A smart water service status online monitoring and management system

By selecting the monitoring module in smart water affairs, we obtain the layout of the water supply pipeline network and historical fault data, form a monitoring point database, and conduct monitoring based on the environment and population distribution, which solves the problems of waste of resources and difficulty in data processing for leakage monitoring of the water supply pipeline network, and achieves Provide efficient and accurate monitoring and management.

CN118552183BActive Publication Date: 2024-10-25ANHUI HIGHWELL ELECTRONICS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410986065.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-25
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

In the status online monitoring and management of smart water affairs, leakage monitoring of the water supply pipeline network requires a large number of monitoring points, resulting in a waste of resources and difficulty in data processing, and invalid data increases the inconvenience of management.

Method used

By selecting the monitoring module to obtain the layout diagram and historical fault data of the water supply pipeline network, a monitoring point database is formed, and the initial monitoring point is selected according to the environmental conditions, the monitoring equipment is started to obtain hydraulic monitoring data, and the data is judged based on the population distribution to confirm the fault point and use Edge computing processes data, reduces the burden on the cloud, and optimizes the use of monitoring resources.

Benefits of technology

It realizes large-scale monitoring of a small number of monitoring points, reduces the burden of data processing, improves the environmental protection and convenience of monitoring management, improves the accuracy and accuracy of monitoring results, and reduces the situation of undiscovered leaks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118552183B_ABST
    Figure CN118552183B_ABST
Patent Text Reader

Abstract

The present application discloses an online status monitoring and management system for smart water affairs, which relates to the technical field of water affairs monitoring and management. The method includes: selecting a monitoring module to obtain a layout diagram and historical fault data of a water supply pipeline network, selecting monitoring points and forming a monitoring point library; the initial monitoring module obtains the environmental conditions around the monitoring point, and selects the initial monitoring point; the effective monitoring module starts the monitoring equipment of the initial monitoring point, and processes the data to obtain valid data; the fault confirmation module obtains the real-time water consumption, and confirms the fault point of the water supply pipeline network; the primary fault module obtains the associated monitoring points of the fault point, controls the monitoring equipment of the associated monitoring points to start, and confirms the primary fault result; the monitoring result module controls the hydraulic equipment to adjust the hydraulic data, and outputs the pipeline fault result after verifying the primary fault result. The present application improves the convenience of online status monitoring and management for smart water affairs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of water affairs monitoring and management, and in particular to an online monitoring and management system for the status of smart water affairs. Background Art

[0002] Smart water services fully explore the value and logical relationship of data through the deep integration of new generation information technology and water technology, realize intelligent control, data resourceization, precise management, and intelligent decision-making of water service systems, ensure the safe operation of water facilities, and make water service operations more efficient, management more scientific, and services better. In smart water services, leakage monitoring of water supply pipeline networks is particularly important, because once leakage occurs in the water supply pipeline network, the operation of smart water services will be seriously disturbed. Therefore, in the online monitoring and management of the status of smart water services, it is necessary to focus on the leakage of the water supply pipeline network.

[0003] In the related art, some hydraulic data of the water supply pipeline network is monitored to determine whether the water supply pipeline network has leakage. However, because the water supply pipeline network is complex and numerous, a large number of monitoring points are required to obtain relatively accurate monitoring results. A large number of monitoring points will lead to a waste of monitoring resources, and a lot of invalid monitoring data will also increase the difficulty of data processing, thus making water monitoring management inconvenient. There is room for improvement. Summary of the invention

[0004] The purpose of the present invention is to provide an online monitoring and management system for the status of smart water services to solve the problems raised in the above-mentioned background technology.

[0005] This application provides an online monitoring and management system for smart water services, which adopts the following technical solutions:

[0006] Select a monitoring module, obtain a layout diagram and historical fault data of the water supply pipeline network, select monitoring points based on the layout diagram and historical fault data, and form a monitoring point library;

[0007] The initial monitoring module is connected to the selected monitoring module signal to obtain the environmental conditions around the monitoring point, and the initial monitoring point is selected based on the monitoring conditions of the monitoring point;

[0008] The effective monitoring module is connected to the initial monitoring module signal, the monitoring equipment at the initial monitoring point is started, the hydraulic monitoring data is monitored, the effective data of the hydraulic monitoring data is judged according to the population distribution to obtain the judgment result, and the data is processed according to the judgment result to obtain the effective data;

[0009] The fault confirmation module is connected with the effective monitoring module signal to obtain the real-time water consumption, and confirms the fault point of the water supply pipeline network according to the real-time water consumption;

[0010] The primary fault module is connected to the fault confirmation module by signal, obtains the associated monitoring points of the fault point according to the monitoring point library, controls the monitoring equipment of the associated monitoring points to start, obtains the associated monitoring data, and confirms the primary fault result according to the associated monitoring data;

[0011] The monitoring result module is connected to the primary fault module signal, controls the hydraulic equipment to adjust the hydraulic data, and outputs the pipeline fault result after verifying the primary fault result.

[0012] Preferably, the steps of obtaining the layout diagram and historical fault data of the water supply pipeline network, selecting monitoring points according to the layout diagram and historical fault data and forming a monitoring point library are specifically as follows:

[0013] Obtaining a layout diagram and historical fault data of a water supply pipeline network, and extracting historical fault locations of the water supply pipeline network from the historical fault data;

[0014] The number of faults and the degree of faults at the historical fault locations are counted, the fault weight ratio of the number of faults and the degree of faults is set, and the fault degree of the fault location is calculated according to the number of faults, the degree of faults and the corresponding fault weight ratio;

[0015] Set a fault degree threshold, and select fault locations whose fault degrees reach the fault degree threshold as candidate monitoring points;

[0016] Obtain the distance between the candidate monitoring points and set a distance threshold. If the distance between the two candidate monitoring points does not reach the distance threshold, obtain the center position of the two candidate monitoring points, extract the pipeline position closest to the center position of the water supply pipeline network as a new candidate monitoring point and replace the original two candidate monitoring points;

[0017] When the distances between all candidate monitoring points reach the distance threshold, all candidate monitoring points are counted as monitoring points and a monitoring point library is formed.

