Intelligent cost estimation system based on CAD, Huizhu Cloud big data and BIM technology
Through an intelligent cost estimation system based on CAD, Huizhuyun big data and BIM technology, the problems of difficulty in processing drawing data and inaccurate cost estimation in traditional technology are solved, and efficient and accurate cost management and risk prediction of construction projects are achieved, improving the efficiency and accuracy of cost management and risk prediction of construction projects. Project execution efficiency and economic benefits.
Patent Information
- Application Number
- CN202410986229.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-23
AI Technical Summary
Traditional cost estimation technology is difficult to process drawing data, resulting in inaccurate cost estimation of construction projects, low material evaluation efficiency, ineffective response to project changes and risks, and affecting project execution efficiency and cost control.
Using an intelligent cost estimation system based on CAD, Huizhuyun big data and BIM technology, the drawing data processing module, building materials evaluation module, model construction analysis module, material human computing module, risk prediction evaluation module and automation integration module are used to identify drawings. Key information in the BIM model, converts materials and equipment costs, predicts risk costs, and optimizes supplier selection and worker configuration.
It improves the efficiency and accuracy of construction project management, optimizes budget allocation and material procurement, enhances the ability to respond to project risks, and improves cost estimation efficiency and supply chain management.
Smart Images

Figure CN118521362B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of construction engineering technology, and in particular to an intelligent cost estimation system based on CAD, Huizhu Cloud Big Data and BIM technology. Background Art
[0002] The field of construction engineering technology aims to design, build and maintain buildings and various physical structures, including bridges, tunnels and roads, combining civil engineering, architectural design, environmental engineering and project management, optimizing the construction process by applying a variety of technologies and engineering methods, using computer-aided design, building information modeling technology, material science and modern construction technology to improve construction efficiency, ensure structural safety, combine energy efficiency and environmental impact, improve the functionality, safety and economic efficiency of buildings, and optimize the impact on the environment and sustainability.
[0003] Among them, the intelligent cost estimation system uses machine learning and data mining to estimate and manage the cost of construction projects, aiming to improve the accuracy and efficiency of cost estimation, predict the costs of multiple projects by analyzing batch data and the cost performance of historical projects, and help project managers make decisions. By updating cost information in real time, it can respond to various changes that occur during the project process, optimize the efficiency and effectiveness of project cost control and ensure that projects are executed according to budget, improve the efficiency of engineers and cost estimators, and enhance the professional level and efficiency of overall project management.
[0004] Traditional cost estimation technology cannot effectively process drawing data, and it is difficult to convert and verify building models. It is inefficient in building material evaluation and is prone to errors that lead to cost estimation errors. It is difficult to fully consider the impact of multiple factors in material and manpower calculations. It is unable to effectively respond to changes and risks during the project process, affecting the execution efficiency and cost control of the project. It lacks the ability to respond quickly to market changes and is difficult to accurately predict fluctuations in material costs and labor costs, resulting in poor cost control and untimely risk response, affecting the economic benefits and completion time of the project, causing cost overruns and project delays, and affecting the professional level and efficiency of project management. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings existing in the prior art and propose an intelligent cost estimation system based on CAD, Huizhu Cloud Big Data and BIM technology.
[0006] In order to achieve the above purpose, the present invention adopts the following technical solutions: The intelligent cost estimation system based on CAD, Huizhu Cloud big data and BIM technology includes:
[0007] The drawing data processing module processes the architectural CAD drawings based on the user's architectural drawing data, identifies various key information from the drawings, and generates drawing information analysis results;
[0008] The building material assessment module identifies the types of materials and equipment in the drawings based on the analysis results of the drawing information and combines it with the big data of Huizhu Cloud to generate material and equipment identification results;
[0009] The model building and analysis module converts the drawing information into a BIM model based on the material and equipment identification results, performs structural and functional verification, and generates a building model conversion result;
[0010] The material and manpower calculation module calculates the material and equipment costs of the engineering project based on the building model conversion results, combined with the material and equipment data and the BIM model, using the Huizhu Cloud big data to generate the project expenditure calculation results;
[0011] The risk prediction and assessment module analyzes the complexity of the building structure and the difficulty of construction based on the calculation results of the project expenditure, estimates the risk cost and design change cost through historical data, and generates risk cost prediction information;
[0012] The automated integration module combines the project expenditure calculation results and risk cost forecast information, calculates and adjusts supplier selection and construction worker configuration, evaluates the maintenance and upkeep costs of the building, and builds a user interface to obtain intelligent cost estimation data.
