Forward design method and system of building water supply and drainage system based on PLM platform

By configuring the water supply and drainage resource library and the 2D and 3D model library on the PLM platform, forward design of the building water supply and drainage system is carried out, which solves the problems of 2D drawing inconsistency and software compatibility in BIM technology, and achieves efficient multi-disciplinary collaboration. and digital delivery, improving design quality and construction efficiency.

CN118551464BActive Publication Date: 2024-10-18中南建筑设计院股份有限公司
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411026324.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-18
Estimated Expiration
2044-07-30

AI Technical Summary

Technical Problem

BIM technology suffers from inconsistencies in two-dimensional drawings, cumbersome mold turning, and low efficiency in building water supply and drainage design. In addition, compatibility and data exchange between different software and platforms are difficult, resulting in difficulties in information sharing and collaboration.

Method used

The forward design method of the building water supply and drainage system based on the PLM platform configures the water supply and drainage resource library, 2D schematic library and 3D model library to carry out preliminary design, simulation model construction, hydraulic calculation, logical component association, detailed design and 3D annotation. Achieve high-precision 3D model design and digital delivery under a single data source.

Benefits of technology

It realizes multi-disciplinary real-time collaborative work, improves design quality and construction efficiency, solves the problem of inconsistent drawings and models, reduces understanding errors, optimizes pipeline layout, avoids rework, and achieves drawing-less delivery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551464B_ABST
    Figure CN118551464B_ABST
Patent Text Reader

Abstract

The present invention provides a forward design method and system for building water supply and drainage systems based on a PLM platform. In the PLM platform, the system schematic function is combined with the three-dimensional modeling process, and the design process meets the requirements of multi-level design depth. Strict logic inspection, intelligent troubleshooting, two-dimensional and three-dimensional linkage and real-time simulation are also performed through the schematic diagram to discover and optimize design problems in advance, enhance the foresight and accuracy of the design, and realize forward three-dimensional design of a single data source and information sharing and collaboration of various professions and stages. The non-drawing delivery process based on MBD technology reduces the understanding deviation and efficiency loss problems that may be caused by traditional two-dimensional drawings in information transmission. This innovative design system is based on the water supply and drainage profession, promotes real-time collaborative work in multiple professional fields, greatly improves the efficiency and quality of three-dimensional design, avoids the tedious mold remodeling work of traditional BIM, shortens the design cycle, and provides a new technical route for the digital transformation of buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of building water supply and drainage, and in particular relates to a forward design method and system for a building water supply and drainage system based on a PLM platform. Background Art

[0002] In recent years, with the popularization of BIM technology, this technology has been widely used in the construction industry. However, the application of BIM technology in water supply and drainage is mainly focused on mold reversal and collision inspection between pipelines. Water supply and drainage design can never be separated from two-dimensional drawings. It is difficult to ensure the consistency of drawings and models in the delivery results. The entire mold reversal process is cumbersome and inefficient. When using BIM technology for water supply and drainage forward design, there are problems with compatibility and data exchange between different software and platforms, which makes information sharing and collaboration among various disciplines and stages more difficult.

[0003] The PLM (Product Lifecycle Management) system is a unified platform for establishing product design and development, collaborative design and manufacturing, and project management. It can complete the entire process of product design, manufacturing, delivery, and operation and maintenance based on a single data source. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a forward design method and system for a building water supply and drainage system based on a PLM platform, which is used for high-precision three-dimensional model design based on a single data source.

