An outdoor spraying platform for drying integrated steel structure bridges

By designing a transparent shielding film and multi-section bending spray painting components, the problems of severe weather protection and low spray efficiency in outdoor spray painting of steel structure bridges are solved, and efficient full coverage spraying of the bridge is achieved.

CN118513183BActive Publication Date: 2024-10-11ANHUI ZHONGDA BRIDGE STEEL STRUCTURE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410978539.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-11
Estimated Expiration
2044-07-22

AI Technical Summary

Technical Problem

During outdoor spraying construction, steel structure bridges face problems such as insufficient protection from severe weather, low spraying efficiency, and especially difficulty in spraying the bridge support parts.

Method used

An outdoor spraying platform for drying and drying integrated steel structure bridges is designed, which uses a transparent shielding film, a multi-section bending spray painting assembly and a detachable main lifting assembly. The transparent shielding film automatically expands to protect the bridge in bad weather and is passed through the main lifting assembly. and walking components to achieve comprehensive spraying of the top and bottom surfaces of the bridge.

Benefits of technology

It improves drying safety and spraying efficiency, ensures that the bridge is effectively protected under severe weather conditions, and realizes automatic and efficient spraying of the top and bottom surfaces of the bridge.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118513183B_ABST
    Figure CN118513183B_ABST
Patent Text Reader

Abstract

The present invention provides an outdoor spraying platform for drying steel structure bridges, comprising a bottom plate, a main frame assembly is installed on the surface of the bottom plate, a transparent shielding film of a telescopic structure is stored on the inner wall of the second gantry, the end of the transparent shielding film is connected to a traction assembly, the traction assembly is installed on the middle frame, and in bad weather, the traction assembly pulls the transparent shielding film to enclose the outside of the steel bridge; the bottom surfaces of the two groups of upper beam bodies are installed with a main lifting assembly and a secondary lifting assembly, the bottom of the main lifting assembly is detachably connected with a spraying assembly, the spraying assembly adopts a multi-section bending structure, and the surface of the bottom plate is symmetrically provided with two groups of support rails, and the surface of each group of support rails is slidably installed with a group of walking assemblies. The present invention can perform spraying and drying operations outdoors, and in bad weather, the transparent shielding film can be unfolded to protect the steel bridge; the spraying assembly can automatically spray the top surface of the steel bridge, and can also automatically spray the bottom surface of the steel bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel structure bridge spraying equipment, and in particular to an outdoor spraying platform for a steel structure bridge with an integrated drying system. Background Art

[0002] A steel structure bridge is a bridge structure mainly made of steel. It has the following advantages: it can bear large loads and meet the requirements of modern traffic on the bearing capacity of bridges. Steel structure components are usually prefabricated in factories and then assembled on site, which greatly shortens the construction period. Compared with traditional concrete bridges, steel structure bridges are lighter in weight and have fewer requirements on foundations. It can be designed in various complex shapes and structures to meet different architectural aesthetics and functional requirements.

[0003] After welding, steel structure bridges need to be sprayed on the surface. Due to the large size of the steel structure bridge, it is usually hoisted to a spacious outdoor area for spraying. After spraying, it can be dried outdoors. However, the traditional spraying platform has the following defects:

[0004] When drying outdoors, we often encounter sudden bad weather. The current enclosure facilities are slow to erect, which affects the protection speed of steel structure bridges. During spraying, bottom spraying is difficult and requires manual drilling into the top of the bridge for construction. The working surface is small and the working efficiency is low. At the same time, the supporting parts of the bridge are difficult to spray. In summary, there is a need for an outdoor spraying platform for steel structure bridges that can improve drying safety and spraying efficiency. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides an outdoor spraying platform for an integrated steel structure bridge for drying, which solves the problems mentioned in the background technology.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0007] An outdoor spraying platform for an integrated steel structure bridge for drying, comprising a bottom plate, a main frame assembly being installed on the surface of the bottom plate, the main frame assembly comprising a first gantry, a second gantry, an upper beam, a lower beam and a middle frame, the first gantry and the second gantry being respectively arranged at two ends of the bottom plate, an outrigger cover being arranged on the top of the outer wall of the first gantry, an upper beam being symmetrically arranged on the top between the first gantry and the second gantry, a lower beam being symmetrically arranged on the bottom between the first gantry and the second gantry, a middle frame being arranged in the middle between the first gantry and the second gantry, a transparent shielding film of a telescopic structure being stored on the inner wall of the second gantry, an end of the transparent shielding film being connected to a traction assembly, the traction assembly being installed on the middle frame, and in bad weather, the traction assembly tractions the transparent shielding film to enclose the outside of the steel bridge;

[0008] The bottom surfaces of the two sets of upper beam bodies are both installed with a main lifting assembly and a secondary lifting assembly. The bottom of the main lifting assembly is detachably connected with a spray painting assembly. The spray painting assembly adopts a multi-section bending structure. Two sets of support rails are symmetrically arranged on the surface of the bottom plate. A set of walking assemblies is slidably installed on the surface of each set of support rails.