[0013] As a further solution of the present invention, the drawing information analysis results include drawing size parameter data, component material type information, and component layout information; the material and equipment identification results include identified building material name information, material specification identification data, and equipment model identification information; the building model conversion results include structural verification data of the building model, functional consistency assessment information, and model integrity information; the project expenditure calculation results include calculated total material cost calculation results, equipment investment cost calculation information, and human resource cost calculation results; the risk cost prediction information includes a structural complexity rating score, a construction difficulty assessment result, and a design change cost calculation result; the intelligent cost estimation data includes supplier matching results, worker configuration optimization information, and maintenance budget assessment information.
[0014] As a further solution of the present invention, the drawing data processing module includes:
[0015] The drawing format processing submodule verifies and processes the drawing file format based on the user's architectural drawing data, removes non-structural comments and marks, optimizes the readability of the data, and generates data format verification results;
[0016] The building information analysis submodule identifies key building information in the drawings based on the data format verification result, including size, material type, equipment specifications, and quantity, and generates key information identification data;
[0017] The material specification evaluation submodule evaluates the specifications of materials and equipment and their impact on architectural design based on the key information identification data, and generates drawing information analysis results.
[0018] As a further solution of the present invention, the building material evaluation module comprises:
[0019] The type identification submodule identifies the types of various materials and equipment in the drawing based on the drawing information analysis result, and generates material type identification data;
[0020] The key parameter extraction submodule identifies key parameters of multiple materials based on the material type identification data, including size, material quality and expected service life, to obtain a material parameter data set;
[0021] The data fusion submodule uses Huizhu Cloud to match and analyze historical data based on the material parameter data set, including actual consumption records, cost fluctuations, and supply chain changes of multiple historical projects, to identify a variety of materials and equipment that need to be replaced and are missing, and generate material and equipment identification results.
[0022] As a further solution of the present invention, the model building and analysis module includes:
[0023] The drawing conversion processing submodule analyzes the drawing information based on the material and equipment identification results, constructs a building information model, and generates information model construction data;
[0024] The building structure analysis submodule analyzes the structural integrity of the building model based on the information model construction data, adopts finite element analysis, and evaluates the bearing capacity and stability of the model in combination with safety standards to obtain structural safety verification results;
[0025] The model function verification submodule analyzes the functionality of the building model based on the structural safety verification results, evaluates the matching degree with the design requirements, and obtains the building model conversion results.
[0026] As a further solution of the present invention, the finite element analysis is performed according to the formula:
[0027] Calculate the stress conditions of multiple structural points, where K is the overall stiffness matrix, E is the material elastic modulus, A is the cross-sectional area, and L is the element length. is the structural damping ratio, I is the unit matrix, and C is the damping matrix.
[0028] As a further solution of the present invention, the material manpower calculation module includes:
[0029] The material integration classification submodule analyzes the material equipment data based on the building model conversion result, classifies the types and specifications of the materials, and obtains the material data analysis results;
[0030] The cost budget analysis submodule uses Monte Carlo simulation based on the material data analysis results to calculate the materials, equipment, labor costs, and taxes required for the construction project, identify the material and labor inputs and record the cost items to obtain the construction budget record information;
[0031] The phase demand assessment submodule calculates the funds required for multiple engineering phases based on the construction budget record information, combined with the project's schedule requirements and resource allocation, and analyzes the impact of schedule changes on costs to generate project expenditure calculation results.
[0032] As a further solution of the present invention, the Monte Carlo simulation is performed according to the formula:
[0033] Calculate the total project cost, where C is the total project cost, is the weight coefficient of environmental factors, is the environmental factor value related to the i-th resource, is the weight coefficient of technical factors, is the technical factor value related to the i-th resource, is the cost probability distribution of the i-th resource, is the cost input for the i-th resource category, i is the index representing the resource category, and n is the total number of resource categories in the project.
[0034] As a further solution of the present invention, the risk prediction and assessment module includes:
[0035] The construction risk assessment submodule evaluates the complexity and construction difficulty of the building structure based on the calculation results of the project expenditure and combines historical building construction data, identifies key risk factors, and obtains structural risk analysis data;
[0036] The risk cost estimation submodule analyzes various costs associated with structural risks, including design change costs and construction costs, based on the structural risk analysis data, calculates the impact of various risk factors on budget expenditures, and obtains budget impact calculation results;
[0037] The risk information integration submodule performs risk point and cost correlation analysis based on the budget impact calculation results, optimizes the accuracy and reliability of risk prediction through comparative analysis and data verification, and obtains risk cost prediction information.
