Power load dispatching method and electronic equipment

By determining the candidate scheduling user resource pool in the power load scheduling and selecting the matching target scheduling user to perform power load scheduling, the problem of insufficient power load scheduling reliability in the prior art is solved, and higher power load scheduling reliability is achieved.

CN118508435BActive Publication Date: 2024-11-19GUANGZHOU BAILING DATA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410955606.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-19
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

The existing power load scheduling technology has poor reliability during operation, resulting in poor power load scheduling.

Method used

By determining the candidate scheduling user resource pool, based on the total power load load load scheduling parameters of the candidate scheduling user, the target scheduling user with matching load scheduling response capabilities is selected to perform the power load scheduling operation.

Benefits of technology

The reliability of power load scheduling is improved, ensuring that the target scheduling users matches the scheduling operations, and it has higher reliability than the method of randomly selecting power users.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118508435B_ABST
    Figure CN118508435B_ABST
Patent Text Reader

Abstract

The power load dispatching method and electronic device provided in the present application relate to the technical field of power load dispatching. In the present application, firstly, a candidate dispatching user resource pool can be determined; secondly, based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, at least one candidate dispatching user can be determined as a target dispatching user in the target dispatching user resource pool to obtain at least one target dispatching user; then, a power load dispatching operation can be performed on at least one target dispatching user. Based on the above content, the problem of relatively poor reliability of power load dispatching operations existing in the prior art can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power load scheduling, and in particular to a power load scheduling method and electronic equipment. Background Art

[0002] Power load dispatching refers to the process of reasonably allocating and controlling power loads in a power system according to the load demand and available resources of the system, so as to meet the needs of peak shifting and valley filling. However, the inventors have found that in the existing power load dispatching technology, in the process of power load dispatching operation, generally all users in the area are directly guided to reduce power consumption. In this way, the reliability of power load dispatching operation is relatively poor. Summary of the invention

[0003] In view of this, the purpose of the present application is to provide a power load scheduling method and electronic equipment to improve the problem of relatively poor reliability of power load scheduling operations existing in the prior art.

[0004] To achieve the above purpose, the embodiment of the present application adopts the following technical solution:

[0005] A method for dispatching electric loads, comprising:

[0006] Determine a candidate scheduling user resource pool, wherein the candidate scheduling user resource pool includes a plurality of candidate scheduling users in a target area, and each of the candidate scheduling users has a target scheduling parameter, and the target scheduling parameter is used to characterize the load scheduling response capability of the candidate scheduling user;

[0007] Based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, at least one candidate dispatching user is determined as a target dispatching user in the target dispatching user resource pool to obtain at least one target dispatching user, wherein the load dispatching response capability of the at least one target dispatching user matches the total power load;

[0008] An electric power load dispatching operation is performed on the at least one target dispatching user, wherein the electric power load dispatching operation is at least used to instruct the target dispatching user to reduce the electric power load.

[0009] In a preferred embodiment of the present application, in the above-mentioned power load scheduling method, the step of determining the candidate scheduling user resource pool includes:

[0010] Determine a plurality of initial scheduling users, wherein each of the plurality of initial scheduling users is an electricity user in a target area;

[0011] For each of the initial scheduling users, based on the historical power load scheduling data corresponding to the initial scheduling user, determine the historical power load response parameter corresponding to the initial scheduling user, wherein the historical power load response parameter is used to reflect the response of the initial scheduling user to the power load scheduling operation performed historically;

[0012] For each of the initial scheduling users, based on the historical power load response parameters corresponding to the initial scheduling user, determine the target scheduling parameters corresponding to the initial scheduling user;

[0013] Each initial scheduling user for which the target scheduling parameter is determined is respectively used as a candidate scheduling user to form a plurality of candidate scheduling users, and a corresponding candidate scheduling user resource pool is constructed based on the plurality of candidate scheduling users.

[0014] In a preferred embodiment of the present application, in the above-mentioned power load dispatching method, the step of determining the historical power load response parameter corresponding to the initial dispatching user for each of the initial dispatching users based on the historical power load dispatching data corresponding to the initial dispatching user includes:

[0015] For each of the initial scheduling users, based on multiple historical power loads in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical response baseline load corresponding to the initial scheduling user, wherein the historical power load is used to reflect the actual power consumption of the initial scheduling user in history, and the historical response baseline load is used to reflect the security load of the initial scheduling user;

[0016] For each of the initial scheduling users, based on the historical response baseline load corresponding to the initial scheduling user and at least one of the most recent historical power loads in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical user response load corresponding to the initial scheduling user, wherein the historical user response load is used to reflect the response degree of the initial scheduling user to the power load scheduling operation performed historically;

[0017] For each of the initial scheduling users, based on the response time information of the most recent power load scheduling operation in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical response time corresponding to the initial scheduling user, wherein the historical response time is used to reflect the length from the time when the initial scheduling user starts responding to the power load scheduling operation to the time when the user reaches the peak load response;

[0018] For each of the initial scheduling users, the ramp rate corresponding to the initial scheduling user is determined based on the historical response baseline load corresponding to the initial scheduling user, the historical response duration corresponding to the initial scheduling user, and the user response peak load in the historical power load scheduling data corresponding to the initial scheduling user, wherein the user response peak load refers to the minimum power load reached by the power load scheduling operation performed by the initial scheduling user in response;

[0019] For each of the initial scheduling users, based on a plurality of power load sampling values ​​in the historical power load scheduling data corresponding to the initial scheduling user, determine the power stability parameter corresponding to the initial scheduling user;

[0020] For each of the initial scheduling users, the communication success rate corresponding to the initial scheduling user is determined based on the scheduling invitation parameter and the user response parameter in the historical power load scheduling data corresponding to the initial scheduling user, wherein the scheduling invitation parameter is used to reflect the number of times the power load scheduling operation has been performed on the initial scheduling user in history, and the user response parameter is used to reflect the number of times the initial scheduling user has responded to the power load scheduling operation in history;

[0021] The historical response baseline load, the historical user response load, the historical response duration, the ramp rate, the power consumption stability parameter and the communication success rate are used as the historical power load response parameters of the corresponding initial scheduling user.

[0022] In a preferred embodiment of the present application, in the above-mentioned power load dispatching method, the step of determining the target dispatching parameter corresponding to each of the initial dispatching users based on the historical power load response parameters corresponding to the initial dispatching user includes:

[0023] For each of the initial scheduling users, based on a plurality of response sub-parameters included in the historical power load response parameters corresponding to the initial scheduling user, respectively determine the comparative characterization parameters and the contradictory characterization parameters of each response sub-parameter corresponding to the initial scheduling user;

[0024] For each of the initial scheduling users, based on the contrast characterization parameter and the contradictory characterization parameter of each response sub-parameter corresponding to the initial scheduling user, respectively determine the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user, wherein there is a positive correlation between the information carrying capacity and the contrast characterization parameter, and there is a positive correlation between the information carrying capacity and the contradictory characterization parameter;

[0025] For each of the initial scheduling users, based on the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user, a weight parameter of each response sub-parameter corresponding to the initial scheduling user is determined respectively, wherein the weight parameter has a positive correlation with the corresponding response sub-parameter, and has a negative correlation with the sum of the information carrying capacity of each of the corresponding response sub-parameters;

[0026] For each of the initial scheduling users, based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user, a target scheduling parameter corresponding to the initial scheduling user is determined.

