BIM-based highway engineering automation monitoring and control system
Through the BIM-based highway engineering automation monitoring and control system, the soil and climate factors of different road sections are analyzed, and the thickness and compaction of the roadbed are adjusted. The problem of ignoring environmental differences in the unified roadbed filling standards is solved, and the durability and construction of the road are improved. efficiency.
Patent Information
- Application Number
- CN202411009853.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-26
AI Technical Summary
In highway projects, the unified roadbed filling standards ignore the differences in soil conditions and climatic factors in different road sections, resulting in inaccurate monitoring results, affecting the safety and durability of the road.
Using BIM-based highway engineering automation monitoring and control system, the data acquisition module, roadbed stability analysis module, road section relative environmental impact factor analysis module and road section adjustment analysis module are divided into several equal-length sections, and the soil conditions of each section are analyzed. and climate factors, calculate the relative environmental impact factors, adjust the thickness and compaction of the roadbed to adapt to different environmental conditions.
Ensure the quality, stability and service life of the road, improve the durability and safety of the road, optimize construction efficiency, and rationally allocate engineering resources.
Smart Images

Figure CN118534831B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a BIM-based highway engineering automated monitoring and control system. Background Art
[0002] The subgrade design in highway engineering is a key link to ensure the long-term stability and performance of the road. The subgrade refers to the geotechnical structure that supports the pavement structure, including embankments and road trenches. A good subgrade design can effectively distribute the load from vehicles, reduce maintenance costs, and extend the service life of the road. The use of BIM data models for real-time monitoring and control during highway construction and maintenance can achieve efficient highway management. In the process of monitoring the subgrade stability of a certain road, in general, the subgrade filling usually needs to determine the uniform standard filling thickness and compaction degree based on geological survey results and traffic engineering. However, if the road extends for a long time, the soil conditions and climate factors in different regions may be different. Then the unified subgrade filling standard may not be applicable to road sections under different environmental conditions, thus affecting the safety and durability of the road. Due to the differences in environmental factors in different sections, the use of a unified subgrade filling standard will lead to inaccurate monitoring results. Summary of the invention
[0003] The present invention provides a BIM-based highway engineering automated monitoring and control system to solve the problem of using a unified roadbed filling standard during road monitoring while ignoring the impact of soil conditions and climate factors in different sections of the road on roadbed monitoring.
[0004] The BIM-based highway engineering automated monitoring and control system of the present invention adopts the following technical solutions:
[0005] An embodiment of the present invention provides a BIM-based highway engineering automated monitoring and control system, which includes the following modules:
[0006] Data acquisition module: used to obtain the roadbed thickness and compaction degree of the road at equal intervals along the road direction on a preset length of road;
[0007] Roadbed stability analysis module: used to divide the road into several equal-length sections; according to the roadbed thickness and compaction degree corresponding to each section of the road, the roadbed stability corresponding to each section of the road is obtained;
[0008] Road section relative environmental impact factor analysis module: used to obtain the average temperature of each road section and the moisture content and viscosity of the soil along the road; according to the average temperature of each road section and the moisture content and viscosity of the soil along the road, the environmental impact factor corresponding to each road section is obtained; according to the difference between the environmental impact factors corresponding to the road section and other road sections, the relative environmental impact factor corresponding to each road section is obtained;
[0009] Road section adjustment analysis module: used to obtain the roadbed adjustment coefficient of each road section according to the relative environmental impact factor and roadbed stability corresponding to each road section; obtain the roadbed thickness corresponding to each road section after adjustment according to the roadbed adjustment coefficient and roadbed thickness of each road section; obtain the compaction corresponding to each road section after adjustment according to the roadbed adjustment coefficient and compaction of each road section;
[0010] Road construction analysis module: used to adjust road construction according to the corresponding roadbed thickness and compaction degree after adjustment of each section of the road.
[0011] Preferably, dividing the road into a plurality of sections of equal length comprises:
[0012] Divide the road into sections of equal length; is the default value.