[0005] The technical solution adopted by the present invention to solve the above technical problems is: a forward design method for a building water supply and drainage system based on a PLM platform, comprising the following steps:

[0006] S1: Configure the water supply and drainage resource library, water supply and drainage 2D schematic library and water supply and drainage 3D model library in the early stage of design;

[0007] S2: Determine the preliminary design of the water supply and drainage system based on the project characteristics, engineering funding and building functions, and select equipment;

[0008] S3: Create a two-dimensional schematic diagram of the water supply and drainage system in the PLM platform based on the preliminary design plan and equipment selection results;

[0009] S4: Rapidly generate and build a simulation model based on the two-dimensional schematic diagram of the water supply and drainage system, analyze the working conditions of the water supply and drainage equipment at the schematic stage, perform hydraulic calculations, and compare the combination of equipment;

[0010] S5: Associating the logical components in the 2D schematic with the corresponding 3D models;

[0011] S6: Construct a three-dimensional model of the water supply and drainage system and conduct hydraulic calculation review;

[0012] S7: Deepen the 3D model of the water supply and drainage system after hydraulic calculation and verification;

[0013] S8: Carry out 3D annotation and delivery of the 3D model of the detailed water supply and drainage system.

[0014] According to the above scheme, in step S1,

[0015] The water supply and drainage resource library includes water supply and drainage resource sets and pipeline specification resources; the drainage resource set includes various engineering technical tables, including standard tables, nominal diameter tables, pressure grade tables, material tables, material type tables and end type tables; the engineering technical tables are used to filter out the required components in subsequent modeling work; the pipeline specification resources include water supply and drainage pipeline specification resources, water supply and drainage part subtype tables, water supply and drainage logic part subtype tables, water supply and drainage mapping part subtype tables and water supply and drainage material tables; the mapping part subtype tables are used to associate 2D logical symbols with 3D models;

[0016] The two-dimensional schematic library of water supply and drainage includes various components, including pipelines, pipeline accessories, pipeline connectors, valves, various equipment and instruments;

[0017] The water supply and drainage 3D model library is used to associate parametric models with design tables, batch generate models including pipes, elbows, and valves, and store them in the standard parts 3D model library; design parametric equipment models and store them in the equipment 3D model library; the templates in the water supply and drainage 3D model library include single component forms and group forms; the group form is valves and instruments pre-connected with the equipment, which are used for overall call when building the model;

[0018] The properties of the components in the two-dimensional water supply and drainage schematic library and the three-dimensional water supply and drainage model library are expanded accordingly according to simulation requirements and quantity calculation requirements.

[0019] According to the above scheme, in step S2, the specific steps are:

[0020] Design a preliminary water supply and drainage plan based on the relevant technical information provided by the architecture and structure professionals and the municipal information provided by the construction unit in the early stage of communication; the design scope includes: water supply system, hot water system, domestic drainage system, rainwater system and fire protection system, as well as the connection method between building pipelines and municipal pipelines;

[0021] The water supply system calculates the water consumption standard, the number of water use units, working hours, hourly variation coefficient, the maximum daily water consumption and the maximum hourly water consumption according to the project funding, and comprehensively compares various water supply plans and selects the appropriate water supply method on the premise of meeting the specific conditions of the building and the local municipal departments and local regulations; the water supply plan includes determining the division and water supply method of the water supply system, the requirements for water supply in different zones and the measures to be taken, preliminarily determining the parameters including the water tank volume, water pump head and flow, and selecting the main equipment;

[0022] The hot water system selects the heat source comprehensively according to the project characteristics, including the maximum daily water consumption, maximum hourly water consumption, designed hourly heat consumption and designed outlet water temperature, and the form of the hot water system is selected in combination with the local sunshine and solar energy conditions;

[0023] The pipe diameters of domestic drainage systems and rainwater systems are determined according to the amount of sewage or water discharged;

[0024] The fire protection system includes fire hydrant system, automatic sprinkler system and deluge sprinkler system. The parameters of fire protection equipment are determined according to the building type, hazard level, fire duration and maximum fire water consumption of the project. Fire protection equipment includes fire water tank, booster pump and pressure stabilizing equipment.

[0025] According to the above scheme, in step S3, a preliminary judgment is made on the reliability and feasibility of the water supply and drainage system based on the created two-dimensional schematic diagram; different types of attributes are mounted on the components of the two-dimensional schematic diagram by means of attribute extension.

