A remote monitoring system for operation data of smart electric meter box
By combining the analysis of the access current, access voltage and load branch in the smart meter box operation data remote monitoring system, intelligently controlling the switch and disconnecting the abnormal load branch solves the problem that the existing system cannot detect power abnormalities in a timely manner. Improved electricity safety and energy efficiency.
Patent Information
- Application Number
- CN202410948856.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-16
AI Technical Summary
The existing smart meter box operation data remote monitoring system fails to effectively combine the analysis of access current, access voltage and load branch, resulting in the inability to detect power abnormalities in a timely manner, which poses safety risks and reduces power safety and energy utilization efficiency.
A smart meter box operating data remote monitoring system is designed, including an access power stability analysis module, an output gate control module, a load branch information collection module, an abnormal load branch feedback module and a power consumption information extraction module. Through analysis The power stability of the access terminal and load branch can be monitored intelligently to control the switch, disconnect abnormal load branches, and conduct in-depth analysis of power loss issues.
It improves users' electricity safety, promptly discovers and handles potential safety hazards, extends equipment life, reduces maintenance costs, improves energy utilization efficiency, and provides stronger energy management support.
Smart Images

Figure CN118487385B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of remote monitoring of operating data of a smart meter box, and in particular to a remote monitoring system for operating data of a smart meter box. Background Art
[0002] With the rapid development of smart grids, higher requirements are placed on the monitoring and management of the operation data of electric meter boxes. Traditional monitoring methods for electric meter boxes mostly use manual inspections, which have problems such as low efficiency and inaccurate data. Therefore, developing a remote monitoring system that can monitor the operation data of electric meter boxes in real time, accurately and quickly is of great significance to improving the operating efficiency and safety of the power system.
[0003] The existing remote monitoring methods for the operation data of smart meter boxes still have the following problems: 1. The access power stability of the access end is not analyzed in combination with the access current and access voltage. As a result, when the power at the access end is abnormal, the output end switch cannot be controlled, which may bring serious safety hazards and reduce the user's electricity safety.
[0004] 2. The power stability of the load branch is not analyzed in combination with the through voltage and through current, so it is impossible to confirm and disconnect each abnormal load branch, and it is impossible to discover and deal with potential safety hazards in time, which poses a threat to personnel and equipment, and may also shorten the life of the equipment and increase the cost of maintenance and replacement.
[0005] 3. The power loss problem at the output end is not deeply analyzed in combination with the power consumption relationship between the output end and each load branch, so that the abnormal power loss branches at the output end cannot be confirmed, making it impossible for users to manage power usage more conveniently, reducing energy utilization efficiency, and failing to provide strong support for energy management. Summary of the invention
[0006] In view of this, in order to solve the problems raised in the above background technology, a smart meter box operation data remote monitoring system is proposed.
[0007] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a remote monitoring system for the operation data of a smart meter box, including: an access power stability analysis module, used to extract the set access current and set access voltage of the access end in the target meter box, collect the access current and access voltage corresponding to the access end in the target meter box at each monitoring time point in each monitoring day, and analyze the access power stability of the access end in the target meter box at each monitoring time point in each monitoring day.
[0008] The output-end switch control module is used to confirm the abnormal time points of the access end in the target meter box during each monitoring day, and to intelligently control the output-end switch of the target meter box during each monitoring day.
[0009] The load branch information collection module is used to collect the through-voltage and through-current corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, and to extract the set through-voltage and set through-current corresponding to the load branch at the output end of the target meter box.
[0010] The abnormal load branch feedback module is used to analyze the power stability of each load branch at the output end of the target meter box, confirm each abnormal load branch at the output end of the target meter box, disconnect each abnormal load branch and feed back the abnormal load branches.
[0011] The power consumption information extraction module is used to extract the total power consumption of the output end in the target meter box on each monitoring day and the power consumption and actual operating time corresponding to each load branch.
[0012] The power loss abnormality feedback module is used to determine whether there is a power loss problem at the output end of the target meter box. If so, it confirms each power loss abnormal branch at the output end of the target meter box and feeds back the abnormal branches.