[0009] The spraying platform includes the following states:

[0010] In the first state, the steel bridge passes through the area between the two sets of upper beams and is lowered onto the two sets of support rails;

[0011] In the second state, two sets of spray painting assemblies are horizontally placed on the top of the steel bridge and the two sets of spray painting assemblies are staggered, and the two sets of main lifting assemblies move laterally synchronously, so that the two sets of spray painting assemblies can fully spray the top surface of the steel bridge;

[0012] In the third state, the spray painting assembly is adjusted to the bottom spraying posture, and the spray painting assembly in the bottom spraying posture is adapted to the contour of the bottom half of the steel bridge;

[0013] In the fourth state, the painting assembly is stuck on the walking assembly and detached from the main lifting assembly;

[0014] In the fifth state, the main lifting assembly and the auxiliary lifting assembly jointly lift the steel bridge, and the walking assembly moves along the support rail to drive the painting assembly to fully spray the bottom surface of the steel bridge.

[0015] Furthermore, the main lifting assembly and the auxiliary lifting assembly adopt the same structure, the main lifting assembly includes a first moving block, the first moving block is slidably installed at the bottom of the upper beam body, the bottom surface of the first moving block is vertically provided with a first driving rod, the bottom end of the first driving rod is vertically provided with a horizontally arranged first lifting seat, the bottom surface of the first lifting seat is provided with a first landing column, the side of the first lifting seat close to the walking assembly is provided with a side slot, the first painting assembly is horizontally inserted into the side slot; the inner wall of the first lifting seat is telescopically embedded with a first lifting plate;

[0016] The auxiliary lifting assembly includes a second moving block, a second driving rod and a second lifting seat. The second moving block is slidably mounted on the bottom of the upper beam body. The bottom surface of the second moving block is vertically provided with a second driving rod. The bottom end of the second driving rod is vertically provided with a horizontally arranged second lifting seat. The bottom surface of the second lifting seat is provided with a second landing column. The auxiliary lifting assembly is placed at the end of the upper beam body when not in operation. The inner wall of the second lifting seat is telescopically embedded with a second lifting plate.

[0017] In the fifth state, the first lifting plate and the second lifting plate extend into the lower part of the steel bridge. After the steel bridge is lifted to a specified height, the first landing column and the second landing column are synchronously grounded to stably support the steel bridge.

[0018] Furthermore, the paint spraying assembly includes a first tube body, a second tube body and a third tube body. An assembly assembly is provided on the outer wall of one end of the first tube body, and the assembly assembly is inserted into the side slot. A first hose is provided on the outer end of the first tube body, and a second tube body is provided on the outer end of the first hose. A second hose is provided on the outer end of the second tube body, and a third tube body is provided on the outer end of the second tube body. The first tube body and the second tube body are connected by a first swinging assembly, and the first swinging assembly is provided at the end of the first tube body. The first swinging assembly is used to drive the second tube body to rotate. The second tube body and the third tube body are connected by a second swinging assembly, and the second swinging assembly is provided at the end of the second tube body. The second swinging assembly is used to drive the third tube body to rotate. The bottom surfaces of the first tube body, the second tube body and the third tube body are all provided with nozzles.

[0019] Furthermore, the steel bridge comprises a top steel plate, side steel plates and a bottom steel plate, the top steel plate is welded to the top ends of the two groups of side steel plates, the bottom steel plate is welded to the bottom ends of the two groups of side steel plates, the top steel plate is arranged in parallel above the bottom steel plate, both ends of the top steel plate extend outward from the side steel plates and the extended parts are overlapping parts; the paint spraying components in the bottom spraying posture are specifically as follows: the outer end of the first tube body is placed parallel to the bottom of the overlapping part, the second tube body is placed parallel to the outer side of the side steel plate, and the third tube body is placed parallel to the bottom of the bottom steel plate.

[0020] Furthermore, the first swinging assembly and the second swinging assembly adopt the same structure. The first swinging assembly includes a side rod body, a second motor and a rocker arm. One end of the side rod body is fixed to the outer end of the first tube body. The outer end of the side rod body is rotatably connected to the rocker arm and the second motor is installed at the rotatable connection. The outer end of the rocker arm is fixedly connected to the second tube body.

[0021] Furthermore, the assembly component includes an assembly plate and a hanging plate; a "7"-shaped hanging plate is provided at the top of the assembly plate, and the hanging plate is horizontally inserted into the side slot, a storage groove is opened at the inner end of the side slot, the storage groove is located below the side slot, and an elastic resistance column is provided above the storage groove; when the assembly component is assembled with the first lifting seat, the hanging plate is embedded in the storage groove, and the elastic resistance column presses down the hanging plate.

[0022] Furthermore, the assembly component also includes a gear, a square plate, a third driving rod and a first motor. The outer wall of the first tube body is provided with a gear and a square plate. The square plate is located on the outside of the gear, and the assembly plate is located on the inside of the gear. The outer wall of the assembly plate is provided with a third driving rod, and the inner wall of the square plate is provided with a first motor. The output end of the first motor is meshed and connected to the gear, and the output end of the third driving rod is connected to the square plate; the first motor is used to drive the first tube body to rotate so that the nozzle is facing up or down; the third driving rod is used to drive the first tube body to move.

[0023] Furthermore, a shooting assembly is vertically provided on the outer end side wall of the second tube body, and the shooting assembly includes a back plate and a camera. The back plate is vertically provided on the side wall of the second tube body, and the camera is provided on the bottom surface of the back plate; in the fifth state, the camera is located on the front side of the second tube body, and the camera faces the connection between the side steel plate and the bottom steel plate to shoot the weld between the side steel plate and the bottom steel plate.

