A precise positioning system for power assets based on Beidou navigation

Through the power asset precise positioning system based on Beidou navigation, the problem of precise positioning and upgrade guidance of old thermal power generating units has been solved, and the efficient elimination of thermal power generating units and the transformation of the energy structure have been achieved.

CN118465532BActive Publication Date: 2024-10-18ZHUJI POWER SUPPLY CO OF STATE GRID ZHEJIANG ELECTRIC POWER CO LTD +3
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410877821.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-10-18
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

It is difficult to accurately locate and guide the elimination and upgrade of old thermal power generating units with existing technology. Especially in the process of energy structure transformation, it is necessary to efficiently identify and replace the location and upgrade direction of old thermal power generating units.

Method used

The power asset precise positioning system based on Beidou navigation is used to obtain the location and environmental parameters of the thermal power generation unit through the asset information collection module, status monitoring module and environmental parameter collection module, calculate the status coefficient and environmental coefficient, and determine the age of the thermal power generation unit. status and upgrade direction, and then provide precise positioning and upgrade guidance.

Benefits of technology

It achieves precise positioning and guidance on the direction of upgrading old thermal power generating units, improves the efficiency of elimination and replacement of thermal power generating units, and supports the transformation of the energy structure and the reduction of greenhouse gas emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118465532B_ABST
    Figure CN118465532B_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power asset management, and discloses a power asset precise positioning system based on Beidou navigation. The system compares a state coefficient of a thermal power generator set with a preset state coefficient threshold of the thermal power generator set, and calculates the position coordinate information and altitude information of all thermal power generator sets in an old state based on Beidou, and then calculates the first environmental coefficient and the second environmental coefficient of the positions of all thermal power generator sets in an old state according to the position coordinate information and the altitude information of all thermal power generator sets in an old state, and compares the first environmental coefficient and the second environmental coefficient with the corresponding threshold, and records the position number of the supply side that can be iteratively upgraded to a wind power generator set, the position number of the supply side that can be iteratively upgraded to a photovoltaic generator set, and the position number of the supply side that can be iteratively upgraded to a wind power generator set and a photovoltaic generator set, respectively, so as to provide guidance on the upgrade direction of the old thermal power generator sets.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power asset management, and in particular to a power asset precise positioning system based on Beidou navigation. Background Art

[0002] Power assets cover the asset allocation and operation management of power generation, transmission, and sales. In modern society, power is an indispensable infrastructure for daily life and industrial development, and its asset management is becoming increasingly important. Power assets include not only traditional thermal power generation assets, but also new energy forms such as solar and wind.

[0003] With the development of society, in order to promote the transformation of energy structure and reduce greenhouse gas emissions, it is necessary to eliminate old thermal power generating units and replace them with solar and wind power generating units. Therefore, the present invention provides a precise positioning system for electric power assets based on Beidou navigation, which can accurately locate the location of old thermal power generating units that need to be eliminated, and provide guidance on the upgrade direction of the old thermal power generating units based on the location information. Summary of the invention

[0004] The purpose of the present invention is to provide a precise positioning system for electric power assets based on Beidou navigation to solve the above technical problems.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A precise positioning system for power assets based on Beidou navigation, comprising: an asset information collection module, an inspection module, an environmental parameter collection module and a precise positioning module;

[0007] The asset information location acquisition module is used to obtain the location information of all thermal power generating units in the monitoring area based on Beidou;

[0008] The asset information status monitoring module is used to monitor the status of the thermal power generating units at each location according to the location information of all thermal power generating units acquired by the asset information acquisition module;

[0009] The environmental parameter acquisition module is used to acquire the environmental parameters of the location of each thermal power generation group according to the location information of all thermal power generation groups acquired by the asset information acquisition module;

[0010] The precise positioning module is used to precisely locate the thermal power generating sets that need to be eliminated and upgraded according to the environmental parameters of the locations of the thermal power generating sets and the status parameters of the thermal power generating sets at the locations.

[0011] As a further description of the solution of the present invention, the working process of the asset information collection module includes:

[0012] All thermal power generating units in the monitoring area are numbered in the following order: 1, 2, ... n ;

[0013] Based on Beidou navigation, the i The location information of the thermal power generating unit is stored under the corresponding number, where: i belongs to [1, n ];

[0014] The location information includes geographic location coordinate data and altitude data.

