Automatic pit digging device for oil-tea planting

By designing an automatic pit digging device for oil tea planting, the soil is treated with auger drill bits and broken blades, and the plant rhizomes are maintained through the clamping and guide plates of the plant transport body, the problem of soil agglomeration during filling is solved, and the growth and survival rate of tea seedlings is improved.

CN118525637BActive Publication Date: 2025-03-11HUNAN LONGQUAN ECOLOGICAL CAMELLIA CAMELLIA AGRI SCI & TECH DEV CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410800138.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2025-03-11
Estimated Expiration
2044-06-20

AI Technical Summary

Technical Problem

Existing oil tea planting equipment can easily cause soil agglomeration when filling soil, crushing the rhizomes of tea seedlings, affecting the growth and survival rate of tea seedlings.

Method used

An automatic pit digging device was designed. After digging a pit using a spiral pit drill bit, the soil was finely processed by combining the broken blades of the box to make it suitable for the filling needs of tea oil plants. After filling, the soil was maintained through the clamps and movable guide plates of the plant to maintain the stretch of the plant's rhizomes.

Benefits of technology

The fine soil processing is achieved, which avoids the damage to the rhizomes of soil clumping and ensures the growth and survival rate of tea seedlings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118525637B_ABST
    Figure CN118525637B_ABST
Patent Text Reader

Abstract

The invention discloses an automatic pit digging device for oil tea planting, wherein a pit digging drill bit, a first shell body and a second shell body are arranged on a digging support, the first shell body and the second shell body are combined to form a combined box body for wrapping the pit digging drill bit, a crushing blade is arranged on the inner wall of the combined box body, the combined box body is used for crushing the soil brought out by the spiral blade of the pit digging drill bit, the second shell body is provided with a planting conveyor body for plant planting and a discharge pipe for soil discharge, the pit digging drill bit of the automatic pit digging device for oil tea planting of the invention can not only be used for digging soil and pits, but also can be used as a stirring member to stir and crush the soil to obtain finely crushed soil for filling, the planting conveyor body can be planted by the rotating power of the pit digging drill bit, and after the filling is completed, the clamping member on the planting conveyor body can pull the plant upward for a section and then release the clamp, so as to realize the extension of the plant root inside the soil.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of oil-tea planting equipment, and in particular to an automatic pit digging device used for oil-tea planting. Background Art

[0002] The seeds of Camellia oleifera can be used to extract oil, which is not only edible, but also used in industry as lubricating oil and anti-rust oil. Its tea cakes are both pesticides and fertilizers, which can improve the water storage capacity of farmland and prevent rice field pests. Therefore, Camellia oleifera is a suitable economic crop.

[0003] When planting large areas of tea oil seedlings, mechanical digging is often used. In the prior art, many digging equipment uses a digging drill bit with spiral blades to dig holes, such as patent CN220935576U and patent CN116076324A. The digging drill bit digs the hole by rotating downward to bring out the soil in the ground. After digging the hole, soil will remain between the spiral blades of the digging drill bit. The general digging drill bit will throw out this part of the soil by rotating. Some digging equipment can not only dig holes, but also have plant planting and filling functions, such as patent CN219938907U.

[0004] When the tea oil plant is planted in a pit, the root system needs to be kept naturally stretched downward. Therefore, when filling the soil, the rhizomes of the tea oil plant need to be covered with loose fine soil first, and then the tea seedlings are gently lifted up to stretch the root system, and finally the soil is compacted. The pit digging device in the prior art directly pushes the excavated soil into the planting pit when filling the soil. If the soil is sometimes agglomerated in large quantities, the soil may break the rhizomes of the tea seedlings and cause the rhizomes to be unable to stretch, affecting the growth and survival rate of the tea seedlings. Summary of the invention

[0005] The present invention combines the function of a spiral pit-digging drill bit to bring out soil and the need for filling soil when planting tea oil plants, and proposes an automatic pit-digging device for oil tea planting. After the pit-digging drill bit digs the pit, the soil between the spiral blades of the pit-digging drill bit is finely crushed to meet the filling soil requirement for planting tea oil plants. At the same time, the tea oil plants can be pulled after filling the soil to keep the roots of the tea oil plants stretched after planting, which is beneficial to the survival and growth of the tea oil plants.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] An automatic pit digging device for oil tea planting includes a digging support, a pit digging drill bit and a pit digging seat. The digging support is used to install a pit digging seat that can move in the vertical direction. The pit digging drill bit is arranged on the pit digging seat. The pit digging drill bit is arranged on the pit digging drill bit for realizing soil digging and pit digging by rotation. The digging support is also provided with a first shell and a second shell. The first shell and the second shell are combined to form a combined box body for wrapping the pit digging drill bit. The inner walls of the first shell and the second shell are respectively provided with crushing blades. The combined box body is used to crush the soil brought out by the spiral blade on the pit digging drill bit. The pit digging seat is located between the first shell and the second shell. The pit digging seat, the first shell and the second shell are respectively slidably connected with the combined slide rail to realize the combination and separation of the first shell and the second shell.