[0026] Furthermore, in step S4, the specific steps are:

[0027] Review the 2D schematic diagram of the drainage system based on the design specifications to ensure that the 2D schematic diagram meets the specification requirements;

[0028] After expanding the simulation properties of logic symbols in the PLM platform, the simulation model is quickly generated based on the reviewed 2D schematic diagram, and the modified properties in the 2D schematic diagram are synchronized to the simulation model in real time;

[0029] The working conditions of the water supply and drainage equipment at the schematic diagram stage are studied, the hydraulic calculation of the drainage system is carried out according to the resistance loss along the pipeline of different materials, and the combination of various equipment is compared according to the principles of cost reduction, energy saving and efficiency improvement to verify the rationality of the two-dimensional schematic diagram; the local head loss and flow distribution of pipe accessories including elbows, tees, crosses and valves are simulated and verified, and the simulation results, standard theories and measured data are compared to ensure the accuracy and reliability of the simulation results.

[0030] According to the above scheme, in step S5, the specific steps are:

[0031] Create a model link relationship between the 2D schematic library of water supply and drainage and the 3D model library of water supply and drainage, and add the implementation relationship between the 2D schematic node and the 3D model to complete the driving of the 2D schematic to the 3D model, thus realizing the 2D and 3D linkage; check whether the connectivity of the 3D model is correct based on the 2D schematic, and perform hydraulic simulation calculation based on the 2D schematic;

[0032] Generate 3D models of associated devices based on 2D schematics; automatically retrieve physical 3D models corresponding to logical device symbols through predefined part numbers to achieve automatic device layout from logic to physical; check the association between 2D schematics and 3D models in real time during design to dynamically verify the correctness of the design;

[0033] Generate a 3D model of the associated pipeline based on the 2D schematic diagram; automatically filter the pipeline parts that meet the standards in the parts library through the link relationship between the 2D logical symbols and the 3D parts, so that the pipeline specifications in the 2D schematic diagram are transferred to the 3D model to achieve unified specifications.

[0034] According to the above scheme, in step S6, the specific steps are:

[0035] A three-dimensional model of the pipeline is established in the PLM platform and engineering mapping is added to generate a hydraulic calculation model. Information about the pipeline's spatial position, material, and scale is transferred to the hydraulic calculation model, so that hydraulic calculations can be quickly reviewed. The position and corresponding pressure of the most unfavorable end of the system are accurately analyzed based on the hydraulic calculation review results, and fine adjustments are made to the pipeline and equipment.

[0036] According to the above scheme, in step S7, the specific steps are:

[0037] In the PLM platform, different disciplines work together and process design changes in real time to deepen the design of the 3D model after hydraulic review; determine the installation height of the pipeline based on the spatial relationship between the civil engineering model, HVAC model and electrical model to ensure that the pipeline layout meets the net height requirements; automatically interrupt the pipe section after deepening, reorganize the processing model and design comprehensive supports and hangers;

[0038] Through the above pipeline layout plan, comprehensive supports and hangers are used to uniformly support various professional pipelines, and the mechanical and electrical installation plan is determined through the PLM platform.

[0039] According to the above scheme, in step S8, the specific steps are:

[0040] Based on MBD technology, 3D annotation is performed on the detailed model and a 3D electronic instruction manual is produced;

[0041] Reorganize the detailed model to define the prefabricated nodes for manufacturing and construction;

[0042] Carry out 3D annotation on the detailed model, including dimension information annotation, positioning information annotation and processing information annotation;

[0043] Deliver the water supply and drainage professional model in three dimensions, and pass the model's manufacturing and construction information to downstream in the form of electronic atlas.

