Large-span pipe gallery sliding hoisting device, control method and related products
By adopting large-span pipe rack sliding hoisting devices in steel plants and using technologies such as portal masts, sliding slings and sensors, the low efficiency and safety hazards of traditional hoisting methods under restricted site conditions are solved, achieving It ensures efficient and safe installation of large-span pipe racks and reduces costs.
Patent Information
- Application Number
- CN202410977626.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-22
AI Technical Summary
In steel plants, traditional hoisting methods are difficult to install long-span pipe racks efficiently and safely, especially under restricted site conditions, such as across railways, resulting in complex operations, low efficiency and potential safety hazards.
A sliding hoisting device for a large-span pipe gallery frame is designed, using components such as portal masts, sliding slings, electric hoists, anchor cables, wind ropes, traction wire ropes and sensors. It is hoisted through segmented splicing and electric hoists, combined with the inclination angle. Sensors and tension sensors monitor and adjust in real time to ensure the levelness and tension of the pipe rack and achieve stable installation of the pipe rack.
This device enables efficient and safe installation of large-span pipe racks under restricted site conditions, reduces the need for large cranes and diversion solutions, reduces installation costs, and ensures the smooth installation and stability of pipe rack components. .
Smart Images

Figure CN118495368B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electromechanical installation, and in particular to a sliding hoisting device for a large-span pipe gallery, a control method thereof and related products. Background Art
[0002] At present, the main problems of energy utilization are still low efficiency, poor economic benefits, and great pressure on the ecological environment. Energy conservation and emission reduction, reducing energy consumption, and improving the comprehensive utilization rate of energy are the fundamental ways to solve energy problems. At present, the energy consumption of the steel and metallurgical industry is very large, and the waste heat resources of steel plants are distributed in various links of steel production.
[0003] If the waste heat generated at each stage of steel plant production can be efficiently recovered, it will generate greater economic benefits for steel companies. The utilization of waste heat in steel plants is inseparable from the transportation of industrial pipelines. As an important structure for supporting and fixing pipelines, the installation quality of pipe racks directly affects the safety and efficiency of pipeline transportation. However, in practical applications, especially when it comes to the installation of large-span pipe racks, the problem of limited space is often encountered. For example, the railway between the bases of the pipe racks crosses, and large truck cranes cannot be used for operation, which brings great challenges to the hoisting and positioning of large-span pipe racks.
[0004] When facing the installation of such a large-span pipe rack, the traditional hoisting method has problems such as complex operation, low efficiency and potential safety hazards. How to improve the hoisting efficiency and installation accuracy of the large-span pipe rack while ensuring safety has become a technical problem that needs to be solved urgently. To this end, the present invention provides a large-span pipe rack sliding hoisting device suitable for restricted site conditions to meet actual production needs, which has important practical significance. Summary of the invention
[0005] In order to solve the above technical problems, the present invention aims to provide a sliding hoisting device for a large-span pipe gallery, a control method thereof and related products, thereby realizing the installation of a large-span pipe gallery.
[0006] The present invention is achieved through the following technical solutions:
[0007] A sliding hoisting device for a large-span pipe gallery, the large-span pipe gallery comprising: a pipe gallery base and a pipe gallery assembly, two pipe gallery bases are respectively arranged on both sides of a large-span area, after installation, two ends of the pipe gallery assembly are respectively fixedly connected to the two pipe gallery bases; the pipe gallery assembly comprises a plurality of pipe gallery frames spliced in series;
[0008] The lifting device comprises:
[0009] A portal mast, wherein two portal masts are respectively arranged on both sides of the large span area, and two pipe gallery bases are located between the two portal masts;
[0010] A splicing platform, which is arranged between one of the pipe gallery bases and the portal mast adjacent thereto;
[0011] A sliding sling, both ends of which are fixedly connected to the two portal masts respectively;
[0012] An electric hoist is arranged on the sliding sling, and the lifting end of the electric hoist hoists the pipe gallery frame.
[0013] Furthermore, the hoisting device further comprises:
[0014] An anchoring cable wind rope, one end of which is fixedly connected to the upper end of the portal mast, and the other end of which is fixedly connected to the ground of the site, and the anchoring cable wind rope provides lateral tension for the portal mast;
[0015] A traction wire rope and an electric winch, wherein one end of the traction wire rope is fixedly connected to the pipe gallery frame assembly, and the other end of the traction wire rope is connected to the electric winch;
[0016] An inclination sensor and a tension sensor, wherein the inclination sensor is installed on the pipe rack, and the tension sensor is installed between the electric hoist and the pipe rack;
[0017] The projection of the sliding sling on the horizontal plane is parallel to the line between the two pipe rack bases, the traction direction of the traction wire rope is parallel to the line between the two pipe rack bases, and is directed from the splicing platform to the pipe rack base;
[0018] The inclination sensor is used to detect the horizontality of the pipe rack;
[0019] The tension sensor is used to detect the pulling force of the electric hoist on the pipe rack.