[0008] The above-mentioned second shell is provided with a planting conveyor body for planting plants and a discharge pipe for discharging soil and which is in a normally closed state. The planting conveyor body is provided with a clamping member for clamping the plant and a starting plate for opening the discharge pipe. The planting conveyor body completes the vertical movement of the clamping member and the movement of the starting plate during the conveying process.

[0009] Preferably, the combined slide rail includes a first slide rail, a second slide rail and a third slide rail arranged in the horizontal direction, the first slide rail and the third slide rail are fixedly connected to the excavation support and are located at the same horizontal position, the second slide rail is arranged in parallel with the first slide rail or the third slide rail, and the second slide rail is slidably connected to the excavation support in the vertical direction to form the separation and combination of the second slide rail and the first slide rail and the third slide rail. The first slide rail matches the first sliding block slidably connected to the first slide rail, and the first sliding block is fixedly connected to the first shell; the second slide rail matches the pit digging seat slidably connected to the second slide rail; the third slide rail matches the second sliding block slidably connected to the third slide rail, and the second sliding block is connected to the second shell through the sliding bracket.

[0010] Preferably, the excavation support is provided with a first sliding cylinder for driving the first sliding block to move in the horizontal direction and a second sliding cylinder for driving the second sliding block to move in the horizontal direction. When the second slide rail is combined with the first slide rail and the third slide rail, the first shell and the second shell are combined by the first slide block and the second slide block respectively moving close to the excavation seat to the extreme position to form a combined box.

[0011] Preferably, the automatic digging device further comprises a connecting seat, the connecting seat is fixedly connected to the support rod, the support rod is slidably connected to the digging bracket in the vertical direction, the connecting seat is fixedly connected to the second slide rail, and a limit cylinder is arranged on the connecting seat for limiting the position of the digging seat on the second slide rail.

[0012] Preferably, a driving wheel is provided on the upper part of the pit-digging drill bit, and the driving wheel can extend to the outside of the combined box body after the combined box body is formed. A combining wheel and a power transmission assembly are provided on the sliding bracket. The combining wheel is used to connect or cut off the power between the power transmission assembly and the driving wheel. The power transmission assembly is used to transmit the power of the driving wheel to the transmission wheel of the planting transmission body to realize the transmission of the planting transmission body.

[0013] Preferably, a sealing cover for shielding the driving wheel joint surface is provided at the bottom of the digging seat, and the sealing cover is connected to the digging seat through a sealing cylinder.

[0014] Preferably, the clamping member includes a fixed plate, a fixed rod, a movable seat, a first elastic member, a movable sleeve, a second elastic member, a first elastic clamp, a second elastic clamp and a third elastic member, the fixed rod is fixedly connected to the conveying surface of the implant conveying body through the fixed plate, the fixed rod is axially connected to the movable seat, and the first elastic member is located between the fixed rod and the movable seat. A clamping column composed of a first elastic clamp and a second elastic clamp is fixedly arranged on the movable seat, a third elastic member for separating the first elastic clamp and the second elastic clamp is arranged between the ends of the first elastic clamp and the second elastic clamp, the movable sleeve is movably sleeved on the clamping column, and a second elastic member is arranged between the movable sleeve and the movable seat.

[0015] Preferably, the second shell is provided with a movable guide plate, which is connected to the second shell through a guide cylinder, and the movable guide plate is provided with a first guide block for pushing the movable seat and a second guide block for pushing the movable sleeve, and the lower end of the first guide block is located above the lower end of the second guide block.

[0016] The beneficial effects of the present invention are:

[0017] 1. The automatic pit digging device for oil tea planting can realize automatic pit digging through the pit digging drill bit, and the spiral blade on it brings out the soil in the pit. The first shell and the second shell are respectively arranged on both sides of the pit digging drill bit. After the soil is brought out, the first shell and the second shell can be combined to form a combined box with a crushing blade. The combined box can store the soil brought out by the pit digging drill bit. The pit digging drill bit can stir the soil by rotating itself to achieve soil crushing and obtain finely crushed soil for filling. The pit digging drill bit in the present invention can not only be used for digging soil and pits, but also can be used as a stirring piece and a crushing piece to stir and crush the soil.

[0018] 2. The automatic pit digging device for oil tea planting is provided with a combined slideway, wherein the second slide rail can move in the vertical direction with the pit digging seat when digging a pit, and after the pit digging is completed, it is combined with the first slide rail and the third slide rail to serve as a horizontal moving channel. This structure can ensure that the pit digging seat moves alone in the vertical direction when digging a pit, and does not affect the combination of the pit digging seat with other components in the horizontal direction.