[0044] A forward design system for a building water supply and drainage system based on a PLM platform, the system comprising a processor and a memory, the memory storing computer instructions, the processor being used to execute the computer instructions stored in the memory, and when the computer instructions are executed by the processor, the system implements the steps of a forward design method for a building water supply and drainage system based on a PLM platform.

[0045] The beneficial effects of the present invention are:

[0046] 1. The forward design method and system of the building water supply and drainage system based on the PLM platform of the present invention, through the forward design process of the water supply and drainage profession, multiple professions work together in real time to efficiently solve problems, and realize the function of high-precision three-dimensional model design based on a single data source, further realizing digital delivery, thereby improving design quality and construction efficiency.

[0047] 2. The water supply and drainage system schematic diagram based on the PLM platform of the present invention not only has the functions of displaying the direction of pipelines, reflecting the system principles, expressing the contents that are difficult to express clearly in the plan view, and cooperating with the plan view to express the connection relationship of pipelines and equipment of the entire system, but also has the functions of logic checking to assist in troubleshooting, two- and three-dimensional linkage, and rapid simulation.

[0048] 3. The present invention solves the compatibility and data exchange problems between different software and platforms, and realizes information sharing and collaboration in various disciplines and stages. The PLM platform provides the function of real-time collaborative work among multiple disciplines, so that designers can efficiently handle cross-disciplinary collaborative problems and avoid collision and interference problems between different professional models; considering the construction characteristics of each professional pipeline, optimizing pipeline layout, reducing bends, avoiding rework problems at the later construction site, and improving design quality and efficiency.

[0049] 4. The present invention uses MBD technology to perform three-dimensional annotation and digital delivery of the detailed model, accurately expressing the designer's design intent and manufacturing requirements, and on this basis accurately delivering information to the downstream, improving the design quality and reliability, and solving the problem of inconsistency between drawings and models that is difficult to solve with traditional BIM technology, realizing delivery without drawings, and reducing problems such as misunderstanding caused by using traditional two-dimensional drawings to transmit information. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 is a flow chart of an embodiment of the present invention.

[0051] Figure 2 This is a display diagram of a water supply and drainage resource set according to an embodiment of the present invention.

[0052] Figure 3 It is a two-dimensional schematic diagram showing the water supply, drainage and fire protection system of an embodiment of the present invention.

[0053] Figure 4 1 is a schematic diagram of a fire protection system according to an embodiment of the present invention.

[0054] Figure 5 2 is a plan view of a sprinkler system according to an embodiment of the present invention.

[0055] Figure 6 It is a two-dimensional simulation diagram of the fire protection system of an embodiment of the present invention.

[0056] Figure 7 It is a two-dimensional and three-dimensional linkage diagram of the spray system of an embodiment of the present invention.

[0057] Figure 8 It is a three-dimensional hydraulic calculation diagram of the fire protection system according to an embodiment of the present invention.

[0058] Fig. 9 It is a multi-professional model diagram of an embodiment of the present invention.

[0059] Fig.10 It is a pipeline bending diagram according to an embodiment of the present invention.

[0060] Fig.11 2 is a diagram of a comprehensive support and hanger according to an embodiment of the present invention.

[0061] Fig.12 It is a three-dimensional annotation diagram of the fire protection pipe size information according to an embodiment of the present invention.

[0062] Fig.13 It is a three-dimensional annotation diagram of the fire protection pipeline positioning and processing information according to an embodiment of the present invention. DETAILED DESCRIPTION

[0063] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0064] See also Figure 1 Taking a science and technology museum as an example, the embodiment of the present invention includes the following steps:

[0065] S1: Establish water supply and drainage resource set, water supply and drainage logic schematic library and 3D model library in the early stage of project preparation, including:

[0066] Establish a water supply and drainage resource set, mainly including standard tables, nominal diameter tables, pressure grade tables, material tables, material type tables, end type tables, etc. Various engineering technical tables together constitute the basic environment for fluid design.