[0038] As a further solution of the present invention, the automation integration module includes:
[0039] The supply analysis and matching submodule evaluates the supply capabilities, cost quotations, and delivery times of multiple suppliers based on the project expenditure calculation results and risk cost forecast information, matches suppliers for the construction project, and obtains supplier matching results;
[0040] The manpower demand analysis submodule analyzes the manpower demand of the project based on the supplier matching results, adjusts the configuration of construction workers, optimizes resource allocation, and generates project manpower configuration parameters;
[0041] The maintenance cost assessment submodule calculates the expected cost of building maintenance and upkeep based on the project human resource configuration parameters and combined with the building design information, and constructs a user interface to display the cost data, optimizes the efficiency of project management and financial personnel in managing projects, and obtains intelligent cost estimation data.
[0042] Compared with the prior art, the advantages and positive effects of the present invention are:
[0043] In the present invention, by processing the building drawing data and combining it with Huizhu Cloud big data, the material and equipment types in the drawings are identified, and the drawing information is converted into a BIM model, thereby improving the efficiency and accuracy of construction project management. By analyzing the data in the drawings, project managers can accurately estimate material requirements and costs at the beginning of the project, optimize budget allocation and material procurement, and predict risks and design change costs in combination with historical construction data to optimize the ability to respond to project risks. In combination with Huizhu Cloud, suppliers and human resource allocation are adjusted to optimize supply chain management and human resource utilization, thereby improving the efficiency of cost estimation. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 is a system flow chart of the present invention;
[0045] Figure 2 It is a schematic diagram of the system framework of the present invention;
[0046] Figure 3 It is a flow chart of the drawing data processing module of the present invention;
[0047] Figure 4 It is a flow chart of the building material evaluation module of the present invention;
[0048] Figure 5 A flow chart of the analysis module for model construction of the present invention;
[0049] Figure 6 It is a flow chart of the material manpower calculation module of the present invention;
[0050] Figure 7 It is a flow chart of the risk prediction and assessment module of the present invention;
[0051] Figure 8This is a flow chart of the automation integration module of the present invention. DETAILED DESCRIPTION
[0052] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0053] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.
[0054] Example 1: Please refer to Figure 1 to Figure 2 The intelligent cost estimation system based on CAD, Huizhu Cloud big data and BIM technology includes:
[0055] The drawing data processing module processes the architectural CAD drawings based on the user's architectural drawing data, identifies various key information from the drawings, and generates drawing information analysis results;
[0056] The building materials assessment module is based on the analysis results of the drawing information and combined with the big data of Huizhu Cloud to identify the types of materials and equipment in the drawings and generate material and equipment identification results;
[0057] The model building analysis module converts the drawing information into a BIM model based on the material and equipment identification results, performs structural and functional verification, and generates a building model conversion result;
[0058] The material and manpower calculation module is based on the building model conversion results, combined with material and equipment data and BIM models, using Huizhu Cloud big data to calculate the material and equipment costs of the engineering project and generate project expenditure calculation results;
[0059] The risk prediction and assessment module analyzes the complexity of the building structure and the difficulty of construction based on the project expenditure calculation results, estimates the risk cost and design change cost through historical data, and generates risk cost prediction information;
[0060] The automated integration module combines project expenditure calculation results and risk cost forecast information to calculate and adjust supplier selection and construction worker configuration, evaluate the maintenance and upkeep costs of the building, and build a user interface to obtain intelligent cost estimation data.
[0061] The drawing information analysis results include drawing size parameter data, component material type information, and component layout information. The material and equipment identification results include the identified building material name information, material specification identification data, and equipment model identification information. The building model conversion results include the structural verification data of the building model, functional consistency assessment information, and model integrity information. The project expenditure calculation results include the calculated total material cost calculation results, equipment investment cost calculation information, and human resource cost calculation results. The risk cost prediction information includes the structural complexity rating score, construction difficulty assessment results, and design change cost calculation results. The intelligent cost estimation data includes supplier matching results, worker configuration optimization information, and maintenance budget assessment information.