[0019] 3. The automatic pit digging device for oil tea planting is also equipped with a planting conveyor for planting plants. The planting conveyor can be planted by the rotational power of the pit digging drill bit. The planting is carried out under the condition of soil stirring. After the plant is placed in the pit to a suitable position, the soil is filled. The function is practical. After the filling is completed, the clamping part and the movable guide plate on the planting conveyor work together, and the planting conveyor can pull the plant up for a section and then release the clamp, so as to realize the extension of the plant root inside the soil. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the structure of the automatic pit digging device for oil-tea planting;

[0021] Figure 2 This is a schematic diagram of the structure of the pit digging seat of the pit digging device;

[0022] Figure 3 This is a schematic diagram of the structure of the digging device when viewed from above the support rod;

[0023] Figure 4 This is a schematic diagram of the structure of the side of the second slide rail of the digging device;

[0024] Figure 5 This is a schematic diagram of the structure of the digging device when digging a hole;

[0025] Figure 6 This is a schematic diagram of the structure of the combination of the first shell and the second shell of the digging device;

[0026] Figure 7 This is a schematic diagram of the structure of the second shell of the pit digging device;

[0027] Figure 8 This is a schematic diagram of the structure at A when the first shell and the second shell of the digging device are combined;

[0028] Fig. 9 This is a schematic diagram of the structure of the clamping part of the digging device;

[0029] Fig.10 This is a schematic diagram of the structure of the digging device from a top view of the clamping member;

[0030] Fig.11 This is a schematic diagram of the structure of two clamping parts of the digging device being separated;

[0031] Fig.12 This is a schematic diagram of the structure of the digging device when the clamping member returns to its original position;

[0032] Fig.13 This is a schematic diagram of the structure of the pit digging device during planting.

[0033] In the figure: 1, excavation support; 2, pit digging drill; 3, pit digging seat; 4, first slide rail; 5, second slide rail; 6, third slide rail; 7, first housing; 8, second housing; 9, planting transmission body; 10, support rod; 11, connecting seat; 12, adjustment rod; 13, adjustment cylinder; 14, positioning nail; 15, crushing blade; 16, rotating motor; 17, combining wheel; 18, first connecting wheel; 19, first bevel gear; 20, second bevel gear; 21, second connecting wheel; 22, third connecting wheel; 23, transmission wheel; 24, synchronous shaft;

[0034] 201, spiral sheet; 202, driving wheel; 31, sealing cylinder; 32, sealing cover; 33, support frame; 41, first sliding block; 42, first sliding cylinder; 61, second sliding block; 62, second sliding cylinder; 63, sliding bracket; 71, first through hole; 81, second through hole; 82, discharge pipe; 83, sensor; 84, adsorption positioning plate; 85, movable guide plate; 86, guide cylinder; 821, discharge valve Door; 851, first guide block; 852, second guide block; 91, clamping member; 92, starting plate; 911, fixing plate; 912, fixing rod; 913, movable seat; 914, first elastic member; 915, movable sleeve; 916, second elastic member; 917, first elastic clamping plate; 918, second elastic clamping plate; 919, third elastic member; 111, limiting cylinder; 141, positioning cylinder; 171, combining cylinder. DETAILED DESCRIPTION

[0035] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0036] Reference Figure 1 An automatic pit digging device for oil tea planting includes a digging bracket 1, a pit digging drill bit 2 and a pit digging seat 3. The digging bracket 1 stands on the ground, and the digging bracket 1 is used to install the pit digging drill bit 2 and the pit digging seat 3. The bottom of the digging bracket 1 is provided with a sliding wheel and a positioning pin 14 for moving. The positioning pin 14 is connected to the digging bracket 1 through a positioning cylinder 141. The positioning cylinder 141 is used to drive the positioning pin 14 to move in the vertical direction, so as to realize the positioning pin 14 being inserted into and pulled out of the ground, and is used for positioning the digging bracket 1.

[0037] refer to Figure 2 The pit-digging seat 3 is provided with a pit-digging drill bit 2 and a rotary motor 16 for driving the pit-digging drill bit 2 to rotate. The pit-digging drill bit 2 is a spiral rod with a spiral blade 201. The spiral blade 201 realizes digging soil and digging pits by rotating and moving downward. A support frame 33 is provided on the pit-digging seat 3. The support frame 33 is rotatably connected to the pit-digging drill bit 2 through a slewing bearing. The support frame 33 is used to support the pit-digging drill bit 2 in the axial direction of the pit-digging drill bit 2 and bear the weight of the pit-digging drill bit 2.

[0038] refer to Figure 1 and Figure 2 The excavation support 1 is also provided with a combined slideway, and the combined slideway includes a first slideway 4, a second slideway 5 and a third slideway 6 arranged in a horizontal direction, and the second slideway 5 is located between the first slideway 4 and the third slideway 6. The first slideway 4 and the third slideway 6 are fixedly connected to the excavation support 1 and are located at the same horizontal position, and the second slideway 5 is arranged in parallel with the first slideway 4 or the third slideway 6, and the second slideway 5 is slidably connected with the excavation support 1 in a vertical direction to form the separation and combination of the second slideway 5 and the first slideway 4 and the third slideway 6.

[0039] refer to Figure 1 The first slide rail 4 matches the first sliding block 41 that is slidably connected to the first slide rail 4, and the first sliding block 41 is fixedly connected to the first housing 7. The second slide rail 5 matches the second sliding block 61 that is slidably connected to the second slide rail 5, and the third slide rail 6 matches the second sliding block 61 that is slidably connected to the third slide rail 6, and the second sliding block 61 is connected to the second housing 8 through a sliding bracket 63. The digging seat 3 and the digging drill bit 2 are located between the first housing 7 and the second housing 8.