[0013] Preferably, obtaining the roadbed stability corresponding to each road section according to the roadbed thickness and compaction degree corresponding to each road section includes:
[0014]
[0015] In the formula, Indicates the road The roadbed stability corresponding to each road section; Indicates the road The average roadbed thickness corresponding to each road section; Indicates the minimum value of the roadbed thickness on the road; Indicates the road The average compaction degree corresponding to each road section; It represents the minimum value of the average compaction degree corresponding to all road sections; Indicates a preset constant; is an exponential function with a natural constant as its base.
[0016] Preferably, the step of obtaining the average temperature of each road section and the water content and viscosity of the soil along the road section includes:
[0017] For any road section, several monitoring points are evenly set up along the road section. Moisture sensors, rheometer tests and meteorological sensors are used to collect soil moisture content, soil viscosity and air temperature at each monitoring point. The average of the soil moisture content at all monitoring points is taken as the moisture content of the soil along the road section, the average of the soil viscosity at all monitoring points is taken as the viscosity of the soil along the road section, and the average of the air temperature at all monitoring points is taken as the average temperature of the road section.
[0018] Preferably, the environmental impact factor corresponding to each section of the road is obtained according to the average temperature of each section of the road and the moisture content and viscosity of the soil along the road, including:
[0019] According to the average temperature of all road sections, the temperature characteristic value of each road section is obtained;
[0020] According to the temperature characteristic values of each road section, the moisture content and viscosity of the soil along the road, the environmental impact factor corresponding to each road section is obtained.
[0021] Preferably, the environmental impact factor corresponding to each road section is obtained according to the temperature characteristic value of each road section, the water content and viscosity of the soil along the road, and includes:
[0022]
[0023] In the formula, Indicates the road Environmental impact factors corresponding to each road section; Indicates the road The moisture content of soil along each road section; It represents the minimum value of soil moisture content along all sections of the road; Indicates the road The viscosity of the soil along each road section; It represents the maximum value of the viscosity of the soil along all sections of the road; Indicates the road The average temperature of each road section; represents the average of the average temperatures of all sections of the road; is the normalization function; is the absolute value function; For the road The temperature characteristic value of each road section.
[0024] Preferably, obtaining the relative environmental impact factor corresponding to each road section according to the difference between the environmental impact factors corresponding to the road section and other road sections comprises:
[0025]
[0026] In the formula, Indicates the road The relative environmental impact factor corresponding to each road section; Indicates the road Environmental impact factors corresponding to each road section; Indicates that except for the The first section Environmental impact factors corresponding to each road section; Indicates the number of road segments; is the normalization function.
[0027] Preferably, obtaining the roadbed adjustment coefficient of each road section according to the relative environmental impact factor and roadbed stability corresponding to each road section includes:
[0028] The road The relative environmental impact factor corresponding to each road section is The normalized result of the ratio of the roadbed stability corresponding to each road section is taken as the first The roadbed adjustment coefficient of a road section.
[0029] Preferably, obtaining the roadbed thickness corresponding to each section of the road after adjustment according to the roadbed adjustment coefficient and the roadbed thickness of each section of the road comprises:
[0030]
[0031] In the formula, Indicates the road The corresponding roadbed thickness after adjustment of each road section; Indicates the road The average roadbed thickness corresponding to each road section; Indicates the road The roadbed adjustment coefficient of a road section.
[0032] Preferably, obtaining the corresponding compaction degree of each road section after adjustment according to the roadbed adjustment coefficient and compaction degree of each road section comprises:
[0033]
[0034] In the formula, Indicates the road The corresponding compaction degree after adjustment of each road section; Indicates the road The average compaction degree corresponding to each road section; Indicates the road The roadbed adjustment coefficient of a road section.