[0027] In a preferred embodiment of the present application, in the above-mentioned power load scheduling method, for each of the initial scheduling users, based on a plurality of response sub-parameters included in the historical power load response parameters corresponding to the initial scheduling user, the steps of respectively determining the comparative characterization parameters and the contradictory characterization parameters of each response sub-parameter corresponding to the initial scheduling user include:

[0028] For each response sub-parameter included in the historical power load response parameter corresponding to each of the initial scheduling users, determine the cumulative sum of the differences between the response sub-parameter and each other response sub-parameter corresponding to the initial scheduling user, and, based on the cumulative sum and the number of other response sub-parameters, determine the comparative characterization parameter of the response sub-parameter;

[0029] For each response sub-parameter included in the historical power load response parameter corresponding to each of the initial scheduling users, determine the correlation characterization parameter between the response sub-parameter and each other response sub-parameter corresponding to the initial scheduling user, and determine the cumulative sum of the differences between each correlation characterization parameter corresponding to the response sub-parameter and a predetermined reference coefficient, and, based on the cumulative sum, determine the contradiction characterization parameter of the response sub-parameter.

[0030] In a preferred embodiment of the present application, in the above-mentioned power load scheduling method, the step of determining, for each of the initial scheduling users, a target scheduling parameter corresponding to the initial scheduling user based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user, includes:

[0031] For each of the initial scheduling users, a weighted sum calculation is performed based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user to obtain a weighted response parameter corresponding to the initial scheduling user, and based on the weighted response parameter, a response capability redundancy parameter corresponding to the initial scheduling user is determined, wherein there is a negatively correlated corresponding relationship between the response capability redundancy parameter and the weighted response parameter;

[0032] The response capability redundancy parameter is used as the target scheduling parameter of the corresponding initial scheduling user.

[0033] In a preferred embodiment of the present application, in the above-mentioned power load scheduling method, based on the total power load that needs to be scheduled in the target area and the target scheduling parameters of each of the candidate scheduling users, at least one candidate scheduling user is determined as a target scheduling user in the target scheduling user resource pool to obtain at least one target scheduling user, including:

[0034] Respectively obtaining a historical user response load of each candidate scheduling user;

[0035] Determine the sum and mean of the historical user response loads of each candidate scheduling user, determine the difference between the sum and the total power load that needs to be scheduled in the target area, and determine a larger value between the mean and the difference;

[0036] Based on the historical user response load of each of the candidate scheduling users, the larger value, the total power load and the target scheduling parameters of each of the candidate scheduling users, at least one candidate scheduling user is determined as the target scheduling user in the target scheduling user resource pool to obtain at least one target scheduling user, so that the sum of the historical user response loads corresponding to the at least one target scheduling user matches the total power load.

[0037] In a preferred embodiment of the present application, in the above-mentioned power load scheduling method, after executing the step of performing the power load scheduling operation on the at least one target scheduling user, the power load scheduling method further includes:

[0038] Determining a load scheduling willingness coefficient of each target scheduling user based on a response of the at least one target scheduling user to the performed power load scheduling operation;

[0039] Based on the load scheduling willingness coefficient of each target scheduling user, the candidate scheduling user resource pool is updated to form a new candidate scheduling user resource pool, wherein in the new candidate scheduling user resource pool, the target scheduling parameters of at least one candidate scheduling user are updated to new target scheduling parameters.

[0040] In a preferred embodiment of the present application, in the above-mentioned power load dispatching method, the step of determining the load dispatching willingness coefficient of each target dispatching user based on the response of the at least one target dispatching user to the performed power load dispatching operation includes:

[0041] Based on the response of at least one target scheduling user to the electric load scheduling operation, a plurality of response situation characterization parameters of each target scheduling user to the electric load scheduling operation are determined respectively, wherein the plurality of response situation characterization parameters at least include a user response load ratio, a user response time efficiency and a user response efficiency, the user response load ratio is related to the actual response load and the preset response load of the target scheduling user, the user response time efficiency is related to the actual response time and the required response time of the target scheduling user, and the user response efficiency is related to the number of times the electric load scheduling operation is performed on the target scheduling user and the number of times the target scheduling user responds to the electric load scheduling operation;

[0042] Based on a plurality of response situation characterization parameters corresponding to each of the target scheduling users, determining a correlation parameter between every two response situation characterization indicators among a plurality of response situation characterization indicators corresponding to the plurality of response situation characterization parameters;

[0043] For each of the response condition characterization indicators, the mean and standard deviation of the correlation parameters between the response condition characterization indicator and each other response condition characterization indicator are calculated to obtain the correlation mean and correlation standard deviation corresponding to the response condition characterization indicator;

[0044] Based on the correlation mean and correlation standard deviation corresponding to each of the response condition characterization indicators, respectively, a coefficient of variation corresponding to each of the response condition characterization indicators is determined, wherein the coefficient of variation and the correlation mean have a negative correlation corresponding relationship, and the coefficient of variation and the correlation standard deviation have a positive correlation corresponding relationship;

[0045] Based on the coefficient of variation corresponding to each of the response condition characterization indicators, respectively determine the weight coefficient corresponding to each of the response condition characterization indicators;

[0046] For each of the target scheduling users, based on the weight coefficient corresponding to each of the response situation characterization indicators, a weighted sum calculation is performed on multiple response situation characterization parameters corresponding to the target scheduling user to obtain the load scheduling willingness coefficient corresponding to the target scheduling user.

[0047] Based on the above, an embodiment of the present application further provides an electronic device, including:

[0048] Memory for storing computer programs;

[0049] The processor connected to the memory is used to execute the computer program stored in the memory to implement the above-mentioned power load scheduling method.

[0050] The power load dispatching method and electronic device provided in the present application can first determine a candidate dispatching user resource pool; secondly, based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, at least one candidate dispatching user can be determined as a target dispatching user in the target dispatching user resource pool to obtain at least one target dispatching user; then, the power load dispatching operation can be performed on at least one target dispatching user. Based on the above content, since the target dispatching parameter can characterize the load dispatching response capability of the candidate dispatching user, when the target dispatching user is determined based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, it can be ensured that the determined target dispatching user is more matched with the power load dispatching operation that needs to be performed, so that the reliability of the power load dispatching operation based on the target dispatching user can be higher, and therefore, the problem of relatively poor reliability of the power load dispatching operation existing in the prior art can be improved. Moreover, compared with the conventional technical solution of randomly selecting a portion of power users, it can also have higher reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings.

[0052] Figure 1 A structural block diagram of an electronic device provided in an embodiment of the present application.

[0053] Figure 2 A flow chart of a method for dispatching electric power load provided in an embodiment of the present application.

[0054] Figure 3 A block diagram of an electric power load dispatching device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0056] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0057] like Figure 1 As shown, an embodiment of the present application provides an electronic device, wherein the electronic device may include a memory, a processor, and a power load scheduling device.

[0058] In detail, the memory and the processor are electrically connected directly or indirectly to achieve data transmission or interaction. For example, the memory and the processor can be electrically connected through one or more communication buses or signal lines. The power load dispatching device includes at least one software function module stored in the memory in the form of software or firmware. The processor is used to execute an executable computer program stored in the memory, for example, the software function module and computer program included in the power load dispatching device, so as to implement the power load dispatching method provided in the embodiment of the present application.

[0059] Optionally, the memory may be, but is not limited to, a random access memory (RAM), a read only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable read-only memory (EEPROM), etc.

[0060] Furthermore, the processor may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), a system on chip (SoC), etc.; it may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components.

[0061] Understandably, Figure 1 The structure shown is for illustration only, and the electronic device may also include Figure 1 More or fewer components as shown, or with Figure 1 The different configurations shown, for example, may also include a communication unit for exchanging information with other electronic devices.