[0024] Furthermore, the walking assembly includes a walking block, a clamping ring and an inclined seat, the walking block is slidably arranged on the surface of the support rail, the clamping ring is arranged in the middle of the surface of the walking block, the side wall of the walking block is vertically provided with an inclined seat, and the surface of the inclined seat is provided with a first bracket and a second bracket;

[0025] In the fourth state, specifically:

[0026] The first moving block drives the first lifting seat and the painting assembly to move above the walking assembly;

[0027] The first driving rod drives the first lifting seat to descend, so that the first tube body is embedded in the first bracket, the second tube body is embedded in the second bracket, and the third tube body is clamped in the clamping ring. At the same time, the hanging plate is separated from the storage groove and pushes up the elastic resistance column;

[0028] The first moving block drives the first lifting seat to move horizontally, so that the hanging plate moves horizontally and leaves the side slot, and the painting assembly is transferred to the walking assembly.

[0029] Furthermore, the inner wall of the transparent shielding film is provided with a plurality of inverted U-shaped reinforcement frames, and the traction assembly includes guide wheels, traction ropes, traction gantry and traction plates; a traction gantry is provided at the end of the transparent shielding film, and when the transparent shielding film is not in use, the traction gantry is arranged in contact with the second gantry; the traction gantry and each reinforcement frame are slidably arranged on the outside of the middle frame, and the traction plate is slidably arranged on the inner wall of the middle frame, and a guide wheel is provided at the end of the middle frame close to the first gantry, and the traction rope passes through the guide wheel, one end of the traction rope is connected to the traction plate, and the other end is connected to the traction gantry; a push plate is provided on the side of the first lifting seat close to the traction plate, and the push plate extends outward from the first lifting seat, and the extended part of the push plate is used to push the traction plate to automatically move, so that the traction gantry moves to bring out the transparent shielding film.

[0030] The present invention provides an outdoor spraying platform for an integrated steel structure bridge for drying. Compared with the prior art, it has the following beneficial effects:

[0031] 1. The transparent shielding film is designed to be folded and collected on the second gantry when not in use. In this way, the entire main frame assembly is an open structure, spraying and drying can be carried out normally, and a gap is left between the two sets of upper beams. In this way, the loading and unloading of the steel bridge is carried out in a vertical hoisting manner; when it rains, snows and other bad weather, the traction component can automatically pull out the transparent shielding film, which can keep the light from shining and block the rain and snow, thereby protecting the steel bridge;

[0032] 2. The design of the main lifting component can achieve the following effects: when spraying the top surface of the steel bridge, the painting component is pulled to move to achieve comprehensive spraying of the top surface of the steel bridge; when spraying the bottom surface of the steel bridge, the painting component is transferred to the walking component to separate the painting component from the walking component; when spraying the bottom surface of the steel bridge, it works with the auxiliary lifting component to lift the steel bridge so that the painting component can walk across; when covering the transparent shielding film, the main lifting component serves as the walking power source of the traction component;

[0033] 3. The paint spraying component is designed as a multi-section bending structure, which can be fully extended to horizontal when spraying the top surface of the steel bridge, thereby achieving full coverage of the top surface of the steel bridge; when spraying the bottom surface of the steel bridge, the paint spraying component can be deformed to adapt to half of the contour of the bottom surface of the steel bridge. The two sets of paint spraying components are docked to achieve full coverage, thus realizing automatic and efficient spraying of the top and bottom surfaces of the steel bridge. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 A schematic structural diagram of an outdoor spraying platform for an integrated steel structure bridge for drying the sun of the present invention is shown;

[0036] Figure 2 A schematic diagram of the horizontal cross-section structure of the spraying platform of the present invention is shown;

[0037] Figure 3 A schematic diagram of the layout structure of the main lifting assembly and the auxiliary lifting assembly of the present invention is shown;

[0038] Figure 4 A schematic diagram of the connection structure of the first tube body, the second tube body and the third tube body of the present invention is shown;

[0039] Figure 5 A schematic diagram of the structure of the assembly component of the present invention from one perspective is shown;

[0040] Figure 6 Another structural schematic diagram of the assembly component of the present invention is shown;

[0041] Figure 7 A schematic diagram of the coordination structure between the hanging plate and the side slot of the present invention is shown;

[0042] Figure 8 A schematic diagram of the coordination structure between the hanging plate and the storage slot of the present invention is shown;

[0043] Fig. 9 The schematic diagram of the structure of the walking assembly of the present invention is shown;

[0044] Fig.10 It shows a schematic diagram of the spraying structure of the paint spraying assembly of the present invention on the bottom of a steel bridge;

[0045] Fig.11 A schematic diagram of the structure of the transparent shielding film of the present invention in a pulled-out state is shown;

[0046] Fig.12 A schematic diagram of the reinforcing frame structure of the present invention is shown;

[0047] As shown in the figure:

[0048] Main frame assembly, 11, first gantry, 12, overhanging cover, 13, second gantry, 14, middle frame, 15, upper beam, 16, lower beam, 2, main lifting assembly, 21, first moving block, 22, first driving rod, 23, first lifting seat, 231, side slot, 232, storage slot, 233, elastic resistance column, 24, push plate, 25, first landing column, 26, first lifting plate, 3, auxiliary lifting assembly, 31, second moving block, 32, second driving rod, 33, second lifting seat, 34, second landing column, 35, second lifting plate, 4, traction assembly, 41, guide wheel, 42, traction rope, 43, traction gantry, 44, traction plate, 5, bottom plate, 51, support rail, 6, walking assembly, 6 1. Walking block, 62. Snap ring, 63. Slanted seat, 631. First bracket, 632. Second bracket, 7. Paint spraying assembly, 71. First tube body, 711. Gear, 712. Square plate, 713. First motor, 72. Second tube body, 721. First hose, 722. Second hose, 73. Third tube body, 74. First swing assembly, 741. Side rod body, 742. Second motor, 743. Swing rod, 75. Second swing assembly, 76. Spray head, 77. Shooting assembly, 771. Back plate, 772. Camera, 78. Assembly plate, 781. Third driving rod, 782. Hanging plate, 8. Steel bridge, 81. Top steel plate, 82. Side steel plate, 83. Bottom steel plate, 9. Transparent shielding film, 91. Reinforcement frame. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0050] In order to solve the technical problems in the background technology, the following embodiments are provided:

[0051] Combination Figure 1-Figure 12 As shown, the present invention provides an outdoor spraying platform for an integrated steel structure bridge, comprising a bottom plate 5, a main frame assembly 1 is installed on the surface of the bottom plate 5, the main frame assembly 1 comprises a first gantry 11, a second gantry 13, an upper beam 15, a lower beam 16 and a middle frame 14, the first gantry 11 and the second gantry 13 are respectively arranged at two ends of the bottom plate 5, an overhanging cover 12 is arranged on the top of the outer wall of the first gantry 11, an upper beam 15 is symmetrically arranged on the top between the first gantry 11 and the second gantry 13, a lower beam 16 is symmetrically arranged on the bottom between the first gantry 11 and the second gantry 13, a middle frame 14 is arranged in the middle between the first gantry 11 and the second gantry 13, a transparent shielding film 9 of a telescopic structure is stored on the inner wall of the second gantry 13, an end of the transparent shielding film 9 is connected to the traction assembly 4, the traction assembly 4 is installed on the middle frame 14, and in bad weather, the traction assembly 4 pulls the transparent shielding film 9 to enclose the outside of the steel bridge 8;

[0052] The bottom surfaces of the two groups of upper beam bodies are both installed with a main lifting assembly 2 and an auxiliary lifting assembly 3. The bottom of the main lifting assembly 2 is detachably connected with a spray painting assembly 7. The spray painting assembly 7 adopts a multi-section bending structure. The surface of the bottom plate 5 is symmetrically provided with two groups of support rails 51. The surface of each group of support rails 51 is slidably installed with a group of walking assemblies 6.

[0053] The spraying platform includes the following states: in the first state, the steel bridge 8 passes through the area between the two groups of upper beams 15 and is lowered onto the two groups of support rails 51; in the second state, the two groups of paint spraying components 7 are horizontally placed on the top of the steel bridge 8 and the two groups of paint spraying components 7 are staggered, and the two groups of main lifting components 2 move laterally synchronously so that the two groups of paint spraying components 7 can fully spray the top surface of the steel bridge 8; in the third state, the paint spraying component 7 is adjusted to the bottom spraying posture, and the paint spraying component 7 in the bottom spraying posture is adapted to the contour of half of the bottom surface of the steel bridge 8; in the fourth state, the paint spraying component 7 is stuck on the walking component 6 and detached from the main lifting component 2; in the fifth state, the main lifting component 2 and the auxiliary lifting component 3 jointly lift the steel bridge 8, and the walking component 6 moves along the support rail 51 to drive the paint spraying component 7 to fully spray the bottom surface of the steel bridge 8.

[0054] In the above scheme:

[0055] 1. The transparent shielding film is designed to be folded and collected on the second gantry when not in use. In this way, the entire main frame assembly is an open structure, spraying and drying can be carried out normally, and a gap is left between the two sets of upper beams. In this way, the loading and unloading of the steel bridge is carried out in a vertical hoisting manner; when it rains, snows and other bad weather, the traction component can automatically pull out the transparent shielding film, which can keep the light from shining and block the rain and snow, thereby protecting the steel bridge;

[0056] 2. The design of the main lifting component can achieve the following effects:

[0057] 2.1. When spraying the top surface of the steel bridge, the spray painting assembly is pulled to move so as to achieve full spraying of the top surface of the steel bridge;

[0058] 2.2. When spraying the bottom surface of the steel bridge, transfer the spray painting assembly to the walking assembly to separate the spray painting assembly from the walking assembly;

[0059] 2.3. When spraying the bottom surface of the steel bridge, it works with the auxiliary lifting component to lift the steel bridge so that the spray-painted component can walk across;

[0060] 2.4. When covering the transparent shielding film, the main lifting assembly serves as the walking power source of the traction assembly;

[0061] 3. The paint spraying component is designed as a multi-section bending structure, which can be fully extended to horizontal when spraying the top surface of the steel bridge, thereby achieving full coverage of the top surface of the steel bridge; when spraying the bottom surface of the steel bridge, the paint spraying component can be deformed to adapt to half of the contour of the bottom surface of the steel bridge. The two sets of paint spraying components are docked to achieve full coverage, thus realizing automatic and efficient spraying of the top and bottom surfaces of the steel bridge.