[0035] The beneficial effects of the technical solution of the present invention are: dividing a road into several sections, and then adjusting the thickness and compaction of the roadbed of different sections by analyzing the difference in the degree of influence of the environment of different sections on the stability of the roadbed, thereby ensuring the quality, stability and service life of the road. According to the average temperature of each section of the road and the moisture content and viscosity of the soil along the road, the environmental impact factor corresponding to each section of the road is obtained; according to the difference in the environmental impact factors corresponding to the section of the road and other sections, the relative environmental impact factor corresponding to each section of the road is obtained; while ensuring the stability of the roadbed, the environmental impact factors of different sections are taken into account, thereby improving the durability and safety of the road. According to the relative environmental impact factor and roadbed stability corresponding to each section of the road, the roadbed adjustment coefficient of each section of the road is obtained; according to the roadbed adjustment coefficient and roadbed thickness of each section of the road; the roadbed thickness corresponding to each section of the road after adjustment is obtained; according to the roadbed adjustment coefficient and compaction of each section of the road; the compaction corresponding to each section of the road after adjustment is obtained; based on the roadbed adjustment degree of different sections of the road, engineering resources are reasonably allocated, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 It is a module flow chart of the highway engineering automation monitoring and control system based on BIM of the present invention;
[0038] Figure 2 This is a flow chart of the automated monitoring and control of highway engineering based on BIM of the present invention. DETAILED DESCRIPTION
[0039] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation method, structure, features and effects of the BIM-based highway engineering automation monitoring and control system proposed by the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments. In the following description, different "one embodiment" or "another embodiment" does not necessarily refer to the same embodiment. In addition, specific features, structures or characteristics in one or more embodiments may be combined in any suitable form.
[0040] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.
[0041] The specific scheme of the BIM-based highway engineering automated monitoring and control system provided by the present invention is described in detail below with reference to the accompanying drawings.
[0042] See also Figure 1 , which shows a module flow chart of a highway engineering automation monitoring and control system based on BIM provided by an embodiment of the present invention, the system includes the following modules:
[0043] Module 101: Data acquisition module.
[0044] Data acquisition module: used to obtain the roadbed thickness and compaction degree of the road at equal intervals along the road direction on a preset length of road.
[0045] It should be noted that: the preset length of this embodiment is 100 meters, and the roadbed thickness and compaction degree are collected every 10 centimeters, and this is used as an example for description.
[0046] It should be noted that in highway engineering, the types and uses of BIM data models are wide-ranging. Through these data, BIM technology can effectively integrate and manage information in highway engineering, optimize design decisions, and improve construction efficiency. This embodiment obtains the roadbed filling thickness and compaction data of a road under construction through the corresponding BIM data model. The roadbed thickness refers to the vertical thickness of the road base layer, which is responsible for providing sufficient vehicle support loads and dispersing these loads to the soil below; compaction is a measure of the degree to which the roadbed material is compacted. Proper compaction can improve the stability and bearing capacity of the roadbed. Therefore, appropriate roadbed thickness and good compaction are the basis for ensuring road quality and stability.
[0047] Module 102: Roadbed stability analysis module.
[0048] Roadbed stability analysis module: used to divide the road into several sections of equal length; according to the roadbed thickness and compaction degree corresponding to each section of the road, the roadbed stability corresponding to each section of the road is obtained.
[0049] It should be noted that since the extension of the road may pass through different soil types and climates, and different soil conditions and climatic factors have different degrees of influence on the stability of the road, in order to ensure the roadbed stability under different environmental factors, the road is first divided into multiple sections, and then the roadbed thickness and compaction data corresponding to each section are analyzed to calculate the corresponding roadbed stability, and then the soil conditions and climatic factors of different sections are analyzed to calculate the environmental impact factors of the corresponding sections, and then the standard adjustment coefficient of the corresponding section is calculated based on the differences in environmental impact factors and stability of different sections. Finally, the roadbed thickness and compaction of different sections are adjusted in response to the standard adjustment coefficient to adapt to the environmental impacts of different sections.
[0050] It should be noted that in order to analyze the impact of different soil conditions and climatic factors on the roadbed, the entire road is divided into multiple sections. Since the external environment corresponding to different sections may have different degrees of impact on the stability of the roadbed, it is first necessary to calculate the roadbed stability of the corresponding section based on the roadbed thickness and compaction data of each section, so as to subsequently adjust the roadbed filling standards of different sections.
[0051] BIM software is used for roads, which can automatically measure their length and display it to obtain the road length.