[0020] A control method for a sliding hoisting device of a large-span pipe gallery, the control method comprising:
[0021] Divide the multiple pipe racks into pipe rack A, pipe rack B, ..., pipe rack N in sequence;
[0022] Lift the pipe rack A to the splicing platform, and lift the pipe rack A to the sliding slings through four electric hoists;
[0023] Lift the pipe rack B to the splicing platform, and use four electric hoists to lift the pipe rack B to the sliding slings, and then splice the pipe rack A with the pipe rack B;
[0024] The electric hoist lifts the pipe rack, and then the electric winch and traction wire rope pull the spliced pipe rack A and pipe rack B along the sliding sling;
[0025] The inclination of each pipe rack is detected by the inclination sensor and the tension sensor, and the pipe rack is leveled by the electric hoist;
[0026] Lift the pipe rack C to the splicing platform, and use four electric hoists to lift the pipe rack C to the sliding slings, and then splice the pipe rack B with the pipe rack C;
[0027] Repeat the above steps until the splicing of pipe rack N and pipe rack N-1 is completed;
[0028] Connect the assembled pipe gallery assembly to the pipe gallery base.
[0029] Specifically, the method for detecting the inclination of the pipe gallery includes:
[0030] Acquire first inclination angle data of the pipe gallery through an inclination sensor;
[0031] Calculate the second inclination angle data of the pipe gallery through the tension sensor;
[0032] An error threshold is set, and if the difference between the first tilt angle data and the second tilt angle data is less than the error threshold, the electric hoist is adjusted according to the first tilt angle data and the second tilt angle data;
[0033] If the difference between the first tilt angle data and the second tilt angle data is greater than the error threshold, the action is stopped.
[0034] Specifically, a horizontal plane is determined on the pipe gallery, and on the horizontal plane, the axial direction of the pipe gallery is taken as the x-axis, and the direction perpendicular to the x-axis is taken as the y-axis;
[0035] The first tilt angle data includes an x-axis tilt angle and a y-axis tilt angle, and the obtaining method includes:
[0036] An x-axis tilt sensor is arranged along the x-axis, and a y-axis tilt sensor is arranged along the y-axis;
[0037] The x-axis inclination angle in the first inclination angle data of the pipe rack is obtained by the x-axis inclination sensor The y-axis inclination angle in the first inclination angle data of the pipe gallery is obtained by the y-axis inclination angle sensor. .
[0038] Specifically, four electric hoists are connected to the pipe gallery in a rectangular shape, and the four electric hoists are named the first electric hoist, the second electric hoist, the third electric hoist and the fourth electric hoist in sequence, wherein the first electric hoist and the second electric hoist are connected to the same sliding sling, the third electric hoist and the fourth electric hoist are connected to another sliding sling, and the connection line between the first electric hoist and the third electric hoist is parallel to the y-axis;
[0039] The second tilt angle data includes an x-axis tilt angle and a y-axis tilt angle, and the obtaining method includes:
[0040] Get the initial tension data of the pipe rack in the horizontal state: the tension reading of the tension sensor of the first electric hoist , the tension reading of the tension sensor of the second electric hoist , the tension reading of the tension sensor of the third electric hoist And the tension reading of the tension sensor of the fourth electric hoist , and determine the total mass of the pipe gallery ;
[0041] Determine the center of gravity of the pipe rack and make the distance between the center of gravity of the pipe gallery and the first electric hoist not equal to the distance between the center of gravity of the pipe gallery and the second electric hoist;
[0042] Get the initial tension data of the pipe rack in real time: the tension reading of the tension sensor of the first electric hoist , the tension reading of the tension sensor of the second electric hoist , the tension reading of the tension sensor of the third electric hoist And the tension reading of the tension sensor of the fourth electric hoist ;
[0043] Calculate the tension changes of four electric hoists: ;
[0044] Calculate the x-axis inclination angle in the second inclination angle data of the pipe gallery ,in, is the distance between the first electric hoist and the second electric hoist;
[0045] Calculate the y-axis inclination angle in the second inclination angle data of the pipe gallery ,in, is the distance between the first electric hoist and the second electric hoist.
[0046] Specifically, the center of gravity of the pipe gallery The calculation method is: ;
[0047] If the distance between the center of gravity of the pipe gallery and the first electric hoist is equal to the distance between the center of gravity of the pipe gallery and the second electric hoist, adjust the connection position of the electric hoist and the pipe gallery.