[0062] See also Figure 2 and Figure 3 , the drawing data processing module includes:
[0063] The drawing format processing submodule verifies and processes the drawing file format based on the user's architectural drawing data, removes non-structural comments and marks, optimizes the readability of the data, and generates the specific process of data format verification results as follows;
[0064] In the drawing format processing submodule, based on the user's architectural drawing data, the drawing file format is checked through the data verification step to ensure that the file meets the technical specifications. The drawing cleaning algorithm is used to remove non-structural annotations and marks in the drawings, including scanning the text and graphic elements of the drawings, identifying and removing non-critical elements to improve the clarity and usability of the data. The data optimization model is used, and the formula is in, is the processing quality score of drawing i, is the weight coefficient of the j-th data item, It is the clarity index of the j-th data item in drawing i, optimizes the readability of the data, and generates the data format verification result.
[0065] The building information analysis submodule identifies key building information in the drawings based on the data format verification results, including dimensions, material types, equipment specifications, and quantities. The specific process of generating key information identification data is as follows;
[0066] In the building information analysis submodule, based on the data format verification results, an information extraction framework is established to extract key information such as size, material type, equipment specifications and quantity from the verified drawings. The symbols and annotations in the drawings are analyzed and identified through the information recognition algorithm to extract information. The information quantification analysis model is adopted, and the formula is: ,in, is the quantitative value of the key information item K, For information items The importance factor in architectural design, For the frequency of occurrence of information item I in drawing K, key information identification data is generated.
[0067] The material specification assessment submodule evaluates the specifications of materials and equipment and their impact on architectural design based on key information identification data, and generates the specific process of drawing information analysis results as follows;
[0068] In the material specification assessment submodule, based on the key information identification data, the material and equipment specifications are evaluated to calculate the potential impact on the overall building design and apply the material impact model, the formula is ,in, For materials Impact score on building design, is the influence coefficient of the nth type of material properties on building performance, It is the nth type specification coefficient of material m, analyzes the impact of material specifications on building design, and generates drawing information analysis results.
[0069] See also Figure 2 and Figure 4 , the building materials assessment module includes:
[0070] The type identification submodule identifies the types of various materials and equipment in the drawings based on the analysis results of the drawing information. The specific process of generating material type identification data is as follows;
[0071] In the type identification submodule, based on the analysis results of the drawing information, the material and equipment identification technology is applied to analyze and define the classification standards of materials and equipment, classify the various materials and equipment in the drawings, execute the classification algorithm, classify the various materials and equipment, and adopt the type classification model. The formula is ,in, Identification label for the type of material or equipment i, is the weight of identification criterion j, Identify multiple material and equipment types in drawings and generate material type identification data for the degree of compliance of material or equipment i under standard j.
[0072] The key parameter extraction submodule identifies the key parameters of various materials based on the material type identification data, including size, material quality and expected service life. The specific process of obtaining the material parameter data set is as follows;
[0073] In the key parameter extraction submodule, based on the material type identification data, the parameter extraction process is set up to identify the key parameters of size, quality and expected service life of various materials. By applying the drawing data and material database information, the core properties of the material are extracted and calculated. The parameter extraction model is adopted, and the formula is ,in, is the parameter value of material K, For parameter type The influence weight of Is the parameter type in material K The material parameter data set is obtained by using the value of
[0074] The data fusion submodule uses Huizhu Cloud to match and analyze historical data based on the material parameter data set, including actual consumption records, cost fluctuations, and supply chain changes of multiple historical projects, to identify a variety of materials and equipment that need to be replaced and missing. The specific process for generating material and equipment identification results is as follows;
[0075] In the data fusion submodule, based on the material parameter data set and combined with Huizhu Cloud technology, the actual consumption records, cost fluctuations and supply chain changes of historical projects are analyzed by comparing and analyzing with historical data, and the data matching algorithm is applied. The formula is: ,in, is the data fusion effect score, is the relevance weight of historical data category p, Based on the matching degree of material or equipment d in historical data category p, the materials and equipment that need to be replaced and are missing are analyzed and identified, and material and equipment identification results are generated.