[0015] As a further description of the solution of the present invention, the working process of the asset information status monitoring module includes:

[0016] First, obtain the i The first j Item status parameters m The monitoring results are obtained by fitting the i The first j Function of item state parameters changing over time f ij ( t );

[0017] Then, the i The first j Item status parameters m The monitoring results and i The first j Function of item state parameters changing over time f ij ( t ) into the following formula:

[0018]

[0019] In the formula, f ij0 For the i The first j The standard value corresponding to the item status parameter, f ijk For the i The first j The state parameter k The monitoring results include: k belongs to [1, m ], For the i The first j Item status parameters m The average value of monitoring results, Aij For the i The first j Item status parameter warning indicator, t 1 is the initial time point of monitoring, t 2 is the current time point for monitoring, △ t = t 2- t 1, α ij and β ij For the i The first j The weight coefficient corresponding to the item state parameter;

[0020] Finally, according to i The first j Item status parameter warning indicator A ij Calculate the i The state coefficient of the thermal power generating unit σ i :

[0021]

[0022] In the formula, s For the i The number of status parameters monitored by the thermal power generating units, j belongs to [1, s ],ω ij For the i The first j The weight coefficient corresponding to the early warning indicator of the item status parameter.

[0023] As a further description of the solution of the present invention, the working process of the environmental parameter acquisition module includes:

[0024] Get the i The geographical location coordinate data of the thermal power generating unit is obtained based on the geographical location coordinate data to obtain the temperature change function of the area corresponding to the location point over time T i ( t ), humidity changes over time function H i ( t ) and wind speed as a function of time V i ( t ) and the light intensity as a function of time Q i ( t );

[0025] Get the i Geographical location altitude data of thermal power generating units Hi ;

[0026] According to the temperature change function T i ( t ), humidity changes over time function H i ( t ), wind speed variation function over time V i ( t ) and the light intensity as a function of time Q i ( t ), fitting curve l i1 , l i2 , l i3 and l i4 ;

[0027] Get Curve l i1 and x Area enclosed by the axis S i1 , get the curve l i2 and x Area enclosed by the axis S i2 and get the curve l i3 and x Area enclosed by the axis S i3 , get the curve l i4 and x Area enclosed by the axis S i4 ;

[0028] Calculate the i The first environmental factor of thermal power generating units:

[0029]

[0030] Calculate the first i The second environmental factor of thermal power generating units:

[0031]

[0032] In the formula, S i10 For area S i1 The corresponding standard reference value, Si20 For area S i2 The corresponding standard reference value, S i30 For area S i3 The corresponding standard reference value, S i40 For area S i4 The corresponding standard reference value, H i0 For altitude data H i The corresponding standard reference values, μ and π are conversion coefficients.

[0033] As a further description of the solution of the present invention, the working process of the precise positioning module includes:

[0034] step S 1. Based on i The state coefficient of the thermal power generating unit at i Determine the current status of the thermal power generating unit;

[0035] step S 2. Based on i The environmental factor of the thermal power generating unit is i Judge the environmental status of the thermal power generating unit.

[0036] step S 3. Repeat steps S 1 in sequence n Determine the current status of the thermal power generating units and record the numbers of all old thermal power generating units;

[0037] step S 4. Repeat steps S 2 pairs of steps S 2. The environmental status of all old thermal power generating units in the state is judged;

[0038] step S 5. According to the steps S 3 and Steps S 4, accurately locate the number and location information of the thermal power generating unit for supply-side upgrade.

[0039] As a further description of the scheme of the present invention, the steps S The specific process of 1 includes:

[0040] The first i The state coefficient of the thermal power generating unit σ i With the preset iThe state coefficient threshold σ of the thermal power generating unit ith Compare, if σ i Greater than or equal to σ ith It means that i The thermal power generating units are in old condition and need to be upgraded on the supply side;

[0041] The steps S The specific process of 3 includes:

[0042] Sequentially n The state coefficient of the thermal power generating set is compared with the preset state coefficient threshold of the corresponding thermal power generating set, and the serial numbers of all the old thermal power generating sets are recorded.

