoisting sequence and a hoisting position of each hanger to be installed; A pole parameter determination unit, used to move the electromagnetic hook of the power tower to an initial position determined according to the hoisting position, rotate the power pole to perform three-dimensional modeling with the ground position of the pole center as the origin, and determine the amplitude, rotation angle, and height of the power pole; A coordinate determination unit, used to determine the maximum safe amplitude range of the power pole according to the amplitude, rotation angle and height of the power pole, place each hanging component in the pre-installation position within the maximum safe amplitude range according to the hanging component information, and determine the coordinates of the lifting ring and the notch on each hanging component; A hanging component fixing unit is used to determine the target hanging component through the hoisting sequence, determine the coordinates of the center point of the hanging ring of the target hanging component, move the electromagnetic hook to the coordinates of the center point of the hanging ring through the controller of the power tower, control the motor of the rotating device to make the electromagnetic hook move to the coordinate position of the hanging ring of the target hanging component, lock the electromagnetic hook, and make the electromagnetic hook hook the hanging ring of the target hanging component; The target position to which the electromagnetic hook needs to rise is determined by the current highest point position of the power tower, the center point coordinates of the target hanging part are determined, the rotation angle and the amplitude change distance of the power pole are determined by the center point coordinates of the lifting ring and the center point coordinates of the target hanging part, and the target hanging part is moved to a fixed height directly above the lifting position; The electric pole is adjusted by the rotation angle and the amplitude change distance so that the coordinates of the electric pole in the X and Y directions are consistent with the hoisting position, and the electromagnetic hook is controlled to descend to the initial position; According to the initial position, the stopper corresponding to the target hanging part is moved to the slot coordinate position of the target hanging part, and the electromagnetic hook is controlled to descend so that the stopper enters the slot; After determining that the target hanging parts are fixed, the target hanging parts are re-determined according to the hoisting sequence, and the re-determined target hanging parts are fixed until all hanging parts are fixed.
5. The device according to claim 4, characterized in that Determining the initial coordinate map of the power tower containing the hanger information in the map determination unit includes: Taking the ground position of the center of the power tower pole as the origin, three-dimensional modeling is performed on the camera and ranging radar installed on the double-jib power pole to generate an initial coordinate map of the power tower, and the hoisting order and hoisting position of the hanging parts to be installed are calibrated on the initial coordinate map.
6. The device according to claim 4, characterized in that The process of moving the electromagnetic hook to the center point coordinate of the lifting ring by the controller of the power tower in the hanging fixture fixing unit includes: Determine the coordinates of the center point of the target hanging component, and determine the rotation angle and the amplitude change distance of the electric pole through the coordinates of the center point of the lifting ring and the coordinates of the center point of the target hanging component; The electric pole is adjusted by the rotation angle and the amplitude change distance, and the electromagnetic hook is controlled to descend to the midpoint of the lifting ring.