[0076] See also Figure 2 and Figure 5 , the model building and analysis modules include:
[0077] The specific process of the drawing conversion processing submodule to analyze the drawing information based on the material and equipment identification results, construct the building information model, and generate the information model construction data is as follows;
[0078] In the drawing conversion processing submodule, based on the material and equipment identification results, the drawing information is summarized and organized and constructed into a building information model, including extracting structural data and material information from the drawings, converting the target data into a model input format through structured processing, and using the information model to build the formula. The formula is ,in, represents the information model constructed, and They are conversion coefficients, representing multiple categories of drawing information, and Structural and material data items extracted from drawings, and The coefficients used to adjust the impact of differentiated data types are used to generate information model construction data.
[0079] The building structure analysis submodule builds data based on the information model, uses finite element analysis to analyze the structural integrity of the building model, and combines safety standards to evaluate the bearing capacity and stability of the model. The specific process of obtaining the structural safety verification result is as follows;
[0080] In the building structure analysis submodule, data is constructed based on the information model, and finite element analysis is used to evaluate the structural integrity of the building model. The geometric model of the building is imported into the analysis software, and the corresponding material properties are set according to the physical properties of the actual construction materials, including elastic modulus and yield strength. Loading conditions are applied to simulate differentiated working conditions, including self-weight, wind load, snow load and earthquake action. Grid division is automatically performed to optimize calculation efficiency, and structural stress and displacement calculations are performed to evaluate the bearing capacity and stability of the model and obtain structural safety verification results.
[0081] Finite element analysis, according to the formula:
[0082] Calculate the stress conditions of multiple structural points, where K is the overall stiffness matrix, which is used to describe the overall ability of the structure to resist deformation, E is the elastic modulus of the material, indicating the stress under unit deformation of the material, A is the cross-sectional area, indicating the area of the cross-section of the component, and L is the element length, indicating the length of the component. is the structural damping ratio, which is used to describe the ability of the structure to dissipate energy during vibration. I is the unit matrix, a square matrix in which all elements on the main diagonal are 1 and elements in other positions are 0. It is used to simplify linear algebraic expressions. C is the damping matrix, which represents the damping characteristics of the structure and is used to describe and calculate the response of the structure under dynamic loads.
[0083] The specific execution process of the formula is as follows:
[0084] The elastic modulus E and cross-sectional area A of the material are determined by using a variety of material samples, the length L of the component is determined by combining on-site and design parameter measurements, and the damping ratio of the structure is determined by vibration experiments. , substitute the parameter values into the finite element analysis formula, calculate the displacement and stress conditions of multiple nodes in the structure, and evaluate the bearing capacity, stability and safety risks of the building structure.
[0085] The model function verification submodule analyzes the functionality of the building model based on the structural safety verification results, evaluates the matching degree with the design requirements, and obtains the specific process of the building model conversion results as follows;
[0086] In the model function verification submodule, based on the structural safety verification results, the correspondence between the functionality of the building model and the design requirements is analyzed. The functional evaluation formula is: ,in, For the functional score, are the actual operating parameters in the model, is the corresponding design requirement, It is the weight of the target parameter, which evaluates the matching degree between the actual functionality of the building model and the preset design requirements, and obtains the building model conversion result.
[0087] See also Figure 2 and Figure 6 , the material manpower calculation module includes:
[0088] The material integration classification submodule analyzes the material equipment data based on the building model conversion results, classifies the types and specifications of the materials, and obtains the specific process of the material data analysis results as follows;
[0089] In the material integration classification submodule, data processing and analysis are performed based on the building model conversion results, and the material equipment data is organized and classified. The materials are distinguished according to performance specifications and usage types. The classification formula is: ,in, Indicates the classification result of the material. is the influence coefficient of the target attribute n, is the value of material i on attribute n, It is a normalization function that optimizes the uniformity and comparability of the classification results to obtain the material data analysis results.
[0090] The cost budget analysis submodule uses Monte Carlo simulation based on the material data analysis results to calculate the materials, equipment, labor costs, and taxes required for the construction project, identify the material and labor inputs and record the cost items. The specific process of obtaining the construction budget record information is as follows;
[0091] In the cost budget analysis submodule, based on the material data analysis results, Monte Carlo simulation is used to calculate the multiple costs required for the construction project. By establishing a project cost model, including material costs, equipment costs, labor expenses and taxes, a probability distribution model is constructed for various costs, including the impact of market fluctuations on material costs and differences in labor costs due to regional and seasonal changes. Random sampling technology is used to generate cost scenarios, and statistical analysis of the data is performed to predict the probability distribution of the total cost, identify uncertainties and risk points in the cost, and record the input of various materials and labor to form construction budget record information.