[0067] Configure pipeline / pipeline specification resources, mainly including water supply and drainage parts subtype table, water supply and drainage logic parts subtype table, water supply and drainage mapping parts subtype table, etc.

[0068] Design standard pipe fittings and associate them with product design tables, batch generate standard parts such as pipes, elbows, valves, etc., and store them in the standard parts 3D model library; design parametric equipment models and store them in the 3D model equipment library.

[0069] Refer to the two-dimensional symbol drawing standards in the standard "Building Water Supply and Drainage Drawing Standard" GB / T 50106-2010.[S], and establish a two-dimensional schematic library in the PLM platform.

[0070] In the PLM platform, the mapping relationship between the 3D model and the 2D model is set to establish a link between the 2D and 3D models.

[0071] In order to meet the requirements of simulation, quantity calculation, cost estimation, etc., IFC attributes are expanded for two-dimensional logical components and three-dimensional models.

[0072] S2: In the preliminary design stage of the project, water supply and drainage scheme design is required, which mainly includes: the selection of main equipment and schematic design of each water supply and drainage system. The science and technology museum project in this embodiment is a large public building with a construction area of ​​8735m3, three floors above ground and a building height of 22.5m.

[0073] The fire protection system of this embodiment includes the design of indoor fire hydrant water supply system and automatic sprinkler fire extinguishing system. The water consumption of the indoor fire hydrant system in this embodiment is 40L / s, and the fire duration is 2 hours. The main equipment of the indoor fire hydrant water supply system is a high-level fire water tank (volume 18 cubic meters), two fire hydrant booster pumps (Q=80L / s, H=80m, N=132kW), fire hydrant pressure stabilizing equipment, etc.

[0074] The automatic sprinkler fire extinguishing system of this embodiment is calculated according to the medium I danger level according to the project level, the water spraying intensity is 6L / minm2, the action area of ​​the wet automatic sprinkler fire extinguishing system is 160m2, and the action area of ​​the pre-action system is 208m2. Its main equipment is the roof fire water tank shared with the fire hydrant system, the automatic sprinkler pressure pump (Q=52L / s, H=85m, N=110kW), and the automatic sprinkler system pressure stabilizing equipment.

[0075] S3: The schematic diagrams of this embodiment include: schematic diagrams of indoor fire hydrant system, automatic sprinkler system, domestic water supply, wastewater and sewage system. According to the equipment selection results included, design the two-dimensional schematic diagram of each system in the PLM platform.

[0076] In the schematic diagram, zoning design is carried out according to the number of building floors and elevations. According to the equipment selection results, principle design of each water supply and drainage system is carried out, and the system logic is checked through the schematic diagram inspection function.

[0077] According to the project requirements, draw the schematic diagram and generate the corresponding equipment list and equipment report. Taking the fire protection system as an example, the two-dimensional schematic diagram of the fire protection system is as follows: Figure 4 As shown, the two-dimensional schematic diagram of the spray system is as follows Figure 5 shown.

[0078] S4: Verify the simulation model before simulation calculation, calculate the resistance loss along the pipeline of different materials and compare it with the calculation results of the normative empirical formula and the existing test results. Simulate and verify the local head loss and flow distribution of pipe accessories such as elbows, tees, crosses, valves, etc., and compare the simulation results with standards, theories and measured data to ensure the accuracy and reliability of the simulation results.

[0079] The rationality of the schematic diagrams of each water supply and drainage system needs to be verified, and the system schematic diagrams are reviewed based on the design specifications to ensure that the schematic diagrams meet the specification requirements. Based on the reviewed system schematic diagrams, a simulation model is quickly generated, the working conditions of the water supply and drainage equipment at the schematic stage are studied, and the combination of various equipment is compared.

[0080] Simulate the water supply and drainage systems. Take the fire protection system as an example. The two-dimensional simulation model is as follows: Figure 6 Verify whether the system schematic meets the design requirements. If not, readjust the schematic.