[0013] The database is used to store the power consumption required for each load branch corresponding to the unit operating time.
[0014] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects: (1) The present invention analyzes the access power stability of the access end by combining the access current and the access voltage, and then controls the switch of the output end when the power at the access end is abnormal, thereby avoiding serious safety hazards and improving the user's power safety.
[0015] (2) The present invention analyzes the power stability of each load branch by combining the through voltage and the through current, thereby identifying each abnormal load branch and disconnecting each abnormal load branch, so as to timely discover and deal with potential safety hazards, avoid threats to personnel and equipment, avoid shortening the life of equipment, and reduce maintenance and replacement costs.
[0016] (3) The present invention conducts an in-depth analysis of the power loss problem at the output end by combining the power consumption relationship between the output end and each load branch, thereby identifying each branch with abnormal power loss at the output end, allowing users to manage power usage more conveniently, improving energy utilization efficiency, and providing strong support for energy management. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0018] Figure 1 It is a schematic diagram of the system module structure connection of the present invention. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] See also Figure 1 As shown, the present invention provides a remote monitoring system for operation data of a smart meter box, including: an access power stability analysis module, an output power switch control module, a load branch information acquisition module, an abnormal load branch feedback module, a power consumption information extraction module, a power loss abnormality feedback module and a database.
[0021] The access power stability analysis module is connected to the output switch control module, the load branch information acquisition module is connected to the abnormal load branch feedback module, the power consumption information extraction module is connected to the power loss abnormal feedback module, and the power loss abnormal feedback module is connected to the database.
[0022] The access power stability analysis module is used to extract the set access current and the set access voltage of the access end in the target meter box, collect the access current and the access voltage corresponding to the access end in the target meter box at each monitoring time point in each monitoring day, and analyze the access power stability of the access end in the target meter box at each monitoring time point in each monitoring day.
[0023] It should be noted that the set access current and set access voltage of the access end in the target meter box are extracted from the power supply specification manual, and the access current and access voltage corresponding to each monitoring time point in the access end of the target meter box on each monitoring day are collected by the current sensor and voltage sensor installed at the access end.
[0024] In a specific embodiment of the present invention, the specific process of analyzing the access power stability of the access terminal in the target meter box at each monitoring time point in each monitoring day is as follows: A1, the access current corresponding to each monitoring time point in the access terminal of the target meter box is recorded as ,in, Indicates the number of the monitoring day, , Indicates the number of the monitoring time point, .
[0025] A2. Record the set access current at the access terminal of the target meter box as .
[0026] A3. Calculate the access current stability of the access terminal in the target meter box at each monitoring time point on each monitoring day. , ,in, Indicates the access current deviation of the setting reference, Represents a natural constant.
[0027] A4. Based on the access voltage corresponding to each monitoring time point in each monitoring day at the access terminal in the target meter box, the access voltage stability at each monitoring time point in each monitoring day is calculated in the same way as the access current stability at each monitoring time point in the access terminal in the target meter box. .
[0028] A5. Calculate the access power stability of the access terminal in the target meter box at each monitoring time point on each monitoring day. , ,in, and They represent the weights of the access current stability and access voltage stability corresponding to the access power stability assessment. .
[0029] In a specific embodiment of the present invention, The setting value of is 0.5. The setting value is 0.5.
[0030] The output terminal switch control module is used to confirm the abnormal power time points of the access end in the target meter box on each monitoring day, and intelligently control the output terminal switch of the target meter box on each monitoring day.
[0031] In a specific embodiment of the present invention, the method for confirming each abnormal power time point of the access terminal in the target meter box on each monitoring day is: comparing the access power stability of the access terminal in the target meter box at each monitoring time point on each monitoring day with the access power stability of the set reference; if the access power stability at a certain monitoring time point is less than the access power stability of the set reference, then the monitoring time point is recorded as the abnormal power time point, thereby obtaining the abnormal power time point of the access terminal in the target meter box on each monitoring day.