[0040] Furthermore, the excavation support 1 is provided with a first sliding cylinder 42 for driving the first sliding block 41 to move in the horizontal direction and a second sliding cylinder 62 for driving the second sliding block 61 to move in the horizontal direction. Figure 6 The movement of the first sliding block 41 and the second sliding block 61 can realize the movement of the first shell 7 and the second shell 8 relative to the pit digging seat 3 and the pit digging drill bit 2, thereby realizing the combination and separation of the first shell 7 and the second shell 8.

[0041] refer to Figure 5 When the pitting drill bit 2 is digging a pit, the first shell 7 and the second shell 8 are separated and located on both sides of the pitting drill bit 2. Figure 6 When the pit-digging drill bit 2 finishes digging the pit, the pit-digging drill bit 2 moves vertically upward, and the spiral piece 201 brings out the soil in the pit. The first shell 7 and the second shell 8 move close to the pit-digging drill bit 2 respectively, and the first shell 7 and the second shell 8 form a combined box body, which can wrap the pit-digging drill bit 2, and the combined box body can store the soil brought out by the pit-digging drill bit 2.

[0042] Furthermore, the inner walls of the first shell 7 and the second shell 8 are respectively provided with crushing blades 15. When the pit-digging drill bit 2 rotates in the positive direction, the spiral blades 201 thereon can move the soil upward to achieve soil stirring. At the same time, the edges of the spiral blades 201 can crush the soil. The crushing blades 15 can be used to assist in crushing the soil inside the combined box, forming finely crushed soil inside the combined box. A discharge pipe 82 for discharging the soil inside the combined box is also provided at the bottom of the second shell 8.

[0043] refer to Figure 1 , Figure 3 and Figure 4 The second slide rail 5 is fixedly connected to the connecting seat 11, and the connecting seat 11 is fixedly connected to the support rod 10. Both ends of the support rod 10 are slidably connected to the excavation support 1 in the vertical direction. The top of the excavation support 1 is provided with an adjustment assembly for driving the support rod 10 to move in the vertical direction. The adjustment assembly includes an adjustment rod 12 and an adjustment cylinder 13. One end of the adjustment rod 12 is rotationally connected to the working end of the adjustment cylinder 13, and the other end of the adjustment rod 12 is rotationally connected to the top of the connecting seat 11. The adjustment cylinder 13 drives the adjustment rod 12 to realize the movement of the connecting seat 11 and the support rod 10 in the vertical direction, thereby realizing the movement of the second slide rail 5 relative to the first slide rail 4 and the third slide rail 6 in the vertical direction, and realizing the separation and combination of the second slide rail 5 with the first slide rail 4 and the third slide rail 6.

[0044] When the second slide rail 5 is combined with the first slide rail 4 and the third slide rail 6, the first sliding block 41 and the second sliding block 61 are respectively moved close to the pit digging seat 3 to the limit position to complete the combination of the first shell 7 and the second shell 8 to form a combined box.

[0045] refer to Figure 3 and Figure 4 A limit cylinder 111 with a vertical axis is provided on the connecting seat 11, and the limit cylinder 111 is used to limit the position of the pit-digging seat 3 on the second slide rail 5. The limit cylinder 111 is extended, and the working end of the limit cylinder 111 contacts the pit-digging seat 3, and the limit cylinder 111 applies pressure to the pit-digging seat 3 to achieve the positioning of the pit-digging seat 3. The limit cylinder 111 is shortened, and the limit cylinder 111 releases the limit on the pit-digging seat 3, and the pit-digging seat 3 can slide relative to the second slide rail 5.

[0046] refer to Figure 7 The second housing 8 is provided with a planting conveyor 9, and the discharge end of the discharge pipe 82 is located below the planting conveyor 9, so that the discharge pipe 82 can conveniently guide the soil inside the combined box into the planting pit. A clamping member 91 is provided on the planting conveyor 9, and the clamping member 91 is used to clamp the plant. The planting conveyor 9 completes the movement of the clamping member 91 in the vertical direction during the conveying process to realize the planting of the plant.

[0047] In addition, a start plate 92 is provided on the planting conveyor 9, and a sensor 83 and an adsorption positioning plate 84 are provided on the second shell 8. An electrically controlled discharge valve 821 is provided on the discharge pipe 82, and the discharge valve 821 is in a normally closed state. The discharge valve 821 is opened by the sensor 83 sensing an opening signal. When the start plate 92 contacts the sensor 83, the sensor 83 senses the opening signal, and the discharge valve 821 is opened. The planting conveyor 9 completes the movement of the start plate 92 during the conveying process, so that the start plate 92 contacts the sensor 83, and the discharge valve 821 is opened. In addition, a magnetic block is provided on the start plate 92, and an electromagnetic block is provided on the adsorption positioning plate 84. When the start plate 92 contacts the sensor 83, the electromagnetic block of the adsorption positioning plate 84 is energized to generate magnetic attraction, which can adsorb the start plate 92 and realize the positioning of the start plate 92.