[0062] Combination Figure 2 The present application also provides a method for dispatching electric loads applicable to the above electronic device. The method steps defined in the process related to the method for dispatching electric loads can be implemented by the electronic device. Figure 2 The specific process shown is explained in detail.

[0063] Step S110: determining a candidate scheduling user resource pool.

[0064] In an embodiment of the present application, the electronic device may determine a candidate scheduling user resource pool. The candidate scheduling user resource pool includes multiple candidate scheduling users in a target area, and each candidate scheduling user has a target scheduling parameter, and the target scheduling parameter is used to characterize the load scheduling response capability of the candidate scheduling user. The specific scope of the target area is not limited and can be selected according to actual needs, such as an industrial park or an administrative district.

[0065] Step S120, based on the total power load that needs to be scheduled in the target area and the target scheduling parameters of each of the candidate scheduling users, at least one candidate scheduling user is determined as a target scheduling user in the target scheduling user resource pool to obtain at least one target scheduling user.

[0066] In an embodiment of the present application, after determining the candidate scheduling user resource pool, at least one candidate scheduling user can be determined as a target scheduling user in the target scheduling user resource pool based on the total power load that needs to be scheduled in the target area and the target scheduling parameters of each candidate scheduling user, so as to obtain at least one target scheduling user, that is, one candidate scheduling user as a target scheduling user. The load scheduling response capability of the at least one target scheduling user matches the total power load.

[0067] Step S130: performing power load dispatching operations on the at least one target dispatching user.

[0068] In an embodiment of the present application, after determining the at least one target scheduling user, the electronic device may perform a power load scheduling operation on the at least one target scheduling user. The power load scheduling operation is at least used to instruct the target scheduling user to reduce the power load, that is, to reduce the power consumption of the target scheduling user, such as shutting down at least part of the power-consuming equipment.

[0069] Based on the above content, since the target dispatching parameter can characterize the load dispatching response capability of the candidate dispatching user, when the target dispatching user is determined based on the total power load to be dispatched in the target area and the target dispatching parameter of each candidate dispatching user, it can be ensured that the determined target dispatching user is more matched with the power load dispatching operation to be performed, so that the reliability of the power load dispatching operation based on the target dispatching user can be higher, thus improving the relatively poor reliability of the power load dispatching operation existing in the prior art. Moreover, compared with the conventional technical solution of randomly selecting some power users, it can also have higher reliability.

[0070] First, it should be noted that for step S110, the specific method of determining the candidate scheduling user resource pool is not limited and can be selected according to actual needs.

[0071] For example, in an alternative implementation, in order to reduce resource consumption of the electronic device, corresponding data may be acquired from other electronic devices, that is, the candidate scheduling user resource pool may be determined through other electronic devices.

[0072] For example, in another alternative implementation, in order to improve the reliability of the candidate scheduling users in the determined candidate scheduling user resource pool, the above-mentioned step S110 may further include step S111, step S112, step S113 and step S114, and the specific content of each step is as follows.

[0073] Step S111, determining a plurality of initial scheduling users.

[0074] In an embodiment of the present application, a plurality of initial scheduling users may be determined first. Each of the plurality of initial scheduling users belongs to an electricity user in the target area. Exemplarily, the initial scheduling user may refer to any electricity user in the target area, or may refer to an electricity user selected according to a certain strategy, such as screening according to the results of a scheduling willingness survey, such as screening out electricity users willing to participate in scheduling in the results, etc. In other words, it is possible to determine electricity users whose participation in charge scheduling will not affect their own production.

[0075] Step S112: for each of the initial scheduling users, based on the historical power load scheduling data corresponding to the initial scheduling user, determine the historical power load response parameters corresponding to the initial scheduling user.

[0076] In the embodiment of the present application, after determining a plurality of initial scheduling users, the historical power load response parameters corresponding to each of the initial scheduling users can be determined based on the historical power load scheduling data corresponding to the initial scheduling user. The historical power load response parameters are used to reflect the response of the initial scheduling user to the power load scheduling operations performed historically, such as whether there is a response, and the specific response results.

[0077] Step S113: for each of the initial scheduling users, based on the historical power load response parameters corresponding to the initial scheduling user, determine the target scheduling parameters corresponding to the initial scheduling user.

[0078] In an embodiment of the present application, after determining the historical power load response parameters, the target scheduling parameters corresponding to the initial scheduling user can be determined for each of the initial scheduling users based on the historical power load response parameters corresponding to the initial scheduling user, that is, based on the historical power load response parameters corresponding to the initial scheduling user, the corresponding load scheduling response capability can be determined.

[0079] Step S114: taking each of the initial scheduling users for which the target scheduling parameters are determined as candidate scheduling users to form a plurality of candidate scheduling users, and constructing a corresponding candidate scheduling user resource pool based on the plurality of candidate scheduling users.

[0080] In an embodiment of the present application, after determining the target scheduling parameters, each initial scheduling user having the target scheduling parameters can be further used as a candidate scheduling user. In this way, a plurality of candidate scheduling users can be formed, and based on the plurality of candidate scheduling users, a corresponding candidate scheduling user resource pool can be constructed.

[0081] It can be understood that, for the above-mentioned step S112, the specific method of determining the historical power load response parameter corresponding to the initial scheduling user is not limited and can be selected according to demand.

[0082] For example, in an alternative embodiment, in order to ensure that the determined historical power load response parameters have high reliability, the above-mentioned step S112 may further include step S112a, step S112b, step S112c, step S112d, step S112e, step S112f, and step S112g, and the specific content of each step is described as follows.

[0083] Step S112a: for each of the initial scheduling users, based on multiple historical power loads in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical response baseline load corresponding to the initial scheduling user.

[0084] In the embodiment of the present application, after determining a plurality of initial scheduling users, the historical response baseline load corresponding to each of the initial scheduling users can be determined based on a plurality of historical power loads in the historical power load scheduling data corresponding to the initial scheduling user. The historical power load is used to reflect the actual power consumption of the initial scheduling user in history, and the historical response baseline load is used to reflect the security load of the initial scheduling user. Exemplarily, if the date on which the power load dispatching operation is currently required is a working day, the five most recent working days can be determined as reference days (if the date on which the power load dispatching operation is currently required is a non-working day, the three most recent non-working days can be determined as reference days). Then, for each reference day, the historical power load of the reference day can be obtained (such as the load average during the historical power load dispatching operation, exemplarily, it can be the load average for each hour). Then, the average of the historical power loads of the five reference days can be calculated. Further, for each reference day, it can be determined whether the historical power load of the reference day is less than 0.75 times the average. If it is less than 0.75 times the average, the reference day is discarded, and then a working day is added as a new reference day. Then, the same judgment is made again until the historical power loads of the five reference days are no less than 0.75 times the corresponding average, or until the added working day is 45 days away from the current day, and then the judgment is stopped. Just select 4 reference days. Finally, the minimum value of the historical power loads of the five reference days may be discarded, and the average of the retained historical power loads may be calculated, and then the historical response baseline load may be obtained.

[0085] Step S112b, for each of the initial scheduling users, determine the historical user response load corresponding to the initial scheduling user based on the historical response baseline load corresponding to the initial scheduling user and at least one of the most recent historical power loads in the historical power load scheduling data corresponding to the initial scheduling user.

[0086] In an embodiment of the present application, after a plurality of initial scheduling users are determined, for each of the initial scheduling users, the historical user response load corresponding to the initial scheduling user can be determined based on the historical response baseline load corresponding to the initial scheduling user and at least one of the most recent historical power loads in the historical power load scheduling data corresponding to the initial scheduling user. The historical user response load is used to reflect the degree of response of the initial scheduling user to the power load scheduling operation performed historically. Exemplarily, the difference between the historical response baseline load and the most recent historical power load can be calculated as the corresponding historical user response load.