[0032] In a specific embodiment of the present invention, the specific method of intelligently controlling the output-end switch of the target meter box on each monitoring day is: when the access end in the target meter box is at a certain power abnormality time point on each monitoring day, the output-end switch of the target meter box at the power abnormality time point is disconnected, and the access current and access voltage corresponding to the target meter box at each monitoring time point after the power abnormality time point are extracted, and the access power stability of the target meter box at each monitoring time point after the power abnormality time point is calculated according to the calculation method of the access power stability of the access end in the target meter box at each monitoring time point on each monitoring day, and compared with the access power stability of the set reference, and the output-end switch of the target meter box is reopened when the access power stability after the power abnormality time point is greater than the access power stability of the set reference at the latest monitoring time point.
[0033] The embodiment of the present invention analyzes the access power stability of the access end by combining the access current and the access voltage, and then controls the switch of the output end when the power of the access end is abnormal, thereby avoiding serious safety hazards and improving the user's power safety.
[0034] The load branch information collection module is used to collect the through-voltage and through-current corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, and extract the set through-voltage and set through-current corresponding to the load branch at the output end of the target meter box.
[0035] It should be noted that the through-voltage and through-current corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day are collected by voltage sensors and current sensors installed in each load branch, and the set through-voltage and set through-current corresponding to the load branch at the output end of the target meter box are extracted from the power transmission specification manual.
[0036] The abnormal load branch feedback module is used to analyze the power stability of each load branch at the output end of the target meter box, confirm each abnormal load branch at the output end of the target meter box, disconnect each abnormal load branch and feed back the abnormal load branches.
[0037] In a specific embodiment of the present invention, the specific process of analyzing the power stability of each load branch at the output end of the target meter box is as follows: B1, based on the through voltage corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, the through voltage fluctuation coefficient of each load branch at the output end of the target meter box is calculated respectively. and the voltage difference coefficient ,in, Indicates the number of the load branch, .
[0038] In a specific embodiment of the present invention, the specific process of calculating the voltage fluctuation coefficient of each load branch at the output end of the target meter box is as follows: C1, extracting the maximum value and the minimum value from the voltage corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, and recording them as and .
[0039] C2. Calculate the voltage fluctuation coefficient of each load branch at the output end of the target meter box , ,in, Indicates the voltage extreme value difference of the set reference, Indicates the number of monitoring days.
[0040] It should be noted that the specific process of calculating the through voltage difference coefficient of each load branch at the output end of the target meter box is: the set through voltage corresponding to the load branch at the output end of the target meter box is recorded as .
[0041] The corresponding through voltage of each load branch at the output end of the target meter box at each monitoring time point on each monitoring day is recorded as .
[0042] Calculate the voltage difference coefficient of each load branch at the output end of the target meter box , ,in, Indicates the set reference voltage deviation. Indicates the number of monitoring time points.
[0043] B2. Calculate the voltage stability of each load branch at the output end of the target meter box , ,in, and They represent the weights of the set voltage fluctuation coefficient and voltage difference coefficient corresponding to the voltage stability assessment. .
[0044] In a specific embodiment of the present invention, The setting value of is 0.5. The setting value is 0.5.
[0045] B3. Based on the through-current corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, the through-current stability of each load branch at the output end of the target meter box is calculated in the same way as the through-voltage stability of each load branch at the output end of the target meter box. .
[0046] B4. Calculate the power stability of each load branch at the output end of the target meter box , ,in, and They represent the weights of the set voltage stability and current stability in the power stability assessment. .
[0047] In a specific embodiment of the present invention, The setting value of is 0.5. The setting value is 0.5.
[0048] In a specific embodiment of the present invention, the method for confirming the abnormal load branches at the output end of the target meter box is: comparing the power stability of each load branch at the output end of the target meter box with the power stability of a set reference; if the power stability of a load branch is less than the power stability of the set reference, the load branch is recorded as an abnormal load branch, thereby obtaining the abnormal load branches at the output end of the target meter box.
[0049] The embodiment of the present invention analyzes the power stability of each load branch in combination with the through voltage and the through current, thereby identifying each abnormal load branch and disconnecting each abnormal load branch, and can timely discover and deal with potential safety hazards, avoid threats to personnel and equipment, avoid shortening the life of equipment, and reduce maintenance and replacement costs.