[0081] S5: During the detailed design phase of a project, it is necessary to quickly create a 3D model based on the schematic diagram and conduct 3D deepening so that the 3D model can be applied to the processing and construction phases.

[0082] Build a 3D model in the PLM platform. Since the equipment model in the 2D schematic has been associated with the 3D equipment model through predefined part numbers, the associated 3D model can be automatically generated through the synchronization function, and then the equipment position can be adjusted to complete the equipment layout. By associating the 2D logical schematic with the 3D physical model, a 3D model can be quickly generated, and accessories such as tees and flanges can be automatically arranged based on the configured pipeline specifications. This embodiment takes the sprinkler system as an example. Figure 7 It shows the relationship between the 3D model of the sprinkler system and the 2D schematic diagram.

[0083] S6: Add engineering mapping to the 3D pipeline model to generate a hydraulic calculation model. The spatial position, material, scale and other information of the 3D pipeline can be transferred to the calculation model to quickly perform hydraulic calculations. Figure 8The hydraulic calculation process of the fire protection pipeline is displayed. Based on the hydraulic calculation results, the most unfavorable end position and corresponding pressure of the system are accurately analyzed, and the pipelines and equipment are finely adjusted.

[0084] S7: The PLM platform provides the function of real-time collaboration among multiple disciplines, so designers can efficiently handle multi-disciplinary collaboration issues. When deepening the water supply and drainage model, it is necessary to consider the spatial coordination relationship with the civil engineering, HVAC, and electrical models, meet the building net height requirements, and reasonably determine the pipeline installation height. Fig. 9 shown.

[0085] In the PLM platform, the conflict between mechanical and electrical disciplines is solved, and the pipeline construction characteristics of each discipline are considered, such as Fig.10 As shown, the pipeline layout plan can be reasonably determined, the pipeline layout can be optimized, bends can be reduced, and rework and other problems can be avoided at the later construction site.

[0086] Through the above reasonable pipeline arrangement scheme, such as Fig.11 As shown in the figure, comprehensive supports and hangers are used to uniformly support various professional pipelines, reduce the number of hangers, speed up construction efficiency, and determine a hanger construction plan that is both beautiful and efficient through the PLM platform.

[0087] S8: In the project delivery phase, the MBD (Model-Based Definition) technology based on the PLM platform can effectively solve the problem of inconsistent drawings and models that is difficult to solve with traditional BIM technology. Reorganize the detailed model and define the prefabricated nodes for manufacturing and construction. Perform three-dimensional annotation on the detailed model, mainly including dimension information annotation, positioning information annotation, and processing information annotation. Fig.12 Displays the size information of the fire protection pipe. Fig.13 The positioning and processing information of the fire protection pipes are displayed.

[0088] The core issue to be solved by three-dimensional delivery of water supply and drainage professional models is to transmit the manufacturing and construction information of the building information model to the downstream in the form of electronic atlases, realize delivery without drawings, and reduce problems such as misunderstanding caused by using traditional two-dimensional drawings to transmit information.

[0089] The above embodiments are only used to illustrate the design ideas and features of the present invention, and their purpose is to enable those skilled in the art to understand the content of the present invention and implement it accordingly. The protection scope of the present invention is not limited to the above embodiments. Therefore, any equivalent changes or modifications made based on the principles and design ideas disclosed by the present invention are within the protection scope of the present invention.