[0018] Preferably, the step of obtaining the environmental conditions around the monitoring point and selecting the initial monitoring point in combination with the monitoring conditions of the monitoring point is specifically:

[0019] Obtain the environmental conditions around the monitoring point, extract the factors that affect the hydraulic data monitoring process from the environmental conditions and record them as influencing factors, and set the impact threshold of the influencing factors;

[0020] Obtain the average impact value of the impact factor at the monitoring point location, and calculate the impact difference when the average impact value exceeds the impact threshold;

[0021] All impact differences are accumulated to obtain the impact degree of the impact factor of the monitoring point, and an impact degree threshold is set. The monitoring point whose impact degree reaches the impact degree threshold is selected as the first monitoring point;

[0022] The monitoring range of the first monitoring point is obtained, and the first monitoring point that meets the monitoring range requirements is selected from the first monitoring points according to the monitoring range as the initial monitoring point.

[0023] Preferably, the step of obtaining the monitoring range of the first monitoring point and selecting the first monitoring point that meets the monitoring range requirements from the first monitoring points as the initial monitoring point according to the monitoring range is specifically:

[0024] Obtain the number AL of routes from the water supply starting point to the first monitoring point and the total distance AZ of routes from the water supply starting point to the first monitoring point;

[0025] Obtain the number AD of water supply endpoints passing through the first monitoring point, obtain the average value of water consumption change of the water supply endpoints passing through the first monitoring point, and obtain the water consumption change value AB after superposition;

[0026] Correlation function based on monitoring range The monitoring range value AF of the first monitoring point is calculated, where , , , is the scale factor and is greater than 0;

[0027] Set a monitoring range value threshold, and select the first monitoring point whose monitoring range value reaches the monitoring range value threshold as the initial monitoring point.

[0028] Preferably, the steps of starting the monitoring equipment at the initial monitoring point, monitoring and obtaining hydraulic monitoring data, determining effective data of the hydraulic monitoring data according to the population distribution to obtain a determination result, and processing the data according to the determination result to obtain effective data are specifically:

[0029] Control the monitoring equipment at the initial monitoring point to start, collect the hydraulic monitoring data at the initial monitoring point, perform edge computing on the hydraulic monitoring data, and obtain the hydraulic change value of the hydraulic monitoring data;

[0030] Obtain the population distribution, obtain the predicted water consumption according to the population distribution, set the hydraulic change value range according to the predicted water consumption, and when the hydraulic change value does not exceed the hydraulic change value range, judge the hydraulic monitoring data as invalid data and store it locally;

[0031] Set a standard time period, calculate the invalid data within the standard time period through edge computing to obtain the hydraulic average value and upload it to the cloud;

[0032] When the hydraulic change value exceeds the hydraulic change value range, the hydraulic monitoring data is considered to be valid data and the valid data is transmitted to the cloud;

[0033] The monitoring time point with valid data is obtained, and the invalid data of the nearest standard time period within the monitoring time point is synchronously transmitted to the cloud.

[0034] Preferably, the step of obtaining the population distribution and obtaining the predicted water consumption according to the population distribution is specifically as follows:

[0035] Obtain a water supply coverage area according to the layout diagram, divide the water supply coverage area, and obtain multiple water supply areas;

[0036] The number of vehicles in the water supply area is counted by edge cameras in the area, and the first number of personnel flows is predicted based on the number of vehicles;

[0037] Combined with edge cameras to count the flow of people in the area, the second flow of people is obtained;

[0038] According to the flow data of people in the water supply area where the flow of people is counted, the third flow of people is obtained;

[0039] The total flow quantity is obtained by adding the first flow quantity, the second flow quantity and the third flow quantity;

[0040] The per capita water consumption in the water supply coverage area is obtained, and the predicted water consumption in the water supply area is calculated by combining the total flow quantity and per capita water consumption.

[0041] Preferably, the fault confirmation module is connected to the effective monitoring module signal to obtain the real-time water consumption, and the steps of confirming the fault point of the water supply pipeline network according to the real-time water consumption are specifically as follows:

[0042] Obtain real-time water consumption, calculate the difference between real-time water consumption and predicted water consumption, set a water difference threshold, and if the water difference does not reach the water difference threshold, compare the valid data with the corresponding data of real-time water consumption to obtain the fault point;

[0043] If the water volume difference reaches the water volume difference threshold, the monitoring device at the water volume counting device is turned on, and the corresponding monitoring point is recorded as the primary monitoring point, and the hydraulic monitoring data around the water volume counting device is obtained and recorded as the primary monitoring data;

[0044] Determine whether the primary monitoring point is faulty according to the primary monitoring data. If the primary monitoring point is faulty, record the primary monitoring point as a faulty point.

[0045] If the primary monitoring point is not faulty, the real-time water consumption is sent to the effective monitoring module, the predicted water consumption is updated to the real-time water consumption, and the effective data is received again.