[0048] Specifically, the error threshold includes the x-axis threshold and the y-axis threshold ;
[0049] like and , it is determined that the difference between the first tilt angle data and the second tilt angle data is less than the error threshold;
[0050] like or , it is determined that the difference between the first tilt angle data and the second tilt angle data is greater than the error threshold.
[0051] Specifically, the method for adjusting the electric hoist according to the first inclination angle data and the second inclination angle data includes:
[0052] Set the leveling inclination angle threshold and leveling tension threshold to control the lifting height of the pipe gallery by the electric hoist;
[0053] and make , if it is detected during the approach , then the leveling of the pipe gallery is completed, among which, , , , To level the tension threshold, , is the leveling tilt angle threshold.
[0054] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described above is implemented.
[0055] A computer program product comprises a computer program / instruction, which implements the method described above when executed by a processor.
[0056] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0057] The present invention forms the moving part of the pipe gallery assembly by using a door-type mast and a sliding sling, and sets the pipe gallery assembly as a segmented structure. During the installation process, the pipe gallery assembly can be installed step by step on the splicing platform, and then hoisted by an electric hoist after installation, so that it moves on the sliding sling until the installation of the entire pipe gallery assembly is finally completed.
[0058] The present invention divides the pipe gallery assembly into multiple pipe gallery racks, so that only the light-weight pipe gallery racks need to be hoisted during hoisting, without the need for a large crane. The door-type mast and the sliding sling make it particularly suitable for the installation of large-span pipe gallery racks under restricted site conditions, solving the hoisting problem of special sites such as crossing railways. At the same time, it also avoids the use of expensive large cranes and diversion schemes, thereby reducing installation costs.
[0059] The present invention also monitors and adjusts the inclination of the pipe gallery in real time by arranging a tilt sensor and a tension sensor, thereby preventing the pipe gallery from being excessively tilted during the movement along the sliding slings, thereby ensuring the smooth installation of the entire pipe gallery assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] The accompanying drawings illustrate exemplary embodiments of the present invention and, together with the description thereof, are used to explain the principles of the present invention. These drawings are included to provide a further understanding of the present invention, and the accompanying drawings are included in and constitute a part of this specification and do not constitute a limitation of the embodiments of the present invention.
[0061] Figure 1 It is a structural schematic diagram of the sliding hoisting device for a large-span pipe gallery according to the present invention.
[0062] Figure 2 It is a flow chart of a control method of a sliding hoisting device for a large-span pipe gallery according to the present invention.
[0063] Figure numerals: 1-portal mast, 2-splicing platform, 3-sliding sling, 4-electric hoist, 5-anchoring cable, 6-traction wire rope, 7-electric winch, 8-pipe gallery base, 9-pipe gallery assembly. DETAILED DESCRIPTION
[0064] To make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and implementation methods. It is understood that the specific implementation methods described herein are only used to explain the relevant content, rather than to limit the present invention.
[0065] It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the drawings.
[0066] In the absence of conflict, the embodiments and features of the embodiments of the present invention may be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0067] Embodiment 1, as Figure 1As shown, a sliding hoisting device for a large-span pipe gallery is provided. The large-span pipe gallery comprises: a pipe gallery base 8 and a pipe gallery assembly 9. Two pipe gallery bases 8 are respectively arranged on both sides of the large-span area. After installation, the two ends of the pipe gallery assembly 9 are respectively fixedly connected to the two pipe gallery bases 8; the pipe gallery assembly 9 comprises a plurality of pipe gallery frames spliced in series.
[0068] The pipe gallery assembly 9 is designed as a plurality of pipe gallery frames spliced in series, and pipe gallery bases 8 are respectively arranged on both sides of the large-span area to support the entire structure. During the installation process, the two pipe gallery bases 8 are first fixed at a predetermined position, and then the various parts of the pipe gallery assembly 9 are gradually spliced together. After the splicing is completed, the two ends of the entire pipe gallery assembly 9 are respectively fixedly connected to the two pipe gallery bases 8 to form a stable large-span pipe gallery structure.
[0069] By splicing the pipe gallery assembly 9 in sections, the installation process can be simplified, the installation efficiency can be improved, and the construction difficulty can be reduced. The pipe gallery is hoisted to the assembly platform by a small truck crane that can enter the site, and is lifted by adjusting the electric hoist 4, slides forward a section length, and then descends to the height of the assembly platform to assemble the next section, until all the pipe gallery frames are connected as a whole and slide into place on the pipe gallery frame base 8, and then adjusted to the level and descended before being installed and fixed.