[0050] The power consumption information extraction module is used to extract the total power consumption of the output end in the target meter box on each monitoring day and the power consumption and actual operation time corresponding to each load branch.
[0051] It should be noted that the total power consumption of the output end in the target electric meter box on each monitoring day and the power consumption corresponding to each load branch are collected by the electric energy meter installed at the output end and the electric energy meter of each load branch respectively.
[0052] It should also be noted that the duration when current flows through each load branch is used as the actual operating time corresponding to each load branch. The electric energy meter installed in each load branch can monitor the time point when current flows through, and the time points are subtracted to obtain the duration when current flows through.
[0053] The power loss abnormality feedback module is used to determine whether there is a power loss problem at the output end of the target meter box. If so, it confirms each power loss abnormal branch at the output end of the target meter box and feeds back the abnormal branches.
[0054] In a specific embodiment of the present invention, the specific process of determining whether there is an energy loss problem at the output end of the target meter box is as follows: D1, accumulating the power consumption corresponding to each load branch of the output end of the target meter box on each monitoring day to obtain the total power consumption of the branch at the output end of the target meter box on each monitoring day, and based on the total power consumption of the output end of the target meter box on each monitoring day, calculating the power loss trend index corresponding to the output end of the target meter box .
[0055] In a specific embodiment of the present invention, the specific process of calculating the power loss trend index corresponding to the output end in the target meter box is as follows: E1. Compare the total power consumption of the output end in the target meter box on each monitoring day with the total power consumption of the branch. If the total power consumption of the branch on a certain monitoring day is greater than the total power consumption, record the monitoring day as an abnormal monitoring day, and count the number of abnormal monitoring days of the output end in the target meter box, recorded as .
[0056] E2. Subtract the total branch power consumption at the output end of the target meter box on each monitoring day from the total power consumption, and extract the maximum value from them, recorded as .
[0057] E3. Calculate the energy loss trend index corresponding to the output end of the target meter box , ,in, and They represent the percentage of abnormal monitoring days and the deviation of power consumption of the set reference respectively. and They represent the percentage of the number of abnormal monitoring days and the weight of the power consumption deviation corresponding to the power loss trend assessment. .
[0058] In a specific embodiment of the present invention, The setting value of is 0.5. The setting value is 0.5.
[0059] D2. Compare the power loss trend index corresponding to the output end of the target meter box with the set reference power loss trend index. If the power loss trend index corresponding to the output end of the target meter box is greater than or equal to the set reference power loss trend index, it indicates that there is a power loss problem at the output end of the target meter box.
[0060] In a specific embodiment of the present invention, the specific process of confirming each abnormal power consumption branch at the output end of the target meter box is as follows: F1, recording the actual operation time corresponding to each load branch at the output end of the target meter box on each monitoring day as .
[0061] F2. Extract the power consumption of each load branch corresponding to the unit running time from the database and record it as .
[0062] F3. Record the power consumption corresponding to each load branch at the output end of the target meter box on each monitoring day as .
[0063] F4. Calculate the abnormal power loss index corresponding to each load branch at the output end of the target meter box , ,in, Indicates The permissible power loss deviation is set for each load branch within the corresponding unit operating time.
[0064] F5. Compare the abnormal power loss index corresponding to each load branch at the output end of the target meter box with the set reference abnormal power loss index. If the abnormal power loss index corresponding to a load branch is greater than or equal to the set reference abnormal power loss index, then the load branch is recorded as an abnormal power loss branch, thereby obtaining the abnormal power loss branches at the output end of the target meter box.
[0065] The embodiment of the present invention conducts an in-depth analysis of the power loss problem at the output end by combining the power consumption relationship between the output end and each load branch, thereby identifying each branch with abnormal power loss at the output end, allowing users to manage power usage more conveniently, improving energy utilization efficiency, and providing strong support for energy management.
[0066] The database is used to store the power consumption required for each load branch corresponding to a unit operating time.
[0067] The data sources in the database of this embodiment are shown in Table 1 below.
