A method, system, device and medium for predicting power grid load

By dividing the power consumption area into sub-areas and constructing a neural network model, the difficulty in power grid load prediction caused by various meteorological factors and power consumption scenarios in large power consumption areas is solved, the prediction accuracy is improved, and the power resources are ensured to be reasonable. Distribution and user experience.

CN118536841BActive Publication Date: 2024-10-25STATE GRID SHANDONG ELECTRIC POWER CO WUDI COUNTY POWER SUPPLY CO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411010224.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-25
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

In large power consumption areas, due to the existence of various meteorological factors and various power consumption scenarios, power grid load prediction is difficult and accurate, affecting power resource allocation and user experience.

Method used

The power consumption area is divided into sub-power consumption areas based on meteorological factors. Daily load curve samples of the application scenario are obtained through fluctuation trend interpolation and cluster analysis. A neural network model is constructed for prediction, and the predicted values ​​of each sub-power consumption area are weighted. and to obtain the total load forecast value.

Benefits of technology

It realizes power grid load prediction for a variety of meteorological factors and power consumption scenarios, improves prediction accuracy, and ensures reasonable distribution of power resources and user experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118536841B_ABST
    Figure CN118536841B_ABST
Patent Text Reader

Abstract

The present invention provides a power grid load prediction method, system, device and medium, belonging to the technical field of power grid load prediction, the method steps are as follows: divide the target power consumption area based on meteorological factors; obtain the daily load curve in each sub-power consumption area, perform fluctuation trend interpolation to obtain a curve combination, and then perform cluster analysis according to the application scenario to obtain curve samples of different application scenarios, and divide them into training and test samples; construct a neural network model for each application scenario, and then use the training and test samples to train and test to obtain a daily load prediction model, and calculate the prediction accuracy; use the daily load prediction model to predict the daily load of the application scenario, and weighted sum the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add the daily load prediction values ​​of each sub-power consumption area. The present invention realizes the accurate prediction of the power grid load of the target power consumption area with multiple meteorological factors and multiple application scenarios.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] With the increase in electricity demand, accurate grid load forecasting is becoming more and more important. If the grid load forecast is inaccurate, it will affect the arrangement of power production, transmission and distribution, leading to unreasonable energy distribution and low energy utilization. There will also be safety hazards such as grid overload and voltage fluctuation, resulting in unstable grid operation and affecting the user's electricity experience. There are many factors affecting grid load, such as power consumption scenarios and meteorological factors. For large power consumption areas, due to the large number of power consumption scenarios and the possibility of multiple meteorological factors in the area, the grid load forecasting of the entire power consumption area is affected. First, the meteorological conditions in large power consumption areas are complex and changeable, and there may be significant differences in different meteorological modes, resulting in the meteorological condition input of the grid load model cannot take into account various meteorological conditions. Secondly, the power consumption scenarios involved in large power consumption areas are diverse, such as industrial power consumption, residential power consumption and commercial power consumption. The changing trends of different power consumption scenarios are inconsistent, and the grid load model is difficult to build, which ultimately affects the accuracy of power load forecasting in large power consumption areas, resulting in unreasonable allocation of power resources, waste of power energy or short-term power energy, which affects power utilization and user experience.

[0003] This is a shortcoming of the prior art. Therefore, it is very necessary to provide a power grid load prediction method, system, equipment and medium to address the above-mentioned defects in the prior art. Summary of the invention

[0004] In view of the defects of the prior art that the above-mentioned large power consumption area involves multiple meteorological factors and multiple power consumption scenarios, which makes overall power grid load prediction difficult and has low prediction accuracy, the present invention provides a power grid load prediction method, system, equipment and medium to solve the above-mentioned technical problems.