[0046] Preferably, the steps of obtaining the associated monitoring points of the fault point according to the monitoring point library, controlling the monitoring equipment of the associated monitoring points to start, obtaining the associated monitoring data, and confirming the primary fault result according to the associated monitoring data are specifically:

[0047] Establish a positive correlation curve between data difference and fault degree, and find the fault degree corresponding to the fault point according to the data difference;

[0048] Establish a positive correlation curve between fault degree and monitoring distance, and find the corresponding monitoring distance according to the fault degree;

[0049] With the fault point as the center and the monitoring distance as the radius, a fault area is formed, and the monitoring points in the fault area are found as associated monitoring points;

[0050] Start the monitoring equipment of the associated monitoring point, obtain the hydraulic data of the associated monitoring point and record it as the associated monitoring data;

[0051] The fault degree of the associated monitoring point is obtained according to the associated monitoring data, and the monitoring point with the largest fault degree among the fault point and the associated monitoring points is selected as the actual fault position, and the maximum fault degree is taken as the actual fault degree, and the primary fault result is output.

[0052] Preferably, the step of starting the monitoring equipment of the associated monitoring point, obtaining the hydraulic data of the associated monitoring point and recording it as the associated monitoring data is specifically:

[0053] Obtain the time point of receiving valid data corresponding to the fault point as the reference time point, and obtain the distance between the associated monitoring point and the fault monitoring point;

[0054] Obtain the water supply flow velocity, and calculate the water flow arrival time according to the distance between the associated monitoring point and the fault monitoring point and the water flow velocity;

[0055] The device start time is calculated based on the water flow arrival time and the reference time, the real-time time is obtained, and it is determined whether the real-time time is greater than the device start time of the associated monitoring point;

[0056] If the real-time time point is greater than the device start-up time point of the associated monitoring point, the monitoring device of the associated monitoring point is started, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data;

[0057] If the real-time time point is not greater than the equipment start-up time point of the associated monitoring point, the monitoring equipment of the associated monitoring point is started when the equipment start-up time point is reached, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data.

[0058] Preferably, the step of controlling the hydraulic equipment to adjust the hydraulic data and outputting the pipeline fault result after verifying the primary fault result is specifically:

[0059] Control the hydraulic equipment to adjust the hydraulic data, and obtain the theoretical adjustment value of the actual fault location according to the hydraulic equipment adjusting hydraulic data;

[0060] Obtain the changes in hydraulic monitoring data at the actual fault location and record them as actual adjustment values;

[0061] Calculate the adjustment difference between the theoretical adjustment value and the actual adjustment value, set a positive correlation curve between the adjustment difference and the fault degree, find the fault degree corresponding to the adjustment difference and record it as the verification fault degree;

[0062] Compare and verify whether the difference between the fault degree and the actual fault degree is within the preset standard range. If it is within the preset standard range, the verification is successful, and the primary fault result is output as the pipeline fault result;

[0063] If it is not within the preset standard range, the verification fails, and the monitoring fault is output as the pipeline failure result, and fed back to the effective monitoring module to control the effective monitoring module to reprocess the data.

[0064] In summary, the present application includes at least one of the following beneficial technical effects:

[0065] 1. Select a monitoring point library based on the fault situation, then select the initial monitoring point based on the environmental conditions around the monitoring point. When a fault is detected at the initial monitoring point, select the monitoring point to start the monitoring equipment, and get the monitoring result based on the monitored hydraulic monitoring data. Select a small number of monitoring points for large-scale monitoring, and start a small-scale monitoring point to assist in obtaining accurate monitoring results, which reduces the processing of large amounts of data, reduces the burden on the server, and improves the energy conservation and environmental protection of the online monitoring management of the status of smart water services.

[0066] 2. Prioritize edge processing of data, store normal data locally, generate average values ​​and send them to the cloud, and retrieve valid data and related data and send them to the cloud when data is abnormal. This reduces the burden on cloud servers and increases the speed of data processing, allowing more accurate data to be obtained more quickly, thus improving the convenience of online monitoring and management of the status of smart water services.

[0067] 3. Use population distribution to obtain predicted water consumption, make a preliminary fault judgment based on the predicted water consumption, further confirm the fault judgment based on real-time water consumption, and finally verify the fault result by adjusting hydraulic data. This not only improves the accuracy of the monitoring results, but also expands the monitoring scope, reduces the situation where terminal leakage is included in the water consumption but not discovered, and improves the accuracy of online monitoring and management of the status of smart water services. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] Figure 1 It is a module connection diagram of an embodiment of an online monitoring and management system for the status of smart water services of the present invention.

[0069] Figure 2 It is a schematic diagram of the specific steps of an embodiment of an online monitoring and management system for the status of smart water services of the present invention.

[0070] Description of reference numerals: 1. Monitoring selection module. 2. Initial monitoring module. 3. Effective monitoring module. 4. Fault confirmation module. 5. Primary fault module. 6. Monitoring result module. DETAILED DESCRIPTION

[0071] Below is a combination of the embodiments and Figure 1-Figure 2 The present invention is further described in detail, but the embodiments of the present invention are not limited thereto.

[0072] The present invention discloses an online monitoring and management system for the status of smart water services, which specifically includes the following steps:

[0073] Select monitoring module 1, obtain the layout diagram and historical fault data of the water supply pipeline network, select monitoring points according to the layout diagram and historical fault data, and form a monitoring point library.

[0074] The initial monitoring module 2 is connected to the selective monitoring module 1 by signals to obtain the environmental conditions around the monitoring point, and select the initial monitoring point in combination with the monitoring conditions of the monitoring point.