[0048] refer to Figure 2 The driving wheel 202 is arranged on the upper part of the pit-digging drill bit 2, and the driving wheel 202 is located above the spiral piece 201. The side of the driving wheel 202 is arranged with a joint surface for power transmission. The bottom of the pit-digging seat 3 is arranged with a sealing cover 32 for shielding the joint surface of the driving wheel 202. When the pit-digging drill bit 2 is used for digging, the sealing cover 32 shields the joint surface of the driving wheel 202 to protect the joint surface of the driving wheel 202. The sealing cover 32 is connected to the pit-digging seat 3 through a sealing cylinder 31, so that the sealing cover 32 shields and separates the joint surface of the driving wheel 202.

[0049] refer to Figure 6 and Figure 8 The first shell 7 is provided with a first through hole 71, and the second shell 8 is provided with a second through hole 81. The positions of the first through hole 71 and the second through hole 81 correspond to the positions of the driving wheel 202. After the first shell 7 and the second shell 8 form a combined box, the driving wheel 202 can extend from the first through hole 71 and the second through hole 81 to the outside of the combined box.

[0050] refer to Figure 8 The sliding bracket 63 is provided with a coupling wheel 17 and a power transmission assembly. The coupling wheel 17 is connected to the sliding bracket 63 via a coupling cylinder 171, and the coupling cylinder 171 is used to drive the coupling wheel 17 to move, and the coupling wheel 17 is used to connect or cut off the power between the power transmission assembly and the driving wheel 202 by moving.

[0051] refer to Figure 7 and Figure 8The power transmission assembly is used to transmit the power of the driving wheel 202 to the transmission wheel 23 of the planting transmission body 9 to realize the transmission of the planting transmission body 9. The power transmission assembly includes a first connecting wheel 18, a first bevel gear 19, a second bevel gear 20, a second connecting wheel 21, a third connecting wheel 22, a transmission wheel 23 and a synchronous shaft 24. The first connecting wheel 18 is used to be combined with the driving wheel 202 through the combining wheel 17, and the combining surface of the driving wheel 202, the combining wheel 17 and the first connecting wheel 18 are combined through friction contact to realize transmission. The first connecting wheel 18 is coaxially fixedly connected with the first bevel gear 19, and the first bevel gear 19 is located below the first connecting wheel 18; the first bevel gear 19 is meshed with the second bevel gear 20, the second bevel gear 20 is coaxially fixedly connected with the second connecting wheel 21, the second connecting wheel 21 is meshed with the third connecting wheel 22, the third connecting wheel 22 is located below the second connecting wheel 21, and the third connecting wheel 22 is synchronously fixedly connected with the transmission wheel 23 through the synchronous shaft 24. The rotating motor 16 rotates the pit-digging drill bit 2 and the driving wheel 202, and the combining wheel 17 connects the first connecting wheel 18 and the driving wheel 202 to realize the rotation of the first connecting wheel 18. The first bevel gear 19 rotates with the first connecting wheel 18. The first bevel gear 19 rotates with the second bevel gear 20 and the second connecting wheel 21. The second connecting wheel 21 drives the third connecting wheel 22 and the transmission wheel 23 to rotate, thereby realizing the transmission of the planting transmission body 9.

[0052] refer to Fig. 9 , Fig.10 and Fig.11 The clamping member 91 includes a fixed plate 911, a fixed rod 912, a movable seat 913, a first elastic member 914, a movable sleeve 915, a second elastic member 916, a first elastic clamping plate 917, a second elastic clamping plate 918 and a third elastic member 919. The fixed rod 912 is fixedly connected to the conveying surface of the implant conveying body 9 through the fixed plate 911, the fixed rod 912 is axially connected to the movable seat 913, the first elastic member 914 is located between the fixed rod 912 and the movable seat 913, and the first elastic member 914 is used to support the movable seat 913 so that the movable seat 913 is away from the fixed plate 911.

[0053] Furthermore, the first elastic clamp 917 and the second elastic clamp 918 are fixedly arranged on the movable seat 913, and the first elastic clamp 917 and the second elastic clamp 918 can be combined to form a cylindrical clamping column. One end of the first elastic clamp 917 and the second elastic clamp 918 are fixedly connected to the movable seat 913, and the other ends of the first elastic clamp 917 and the second elastic clamp 918 are respectively provided with clamping blocks for clamping plants, and a third elastic member 919 is arranged between the ends of the first elastic clamp 917 and the second elastic clamp 918 where the clamping blocks are arranged, and the third elastic member 919 is used to separate the first elastic clamp 917 and the second elastic clamp 918. The movable sleeve 915 is movably connected to the clamping column, and the inner hole size of the movable sleeve 915 is larger than the outer diameter size of the clamping column, and the movable sleeve 915 can move axially on the clamping column. A second elastic member 916 is disposed between the movable sleeve 915 and the movable seat 913 , and the second elastic member 916 is used to push the movable sleeve 915 toward the clamping block, so that the first elastic clamping plate 917 and the second elastic clamping plate 918 are close to each other to achieve clamping.