[0005] In a first aspect, the present invention provides a method for predicting power grid load, comprising the following steps:

[0006] S1. Divide the target power consumption area into several sub-power consumption areas based on meteorological factors, so that the meteorological factors in the sub-power consumption areas are consistent;

[0007] S2. Obtain a set number of daily load curves in each sub-power consumption area, perform fluctuation trend interpolation on each daily load curve to obtain a curve combination, perform cluster analysis on the curve combination according to the application scenario, obtain curve samples for different application scenarios, and divide the curve samples into training samples and test samples;

[0008] S3. Build a neural network model for each application scenario, and use the corresponding training samples to train to obtain a daily load forecasting model, and then use the test samples to test and calculate the prediction accuracy;

[0009] S4. Use the daily load prediction model to predict the daily load of the corresponding application scenario, and perform weighted summation on the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add up the daily load prediction values ​​of each sub-power consumption area to obtain a total daily load prediction value.

[0010] Furthermore, the specific steps of step S1 are as follows:

[0011] S11. Calculate the correlation between each meteorological factor and the daily load forecast, wherein the meteorological factors include temperature, humidity, rainfall, sunshine and wind speed;

[0012] S12. Select the meteorological factor with the greatest correlation as the main meteorological factor, and set the range deviation threshold of the main meteorological factor;

[0013] S13. Divide the target power consumption area into several sub-power consumption areas according to the range deviation threshold of the main meteorological factors.

[0014] Furthermore, the specific steps of step S2 are as follows:

[0015] S21. Obtain the daily load curve within the current set number of days in each sub-power consumption area;

[0016] S22. Identify the inflection point of the daily load curve and perform fluctuation trend interpolation to obtain a curve combination of the daily load curve;

[0017] S23. Calculate the dynamic bending distance between any two daily load curves in the curve combination, and perform K-means clustering based on each dynamic bending distance, identify the application scenario of each cluster, and obtain curve samples of different application scenarios;

[0018] S24. Divide the curve samples into training samples and test samples according to a set ratio.

[0019] Furthermore, the specific steps of step S22 are as follows:

[0020] S221. Analyze each daily load curve, identify the inflection point, and locate the inflection point in sequence;

[0021] S222. Determine whether the inflection point of the positioning is a sampling point;

[0022] If yes, go to step S224;

[0023] If not, proceed to step S223;

[0024] S223. Set a sampling point at the inflection point to complete the interpolation of the daily load curve;

[0025] S224. Determine whether the inflection point of the daily load curve has been located;

[0026] If yes, go to step S225;

[0027] If not, locate the next inflection point and return to step S223;

[0028] S225. Generate a curve combination from the processed daily load curves in the sub-power consumption areas.

[0029] Furthermore, the specific steps of step S23 are as follows:

[0030] S231. Compare each curve in the curve combination in pairs;

[0031] S232. Obtain two curves Q and C to be compared, with sample numbers n and m respectively;

[0032] ;

[0033] ;

[0034] Construct an n×m matrix D, the elements of which are d(q i , c j )= ;

[0035] Where d(qi, cj) represents the Euclidean distance between two sample points qi and cj, 1≤i≤n, 1≤j≤m;

[0036] S233. Find a set W of regular paths in the grid through the matrix D:

[0037] ,in, ;

[0038] S234. Find the regular path DTW (Q, C) with the minimum regular cost:

[0039] ;

[0040] S235. Using the regularization path DTW (Q, C) with the minimum regularization cost as the dynamic bending distance of the daily load curve Q and the daily load curve C;

[0041] S236. Randomly select K daily load curves from the curve combination as initial cluster centers;

[0042] S237. Select a dynamic bending distance between a daily load curve and each cluster center, and classify the selected daily load curve into the class of the cluster center with the smallest dynamic bending distance, until the calculation of each daily load curve is completed;

[0043] S238. Recalculate the cluster centers for each category and determine whether the cluster centers have changed;

[0044] If yes, return to step S237;

[0045] If not, clustering ends and the process goes to step S239;

[0046] S239. Identify the application scenarios of each category of daily load curve and obtain curve samples of different application scenarios.

