Operation optimization control method, system and device of energy storage converter

By constructing a virtual power plant model and optimizing power dispatch, the problems of high power loss and air pollution in power grid transmission lines are solved, the close deployment and efficient use of power are achieved, and the loss and congestion of transmission lines are reduced.

CN118472996BActive Publication Date: 2024-10-18SHANDONG TAILAI ELECTRIC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410940109.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-18
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

Existing technologies have problems with high power losses and air pollution in grid transmission lines, especially during peak charge consumption periods. Centralized energy generation and long-distance power transmission have led to increased use of fossil fuels, leading to global warming and climate change.

Method used

By obtaining information about distributed energy storage equipment and grid transmission lines, a virtual power plant model is constructed to simulate the power demand status, optimize power dispatching, and update power transfer paths to reduce long-distance transmission and losses.

Benefits of technology

It reduces the flow and loss of power grid transmission lines, improves energy efficiency, extends the life of power grid infrastructure, and reduces the need for new transmission lines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118472996B_ABST
    Figure CN118472996B_ABST
Patent Text Reader

Abstract

The invention discloses an operation optimization control method for an energy storage converter, which relates to the technical field of energy storage converters. The method comprises the following steps: collecting operation data of the energy storage converter and marking the collection time, setting a monitoring cycle, obtaining a virtual power plant model of a target area, simulating the power demand state of power grid transmission lines connected to each energy storage converter in the current monitoring cycle through the virtual power plant model, obtaining the power demand state of each power grid transmission line at different times, constructing an operation process sequence and power dispatch matching points of each power grid transmission line according to the power demand state of each power grid transmission line, and obtaining a power transfer path between energy storage converters; obtaining an estimated power demand of an operation process subsequence in a peak demand state, comparing the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of other operation process subsequences, updating the power transfer path, and reducing the power transmission loss of the transmission line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of energy storage converters, and in particular to an operation optimization control method for an energy storage converter. Background Art

[0002] The prior art CN114221367A "A method, device and energy storage converter for optimizing operation control of an energy storage converter" adopts an energy shaping and port-controlled dissipative Hamiltonian control method to establish a port-controlled dissipative Hamiltonian mathematical model of the energy storage converter; a passive controller of the system is obtained by using a damping configuration passivity control strategy; a disturbance feedforward compensator is designed by using a nonlinear disturbance observer; the output of the above-mentioned disturbance observer is used as compensation for the output of the passive controller to obtain a modulation signal of the energy storage converter, thereby improving the current inner loop control performance of the energy storage converter, overcoming the parameter dependence characteristics of the passive controller, and effectively suppressing the influence of nonlinear disturbances on the output power quality of the energy storage converter.

[0003] The prior art CN109599878A "A method for controlling an energy storage converter for power quality optimization needs" detects the harmonic current of the output stage of the energy storage converter; outputs a tracking signal after the harmonic current detection value passes through a neural network controller, and adopts multi-frequency-hysteresis compound control for the tracking signal; after the tracking signal passes through the multi-frequency controller, it generates a PWM signal through pulse width modulation to control the energy storage converter. The present invention designs a comprehensive compensation strategy for the energy storage converter based on multi-frequency-hysteresis compound control, and cooperates with the neural network controller to enable the energy storage converter to have a fast response speed such as harmonic suppression tracking, and has a high compensation accuracy; based on the self-disturbance rejection controller of the small signal model of the energy storage converter, the PI parameters of the proportional resonant controller are adjusted, the input and output power of the energy storage converter are optimized, and the grid-connected anti-disturbance capability is improved under the premise of stable operation of the energy storage system, and the fluctuation of the grid-connected frequency is suppressed; and the compensation control of the DC bus voltage is realized at other times of frequency change.

[0004] When the power grid transmission line is in a peak demand state, it means that the area where the power grid transmission line is located is in the peak period of charge consumption, and the charge energy storage in the area where the power grid transmission line is located is insufficient. The existing technology increases the power generation of the power grid transmission line in the target area through power stations (such as coal and natural gas power stations), thereby increasing the active power of the power grid transmission line. However, there are centralized energy generation and long-distance transmission in the power generation process. Centralized thermal power stations often use fossil fuels, which will cause air pollution, greenhouse gas emissions and other harmful emissions, exacerbating global warming and climate change problems. At the same time, in the power grid transmission line, electrical energy is lost in the form of electromagnetic fields, resistance and corona discharge, especially in ultra-long distance transmission, the loss will be more significant. How to integrate the use of renewable energy power generation in the target area, smooth the centralized energy generation time, reduce the long-distance transmission of the entire power grid, reduce the flow of transmission lines, and reduce the possibility of line losses and congestion is an issue that we urgently need to solve. Summary of the invention

[0005] In order to solve the above technical problems, the object of the present invention is to provide an operation optimization control method of an energy storage converter, comprising the following steps:

[0006] Step S1: Obtain information about distributed energy storage devices and power grid transmission lines in the target area. Each energy storage device in the target area is connected to the power grid transmission line in a distributed manner through an energy storage converter. The operation data of the energy storage converter is collected and the collection time is marked, and a monitoring cycle is set.