[0092] Monte Carlo simulation, according to the formula:
[0093] Calculate the total project cost, where C is the total project cost, is the weight coefficient of environmental factors, is the environmental factor value related to the i-th resource, is the weight coefficient of technical factors, is the technical factor value related to the i-th resource, is the cost probability distribution of the i-th resource, is the cost input for the i-th resource category, i is the index representing the resource category, and n is the total number of resource categories in the project.
[0094] The specific execution process of the formula is as follows:
[0095] Collect environmental data and technical data related to the project, and based on the target data and historical cost data, determine the weight coefficients of environmental and technical factors through linear regression analysis, bring them into Monte Carlo simulation, calculate the costs of various resources, and obtain the budget cost of the project by calculating the costs of various materials.
[0096] The stage demand assessment submodule calculates the funds required for multiple engineering stages based on the construction budget record information, combined with the project schedule requirements and resource allocation, and analyzes the impact of schedule changes on costs. The specific process of generating project expenditure calculation results is as follows;
[0097] In the stage demand assessment submodule, the capital demand is calculated based on the construction budget record information, combined with the project schedule requirements and resource allocation, and quantitative analysis is used to evaluate the resource and time costs of multiple stages. The formula is: ,in, Indicates the funding requirements at multiple stages, is the basic funding requirement for the Kth stage. is the length of the target phase, It is a time sensitivity parameter that evaluates the impact of schedule changes on costs and generates project expenditure calculation results.
[0098] See also Figure 2 and Figure 7 , the risk prediction and assessment modules include:
[0099] The construction risk assessment submodule evaluates the complexity and construction difficulty of the building structure based on the project expenditure calculation results and combines historical building construction data to identify key risk factors and obtain the specific process of structural risk analysis data:
[0100] In the construction risk assessment submodule, based on the project expenditure calculation results and combined with historical building construction data, the complexity of the building structure and the construction difficulty are evaluated to identify key risk factors. The target factors include design complexity, material supply issues, and construction technology challenges. The construction risk assessment formula is: ,in, represents the risk rating of building i, is the importance coefficient of risk factor n, It is the difficulty index of risk factor n, and the structural risk analysis data is obtained.
[0101] The risk cost estimation submodule analyzes various costs associated with structural risks, including design change costs and construction costs, based on structural risk analysis data, and calculates the impact of various risk factors on budget expenditures. The specific process for obtaining the budget impact calculation results is as follows;
[0102] In the risk cost estimation submodule, based on the structural risk analysis data, the relationship between structural risk and cost is evaluated, and the cost impact model is used to analyze the changes in design change costs and construction costs. The formula is as follows: ,in, represents the total cost impact, is the risk weight of the ith risk factor, indicating the importance of the target risk factor in the overall structural risk assessment and the relative proportion of its impact on the cost. Quantify the actual cost increase caused by the target risk factors, analyze the impact of the risk factors on budget expenditures, and generate budget impact calculation results.
[0103] The risk information integration submodule conducts risk point and cost correlation analysis based on the budget impact calculation results. Through comparative analysis and data verification, the accuracy and reliability of risk prediction are optimized. The specific process of obtaining risk cost prediction information is as follows:
[0104] In the risk information integration submodule, based on the budget impact calculation results, risk point and cost correlation analysis is performed, and statistical methods and comparative analysis techniques are applied to verify the data of differentiated risk prediction. The formula is: ,in, represents the risk efficiency score, is the reliability weight of risk factor K, is the sensitivity score of the risk assessment, It is the risk data value obtained during verification, which optimizes the accuracy and reliability of risk prediction and obtains risk cost prediction information.
[0105] See also Figure 2 and Figure 8 , the automation integration module includes:
[0106] The supply analysis and matching submodule evaluates the supply capacity, cost quotation, and delivery time of multiple suppliers based on the project expenditure calculation results and risk cost forecast information, and matches suppliers for construction projects. The specific process of obtaining supplier matching results is as follows;
[0107] In the supply analysis and matching submodule, based on the project expenditure calculation results and risk cost forecast information, the supply capabilities, cost quotations and delivery times of multiple suppliers are quantified and compared, and a supplier evaluation model is constructed. Multiple evaluation indicators are analyzed by arithmetic weighting method. The formula is: ,in, Indicates the total score of the supplier, A represents the evaluation value of supply capacity, B represents the evaluation value of cost quotation, and C represents the evaluation value of delivery time. is the weight factor of the supply capacity assessment value, is the weight factor of the cost quotation evaluation value, It is the weight factor of the delivery time evaluation value, ensuring that the capabilities of multiple suppliers are fairly evaluated and matched to obtain the supplier matching result.