[0043] As a further description of the scheme of the present invention, the steps S The specific process of 2 includes:

[0044] The first i The first environmental factor of thermal power generating units E 1i With the preset i The first environmental coefficient threshold interval of the thermal power generating unit E 1Compare, if E 1i belong E 1i , then it means i The supply side of thermal power generating units can be upgraded to wind power generating units;

[0045] The first i The second environmental factor of thermal power generating units E 2i With the preset i The second environmental coefficient threshold interval of the thermal power generating unit E 2Compare, if E 2i belong E 2, then it means i The supply side of thermal power generating units can be upgraded to solar power generating units;

[0046] The steps S The specific process of 4 includes:

[0047] Compare the first environmental coefficient and the second environmental coefficient of the environment of all old thermal power generating units in each state with the corresponding threshold intervals in turn;

[0048] Record the numbers of wind turbines that can be iteratively upgraded to the supply side, the numbers of photovoltaic generators that can be iteratively upgraded to the supply side, and the numbers of wind turbines and photovoltaic generators that can be iteratively upgraded to the supply side.

[0049] Beneficial effects of the present invention:

[0050] The present invention compares the state coefficient of the thermal power generator set with a preset state coefficient threshold of the thermal power generator set, and based on Beidou statistics, calculates the position coordinate information and altitude information of all the thermal power generator sets in old states, and then calculates the first environmental coefficient and the second environmental coefficient of the positions of all the thermal power generator sets in old states according to the position coordinate information and the altitude information of all the thermal power generator sets in old states, and compares the first environmental coefficient and the second environmental coefficient with the corresponding threshold, and respectively records the position number of the supply side that can be iteratively upgraded to a wind power generator set, the position number of the supply side that can be iteratively upgraded to a photovoltaic generator set, and the position number of the supply side that can be iteratively upgraded to a wind power generator set and a photovoltaic generator set, so as to provide guidance on the upgrade direction of the old thermal power generator sets. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a module block diagram of the power asset precise positioning system based on Beidou navigation provided by the present invention. DETAILED DESCRIPTION

[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0053] See also Figure 1 As shown, the present invention is a precise positioning system for power assets based on Beidou navigation, comprising: an asset information collection module, an inspection module, an environmental parameter collection module and a precise positioning module;

[0054] The asset information location acquisition module is used to obtain the location information of all thermal power generating units in the monitoring area based on Beidou;

[0055] The asset information status monitoring module is used to monitor the status of the thermal power generating units at each location according to the location information of all thermal power generating units acquired by the asset information acquisition module;

[0056] The environmental parameter acquisition module is used to acquire the environmental parameters of the location of each thermal power generation group according to the location information of all thermal power generation groups acquired by the asset information acquisition module;

[0057] The precise positioning module is used to precisely locate the thermal power generating sets that need to be eliminated and upgraded according to the environmental parameters of the locations of the thermal power generating sets and the status parameters of the thermal power generating sets at the locations.

[0058] Through the above technical scheme, the present invention monitors the location information of all thermal power generating units in the area based on Beidou positioning, and obtains the historical parameters of environmental data at the corresponding positions based on the location information of all thermal power generating units, and then obtains the state parameters of the thermal power generating units at each position, and accurately locates the thermal power generating units that need to be eliminated and upgraded through the precise positioning module, and provides guidance on the direction of elimination and upgrading of old thermal power generating units based on the information data at each position.

[0059] As a further description of the solution of the present invention, the working process of the asset information collection module includes:

[0060] All thermal power generating units in the monitoring area are numbered in the following order: 1, 2, ... n ;

[0061] Based on Beidou navigation, the i The location information of the thermal power generating unit is stored under the corresponding number, where: i belongs to [1, n ];

[0062] The location information includes geographic location coordinate data and altitude data.