[0047] Furthermore, the specific steps of step S3 are as follows:

[0048] S31. Build a convolutional neural network model for each application scenario;

[0049] S32. Input the meteorological factors and time corresponding to the daily load curve in the training sample into the convolutional neural network model, start the training according to the set number of iterations, and use the loss function to evaluate the model until the convolutional neural network model meets the prediction accuracy, and obtain the daily load prediction model;

[0050] S33. Use the test sample to test the daily load prediction model, and when the loss function meets the requirements, obtain the actual daily load corresponding to the test sample, and then compare the actual daily load with the predicted daily load to calculate the prediction accuracy.

[0051] Furthermore, the specific steps of step S4 are as follows:

[0052] S41. Obtain the current meteorological factors and current time of each application scenario, and input them into the daily load forecasting model of the corresponding application scenario to obtain the predicted daily load;

[0053] S42. Perform a weighted summation of the daily load usage prediction accuracy of each application scenario:

[0054]

[0055] Where Pz represents the daily load forecast value of the z-th sub-power consumption area, p g represents the daily load forecast value of the g-th application scenario, and g represents the number of application scenarios in the z-th self-use area is g. is the weight of each item;

[0056] S43. Add the daily load forecast values ​​of each sub-power consumption area to obtain the total daily load forecast value Ptotal:

[0057] P 总 =P1+…+P z +…P v

[0058] Among them, P1 represents the daily load forecast value of the first sub-power consumption area, P z represents the daily load forecast value of the z-th sub-power consumption area, Pv It represents the daily load forecast value of the vth sub-power consumption area, and v is the number of sub-power consumption areas in the target power consumption area.

[0059] In a second aspect, the present invention provides a power grid load forecasting system, comprising:

[0060] A power consumption area division module, used to divide the target power consumption area into several sub-power consumption areas based on meteorological factors, so that the meteorological factors in the sub-power consumption areas are consistent;

[0061] A daily load curve sample generation module is used to obtain a set number of daily load curves in each sub-power consumption area, perform fluctuation trend interpolation on each daily load curve to obtain a curve combination, and perform cluster analysis on the curve combination according to the application scenario to obtain curve samples for different application scenarios, and divide the curve samples into training samples and test samples;

[0062] The model building and training module is used to build a neural network model for each application scenario, and use the corresponding training samples to train to obtain a daily load forecasting model, and then use the test samples to test and calculate the forecast accuracy;

[0063] The daily load forecasting module is used to use the neural network model to predict the daily load of the corresponding application scenario, and to perform weighted summation on the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add up the daily load prediction values ​​of each sub-power consumption area to obtain the total daily load prediction value.

[0064] In a third aspect, the present invention provides a device, comprising a processor and a memory;

[0065] The memory is used to store a computer program, and the processor is used to call and run the computer program from the memory, so that the device executes the method described in the first aspect above.

[0066] In a fourth aspect, the present invention provides a storage medium,

[0067] The storage medium stores instructions, which, when executed on a computer, enable the computer to execute the method described in the first aspect.

[0068] The beneficial effects of the present invention are:

[0069] The power grid load prediction method, system, equipment and medium provided by the present invention divide the power consumption area according to meteorological factors, perform cluster analysis to obtain the daily load curve of the application scenario, weight the daily load curves of different application scenarios by prediction accuracy and sum them up to obtain the predicted load of the entire sub-power consumption area, and finally add the predicted loads of each sub-power consumption area to obtain the total load prediction value, thereby finally achieving accurate prediction of the power grid load of the target power consumption area with multiple meteorological factors and multiple application scenarios.

[0070] In addition, the invention has a reliable design principle, a simple structure and a very broad application prospect.