[0087] Step S112c, for each of the initial scheduling users, based on the response time information formed by the most recent power load scheduling operation in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical response time corresponding to the initial scheduling user.

[0088] In the embodiment of the present application, after determining a plurality of initial scheduling users, the historical response duration corresponding to each of the initial scheduling users can be determined based on the response time information of the most recent power load scheduling operation in the historical power load scheduling data corresponding to the initial scheduling user. The historical response duration is used to reflect the length from the time when the initial scheduling user starts responding to the power load scheduling operation to the time when the user reaches the peak load response.

[0089] Step S112d, for each of the initial scheduling users, determine the climbing rate corresponding to the initial scheduling user based on the historical response baseline load corresponding to the initial scheduling user, the historical response time corresponding to the initial scheduling user, and the user response peak load in the historical power load scheduling data corresponding to the initial scheduling user.

[0090] In an embodiment of the present application, after determining a plurality of initial scheduling users, the climbing rate corresponding to the initial scheduling user can be determined for each of the initial scheduling users based on the historical response baseline load corresponding to the initial scheduling user, the historical response time corresponding to the initial scheduling user, and the user response peak load in the historical power load scheduling data corresponding to the initial scheduling user. The user response peak load refers to the minimum power load reached by the power load scheduling operation performed by the initial scheduling user in response, such as shutting down power device A first, then shutting down power device B, until no new equipment is shut down and the minimum power load is reached. Exemplarily, the absolute difference between the historical response baseline load and the user response peak load can be calculated first, and then the ratio between the absolute difference and the historical response time can be calculated, so that the climbing rate can be obtained.

[0091] Step S112e: for each of the initial scheduling users, based on a plurality of power load sampling values ​​in the historical power load scheduling data corresponding to the initial scheduling user, determine the power stability parameter corresponding to the initial scheduling user.

[0092] In an embodiment of the present application, after determining a plurality of initial scheduling users, the power stability parameter corresponding to the initial scheduling user can be determined for each of the initial scheduling users based on a plurality of power load sampling values ​​in the historical power load scheduling data corresponding to the initial scheduling user. Exemplarily, the standard deviation of the 96 power load sampling values ​​of the initial scheduling user in a day (collected once every 15 minutes) can be calculated to obtain the power stability parameter. The larger the standard deviation, the worse the stability; the smaller the standard deviation, the better the stability.

[0093] Step S112f, for each of the initial scheduling users, based on the scheduling invitation parameters and user response parameters in the historical power load scheduling data corresponding to the initial scheduling user, determine the communication success rate corresponding to the initial scheduling user.

[0094] In an embodiment of the present application, after a plurality of initial scheduling users are determined, the communication success rate corresponding to each of the initial scheduling users can be determined based on the scheduling invitation parameter and the user response parameter in the historical power load scheduling data corresponding to the initial scheduling user. The scheduling invitation parameter is used to reflect the number of times the power load scheduling operation has been performed on the initial scheduling user in history, and the user response parameter is used to reflect the number of times the initial scheduling user has responded to the power load scheduling operation in history. Exemplarily, the communication success rate may refer to the ratio between the user response parameter and the scheduling invitation parameter.

[0095] Step S112g, taking the historical response baseline load, the historical user response load, the historical response time, the climbing rate, the power consumption stability parameter and the communication success rate as the historical power load response parameters corresponding to the initial scheduling user.

[0096] In the embodiment of the present application, after determining a plurality of initial scheduling users, the historical response baseline load, the historical user response load, the historical response duration, the ramp rate, the power stability parameter, and the communication success rate may be used as the historical power load response parameters of the corresponding initial scheduling users. In other words, the historical power load response parameters may at least include the historical response baseline load, the historical user response load, the historical response duration, the ramp rate, the power stability parameter, and the communication success rate.

[0097] For example, in another alternative implementation, some parameters of the historical response baseline load, the historical user response load, the historical response time, the climbing rate, the power consumption stability parameter and the communication success rate can be determined as the corresponding historical power load response parameters of the initial scheduling user to improve the efficiency of parameter determination.

[0098] It can be understood that, for the above step S113, the specific method of determining the target scheduling parameters corresponding to the initial scheduling user is not limited and can be selected according to actual needs.

[0099] For example, in an alternative embodiment, in order to improve the reliability of the determined target scheduling parameters, the historical power load response parameters may include multiple response sub-parameters, such as the aforementioned historical response baseline load, historical user response load, historical response time, climbing rate, power stability parameters and communication success rate, etc. Based on this, the above-mentioned step S113 may further include step S113a, step S113b, step S113c and step S113d, and the specific contents of each step are as follows.

[0100] Step S113a, for each of the initial scheduling users, based on a plurality of response sub-parameters included in the historical power load response parameters corresponding to the initial scheduling user, respectively determine the comparative characterization parameters and the contradictory characterization parameters of each response sub-parameter corresponding to the initial scheduling user.

[0101] In an embodiment of the present application, after determining the historical power load response parameters, for each of the initial scheduling users, based on the multiple response sub-parameters included in the historical power load response parameters corresponding to the initial scheduling user, the comparative characterization parameters and contradictory characterization parameters of each response sub-parameter corresponding to the initial scheduling user can be determined respectively.

[0102] Step S113b, for each of the initial scheduling users, based on the comparative characterization parameters and the contradictory characterization parameters of each response sub-parameter corresponding to the initial scheduling user, respectively determine the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user.

[0103] In the embodiment of the present application, after determining the contrast characterization parameter and the contradictory characterization parameter, the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user can be further determined for each of the initial scheduling users based on the contrast characterization parameter and the contradictory characterization parameter of each response sub-parameter corresponding to the initial scheduling user. For example, for the initial scheduling user A, the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user A can be determined based on the contrast characterization parameter and the contradictory characterization parameter of each response sub-parameter corresponding to the initial scheduling user A, such as the information carrying capacity of the historical response baseline load corresponding to the initial scheduling user A, the information carrying capacity of the historical user response load, the information carrying capacity of the historical response time, the information carrying capacity of the ramp rate, the information carrying capacity of the power stability parameter, and the information carrying capacity of the communication success rate. Among them, there is a positive correlation between the information carrying capacity and the contrast characterization parameter, and there is a positive correlation between the information carrying capacity and the contradictory characterization parameter. Exemplarily, the contrast characterization parameter and the contradictory characterization parameter can be multiplied to obtain the information carrying capacity.

[0104] Step S113c: for each of the initial scheduled users, based on the information carrying capacity of each response sub-parameter corresponding to the initial scheduled user, respectively determine the weight parameter of each response sub-parameter corresponding to the initial scheduled user.

[0105] In an embodiment of the present application, after determining the information carrying capacity, the weight parameter of each response sub-parameter corresponding to the initial scheduling user can be determined for each of the initial scheduling users based on the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user. There is a positive correlation between the weight parameter and the corresponding response sub-parameter, and there is a negative correlation between the weight parameter and the sum of the information carrying capacity of each of the corresponding response sub-parameters. Exemplarily, for each response sub-parameter, the ratio between the information carrying capacity of the response sub-parameter and the sum of the information carrying capacity of each of the corresponding response sub-parameters of the initial scheduling user can be calculated to obtain the weight parameter corresponding to the response sub-parameter.

[0106] Step S113d: for each of the initial scheduling users, based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user, determine a target scheduling parameter corresponding to the initial scheduling user.