[0070] The structure of the lifting device is described below:
[0071] The hoisting device comprises: a portal mast 1, a splicing platform 2, a sliding sling 3, an electric hoist 4, an anchoring cable wind rope 5, a traction wire rope 6, an electric winch 7, an inclination sensor and a tension sensor.
[0072] Two gantry masts 1 are respectively arranged on both sides of the large-span area, and two pipe gallery bases 8 are located between the two gantry masts 1. The gantry mast 1 is a support rod with a gate-like structure, which is used to support and move the pipe gallery assembly 9, and the height of the gantry mast 1 can be adjusted according to the spacing of obstacles such as cross-railways.
[0073] The splicing platform 2 is arranged between one of the pipe gallery bases 8 and the adjacent portal mast 1; the splicing platform 2 is made of a modular frame, which is convenient for assembly and disassembly and quick to install, and is mainly used for splicing two adjacent pipe gallery bases.
[0074] The two ends of the sliding sling 3 are respectively fixedly connected to the two gantry masts 1; the sliding sling 3 is used to carry the electric hoist 4 and move it between the gantry masts 1. In addition, the sliding sling is provided with a sag to ensure that it is deformed flexibly under force and will not be damaged. The electric hoist 4 is arranged on the sliding sling 3, and the lifting end of the electric hoist 4 is used to hoist the pipe gallery.
[0075] One end of the anchoring cable wind rope 5 is fixedly connected to the upper end of the portal mast 1, and the other end of the anchoring cable wind rope 5 is fixedly connected to the ground of the site. The anchoring cable wind rope 5 provides lateral tension for the portal mast 1, that is, it provides support and stability for the portal mast 1 through the lateral tension to prevent it from tilting or moving during the lifting process.
[0076] One end of the traction wire rope 6 is fixedly connected to the pipe gallery frame assembly 9, and the other end of the traction wire rope 6 is connected to the electric winch 7; the projection of the sliding sling 3 on the horizontal plane is parallel to the line between the two pipe gallery frame bases 8, and the traction direction of the traction wire rope 6 is parallel to the line between the two pipe gallery frame bases 8, and is pointed from the splicing platform 2 to the pipe gallery frame base 8; the traction wire rope 6 and the electric winch 7 provide a stable horizontal power for the pipe gallery frame, pulling the pipe gallery bridge to move along the sliding sling 3.
[0077] The inclination sensor is installed on the pipe rack, and the tension sensor is installed between the electric hoist 4 and the pipe rack; the inclination sensor is used to detect the horizontality of the pipe rack; the tension sensor is used to detect the pulling force of the electric hoist 4 on the pipe rack. Because the sliding sling 3 is provided with a sag, the pipe rack may tilt during the movement of the electric hoist 4. In order to avoid this situation, the inclination of the pipe rack is detected by setting the inclination sensor and the tension sensor, and the pipe rack is made level by adjusting the electric hoist 4.
[0078] In this embodiment, all electronic controls involved can be connected to the central processing unit and controlled by the central processing unit.
[0079] In the second embodiment, in order to facilitate the subsequent description of the control method, it is set as follows:
[0080] Multiple pipe racks are divided into pipe rack A, pipe rack B, ..., pipe rack N in sequence; multiple pipe racks are made of pipe and rack support modules, hoisted and transported as a whole, and the order can be replaced during the installation process. In the actual work process, multiple pipe rack modules are divided and numbered in a predetermined order. Each pipe rack module is composed of pipes and rack supports, and is hoisted and transported as a whole. During installation, the installation order can be replaced as needed to improve flexibility and adaptability.
[0081] Determine the horizontal plane on the pipe gallery (the horizontal reference plane that needs to be maintained during the installation of the pipe gallery), and on the horizontal plane, take the axial direction of the pipe gallery as the x-axis and the direction perpendicular to the x-axis as the y-axis;
[0082] Four electric hoists are connected to the pipe gallery in a rectangular shape, and the four electric hoists are named the first electric hoist, the second electric hoist, the third electric hoist and the fourth electric hoist in sequence, wherein the first electric hoist and the second electric hoist are connected to the same sliding sling, the third electric hoist and the fourth electric hoist are connected to another sliding sling, and the connecting line between the first electric hoist and the third electric hoist is parallel to the y-axis.
[0083] like Figure 2 As shown, a control method for a sliding hoisting device for a large-span pipe gallery is provided, and the control method comprises:
[0084] Lift the pipe rack A to the splicing platform, and lift the pipe rack A to the sliding slings through four electric hoists; ensure its stable position and determine the center of gravity of the pipe rack A.
[0085] Lift the pipe gallery B to the splicing platform, and lift the pipe gallery B to the sliding slings through four electric hoists, and then splice the pipe gallery A and the pipe gallery B; after determining the center of gravity of the pipe gallery B, splice them to obtain the pipe gallery A-pipe gallery B.