[0071] It can be seen that compared with the prior art, the present invention has outstanding substantive features and significant progress, and the beneficial effects of its implementation are also obvious. BRIEF DESCRIPTION OF THE DRAWINGS

[0072] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0073] Figure 1 It is a schematic flow chart of the power grid load forecasting method of the present invention.

[0074] Figure 2 It is a schematic diagram of the power grid load prediction system of the present invention. DETAILED DESCRIPTION

[0075] The power grid load forecasting method can be applied to one or more devices, wherein the device is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application specific integrated circuits 10 (Application Specific Integrated Circuit, ASIC), programmable gate arrays (Field-Programmable Gate Array, FPGA), digital processors (Digital Signal Processor, DSP), embedded devices, etc.

[0076] The device can be any electronic product that can interact with the user, such as a personal computer, tablet computer, smart phone, personal digital assistant (PDA), interactive network television (IPTV), etc. The network where the device is located includes but is not limited to the Internet, wide area network, metropolitan area network, local area network, virtual private network (VPN), etc.

[0077] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0078] See also Figure 1 The figure shows a specific implementation of a power grid load forecasting method, comprising the following steps:

[0079] S1. Divide the target power consumption area into several sub-power consumption areas based on meteorological factors, so that the meteorological factors in the sub-power consumption areas are consistent;

[0080] S2. Obtain a set number of daily load curves in each sub-power consumption area, perform fluctuation trend interpolation on each daily load curve to obtain a curve combination, perform cluster analysis on the curve combination according to the application scenario, obtain curve samples for different application scenarios, and divide the curve samples into training samples and test samples;

[0081] S3. Build a neural network model for each application scenario, and use the corresponding training samples to train to obtain a daily load forecasting model, and then use the test samples to test and calculate the prediction accuracy;

[0082] S4. Use the daily load prediction model to predict the daily load of the corresponding application scenario, and perform weighted summation on the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add up the daily load prediction values ​​of each sub-power consumption area to obtain a total daily load prediction value.

[0083] In this embodiment, the specific steps of step S1 are as follows:

[0084] S11. Calculate the correlation between each meteorological factor and the daily load forecast, wherein the meteorological factors include temperature, humidity, rainfall, sunshine and wind speed;

[0085] S12. Select the meteorological factor with the greatest correlation as the main meteorological factor, and set the range deviation threshold of the main meteorological factor;

[0086] S13. Divide the target power consumption area into several sub-power consumption areas according to the range deviation threshold of the main meteorological factors;

[0087] The specific steps of step S2 are as follows:

[0088] S21. Obtain the daily load curve within the current set number of days in each sub-power consumption area;

[0089] S22. Identify the inflection point of the daily load curve and perform fluctuation trend interpolation to obtain a curve combination of the daily load curve; the specific steps of step S22 are as follows:

[0090] S221. Analyze each daily load curve, identify the inflection point, and locate the inflection point in sequence;

[0091] S222. Determine whether the inflection point of the positioning is a sampling point;

[0092] If yes, go to step S224;

[0093] If not, proceed to step S223;

[0094] S223. Set a sampling point at the inflection point to complete the interpolation of the daily load curve;

[0095] S224. Determine whether the inflection point of the daily load curve has been located;

[0096] If yes, go to step S225;

[0097] If not, locate the next inflection point and return to step S223;

[0098] S225. Generate a curve combination from the processed daily load curves in the sub-power consumption area;

[0099] S23. Calculate the dynamic bending distance between any two daily load curves in the curve combination, and perform K-means clustering based on each dynamic bending distance, identify the application scenario of each cluster, and obtain curve samples of different application scenarios; the specific steps of step S23 are as follows:

[0100] S231. Compare each curve in the curve combination in pairs;

[0101] S232. Obtain two curves Q and C to be compared, with sample numbers n and m respectively;

[0102] ;

[0103] ;

[0104] Construct an n×m matrix D, the elements of which are d(q i, c j )= ;

[0105] Where d(qi, cj) represents the Euclidean distance between two sample points qi and cj, 1≤i≤n, 1≤j≤m;