[0062] In this embodiment, the main lifting component 2 and the auxiliary lifting component 3 adopt the same structure. The main lifting component 2 includes a first moving block 21, which is slidably installed at the bottom of the upper beam body 15. The bottom surface of the first moving block 21 is vertically provided with a first driving rod 22, and the bottom end of the first driving rod 22 is vertically provided with a horizontally arranged first lifting seat 23. The bottom surface of the first lifting seat 23 is provided with a first landing column 25. The side of the first lifting seat 23 close to the walking component 6 is provided with a side slot 231, and the first paint spraying component 7 is horizontally inserted into the side slot 231; the inner wall of the first lifting seat 23 is telescopically embedded with a first lifting plate 26; the auxiliary lifting component 3 includes a second moving block 31, a first lifting plate 26 is telescopically embedded in the inner wall of the first lifting seat 23 ... Two driving rods 32 and a second lifting seat 33, the second moving block 31 is slidably installed at the bottom of the upper beam body 15, the bottom surface of the second moving block 31 is vertically provided with a second driving rod 32, the bottom end of the second driving rod 32 is vertically provided with a horizontally arranged second lifting seat 33, and the bottom surface of the second lifting seat 33 is provided with a second ground column 34; the auxiliary lifting component 3 is placed at the end of the upper beam body 15 when not in operation; the inner wall of the second lifting seat 33 is telescopically embedded with a second lifting plate 35; in the fifth state, the first lifting plate 26 and the second lifting plate 35 extend into the lower part of the steel bridge 8, and after the steel bridge 8 is lifted to a specified height, the first ground column 25 and the second ground column 34 are synchronously grounded to firmly support the steel bridge 8.

[0063] In the above scheme: an auxiliary lifting component is designed to assist in lifting. When not lifting, the auxiliary lifting components are moved and stored under the overhanging cover. When not lifting, the lifting plate is retracted into the lifting seat, and the lifting seat is placed on both sides of the steel bridge. When lifting, the lifting seat first raises and lowers to adjust the height of the lifting plate so that the lifting plate extends to both sides of the steel bridge.

[0064] In order to make the spraying posture of the paint spraying component adjustable, the following solution is given:

[0065] In this embodiment, the paint spraying assembly 7 includes a first tube body 71, a second tube body 72 and a third tube body 73. An outer wall of one end of the first tube body 71 is provided with an assembly assembly, which is inserted into the side slot 231. The outer end of the first tube body 71 is provided with a first hose 721, the outer end of the first hose 721 is provided with a second tube body 72, the outer end of the second tube body 72 is provided with a second hose 722, and the outer end of the second tube body 72 is provided with a third tube body 73. The first tube body 71 and the second tube body 72 are connected by a first swinging assembly 74, which is provided at the end of the first tube body 71 and is used to drive the second tube body 72 to rotate. The second tube body 72 and the third tube body 73 are connected by a second swinging assembly 75, and the second swinging assembly 75 is arranged at the end of the second tube body 72, the second swinging assembly 75 is used to drive the third tube body 73 to rotate, and the bottom surfaces of the first tube body 71, the second tube body 72 and the third tube body 73 are all provided with nozzles 76; the steel bridge 8 includes a top steel plate 81, a side steel plate 82 and a bottom steel plate 83, the top steel plate 81 is welded to the top ends of the two groups of side steel plates 82, the bottom steel plate 83 is welded to the bottom ends of the two groups of side steel plates 82, the top steel plate 81 is arranged parallel to the top of the bottom steel plate 83, both ends of the top steel plate 81 extend outward from the side steel plates 82 and the extended parts are overlapping parts; the paint spraying assembly 7 in the bottom spraying posture is specifically as follows: the outer end of the first tube body 71 is placed parallel to the bottom of the overlapping part, the second tube body 72 is placed parallel to the outer side of the side steel plate 82, and the third tube body 73 is placed parallel to the bottom of the bottom steel plate 83.

[0066] In the above scheme: the main part of the paint spraying assembly is designed to be composed of three tube bodies, and the three tube bodies are connected by hoses, so that the three tube bodies can be bent to form three-section bending shapes, which can adapt to the bottom shape of the steel bridge; the first tube body, the second tube body and the third tube body can be treated for painting to avoid paint residue; the first swing assembly and the second swing assembly are designed to drive the second tube body and the third tube body to rotate.

[0067] In this embodiment, the first swing assembly 74 and the second swing assembly 75 adopt the same structure. The first swing assembly 74 includes a side rod body 741, a second motor 742 and a rocker arm 743. One end of the side rod body 741 is fixed to the outer end of the first tube body 71. The outer end of the side rod body 741 is rotatably connected to the rocker arm 743 and the second motor 742 is installed at the rotatable connection. The outer end of the rocker arm 743 is fixedly connected to the second tube body 72.

[0068] In the above solution: the second motor can drive the swing rod to rotate, and the swing rod drives the second tube body to rotate, and the side rod body can support and fix the second motor.

[0069] In this embodiment, the assembly component includes an assembly plate 78 and a hanging plate 782; a "7"-shaped hanging plate 782 is provided at the top of the assembly plate 78, and the hanging plate 782 is horizontally inserted into the side slot 231. A storage groove 232 is opened at the inner end of the side slot 231, and the storage groove 232 is located below the side slot 231. An elastic resistance column 233 is provided above the storage groove 232; when the assembly component is assembled with the first lifting seat 23, the hanging plate 782 is embedded in the storage groove 232, and the elastic resistance column 233 presses down the hanging plate 782.