[0075] The effective monitoring module 3 is connected to the initial monitoring module 2 by signal, the monitoring equipment of the initial monitoring point is started, the hydraulic monitoring data is monitored, the effective data of the hydraulic monitoring data is judged according to the population distribution to obtain the judgment result, and the data is processed according to the judgment result to obtain the effective data.

[0076] The fault confirmation module 4 is connected to the effective monitoring module 3 signal to obtain the real-time water consumption, and confirms the fault point of the water supply pipeline network according to the real-time water consumption.

[0077] The primary fault module 5 is connected to the fault confirmation module 4 by signal, obtains the associated monitoring points of the fault point according to the monitoring point library, controls the monitoring equipment of the associated monitoring points to start, obtains the associated monitoring data, and confirms the primary fault result according to the associated monitoring data.

[0078] The monitoring result module 6 is connected to the primary fault module 5 by signal, controls the hydraulic equipment to adjust the hydraulic data, and outputs the pipeline fault result after verifying the primary fault result.

[0079] In actual use, leakage in the water supply pipeline network has a serious impact on the operation of smart water services, so it is very necessary to monitor the leakage of the water supply pipeline network. The water supply pipeline network is complex and large, and setting up a large number of monitoring points will lead to a waste of resources. In addition, when there is no leakage in the water supply pipeline network, the continuous operation of the monitoring equipment will also cause losses, resulting in waste of resources and accumulation of useless data. For example, setting up multiple monitoring points for real-time monitoring will store a large amount of monitoring data and consume a lot of resources. Due to the excessive amount of data, it is also extremely inconvenient to analyze and process. The water supply pipeline network is interconnected, and a failure at a certain point will also affect other pipeline locations. Monitoring through a small number of monitoring points and starting some monitoring points in abnormal situations can save a lot of unnecessary waste of resources when monitoring the leakage of the water supply pipeline network, and reduce unnecessary data storage, making the monitoring of smart water services more convenient and environmentally friendly.

[0080] The steps of obtaining the layout diagram and historical fault data of the water supply pipeline network, selecting monitoring points according to the layout diagram and historical fault data and forming a monitoring point library are specifically as follows:

[0081] The layout diagram and historical fault data of the water supply pipeline network are obtained, and the historical fault locations of the water supply pipeline network are extracted from the historical fault data.

[0082] The number of faults and the degree of faults at the historical fault locations are counted, the fault weight ratio of the number of faults and the degree of faults is set, and the fault degree of the fault location is calculated according to the number of faults, the degree of faults and the corresponding fault weight ratio.

[0083] Set a fault degree threshold and select fault locations whose fault degrees reach the fault degree threshold as candidate monitoring points.

[0084] Get the distance between the candidate monitoring points and set a distance threshold. If the distance between the two candidate monitoring points does not reach the distance threshold, get the center position of the two candidate monitoring points, extract the pipeline position closest to the center position of the water supply pipeline network as the new candidate monitoring point and replace the original two candidate monitoring points.

[0085] When the distances between all candidate monitoring points reach the distance threshold, all candidate monitoring points are counted as monitoring points and a monitoring point library is formed.

[0086] In actual application, due to the complexity and large size of the water supply pipeline network, it is difficult to monitor all locations, and there is no need to waste a lot of resources to monitor all pipeline locations. According to the fault situation, the high-incidence points of the fault can be monitored, and the leakage of the water supply pipeline network can be monitored to a greater extent while saving resources. Selecting monitoring points according to the number of faults and the degree of faults can effectively monitor more fault conditions. Some of the selected monitoring points are relatively close, so two selected monitoring points can be merged to save resources. For example, the three selected monitoring points A, B, and C are set with a distance threshold of 10 meters. The distance between point A and point B is 5 meters, and the distance between point B and point C is 8 meters. The distance between point A and point B does not reach the distance threshold. Therefore, the center point between point A and point B is selected. If the center point is on the pipeline position, the center point is directly used as the new monitoring point D. If the center point is not on the pipeline position, a vertical line with the pipeline is made, and the vertical intersection is used as the new monitoring point D, replacing points A and B. The distance between point D and point C is 10.5 meters, and no more merging is performed when the distance threshold is reached. If the distance between the new monitoring point D and point C still does not reach the distance threshold, a new monitoring point E is selected to replace points C and D.

[0087] The steps of obtaining the environmental conditions around the monitoring point and selecting the initial monitoring point based on the monitoring conditions of the monitoring point are as follows:

[0088] The environmental conditions around the monitoring point are obtained, the factors that affect the hydraulic data monitoring process are extracted from the environmental conditions and recorded as influencing factors, and the influence threshold of the influencing factors is set.

[0089] Environmental conditions include factors such as temperature, humidity, and air pressure, while hydraulic data include flow, pressure, vibration, noise, and other data. Relevant influencing factors are extracted as influencing factors. For example, if temperature affects flow monitoring, it is an influencing factor of flow monitoring, while if noise does not affect flow monitoring, it is not an influencing factor of flow monitoring.

[0090] The average impact value of the impact factor at the monitoring point location is obtained, and the impact difference when the average impact value exceeds the impact threshold is calculated.

[0091] All impact differences are accumulated to obtain the degree of influence of the monitoring point on the influencing factor, an impact degree threshold is set, and the monitoring point whose impact degree reaches the impact degree threshold is selected as the first monitoring point.

[0092] The influence degree of different hydraulic data on the influencing factors is accumulated to obtain the influence degree of the monitoring point.

[0093] The monitoring range of the first monitoring point is obtained, and the first monitoring point that meets the monitoring range requirements is selected from the first monitoring points according to the monitoring range as the initial monitoring point.