[0106] S233. Find a set W of regular paths in the grid through the matrix D:

[0107] ,in, ;

[0108] S234. Find the regular path DTW (Q, C) with the minimum regular cost:

[0109] ;

[0110] S235. Using the regularization path DTW (Q, C) with the minimum regularization cost as the dynamic bending distance of the daily load curve Q and the daily load curve C;

[0111] S236. Randomly select K daily load curves from the curve combination as initial cluster centers;

[0112] S237. Select a dynamic bending distance between a daily load curve and each cluster center, and classify the selected daily load curve into the class of the cluster center with the smallest dynamic bending distance, until the calculation of each daily load curve is completed;

[0113] S238. Recalculate the cluster centers for each category and determine whether the cluster centers have changed;

[0114] If yes, return to step S237;

[0115] If not, clustering ends and the process goes to step S239;

[0116] S239. Identify the application scenario of each category of daily load curve, and obtain curve samples of different application scenarios;

[0117] S24. Divide the curve samples into training samples and test samples according to a set ratio;

[0118] The specific steps of step S3 are as follows:

[0119] S31. Build a convolutional neural network model for each application scenario;

[0120] S32. Input the meteorological factors and time corresponding to the daily load curve in the training sample into the convolutional neural network model, start the training according to the set number of iterations, and use the loss function to evaluate the model until the convolutional neural network model meets the prediction accuracy, and obtain the daily load prediction model;

[0121] S33. Use the test sample to test the daily load forecasting model, and when the loss function meets the requirements, obtain the actual daily load corresponding to the test sample, and then compare the actual daily load with the predicted daily load to calculate the prediction accuracy;

[0122] The specific steps of step S4 are as follows:

[0123] S41. Obtain the current meteorological factors and current time of each application scenario, and input them into the daily load forecasting model of the corresponding application scenario to obtain the predicted daily load;

[0124] S42. Perform a weighted summation of the daily load usage prediction accuracy of each application scenario:

[0125]

[0126] Where Pz represents the daily load forecast value of the z-th sub-power consumption area, p g represents the daily load forecast value of the g-th application scenario, and g represents the number of application scenarios in the z-th self-use area is g. is the weight of each item;

[0127] S43. Add the daily load forecast values ​​of each sub-power consumption area to obtain the total daily load forecast value Ptotal:

[0128] P 总 =P1+…+P z +…P v

[0129] Among them, P1 represents the daily load forecast value of the first sub-power consumption area, P z represents the daily load forecast value of the z-th sub-power consumption area, P v It represents the daily load forecast value of the vth sub-power consumption area, and v is the number of sub-power consumption areas in the target power consumption area.

[0130] It should be understood that the order of execution of the steps in the above embodiment does not mean that the execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0131] The following is an embodiment of the power grid load prediction system provided by the embodiments of the present disclosure. The system and the power grid load prediction methods of the above-mentioned embodiments belong to the same inventive concept. For details not described in detail in the embodiments of the power grid load prediction system, please refer to the embodiments of the above-mentioned power grid load prediction method.

[0132] like Figure 2 As shown, the system includes:

[0133] A power consumption area division module, used to divide the target power consumption area into several sub-power consumption areas based on meteorological factors, so that the meteorological factors in the sub-power consumption areas are consistent;

[0134] A daily load curve sample generation module is used to obtain a set number of daily load curves in each sub-power consumption area, perform fluctuation trend interpolation on each daily load curve to obtain a curve combination, and perform cluster analysis on the curve combination according to the application scenario to obtain curve samples for different application scenarios, and divide the curve samples into training samples and test samples;

[0135] The model building and training module is used to build a neural network model for each application scenario, and use the corresponding training samples to train to obtain a daily load forecasting model, and then use the test samples to test and calculate the forecast accuracy;

[0136] The daily load forecasting module is used to use the neural network model to predict the daily load of the corresponding application scenario, and to perform weighted summation on the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add up the daily load prediction values ​​of each sub-power consumption area to obtain the total daily load prediction value.