Claims

1. Forward design method of building water supply and drainage system based on PLM platform, Features: The following steps are involved: S1: Configure the water supply and drainage resource library, water supply and drainage 2D schematic library and water supply and drainage 3D model library in the early stage of design; S2: Determine the preliminary design of the water supply and drainage system based on the project characteristics, engineering funding and building functions, and select equipment; S3: Create a two-dimensional schematic diagram of the water supply and drainage system in the PLM platform based on the preliminary design plan and equipment selection results; S4: Rapidly generate and build a simulation model based on the two-dimensional schematic diagram of the water supply and drainage system, analyze the working conditions of the water supply and drainage equipment in the schematic diagram stage and perform hydraulic calculations, and compare the combination of equipment; the specific steps are: Review the 2D schematic diagram of the drainage system based on the design specifications to ensure that the 2D schematic diagram meets the specification requirements; After expanding the simulation properties of logic symbols in the PLM platform, the simulation model is quickly generated based on the reviewed 2D schematic diagram, and the modified properties in the 2D schematic diagram are synchronized to the simulation model in real time; The working conditions of water supply and drainage equipment at the schematic diagram stage were studied, hydraulic calculations of the drainage system were performed based on the resistance loss along the pipelines of different materials, and the combination of various equipment was compared based on the principles of cost reduction, energy saving, and efficiency improvement to verify the rationality of the two-dimensional schematic diagram; local head loss and flow distribution of pipe accessories including elbows, tees, crosses, and valves were simulated and verified, and the simulation results, standard theories, and measured data were compared to ensure the accuracy and reliability of the simulation results; S5: Associating the logical components in the two-dimensional schematic diagram with the corresponding three-dimensional model; the specific steps are: Create a model link relationship between the 2D schematic library of water supply and drainage and the 3D model library of water supply and drainage, and add the implementation relationship between the 2D schematic node and the 3D model to complete the driving of the 2D schematic to the 3D model, thus realizing the 2D and 3D linkage; check whether the connectivity of the 3D model is correct based on the 2D schematic, and perform hydraulic simulation calculation based on the 2D schematic; Generate 3D models of associated devices based on 2D schematics; automatically retrieve physical 3D models corresponding to logical device symbols through predefined part numbers to achieve automatic device layout from logic to physical; check the association between 2D schematics and 3D models in real time during design to dynamically verify the correctness of the design; Generate a 3D model of the associated pipeline based on the 2D schematic diagram; automatically filter the pipeline parts that meet the standards in the parts library through the link relationship between the 2D logical symbols and the 3D parts, so that the pipeline specifications in the 2D schematic diagram are transferred to the 3D model to achieve unified specifications; S6: Construct a three-dimensional model of the water supply and drainage system and conduct hydraulic calculation review; S7: Deepen the 3D model of the water supply and drainage system after hydraulic calculation and verification; S8: Carry out 3D annotation and delivery of the 3D model of the detailed water supply and drainage system.

2. According to the forward design method of building water supply and drainage system based on PLM platform in claim 1, Features: In the step S1, The water supply and drainage resource library includes water supply and drainage resource sets and pipeline specification resources; the drainage resource set includes various engineering technical tables, including standard tables, nominal diameter tables, pressure grade tables, material tables, material type tables and end type tables; the engineering technical tables are used to filter out the required components in subsequent modeling work; the pipeline specification resources include water supply and drainage pipeline specification resources, water supply and drainage part subtype tables, water supply and drainage logic part subtype tables, water supply and drainage mapping part subtype tables and water supply and drainage material tables; the mapping part subtype tables are used to associate 2D logical symbols with 3D models; The two-dimensional schematic library of water supply and drainage includes various components, including pipelines, pipeline accessories, pipeline connectors, valves, various equipment and instruments; The water supply and drainage 3D model library is used to associate parametric models with design tables, batch generate models including pipes, elbows, and valves, and store them in the standard parts 3D model library; design parametric equipment models and store them in the equipment 3D model library; the templates in the water supply and drainage 3D model library include single component forms and group forms; the group form is valves and instruments pre-connected with the equipment, which are used for overall call when building the model; The component properties in the 2D schematic library and 3D model library of the water supply and drainage system are expanded accordingly based on the simulation analysis requirements and accurate quantity calculation requirements.