[0094] In actual application, hydraulic data monitoring includes monitoring parameters such as pipeline flow and pipeline pressure. During the monitoring process, these hydraulic data will be affected by the external environment, thus affecting the accuracy of monitoring. For example, an increase in temperature will cause the volume of the fluid to expand, which will make the flow measurement value larger. Extreme weather conditions may cause pipeline vibration to increase, thereby affecting the flow state of the fluid, causing deviations in the flow monitoring results. In addition, storms and other weather may also bring a lot of precipitation, increase the volume and flow rate of the fluid in the pipeline, and further affect the accuracy of flow monitoring. Geological activities such as earthquakes can cause pipeline deformation, rupture or displacement, thereby affecting the flow state and monitoring results of the fluid. Temperature changes can affect the thermal stress properties of pipeline materials, causing the pipeline to expand or contract. This change will change the pressure distribution inside the pipeline and affect the accuracy of pressure monitoring. Extreme weather conditions, earthquakes and other geological activities will also affect the accuracy of pressure monitoring. Therefore, there is no need to monitor monitoring points with inaccurate monitoring data, which are prone to erroneous results due to erroneous data. Choosing monitoring points with more accurate monitoring results is conducive to obtaining more accurate monitoring results.

[0095] The steps of obtaining a monitoring range of the first monitoring point and selecting, according to the monitoring range, first monitoring points that meet the requirements of the monitoring range from the first monitoring points as initial monitoring points are specifically as follows:

[0096] The number AL of routes from the water supply starting point to the first monitoring point and the total distance AZ of routes from the water supply starting point to the first monitoring point are obtained.

[0097] The number AD of water supply endpoints passing through the first monitoring point is obtained, the average change in water consumption of the water supply endpoints passing through the first monitoring point is obtained, and the water consumption change value AB is obtained by superposition.

[0098] Correlation function based on monitoring range The monitoring range value AF of the first monitoring point is calculated, where , , , is the scaling factor and is greater than 0.

[0099] Set a monitoring range value threshold, and select the first monitoring point whose monitoring range value reaches the monitoring range value threshold as the initial monitoring point.

[0100] In actual application, the selection of the initial monitoring point should not only consider the accuracy of the monitoring data, but also the coverage of the monitoring point. The larger the coverage of the monitoring point, the larger the coverage area of ​​the water supply pipeline network as the initial monitoring point, which reduces the occurrence of missed detection. The more routes from the water supply starting point to the first monitoring point, the more leakage of the routes can be monitored by the first monitoring point. At the same time, the farther the distance between the water supply starting point and the first monitoring point, the larger the area of ​​the water supply pipeline covered. The more water supply endpoints there are, the greater the fluctuation of water consumption will be. If the water consumption of the water supply endpoint fluctuates greatly, it will further affect the accuracy of the data analysis results. For example, there are 3 routes from the water supply starting point to the first monitoring point A. If the pipelines of these 3 routes leak, they will affect the flow and pressure changes at point A. The farther the pipeline distance, the longer the monitored pipeline length and the larger the coverage. The water supply endpoints passing through point A have two communities, A and B. If the water consumption of community A fluctuates between 300 tons and 320 tons, the water consumption of community B fluctuates between 280 tons and 350 tons. The water consumption reference value of the flow at point A fluctuates between 580 tons and 670 tons. If the fluctuation range of the community increases and the number of communities supplied with water increases, the fluctuation range of the water consumption reference value of the flow at point A will be larger, which will further affect the accuracy of the data analysis results.

[0101] The steps of starting the monitoring equipment at the initial monitoring point, monitoring and obtaining hydraulic monitoring data, determining the effective data of the hydraulic monitoring data according to the population distribution to obtain the determination result, and processing the data according to the determination result to obtain the effective data are specifically as follows:

[0102] The monitoring equipment at the initial monitoring point is controlled to start, the hydraulic monitoring data at the initial monitoring point is collected, and edge computing is performed on the hydraulic monitoring data to obtain the hydraulic change value of the hydraulic monitoring data.

[0103] Obtain the population distribution, obtain the predicted water consumption based on the population distribution, set the hydraulic change value range based on the predicted water consumption, and when the hydraulic change value does not exceed the hydraulic change value range, judge the hydraulic monitoring data as invalid data and store it locally.

[0104] Set a standard time period, use edge computing to calculate the invalid data within the standard time period to obtain the hydraulic average value and upload it to the cloud.

[0105] When the hydraulic change value exceeds the hydraulic change value range, the hydraulic monitoring data is considered to be valid data and the valid data is transmitted to the cloud.

[0106] The monitoring time point with valid data is obtained, and the invalid data of the nearest standard time period within the monitoring time point is synchronously transmitted to the cloud.

[0107] In actual use, it is not necessary to start monitoring at all monitoring points. Controlling the start of monitoring equipment at monitoring points according to actual conditions can effectively save resources. However, the water supply pipeline network is in a non-leakage state most of the time, which will cause many of the monitoring data to be useless for leakage analysis and belong to invalid data. The accumulation of invalid data will increase the storage burden on the one hand, and slow down and interfere with data analysis on the other hand. Therefore, processing the data before data analysis can improve the efficiency of the operating system. Edge computing does not require uploading data to the cloud, which not only reduces the burden on the cloud server, but also allows faster results. For example, the monitoring equipment continuously monitors and generates a data per second, but in fact, these data change little, so many of them are invalid data. First, collect hydraulic data over a period of time, and directly calculate the change value at the edge to know the fluctuation of hydraulic power. Set the hydraulic data change range according to the predicted water consumption to determine whether the pipeline is abnormal. If there is no abnormality, normal data does not need to be uploaded to the cloud, reducing unnecessary operations, and reducing redundant data by uploading the average value. Abnormal data is considered useful for judging pipeline leakage failures, so it is uploaded to the cloud as valid data for confirmation in the next step. At the same time, the monitoring data during the abnormal time period is uploaded so that the cloud can be used as auxiliary data for viewing and analysis.

