A production scheduling system for injection blow molding machines

By designing a production scheduling system in the injection-blowing hollow molding machine, using the contour image and quantity to determine the accuracy of the molded product, adjusting the conveying speed and blow molding parameters, the problem of low accuracy and efficiency of the molded product of the injection-blowing hollow molding machine is solved. Achieve higher accuracy and efficiency.

CN118493830BActive Publication Date: 2024-11-12ZHANGJIAGANG LIANXIN PLASTIC MASCH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410954218.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-12
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

The precision and efficiency of the molding products of existing injection blowing hollow molding machines are low, making it difficult to effectively improve.

Method used

A production scheduling system for injection-blowing hollow molding machine is designed, including a production unit, a conveying unit, an information acquisition unit and a scheduling unit. The outline images and quantity of molded products are collected through cameras and photoelectric sensors, based on the outline overlap and the number of molded products. Make judgments and corrections, adjust the raw material conveying speed, blowing interval duration and blowing pressure of the blow molding mechanism, and improve the accuracy and efficiency of the molded product.

Benefits of technology

By quickly determining and correcting the accuracy of molded products, the occurrence of size inconsistencies is reduced, the production accuracy and efficiency of injection-blown hollow molded products are improved, and the cause investigation time is saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118493830B_ABST
    Figure CN118493830B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of injection blow molding, and in particular to a production scheduling system for an injection blow molding machine, comprising a production unit, a conveying unit, an information collection unit and a scheduling unit; the present invention is capable of quickly determining whether a molded product meets standards based on the contour overlap of the molded product by providing a scheduling unit, thereby improving the production accuracy of the injection blow molding product; at the same time, the scheduling unit adjusts a mechanism corresponding to the scheduling unit by determining the reason why the molded product does not meet the standards; the scheduling unit improves the accuracy and efficiency of the molded product by adjusting the raw material conveying speed, the blow molding blowing interval time and the blow molding mechanism blowing pressure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of injection blow molding, and in particular to a production scheduling system of an injection blow molding machine. Background Art

[0002] One-step injection blow molding machine uses hydraulic, pneumatic and electrical components to achieve mechanical, electrical, gas and hydraulic integration. The product has the advantages of precision, high efficiency, energy saving, environmental protection, easy operation, large output and stable quality. How to further use the human-machine interaction system to control the injection and blow molding process in one machine to improve the accuracy and efficiency of the molded products is becoming more and more important.

[0003] The prior art patent number is CN115284579B. This prior art provides a high-precision injection blow molding machine, including a drive module, a stirring module, a conveying module, an injection mechanism, a blow molding mechanism, a mold clamping mechanism and a central control module, which improves the yield of the molding machine, but does not solve the problem of how to improve the low precision and low efficiency of the production of injection blow molding products. Summary of the invention

[0004] To this end, the present invention provides a production scheduling system for an injection blow molding machine, which is used to overcome the problems of low precision and low efficiency of injection blow molding products in the prior art.

[0005] To achieve the above object, the present invention provides a production scheduling system for an injection blow molding machine, comprising:

[0006] The production unit includes an injection molding mechanism for extruding heated and molten raw materials, a blow molding mechanism arranged below the injection molding mechanism for blow-molding the extrudate to output a molded product, and a dust removal mechanism arranged on the side wall of the injection molding mechanism for environmental dust removal;

[0007] A conveying unit connected to the production unit, comprising a first conveying mechanism for conveying raw materials to the blow molding mechanism and a second conveying mechanism for conveying the molded product to an inspection workshop;

[0008] An information collection unit connected to the production unit, for respectively collecting the conveying speed of the first conveying mechanism, the contour image of the molded product and the characteristic parameters of the molded product, wherein the characteristic parameters of the molded product include the blowing interval duration of the blow molding mechanism, the blowing pressure of the blow molding mechanism and the number of molded products output in a single cycle;

[0009] a scheduling unit, which is connected to the production unit, the conveying unit and the information collection unit respectively, and is used to determine the reason why the molded product does not meet the standard based on the difference between the preset first contour overlap and the contour overlap when the molded product is determined not to meet the standard according to the contour overlap of the molded product, and to determine whether the molded product meets the standard based on the number of molded products in a single cycle when the molded product is preliminarily determined not to meet the standard according to the contour overlap of the molded product, and,

[0010] When it is determined that the molded product does not meet the standards for the second time, the material conveying speed of the conveying mechanism is corrected or the blowing interval time of the blow molding mechanism is corrected.