3. According to the forward design method of building water supply and drainage system based on PLM platform in claim 1, Features: In the step S2, the specific steps are: Design a preliminary water supply and drainage plan based on the relevant technical information provided by the architecture and structure professionals and the municipal information provided by the construction unit in the early stage of communication; the design scope includes: water supply system, hot water system, domestic drainage system, rainwater system and fire protection system, as well as the connection method between building pipelines and municipal pipelines; The water supply system calculates the water consumption standard, the number of water use units, working hours, hourly variation coefficient, the maximum daily water consumption and the maximum hourly water consumption according to the project funding, and comprehensively compares various water supply plans and selects the appropriate water supply method on the premise of meeting the specific conditions of the building and the local municipal departments and local regulations; the water supply plan includes determining the division and water supply method of the water supply system, the requirements for water supply in different zones and the measures to be taken, preliminarily determining the parameters including the water tank volume, water pump head and flow, and selecting the main equipment; The hot water system selects the heat source comprehensively according to the project characteristics, including the maximum daily water consumption, maximum hourly water consumption, designed hourly heat consumption and designed outlet water temperature, and the form of the hot water system is selected in combination with the local sunshine and solar energy conditions; The pipe diameters of domestic drainage systems and rainwater systems are determined according to the amount of sewage or water discharged; The fire protection system includes a fire hydrant system and an automatic sprinkler fire extinguishing system. The parameters of the fire protection equipment are determined based on the building type, hazard level, fire duration and the maximum fire water consumption of the project. The fire protection equipment includes a fire water tank, a pressure pump and a pressure stabilizing device.

4. According to the forward design method of building water supply and drainage system based on PLM platform in claim 1, Features: In the step S3, a preliminary judgment is made on the reliability and feasibility of the water supply and drainage system based on the created two-dimensional schematic diagram; different types of attributes are mounted on the components of the two-dimensional schematic diagram by means of attribute extension.

5. According to the forward design method of building water supply and drainage system based on PLM platform in claim 1, Features: In the step S6, the specific steps are: A three-dimensional model of the pipeline is established in the PLM platform and engineering mapping is added to generate a hydraulic calculation model. Information about the pipeline's spatial position, material, and scale is transferred to the hydraulic calculation model, so that hydraulic calculations can be quickly reviewed. The position and corresponding pressure of the most unfavorable end of the system are accurately analyzed based on the hydraulic calculation review results, and fine adjustments are made to the pipeline and equipment.

6. According to the forward design method of building water supply and drainage system based on PLM platform in claim 1, Features: In the step S7, the specific steps are: In the PLM platform, different disciplines work together and process design changes in real time to deepen the design of the 3D model after hydraulic review; according to the spatial relationship between the civil engineering model, HVAC model and electrical model, ensure that the pipeline layout meets the net height requirements and determine the installation height of the pipeline; automatically interrupt the pipe section after deepening, reorganize the processing model and design comprehensive supports and hangers; Through the above pipeline layout plan, comprehensive supports and hangers are used to uniformly support various professional pipelines, and the mechanical and electrical installation plan is determined through the PLM platform.

7. According to the forward design method of building water supply and drainage system based on PLM platform in claim 1, Features: In the step S8, the specific steps are: Based on MBD technology, 3D annotation is performed on the detailed model and a 3D electronic instruction manual is produced; Reorganize the detailed model to define the prefabricated nodes for manufacturing and construction; Carry out 3D annotation on the detailed model, including dimension information annotation, positioning information annotation and processing information annotation; Deliver the water supply and drainage professional model in three dimensions, and pass the model's manufacturing and construction information to downstream in the form of electronic atlas.

8. A forward design system for building water supply and drainage systems based on a PLM platform, the system comprising a processor and a memory, Features: The memory stores computer instructions, and the processor is used to execute the computer instructions stored in the memory. When the computer instructions are executed by the processor, the system implements the steps of the forward design method of a building water supply and drainage system based on a PLM platform as described in any one of claims 1 to 7.