[0054] Under normal circumstances, the clamping blocks on the first elastic clamp 917 and the second elastic clamp 918 are attached to each other, and the movable sleeve 915 is moved toward the movable seat 913. The first elastic clamp 917 and the second elastic clamp 918 are separated under the action of the third elastic member 919. At this time, the plant can be placed between the two clamping blocks, the movable sleeve 915 is released, and the second elastic member 916 pushes the movable sleeve 915 close to the clamping blocks, so that the two clamping blocks clamp the plant.

[0055] refer to Fig. 9 and Fig.10 The second housing 8 is provided with a fixed bracket, on which a movable guide plate 85 is provided, and the movable guide plate 85 is connected to the fixed bracket via a guide cylinder 86. The guide cylinder 86 is used to drive the movable guide plate 85 to move so that the movable guide plate 85 approaches or moves away from the clamping member 91.

[0056] refer to Fig.10 and Fig.12 A first guide block 851 and a second guide block 852 are provided on the movable guide plate 85. The position of the first guide block 851 corresponds to the position of the movable seat 913. During the return process of the planting conveyor 9, the first guide block 851 is used to push the movable seat 913 to move toward the fixed plate 911, so that the clamping block leaves the trunk of the plant. The second guide block 852 is used to push the movable sleeve 915 to move toward the movable seat 913, so that the clamping member 91 loosens the planting.

[0057] Furthermore, the lower end of the first guide block 851 is located above the lower end of the second guide block 852. During the return process of the planting conveyor 9, the second guide block 852 first pushes the movable sleeve 915 to move toward the movable seat 913, thereby loosening the clamping member 91 on the planting. Then, the first guide block 851 pushes the movable seat 913 to move toward the fixed plate 911, so that the clamping block leaves the main trunk of the plant to prevent the clamping block from clamping the plant again.

[0058] The automatic pit digging device for oil-tea planting includes the following working steps:

[0059] Step 1: The excavation support 1 is moved to the target position, and the positioning cylinder 141 drives the positioning pin 14 to penetrate into the ground, thereby completing the positioning of the excavation support 1 and keeping the excavation drill bit 2 at the target excavation position;

[0060] refer to Figure 1 At this time, the first slide rail 4, the second slide rail 5 and the third slide rail 6 are on the same horizontal line, forming a combined state; the first sliding block 41 is kept at the initial position of the first slide rail 4; the digging seat 3 is located at the initial position of the second slide rail 5, and the limit cylinder 111 limits the digging seat 3; the second sliding block 61 is located at the initial position of the third slide rail 6; the combining wheel 17 is not combined with the first connecting wheel 18 and the driving wheel 202 at this time, and the combining wheel 17 cuts off the power between the power transmission assembly and the driving wheel 202; the sealing cover 32 blocks the combining surface of the driving wheel 202.

[0061] Step 2: Start the rotating motor 16, the rotating motor 16 drives the pit-digging drill bit 2 to rotate forward, and then the adjustment cylinder 13 drives the adjustment rod 12 to realize the vertical downward movement of the connecting seat 11, the second slide rail 5, the pit-digging seat 3 and the pit-digging drill bit 2, refer to Figure 5 , the second slide rail 5 is separated from the first slide rail 4 and the third slide rail 6, and the spiral blade 201 on the hole-digging drill bit 2 realizes digging soil and digging holes by rotating and moving downward. During the digging process, part of the soil is discharged to the ground by the spiral blade 201, and after the digging is completed, part of the soil remains in the spiral blade 201;

[0062] Step 3: Turn off the rotating motor 16, and the adjusting cylinder 13 drives the adjusting rod 12 to make the connecting seat 11, the second slide rail 5, the digging seat 3 and the digging drill bit 2 move vertically upward, and the spiral piece 201 brings the soil in the pit out. At this time, the second slide rail 5 is combined with the first slide rail 4 and the third slide rail 6 again;

[0063] The sealing cylinder 31 drives the sealing cover 32 to move, so that the sealing cover 32 is separated from the joint surface of the driving wheel 202;

[0064] Step 4: The first sliding cylinder 42 drives the first sliding block 41 to move close to the pit digging seat 3, and the second sliding cylinder 62 drives the second sliding block 61 to move close to the pit digging seat 3. The first sliding block 41 and the second sliding block 61 move to the corresponding limit positions. Figure 6 The first shell 7 and the second shell 8 form a combined box, which wraps the pit-digging drill bit 2 and is used to store the soil brought out by the pit-digging drill bit 2;

[0065] Step 5: Start the rotating motor 16, the rotating motor 16 drives the hole digging drill bit 2 to rotate forward, the spiral blade 201 drives the soil to move upward to achieve stirring, and the crushing blade 15 crushes the soil inside the combined box to form finely crushed soil inside the combined box;

[0066] Step 6: Turn off the rotating motor 16, the first sliding cylinder 42 drives the first sliding block 41 to move away from the digging seat 3, and the second sliding cylinder 62 drives the second sliding block 61 to move close to the digging seat 3, and the clamping member 91 of the planting conveying body 9 is moved to the top of the planting pit while keeping the first shell 7 and the second shell 8 in the combined state;