[0086] The electric hoist lifts the pipe rack, and then the electric winch and traction wire rope pull the spliced pipe rack A and pipe rack B along the sliding sling; that is, the pipe rack A-pipe rack B is separated from the splicing platform, and then the pipe rack A-pipe rack B is moved forward (in the x direction) by a distance (which can be set to the length of the pipe rack).
[0087] The inclination of each pipe gallery is detected by the inclination sensor and the tension sensor, and the pipe gallery is leveled by the electric hoist. During the movement, the pipe gallery may tilt due to the influence of the sag of the sliding sling. The parameters of the pipe gallery are detected by the sensor, and the lifting height of the electric hoist is adjusted to keep the pipe gallery level. The inclination of the pipe gallery is detected in real time by the inclination sensor to ensure that the pipe gallery remains level during the movement. The tension sensor monitors the pulling force applied by the electric hoist to the pipe gallery and makes necessary adjustments to maintain balance.
[0088] Lift the pipe rack C to the splicing platform, and use four electric hoists to lift the pipe rack C to the sliding slings, and then splice the pipe rack B with the pipe rack C;
[0089] Repeat the above steps, that is, according to the same method, hoist and splice the subsequent pipe racks one by one until the splicing of pipe rack N and pipe rack N-1 is completed;
[0090] Connect the assembled pipe gallery components to the pipe gallery base. Move all assembled pipe gallery components to the final position. Fix the two ends of the assembled pipe gallery components to the pre-installed pipe gallery base to ensure the stability and safety of the overall structure.
[0091] Embodiment 3: In order to check the inclination of the pipe rack, two detection methods are set for detection to avoid detection errors caused by using only one method. The detection method of the inclination of the pipe rack includes:
[0092] Obtain the first inclination angle data of the pipe gallery (including the inclination angle of the x-axis and the inclination angle of the y-axis) through the inclination sensor;
[0093] Calculate the second inclination angle data of the pipe gallery (including the inclination angle of the x-axis and the inclination angle of the y-axis) through the tension sensor;
[0094] An error threshold is set. If the difference between the first tilt angle data and the second tilt angle data is less than the error threshold, the electric hoist is adjusted according to the first tilt angle data and the second tilt angle data; this proves that the detection difference between the two detection methods is not large and the equipment is operating normally.
[0095] If the difference between the first tilt angle data and the second tilt angle data is greater than the error threshold, the action is stopped, which proves that the error between the two detection methods is too large, and the wrong house may be detected or a serious fault may occur, requiring shutdown for maintenance.
[0096] The method for obtaining the first tilt angle data includes:
[0097] An x-direction tilt sensor is arranged along the x-axis to measure the tilt angle of the pipe rack in the x-axis direction, and a y-direction tilt sensor is arranged along the y-axis to measure the tilt angle of the pipe rack in the y-axis direction;
[0098] The x-axis inclination angle in the first inclination angle data of the pipe rack is obtained by the x-axis inclination sensor The y-axis inclination angle in the first inclination angle data of the pipe gallery is obtained by the y-axis inclination angle sensor. .
[0099] During the installation process, x-axis and y-axis inclination sensors are arranged on the horizontal plane of the pipe rack to detect the inclination angle of the pipe rack in the x-axis and y-axis directions respectively. The inclination sensor transmits the detected inclination angle data to the control system in real time, and the control system adjusts the operation of the electric hoist according to the data to keep the pipe rack horizontal.
[0100] The method for obtaining the second tilt angle data includes:
[0101] Get the initial tension data of the pipe rack in the horizontal state: the tension reading of the tension sensor of the first electric hoist , the tension reading of the tension sensor of the second electric hoist , the tension reading of the tension sensor of the third electric hoist And the tension reading of the tension sensor of the fourth electric hoist , and determine the total mass of the pipe gallery ; Perform independent calculations for each pipe rack. Before splicing pipe rack A and pipe rack B, hoist pipe rack A and pipe rack B to a horizontal position, and then obtain the initial tension data. When splicing pipe rack B and pipe rack C, hoist pipe rack A-pipe rack B to a horizontal position, obtain the initial tension data of the 8 electric hoists of the two pipe racks, and also obtain the initial tension data of pipe rack C. That is, after each splicing, the second inclination angle data needs to be reset and updated for each initial tension data corresponding to the electric hoist.
[0102] Determine the center of gravity of the pipe rack And the distance between the center of gravity of the pipe gallery frame and the first electric hoist is not equal to the distance between the center of gravity of the pipe gallery frame and the second electric hoist; the distance is determined when the electric hoist is connected to the pipe gallery frame for the first time, and the connection position between the electric hoist and the pipe gallery frame will not be changed subsequently.