[0007] Step S2: Acquire historical operating data of the energy storage converter, and perform virtual construction based on the distributed energy storage device information, power grid transmission line information, historical operating data and operating data of the energy storage converter in the target area to obtain a virtual power plant model of the target area;

[0008] Step S3: The virtual power plant model simulates the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period, obtains the power demand state of each power grid transmission line at different times, constructs the operation process sequence and power dispatch matching point of each power grid transmission line according to the power demand state of each power grid transmission line, and performs power dispatch matching on the operation process subsequence in the power grid transmission line in the peak demand state at the power dispatch matching point, screens out the operation process subsequence in the valley demand state within a preset range, and obtains the power transfer path between the energy storage converter of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state; obtains the estimated power demand of the operation process subsequence in the peak demand state, compares the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of the matching operation process subsequence in the valley demand state, and updates the power transfer path between the energy storage converters according to the comparison result.

[0009] Furthermore, the historical operation data of the energy storage converter is obtained, and a virtual construction is performed based on the distributed energy storage device information, the power grid transmission line information, the historical operation data and the operation data of the energy storage converter in the target area to obtain the virtual power plant model of the target area, including:

[0010] Construct a digital space for the target area, obtain the geographical location information of the distributed energy storage equipment in the target area through GIS, obtain the physical entities of each energy storage equipment in the physical space and the multi-source heterogeneous data of each energy storage converter, construct a simulation model of the physical entity of the distributed energy storage equipment, obtain the simulation model of the distributed energy storage equipment, and map the simulation model to the digital space according to the geographical location information of the distributed energy storage equipment;

[0011] The multi-source heterogeneous data of each energy storage converter is preprocessed in data format to generate twin data, and the twin data is assigned to each simulation model according to the connection relationship between each energy storage device and the corresponding energy storage converter to obtain the corresponding instance simulation model;

[0012] Obtain the connection relationship between each energy storage device and the power grid transmission line and the power grid transmission lines in the target area, construct a power grid topology map according to the connection relationship, use each instance simulation model as a node of the power grid topology map, and use the power grid transmission lines as connecting lines of the power grid topology map;

[0013] Obtain the historical operating data of each energy storage inverter, build a data prediction model for each energy storage inverter based on the historical operating data, obtain the operating prediction data of each energy storage inverter in the current monitoring period through the data prediction model, store the operating prediction data in the digital space, and match each instance simulation model with the corresponding operating prediction data to generate a virtual power plant model.

[0014] Furthermore, the process of constructing a data prediction model for each energy storage converter based on historical operation data includes:

[0015] A data prediction model is constructed based on deep learning, and a historical data set is constructed according to the historical operation data of several historical monitoring cycles of each energy storage inverter. The historical data set is divided into a training set and a test set, and the training set is input into the data prediction model for training until the loss function training is stable, and the model parameters are saved. The data prediction model is tested with the test set until it meets the preset requirements, and the data prediction model is output. The data prediction model is used to output the operation prediction data of the current monitoring cycle of each energy storage inverter.

[0016] Furthermore, the virtual power plant model simulates the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period. The process of obtaining the power demand state of each power grid transmission line at different times includes:

[0017] According to the operation prediction data of the current monitoring cycle of each energy storage converter, the predicted active power of the power grid transmission line connected to each energy storage converter at each moment is obtained;

[0018] Obtain the active power upper limit of each power grid transmission line, compare the predicted active power of the power grid transmission line at each moment with the corresponding active power upper limit, and obtain the active power deviation value of the power grid transmission line at different moments;

[0019] The electric energy demand states corresponding to different active power deviation values ​​are set, and the electric energy demand states of each power grid transmission line at different times are obtained according to the power deviation level. The electric energy demand states include peak demand state, normal demand state and valley demand state.

[0020] Furthermore, the virtual power plant model constructs the operation process sequence of each power grid transmission line and the process of power dispatch matching points according to the power demand state of each power grid transmission line, including:

[0021] An operation process sequence of a power grid transmission line is constructed, the operation process sequence is segmented according to the power demand state of the power grid transmission line at different times, the power demand state is used as the segmentation node of the operation process sequence, the operation process sequence is divided into a plurality of operation process subsequences, and the start timestamp of each operation process subsequence is used as the power scheduling matching point.