[0052] Default Value is 20 (in this embodiment, , which can be adjusted appropriately according to the length of the road), and the road length is divided into Then, according to the roadbed thickness data and compaction degree data of each road section, the corresponding roadbed stability is calculated.
[0053] It should be noted that the thickness of the roadbed must be sufficient to support the expected traffic load and adapt to the foundation conditions. A roadbed with insufficient thickness may not be able to effectively disperse the pressure from vehicles, resulting in premature damage or deformation of the road surface and reduced stability (currently, the roadbed thickness of major highways or expressways usually needs to be more than 1 meter to cope with higher traffic pressure). The higher the compaction degree of the roadbed, the more significantly the bearing capacity of the roadbed can be increased, thereby improving the stability of the roadbed.
[0054] The preset constant is 1;
[0055] The road The calculation method of roadbed stability corresponding to each road section is as follows:
[0056]
[0057] In the formula, Indicates the road The roadbed stability corresponding to each road section; Indicates the road The average roadbed thickness corresponding to each road section; Indicates the minimum value of the roadbed thickness on the road; Indicates the road The average compaction degree corresponding to each road section; It represents the minimum value of the average compaction degree corresponding to all road sections; Indicates a preset constant; is an exponential function with a natural constant as its base.
[0058] What needs to be explained is that when the denominator in the formula is 0, set the denominator to 1 and use this as an example to ensure that the formula is valid.
[0059] What needs to be explained is that Take 1; Representing the road The appropriate degree of roadbed thickness of each road section. The thicker the roadbed thickness is, the better it is. Too thick a roadbed will not improve stability but will cause a waste of resources. The larger the value, the Convergence restriction is The larger the value is, the corresponding roadbed stability will gradually decrease. No. Relative compaction level of each road section (plus To prevent it from being 0), since the higher the compaction degree of the roadbed, the higher the corresponding roadbed stability, Big description The higher the roadbed compaction of a road section is compared with other road sections, the higher the corresponding stability is. Finally, the roadbed stability corresponding to all road sections is calculated and differentially mapped through exponential functions for subsequent adjustment.
[0060] Module 103: Road section relative environmental impact factor analysis module.
[0061] Road section relative environmental impact factor analysis module: used to obtain the average temperature of each road section and the moisture content and viscosity of the soil along the road; according to the average temperature of each road section and the moisture content and viscosity of the soil along the road, the environmental impact factor corresponding to each road section is obtained; according to the difference in environmental impact factors corresponding to the road section and other road sections, the relative environmental impact factor corresponding to each road section is obtained.
[0062] What needs to be explained is that after obtaining the roadbed stability corresponding to different sections, due to the different soil conditions and climatic factors of different sections, the roadbed stability corresponding to different sections will also be affected to varying degrees. In order to ensure that the roadbed of each section can better adapt to the local environment, the soil conditions and climatic factor data corresponding to different sections are analyzed to calculate the corresponding environmental impact factors, and then the roadbed adjustment coefficients of different sections are calculated based on the differences in environmental impact factors and the stability of different sections.
[0063] What needs to be explained is that for a certain road section, if the soil moisture content of this road section is higher, the friction between soil particles will be reduced, the shear strength of the soil will be reduced, and the stability of the roadbed will be reduced. At the same time, the higher the soil viscosity, the greater the deformation capacity, which can be significantly deformed under the action of external force, and the stability of the roadbed can also be reduced. From a climatic perspective, the roadbed material will expand and contract due to changes in temperature, so too high or too low temperatures will reduce the stability of the roadbed. Based on the above characteristics, the corresponding environmental impact factor on the stability of the roadbed can be calculated for any road section. If the corresponding environmental impact factor of a certain road section is larger, it means that the environment of this road section has a greater negative impact on the stability of the roadbed. Conversely, the smaller the environmental impact factor, the smaller the negative impact on the stability of the roadbed.