[0070] In the above scheme:

[0071] 1. Design a "7"-shaped hanging plate and a horizontal side slot, so that when the first lifting seat moves horizontally, the hanging plate can be inserted into or out of the side slot;

[0072] 2. The recessed storage slot can be used as a snap-fit ​​positioning structure for the hanging plate to achieve horizontal positioning;

[0073] 3. The elastic resistance column can press the hanging plate vertically downward to achieve vertical positioning and further improve the clamping stability of the hanging plate.

[0074] In this embodiment, the assembly component also includes a gear 711, a square plate 712, a third driving rod 781 and a first motor 713. The outer wall of the first tube body 71 is provided with a gear 711 and a square plate 712. The square plate 712 is located on the outer side of the gear 711. The assembly plate 78 is located on the inner side of the gear 711. The outer wall of the assembly plate 78 is provided with a third driving rod 781. The inner wall of the square plate 712 is provided with a first motor 713. The output end of the first motor 713 is meshed and connected to the gear 711, and the output end of the third driving rod 781 is connected to the square plate 712; the first motor 713 is used to drive the first tube body 71 to rotate so that the nozzle 76 is facing up or down; the third driving rod 781 is used to drive the first tube body 71 to move.

[0075] In the above scheme:

[0076] 1. The first motor can drive the gear to rotate, and then drive the three tubes to rotate, so as to change the direction of the nozzle to achieve top and bottom spraying of the steel bridge;

[0077] 2. The third driving rod is designed to adjust the extension length of the first tube body to adjust the overall position of the paint spraying assembly, so that the two paint spraying assemblies are arranged in a more appropriate position and the two paint spraying assemblies can be normally docked to ensure the spraying effect.

[0078] Since it is difficult to observe the welding point between the bottom steel plate and the side steel plate, the following solution is given to solve this problem:

[0079] In this embodiment, a shooting assembly 77 is vertically provided on the outer end side wall of the second tube body 72, and the shooting assembly 77 includes a back plate 771 and a camera 772. The back plate 771 is vertically provided on the side wall of the second tube body 72, and the camera 772 is provided on the bottom surface of the back plate 771. In the fifth state, the camera 772 is located on the front side of the second tube body 72, and the camera 772 faces the connection between the side steel plate 82 and the bottom steel plate 83 to shoot the weld between the side steel plate 82 and the bottom steel plate 83.

[0080] In the above scheme: in the fifth state, since the steel bridge has been lifted, the weld is exposed. When the walking component drives the spray painting component to move, the camera can shoot the weld for the back control personnel to observe. When there is a quality problem with the weld, the spray painting component can be stopped in time, and the workers can directly enter under the steel bridge to deal with the weld defects;

[0081] The back plate is designed to be fixed at the end of the second tube body. Since the second tube body has been adjusted to face the side steel plate in the fourth state, the camera will also be adjusted to face the weld at this time, and no separate control is required.

[0082] In this embodiment, the walking assembly 6 includes a walking block 61, a retaining ring 62 and an inclined seat 63. The walking block 61 is slidably arranged on the surface of the support rail 51. A retaining ring 62 is provided in the middle of the surface of the walking block 61. An inclined seat 63 is vertically provided on the side wall of the walking block 61. A first bracket 631 and a second bracket 632 are provided on the surface of the inclined seat 63. In the fourth state, the first moving block 21 drives the first lifting seat 23 and the paint spraying assembly 7 to move above the walking assembly 6, and the first driving rod 22 drives the first lifting seat 23 to descend, so that the first tube body 71 is embedded in the first bracket 631, the second tube body 72 is embedded in the second bracket 632, and the third tube body 73 is clamped in the retaining ring 62. At the same time, the hanging plate 782 is disengaged from the storage groove 232 and pushes up the elastic resistance column 233; the first moving block 21 drives the first lifting seat 23 to translate, so that the hanging plate 782 translates and disengages from the side slot 231, and the paint spraying assembly 7 is transferred to the walking assembly 6.

[0083] In the above scheme:

[0084] The designed clamping ring can engage and position the third tube body, and the designed inclined seat with the first bracket and the second bracket can support the first tube body and the second tube body, so that the three tube bodies can be lifted and positioned; when the paint spraying assembly is pressed down to place, the hanging plate will simultaneously detach from the storage slot and push up against the resistance column, and then, when the first lifting seat moves inward, the hanging plate can be separated from the first lifting seat, which can effectively shorten the detachment time of the paint spraying assembly and has high detachment efficiency; the support rail can support and lift the steel bridge, and can also be used as a walking guide structure for the walking assembly, and the walking block can be a pneumatic slider or an electric slider. In this embodiment, the inner wall of the transparent shielding film 9 is provided with a plurality of inverted U-shaped reinforcement frames 91, and the traction assembly 4 includes a guide wheel 41, a traction rope 42, a traction gantry 43 and a traction plate 44; a traction gantry 43 is provided at the end of the transparent shielding film 9, and when the transparent shielding film 9 is not in use, the traction gantry 43 is arranged in contact with the second gantry 13; the traction gantry 43 and each reinforcement frame 91 are slidably arranged on the outside of the middle frame 14, and the traction plate 44 is slidably arranged on the middle frame The inner wall of the body 14 and the end of the middle frame 14 close to the first gantry 11 are provided with a guide wheel 41, and a traction rope 42 passes through the guide wheel 41. One end of the traction rope 42 is connected to the traction plate 44, and the other end is connected to the traction gantry 43; a push plate 24 is provided on the side of the first lifting seat 23 close to the traction plate 44, and the push plate 24 extends outward from the first lifting seat 23. The extending part of the push plate 24 is used to push the traction plate 44 to automatically move, so that the traction gantry 43 moves to bring out the transparent shielding film 9.