[0022] Furthermore, the virtual power plant model performs power dispatch matching on the operation process subsequences in the peak demand state in the power grid transmission line at the power dispatch matching point, screens out the operation process subsequences in the valley demand state within a preset range, and obtains the power transfer path between the energy storage converters of the operation process subsequences in the peak demand state and the operation process subsequences in the valley demand state, including:

[0023] Read the subsequence of the operation process in the peak demand state in the power grid transmission line, and match the subsequence of the operation process in the valley demand state in other power grid transmission lines with the same timestamp according to the subsequence of the operation process in the peak demand state;

[0024] Obtain the power grid transmission line to which the operation process subsequence in the peak demand state belongs, and obtain the position information of the energy storage converter connected to the power grid transmission line. Similarly, obtain the power grid transmission lines to which several other operation process subsequences in the valley demand state belong with the same timestamp, and obtain the position information of the energy storage converter connected to the power grid transmission line. According to the position information and the connection relationship between the power grid transmission lines, obtain several power transfer paths between the energy storage converter connected to the power grid transmission line in the peak demand state and the energy storage converters connected to several other power grid transmission lines in the valley demand state.

[0025] A path distance threshold is set to obtain the path distances of several power transfer paths, and the power transfer paths whose power transfer path distances are greater than the path distance threshold are eliminated from the several power transfer paths. The screened energy storage converters are sorted in reverse order according to the path distance length to obtain the sorting result.

[0026] Furthermore, the process of obtaining the estimated power demand of the running process subsequence in the peak demand state includes:

[0027] According to the operation prediction data of the energy storage inverter connected to the power grid transmission line to which the operation process subsequence in the peak demand state belongs, the predicted electric energy reserves of the energy storage device connected to the energy storage inverter are obtained, and then the time span of the operation process subsequence in the peak demand state is obtained. According to the predicted active power of the power grid transmission line to which the operation process subsequence in the peak demand state belongs, the predicted electric energy reserves and the time span of the operation process subsequence in the peak demand state, the estimated electric energy demand of the operation process subsequence is obtained.

[0028] Further, the process of comparing the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of the operation process subsequence in the matching valley demand state, and updating the power transfer path between the energy storage converters according to the comparison result includes:

[0029] Filter out the predicted electric energy reserves of the energy storage device connected to the energy storage converter with the shortest path distance in the sorting results, and compare the predicted electric energy reserves with the estimated electric energy demand;

[0030] If the predicted electric energy reserve is less than the estimated electric energy demand, the difference between the estimated electric energy demand and the predicted electric energy reserve is obtained, and then the predicted electric energy reserve of the energy storage device connected to the energy storage converter with the shortest path distance is selected from the sorting result, and the predicted electric energy reserve is compared with the difference;

[0031] If the predicted electric energy reserve is less than the difference, repeat the above steps until the sum of the predicted electric energy reserves of the energy storage devices connected to the screened energy storage converter is greater than or equal to the estimated electric energy demand;

[0032] Then, the screened energy storage converters are marked as energy storage converters to be scheduled, and the power transfer paths of the energy storage converters to be scheduled are obtained to determine whether there are other energy storage converters to be scheduled on the power transfer paths of the energy storage converters to be scheduled;

[0033] If there are other energy storage converters to be scheduled on the energy transfer path of the energy storage converter to be scheduled, the energy transfer path of the energy storage converter to be scheduled is updated to the energy transfer path between the energy storage converter to be scheduled and other energy storage converters to be scheduled.

[0034] An operation optimization control system for an energy storage converter includes a monitoring center, wherein the monitoring center is communicatively connected to a data acquisition module, a model simulation module, and a path matching module;

[0035] The data acquisition module is used to obtain the distributed energy storage device information and the power grid transmission line information in the target area. Each energy storage device in the target area is connected to the power grid transmission line in a distributed manner through the energy storage converter, collects the operating data of the energy storage converter and marks the collection time, and sets the monitoring cycle;

[0036] The model simulation module is used to obtain the historical operation data of the energy storage converter, and to perform virtual construction based on the distributed energy storage equipment information, power grid transmission line information, historical operation data and operation data of the energy storage converter in the target area to obtain a virtual power plant model of the target area;

[0037] The path matching module is used to simulate the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period through a virtual power plant model, obtain the power demand state of each power grid transmission line at different times, construct the operation process sequence and power dispatch matching point of each power grid transmission line according to the power demand state of each power grid transmission line, and perform power dispatch matching on the operation process subsequence in the power grid transmission line that is in the peak demand state at the power dispatch matching point, screen out the operation process subsequence in the valley demand state within a preset range, and obtain the power transfer path between the energy storage converter of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state; obtain the estimated power demand of the operation process subsequence in the peak demand state, compare the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of the matching operation process subsequence in the valley demand state, and update the power transfer path between the energy storage converters according to the comparison result.

[0038] An operation optimization control device for an energy storage inverter, the operation optimization control device for the energy storage inverter comprising an operation optimization control method program for the energy storage inverter, and when the operation optimization control method program for the energy storage inverter is executed by the operation optimization control device for the energy storage inverter, the operation optimization control method steps for the energy storage inverter as described in any one of the above items are implemented.