[0064] For any road section, several monitoring points are evenly set up along the road section. Moisture sensors, rheometer tests and meteorological sensors are used to collect soil moisture content, soil viscosity and air temperature at each monitoring point. The average of the soil moisture content at all monitoring points is taken as the moisture content of the soil along the road section, the average of the soil viscosity at all monitoring points is taken as the viscosity of the soil along the road section, and the average of the air temperature at all monitoring points is taken as the average temperature of the road section.
[0065] The road The calculation formula of the environmental impact factor corresponding to each road section is as follows:
[0066]
[0067] In the formula, Indicates the road Environmental impact factors corresponding to each road section; Indicates the road The moisture content of soil along each road section; It represents the minimum value of soil moisture content along all sections of the road; Indicates the road The viscosity of the soil along each road section; It represents the maximum value of the viscosity of the soil along all sections of the road; Indicates the road The average temperature of each road section; represents the average of the average temperatures of all sections of the road; is the normalization function. is the absolute value function; For the road The temperature characteristic value of each road section.
[0068] What needs to be explained is that when the denominator in the formula is 0, set the denominator to 1 and use this as an example to ensure that the formula is valid.
[0069] What needs to be explained is that Represents the The influence of soil conditions along each road section on the roadbed stability. Since higher soil moisture content and soil viscosity will lead to lower roadbed stability, The larger the value is, the higher the level of the two factors in this section is, and the greater the corresponding environmental impact factor is. Represents the The influence of the average temperature of each road section on the roadbed stability is determined by the roadbed temperature. Too high or too low temperature will lead to a decrease in the stability of the roadbed. The larger the value, the greater the temperature fluctuation, and the greater the corresponding environmental impact factor. Finally, the corresponding environmental impact factors are calculated for all road sections and used Normalize the results to the range [0,1].
[0070] It should be noted that the corresponding environmental impact factors are obtained for different road sections, and the ultimate goal is to adjust the corresponding roadbed filling standards based on the degree of environmental impact on the roadbed of different road sections, so that the durability of the road can be guaranteed under different environments. Therefore, the relative size of the environmental impact factors of different road sections needs to be compared to determine the corresponding roadbed adjustment coefficient.
[0071] It should be noted that since the size of the environmental impact factor represents the degree of negative impact of the environment on the roadbed stability, if the environmental impact factor of a certain road section is larger than that of other road sections, it means that the environment of this road section has a greater negative impact on the roadbed stability than other road sections, and the degree of adjustment of the roadbed filling standard of this road section is greater, and vice versa. When adjusting the roadbed filling standard, the stability index of different road sections also affects the degree of adjustment. If the stability of a certain road section is higher, the degree of adjustment can be appropriately reduced during adjustment to ensure efficient use of construction resources.
[0072] The road The calculation method of the relative environmental impact factor corresponding to each road section is as follows:
[0073]
[0074] In the formula, Indicates the road The relative environmental impact factor corresponding to each road section; Indicates the road Environmental impact factors corresponding to each road section; Indicates that except for the The first section Environmental impact factors corresponding to each road section; Indicates the number of road segments; is the normalization function.
[0075] It should be noted that the calculation of the road segment The average difference of the environmental impact factors corresponding to other road sections is taken as the relative environmental impact factor. The larger the value, the more important the environment is for the road section. The greater the impact of the roadbed stability is relative to other road sections, the smaller it is, and then the result is normalized to the range of [0,1].
[0076] Module 104: road section adjustment analysis module.
[0077] Road section adjustment analysis module: used to obtain the roadbed adjustment coefficient of each road section according to the relative environmental impact factor and roadbed stability corresponding to each road section; to obtain the corresponding roadbed thickness of each road section after adjustment according to the roadbed adjustment coefficient and roadbed thickness of each road section; to obtain the corresponding compaction degree of each road section after adjustment according to the roadbed adjustment coefficient and compaction degree of each road section.
[0078] Road-based The relative environmental impact factors and roadbed stability corresponding to each road section, The method for obtaining the roadbed adjustment coefficient of each road section is as follows:
[0079] The road The relative environmental impact factor corresponding to each road section is The normalized result of the ratio of the roadbed stability corresponding to each road section is taken as the first The roadbed adjustment coefficient of each road section is expressed as .
