Auxiliary positioning method for modular assembled building node construction

Through the combination of BIM and AR technology, the digital positioning and precise alignment of modular prefabricated building nodes is achieved, which solves the problems of construction difficulties and low efficiency, improves construction accuracy and safety, reduces costs, and meets personalized needs. .

CN118504065BActive Publication Date: 2024-11-22CHINA CONSTR SCI & IND CORP LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410942282.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-22
Estimated Expiration
2044-07-15

AI Technical Summary

Technical Problem

The complexity of nodes in modular prefabricated buildings leads to construction difficulties and low construction efficiency, especially the hidden and difficult to accurately locate the location of the electromechanical pipeline, resulting in increased difficulty in positioning and inspection.

Method used

BIM technology and AR technology are adopted to obtain positioning parameters through standardized solution design, node large-scale drawing design, deepening design, module processing and AR import, and node splicing is achieved through AR visualization assistance.

Benefits of technology

It significantly improves construction accuracy and efficiency, reduces project costs, ensures construction safety, optimizes construction management processes, and enhances user experience to meet personalized viewing needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118504065B_ABST
    Figure CN118504065B_ABST
Patent Text Reader

Abstract

The present invention discloses an auxiliary positioning method for modular prefabricated building node construction, comprising the following steps: standardized scheme design, node large sample drawing design, module processing and AR import, obtaining positioning parameters and splicing construction. The method realizes the digital positioning of node positioning, can accurately simulate and display the spatial layout of electromechanical pipelines and nodes in the building, and combined with AR technology, construction personnel can directly see the virtual model of electromechanical pipelines and nodes at the construction site, thereby ensuring accurate alignment during the construction process, reducing construction errors, significantly improving the accuracy and efficiency of the construction process, and reducing engineering costs. AR real-time simulation and visual guidance ensure the safety of construction and optimize the entire construction management process. At the same time, it enhances the user experience, allowing users to more intuitively understand the pipeline layout and node location of the building to meet personalized viewing needs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to an auxiliary positioning method for modular assembled building node construction. Background Art

[0002] At present, residential construction has shifted from traditional construction methods to the widespread application of modular prefabricated housing. The traditional construction model can no longer meet the requirements of modern residential construction for efficiency, environmental protection and personalization. In comparison, modular prefabricated housing pays more attention to the functional improvement of buildings, realizes the efficient integration and utilization of resources, and can more flexibly adapt to the changes in modern society and residential needs while maintaining the original residential performance. During the construction process, prefabricated modular housing pays special attention to the safety and convenience of the building. Through advanced prefabrication technology and efficient modular construction methods, the splicing quality and stability of each module are ensured.

[0003] For the new modular steel structure prefabricated houses, it is difficult to locate key nodes and electromechanical pipelines. Its complex structural design includes many steel structure frames, connection nodes, and various pipelines hidden inside the building. Traditional positioning and measurement methods are difficult to accurately capture the location of each key node, and it is also difficult to ensure accurate docking and installation during the construction process. In addition, the electromechanical pipelines are further difficult to locate and inspect due to their hidden locations and difficult to directly observe. Therefore, in the existing modular prefabricated buildings, due to the complex nodes, there are problems of construction difficulties and low construction efficiency. Summary of the invention

[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defects of modular prefabricated buildings in the prior art, such as complex nodes, difficult construction and low construction efficiency, thereby providing an auxiliary positioning method for the construction of modular prefabricated building nodes.