[0107] In an embodiment of the present application, after obtaining the weight parameter, the target scheduling parameter corresponding to each initial scheduling user can be determined for each initial scheduling user based on each response sub-parameter corresponding to the initial scheduling user and the weight parameter of each response sub-parameter corresponding to the initial scheduling user.

[0108] Optionally, in the above step S113a, the specific method of determining the contrast characterization parameter and the contradiction characterization parameter is not limited and can be selected according to actual needs.

[0109] For example, in an alternative implementation, in order to enable the contrast characterization parameter to fully reflect the contrast strength between the response sub-parameters, and in order to enable the conflict characterization parameter to fully reflect the conflict between the response sub-parameters, the above step S113a may further include the following specific implementation contents:

[0110] On the one hand, for each response sub-parameter included in the historical power load response parameter corresponding to each of the initial scheduling users, the cumulative sum of the differences between the response sub-parameter and each other response sub-parameter corresponding to the initial scheduling user can be determined, and based on the cumulative sum and the number of other response sub-parameters, the comparative characterization parameter of the response sub-parameter can be determined; illustratively, for the response sub-parameter 1 of the initial scheduling user A, the difference between the response sub-parameter 1 and the response sub-parameter 2, response sub-parameter 3, etc. of the initial scheduling user A can be calculated first, so that the sum of the differences is calculated to obtain the cumulative sum, and then the ratio between the cumulative sum and the number of response sub-parameters 2, response sub-parameters 3, etc. is calculated, and finally, the ratio can be squared, so as to obtain the comparative characterization parameter of the response sub-parameter 1;

[0111] On the other hand, for each response sub-parameter included in the historical power load response parameter corresponding to each of the initial scheduling users, the correlation characterization parameter between the response sub-parameter and each other response sub-parameter corresponding to the initial scheduling user can be determined, and the cumulative sum of the difference between each correlation characterization parameter corresponding to the response sub-parameter and a predetermined reference coefficient can be determined, and based on the cumulative sum, the contradictory characterization parameter of the response sub-parameter can be determined; exemplarily, for the response sub-parameter 1 of the initial scheduling user A, the correlation characterization parameters between the response sub-parameter 1 and the response sub-parameter 2, response sub-parameter 3, etc. of the initial scheduling user A can be determined first, such as correlation characterization parameter 1, correlation characterization parameter 2, etc., and then the difference between the reference coefficient and the correlation characterization parameter 1, correlation characterization parameter 2, etc. can be calculated, and the sum of each difference can be calculated to obtain the corresponding cumulative sum, and then the cumulative sum can be used as the corresponding contradictory characterization parameter. Exemplarily, the reference coefficient can be 1. Exemplarily, the determination of the correlation characterization parameter can refer to the relevant prior art, and no specific limitation is made here. For example, the correlation characterization parameter can be a statistical indicator first designed by statistician Karl Pearson, which is a quantity that studies the degree of linear correlation between variables, such as the Pearson correlation coefficient. It should be noted that when determining the correlation characterization parameter, it can be based on each response sub-parameter included in the historical power load response parameters corresponding to all initial scheduling users. In this way, for any two response sub-parameters, the correlation characterization parameters between the two response sub-parameters are the same between any two initial scheduling users, or, for any two response sub-parameter indicators, the correlation characterization parameters between the two response sub-parameter indicators can be determined based on the response sub-parameters corresponding to the two response sub-parameter indicators of all initial scheduling users. It can be understood that a response sub-parameter corresponding to an initial scheduling user can be a specific parameter value of the initial scheduling user under a response sub-parameter indicator. For example, for response sub-parameter indicator 1, the initial scheduling user A has a corresponding response sub-parameter A1, and the initial scheduling user B has a corresponding response sub-parameter B1; for response sub-parameter indicator 2, the initial scheduling user A has a corresponding response sub-parameter A2, and the initial scheduling user B has a corresponding response sub-parameter B2; for response sub-parameter indicator 3, the initial scheduling user A has a corresponding response sub-parameter A3, and the initial scheduling user B has a corresponding response sub-parameter B3.

[0112] Optionally, in the above step S113d, the specific method of determining the target scheduling parameters corresponding to the initial scheduling user is not limited and can be selected according to actual needs.

[0113] For example, in an alternative implementation, in order to ensure the reliability of the determined target scheduling parameters, the above step S113d may further include the following specific implementation contents:

[0114] First, for each of the initial scheduling users, a weighted sum calculation can be performed based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user to obtain a weighted response parameter corresponding to the initial scheduling user, and based on the weighted response parameter, a response capacity redundancy parameter corresponding to the initial scheduling user is determined, wherein the response capacity redundancy parameter and the weighted response parameter have a negatively correlated corresponding relationship; exemplarily, a difference between a predetermined target value and the weighted response parameter can be calculated, and then the difference can be used as the corresponding response capacity redundancy parameter; exemplarily, the target value can be a value of 2;

[0115] Secondly, the response capability redundancy parameter may be used as the target scheduling parameter of the corresponding initial scheduling user; illustratively, the response capability redundancy parameter corresponding to the initial scheduling user A may be used as the target scheduling parameter of the initial scheduling user A.

[0116] On the second aspect, it should be explained that for step S120, the specific method of determining at least one candidate scheduling user as the target scheduling user in the target scheduling user resource pool is not limited and can be selected according to actual needs.

[0117] For example, in an alternative implementation, at least one candidate scheduling user may be selected as a target scheduling user based only on the target scheduling parameter and the total power load, thereby ensuring the efficiency of determining the target scheduling user.

[0118] For another example, in another alternative implementation, in order to improve the reliability of the determined target scheduling user, the above-mentioned step S120 may further include step S121, step S122 and step S123, and the specific content of each step is described as follows.

[0119] Step S121, respectively obtaining the historical user response load of each candidate scheduling user.

[0120] In an embodiment of the present application, the historical user response load of each candidate scheduling user can be obtained respectively, which can be the most recent historical user response load or the average of multiple recent historical user response loads. The historical user response load can be as described above.

[0121] Step S122, determining the sum and mean of the historical user response loads of each candidate scheduling user, and determining the difference between the sum and the total power load that needs to be scheduled in the target area, and determining a larger value between the mean and the difference.

[0122] In an embodiment of the present application, after determining the historical user response load, the sum and mean of the historical user response loads of each of the candidate scheduling users can be determined first, and then the difference between the sum and the total power load that needs to be scheduled in the target area can be determined, and a larger value can be determined between the mean and the difference.

[0123] Step S123, based on the historical user response load of each of the candidate scheduling users, the larger value, the total power load and the target scheduling parameters of each of the candidate scheduling users, at least one candidate scheduling user is determined as the target scheduling user in the target scheduling user resource pool to obtain at least one target scheduling user, so that the sum of the historical user response loads corresponding to the at least one target scheduling user matches the total power load.

[0124] In an embodiment of the present application, after determining the larger value, at least one candidate scheduling user can be determined as a target scheduling user in the target scheduling user resource pool based on the historical user response load of each candidate scheduling user, the larger value, the total power load and the target scheduling parameter of each candidate scheduling user, so as to obtain at least one target scheduling user, so that the sum of the historical user response loads corresponding to the at least one target scheduling user matches the total power load, such as the sum of the historical user response loads corresponding to the at least one target scheduling user is close to the total power load. The specific method of determining the target scheduling user can be carried out according to the following formula:

[0125] F(x) = f(x) * P(x);

[0126] Wherein, X=(X1,X2,...Xn), Xi is 0 or 1, 0 indicates that the candidate scheduling user is not determined as the target scheduling user, 1 indicates that the candidate scheduling user is determined as the target scheduling user, the value of i is 1, 2,..., n, and in the iterative calculation process, the function value of F(x) is required to be close to the total power load, such as in various combinations where Xi is 0 or 1, the difference between the total power load and the total power load is the smallest.