[0063] As a further description of the solution of the present invention, the working process of the asset information status monitoring module includes:

[0064] First, obtain the i The first j Item status parameters m The monitoring results are obtained by fitting the i The first j Function of item state parameters changing over time f ij ( t );

[0065] Then, the i The first j Item status parameters m The monitoring results and i The first j Function of item state parameters changing over time f ij ( t ) into the following formula:

[0066]

[0067] In the formula, f ij0 For the i The firstj The standard value corresponding to the item status parameter, f ijk For the i The first j The state parameter k The monitoring results include: k belongs to [1, m ], For the i The first j Item status parameters m The average value of monitoring results, A ij For the i The first j Item status parameter warning indicator, t 1 is the initial time point of monitoring, t 2 is the current time point for monitoring, △ t = t 2- t 1, α ij and β ij For the i The first j The weight coefficient corresponding to the item state parameter;

[0068] Finally, according to i The first j Item status parameter warning indicator A ij Calculate the i The state coefficient of the thermal power generating unit σ i :

[0069]

[0070] In the formula, s For the i The number of status parameters monitored by the thermal power generating units, j belongs to [1, s ],ω ij For the i The first j The weight coefficient corresponding to the early warning indicator of the item status parameter.

[0071] Through the above technical solution, this embodiment provides a working method of an asset information status monitoring module. First, obtain the first i The first j Item status parameters m The monitoring results are obtained by fitting the i The first jFunction of item state parameters changing over time f ij ( t ), and then by the formula Calculate the i The first j Item status parameter warning indicator, It can reflect the overall situation of the deviation of the parameter from the reference value. Reflecting the fluctuation of historical data, finally, according to the formula Calculate the i The state coefficient of the thermal power generating unit σ i .

[0072] As a further description of the solution of the present invention, the working process of the environmental parameter acquisition module includes:

[0073] Get the i The geographical location coordinate data of the thermal power generating unit is obtained based on the geographical location coordinate data to obtain the temperature change function of the area corresponding to the location point over time T i ( t ), humidity changes over time function H i ( t ) and wind speed as a function of time V i ( t ) and the light intensity as a function of time Q i ( t );

[0074] Get the i Geographical location altitude data of thermal power generating units H i ;

[0075] According to the temperature change function T i ( t ), humidity changes over time function H i ( t ), wind speed variation function over time V i ( t ) and the light intensity as a function of time Q i ( t ), fitting curve l i1 , l i2 , l i3 and li4 ;

[0076] Get Curve l i1 and x Area enclosed by the axis S i1 , get the curve l i2 and x Area enclosed by the axis S i2 and get the curve l i3 and x Area enclosed by the axis S i3 , get the curve l i4 and x Area enclosed by the axis S i4 ;

[0077] Calculate the first i The first environmental factor of thermal power generating units:

[0078]

[0079] Calculate the first i The second environmental factor of thermal power generating units:

[0080]

[0081] In the formula, S i10 For area S i1 The corresponding standard reference value, S i20 For area S i2 The corresponding standard reference value, S i30 For area S i3 The corresponding standard reference value, S i40 For area S i4 The corresponding standard reference value, H i0 For altitude data H i The corresponding standard reference values, μ and π are conversion coefficients.

[0082] Through the above technical solution, this embodiment provides a method for monitoring the corresponding location environment based on location information. First, according to the temperature change function over time, Ti ( t ), humidity changes over time function H i ( t ), wind speed variation function over time V i ( t ) and the light intensity as a function of time Q i ( t ), fitting curve l i1 , l i2 , l i3 and l i4 , and then by the formula and Calculate the i The first environmental coefficient and the second environmental coefficient of the thermal power generating unit.

[0083] As a further description of the solution of the present invention, the working process of the precise positioning module includes:

[0084] step S 1. Based on i The state coefficient of the thermal power generating unit at i Determine the current status of the thermal power generating unit;

[0085] step S 2. Based on i The environmental factor of the thermal power generating unit is i Judge the environmental status of the thermal power generating unit.

[0086] step S 3. Repeat steps S 1 in sequence n Determine the current status of the thermal power generating units and record the numbers of all old thermal power generating units;

[0087] step S 4. Repeat steps S 2 pairs of steps S 2. The environmental status of all old thermal power generating units in the state is judged;

[0088] step S 5. According to the steps S 3 and Steps S 4, accurately locate the number and location information of the thermal power generating unit for supply-side upgrade.

[0089] As a further description of the scheme of the present invention, the steps S The specific process of 1 includes:

[0090] The first i The state coefficient of the thermal power generating unit σ i With the preset i The state coefficient threshold σ of the thermal power generating unit ith Compare, if σ i Greater than or equal to σ ith It means that i The thermal power generating units are in old condition and need to be upgraded on the supply side;

[0091] The steps S The specific process of 3 includes:

[0092] Sequentially n The state coefficient of the thermal power generating set is compared with the preset state coefficient threshold of the corresponding thermal power generating set, and the serial numbers of all the old thermal power generating sets are recorded.