[0005] In order to solve the above technical problems, the technical solution of the present invention is as follows:

[0006] An auxiliary positioning method for modular prefabricated building node construction, based on BIM technology and AR technology, comprising:

[0007] Standardized scheme design: Carry out standardized scheme design for modular prefabricated buildings, obtain standardized large-scale drawings, and simultaneously complete the BIM main model in the design stage;

[0008] Node detail drawing design: divide the building into multiple modules according to layout requirements and functional requirements, and design node detail drawings for the multiple modules after division, and build BIM node models simultaneously;

[0009] Node deepening design: according to the BIM node model, the node drawings of the multiple modules are deepened, and according to the deepened node drawings of the multiple modules, the BIM main model is deepened synchronously;

[0010] Module processing and AR import: prefabricate the multiple modules after deepening, upload the deepened BIM main module to the AR system, and perform area cutting according to the division of the multiple modules;

[0011] Obtaining positioning parameters: positioning the BIM main model at the construction site through the AR system, simulating the construction process to obtain node positioning parameters;

[0012] The splicing construction is to perform node splicing of the plurality of modules according to the node positioning parameters and with the assistance of AR visualization.

[0013] According to some embodiments of the present invention, when the building is divided into a plurality of modules, the building is divided into stair modules, opening modules, end modules, corridor modules and roof modules according to layout requirements and functional requirements.

[0014] According to some embodiments of the present invention, building a BIM node model includes defining geometric expression and material expression using BIM software according to existing information in the standardized large-scale drawing and construction site conditions, and establishing the BIM node model.

[0015] According to some embodiments of the present invention, the node deepening design includes:

[0016] Identify drawing defects, review the node detail drawings, and identify missing or unclear parts;

[0017] Supplement drawing information, display the node space layout and construction features according to the three-dimensional visualization features of the BIM node model, supplement the missing dimensioning, material information and connection methods of the node large-scale drawing in the BIM node model, and export the detailed node drawings;

[0018] Inspect and check, compare the detailed node drawings exported from the BIM node model with the node detail drawings, and verify whether the supplementary information is correct and complete.

[0019] According to some embodiments of the present invention, the node deepening design also includes, based on the BIM node model, outputting multiple model views of the BIM node model, and combining the model views with the deepening node drawings to ensure that the nodes of each module are clearly expressed.

[0020] According to some embodiments of the present invention, the plurality of model views include: a plan view, an elevation view, and a section view.

[0021] According to some embodiments of the present invention, the auxiliary positioning method for modular prefabricated building node construction also includes reviewing the electromechanical pipeline nodes, completing the splicing construction, entering the fine decoration delivery stage, verifying the consistency of the BIM node model points with the construction site layout, and reviewing the electromechanical pipeline node position parameters.

[0022] According to some embodiments of the present invention, after verifying the consistency of the BIM node model points with the construction site layout, it is determined that the construction site points are consistent with the BIM node model points, a QR code containing the BIM node model points is output and obtained, the three-dimensional image of the BIM node model and its data parameters are transmitted to the AR system, and the QR code is scanned by a terminal to view and assist in positioning the BIM node model and its data parameters.

[0023] The technical solution of the present invention has the following advantages:

[0024] The auxiliary positioning method for modular prefabricated building node construction provided by the present invention realizes the digital positioning of node positioning, can accurately simulate and display the spatial layout of electromechanical pipelines and nodes in the building, and combined with AR technology, construction personnel can directly see the virtual model of electromechanical pipelines and nodes at the construction site, thereby ensuring accurate alignment during the construction process, reducing construction errors, significantly improving the accuracy and efficiency of the construction process, and reducing engineering costs. AR real-time simulation and visual guidance ensure the safety of construction and optimize the entire construction management process. At the same time, it enhances the user experience, allowing users to more intuitively understand the pipeline layout and node location of the building, meeting personalized viewing needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0026] Figure 1 A flow chart of an auxiliary positioning method for modular prefabricated building node construction provided in some embodiments of the present invention;

[0027] Figure 2 A flowchart of a node deepening design provided in some embodiments of the present invention. DETAILED DESCRIPTION