[0108] The steps of obtaining the population distribution and obtaining the predicted water consumption according to the population distribution are as follows:

[0109] A water supply coverage area is obtained according to the layout diagram, and the water supply coverage area is divided to obtain a plurality of water supply areas.

[0110] The number of vehicles in the water supply area is counted by edge cameras in the area, and the first number of personnel flows is predicted based on the number of vehicles.

[0111] Combined with edge cameras, the flow of people in the statistical area is used to obtain the second flow of people number.

[0112] The third personnel flow quantity is obtained based on the passenger flow data of occasions where passenger flow is counted in the water supply area.

[0113] The total flow number is obtained by adding the first flow number, the second flow number, and the third flow number.

[0114] The per capita water consumption in the water supply coverage area is obtained, and the predicted water consumption in the water supply area is calculated by combining the total flow quantity and per capita water consumption.

[0115] In actual use, real-time water consumption data can immediately reflect the user's water consumption and help to detect leakage problems in a timely manner. However, there are cases where the water supply pipeline is damaged but mistakenly believed to be the user's water use. In this case, the change in hydraulic data will be considered normal, but in fact, the water supply pipeline network has leaked. Therefore, predicting water consumption based on the distribution of the population can reduce the situation where leakage is not monitored to a greater extent. For example, the predicted water consumption is 300 tons, and the flow rate of the pipeline should be 3.5 liters / second at this time, but in fact the pipeline flow rate reaches 7 liters / second. It is considered that this situation is abnormal, and there is a terminal leakage in the water supply pipeline network, but the water meter is still counting. The flow of people is obtained based on the vehicles, personnel and occasions for counting the flow of people in the area. Some scenic spots and shopping malls will count the changes in the flow of people. According to the number of vehicles and the average number of passengers in the vehicle, the flow of people driven by the vehicle is obtained.

[0116] The fault confirmation module 4 is connected to the effective monitoring module 3 signal to obtain the real-time water consumption, and the steps of confirming the fault point of the water supply pipeline network according to the real-time water consumption are specifically as follows:

[0117] Obtain real-time water consumption, calculate the water volume difference between real-time water consumption and predicted water consumption, set the water volume difference threshold, and if the water volume difference does not reach the water volume difference threshold, compare the valid data with the corresponding data of the real-time water consumption to obtain the fault point.

[0118] If the water volume difference reaches the water volume difference threshold, the monitoring device at the water volume counting device is turned on, and the corresponding monitoring point is recorded as the primary monitoring point, and the hydraulic monitoring data around the water volume counting device is obtained and recorded as the primary monitoring data.

[0119] It is determined whether the primary monitoring point is faulty according to the primary monitoring data. If the primary monitoring point is faulty, the primary monitoring point is recorded as a faulty point.

[0120] If the primary monitoring point is not faulty, the real-time water consumption is sent to the effective monitoring module 3, the predicted water consumption is updated to the real-time water consumption, and the effective data is received again.

[0121] In actual use, the real-time water consumption is used to determine whether an abnormality occurs. If the flow rate suddenly increases, but the real-time water consumption also suddenly increases, it is a normal phenomenon. The standard hydraulic data of the pipeline is obtained according to the real-time water consumption, and then compared with the effective data to confirm whether it is within the normal range, so as to determine whether the monitoring point is faulty. If it is faulty, it is recorded as the fault point. If the deviation between the predicted water consumption and the real-time water consumption is not large, it means that there is no terminal fault but the water meter is counting. If the deviation between the predicted water consumption and the real-time water consumption is too large, it means that there may be a terminal fault but the water meter is counting. At this time, the monitoring points around the water volume counting equipment such as the water meter are controlled to start the monitoring equipment monitoring to determine whether there is a fault around the water meter. If there is a fault around the water meter, it is determined that there is a terminal fault but the water meter is counting, and the fault point is determined. If there is no fault around the water meter, it means that the predicted water consumption is inaccurate for some reason. At this time, the fault judgment can no longer be made based on the predicted water consumption. The real-time water consumption needs to be replaced with the predicted water consumption to obtain valid data again.

[0122] The steps of obtaining the associated monitoring points of the fault point according to the monitoring point library, controlling the monitoring equipment of the associated monitoring points to start, obtaining the associated monitoring data, and confirming the primary fault result according to the associated monitoring data are specifically as follows:

[0123] A positive correlation curve between the data difference and the fault degree is established, and the fault degree corresponding to the fault point is found according to the data difference.

[0124] A positive correlation curve between the fault degree and the monitoring distance is established, and the corresponding monitoring distance is obtained according to the fault degree.

[0125] With the fault point as the center and the monitoring distance as the radius, a fault area is formed, and the monitoring points in the fault area are found as associated monitoring points.

[0126] The monitoring equipment of the associated monitoring point is started, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data.

[0127] The fault degree of the associated monitoring point is obtained according to the associated monitoring data, and the monitoring point with the largest fault degree among the fault point and the associated monitoring points is selected as the actual fault position, and the maximum fault degree is taken as the actual fault degree, and the primary fault result is output.