[0108] The specific process of the manpower demand analysis submodule, based on the supplier matching results, analyzing the project manpower demand, adjusting the construction worker configuration, optimizing resource allocation, and generating project manpower configuration parameters is as follows;
[0109] In the manpower demand analysis submodule, based on the supplier matching results, the manpower demand of multiple projects is analyzed. By investigating the correspondence between the existing construction worker configuration and project demand, the human resources are adjusted through the optimization model. The manpower configuration optimization model is used. The formula is: ,in, represents the optimized human resource configuration parameters, is the number of workers in the ith type of job, Adjust the human resource allocation of various types of work based on the demand intensity of the target type of work, optimize resource allocation efficiency, and generate project human resource allocation parameters.
[0110] The maintenance cost assessment submodule calculates the expected cost of building maintenance and upkeep based on the project manpower configuration parameters and combined with the building design information, and builds a user interface to display the cost data, optimizes the efficiency of project management and financial personnel in managing projects, and obtains the specific process of intelligent cost estimation data as follows;
[0111] In the maintenance cost assessment submodule, based on the project manpower configuration parameters and combined with the building design information, the maintenance and upkeep costs of the building are calculated, the durability and maintenance requirements of the building materials are analyzed, and the maintenance cost model is constructed. The formula is: ,in, is the expected maintenance cost, is the unit price of the jth material and equipment, is the number of items that need to be maintained, For the maintenance frequency factor of materials, the use frequency and maintenance cycle of various materials are considered, the cost management process is optimized, the maintenance cost is calculated, and the constructed user interface intuitively displays the target data, assists project management and financial personnel in managing projects, and obtains intelligent cost estimation data.
[0112] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. Intelligent cost estimation system based on CAD, Huizhu Cloud big data and BIM technology, characterized by: The system comprises: The drawing data processing module processes the architectural CAD drawings based on the user's architectural drawing data, identifies various key information from the drawings, and generates drawing information analysis results; The building material assessment module identifies the types of materials and equipment in the drawings based on the analysis results of the drawing information and combines it with the big data of Huizhu Cloud to generate material and equipment identification results; The model building and analysis module converts the drawing information into a BIM model based on the material and equipment identification results, performs structural and functional verification, and generates a building model conversion result; The material and manpower calculation module calculates the material and equipment costs of the engineering project based on the building model conversion results, combined with the material and equipment data and the BIM model, using the Huizhu Cloud big data to generate the project expenditure calculation results; The risk prediction and assessment module analyzes the complexity of the building structure and the difficulty of construction based on the calculation results of the project expenditure, estimates the risk cost and design change cost through historical data, and generates risk cost prediction information; The automated integration module combines the project expenditure calculation results and risk cost forecast information, calculates and adjusts supplier selection and construction worker configuration, evaluates the maintenance and upkeep costs of the building, and builds a user interface to obtain intelligent cost estimation data; The material manpower calculation module includes: The material integration classification submodule analyzes the material equipment data based on the building model conversion result, classifies the types and specifications of the materials, and obtains the material data analysis results; The cost budget analysis submodule uses Monte Carlo simulation based on the material data analysis results to calculate the materials, equipment, labor costs, and taxes required for the construction project, identify the material and labor inputs and record the cost items to obtain the construction budget record information; The phase demand assessment submodule calculates the funds required for multiple engineering phases based on the construction budget record information, combined with the project schedule requirements and resource allocation, and analyzes the impact of schedule changes on costs to generate project expenditure calculation results; The Monte Carlo simulation is based on the formula: Calculate the total project cost, where C is the total project cost, w1 is the weight coefficient of environmental factors, e i is the environmental factor value related to the i-th resource, w2 is the weight coefficient of the technical factor, t i is the technical factor value related to the i-th resource, p i is the cost probability distribution of the i-th resource, c i is the cost input of the i-th resource, i is the index representing the resource category, and n is the total number of resource categories in the project; The drawing data processing module includes: The drawing format processing submodule verifies and processes the drawing file format based on the user's architectural drawing data, removes non-structural comments and marks, optimizes the readability of the data, and generates data format verification results; The building information analysis submodule identifies key building information in the drawings based on the data format verification result, including size, material type, equipment specifications, and quantity, and generates key information identification data; The material specification