[0039] Compared with the prior art, the beneficial effect of the present invention is that when the electric energy that the energy storage converter to be dispatched originally needs to transmit to the energy storage converter in the peak demand state is converted into the energy storage device to be transmitted to other energy storage converters to be dispatched on the electric energy transfer path, compared with the traditional point-to-point electric energy dispatch, especially when the electric energy transfer path between the energy storage converter to be dispatched and the energy storage converter in the peak state is far away, the present invention converts the energy storage device that directly transmits electric energy to the energy storage converter in the peak state into the energy storage device that transmits electric energy to other energy storage devices on the path, and the other energy storage devices integrate the received electric energy and transmit it to the energy storage device of the energy storage converter in the peak state. Through the above measures, the energy storage converter enables electricity to be deployed and used at a short distance during peak demand, avoiding unnecessary long-distance transmission through the entire power grid, reducing the flow of transmission lines, reducing losses, and reducing the possibility of power grid congestion, which not only improves the energy utilization efficiency, but also extends the life of existing power grid infrastructure and reduces the demand for new transmission lines. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 This is a schematic diagram of the operation optimization control method of the energy storage converter according to an embodiment of the present application.

[0041] Figure 2 This is a schematic diagram of an operation optimization control system for an energy storage converter according to an embodiment of the present application. DETAILED DESCRIPTION

[0042] The following is a clear and complete description of the technical solutions in the embodiments of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0043] like Figure 1 As shown, the operation optimization control method of the energy storage converter includes the following steps:

[0044] Step S1: Obtain information about distributed energy storage devices and power grid transmission lines in the target area. Each energy storage device in the target area is connected to the power grid transmission line in a distributed manner through an energy storage converter. The operation data of the energy storage converter is collected and the collection time is marked, and a monitoring cycle is set.

[0045] Step S2: Acquire historical operating data of the energy storage converter, and perform virtual construction based on the distributed energy storage device information, power grid transmission line information, historical operating data and operating data of the energy storage converter in the target area to obtain a virtual power plant model of the target area;

[0046] Step S3: The virtual power plant model simulates the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period, obtains the power demand state of each power grid transmission line at different times, constructs the operation process sequence and power dispatch matching point of each power grid transmission line according to the power demand state of each power grid transmission line, and performs power dispatch matching on the operation process subsequence in the power grid transmission line in the peak demand state at the power dispatch matching point, screens out the operation process subsequence in the valley demand state within a preset range, and obtains the power transfer path between the energy storage converter of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state; obtains the estimated power demand of the operation process subsequence in the peak demand state, compares the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of the matching operation process subsequence in the valley demand state, and updates the power transfer path between the energy storage converters according to the comparison result.

[0047] It should be further explained that, in the specific implementation process, the historical operation data of the energy storage converter is obtained, and a virtual construction is performed based on the distributed energy storage device information, the power grid transmission line information, the historical operation data and the operation data of the energy storage converter in the target area to obtain the virtual power plant model of the target area, including:

[0048] Construct a digital space for the target area, obtain the geographical location information of the distributed energy storage equipment in the target area through GIS, obtain the physical entities of each energy storage equipment in the physical space and the multi-source heterogeneous data of each energy storage converter, construct a simulation model of the physical entity of the distributed energy storage equipment, obtain the simulation model of the distributed energy storage equipment, and map the simulation model to the digital space according to the geographical location information of the distributed energy storage equipment;

[0049] The multi-source heterogeneous data of each energy storage converter is preprocessed in data format to generate twin data, and the twin data is assigned to each simulation model according to the connection relationship between each energy storage device and the corresponding energy storage converter to obtain the corresponding instance simulation model;

[0050] Obtain the connection relationship between each energy storage device and the power grid transmission line and the power grid transmission lines in the target area, construct a power grid topology map according to the connection relationship, use each instance simulation model as a node of the power grid topology map, and use the power grid transmission lines as connecting lines of the power grid topology map;

[0051] Obtain the historical operating data of each energy storage inverter, build a data prediction model for each energy storage inverter based on the historical operating data, obtain the operating prediction data of each energy storage inverter in the current monitoring period through the data prediction model, store the operating prediction data in the digital space, and match each instance simulation model with the corresponding operating prediction data to generate a virtual power plant model.

[0052] It should be further explained that, in the specific implementation process, the process of building the data prediction model of each energy storage converter based on the historical operation data includes:

[0053] A data prediction model is constructed based on deep learning, and a historical data set is constructed according to the historical operation data of several historical monitoring cycles of each energy storage inverter. The historical data set is divided into a training set and a test set, and the training set is input into the data prediction model for training until the loss function training is stable, and the model parameters are saved. The data prediction model is tested with the test set until it meets the preset requirements, and the data prediction model is output. The data prediction model is used to output the operation prediction data of the current monitoring cycle of each energy storage inverter.

[0054] It should be further explained that the energy storage inverter is the key interface between the energy storage system (such as battery energy storage, pumped storage, compressed air energy storage, etc.) and the power grid. Its main function is to convert the DC power output of the energy storage equipment into AC power that meets the requirements of the power grid, or vice versa. The optimization control method of the energy storage inverter is an important part of improving the efficiency and reliability of the power grid. The operating data of the energy storage inverter includes parameters such as the voltage, frequency, power flow direction of the power grid transmission line, and the state of charge (SOC), temperature, energy storage, and charge and discharge rate of the energy storage system.