[0128] In actual use, it is a waste of monitoring resources to monitor all monitoring points. By selectively starting monitoring points based on the degree of failure of the initial monitoring point, resources can be effectively saved without affecting the monitoring effect. The more serious the failure of the fault point, the greater the impact on the remaining water supply pipelines, and the easier it is to monitor the fault. For example, the flow rate at point A is theoretically 4 liters / second, but in fact the pipeline flow rate is only 2 liters / second, which indicates that there is an obvious leakage. At point C, 100 meters away from point A, the pipeline flow rate also changes. At this time, the flow rate at point C also decreases, which further indicates that leakage does occur at point A. However, if the flow rate at point A is 4.7 liters / second, the flow rate at point C will change very little, and even if point C is monitored, it will not play a significant auxiliary role.

[0129] The steps of starting the monitoring equipment of the associated monitoring point, obtaining the hydraulic data of the associated monitoring point and recording it as the associated monitoring data are specifically as follows:

[0130] The time point of receiving the valid data corresponding to the fault point is obtained as the reference time point, and the distance between the associated monitoring point and the fault monitoring point is obtained.

[0131] The water supply flow velocity is obtained, and the water flow arrival time is calculated based on the distance between the associated monitoring point and the fault monitoring point and the water flow velocity.

[0132] The device start time point is calculated according to the water flow arrival time and the reference time point, the real-time time point is obtained, and it is determined whether the real-time time point is greater than the device start time point of the associated monitoring point.

[0133] If the real-time time point is greater than the equipment start-up time point of the associated monitoring point, the monitoring equipment of the associated monitoring point is started, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data.

[0134] If the real-time time point is not greater than the equipment start-up time point of the associated monitoring point, the monitoring equipment of the associated monitoring point is started when the equipment start-up time point is reached, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data.

[0135] In actual use, the water flow rate will affect the time it takes for water to reach another point. When a fault occurs, the flow of all pipes is not immediately affected. Therefore, when starting the monitoring equipment at the associated monitoring point, you need to set the start time. For example, if a fault occurs at point A, you need to start the monitoring equipment at point C. According to the water flow rate, it is known that the water flow at point A will reach point C 30 seconds later. That is, when a fault occurs at point A, it will take 30 seconds to affect point C. Real-time monitoring will not obtain more valid data. By setting the monitoring time, you can reduce the storage of invalid data and save the resources of the detection equipment.

[0136] The steps of controlling the hydraulic equipment to adjust the hydraulic data and outputting the pipeline fault results after verifying the primary fault results are as follows:

[0137] The hydraulic equipment is controlled to adjust the hydraulic data, and the theoretical adjustment value of the actual fault position is obtained according to the hydraulic equipment adjusting the hydraulic data.

[0138] Obtain the changes in hydraulic monitoring data at the actual fault location and record them as the actual adjustment value.

[0139] Calculate the adjustment difference between the theoretical adjustment value and the actual adjustment value, set a positive correlation curve between the adjustment difference and the fault degree, find the fault degree corresponding to the adjustment difference and record it as the verification fault degree.

[0140] The difference between the verification fault degree and the actual fault degree is compared to determine whether it is within the preset standard range. If it is within the preset standard range, the verification is successful and the primary fault result is output as the pipeline fault result.

[0141] If it is not within the preset standard range, the verification fails, and the monitoring fault is output as the pipeline fault result, and fed back to the effective monitoring module 3 to control the effective monitoring module 3 to reprocess the data.

[0142] In actual use, the hydraulic data is adjusted, that is, the water flow rate and other parameters are adjusted to determine whether the fault is faulty. For example, the theoretical flow rate at point A is 4 liters / second. After adjusting the hydraulic data, point A theoretically drops by 2 liters / second, but in fact, point A drops by 3 liters / second, and the adjustment difference is 1 liter / second. Therefore, the larger the difference, the more serious the fault. If the error between the fault degree and the actual fault degree is not large, it means that the monitoring result is accurate. If the error is serious, it means that the monitoring has a fault, and immediate feedback and re-monitoring are performed to achieve a self-checking effect.

[0143] The implementation principle of this system is: the selection monitoring module 1 obtains the layout diagram and historical fault data of the water supply pipeline network, selects the monitoring point according to the layout diagram and historical fault data, and forms a monitoring point library. The initial monitoring module 2 is connected to the selection monitoring module 1 by signal, obtains the environmental conditions around the monitoring point, and judges the accuracy and coverage of the monitoring data of the monitoring point according to the conditions around the monitoring point, so as to select the initial monitoring point. The effective monitoring module 3 is connected to the initial monitoring module 2 by signal, starts the monitoring equipment of the initial monitoring point, monitors and obtains the hydraulic monitoring data, obtains the predicted water consumption according to the population distribution, judges whether the data is abnormal, and screens to obtain the effective data. The fault confirmation module 4 is connected to the effective monitoring module 3 by signal, obtains the real-time water consumption, and confirms the fault point of the water supply pipeline network according to the real-time water consumption. The primary fault module 5 is connected to the fault confirmation module 4 by signal, obtains the associated monitoring point of the fault point according to the monitoring point library, controls the monitoring equipment of the associated monitoring point to start at the set time, obtains the associated monitoring data, and confirms the primary fault result according to the associated monitoring data. The monitoring result module 6 is connected to the primary fault module 5 by signal, controls the hydraulic equipment to adjust the hydraulic data, and outputs the pipeline fault result after verifying the primary fault result.