[0067] Step 7: Reference Fig.13 , clamp the plant on the clamping member 91, the coupling cylinder 171 drives the coupling wheel 17 to move, the coupling cylinder 171 is coupled with the first coupling wheel 18 and the driving wheel 202, and the coupling wheel 17 connects the power transmission component and the driving wheel 202. Fig.10 , the movable guide plate 85 is located behind the clamping member 91;

[0068] The rotating motor 16 is started, and the rotating motor 16 rotates forward, so that the driving wheel 202 rotates, and the driving wheel 202 realizes the transmission of the planting transmission body 9 through the combination wheel 17 and the power transmission assembly, and the clamping member 91 moves downward in the vertical direction, so that the root of the plant enters the planting pit;

[0069] Step 8: When the start plate 92 contacts the sensor 83, the root of the plant is located at a suitable position in the planting pit, the clamping member 91 is located below the movable guide plate 85, and the sensor 83 senses the opening signal, the discharge valve 821 opens, and the soil inside the combined box enters the planting pit through the discharge pipe 82 for filling; at the same time, the electromagnetic block of the adsorption positioning plate 84 is energized to generate magnetic attraction, which can adsorb the start plate 92 to achieve the positioning of the start plate 92;

[0070] After the start plate 92 is positioned, the combination cylinder 171 drives the combination wheel 17 to move, and the combination cylinder 171 leaves the first connection wheel 18 and the driving wheel 202. The clamping member 91 clamps the plant to be stably located in the planting pit, and the rotary motor 16 rotates in the reverse direction, the pit-digging drill bit 2 rotates, and the spiral piece 201 of the pit-digging drill bit 2 moves the soil downward, so that the soil inside the combination box can all enter the planting pit;

[0071] Step nine: When the soil inside the combined box body completely enters the planting pit, the combination cylinder 171 drives the combination wheel 17 to move, and the combination cylinder 171 is combined with the first connecting wheel 18 and the driving wheel 202. At this time, the transmission wheel 23 rotates in the opposite direction, the starting plate 92 leaves the sensor 83, the electromagnetic block of the adsorption positioning plate 84 is powered off, the planting transmission body 9 returns to its position, and the guide cylinder 86 drives the movable guide plate 85 to move forward, and the movable guide plate 85 is close to the clamping member 91;

[0072] During the return process of the planting transmission body 9, the clamping member 91 pulls the plant upward for a short distance. The clamping member 91 pulls the plant upward to achieve the extension of the plant root inside the soil. Then the clamping member 91 contacts the guide block on the movable guide plate 85. The second guide block 852 first pushes the movable sleeve 915 to move in the direction close to the movable seat 913 to achieve the clamping member 91 to loosen the clamping of the planting. Then the first guide block 851 pushes the movable seat 913 to move in the direction close to the fixed plate 911. Under the condition of keeping the clamping loose, the clamping block is separated from the main trunk of the plant to prevent the clamping block from clamping the plant again.

[0073] Step 10: After the implantation transmission body 9 is completely returned to its original position, the guide cylinder 86 drives the movable guide plate 85 to move backward, and the movable guide plate 85 leaves the clamping member 91;

[0074] The first sliding cylinder 42 drives the first sliding block 41 to move, and the second sliding cylinder 62 drives the second sliding block 61 to move, so that the digging seat 3 returns to the initial position of the second slide rail 5 and is positioned by the limiting cylinder 111, and then the first shell 7 and the second shell 8 are separated, and the first sliding block 41 and the second sliding block 61 return to the initial position.

[0075] Step 11: The positioning cylinder 141 pulls out the positioning pin 14, removes the excavation support 1, pushes the soil on the ground into the planting pit, and compacts the soil to prevent the plant from lodging.

[0076] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An automatic pit digging device for oil tea planting, comprising a pit digging support (1), a pit digging drill bit (2) and a pit digging seat (3), wherein the pit digging support (1) is used to install a pit digging seat (3) that can move in a vertical direction, the pit digging drill bit (2) is arranged on the pit digging seat (3), and the pit digging drill bit (2) is arranged on the screw blade (201) for digging soil and pits by rotating, characterized in that: It also comprises a first shell (7) and a second shell (8), wherein the first shell (7) and the second shell (8) are combined to form a combined box body for enclosing the hole digging drill bit (2), and the inner walls of the first shell (7) and the second shell (8) are respectively provided with crushing blades (15), and the combined box body is used to crush the soil brought out by the spiral blade (201) on the hole digging drill bit (2); The pit digging seat (3) is located between the first shell (7) and the second shell (8); the pit digging seat (3), the first shell (7) and the second shell (8) are respectively slidably connected to the combined slide rail to achieve the combination and separation of the first shell (7) and the second shell (8); The second shell (8) is provided with a planting conveyor (9) for planting plants and a discharge pipe (82) for discharging soil and being in a normally closed state. The planting conveyor (9) is provided with a clamping member (91) for clamping plants and a start plate (92) for opening the discharge pipe (82). The planting conveyor (9) completes the movement of the clamping member (91) in the vertical direction and the movement of the start plate (92) during the conveying process. The combined slide rail comprises a first slide rail (4), a second slide rail (5) and a third slide rail (6) arranged in a horizontal direction, the first slide rail (4) and the third slide rail (6) are fixedly connected to the excavation support (1) and are located at the same horizontal position, the second slide rail (5) is arranged in parallel with the first slide rail (4) or the third slide rail (6), and the second slide rail (5) is slidably connected with the excavation support (1) in a vertical direction to form the separation and combination of the second slide rail (5) and the first slide rail (4) and the third slide rail (6); The first slide rail (4) matches a first slide block (41) that is slidably connected to the first slide rail (4), and the first slide block (41) is fixedly connected to the first shell (7); the second slide rail (5) matches a second slide block (61) that is slidably connected to the second slide rail (5), and the second slide block (61) is connected to the second shell (8) via a slide bracket (63).