[0137] The power grid load forecasting method provided by the present invention is a module and algorithm step of each example described in combination with the embodiments disclosed herein, and can be implemented by electronic hardware, computer software or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to the function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0138] Those skilled in the art will appreciate that various aspects of the power grid load forecasting method provided by the present invention can be implemented as a system, method or program product. Therefore, various aspects of the present disclosure can be specifically implemented in the following forms, namely: a complete hardware implementation, a complete software implementation (including firmware, microcode, etc.), or an implementation combining hardware and software aspects, which can be collectively referred to as "circuit", "module" or "system" here.

[0139] In the non-transitory computer-readable storage medium of the power grid load forecasting method, it can be but not limited to an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination thereof. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more conductors, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination thereof.

[0140] Although the present invention has been described in detail with reference to the accompanying drawings and in combination with the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person of ordinary skill in the art may easily think of changes or substitutions within the technical scope disclosed by the present invention, and these shall be within the scope of protection of the present invention.

Claims

1. A method for predicting power grid load, characterized in that: The steps include: S1. Divide the target power consumption area into several sub-power consumption areas based on meteorological factors, so that the meteorological factors in the sub-power consumption areas are consistent; S2. Obtain a set number of daily load curves in each sub-power consumption area, perform fluctuation trend interpolation on each daily load curve to obtain a curve combination, and perform cluster analysis on the curve combination according to the application scenario to obtain curve samples for different application scenarios, and divide the curve samples into training samples and test samples; the specific steps of step S2 are as follows: S21. Obtain the daily load curve within the current set number of days in each sub-power consumption area; S22. Identify the inflection point of the daily load curve and perform fluctuation trend interpolation to obtain a curve combination of the daily load curve; S23. Calculate the dynamic bending distance between any two daily load curves in the curve combination, and perform K-means clustering based on each dynamic bending distance, identify the application scenario of each cluster, and obtain curve samples of different application scenarios; the specific steps of step S23 are as follows: S231. Compare each curve in the curve combination in pairs; S232. Obtain two curves Q and C to be compared, with sample numbers n and m respectively; ; ; Construct an n×m matrix D, the elements of which are d(q i , c j )= ; Where d(qi, cj) represents the Euclidean distance between two sample points qi and cj, 1≤i≤n, 1≤j≤m; S233. Find a set W of regular paths in the grid through the matrix D: ,in, ; S234. Find the regular path DTW (Q, C) with the minimum regular cost: ; S235. Using the regularization path DTW (Q, C) with the minimum regularization cost as the dynamic bending distance of the daily load curve Q and the daily load curve C; S236. Randomly select K daily load curves from the curve combination as initial cluster centers; S237. Select a dynamic bending distance between a daily load curve and each cluster center, and classify the selected daily load curve into the class of the cluster center with the smallest dynamic bending distance, until the calculation of each daily load curve is completed; S238. Recalculate the cluster centers for each category and determine whether the cluster centers have changed; If yes, return to step S237; If not, clustering ends and the process goes to step S239; S239. Identify the application scenario of each category of daily load curve, and obtain curve samples of different application scenarios; S24. Divide the curve samples into training samples and test samples according to a set ratio; S3. Build a neural network model for each application scenario, and use the corresponding training samples to train to obtain a daily load forecasting model, and then use the test samples to test and calculate the prediction accuracy; S4. Use the daily load prediction model to predict the daily load of the corresponding application scenario, and perform weighted summation on the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add up the daily load prediction values ​​of each sub-power consumption area to obtain a total daily load prediction value.