[0127] For example, f(x) may be a piecewise function as follows:

[0128] , ;

[0129] , ;

[0130] Wherein, Vi represents the target scheduling parameter of the candidate scheduling user, Wi represents the historical user response load of the candidate scheduling user, and C represents the total power load.

[0131] Exemplarily, the P(x) may be a penalty function as follows:

[0132] ;

[0133] ;

[0134] Wherein, w represents the mean value of the historical user response load of each candidate scheduling user, and δ represents the larger value.

[0135] On the third aspect, it should be noted that for step S130, the specific method of performing the power load scheduling operation on the at least one target scheduling user is not limited and can be selected according to demand.

[0136] For example, in an alternative implementation, the power load of the at least one target scheduling user may be directly managed and controlled, such as controlling the operation of the power-consuming equipment, such as shutting down the equipment.

[0137] For example, in another alternative implementation, a notification message may be sent to a terminal device (such as a mobile phone, etc.) corresponding to at least one target scheduling user, so that the target scheduling user can respond to the notification message and shut down the corresponding electrical equipment, etc., to reduce the power load of the target scheduling user.

[0138] Fourthly, in order to further improve the reliability of power load scheduling operations, in an alternative implementation, after the above-mentioned step S130, that is, after executing the step of performing power load scheduling operations on the at least one target scheduling user, the power load scheduling method may also include step S140 and step S150, and the specific content of each step is described as follows.

[0139] Step S140: determining a load scheduling willingness coefficient of each target scheduling user based on the response of the at least one target scheduling user to the performed power load scheduling operation.

[0140] In an embodiment of the present application, after performing a power load dispatching operation, the load dispatching willingness coefficient of each target dispatching user may be determined based on the response of the at least one target dispatching user to the performed power load dispatching operation.

[0141] Step S150: Based on the load scheduling willingness coefficient of each target scheduling user, the candidate scheduling user resource pool is updated to form a new candidate scheduling user resource pool.

[0142] In an embodiment of the present application, after determining the load scheduling willingness coefficient of each of the target scheduling users, the candidate scheduling user resource pool can be updated based on the load scheduling willingness coefficient of each of the target scheduling users to form a new candidate scheduling user resource pool. Among them, in the new candidate scheduling user resource pool, the target scheduling parameters of at least one candidate scheduling user are updated to new target scheduling parameters. In other words, the target scheduling parameters can be re-determined so that the target scheduling parameters can reflect the user's load scheduling willingness. Exemplarily, the load scheduling willingness coefficient can be used as a new response sub-parameter to participate in the calculation of the target scheduling parameter. The specific calculation method is as described above and will not be repeated here. In addition, for candidate scheduling users other than the target scheduling user, the load scheduling willingness coefficient may not be used, or the load scheduling willingness coefficient may be determined according to certain rules, such as directly assigning a value of 1 or 0, or a willingness survey may be conducted on the corresponding candidate scheduling users.

[0143] It can be understood that, for the above-mentioned step S140, the specific method of determining the load scheduling willingness coefficient of the target scheduling user is not limited and can be selected according to actual needs.

[0144] For example, in an alternative implementation, in order to ensure the reliability of the determined load scheduling willingness coefficient, the above-mentioned step S140 may further include step S141, step S142, step S143, step S144, step S145 and step S146, and the specific content of each step is described as follows.

[0145] Step S141: Based on the response of the at least one target scheduling user to the electric load scheduling operation, a plurality of response characterization parameters of each target scheduling user to the electric load scheduling operation are determined respectively.

[0146] In an embodiment of the present application, the response of at least one target scheduling user to the power load scheduling operation can be determined first, and then, based on the response of at least one target scheduling user to the power load scheduling operation, multiple response characterization parameters of each target scheduling user to the power load scheduling operation can be determined respectively. Among them, the multiple response characterization parameters include at least user response load ratio, user response time efficiency and user response efficiency. The user response load ratio is related to the actual response load and the preset response load of the target scheduling user. For example, the user response load ratio can be the ratio between the actual response load and the preset response load (which can be obtained by information interaction with the corresponding user in the early stage) (such as the former divided by the latter). The user response time efficiency is related to the actual response time length and the required response time length of the target scheduling user. For example, the user response time efficiency can be the ratio between the actual response time length and the required response time length (which can be configured according to actual needs) of the target scheduling user (such as the former divided by the latter). The user response efficiency is related to the number of times the power load dispatching operation is performed on the target dispatching user and the number of times the target dispatching user responds to the power load dispatching operation. For example, the user response efficiency may be the ratio (such as the latter divided by the former) between the number of times the power load dispatching operation is performed on the target dispatching user (such as the number of times the target dispatching user is determined as the target dispatching user) and the number of times the target dispatching user responds to the power load dispatching operation (such as the number of times the target dispatching user participates in the power load dispatching operation after being determined as the target dispatching user, that is, the number of times the power load is reduced). Exemplarily, the characterization parameters of each response situation are shown in the following table:

[0147]

[0148] Step S142: determining, based on a plurality of response situation characterization parameters corresponding to each of the target scheduling users, a correlation parameter between every two response situation characterization indicators among a plurality of response situation characterization indicators corresponding to the plurality of response situation characterization parameters.

[0149] In an embodiment of the present application, after determining a plurality of response situation characterization parameters, a target parameter matrix can be constructed based on the plurality of response situation characterization parameters corresponding to each of the target scheduling users. For example, if there are n target scheduling users and m response situation characterization parameters, an n*m target parameter matrix can be obtained (it is also possible not to construct a target parameter matrix). Then, based on the plurality of response situation characterization parameters corresponding to each of the target scheduling users, the correlation parameter between each two response situation characterization indicators in the plurality of response situation characterization indicators corresponding to the plurality of response situation characterization parameters can be determined. The response situation characterization indicator may refer to the user response load ratio, user response timeliness, and user response efficiency as described above, and the corresponding response situation characterization parameter refers to the specific values ​​of the user response load ratio, user response timeliness, and user response efficiency. In addition, the correlation parameter may also be a statistical indicator first designed by statistician Karl Pearson, which is a quantity for studying the degree of linear correlation between variables.

[0150] Step S143, for each of the response condition characterization indicators, perform mean calculation and standard deviation calculation on the correlation parameters between the response condition characterization indicator and each other response condition characterization indicator to obtain the correlation mean and correlation standard deviation corresponding to the response condition characterization indicator.

[0151] In an embodiment of the present application, after the correlation parameters are determined, for each of the response situation characterization indicators, the mean and standard deviation of the correlation parameters between the response situation characterization indicator and each other response situation characterization indicator can be calculated to obtain the correlation mean and correlation standard deviation corresponding to the response situation characterization indicator.

[0152] Step S144, determining the coefficient of variation corresponding to each of the response condition characterization indicators based on the correlation mean and the correlation standard deviation corresponding to each of the response condition characterization indicators.

[0153] In an embodiment of the present application, after determining the correlation mean and the correlation standard deviation, the coefficient of variation corresponding to each of the response condition characterization indicators can be determined based on the correlation mean and the correlation standard deviation corresponding to each of the response condition characterization indicators. There is a negative correlation between the coefficient of variation and the correlation mean, and there is a positive correlation between the coefficient of variation and the correlation standard deviation. Exemplarily, the ratio between the correlation standard deviation and the correlation mean (such as the former divided by the latter) can be calculated, and then the ratio can be used as the corresponding coefficient of variation.