[0055] It should be further explained that, in the specific implementation process, the virtual power plant model simulates the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period, and the process of obtaining the power demand state of each power grid transmission line at different times includes:

[0056] According to the operation prediction data of the current monitoring cycle of each energy storage converter, the predicted active power of the power grid transmission line connected to each energy storage converter at each moment is obtained;

[0057] Obtain the active power upper limit of each power grid transmission line, compare the predicted active power of the power grid transmission line at each moment with the corresponding active power upper limit, and obtain the active power deviation value of the power grid transmission line at different moments;

[0058] The electric energy demand states corresponding to different active power deviation values ​​are set, and the electric energy demand states of each power grid transmission line at different times are obtained according to the power deviation level. The electric energy demand states include peak demand state, normal demand state and valley demand state.

[0059] It should be further explained that, in the specific implementation process, the virtual power plant model constructs the operation process sequence of each power grid transmission line and the process of power dispatch matching points according to the power demand state of each power grid transmission line, including:

[0060] An operation process sequence of a power grid transmission line is constructed, the operation process sequence is segmented according to the power demand state of the power grid transmission line at different times, the power demand state is used as the segmentation node of the operation process sequence, the operation process sequence is divided into a plurality of operation process subsequences, and the start timestamp of each operation process subsequence is used as the power scheduling matching point.

[0061] It should be further explained that, in the specific implementation process, the virtual power plant model performs power dispatch matching on the operation process subsequence in the peak demand state in the power grid transmission line at the power dispatch matching point, screens out the operation process subsequence in the valley demand state within a preset range, and obtains the power transfer path between the energy storage converter of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state, including:

[0062] Read the subsequence of the operation process in the peak demand state in the power grid transmission line, and match the subsequence of the operation process in the valley demand state in other power grid transmission lines with the same timestamp according to the subsequence of the operation process in the peak demand state;

[0063] Obtain the power grid transmission line to which the operation process subsequence in the peak demand state belongs, and obtain the position information of the energy storage converter connected to the power grid transmission line. Similarly, obtain the power grid transmission lines to which several other operation process subsequences in the valley demand state belong with the same timestamp, and obtain the position information of the energy storage converter connected to the power grid transmission line. According to the position information and the connection relationship between the power grid transmission lines, obtain several power transfer paths between the energy storage converter connected to the power grid transmission line in the peak demand state and the energy storage converters connected to several other power grid transmission lines in the valley demand state.

[0064] A path distance threshold is set to obtain the path distances of several power transfer paths, and the power transfer paths whose power transfer path distances are greater than the path distance threshold are eliminated from the several power transfer paths. The screened energy storage converters are sorted in reverse order according to the path distance length to obtain the sorting result.

[0065] It should be further explained that, in a specific implementation process, the process of obtaining the estimated power demand of the running process subsequence in the peak demand state includes:

[0066] According to the operation prediction data of the energy storage converter connected to the power grid transmission line to which the operation process subsequence in the peak demand state belongs, the predicted electric energy reserve of the energy storage device connected to the energy storage converter is obtained, and then the time span of the operation process subsequence in the peak demand state is obtained, and according to the predicted active power of the power grid transmission line to which the operation process subsequence in the peak demand state belongs, the predicted electric energy reserve and the time span of the operation process subsequence in the peak demand state, the estimated electric energy demand of the operation process subsequence is obtained;

[0067] In a specific embodiment, the standard active power of the power grid transmission line under normal demand conditions is first determined. When the power grid transmission line is in a peak demand state, it indicates that the area where the power grid transmission line is located is in a peak charge consumption period, and the charge energy storage in the area where the power grid transmission line is located is insufficient. The prior art increases the power generation of the power grid transmission line in the target area through power stations (such as coal and natural gas power stations), thereby increasing the active power of the power grid transmission line. However, there are centralized energy generation and long-distance power transmission in the power generation process. Centralized thermal power stations often use fossil fuels, which can cause air pollution, greenhouse gas emissions and other harmful emissions, exacerbating the problems of global warming and climate change. At the same time, in the power grid transmission line, electric energy is transmitted through Losses in the form of electromagnetic fields, resistance and corona discharge, especially in ultra-long distance transmission, will be more significant. In order to integrate the use of renewable energy power generation in the target area, smooth the centralized energy generation time, reduce the long-distance transmission of the entire power grid, reduce the flow of transmission lines, and reduce losses, the present invention first obtains the active power deviation value between the predicted active power and the standard active power of the power grid transmission line in the peak demand state, and then obtains the estimated power demand of the operation process subsequence in the peak demand state converted into the operation process subsequence in the normal demand state according to the active power deviation value, the predicted electric energy reserves of the energy storage device and the time span of the operation process subsequence in the peak demand state. The calculation formula of the estimated power demand is:

[0068] ;

[0069] Where W is the estimated power demand; P is the active power deviation value; WS is the predicted power reserve of the energy storage device; and T is the time span.