2. The power grid load forecasting method according to claim 1, characterized in that: The specific steps of step S1 are as follows: S11. Calculate the correlation between each meteorological factor and the daily load forecast, wherein the meteorological factors include temperature, humidity, rainfall, sunshine and wind speed; S12. Select the meteorological factor with the greatest correlation as the main meteorological factor, and set the range deviation threshold of the main meteorological factor; S13. Divide the target power consumption area into several sub-power consumption areas according to the range deviation threshold of the main meteorological factors.

3. The power grid load prediction method according to claim 2, characterized in that: The specific steps of step S22 are as follows: S221. Analyze each daily load curve, identify the inflection point, and locate the inflection point in sequence; S222. Determine whether the inflection point of the positioning is a sampling point; If yes, go to step S224; If not, proceed to step S223; S223. Set a sampling point at the inflection point to complete the interpolation of the daily load curve; S224. Determine whether the inflection point of the daily load curve has been located; If yes, go to step S225; If not, locate the next inflection point and return to step S223; S225. Generate a curve combination from the processed daily load curves in the sub-power consumption areas.

4. The power grid load forecasting method according to claim 1, characterized in that: The specific steps of step S3 are as follows: S31. Build a convolutional neural network model for each application scenario; S32. Input the meteorological factors and time corresponding to the daily load curve in the training sample into the convolutional neural network model, start the training according to the set number of iterations, and use the loss function to evaluate the model until the convolutional neural network model meets the prediction accuracy, and obtain the daily load prediction model; S33. Use the test sample to test the daily load prediction model, and when the loss function meets the requirements, obtain the actual daily load corresponding to the test sample, and then compare the actual daily load with the predicted daily load to calculate the prediction accuracy.

5. The power grid load prediction method according to claim 4, characterized in that: The specific steps of step S4 are as follows: S41. Obtain the current meteorological factors and current time of each application scenario, and input them into the daily load forecasting model of the corresponding application scenario to obtain the predicted daily load; S42. Perform a weighted summation of the daily load usage prediction accuracy of each application scenario: Where Pz represents the daily load forecast value of the z-th sub-power consumption area, p g represents the daily load forecast value of the g-th application scenario, and g represents the number of application scenarios in the z-th self-use area is g. is the weight of each item; S43. Add the daily load forecast values ​​of each sub-power consumption area to obtain the total daily load forecast value Ptotal: P 总 =P1+…+P z +…P v Among them, P1 represents the daily load forecast value of the first sub-power consumption area, P z represents the daily load forecast value of the z-th sub-power consumption area, P v It represents the daily load forecast value of the vth sub-power consumption area, and v is the number of sub-power consumption areas in the target power consumption area.

6. A system for implementing the power grid load forecasting method according to any one of claims 1 to 5, characterized in that: include: A power consumption area division module, used to divide the target power consumption area into several sub-power consumption areas based on meteorological factors, so that the meteorological factors in the sub-power consumption areas are consistent; A daily load curve sample generation module is used to obtain a set number of daily load curves in each sub-power consumption area, perform fluctuation trend interpolation on each daily load curve to obtain a curve combination, and perform cluster analysis on the curve combination according to the application scenario to obtain curve samples for different application scenarios, and divide the curve samples into training samples and test samples; The model building and training module is used to build a neural network model for each application scenario, and use the corresponding training samples to train to obtain a daily load forecasting model, and then use the test samples to test and calculate the forecast accuracy; The daily load forecasting module is used to use the neural network model to predict the daily load of the corresponding application scenario, and to perform weighted summation on the daily load prediction accuracy of each application scenario in the sub-power consumption area, and then add up the daily load prediction values ​​of each sub-power consumption area to obtain the total daily load prediction value.

7. A device, characterized in that: including a processor and a memory; The memory is used to store a computer program, and the processor is used to call and run the computer program from the memory, so that the device executes the method described in any one of claims 1 to 5.

8. A storage medium, characterized in that: The storage medium stores instructions, which, when executed on a computer, enable the computer to execute the method described in any one of claims 1 to 5.