[0028] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0031] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0032] Reference Figure 1As shown, in some embodiments of the present invention, an auxiliary positioning method for modular prefabricated building node construction is provided, which is based on BIM technology and AR technology, including: standardized scheme design: standardized scheme design is performed on modular prefabricated buildings, standardized large-scale drawings are obtained, and the BIM main model of the design stage is completed synchronously; node large-scale drawing design: the building is divided into multiple modules according to layout requirements and functional requirements, and node large-scale drawings are designed for the multiple modules after division, and the BIM node model is built synchronously; node deepening design: according to the BIM node model, the node drawings of multiple modules are deepened, and according to the node drawings of the deepened multiple modules, the BIM main model is deepened synchronously; module processing and AR import: prefabrication processing is performed on the deepened multiple modules, and the deepened BIM main modules are uploaded to the AR system, and regional cutting is performed according to the division of multiple modules; obtaining positioning parameters: through the AR system, the BIM main model is positioned at the construction site, and the construction process is simulated to obtain node positioning parameters; splicing construction, according to the node positioning parameters, multiple modules are spliced ​​with the assistance of AR visualization.

[0033] Specifically, this method is based on BIM (Building Information Modeling) technology and AR (Augmented Reality) technology, which realizes the digital positioning of node positioning, can accurately simulate and display the spatial layout of mechanical and electrical pipelines and nodes in the building. Combined with AR technology, construction personnel can directly see the virtual model of mechanical and electrical pipelines and nodes at the construction site, thereby ensuring accurate alignment during the construction process, reducing construction errors, significantly improving the accuracy and efficiency of the construction process, and reducing engineering costs. AR real-time simulation and visual guidance ensure the safety of construction and optimize the entire construction management process. At the same time, it enhances the user experience, allowing users to more intuitively understand the pipeline layout and node location of the building to meet personalized viewing needs.

[0034] According to some embodiments of the present invention, when a building is divided into multiple modules, the building is divided into stair modules, opening modules, end modules, corridor modules and roof modules according to layout requirements and functional requirements.

[0035] According to some embodiments of the present invention, building a BIM node model includes defining geometric expressions and material expressions and establishing a BIM node model using BIM software based on existing information in standardized large-scale drawings and construction site conditions.

[0036] Specifically, during the modeling process, the module's collection expression and material expression are defined to obtain a certain BIM node model. BIM software includes Revit, Archicad and other software.

[0037] Reference Figure 2 As shown, in some embodiments of the present invention, the node deepening design includes:

[0038] Identify drawing defects, review node detail drawings, and identify missing or unclear parts;

[0039] Specifically, when drawings are missing, you can directly skip the step of identifying drawing defects and output node drawings based on the optimized BIM node model.

[0040] Supplement drawing information, display node spatial layout and structural features based on the 3D visualization features of the BIM node model, supplement the missing dimensioning, material information and connection methods of the node detail drawings in the BIM node model, and export the detailed node drawings;

[0041] Specifically, according to the data input function of the BIM software, the missing dimensions, material information and connection methods of the node details drawing are marked on the model, and the detailed node drawings are exported.

[0042] Inspect and check, compare the detailed node drawings exported from the BIM node model with the node details drawings, and verify whether the supplementary information is correct and complete.

[0043] In some embodiments of the present invention, the node deepening design also includes, based on the BIM node model, outputting multiple model views of the BIM node model, and combining the model views with the deepening node drawings to ensure that the nodes of each module are clearly expressed.

[0044] In some embodiments of the present invention, the plurality of model views include: a plan view, an elevation view, and a section view.

[0045] In some embodiments of the present invention, the auxiliary positioning method for modular prefabricated building node construction also includes reviewing the electromechanical pipeline nodes, completing the splicing construction, entering the fine decoration delivery stage, checking the consistency of the BIM node model points with the construction site layout, and reviewing the electromechanical pipeline node position parameters.

[0046] In some embodiments of the present invention, after verifying the consistency of the BIM node model points with the construction site layout, it is determined that the construction site points are consistent with the BIM node model points, a QR code containing the BIM node model points is output, the three-dimensional image of the BIM node model and its data parameters are transmitted to the AR system, and the QR code is scanned by the terminal to view and assist in positioning the BIM node model and its data parameters.