[0093] As a further description of the scheme of the present invention, the steps S The specific process of 2 includes:

[0094] The first i The first environmental factor of thermal power generating units E 1i With the preset i The first environmental coefficient threshold interval of the thermal power generating unit E 1Compare, if E 1i belong E 1i , then it means i The supply side of thermal power generating units can be upgraded to wind power generating units;

[0095] The first i The second environmental factor of thermal power generating units E 2i With the preset i The second environmental coefficient threshold interval of the thermal power generating unit E 2Compare, if E 2i belong E 2, then it means i The supply side of thermal power generating units can be upgraded to solar power generating units;

[0096] The steps S The specific process of 4 includes:

[0097] Compare the first environmental coefficient and the second environmental coefficient of the environment of all old thermal power generating units in each state with the corresponding threshold intervals in turn;

[0098] Record the numbers of wind turbines that can be iteratively upgraded to the supply side, the numbers of photovoltaic generators that can be iteratively upgraded to the supply side, and the numbers of wind turbines and photovoltaic generators that can be iteratively upgraded to the supply side.

[0099] Through the above technical scheme, this embodiment compares the state coefficient of the thermal power generator set with the preset state coefficient threshold of the thermal power generator set, and based on Beidou statistics, the position coordinate information and altitude information of all the thermal power generator sets in the old state are obtained, and then the first environmental coefficient and the second environmental coefficient of the position of all the thermal power generator sets in the old state are calculated according to the position coordinate information and altitude information of all the thermal power generator sets in the old state, and the first environmental coefficient and the second environmental coefficient are compared with the corresponding thresholds, and the position number of the supply side that can be iteratively upgraded to the wind power generator set, the position number of the supply side that can be iteratively upgraded to the photovoltaic generator set, and the position number of the supply side that can be iteratively upgraded to the wind power generator set and the photovoltaic generator set are recorded respectively, so as to provide guidance on the upgrade direction of the old thermal power generator sets.