[0154] Step S145 : determining a weight coefficient corresponding to each of the response condition characterization indicators based on the coefficient of variation corresponding to each of the response condition characterization indicators.

[0155] In an embodiment of the present application, after determining the coefficient of variation, the weight coefficient corresponding to each of the response condition characterization indicators can be determined based on the coefficient of variation corresponding to each of the response condition characterization indicators. For example, the sum of the coefficients of variation corresponding to each of the response condition characterization indicators can be calculated first, and then, for each of the response condition characterization indicators, the ratio between the coefficient of variation corresponding to the response condition characterization indicator and the sum can be calculated (such as the former divided by the latter), and the weight coefficient corresponding to the response condition characterization indicator can be obtained, as shown in the following table:

[0156]

[0157] Step S146, for each of the target scheduling users, based on the weight coefficient corresponding to each of the response situation characterization indicators, a weighted sum calculation is performed on multiple response situation characterization parameters corresponding to the target scheduling user to obtain a load scheduling willingness coefficient corresponding to the target scheduling user.

[0158] In an embodiment of the present application, after obtaining the weight coefficient, for each of the target scheduling users, based on the weight coefficient corresponding to each of the response situation characterization indicators, a weighted sum calculation can be performed on multiple response situation characterization parameters corresponding to the target scheduling user to obtain the load scheduling willingness coefficient corresponding to the target scheduling user.

[0159] Combination Figure 3 The embodiment of the present application also provides a power load dispatching device applicable to the above electronic device. The power load dispatching device may include a resource pool determination module, a target user determination module and a load dispatching module.

[0160] In detail, the resource pool determination module can be used to determine a candidate scheduling user resource pool, wherein the candidate scheduling user resource pool includes multiple candidate scheduling users in a target area, and each of the candidate scheduling users has a target scheduling parameter, and the target scheduling parameter is used to characterize the load scheduling response capability of the candidate scheduling user. In an embodiment of the present application, the resource pool determination module can be used to perform Figure 2 As shown in step S110, the relevant contents of the resource pool determination module can refer to the above description of step S110.

[0161] In detail, the target user determination module can be used to determine at least one candidate scheduling user as a target scheduling user in the target scheduling user resource pool based on the total power load that needs to be scheduled in the target area and the target scheduling parameters of each candidate scheduling user, so as to obtain at least one target scheduling user, wherein the load scheduling response capability of the at least one target scheduling user matches the total power load. In the embodiment of the present application, the target user determination module can be used to perform Figure 2 As shown in step S120, the relevant contents of the target user determination module can refer to the above description of step S120.

[0162] In detail, the load scheduling module can be used to perform an electric load scheduling operation on the at least one target scheduling user, wherein the electric load scheduling operation is at least used to instruct the target scheduling user to reduce the power load. Figure 2 As shown in step S130, the relevant contents of the load scheduling module can refer to the above description of step S130.

[0163] In an embodiment of the present application, corresponding to the above-mentioned power load scheduling method applied to the electronic device, a computer-readable storage medium is also provided, in which a computer program is stored, and when the computer program is run, each step of the power load scheduling method is executed.

[0164] Among them, the steps executed when the aforementioned computer program is running will not be described one by one here, and reference may be made to the explanation of the aforementioned power load scheduling method in the previous text.

[0165] In summary, the power load dispatching method and electronic device provided by the present application can, first, determine a candidate dispatching user resource pool; secondly, based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, at least one candidate dispatching user can be determined as a target dispatching user in the target dispatching user resource pool to obtain at least one target dispatching user; then, the power load dispatching operation can be performed on at least one target dispatching user. Based on the above content, since the target dispatching parameter can characterize the load dispatching response capability of the candidate dispatching user, when the target dispatching user is determined based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, it can be ensured that the determined target dispatching user is more matched with the power load dispatching operation that needs to be performed, so that the reliability of the power load dispatching operation based on the target dispatching user can be higher, and therefore, the problem of relatively poor reliability of the power load dispatching operation existing in the prior art can be improved. Moreover, compared with the conventional technical solution of randomly selecting a portion of power users, it can also have higher reliability.

[0166] In several embodiments provided in the embodiments of the present application, it should be understood that the disclosed device and method can also be implemented in other ways. The device and method embodiments described above are merely schematic, for example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the device, method and computer program product according to multiple embodiments of the present application. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0167] In addition, the functional modules in the various embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.

[0168] If the function is implemented in the form of a software function module and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, electronic device, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program code. It should be noted that in this article, the term "include", "include" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements that are not explicitly listed, or also includes elements inherent to such process, method, article or device. Without more constraints, an element defined by the phrase "comprising a..." does not exclude the existence of other identical elements in the process, method, article or apparatus comprising the element.

[0169] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for dispatching electric load, characterized in that: include: Determine a candidate scheduling user resource pool, wherein the candidate scheduling user resource pool includes a plurality of candidate scheduling users in a target area, and each of the candidate scheduling users has a target scheduling parameter, and the target scheduling parameter is used to characterize the load scheduling response capability of the candidate scheduling user; Based on the total power load that needs to be dispatched in the target area and the target dispatching parameters of each candidate dispatching user, at least one candidate dispatching user is determined as a target dispatching user in the target dispatching user resource pool to obtain at least one target dispatching user, wherein the load dispatching response capability of the at least one target dispatching user matches the total power load; Performing a power load dispatching operation on the at least one target dispatching user, wherein the power load dispatching operation is at least used to instruct the target dispatching user to reduce the power load; The step of determining at least one candidate scheduling user as a target scheduling user in the target scheduling user resource pool based on the total power load that needs to be scheduled in the target area and the target scheduling parameters of each candidate scheduling user to obtain at least one target scheduling user includes: Respectively obtaining a historical user response load of each candidate scheduling user; Determine the sum and mean of the historical user response loads of each candidate scheduling user, determine the difference between the sum and the total power load that needs to be scheduled in the target area, and determine a larger value between the mean and the difference; Based on the historical user response load of each of the candidate scheduling users, the larger value, the total power load and the target scheduling parameters of each of the candidate scheduling users, at least one candidate scheduling user is determined as the target scheduling user in the target scheduling user resource pool to obtain at least one target scheduling user, so that the sum of the historical user response loads corresponding to the at least one target scheduling user matches the total power load.

2. The power load dispatching method according to claim 1, characterized in that: The step of determining a candidate scheduling user resource pool comprises: Determine a plurality of initial scheduling users, wherein each of the plurality of initial scheduling users is an electricity user in a target area; For each of the initial scheduling users, based on the historical power load scheduling data corresponding to the initial scheduling user, determine the historical power load response parameter corresponding to the initial scheduling user, wherein the historical power load response parameter is used to reflect the response of the initial scheduling user to the power load scheduling operation performed historically; For each of the initial scheduling users, based on the historical power load response parameters corresponding to the initial scheduling user, determine the target scheduling parameters corresponding to the initial scheduling user; Each initial scheduling user for which the target scheduling parameter is determined is respectively used as a candidate scheduling user to form a plurality of candidate scheduling users, and a corresponding candidate scheduling user resource pool is constructed based on the plurality of candidate scheduling users.