[0080] What needs to be explained is that when the denominator in the formula is 0, set the denominator to 1 and use this as an example to ensure that the formula is valid.
[0081] It should be noted that the road section The larger the relative environmental impact factor and the smaller the roadbed stability, the larger the corresponding roadbed adjustment coefficient. And use the normalization function Normalize the results to the range of [0,1] for subsequent calculations.
[0082] What needs to be explained is that the thickness and compaction degree of the roadbed filling are adjusted based on the roadbed adjustment coefficient of different road sections. Since the size of the roadbed adjustment coefficient is based on the environmental impact factor, and the environmental impact factor represents the degree of negative impact of the environment on the roadbed stability, when adjusting the roadbed thickness and compaction degree, it is necessary to make positive adjustments based on the roadbed adjustment coefficient.
[0083] On the road, for any section, the larger the corresponding roadbed adjustment coefficient is, the greater the positive adjustment will be made to the roadbed thickness and compaction degree of this section; thereby enhancing the roadbed stability of this section to reduce the impact of the corresponding environment on the roadbed.
[0084] The road The calculation method of the roadbed thickness corresponding to each section after adjustment is as follows:
[0085]
[0086] In the formula, Indicates the road The corresponding roadbed thickness after adjustment of each road section; Indicates the road The average roadbed thickness corresponding to each road section; Indicates the road The roadbed adjustment coefficient of a road section.
[0087] The road The calculation method of the compaction degree corresponding to each road section after adjustment is as follows:
[0088]
[0089] In the formula, Indicates the road The corresponding compaction degree after adjustment of each road section; Indicates the road The average compaction degree corresponding to each road section; Indicates the road The roadbed adjustment coefficient of a road section.
[0090] What needs to be explained is that when the denominator in the formula is 0, set the denominator to 1 and use this as an example to ensure that the formula is valid.
[0091] It should be noted that, through right The value of is smoothly mapped to prevent A value that is too large will result in the adjusted roadbed thickness and compaction data being too large and not in line with the actual situation.
[0092] Module 105: Road construction analysis module.
[0093] Road construction analysis module: used to adjust road construction according to the corresponding roadbed thickness and compaction degree after adjustment of each section of the road.
[0094] The roadbed filling standard of the road is adjusted according to the roadbed adjustment coefficient of each section of the road and the corresponding roadbed thickness and compaction degree after adjustment of each section of the road.
[0095] What needs to be explained is that, now the corresponding adjusted roadbed thickness and compaction data are obtained for different road sections. Then the relevant construction units can allocate different construction resources according to the adjustment coefficients of different road sections and the adjusted roadbed thickness and compaction data, thereby optimizing resource utilization and improving the accuracy of automated monitoring of roads to optimize the operation and maintenance of highway projects.
[0096] The BIM-based highway engineering automation monitoring and control flow chart in this implementation is as follows: Figure 2 shown.
[0097] At this point, this embodiment is completed.
[0098] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the principles of the present invention should be included in the protection scope of the present invention.