[0070] It should be further explained that, in the specific implementation process, the estimated power demand of the operation process subsequence in the peak demand state is compared with the predicted power reserve of the operation process subsequence in the matching low demand state, and the process of updating the power transfer path between the energy storage converters according to the comparison result includes:

[0071] Filter out the predicted electric energy reserves of the energy storage device connected to the energy storage converter with the shortest path distance in the sorting results, and compare the predicted electric energy reserves with the estimated electric energy demand;

[0072] If the predicted electric energy reserve is less than the estimated electric energy demand, the difference between the estimated electric energy demand and the predicted electric energy reserve is obtained, and then the predicted electric energy reserve of the energy storage device connected to the energy storage converter with the shortest path distance is selected from the sorting result, and the predicted electric energy reserve is compared with the difference;

[0073] If the predicted electric energy reserve is less than the difference, repeat the above steps until the sum of the predicted electric energy reserves of the energy storage devices connected to the screened energy storage converter is greater than or equal to the estimated electric energy demand;

[0074] Then, the screened energy storage converters are marked as energy storage converters to be scheduled, and the power transfer paths of the energy storage converters to be scheduled are obtained to determine whether there are other energy storage converters to be scheduled on the power transfer paths of the energy storage converters to be scheduled;

[0075] If there are other energy storage converters to be scheduled on the energy transfer path of the energy storage converter to be scheduled, the energy transfer path of the energy storage converter to be scheduled is updated to the energy transfer path between the energy storage converter to be scheduled and other energy storage converters to be scheduled.

[0076] It should be further explained that, in the specific implementation process, when the electric energy that the energy storage inverter to be dispatched originally needs to transmit to the energy storage inverter in the peak demand state is converted into the energy storage device to be transmitted to other energy storage inverters to be dispatched on the energy transfer path, compared with the traditional point-to-point energy dispatch, especially when the distance of the energy transfer path between the energy storage inverter to be dispatched and the energy storage inverter in the peak state is relatively long, the present invention converts the energy storage device that directly transmits electric energy to the energy storage inverter in the peak state into the energy storage device that transmits electric energy to other energy storage devices on the path, and the other energy storage devices integrate the received electric energy and transmit it to the energy storage device of the energy storage inverter in the peak state, which not only reduces the transmission distance of the long-distance energy transfer path and reduces the transmission loss, but also reduces the flow of the transmission line and improves the energy transmission performance.

[0077] An operation optimization control system for an energy storage converter includes a monitoring center, wherein the monitoring center is communicatively connected to a data acquisition module, a model simulation module, and a path matching module;

[0078] The data acquisition module is used to obtain the distributed energy storage device information and the power grid transmission line information in the target area. Each energy storage device in the target area is connected to the power grid transmission line in a distributed manner through the energy storage converter, collects the operating data of the energy storage converter and marks the collection time, and sets the monitoring cycle;

[0079] The model simulation module is used to obtain the historical operation data of the energy storage converter, and to perform virtual construction based on the distributed energy storage equipment information, power grid transmission line information, historical operation data and operation data of the energy storage converter in the target area to obtain a virtual power plant model of the target area;

[0080] The path matching module is used to simulate the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period through a virtual power plant model, obtain the power demand state of each power grid transmission line at different times, construct the operation process sequence and power dispatch matching point of each power grid transmission line according to the power demand state of each power grid transmission line, and perform power dispatch matching on the operation process subsequence in the power grid transmission line in the peak demand state at the power dispatch matching point, screen out the operation process subsequence in the valley demand state within a preset range, and obtain the power transfer path between the energy storage converter of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state; obtain the estimated power demand of the operation process subsequence in the peak demand state, compare the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of the matching operation process subsequence in the valley demand state, and update the power transfer path between the energy storage converters according to the comparison result;

[0081] An operation optimization control device for an energy storage inverter, the operation optimization control device for the energy storage inverter comprising an operation optimization control method program for the energy storage inverter, and when the operation optimization control method program for the energy storage inverter is executed by the operation optimization control device for the energy storage inverter, the operation optimization control method steps for the energy storage inverter as described in any one of the above items are implemented.