[0103] Get the initial tension data of the pipe rack in real time: the tension reading of the tension sensor of the first electric hoist , the tension reading of the tension sensor of the second electric hoist , the tension reading of the tension sensor of the third electric hoist And the tension reading of the tension sensor of the fourth electric hoist ;
[0104] Calculate the tension changes of four electric hoists: ;
[0105] Calculate the x-axis inclination angle in the second inclination angle data of the pipe gallery ,in, is the distance between the first electric hoist and the second electric hoist; the numerator in the formula represents the difference in tilting moment caused by the change in tension in the x-axis direction. This moment difference will cause the pipe gallery to tilt in the x-axis direction. The arctan function is used to calculate this moment difference and The ratio between them is used to obtain the inclination angle of the pipe gallery in the x-axis direction.
[0106] Calculate the y-axis inclination angle in the second inclination angle data of the pipe gallery ,in, is the distance between the first electric hoist and the second electric hoist. Similarly, the numerator in the formula represents the difference in tilting moment caused by the change in tension in the y-axis direction. This moment difference will cause the pipe rack to tilt in the y-axis direction.
[0107] That is, during the installation of the pipe gallery, the tension change of each electric hoist is calculated by comparing the initial tension data with the real-time tension data. Based on these tension changes, the inclination angle of the pipe gallery in the x-axis and y-axis directions is calculated using relevant formulas.
[0108] In addition, the center of gravity of the pipe gallery is provided. The calculation method is: ;
[0109] If the distance between the center of gravity of the pipe gallery and the first electric hoist is equal to the distance between the center of gravity of the pipe gallery and the second electric hoist, adjust the connection position of the electric hoist and the pipe gallery.
[0110] If the distance between the center of gravity of the pipe gallery and the first electric hoist is equal to the distance between the center of gravity of the pipe gallery and the second electric hoist, it is necessary to adjust the connection position of the electric hoist and the pipe gallery. The main purpose is to change the tension of the electric hoist when the pipe gallery tilts. However, in practice, the distance difference between the two should not be too large to avoid excessive force on one electric hoist and damage to the other.
[0111] Embodiment 4: The error threshold includes an x-axis threshold and the y-axis threshold ;
[0112] like and , it is determined that the difference between the first tilt angle data and the second tilt angle data is less than the error threshold;
[0113] like or , it is determined that the difference between the first tilt angle data and the second tilt angle data is greater than the error threshold.
[0114] That is, the tilt angle is divided into the x-direction and the y-direction, and as long as any one of the angles is greater than a threshold, it is considered that the entire tilt angle data is greater than the threshold.
[0115] The method for adjusting the electric hoist according to the first inclination angle data and the second inclination angle data comprises:
[0116] Set the leveling inclination angle threshold to determine whether the pipe gallery has reached the horizontal state. The inclination angle thresholds are the inclination angle thresholds in the x-axis and y-axis directions. , .
[0117] Set the leveling tension threshold to determine whether the tension of the electric hoist reaches the equilibrium state. , , , .
[0118] Control the lifting height of the pipe gallery by the electric hoist;
[0119] and make , even if the 6 parameters gradually approach 0.
[0120] If it is detected during the approach , that is, the absolute value of the change in tension and inclination is less than the threshold.
[0121] If it is detected during the adjustment process that all parameters meet the leveling threshold conditions, the leveling of the pipe gallery is considered to be completed, where is the leveling tension threshold and is the leveling inclination angle threshold.
[0122] In actual operation, the inclination angle of the pipe gallery and the tension change of the electric hoist are monitored in real time and compared with the set leveling threshold to control the lifting height and tension of the electric hoist. The operation of the electric hoist is adjusted so that the inclination angle and tension change of the pipe gallery gradually approach zero. When all parameters meet the leveling threshold conditions, it indicates that the pipe gallery has reached the ideal horizontal state and the leveling process is completed.
[0123] Embodiment 5, a control terminal of a sliding hoisting device for a large-span pipe gallery, comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the control method for the sliding hoisting device for a large-span pipe gallery when executing the computer program.
[0124] The memory can be used to store software programs and modules. The processor executes various functional applications and data processing of the terminal by running the software programs and modules stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an execution program required for at least one function, etc.
[0125] The data storage area can store data created according to the use of the terminal, etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0126] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the control method of the above-mentioned large-span pipe gallery sliding hoisting device is implemented.