[0011] Furthermore, the information collection unit includes:

[0012] A camera, which is arranged on the top of the inspection workshop and is used to collect contour images of the molded products;

[0013] A photoelectric sensor is arranged on the top of the inspection workshop to collect the number of molded products.

[0014] Furthermore, the contour coincidence degree of the molded product is the ratio of the length of the line segment of the overlapped portion between the contour line of the image of the molded product and the preset contour line of the molded product to the length of the contour line of the image of the molded product.

[0015] Furthermore, the scheduling unit determines whether the molded product meets the standard according to the contour overlap of the molded product, wherein:

[0016] If the contour overlap is less than or equal to the preset first contour overlap, the scheduling unit determines that the molded product does not meet the standard, determines that the molded product does not meet the standard, and determines the reason for not meeting the standard based on the difference between the contour overlap and the preset first contour overlap;

[0017] If the contour overlap is greater than the preset first contour overlap and less than or equal to the preset second contour overlap, it is preliminarily determined that the molded product does not meet the standard, and a second determination is made based on the number of molded products in a single cycle whether the molded product meets the standard;

[0018] If the contour overlap is greater than a preset second contour overlap, the scheduling unit determines that the molded product meets the standard.

[0019] Furthermore, when the scheduling unit initially determines that the molded product does not meet the standard, it secondarily determines whether the molded product meets the standard based on the number of molded products in a single cycle, wherein:

[0020] If the number of molded products in a single cycle is less than or equal to the preset first number of molded products, the scheduling unit determines for the second time that the molded products do not meet the standards and corrects the blowing interval of the blow molding mechanism;

[0021] If the number of molded products in a single cycle is greater than the preset first number of molded products and less than or equal to the preset second number of molded products, the scheduling unit determines for the second time that the molded products do not meet the standards and corrects the raw material conveying speed of the first conveying mechanism;

[0022] If the number of molded products in a single cycle is greater than the preset second number of molded products, the scheduling unit determines for the second time that the molded products meet the standards.

[0023] Furthermore, the scheduling unit corrects the blowing interval of the blow molding mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products, and the corrected blowing interval of the blow molding mechanism is inversely proportional to the number of molded products in a single cycle.

[0024] Furthermore, the scheduling unit corrects the raw material conveying speed of the first conveying mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products, and the corrected raw material conveying speed is proportional to the number of molded products in a single cycle.

[0025] Furthermore, when the scheduling unit determines that the molded product does not meet the standard, the reason why the molded product does not meet the standard is determined based on the absolute value of the difference between the contour coincidence of the molded product and the preset first contour coincidence, wherein:

[0026] If the absolute value of the difference in contour overlap of the molded product is less than or equal to the preset contour overlap difference, the scheduling unit determines that the reason why the molded product does not meet the standard is caused by impurities in the environment, and adjusts the opening cross-sectional area of ​​the air inlet of the dust removal mechanism;

[0027] If the absolute value of the difference in contour overlap of the molded product is greater than a preset contour overlap difference, the scheduling unit determines that the reason why the molded product does not meet the standard is a problem with the blowing pressure of the blow molding mechanism, and adjusts the blowing pressure of the blow molding mechanism.

[0028] Compared with the prior art, the beneficial effect of the present invention lies in that the present invention sets a production unit, a conveying unit, an information collection unit and a scheduling unit; the production scheduling system of the injection blow molding machine of the present invention can determine whether the molded product meets the standards based on the contour overlap of the molded product by setting a scheduling unit, thereby improving the accuracy of the molded product. At the same time, the scheduling unit adjusts the mechanism corresponding to the scheduling unit by determining the reason why the molded product does not meet the standard. The scheduling unit further improves the production accuracy and efficiency of the injection blow molding products by adjusting the raw material conveying speed, the blow molding blowing interval time and the blow molding mechanism blowing pressure.