[0068] Table 1
[0069] Data Category Data Source Storage Location use Store the power consumption required for each load branch corresponding to the unit operating time Externally provided database Used to assist in calculating the abnormal power loss index corresponding to each load branch at the output end of the target meter box
[0070] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A remote monitoring system for the operation data of a smart meter box. It is characterized in that include: The access power stability analysis module is used to extract the set access current and set access voltage of the access terminal in the target meter box, collect the access current and access voltage corresponding to the access terminal in the target meter box at each monitoring time point in each monitoring day, and analyze the access power stability of the access terminal in the target meter box at each monitoring time point in each monitoring day; The output-end switch control module is used to confirm the abnormal time points of the access end in the target meter box during each monitoring day, and to intelligently control the output-end switch of the target meter box during each monitoring day; The load branch information collection module is used to collect the through-voltage and through-current corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, and extract the set through-voltage and set through-current corresponding to the load branch at the output end of the target meter box; The abnormal load branch feedback module is used to analyze the power stability of each load branch at the output end of the target meter box, confirm each abnormal load branch at the output end of the target meter box, disconnect each abnormal load branch and provide feedback; The power consumption information extraction module is used to extract the total power consumption of the output end of the target meter box on each monitoring day and the power consumption and actual operation time corresponding to each load branch; The power loss abnormality feedback module is used to determine whether there is a power loss problem at the output end of the target meter box. If so, it confirms each power loss abnormal branch at the output end of the target meter box and feeds back the abnormal branches; A database is used to store the power consumption required for each load branch corresponding to a unit operating time; The specific process of analyzing the power stability of each load branch at the output end of the target electric meter box is as follows: B1. Based on the through-voltage corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, calculate the through-voltage fluctuation coefficient of each load branch at the output end of the target meter box respectively. and the voltage difference coefficient ,in, Indicates the number of the load branch, ; B2. Calculate the voltage stability of each load branch at the output end of the target meter box , ,in, and They represent the weights of the set voltage fluctuation coefficient and voltage difference coefficient corresponding to the voltage stability assessment. ; B3. Based on the through-current corresponding to each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, the through-current stability of each load branch at the output end of the target meter box is calculated in the same way as the through-voltage stability of each load branch at the output end of the target meter box. ; B4. Calculate the power stability of each load branch at the output end of the target meter box , ,in, and They represent the weights of the set voltage stability and current stability in the power stability assessment. ; The specific process of calculating the voltage fluctuation coefficient of each load branch at the output end of the target electric meter box is as follows: C1. Extract the maximum and minimum values from the voltages of each load branch at the output end of the target meter box at each monitoring time point on each monitoring day, and record them as and ; C2. Calculate the voltage fluctuation coefficient of each load branch at the output end of the target meter box , ,in, Indicates the voltage extreme value difference of the set reference, Indicates the number of monitoring days; The method for confirming the abnormal load branches at the output end of the target meter box is: comparing the power stability of each load branch at the output end of the target meter box with the power stability of a set reference. If the power stability of a load branch is less than the power stability of the set reference, then the load branch is recorded as an abnormal load branch, thereby obtaining the abnormal load branches at the output end of the target meter box.
2. According to claim 1, a remote monitoring system for operation data of a smart electric meter box, Features: The specific process of analyzing the access power stability of the access terminal in the target electric meter box at each monitoring time point on each monitoring day is as follows: A1. Record the access current corresponding to the access terminal in the target meter box at each monitoring time point on each monitoring day as ,in, Indicates the number of the monitoring day, , Indicates the number of the monitoring time point, ; A2. Record the set access current at the access terminal of the target meter box as ; A3. Calculate the access current stability of the access terminal in the target meter box at each monitoring time point on each monitoring day. , ,in, Indicates the access current deviation of the setting reference, represents a natural constant; A4. Based on the access voltage corresponding to each monitoring time point in each monitoring day at the access terminal in the target meter box, the access voltage stability at each monitoring time point in each monitoring day is calculated in the same way as the access current stability at each monitoring time point in the access terminal in the target meter box. ; A5. Calculate the access power stability of the access terminal in the target meter box at each monitoring time point on each monitoring day. , ,in, and They represent the weights of the access current stability and access voltage stability corresponding to the access power stability assessment. .