[0127] Without loss of generality, computer readable media may include computer storage media and communication media. Computer storage media include volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information such as computer readable instruction data structures, program modules or other data. Computer storage media include RAM, ROM, EPROM, EEPROM, flash memory or other solid-state storage technology, CD-ROM, DVD or other optical storage, cassettes, magnetic tapes, disk storage or other magnetic storage devices. Of course, those skilled in the art will appreciate that computer storage media are not limited to the above. The above-mentioned system memory and mass storage devices can be collectively referred to as memory.
[0128] A computer program product includes a computer program / instruction, which, when executed by a processor, implements the control method of the above-mentioned large-span pipe gallery sliding hoisting device.
[0129] A computer program product includes a computer program or set of instructions for performing specific tasks or achieving specific functions. These programs or instructions are designed to be executed by a processor to implement a series of predefined steps or operations. The program product may be stored in various forms of computer storage media, such as memory, hard disk, solid-state drive, optical disk or other forms of digital storage devices. It may exist in the form of compiled binary code or in the form of scripts or bytecodes that can be executed by an interpreter. The program product uses carefully designed algorithms and logical instructions to enable the processor to process data in a specific order and manner to complete various functions such as data analysis, user interaction, device control, etc.
[0130] In the description of this specification, the description with reference to the terms "one embodiment / method", "some embodiments / methods", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment / method or example are included in at least one embodiment / method or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment / method or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments / methods or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments / methods or examples described in this specification and the features of the different embodiments / methods or examples, unless they are contradictory.
[0131] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0132] It should be understood by those skilled in the art that the above embodiments are only for the purpose of clearly illustrating the present invention, and are not intended to limit the scope of the present invention. For those skilled in the art, other changes or modifications may be made based on the above invention, and these changes or modifications are still within the scope of the present invention.
Claims
1. A control method for a large-span pipe gallery sliding hoisting device, characterized in that: A device for controlling the sliding and hoisting of a large-span pipe gallery, the large-span pipe gallery comprising: a pipe gallery base (8) and a pipe gallery assembly (9), wherein two pipe gallery bases (8) are respectively arranged on both sides of a large-span area, and after installation, two ends of the pipe gallery assembly (9) are respectively fixedly connected to the two pipe gallery bases (8); the pipe gallery assembly (9) comprises a plurality of pipe gallery frames spliced in series; the hoisting device comprises: A portal mast (1), wherein two portal masts (1) are respectively arranged on both sides of the large-span area, and two pipe gallery frame bases (8) are located between the two portal masts (1); A splicing platform (2) arranged between one of the pipe gallery bases (8) and the adjacent portal mast (1); A sliding sling (3), both ends of which are respectively fixedly connected to the two portal masts (1); An electric hoist (4) which is arranged on the sliding sling (3), and the lifting end of the electric hoist (4) is used to hoist the pipe gallery; An anchoring cable wind rope (5), one end of which is fixedly connected to the upper end of the portal mast (1), and the other end of which is fixedly connected to the ground of the site, and the anchoring cable wind rope (5) provides lateral tension for the portal mast (1); A traction steel wire rope (6) and an electric winch (7), wherein one end of the traction steel wire rope (6) is fixedly connected to the pipe gallery frame assembly (9), and the other end of the traction steel wire rope (6) is connected to the electric winch (7); An inclination sensor and a tension sensor, wherein the inclination sensor is installed on the pipe rack, and the tension sensor is installed between the electric hoist (4) and the pipe rack; The projection of the sliding sling (3) on the horizontal plane is parallel to the line between the two pipe gallery bases (8); the traction direction of the traction steel wire rope (6) is parallel to the line between the two pipe gallery bases (8), and is directed from the splicing platform (2) to the pipe gallery base (8); The inclination sensor is used to detect the horizontality of the pipe rack; The tension sensor is used to detect the pulling force of the electric hoist (4) on the pipe rack; The control method comprises: Divide the multiple pipe racks into pipe rack A, pipe rack B, ..., pipe rack N in sequence; Lift the pipe rack A to the splicing platform, and lift the pipe rack A to the sliding slings through four electric hoists; Lift the pipe rack B to the splicing platform, and use four electric hoists to lift the pipe rack B to the sliding slings, and then splice the pipe rack A with the pipe rack B; The electric hoist lifts the pipe rack, and then the electric winch and traction wire rope pull the spliced pipe rack A and pipe rack B along the sliding sling; The inclination of each pipe rack is detected by the inclination sensor and the tension sensor, and the pipe rack is leveled by the electric hoist; Lift the pipe rack C to the splicing platform, and use four electric hoists to lift the pipe rack C to the sliding slings, and then splice the pipe rack B with the pipe rack C; Repeat the above steps until the splicing of pipe rack N and pipe rack N-1 is completed; Connect the assembled pipe gallery assembly to the pipe gallery base.