[0029] Furthermore, the present invention can quickly determine the contour overlap of the molded product by setting the image contour line of the molded product and the preset molded product contour line, thereby improving the accuracy of the molded product.

[0030] Furthermore, the present invention can quickly determine the production accuracy of the molded product by setting the contour overlap of the molded product, reduce the occurrence of size inconsistency between the molded product and the preset molded product, and improve the production accuracy efficiency of the injection blow molding product.

[0031] Furthermore, the present invention can quickly determine the treatment method for molded products that do not meet the standards through the number of molded products in a single cycle, saving time for troubleshooting and further improving the efficiency of injection blow molding products.

[0032] Furthermore, the present invention can quickly correct the blowing interval of the blow molding mechanism according to the number of molded products in a single cycle, thereby further improving the efficiency of injection blow molding of hollow molded products.

[0033] Furthermore, the present invention can quickly correct the conveying speed of the raw materials of the first conveying mechanism according to the number of products formed in a single cycle, thereby further improving the accuracy of the injection blow molding products.

[0034] Furthermore, the present invention can quickly determine the reason why the injection blow molding product does not meet the standards through the difference in the contour overlap of the molded product, thereby reducing the occurrence of misjudgment and further improving the efficiency of the injection blow molding product. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a structural block diagram of a production scheduling system of an injection blow molding machine according to an embodiment of the present invention;

[0036] Figure 2 It is a structural schematic diagram of a production scheduling system of an injection blow molding machine according to an embodiment of the present invention;

[0037] Figure 3 This is a flow chart for determining whether the injection blow molding product according to an embodiment of the present invention meets the standards;

[0038] Figure 4 A secondary determination flow chart of whether the injection blow molding product according to an embodiment of the present invention meets the standards;

[0039] Explanation of the accompanying drawings: injection molding mechanism-1, blow molding mechanism-2, first conveying mechanism-3, dust removal mechanism-4, camera-5, photoelectric sensor-6, inspection workshop-7, second conveying mechanism-8, motor-9. DETAILED DESCRIPTION

[0040] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0041] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.

[0042] It should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] It should be noted that the data in this embodiment are obtained by comprehensive analysis and evaluation of the historical test data and corresponding historical test results of the system of the present invention in the six months before this test. The system of the present invention comprehensively determines the values ​​of the preset parameter benchmarks for this test based on the results of the cumulative tests in the previous six months before this test. It can be understood by those skilled in the art that the determination method of the system of the present invention for a single parameter mentioned above can be to select the value with the highest proportion as the preset benchmark parameter according to the data distribution, use weighted summation to use the obtained value as the preset benchmark, use the value of each historical data as the preset benchmark parameter or other selection methods, as long as the system of the present invention can clearly define the different specific situations in the single determination process through the obtained values.

[0044] See also Figure 1 and Figure 2 As shown, the present invention provides a production scheduling system for an injection blow molding machine, comprising:

[0045] The production unit includes an injection molding mechanism 1 for extruding heated and molten raw materials, a blow molding mechanism 2 arranged below the injection molding mechanism for blow-molding the extrudate to output a molded product, and a dust removal mechanism 4 arranged on the side wall of the injection molding mechanism for environmental dust removal;

[0046] A conveying unit connected to the production unit, comprising a first conveying mechanism 3 for conveying raw materials to the blow molding mechanism and a second conveying mechanism 8 for conveying the molded product to an inspection workshop;

[0047] An information collection unit connected to the production unit, for respectively collecting the conveying speed of the first conveying mechanism, the contour image of the molded product and the characteristic parameters of the molded product, wherein the characteristic parameters of the molded product include the blowing interval duration of the blow molding mechanism, the blowing pressure of the blow molding mechanism and the number of molded products output in a single cycle;

[0048] a scheduling unit, which is connected to the production unit, the conveying unit and the information collection unit respectively, and is used to determine the reason why the molded product does not meet the standard based on the difference between the preset first contour overlap and the contour overlap when the molded product is determined not to meet the standard according to the contour overlap of the molded product, and to determine whether the molded product meets the standard based on the number of molded products in a single cycle when the molded product is preliminarily determined not to meet the standard according to the contour overlap of the molded product, and,

[0049] When it is determined that the molded product does not meet the standards for the second time, the material conveying speed of the conveying mechanism is corrected or the blowing interval time of the blow molding mechanism is corrected.