[0082] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. An operation optimization control method for an energy storage converter, characterized in that: The following steps are involved: Step S1: Obtain information about distributed energy storage devices and power grid transmission lines in the target area. Each energy storage device in the target area is connected to the power grid transmission line in a distributed manner through an energy storage converter. The operation data of the energy storage converter is collected and the collection time is marked, and a monitoring cycle is set. Step S2: Acquire historical operating data of the energy storage converter, and perform virtual construction based on the distributed energy storage device information, power grid transmission line information, historical operating data and operating data of the energy storage converter in the target area to obtain a virtual power plant model of the target area; Step S3: The virtual power plant model simulates the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period, obtains the power demand state of each power grid transmission line at different times, constructs the operation process sequence and power dispatch matching point of each power grid transmission line according to the power demand state of each power grid transmission line, and performs power dispatch matching on the operation process subsequence in the power grid transmission line in the peak demand state at the power dispatch matching point, screens out the operation process subsequence in the valley demand state within a preset range, and obtains the power transfer path between the energy storage converters of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state; Obtain the estimated power demand of the operating process subsequence in the peak demand state, compare the estimated power demand of the operating process subsequence in the peak demand state with the predicted power reserve of the operating process subsequence in the matching valley demand state, and update the power transfer path between the energy storage converters according to the comparison result; The virtual power plant model performs power dispatch matching on the operation process subsequences in the power grid transmission line in the peak demand state at the power dispatch matching point, selects the operation process subsequences in the valley demand state within a preset range, and obtains the power transfer path between the energy storage converters of the operation process subsequences in the peak demand state and the operation process subsequences in the valley demand state, including: Read the subsequence of the operation process in the peak demand state in the power grid transmission line, and match the subsequence of the operation process in the valley demand state in other power grid transmission lines with the same timestamp according to the subsequence of the operation process in the peak demand state; Obtain the power grid transmission line to which the operation process subsequence in the peak demand state belongs, and obtain the position information of the energy storage converter connected to the power grid transmission line. Similarly, obtain the power grid transmission lines to which several other operation process subsequences in the valley demand state belong with the same timestamp, and obtain the position information of the energy storage converter connected to the power grid transmission line. According to the position information and the connection relationship between the power grid transmission lines, obtain several power transfer paths between the energy storage converter connected to the power grid transmission line in the peak demand state and the energy storage converters connected to several other power grid transmission lines in the valley demand state. A path distance threshold is set to obtain the path distances of several power transfer paths, and the power transfer paths whose power transfer path distances are greater than the path distance threshold are eliminated from the several power transfer paths. The screened energy storage converters are sorted in reverse order according to the path distance length to obtain the sorting result.

2. The operation optimization control method of the energy storage converter according to claim 1, characterized in that: The process of obtaining the historical operation data of the energy storage converter and virtually constructing the virtual power plant model of the target area based on the distributed energy storage device information, power grid transmission line information, historical operation data and operation data of the energy storage converter in the target area includes: Construct a digital space for the target area, obtain the geographical location information of the distributed energy storage equipment in the target area through GIS, obtain the physical entities of each energy storage equipment in the physical space and the multi-source heterogeneous data of each energy storage converter, construct a simulation model of the physical entity of the distributed energy storage equipment, obtain the simulation model of the distributed energy storage equipment, and map the simulation model to the digital space according to the geographical location information of the distributed energy storage equipment; The multi-source heterogeneous data of each energy storage converter is preprocessed in data format to generate twin data, and the twin data is assigned to each simulation model according to the connection relationship between each energy storage device and the corresponding energy storage converter to obtain the corresponding instance simulation model; Obtain the connection relationship between each energy storage device and the power grid transmission line and the power grid transmission lines in the target area, construct a power grid topology map according to the connection relationship, use each instance simulation model as a node of the power grid topology map, and use the power grid transmission lines as connecting lines of the power grid topology map; Obtain the historical operating data of each energy storage inverter, build a data prediction model for each energy storage inverter based on the historical operating data, obtain the operating prediction data of each energy storage inverter in the current monitoring period through the data prediction model, store the operating prediction data in the digital space, and match each instance simulation model with the corresponding operating prediction data to generate a virtual power plant model.

3. The operation optimization control method of the energy storage converter according to claim 2 is characterized in that: The process of building a data prediction model for each energy storage converter based on historical operating data includes: A data prediction model is constructed based on deep learning, and a historical data set is constructed according to the historical operation data of several historical monitoring cycles of each energy storage inverter. The historical data set is divided into a training set and a test set, and the training set is input into the data prediction model for training until the loss function training is stable, and the model parameters are saved. The data prediction model is tested with the test set until it meets the preset requirements, and the data prediction model is output. The data prediction model is used to output the operation prediction data of the current monitoring cycle of each energy storage inverter.

4. The operation optimization control method of the energy storage converter according to claim 3 is characterized in that: The virtual power plant model simulates the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period. The process of obtaining the power demand state of each power grid transmission line at different times includes: According to the operation prediction data of the current monitoring cycle of each energy storage converter, the predicted active power of the power grid transmission line connected to each energy storage converter at each moment is obtained; Obtain the active power upper limit of each power grid transmission line, compare the predicted active power of the power grid transmission line at each moment with the corresponding active power upper limit, and obtain the active power deviation value of the power grid transmission line at different moments; The electric energy demand states corresponding to different active power deviation values ​​are set, and the electric energy demand states of each power grid transmission line at different times are obtained according to the power deviation level. The electric energy demand states include peak demand state, normal demand state and valley demand state.