2. The control method of the large-span pipe rack sliding hoisting device according to claim 1 is characterized in that: The detection methods of the inclination of the pipe gallery include: Acquire first inclination angle data of the pipe gallery through an inclination sensor; Calculate the second inclination angle data of the pipe gallery through the tension sensor; An error threshold is set, and if the difference between the first tilt angle data and the second tilt angle data is less than the error threshold, the electric hoist is adjusted according to the first tilt angle data and the second tilt angle data; If the difference between the first tilt angle data and the second tilt angle data is greater than the error threshold, the action is stopped.
3. The control method of the large-span pipe rack sliding hoisting device according to claim 2 is characterized in that: Determine a horizontal plane on the pipe gallery, and on the horizontal plane, take the axial direction of the pipe gallery as the x-axis and the direction perpendicular to the x-axis as the y-axis; The first tilt angle data includes an x-axis tilt angle and a y-axis tilt angle, and the obtaining method includes: An x-axis tilt sensor is arranged along the x-axis, and a y-axis tilt sensor is arranged along the y-axis; The x-axis inclination angle in the first inclination angle data of the pipe rack is obtained by the x-axis inclination sensor The y-axis inclination angle in the first inclination angle data of the pipe gallery is obtained by the y-axis inclination angle sensor. .
4. The control method of the large-span pipe gallery sliding hoisting device according to claim 3 is characterized in that: Four electric hoists are connected to the pipe rack in a rectangular shape, and the four electric hoists are named the first electric hoist, the second electric hoist, the third electric hoist and the fourth electric hoist in sequence, wherein the first electric hoist and the second electric hoist are connected to the same sliding sling, the third electric hoist and the fourth electric hoist are connected to another sliding sling, and the connection line between the first electric hoist and the third electric hoist is parallel to the y-axis; The second tilt angle data includes an x-axis tilt angle and a y-axis tilt angle, and the obtaining method includes: Get the initial tension data of the pipe rack in the horizontal state: the tension reading of the tension sensor of the first electric hoist , the tension reading of the tension sensor of the second electric hoist , the tension reading of the tension sensor of the third electric hoist And the tension reading of the tension sensor of the fourth electric hoist , and determine the total mass of the pipe gallery ; Determine the center of gravity of the pipe rack and make the distance between the center of gravity of the pipe gallery and the first electric hoist not equal to the distance between the center of gravity of the pipe gallery and the second electric hoist; Get the initial tension data of the pipe rack in real time: the tension reading of the tension sensor of the first electric hoist , the tension reading of the tension sensor of the second electric hoist , the tension reading of the tension sensor of the third electric hoist And the tension reading of the tension sensor of the fourth electric hoist ; Calculate the tension changes of the four electric hoists: ; Calculate the x-axis inclination angle in the second inclination angle data of the pipe gallery ,in, is the distance between the first electric hoist and the second electric hoist; Calculate the y-axis inclination angle in the second inclination angle data of the pipe gallery ,in, is the distance between the first electric hoist and the second electric hoist.
5. The control method of the large-span pipe gallery sliding hoisting device according to claim 4 is characterized in that: Center of gravity of the pipe rack The calculation method is: ; If the distance between the center of gravity of the pipe gallery and the first electric hoist is equal to the distance between the center of gravity of the pipe gallery and the second electric hoist, adjust the connection position of the electric hoist and the pipe gallery.
6. The control method of the large-span pipe rack sliding hoisting device according to claim 4 is characterized in that: Error thresholds include x-axis thresholds and the y-axis threshold ; like and , it is determined that the difference between the first tilt angle data and the second tilt angle data is less than the error threshold; like or , it is determined that the difference between the first tilt angle data and the second tilt angle data is greater than the error threshold.
7. The control method of the large-span pipe rack sliding hoisting device according to claim 4 is characterized in that: The method for adjusting the electric hoist according to the first inclination angle data and the second inclination angle data comprises: Set the leveling inclination angle threshold and leveling tension threshold to control the lifting height of the pipe gallery by the electric hoist; and make , if it is detected during the approach , then the leveling of the pipe gallery is completed, among which, , , , To level the tension threshold, , is the leveling tilt angle threshold.
8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 2 to 7 is implemented.
9. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instructions are executed by a processor, the method according to any one of claims 2 to 7 is implemented.
Citation Information
Patent Citations
High-altitude sliding hoisting device of corridor truss of mountain and implementing method of high-altitude sliding hoisting device
CN105113803A
Hoisted object balance alarm device
CN112573342A
Movable guide rail device for multi-layer pipe gallery pipeline
CN115159341A
Pipeline mounting device and method
CN117146051A
Hoisting control method and device, hoisting platform and storage medium
CN117720011A