[0100] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A precise positioning system for power assets based on Beidou navigation, It is characterized in that include: Asset information location collection module, asset information status monitoring module, environmental parameter collection module and precise positioning module; The asset information location acquisition module is used to obtain the location information of all thermal power generating units in the monitoring area based on Beidou; The asset information status monitoring module is used to monitor the status of the thermal power generating units at each location according to the location information of all thermal power generating units acquired by the asset information location acquisition module; The environmental parameter acquisition module is used to acquire the environmental parameters of the location of each thermal power generation group according to the location information of all thermal power generation groups acquired by the asset information location acquisition module; The precise positioning module is used to precisely locate the thermal power generating units that need to be eliminated and upgraded according to the environmental parameters of the locations of the thermal power generating units and the state parameters of the thermal power generating units at the locations; The working process of the asset information location acquisition module includes: All thermal power generating units in the monitoring area are numbered in the following order: 1, 2, ..., n; Based on Beidou navigation, the location information of the i-th thermal power generating unit is obtained and stored in the corresponding number, where i belongs to [1, n]; The location information includes geographic location coordinate data and altitude data; The working process of the asset information status monitoring module includes: First, obtain the m monitoring results of the j-th state parameter of the i-th thermal power generating unit, and fit the function f of the j-th state parameter of the i-th thermal power generating unit over time. ij (t); Then, the m monitoring results of the j-th state parameter of the i-th thermal power generating unit and the time variation function f of the j-th state parameter of the i-th thermal power generating unit are calculated. ij Substitute (t) into the following formula: In the formula, f ij0 is the standard value corresponding to the jth state parameter of the i-th thermal power generating unit, f ijk is the kth monitoring result of the jth state parameter of the i-th thermal power generating unit, where k belongs to [1, m], is the mean value of the m-times monitoring results of the j-th state parameter of the i-th thermal power generating unit, A ij is the jth state parameter warning indicator of the i-th thermal power generating unit, t 1 is the initial time point for monitoring, t 2 To monitor the current time point, △t=t 2 -t 1 , α ij and β ij is the weight coefficient corresponding to the jth state parameter of the i-th thermal power generating unit; Finally, according to the jth state parameter warning index A of the i-th thermal power generating unit ij Calculate the state coefficient σ of the thermal power generating unit at the i-th location i : Where s is the number of state parameters monitored by the thermal power generating unit at the i-th location, j belongs to [1, s], ω ij is the weight coefficient corresponding to the j-th state parameter warning indicator of the i-th thermal power generating unit; The working process of the environmental parameter acquisition module includes: Obtain the geographical location coordinate data of the i-th thermal power generating unit, and obtain the temperature change function T of the area corresponding to the location point based on the geographical location coordinate data i (t), humidity change function H i (t) and the wind speed function V i (t) and the light intensity variation function Q i (t); Get the geographical location altitude data H of the i-th thermal power generating unit i ; According to the temperature-time function T i (t), humidity change function H i (t), wind speed function V i (t) and the light intensity variation function Q i (t), fitting curve l i1 , l i2 , l i3 and l i4 ; Get curve l i1 The area S enclosed by the x-axis i1 , get curve l i2 The area S enclosed by the x-axis i2 and obtain the curve l i3 The area S enclosed by the x-axis i3 , get the curve l i4 The area S enclosed by the x-axis i4 ; The first environmental coefficient of the thermal power generating unit at position i is calculated by the following formula: The second environmental coefficient of the thermal power generating unit at location i is calculated by the following formula: In the formula, S i10 is the area S i1 The corresponding standard reference value, S i20 is the area S i2 The corresponding standard reference value, S i30 is the area S i3 The corresponding standard reference value, S i40 is the area S i4 The corresponding standard reference value, H i0 is the altitude data H i The corresponding standard reference values, μ and π are conversion coefficients; The working process of the precise positioning module includes: Step S1, judging the current state of the i-th thermal power generating unit based on the state coefficient of the i-th thermal power generating unit; Step S2, based on the environmental coefficient of the i-th thermal power generating unit, the environmental state of the i-th thermal power generating unit is judged; Step S3, repeating step S1 to judge the current status of the n thermal power generating units in turn, and recording the numbers of all the old thermal power generating units in the state; Step S4, repeating step S2 to judge the environmental status of all old thermal power generating units in step S2; Step S5: Based on the judgment results of step S3 and step S4, accurately locate the number and location information of the thermal power generating unit to be upgraded on the supply side.

2. According to the Beidou navigation-based precise positioning system for power assets described in claim 1, It is characterized in that The specific process of step S1 includes: The state coefficient σ of the i-th thermal power generating unit i and the preset state coefficient threshold σ of the i-th thermal power generating unit ith Compare, if σ i Greater than or equal to σ ith This means that the i-th thermal power generating unit is old and needs to be upgraded on the supply side; The specific process of step S3 includes: The state coefficients of the n thermal power generating units are compared with the preset state coefficient thresholds of the corresponding thermal power generating units in turn, and the numbers of all the old thermal power generating units are recorded.

3. According to the Beidou navigation-based power asset precise positioning system described in claim 1, It is characterized in that The specific process of step S2 includes: The first environmental coefficient E of the i-th thermal power generating unit 1i and the preset first environmental coefficient threshold interval E of the i-th thermal power generating unit 1 Compare, if E 1i Belong to E 1i , it means that the supply side of the thermal power generating unit at the i-th location can be iteratively upgraded to a wind power generating unit; The second environmental coefficient E of the i-th thermal power generating unit 2i and the preset second environmental coefficient threshold interval E of the i-th thermal power generating unit 2 Compare, if E 2i Belong to E 2 , it means that the supply side of the thermal power generating unit at the i-th location can be iteratively upgraded to a solar power generating unit; The specific process of step S4 includes: Compare the first environmental coefficient and the second environmental coefficient of the environment of all old thermal power generating units in each state with the corresponding threshold intervals in turn; Record the numbers of wind turbines that can be iteratively upgraded to the supply side, the numbers of photovoltaic generators that can be iteratively upgraded to the supply side, and the numbers of wind turbines and photovoltaic generators that can be iteratively upgraded to the supply side.

Citation Information

Patent Citations

  • Thermal power plant environment protection equipment online risk evaluation method and thermal power plant environment protection equipment online risk evaluation system

    CN105913185A

  • Thermal generator set online performance monitoring method based on component characteristics

    CN106249728A