[0085] In the above scheme:

[0086] 1. The transparent shielding film is folded up on the second gantry when not in use, and does not occupy space. The traction gantry is also stored inside the second gantry;

[0087] 2. The reinforcement frame is arranged at intervals on the inner wall of the transparent shielding film, which can improve the strength of the transparent shielding film and extend its service life. At the same time, the reinforcement frame can also move along the outer wall of the middle frame to achieve telescopic guidance for the transparent shielding film, so that the transparent shielding film can be accurately extended and retracted;

[0088] 3. When the traction assembly pulls out the transparent shielding film, the first driving rod drives the first lifting seat to move upward, so that the push plate is placed above the traction plate, and the main lifting assembly moves toward the traction plate. When the push plate moves over the traction plate, the first driving rod drives the first lifting seat to descend, and the push plate descends to the outside of the traction plate; then the main lifting assembly moves in the opposite direction, the push plate pushes the traction plate, and the traction plate pulls the traction rope to drive the traction gantry to move, and the traction gantry can pull out the transparent shielding film, so as to realize the automatic extension and covering of the transparent shielding film; the action of the traction assembly can be controlled by workers observing the weather;

[0089] 4. When resetting is required, the worker manually pushes back the traction gantry to drive the transparent shielding film to retract onto the second gantry.

[0090] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0091] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. An outdoor spraying platform for an integrated steel structure bridge, characterized by: It includes a bottom plate, a main frame assembly is installed on the surface of the bottom plate, the main frame assembly includes a first gantry, a second gantry, an upper beam, a lower beam and a middle frame, the first gantry and the second gantry are respectively arranged at two ends of the bottom plate, an outrigger cover is arranged on the top of the outer wall of the first gantry, an upper beam is symmetrically arranged on the top between the first gantry and the second gantry, a lower beam is symmetrically arranged on the bottom between the first gantry and the second gantry, a middle frame is arranged in the middle between the first gantry and the second gantry, a transparent shielding film of a telescopic structure is stored on the inner wall of the second gantry, an end of the transparent shielding film is connected to a traction assembly, the traction assembly is installed on the middle frame, and in bad weather, the traction assembly pulls the transparent shielding film to enclose the outside of the steel bridge; The bottom surfaces of the two sets of upper beam bodies are both installed with a main lifting assembly and a secondary lifting assembly. The bottom of the main lifting assembly is detachably connected with a spray painting assembly. The spray painting assembly adopts a multi-section bending structure. Two sets of support rails are symmetrically arranged on the surface of the bottom plate. A set of walking assemblies is slidably installed on the surface of each set of support rails. The spraying platform includes the following states: In the first state, the steel bridge passes through the area between the two sets of upper beams and is lowered onto the two sets of support rails; In the second state, two sets of spray painting assemblies are horizontally placed on the top of the steel bridge and the two sets of spray painting assemblies are staggered, and the two sets of main lifting assemblies move laterally synchronously, so that the two sets of spray painting assemblies can fully spray the top surface of the steel bridge; In the third state, the spray painting assembly is adjusted to the bottom spraying posture, and the spray painting assembly in the bottom spraying posture is adapted to the contour of the bottom half of the steel bridge; In the fourth state, the painting assembly is stuck on the walking assembly and detached from the main lifting assembly; In the fifth state, the main lifting assembly and the auxiliary lifting assembly jointly lift the steel bridge, and the walking assembly moves along the support rail to drive the painting assembly to fully spray the bottom surface of the steel bridge; The main lifting assembly and the auxiliary lifting assembly adopt the same structure. The main lifting assembly includes a first moving block, which is slidably installed at the bottom of the upper beam body. A first driving rod is vertically provided on the bottom surface of the first moving block. A first lifting seat arranged horizontally is vertically provided at the bottom end of the first driving rod. A first landing column is provided on the bottom surface of the first lifting seat. A side slot is provided on the side of the first lifting seat close to the walking assembly. The first painting assembly is horizontally inserted into the side slot. A first lifting plate is telescopically embedded in the inner wall of the first lifting seat. The auxiliary lifting assembly includes a second moving block, a second driving rod and a second lifting seat. The second moving block is slidably mounted on the bottom of the upper beam body. The bottom surface of the second moving block is vertically provided with a second driving rod. The bottom end of the second driving rod is vertically provided with a horizontally arranged second lifting seat. The bottom surface of the second lifting seat is provided with a second landing column. The auxiliary lifting assembly is placed at the end of the upper beam body when not in operation. The inner wall of the second lifting seat is telescopically embedded with a second lifting plate. In the fifth state, the first lifting plate and the second lifting plate extend into the lower part of the steel bridge, and after the steel bridge is lifted to a specified height, the first landing column and the second landing column are synchronously grounded to stably support the steel bridge; The paint spraying assembly includes a first tube body, a second tube body and a third tube body. An assembly assembly is provided on the outer wall of one end of the first tube body, and the assembly assembly is inserted into a side slot. A first hose is provided at the outer end of the first tube body, and a second tube body is provided at the outer end of the first hose. A second hose is provided at the outer end of the second tube body, and a third tube body is provided at the outer end of the second tube body. The first tube body and the second tube body are connected by a first swinging assembly, which is arranged at the end of the first tube body and is used to drive the second tube body to rotate. The second tube body and the third tube body are connected by a second swinging assembly, which is arranged at the end of the second tube body and is used to drive the third tube body to rotate. Nozzles are provided on the bottom surfaces of the first tube body, the second tube body and the third tube body.