[0050] Specifically, the information collection unit includes:

[0051] A camera 5, which is arranged on the top of the inspection workshop 7 and is used to collect a contour image of the molded product;

[0052] The photoelectric sensor 6 is arranged on the top of the detection workshop 7 to collect the number of molded products.

[0053] Specifically, the contour coincidence of the molded product is the ratio of the length of the line segment of the overlapped portion of the contour line of the image of the molded product and the preset contour line of the molded product to the length of the contour line of the image of the molded product.

[0054] When the injection blow molding machine of the embodiment of the present invention is in operation, the raw material is first heated and melted by the injection molding mechanism in the production unit to be extruded into an extrudate, and the blow molding mechanism blows the extrudate into a molded product. The first conveying mechanism is used to convey the raw material; the second conveying mechanism is used to convey the molded product, and then the information acquisition unit collects the image contour of the molded product and the number of molded products; finally, the scheduling unit determines whether the injection blow molding product meets the standard based on the contour overlap of the molded product. When it is determined that the injection blow molding product does not meet the standard, the scheduling unit is used to determine the reason why the production accuracy of the injection blow molding product does not meet the standard and the treatment method.

[0055] See also Figure 3 As shown, it is a flow chart for determining whether an injection blow molding product meets the standard according to an embodiment of the present invention; the scheduling unit determines whether the molded product meets the standard according to the contour overlap of the molded product, wherein:

[0056] If the contour overlap is less than or equal to the preset first contour overlap, the scheduling unit determines that the molded product does not meet the standard, determines that the molded product does not meet the standard, and determines the reason for not meeting the standard based on the difference between the contour overlap and the preset first contour overlap;

[0057] If the contour overlap is greater than the preset first contour overlap and less than or equal to the preset second contour overlap, it is preliminarily determined that the molded product does not meet the standard, and a second determination is made based on the number of molded products in a single cycle whether the molded product meets the standard;

[0058] If the contour overlap is greater than a preset second contour overlap, the scheduling unit determines that the molded product meets the standard.

[0059] See also Figure 4 As shown, it is a secondary determination flow chart of whether the injection blow molding product meets the standard according to an embodiment of the present invention; when the scheduling unit initially determines that the molded product does not meet the standard, it secondary determines whether the molded product meets the standard based on the number of molded products in a single cycle, wherein:

[0060] If the number of molded products in a single cycle is less than or equal to the preset first number of molded products, the scheduling unit determines for the second time that the molded products do not meet the standards and corrects the blowing interval of the blow molding mechanism;

[0061] If the number of molded products in a single cycle is greater than the preset first number of molded products and less than or equal to the preset second number of molded products, the scheduling unit determines for the second time that the molded products do not meet the standards and corrects the raw material conveying speed of the first conveying mechanism;

[0062] If the number of molded products in a single cycle is greater than the preset second number of molded products, the scheduling unit determines for the second time that the molded products meet the standards.

[0063] Specifically, the scheduling unit corrects the blowing interval of the blow molding mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products, and the corrected blowing interval of the blow molding mechanism is inversely proportional to the number of molded products in a single cycle;

[0064] Specifically, the process of the scheduling unit correcting the blowing interval duration of the blow molding mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products includes:

[0065] If |ΔM1| is less than or equal to the preset first molded product quantity difference, the scheduling unit uses the first blowing interval duration correction coefficient α1 to correct the blowing interval duration of the blow molding mechanism to a corresponding value;

[0066] If |ΔM1| is greater than the preset first molded product quantity difference and less than or equal to the preset second molded product quantity difference, the scheduling unit uses the second blowing interval duration correction coefficient α2 to correct the blowing interval duration of the blow molding mechanism to a corresponding value;

[0067] If |ΔM1| is greater than the preset second molded product quantity difference, the scheduling unit uses the third blowing interval duration correction coefficient α3 to correct the blowing interval duration of the blow molding mechanism to a corresponding value;

[0068] Among them, the blowing interval of the blow molding mechanism is the time interval between the current blowing and the last blowing of the blow molding mechanism, |ΔM1| is the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products; the corrected raw material conveying speed is proportional to the number of molded products in a single cycle.