[0047] Specifically, obtain a QR code containing the BIM node model points. The QR code contains the BIM node model and its data parameters. The QR code can be scanned and viewed according to the terminal to improve the convenience of subsequent inspections and provide users with accurate data support.

[0048] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. An auxiliary positioning method for modular prefabricated building node construction, based on BIM technology and AR technology, characterized in that: include: Standardized scheme design: Carry out standardized scheme design for modular prefabricated buildings, obtain standardized large-scale drawings, and simultaneously complete the BIM main model in the design stage; Node detail drawing design: divide the building into multiple modules according to layout requirements and functional requirements, and design node detail drawings for the multiple modules after division, and build BIM node models simultaneously; Node deepening design: According to the BIM node model, the node drawings of the multiple modules are deepened, and according to the deepened node drawings of the multiple modules, the BIM main model is deepened synchronously; including: identifying drawing defects, reviewing the node large-scale drawings, and identifying missing or unclear parts; supplementing drawing information, displaying the node space layout and construction features according to the three-dimensional visualization features of the BIM node model, supplementing the missing dimensioning, material information and connection methods of the node large-scale drawings in the BIM node model, and exporting the deepening node drawings; inspection and verification, comparing the deepening node drawings exported from the BIM node model with the node large-scale drawings to verify whether the supplemented information is correct and complete; Module processing and AR import: prefabricate the multiple modules after deepening, upload the deepened BIM main module to the AR system, and perform area cutting according to the division of the multiple modules; Obtaining positioning parameters: positioning the BIM main model at the construction site through the AR system, simulating the construction process to obtain node positioning parameters; The splicing construction is to perform node splicing of the plurality of modules according to the node positioning parameters and with the assistance of AR visualization.

2. The auxiliary positioning method for modular prefabricated building node construction according to claim 1 is characterized in that: When the building is divided into a plurality of modules, the building is divided into a stair module, an opening module, an end module, a corridor module and a roof module according to layout requirements and functional requirements.

3. The auxiliary positioning method for modular prefabricated building node construction according to claim 1 is characterized in that: Building the BIM node model includes using BIM software to define geometric expression and material expression based on the existing information in the standardized large-scale drawings and the construction site conditions, and establishing the BIM node model.

4. The auxiliary positioning method for modular prefabricated building node construction according to claim 1 is characterized in that: The node in-depth design also includes, based on the BIM node model, outputting multiple model views of the BIM node model, and combining the model views with the in-depth node drawings to ensure that the nodes of each module are clearly expressed.

5. The auxiliary positioning method for modular prefabricated building node construction according to claim 4 is characterized in that: The multiple model views include: plan view, elevation view and section view.

6. The auxiliary positioning method for modular prefabricated building node construction according to claim 1 is characterized in that: It also includes the review of mechanical and electrical pipeline nodes, completion of the splicing construction, entering the fine decoration delivery stage, checking the consistency of the BIM node model points with the construction site layout, and reviewing the mechanical and electrical pipeline node position parameters.

7. The auxiliary positioning method for modular prefabricated building node construction according to claim 6 is characterized in that: After verifying the consistency between the BIM node model points and the construction site layout, it is determined that the construction site points are consistent with the BIM node model points, and a QR code containing the BIM node model points is output and obtained. The three-dimensional image of the BIM node model and its data parameters are transmitted to the AR system, and the QR code is scanned by a terminal to view and assist in positioning the BIM node model and its data parameters.

Citation Information

Patent Citations

  • Technology for electromechanical modularized design and combined installation

    CN105956310A

  • Assembly type building deepening design and construction method based on BIM and big data

    CN112287448A

  • Construction auxiliary positioning method based on BIM + AR technology

    CN115828386A

  • Construction inspection method, apparatus, and system

    US20240104714A1