3. The power load dispatching method according to claim 2, characterized in that: The step of determining, for each of the initial scheduling users, a historical power load response parameter corresponding to the initial scheduling user based on the historical power load scheduling data corresponding to the initial scheduling user, comprises: For each of the initial scheduling users, based on multiple historical power loads in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical response baseline load corresponding to the initial scheduling user, wherein the historical power load is used to reflect the actual power consumption of the initial scheduling user in history, and the historical response baseline load is used to reflect the security load of the initial scheduling user; For each of the initial scheduling users, based on the historical response baseline load corresponding to the initial scheduling user and at least one of the most recent historical power loads in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical user response load corresponding to the initial scheduling user, wherein the historical user response load is used to reflect the response degree of the initial scheduling user to the power load scheduling operation performed historically; For each of the initial scheduling users, based on the response time information of the most recent power load scheduling operation in the historical power load scheduling data corresponding to the initial scheduling user, determine the historical response time corresponding to the initial scheduling user, wherein the historical response time is used to reflect the length from the time when the initial scheduling user starts responding to the power load scheduling operation to the time when the user reaches the peak load response; For each of the initial scheduling users, the ramp rate corresponding to the initial scheduling user is determined based on the historical response baseline load corresponding to the initial scheduling user, the historical response duration corresponding to the initial scheduling user, and the user response peak load in the historical power load scheduling data corresponding to the initial scheduling user, wherein the user response peak load refers to the minimum power load reached by the power load scheduling operation performed by the initial scheduling user in response; For each of the initial scheduling users, based on a plurality of power load sampling values ​​in the historical power load scheduling data corresponding to the initial scheduling user, determine the power stability parameter corresponding to the initial scheduling user; For each of the initial scheduling users, the communication success rate corresponding to the initial scheduling user is determined based on the scheduling invitation parameter and the user response parameter in the historical power load scheduling data corresponding to the initial scheduling user, wherein the scheduling invitation parameter is used to reflect the number of times the power load scheduling operation has been performed on the initial scheduling user in history, and the user response parameter is used to reflect the number of times the initial scheduling user has responded to the power load scheduling operation in history; The historical response baseline load, the historical user response load, the historical response time, the ramp rate, the power consumption stability parameter and the communication success rate are used as the historical power load response parameters of the corresponding initial scheduling user.

4. The power load dispatching method according to claim 2, characterized in that: The step of determining, for each of the initial scheduling users, a target scheduling parameter corresponding to the initial scheduling user based on a historical power load response parameter corresponding to the initial scheduling user, comprises: For each of the initial scheduling users, based on a plurality of response sub-parameters included in the historical power load response parameters corresponding to the initial scheduling user, respectively determine the comparative characterization parameters and the contradictory characterization parameters of each response sub-parameter corresponding to the initial scheduling user; For each of the initial scheduling users, based on the contrast characterization parameter and the contradictory characterization parameter of each response sub-parameter corresponding to the initial scheduling user, respectively determine the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user, wherein there is a positive correlation between the information carrying capacity and the contrast characterization parameter, and there is a positive correlation between the information carrying capacity and the contradictory characterization parameter; For each of the initial scheduling users, based on the information carrying capacity of each response sub-parameter corresponding to the initial scheduling user, a weight parameter of each response sub-parameter corresponding to the initial scheduling user is determined respectively, wherein the weight parameter has a positive correlation with the corresponding response sub-parameter, and has a negative correlation with the sum of the information carrying capacity of each of the corresponding response sub-parameters; For each of the initial scheduling users, based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user, a target scheduling parameter corresponding to the initial scheduling user is determined.

5. The power load dispatching method according to claim 4, characterized in that: The step of determining, for each of the initial scheduling users, a comparative characterization parameter and a contradictory characterization parameter of each response sub-parameter corresponding to the initial scheduling user based on a plurality of response sub-parameters included in the historical power load response parameter corresponding to the initial scheduling user, comprises: For each response sub-parameter included in the historical power load response parameter corresponding to each of the initial scheduling users, determine the cumulative sum of the differences between the response sub-parameter and each other response sub-parameter corresponding to the initial scheduling user, and, based on the cumulative sum and the number of other response sub-parameters, determine the comparative characterization parameter of the response sub-parameter; For each response sub-parameter included in the historical power load response parameter corresponding to each of the initial scheduling users, determine the correlation characterization parameter between the response sub-parameter and each other response sub-parameter corresponding to the initial scheduling user, and determine the cumulative sum of the differences between each correlation characterization parameter corresponding to the response sub-parameter and a predetermined reference coefficient, and, based on the cumulative sum, determine the contradiction characterization parameter of the response sub-parameter.

6. The power load dispatching method according to claim 4, characterized in that: The step of determining, for each of the initial scheduling users, a target scheduling parameter corresponding to the initial scheduling user based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user, comprises: For each of the initial scheduling users, a weighted sum calculation is performed based on each response sub-parameter corresponding to the initial scheduling user and a weight parameter of each response sub-parameter corresponding to the initial scheduling user to obtain a weighted response parameter corresponding to the initial scheduling user, and based on the weighted response parameter, a response capability redundancy parameter corresponding to the initial scheduling user is determined, wherein there is a negatively correlated corresponding relationship between the response capability redundancy parameter and the weighted response parameter; The response capability redundancy parameter is used as the target scheduling parameter of the corresponding initial scheduling user.

7. The power load dispatching method according to any one of claims 1 to 6, characterized in that: After executing the step of performing the power load dispatching operation on the at least one target dispatching user, the power load dispatching method further includes: Determining a load scheduling willingness coefficient of each target scheduling user based on a response of the at least one target scheduling user to the performed power load scheduling operation; Based on the load scheduling willingness coefficient of each target scheduling user, the candidate scheduling user resource pool is updated to form a new candidate scheduling user resource pool, wherein in the new candidate scheduling user resource pool, the target scheduling parameters of at least one candidate scheduling user are updated to new target scheduling parameters.

8. The power load dispatching method according to claim 7, characterized in that: The step of determining the load scheduling willingness coefficient of each target scheduling user based on the response of the at least one target scheduling user to the performed power load scheduling operation comprises: Based on the response of at least one target scheduling user to the electric load scheduling operation, a plurality of response situation characterization parameters of each target scheduling user to the electric load scheduling operation are determined respectively, wherein the plurality of response situation characterization parameters at least include a user response load ratio, a user response time efficiency and a user response efficiency, the user response load ratio is related to the actual response load and the preset response load of the target scheduling user, the user response time efficiency is related to the actual response time and the required response time of the target scheduling user, and the user response efficiency is related to the number of times the electric load scheduling operation is performed on the target scheduling user and the number of times the target scheduling user responds to the electric load scheduling operation; Based on a plurality of response situation characterization parameters corresponding to each of the target scheduling users, determining a correlation parameter between every two response situation characterization indicators among a plurality of response situation characterization indicators corresponding to the plurality of response situation characterization parameters; For each of the response condition characterization indicators, the mean and standard deviation of the correlation parameters between the response condition characterization indicator and each other response condition characterization indicator are calculated to obtain the correlation mean and correlation standard deviation corresponding to the response condition characterization indicator; Based on the correlation mean and correlation standard deviation corresponding to each of the response condition characterization indicators, respectively, a coefficient of variation corresponding to each of the response condition characterization indicators is determined, wherein the coefficient of variation and the correlation mean have a negative correlation corresponding relationship, and the coefficient of variation and the correlation standard deviation have a positive correlation corresponding relationship; Based on the coefficient of variation corresponding to each of the response condition characterization indicators, respectively determine the weight coefficient corresponding to each of the response condition characterization indicators; For each of the target scheduling users, based on the weight coefficient corresponding to each of the response situation characterization indicators, a weighted sum calculation is performed on multiple response situation characterization parameters corresponding to the target scheduling user to obtain the load scheduling willingness coefficient corresponding to the target scheduling user.

9. An electronic device, characterized in that: include: Memory for storing computer programs; A processor connected to the memory is used to execute the computer program stored in the memory to implement the power load scheduling method described in any one of claims 1-8.