evaluation submodule evaluates the specifications of materials and equipment and their impact on building design based on the key information identification data, and generates drawing information analysis results; The building materials assessment module includes: The type identification submodule identifies the types of various materials and equipment in the drawing based on the drawing information analysis result, and generates material type identification data; The key parameter extraction submodule identifies key parameters of multiple materials based on the material type identification data, including size, material quality and expected service life, to obtain a material parameter data set; The data fusion submodule uses Huizhu Cloud to match and analyze the material parameter data set with historical data, including actual consumption records, cost fluctuations, and supply chain changes of multiple historical projects, to identify a variety of materials and equipment that need to be replaced and missing, and generate material and equipment identification results; The model building and analysis module includes: The drawing conversion processing submodule analyzes the drawing information based on the material and equipment identification results, constructs a building information model, and generates information model construction data; The building structure analysis submodule analyzes the structural integrity of the building model based on the information model construction data, adopts finite element analysis, and evaluates the bearing capacity and stability of the model in combination with safety standards to obtain structural safety verification results; The model function verification submodule analyzes the functionality of the building model based on the structural safety verification result, evaluates the matching degree with the design requirements, and obtains the building model conversion result; The finite element analysis is based on the formula: Calculate the stress status of multiple structural points, where K is the overall stiffness matrix, which is used to describe the overall ability of the structure to resist deformation, E is the elastic modulus of the material, indicating the stress under unit deformation of the material, A is the cross-sectional area, which represents the area of the cross section of the component, L is the element length, which represents the length of the component, ξ is the structural damping ratio, which is used to describe the ability of the structure to dissipate energy during vibration, I is the unit matrix, a square matrix with all elements on the main diagonal being 1 and elements at other positions being 0, which is used to simplify linear algebraic expressions, and C is the damping matrix, which represents the damping characteristics of the structure and is used to describe and calculate the response of the structure under dynamic loads.
2. The intelligent cost estimation system based on CAD, Huizhu Cloud Big Data and BIM technology according to claim 1 is characterized in that: The drawing information analysis results include drawing size parameter data, component material type information, and component layout information; the material and equipment identification results include identified building material name information, material specification identification data, and equipment model identification information; the building model conversion results include structural verification data, functional consistency assessment information, and model integrity information of the building model; the project expenditure calculation results include calculated total material cost calculation results, equipment investment cost calculation information, and human resource cost calculation results; the risk cost prediction information includes a structural complexity rating score, a construction difficulty assessment result, and a design change cost calculation result; the intelligent cost estimation data includes supplier matching results, worker configuration optimization information, and maintenance budget assessment information.
3. The intelligent cost estimation system based on CAD, Huizhu Cloud Big Data and BIM technology according to claim 1 is characterized in that: The risk prediction and assessment module includes: The construction risk assessment submodule evaluates the complexity and construction difficulty of the building structure based on the calculation results of the project expenditure and combines historical building construction data, identifies key risk factors, and obtains structural risk analysis data; The risk cost estimation submodule analyzes various costs associated with structural risks, including design change costs and construction costs, based on the structural risk analysis data, calculates the impact of various risk factors on budget expenditures, and obtains budget impact calculation results; The risk information integration submodule performs risk point and cost correlation analysis based on the budget impact calculation results, optimizes the accuracy and reliability of risk prediction through comparative analysis and data verification, and obtains risk cost prediction information.
4. The intelligent cost estimation system based on CAD, Huizhu Cloud Big Data and BIM technology according to claim 1 is characterized in that: The automation integration module includes: The supply analysis and matching submodule evaluates the supply capabilities, cost quotations, and delivery times of multiple suppliers based on the project expenditure calculation results and risk cost forecast information, matches suppliers for the construction project, and obtains supplier matching results; The manpower demand analysis submodule analyzes the manpower demand of the project based on the supplier matching results, adjusts the configuration of construction workers, optimizes resource allocation, and generates project manpower configuration parameters; The maintenance cost assessment submodule calculates the expected cost of building maintenance and upkeep based on the project human resource configuration parameters and combined with the building design information, and constructs a user interface to display the cost data, optimizes the efficiency of project management and financial personnel in managing projects, and obtains intelligent cost estimation data.