3. According to claim 2, a remote monitoring system for operation data of a smart electric meter box, Features: The method for confirming each abnormal power time point of the access terminal in the target meter box on each monitoring day is as follows: comparing the access power stability of the access terminal in the target meter box at each monitoring time point on each monitoring day with the access power stability of the set reference; if the access power stability at a certain monitoring time point is less than the access power stability of the set reference, then the monitoring time point is recorded as the abnormal power time point, thereby obtaining each abnormal power time point of the access terminal in the target meter box on each monitoring day.
4. According to claim 3, a remote monitoring system for operation data of a smart electric meter box, Features: The specific method of intelligently controlling the output-end switch of the target meter box on each monitoring day is as follows: when the access end in the target meter box is at a certain power abnormality time point on each monitoring day, the output-end switch of the target meter box at the power abnormality time point is disconnected, and the access current and access voltage corresponding to each monitoring time point after the power abnormality time point of the target meter box are extracted, and the access power stability of the target meter box at each monitoring time point after the power abnormality time point is calculated according to the calculation method of the access power stability of the access end in the target meter box at each monitoring time point on each monitoring day, and compared with the access power stability of the set reference, and the output-end switch of the target meter box is reopened when the access power stability after the power abnormality time point is greater than the access power stability of the set reference at the latest monitoring time point.
5. According to claim 1, a remote monitoring system for operation data of a smart electric meter box, Features: The specific process of determining whether there is a power loss problem at the output end of the target electric meter box is as follows: D1. Accumulate the power consumption corresponding to each load branch of the output end of the target meter box on each monitoring day to obtain the total power consumption of the branch of the output end of the target meter box on each monitoring day, and calculate the power loss trend index corresponding to the output end of the target meter box based on the total power consumption of the output end of the target meter box on each monitoring day. ; D2. Compare the power loss trend index corresponding to the output end of the target meter box with the set reference power loss trend index. If the power loss trend index corresponding to the output end of the target meter box is greater than or equal to the set reference power loss trend index, it indicates that there is a power loss problem at the output end of the target meter box.
6. A remote monitoring system for operation data of a smart electric meter box according to claim 5, Features: The specific process of calculating the power loss trend index corresponding to the output end in the target electric meter box is as follows: E1. Compare the total power consumption of the output end of the target meter box on each monitoring day with the total power consumption of the branch. If the total power consumption of the branch on a certain monitoring day is greater than the total power consumption, record the monitoring day as an abnormal monitoring day, and count the number of abnormal monitoring days at the output end of the target meter box, recorded as ; E2. Subtract the total power consumption of the branch at the output end of the target meter box on each monitoring day from the total power consumption, and extract the maximum value from them, recorded as ; E3. Calculate the energy loss trend index corresponding to the output end of the target meter box , ,in, and They represent the percentage of abnormal monitoring days and the deviation of power consumption of the set reference respectively. and They represent the percentage of the number of abnormal monitoring days and the weight of the power consumption deviation corresponding to the power loss trend assessment. .
7. A remote monitoring system for operation data of a smart electric meter box according to claim 6, Features: The specific process of confirming each abnormal power loss branch at the output end of the target electric meter box is as follows: F1. Record the actual running time of each load branch corresponding to the output end of the target meter box on each monitoring day as ; F2. Extract the power consumption of each load branch corresponding to the unit running time from the database and record it as ; F3. Record the power consumption corresponding to each load branch at the output end of the target meter box on each monitoring day as ; F4. Calculate the abnormal power loss index corresponding to each load branch at the output end of the target meter box , ,in, Indicates Set the permissible power loss deviation for each load branch within the unit operating time; F5. Compare the abnormal power loss index corresponding to each load branch at the output end of the target meter box with the set reference abnormal power loss index. If the abnormal power loss index corresponding to a load branch is greater than or equal to the set reference abnormal power loss index, then the load branch is recorded as an abnormal power loss branch, thereby obtaining the abnormal power loss branches at the output end of the target meter box.