2. The outdoor spraying platform for drying integrated steel structure bridge according to claim 1, characterized in that: The steel bridge comprises a top steel plate, side steel plates and a bottom steel plate, wherein the top steel plate is welded to the top ends of two groups of side steel plates, the bottom steel plate is welded to the bottom ends of the two groups of side steel plates, the top steel plate is arranged in parallel above the bottom steel plate, both ends of the top steel plate extend outward from the side steel plates and the extended parts are overlapping parts; the paint spraying assembly in the bottom spraying posture is specifically as follows: the outer end of the first tube body is placed in parallel to the bottom of the overlapping part, the second tube body is placed in parallel to the outer side of the side steel plate, and the third tube body is placed in parallel to the bottom of the bottom steel plate.

3. The outdoor spraying platform for drying integrated steel structure bridge according to claim 2 is characterized by: The first swing assembly and the second swing assembly adopt the same structure. The first swing assembly includes a side rod body, a second motor and a rocker arm. One end of the side rod body is fixed to the outer end of the first tube body. The outer end of the side rod body is rotatably connected to the rocker arm and the second motor is installed at the rotatable connection. The outer end of the rocker arm is fixedly connected to the second tube body.

4. The outdoor spraying platform for drying integrated steel structure bridge according to claim 3 is characterized by: The assembly component includes an assembly plate and a hanging plate; a "7"-shaped hanging plate is provided at the top of the assembly plate, and the hanging plate is horizontally inserted into the side slot, and a storage groove is opened at the inner end of the side slot, and the storage groove is located below the side slot, and an elastic resistance column is provided above the storage groove; when the assembly component is assembled with the first lifting seat, the hanging plate is embedded in the storage groove, and the elastic resistance column presses down the hanging plate.

5. The outdoor spraying platform for drying integrated steel structure bridge according to claim 4 is characterized by: The assembly component also includes a gear, a square plate, a third driving rod and a first motor. The outer wall of the first tube body is provided with a gear and a square plate. The square plate is located on the outer side of the gear, and the assembly plate is located on the inner side of the gear. The outer wall of the assembly plate is provided with a third driving rod, and the inner wall of the square plate is provided with a first motor. The output end of the first motor is meshed and connected to the gear, and the output end of the third driving rod is connected to the square plate; the first motor is used to drive the first tube body to rotate so that the nozzle is facing up or down; the third driving rod is used to drive the first tube body to move.

6. The outdoor spraying platform for drying integrated steel structure bridge according to claim 5, characterized in that: A shooting assembly is vertically provided on the outer end side wall of the second tube body, and the shooting assembly includes a back plate and a camera. The back plate is vertically provided on the side wall of the second tube body, and the camera is provided on the bottom surface of the back plate. In the fifth state, the camera is located on the front side of the second tube body, and the camera faces the connection between the side steel plate and the bottom steel plate to shoot the weld between the side steel plate and the bottom steel plate.

7. The outdoor spraying platform for drying integrated steel structure bridge according to claim 6, characterized in that: The walking assembly comprises a walking block, a clamping ring and an inclined seat, wherein the walking block is slidably arranged on the surface of the support rail, a clamping ring is arranged in the middle of the surface of the walking block, an inclined seat is vertically arranged on the side wall of the walking block, and a first bracket and a second bracket are arranged on the surface of the inclined seat; In the fourth state, specifically: The first moving block drives the first lifting seat and the painting assembly to move above the walking assembly; The first driving rod drives the first lifting seat to descend, so that the first tube body is embedded in the first bracket, the second tube body is embedded in the second bracket, and the third tube body is clamped in the clamping ring. At the same time, the hanging plate is separated from the storage groove and pushes up the elastic resistance column; The first moving block drives the first lifting seat to move horizontally, so that the hanging plate moves horizontally and leaves the side slot, and the painting assembly is transferred to the walking assembly.

8. The outdoor spraying platform for drying integrated steel structure bridge according to claim 7, characterized in that: The inner wall of the transparent shielding film is provided with a plurality of inverted U-shaped reinforcement frames, and the traction assembly includes guide wheels, traction ropes, traction gantry frames and traction plates; a traction gantry frame is provided at the end of the transparent shielding film, and when the transparent shielding film is not in use, the traction gantry frame is arranged in contact with the second gantry frame; the traction gantry frame and each reinforcement frame are slidably arranged on the outside of the middle frame, and the traction plate is slidably arranged on the inner wall of the middle frame, and a guide wheel is provided at the end of the middle frame close to the first gantry frame, and the traction rope passes through the guide wheel, and one end of the traction rope is connected to the traction plate and the other end is connected to the traction gantry frame; a push plate is provided on the side of the first lifting seat close to the traction plate, and the push plate extends outward from the first lifting seat, and the extending part of the push plate is used to push the traction plate to automatically move, so that the traction gantry frame moves to bring out the transparent shielding film.