[0069] The correction formula of this embodiment is, T'=T×αn, wherein T is the blowing interval duration of the blow molding mechanism before correction, T' is the blowing interval duration of the blow molding mechanism after correction, n is 1, 2, 3, αn is the correction coefficient of the blowing interval duration of the blow molding mechanism, and the preferred embodiments of α1, α2 and α3 are: α1=0.96; α2=0.94; α3=0.92.

[0070] Specifically, the scheduling unit corrects the material conveying speed of the first conveying mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products, and the corrected material conveying speed is proportional to the number of molded products in a single cycle;

[0071] Specifically, the process of correcting the conveying speed of the injection molded semi-finished product of the first conveying mechanism according to the absolute value of the difference between the number of molded products in a single cycle and the second preset number of molded products includes:

[0072] If |ΔM2| is less than or equal to the preset first molded product quantity difference, the scheduling unit uses the first conveying speed correction coefficient β1 to correct the conveying speed of the injection molded semi-finished product of the first conveying mechanism to a corresponding value;

[0073] If |ΔM2| is greater than the preset first molded product quantity difference and less than or equal to the preset second molded product quantity difference, the scheduling unit uses the second conveying speed correction coefficient β2 to correct the conveying speed of the injection molded semi-finished product of the first conveying mechanism to a corresponding value;

[0074] If |ΔM2| is greater than the preset second molded product quantity difference, the scheduling unit uses the third conveying speed correction coefficient β3 to correct the conveying speed of the injection molded semi-finished product of the first conveying mechanism to a corresponding value;

[0075] Wherein, |ΔM2| is the absolute value of the difference between the number of molded products in a single cycle and the second preset number of molded products;

[0076] In this embodiment, the adjustment of the conveying speed of the first conveying mechanism is achieved through the motor 9. The correction formula of the conveying speed of the first conveying mechanism is V'=V×βn, wherein V is the conveying speed of the injection molded semi-finished product of the first conveying mechanism before correction, V' is the conveying speed of the injection molded semi-finished product of the first conveying mechanism after correction, n is 1, 2, 3, βn is the correction coefficient of the nth conveying speed of the first conveying mechanism, and the preferred embodiments are β1=1.12; β2=1.14; β3=1.16.

[0077] Specifically, when the scheduling unit determines that the molded product does not meet the standard, the reason why the molded product does not meet the standard is determined based on the absolute value of the difference between the contour coincidence of the molded product and the preset first contour coincidence, wherein:

[0078] If the absolute value of the difference in contour overlap of the molded product is less than or equal to the preset contour overlap difference, the scheduling unit determines that the reason why the molded product does not meet the standard is caused by impurities in the environment, and adjusts the opening cross-sectional area of ​​the air inlet of the dust removal mechanism;

[0079] If the absolute value of the difference in contour overlap of the molded product is greater than a preset contour overlap difference, the scheduling unit determines that the reason why the molded product does not meet the standard is a problem with the blowing pressure of the blow molding mechanism, and adjusts the blowing pressure of the blow molding mechanism.

[0080] Specifically, the scheduling unit adjusts the blowing pressure of the blow molding mechanism based on the absolute value of the difference between the contour coincidence of the molded product and the preset first contour coincidence;

[0081] Specifically, the process of the scheduling unit adjusting the blowing pressure of the blow molding mechanism based on the absolute value of the difference between the acquired contour overlap of the molded product and the preset first contour overlap includes:

[0082] If |ΔC| is less than or equal to the preset first molded product contour overlap difference, the scheduling unit uses the first pressure adjustment coefficient γ1 to adjust the blowing pressure of the blow molding mechanism to a corresponding value;

[0083] If |ΔC| is greater than the preset first molded product contour overlap difference and less than or equal to the preset second molded product contour overlap difference, the scheduling unit uses the second pressure adjustment coefficient γ2 to adjust the blowing pressure of the blow molding mechanism to a corresponding value;