2. The automatic pit digging device according to claim 1, characterized in that: The excavation support (1) is provided with a first sliding cylinder (42) for driving the first sliding block (41) to move in a horizontal direction and a second sliding cylinder (62) for driving the second sliding block (61) to move in a horizontal direction; When the second slide rail (5) is combined with the first slide rail (4) and the third slide rail (6), the first sliding block (41) and the second sliding block (61) are respectively moved close to the pit digging seat (3) to the extreme position to complete the combination of the first shell (7) and the second shell (8), thereby forming a combined box.

3. The automatic pit digging device according to claim 2, characterized in that: It also comprises a connecting seat (11), wherein the connecting seat (11) is fixedly connected to the support rod (10), and the support rod (10) is slidably connected to the excavation support (1) in the vertical direction; The connecting seat (11) is fixedly connected to the second slide rail (5), and a limit cylinder (111) is provided on the connecting seat (11) for limiting the position of the digging seat (3) on the second slide rail (5).

4. The automatic pit digging device according to claim 1, 2 or 3, characterized in that: A driving wheel (202) is arranged on the upper part of the hole-digging drill bit (2), and the driving wheel (202) can extend to the outside of the combined box body after the combined box body is formed. A coupling wheel (17) and a power transmission component are arranged on the sliding bracket (63), and the coupling wheel (17) is used to connect or cut off the power between the power transmission component and the driving wheel (202). The power transmission component is used to transmit the power of the driving wheel (202) to the transmission wheel (23) of the planting transmission body (9), so as to realize the transmission of the planting transmission body (9).

5. The automatic pit digging device according to claim 4, characterized in that: The power transmission assembly comprises a first connecting wheel (18), a first bevel gear (19), a second bevel gear (20), a second connecting wheel (21), a third connecting wheel (22), a transmission wheel (23), and a synchronizing shaft (24); the first connecting wheel (18) is used to be coupled to the driving wheel (202) via a coupling wheel (17); the first connecting wheel (18) is coaxially fixedly connected to the first bevel gear (19); the first bevel gear (19) is meshed with the second bevel gear (20); the second bevel gear (20) is coaxially fixedly connected to the second connecting wheel (21); the second connecting wheel (21) is meshed with the third connecting wheel (22); and the third connecting wheel (22) is synchronously fixedly connected to the transmission wheel (23) via the synchronizing shaft (24).

6. The automatic pit digging device according to claim 4, characterized in that: A sealing cover (32) for shielding the joint surface of the driving wheel (202) is provided at the bottom of the digging seat (3), and the sealing cover (32) is connected to the digging seat (3) via a sealing cylinder (31).

7. The automatic pit digging device according to claim 4, characterized in that: The clamping member (91) comprises a fixed plate (911), a fixed rod (912), a movable seat (913), a first elastic member (914), a movable sleeve (915), a second elastic member (916), a first elastic clamp (917), a second elastic clamp (918) and a third elastic member (919); the fixed rod (912) is fixedly connected to the transmission surface of the implant transmission body (9) via the fixed plate (911); the fixed rod (912) and the movable seat (913) are axially connected; and the first elastic member (914) is located between the fixed rod (912) and the movable seat (913); A clamping column composed of a first elastic clamp (917) and a second elastic clamp (918) is fixedly arranged on the movable seat (913); a third elastic member (919) for separating the first elastic clamp (917) and the second elastic clamp (918) is arranged between the ends of the first elastic clamp (917) and the second elastic clamp (918); a movable sleeve (915) is movably sleeved on the clamping column; and a second elastic member (916) is arranged between the movable sleeve (915) and the movable seat (913).

8. The automatic pit digging device according to claim 7, characterized in that: The second housing (8) is provided with a movable guide plate (85), the movable guide plate (85) being connected to the second housing (8) via a guide cylinder (86), the movable guide plate (85) being provided with a first guide block (851) for pushing the movable seat (913) and a second guide block (852) for pushing the movable sleeve (915), the lower end of the first guide block (851) being located above the lower end of the second guide block (852).

Citation Information

Patent Citations

  • A pit digging device for planting oil-tea forestry trees

    CN220935576U

  • Intelligent soil digging equipment for forestry cultivation

    CN116649023A