Claims
1. The BIM-based highway engineering automated monitoring and control system is characterized by: The system includes the following modules: Data acquisition module: used to obtain the roadbed thickness and compaction degree of the road at equal intervals along the road direction on a preset length of road; Roadbed stability analysis module: used to divide the road into several equal-length sections; according to the roadbed thickness and compaction degree corresponding to each section of the road, the roadbed stability corresponding to each section of the road is obtained; Road section relative environmental impact factor analysis module: used to obtain the average temperature of each road section and the moisture content and viscosity of the soil along the road; According to the average temperature of each road section and the water content and viscosity of the soil along the road, the environmental impact factor corresponding to each road section is obtained; according to the difference between the environmental impact factors corresponding to the road section and other road sections, the relative environmental impact factor corresponding to each road section is obtained; The step of obtaining the roadbed stability corresponding to each road section according to the roadbed thickness and compaction degree corresponding to each road section includes: In the formula, Indicates the road The roadbed stability corresponding to each road section; Indicates the road The average roadbed thickness corresponding to each road section; Indicates the minimum value of the roadbed thickness on the road; Indicates the road The average compaction degree corresponding to each road section; It represents the minimum value of the average compaction degree corresponding to all road sections; Indicates a preset constant; is an exponential function with a natural constant as base; Road section adjustment analysis module: used to obtain the roadbed adjustment coefficient of each road section according to the relative environmental impact factor and roadbed stability corresponding to each road section; obtain the roadbed thickness corresponding to each road section after adjustment according to the roadbed adjustment coefficient and roadbed thickness of each road section; obtain the compaction corresponding to each road section after adjustment according to the roadbed adjustment coefficient and compaction of each road section; Road construction analysis module: used to adjust road construction according to the corresponding roadbed thickness and compaction degree after adjustment of each section of the road; The environmental impact factors corresponding to each section of the road are obtained according to the average temperature of each section of the road and the moisture content and viscosity of the soil along the road, including: According to the average temperature of all road sections, the temperature characteristic value of each road section is obtained; According to the temperature characteristic value of each road section, the water content and viscosity of the soil along the road, the environmental impact factor corresponding to each road section is obtained; The environmental impact factor corresponding to each section of the road is obtained according to the temperature characteristic value of each section of the road, the water content and viscosity of the soil along the road, including: In the formula, Indicates the road Environmental impact factors corresponding to each road section; Indicates the road The moisture content of soil along each road section; It represents the minimum value of soil moisture content along all sections of the road; Indicates the road The viscosity of the soil along each road section; It represents the maximum value of the viscosity of the soil along all sections of the road; Indicates the road The average temperature of each road section; represents the average of the average temperatures of all sections of the road; is the normalization function; is the absolute value function; For the road Temperature characteristic value of each road section; The relative environmental impact factor corresponding to each road section is obtained according to the difference between the environmental impact factors corresponding to the road section and other road sections, including: In the formula, Indicates the road The relative environmental impact factor corresponding to each road section; Indicates the road Environmental impact factors corresponding to each road section; Indicates that except for the The first section Environmental impact factors corresponding to each road section; Indicates the number of road segments; is the normalization function; The roadbed adjustment coefficient of each road section is obtained according to the relative environmental impact factor and roadbed stability corresponding to each road section, including: The road The relative environmental impact factor corresponding to each road section is The normalized result of the ratio of the roadbed stability corresponding to each road section is taken as the first The roadbed adjustment coefficient of each road section; The step of obtaining the roadbed thickness corresponding to each section of the road after adjustment according to the roadbed adjustment coefficient and the roadbed thickness of each section of the road comprises: In the formula, Indicates the road The corresponding roadbed thickness after adjustment of each road section; Indicates the road The average roadbed thickness corresponding to each road section; Indicates the road The roadbed adjustment coefficient of each road section; The step of obtaining the corresponding compaction degree of each road section after adjustment according to the roadbed adjustment coefficient and compaction degree of each road section includes: In the formula, Indicates the road The corresponding compaction degree after adjustment of each road section; Indicates the road The average compaction degree corresponding to each road section; Indicates the road The roadbed adjustment coefficient of a road section.
2. The BIM-based highway engineering automated monitoring and control system according to claim 1 is characterized in that: The step of dividing the road into a plurality of sections of equal length comprises: Divide the road into sections of equal length; is the default value.
3. The BIM-based highway engineering automated monitoring and control system according to claim 1 is characterized in that: The method of obtaining the average temperature of each road section and the water content and viscosity of the soil along the road section includes: For any road section, several monitoring points are evenly set up along the road section. Moisture sensors, rheometer tests and meteorological sensors are used to collect soil moisture content, soil viscosity and air temperature at each monitoring point. The average of the soil moisture content at all monitoring points is taken as the moisture content of the soil along the road section, the average of the soil viscosity at all monitoring points is taken as the viscosity of the soil along the road section, and the average of the air temperature at all monitoring points is taken as the average temperature of the road section.
Citation Information
Cited By
Internet-of-things system for real-time monitoring and quality evaluation of road base compaction degree
CN121959391A
Road base compaction degree real-time monitoring and quality evaluation internet of things system
CN121959391B