[0084] If |ΔC| is greater than the preset second molded product contour overlap difference, the scheduling unit uses the third pressure adjustment coefficient γ3 to adjust the blowing pressure of the blow molding mechanism to a corresponding value;

[0085] Wherein, |ΔC| is the absolute value of the difference between the contour coincidence of the molded product and the preset first contour coincidence,

[0086] Preferably, the adjustment formula of this embodiment is P'=P×γn, wherein P is the blowing pressure of the blow molding mechanism before adjustment, P' is the blowing pressure of the blow molding mechanism after adjustment, n is 1, 2, 3, γn is the correction coefficient of the blowing pressure of the blow molding mechanism, and the preferred embodiments of γ1, γ2 and γ3 are γ1=1.2; γ2=1.3; γ3=1.4 respectively.

[0087] Specifically, the scheduling unit adjusts the opening cross-sectional area of ​​the air inlet of the dust removal mechanism based on the absolute value of the difference between the contour coincidence of the formed product and the preset first contour coincidence;

[0088] Specifically, the process of adjusting the opening cross-sectional area of ​​the air inlet of the dust removal mechanism is as follows:

[0089] If |ΔC| is equal to the preset first profile overlap difference, the opening cross-sectional area adjustment coefficient δ1 of the first air inlet is used to adjust the opening cross-sectional area of ​​the air inlet to a corresponding value;

[0090] If |ΔC| is greater than the preset first profile overlap difference and less than or equal to the preset second profile overlap difference, the opening cross-sectional area adjustment coefficient δ2 of the second air inlet is used to adjust the opening cross-sectional area of ​​the air inlet to a corresponding value;

[0091] If |ΔC| is greater than the preset second profile overlap difference, the opening cross-sectional area adjustment coefficient δ3 of the third air inlet is used to adjust the opening cross-sectional area of ​​the air inlet to a corresponding value;

[0092] Wherein, |ΔC| is the absolute value of the difference between the contour overlap of the molded product and the preset first contour overlap. Specifically, the preferred embodiment of the preset first contour overlap is 80%;

[0093] Preferably, the adjustment formula of this embodiment is K'=K×δn, wherein K is the opening cross-sectional area of ​​the air inlet of the dust removal mechanism before adjustment, K' is the opening cross-sectional area of ​​the air inlet of the dust removal mechanism after adjustment, n is 1, 2, 3, δn is the adjustment coefficient of the opening cross-sectional area of ​​the air inlet of the dust removal mechanism, and the preferred embodiments of δ1, δ2 and δ3 are δ1=1.11; δ2=1.12; δ3=1.13 respectively.

[0094] In a possible embodiment, when the contour overlap of the molded product is 70%, K is an opening cross-sectional area of ​​1.2 square meters, and the opening cross-sectional area of ​​the air inlet of the dust removal mechanism is adjusted, K'=K×δ1=1.2×1.11=1.332, so the opening cross-sectional area of ​​the dust removal mechanism is 1.332 square meters.

[0095] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.