5. The operation optimization control method of the energy storage converter according to claim 4 is characterized in that: The virtual power plant model constructs the operation process sequence of each power grid transmission line and the process of power dispatch matching points according to the power demand status of each power grid transmission line, including: An operation process sequence of a power grid transmission line is constructed, the operation process sequence is segmented according to the power demand state of the power grid transmission line at different times, the power demand state is used as the segmentation node of the operation process sequence, the operation process sequence is divided into a plurality of operation process subsequences, and the start timestamp of each operation process subsequence is used as the power scheduling matching point.

6. The operation optimization control method of the energy storage converter according to claim 5, characterized in that: The process of obtaining the estimated power demand of the running process subsequence in the peak demand state includes: According to the operation prediction data of the energy storage inverter connected to the power grid transmission line to which the operation process subsequence in the peak demand state belongs, the predicted electric energy reserves of the energy storage device connected to the energy storage inverter are obtained, and then the time span of the operation process subsequence in the peak demand state is obtained. According to the predicted active power of the power grid transmission line to which the operation process subsequence in the peak demand state belongs, the predicted electric energy reserves and the time span of the operation process subsequence in the peak demand state, the estimated electric energy demand of the operation process subsequence is obtained.

7. The operation optimization control method of the energy storage converter according to claim 6, characterized in that: The process of comparing the estimated power demand of the operation process subsequence in the peak demand state with the predicted power reserve of the operation process subsequence in the matching valley demand state, and updating the power transfer path between the energy storage converters according to the comparison result includes: Filter out the predicted electric energy reserves of the energy storage device connected to the energy storage converter with the shortest path distance in the sorting results, and compare the predicted electric energy reserves with the estimated electric energy demand; If the predicted electric energy reserve is less than the estimated electric energy demand, the difference between the estimated electric energy demand and the predicted electric energy reserve is obtained, and then the predicted electric energy reserve of the energy storage device connected to the energy storage converter with the shortest path distance is selected from the sorting result, and the predicted electric energy reserve is compared with the difference; If the predicted electric energy reserve is less than the difference, repeat the above steps until the sum of the predicted electric energy reserves of the energy storage devices connected to the screened energy storage converter is greater than or equal to the estimated electric energy demand; Then, the screened energy storage converters are marked as energy storage converters to be scheduled, and the power transfer paths of the energy storage converters to be scheduled are obtained to determine whether there are other energy storage converters to be scheduled on the power transfer paths of the energy storage converters to be scheduled; If there are other energy storage converters to be scheduled on the energy transfer path of the energy storage converter to be scheduled, the energy transfer path of the energy storage converter to be scheduled is updated to the energy transfer path between the energy storage converter to be scheduled and other energy storage converters to be scheduled.

8. An operation optimization control system for an energy storage converter, specifically applied to the operation optimization control method for an energy storage converter according to claim 1, characterized in that: It includes a monitoring center, wherein the monitoring center is communicatively connected with a data acquisition module, a model simulation module and a path matching module; The data acquisition module is used to obtain the distributed energy storage device information and the power grid transmission line information in the target area. Each energy storage device in the target area is connected to the power grid transmission line in a distributed manner through the energy storage converter, collects the operating data of the energy storage converter and marks the collection time, and sets the monitoring cycle; The model simulation module is used to obtain the historical operation data of the energy storage converter, and to perform virtual construction based on the distributed energy storage equipment information, power grid transmission line information, historical operation data and operation data of the energy storage converter in the target area to obtain a virtual power plant model of the target area; The path matching module is used to simulate the power demand state of the power grid transmission lines connected to each energy storage converter in the current monitoring period through a virtual power plant model, obtain the power demand state of each power grid transmission line at different times, construct the operation process sequence and power dispatch matching point of each power grid transmission line according to the power demand state of each power grid transmission line, and perform power dispatch matching on the operation process subsequence in the power grid transmission line that is in the peak demand state at the power dispatch matching point, screen out the operation process subsequence in the valley demand state within a preset range, and obtain the power transfer path between the energy storage converter of the operation process subsequence in the peak demand state and the operation process subsequence in the valley demand state; Obtain the estimated power demand of the operating process subsequence in the peak demand state, compare the estimated power demand of the operating process subsequence in the peak demand state with the predicted power reserve of the operating process subsequence in the matching trough demand state, and update the power transfer path between the energy storage inverters according to the comparison result.

9. An operation optimization control device for an energy storage converter, characterized in that: The operation optimization control device of the energy storage inverter includes an operation optimization control method program of the energy storage inverter. When the operation optimization control method program of the energy storage inverter is executed by the operation optimization control device of the energy storage inverter, the operation optimization control method steps of the energy storage inverter as described in any one of claims 1 to 7 are implemented.

Citation Information

Patent Citations

  • Energy storage converter control method oriented to electric energy quality optimization requirements

    CN109599878A

  • Energy storage converter operation optimization control method and device and energy storage converter

    CN114221367A

  • Optimized scheduling method, device and equipment for virtual power plant and storage medium

    CN116596286A

  • Photovoltaic power station source network load bidirectional prediction method and system based on artificial intelligence

    CN117595384A