Claims

1. A production scheduling system for an injection blow molding machine, characterized in that: include: The production unit includes an injection molding mechanism for extruding the heated and molten raw material, a blow molding mechanism arranged below the injection molding mechanism for blow-molding the extrudate to output a molded product, and a dust removal mechanism arranged on the injection molding mechanism for removing dust from the environment; A conveying unit connected to the production unit, comprising a first conveying mechanism for conveying raw materials to the blow molding mechanism and a second conveying mechanism for conveying the molded product to an inspection workshop; An information collection unit connected to the production unit, for respectively collecting the conveying speed of the first conveying mechanism, the contour image of the molded product and the characteristic parameters of the molded product, wherein the characteristic parameters of the molded product include the blowing interval duration of the blow molding mechanism, the blowing pressure of the blow molding mechanism and the number of molded products output in a single cycle; a scheduling unit, which is connected to the production unit, the conveying unit and the information collection unit respectively, and is used to determine the reason why the molded product does not meet the standard based on the difference between the preset first contour overlap and the contour overlap when the molded product is determined not to meet the standard according to the contour overlap of the molded product, and to determine whether the molded product meets the standard based on the number of molded products in a single cycle when the molded product is preliminarily determined not to meet the standard according to the contour overlap of the molded product, and, When it is determined that the molded product does not meet the standards, the material conveying speed of the conveying mechanism or the blowing interval of the blow molding mechanism is corrected; The information collection unit comprises: A camera, which is arranged on the top of the inspection workshop and is used to collect contour images of the molded products; A photoelectric sensor is arranged on the top of the inspection workshop to collect the number of molded products; The contour coincidence of the molded product is the ratio of the length of the line segment of the overlapped portion of the contour line of the image of the molded product and the preset contour line of the molded product to the length of the contour line of the image of the molded product; The scheduling unit determines whether the molded product meets the standard according to the contour overlap of the molded product, wherein: If the contour overlap is less than or equal to the preset first contour overlap, the scheduling unit determines that the molded product does not meet the standard, determines that the molded product does not meet the standard, and determines the reason for not meeting the standard based on the difference between the contour overlap and the preset first contour overlap; If the contour overlap is greater than the preset first contour overlap and less than or equal to the preset second contour overlap, it is preliminarily determined that the molded product does not meet the standard, and a second determination is made based on the number of molded products in a single cycle whether the molded product meets the standard; If the contour overlap is greater than a preset second contour overlap, the scheduling unit determines that the molded product meets the standard.

2. The production scheduling system of the injection blow molding machine according to claim 1, characterized in that: When the scheduling unit initially determines that the molded product does not meet the standard, it secondarily determines whether the molded product meets the standard based on the number of molded products in a single cycle, wherein: If the number of molded products in a single cycle is less than or equal to the preset first number of molded products, the scheduling unit determines for the second time that the molded products do not meet the standards and corrects the blowing interval of the blow molding mechanism; If the number of molded products in a single cycle is greater than the preset first number of molded products and less than or equal to the preset second number of molded products, the scheduling unit determines for the second time that the molded products do not meet the standards and corrects the raw material conveying speed of the first conveying mechanism; If the number of molded products in a single cycle is greater than the preset second number of molded products, the scheduling unit determines for the second time that the molded products meet the standards.

3. The production scheduling system of the injection blow molding machine according to claim 2, characterized in that: The scheduling unit corrects the blowing interval of the blow molding mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products, and the corrected blowing interval of the blow molding mechanism is inversely proportional to the number of molded products in a single cycle.

4. The production scheduling system of the injection blow molding machine according to claim 3, characterized in that: The scheduling unit corrects the material conveying speed of the first conveying mechanism based on the absolute value of the difference between the number of molded products in a single cycle and the preset first number of molded products, and the corrected material conveying speed is proportional to the number of molded products in a single cycle.

5. The production scheduling system of the injection blow molding machine according to claim 4, characterized in that: When the scheduling unit determines that the molded product does not meet the standard, the reason why the molded product does not meet the standard is determined based on the absolute value of the difference between the contour coincidence of the molded product and the preset first contour coincidence, wherein: If the absolute value of the difference in contour overlap of the molded product is less than or equal to the preset contour overlap difference, the scheduling unit determines that the reason why the molded product does not meet the standard is caused by impurities in the environment, and adjusts the opening cross-sectional area of ​​the air inlet of the dust removal mechanism; If the absolute value of the difference in contour overlap of the molded product is greater than a preset contour overlap difference, the scheduling unit determines that the reason why the molded product does not meet the standard is a problem with the blowing pressure of the blow molding mechanism, and adjusts the blowing pressure of the blow molding mechanism.

6. The production scheduling system of the injection blow molding machine according to claim 5, characterized in that: The scheduling unit adjusts the blowing pressure of the blow molding mechanism based on the absolute value of the difference between the contour overlap of the molded product and the preset first contour overlap.

7. The production scheduling system of the injection blow molding machine according to claim 6, characterized in that: The scheduling unit adjusts the opening cross-sectional area of ​​the air inlet of the dust removal mechanism based on the absolute value of the difference between the contour overlap of the formed product and the preset first contour overlap.