[0144] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A smart water service status online monitoring and management system, characterized in that: The following steps are involved: Selecting a monitoring module (1), obtaining a layout diagram and historical fault data of a water supply pipeline network, selecting monitoring points based on the layout diagram and historical fault data, and forming a monitoring point library; The initial monitoring module (2) is connected to the selected monitoring module (1) by signal, obtains the environmental conditions around the monitoring point, and selects the initial monitoring point based on the monitoring conditions of the monitoring point; The effective monitoring module (3) is connected to the initial monitoring module (2) by signal, the monitoring equipment at the initial monitoring point is started, the hydraulic monitoring data is monitored, the effective data of the hydraulic monitoring data is determined according to the population distribution to obtain the determination result, and the data is processed according to the determination result to obtain the effective data; The fault confirmation module (4) is connected to the effective monitoring module (3) by signal, obtains the real-time water consumption, and confirms the fault point of the water supply pipeline network according to the real-time water consumption; The primary fault module (5) is connected to the fault confirmation module (4) by signal, obtains the associated monitoring point of the fault point according to the monitoring point library, controls the monitoring equipment of the associated monitoring point to start, obtains the associated monitoring data, and confirms the primary fault result according to the associated monitoring data; The steps of obtaining the associated monitoring points of the fault point according to the monitoring point library, controlling the monitoring equipment of the associated monitoring points to start, obtaining the associated monitoring data, and confirming the primary fault result according to the associated monitoring data are specifically as follows: Establish a positive correlation curve between data difference and fault degree, and find the fault degree corresponding to the fault point according to the data difference; Establish a positive correlation curve between fault degree and monitoring distance, and find the corresponding monitoring distance according to the fault degree; With the fault point as the center and the monitoring distance as the radius, a fault area is formed, and the monitoring points in the fault area are found as associated monitoring points; Start the monitoring equipment of the associated monitoring point, obtain the hydraulic data of the associated monitoring point and record it as the associated monitoring data; Obtain the fault degree of the associated monitoring point according to the associated monitoring data, select the monitoring point with the largest fault degree among the fault point and the associated monitoring points as the actual fault location, and the maximum fault degree as the actual fault degree, and output the primary fault result; The step of starting the monitoring equipment of the associated monitoring point, obtaining the hydraulic data of the associated monitoring point and recording it as the associated monitoring data is specifically: Obtain the time point of receiving valid data corresponding to the fault point as the reference time point, and obtain the distance between the associated monitoring point and the fault monitoring point; Obtain the water supply flow velocity, and calculate the water flow arrival time according to the distance between the associated monitoring point and the fault monitoring point and the water flow velocity; The device start time is calculated based on the water flow arrival time and the reference time, the real-time time is obtained, and it is determined whether the real-time time is greater than the device start time of the associated monitoring point; If the real-time time point is greater than the device start-up time point of the associated monitoring point, the monitoring device of the associated monitoring point is started, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data; If the real-time time point is not greater than the device start-up time point of the associated monitoring point, the monitoring device of the associated monitoring point is started when the device start-up time point is reached, and the hydraulic data of the associated monitoring point is obtained and recorded as the associated monitoring data; The monitoring result module (6) is connected to the primary fault module (5) by signal, controls the hydraulic equipment to adjust the hydraulic data, and outputs the pipeline fault result after verifying the primary fault result.

2. The online monitoring and management system for smart water services according to claim 1 is characterized in that: The steps of obtaining the layout diagram and historical fault data of the water supply pipeline network, selecting monitoring points according to the layout diagram and historical fault data and forming a monitoring point library are specifically as follows: Obtaining a layout diagram and historical fault data of a water supply pipeline network, and extracting historical fault locations of the water supply pipeline network from the historical fault data; The number of faults and the degree of faults at the historical fault locations are counted, the fault weight ratio of the number of faults and the degree of faults is set, and the fault degree of the fault location is calculated according to the number of faults, the degree of faults and the corresponding fault weight ratio; Set a fault degree threshold, and select fault locations whose fault degrees reach the fault degree threshold as candidate monitoring points; Obtain the distance between the candidate monitoring points and set a distance threshold. If the distance between the two candidate monitoring points does not reach the distance threshold, obtain the center position of the two candidate monitoring points, extract the pipeline position closest to the center position of the water supply pipeline network as a new candidate monitoring point and replace the original two candidate monitoring points; When the distances between all candidate monitoring points reach the distance threshold, all candidate monitoring points are counted as monitoring points and a monitoring point library is formed.

3. The online monitoring and management system for smart water services according to claim 2 is characterized in that: The step of obtaining the environmental conditions around the monitoring point and selecting the initial monitoring point based on the monitoring conditions of the monitoring point is specifically: Obtain the environmental conditions around the monitoring point, extract the factors that affect the hydraulic data monitoring process from the environmental conditions and record them as influencing factors, and set the impact threshold of the influencing factors; Obtain the average impact value of the impact factor at the monitoring point location, and calculate the impact difference when the average impact value exceeds the impact threshold; All impact differences are accumulated to obtain the impact degree of the impact factor of the monitoring point, and an impact degree threshold is set. The monitoring point whose impact degree reaches the impact degree threshold is selected as the first monitoring point; The monitoring range of the first monitoring point is obtained, and the first monitoring point that meets the monitoring range requirements is selected from the first monitoring points according to the monitoring range as the initial monitoring point.

4. The online monitoring and management system for smart water services according to claim 3 is characterized in that: The step of obtaining the monitoring range of the first monitoring point and selecting the first monitoring point that meets the monitoring range requirements from the first monitoring points as the initial monitoring point according to the monitoring range is specifically: Obtain the number AL of routes from the water supply starting point to the first monitoring point and the total distance AZ of routes from the water supply starting point to the first monitoring point; Obtain the number AD of water supply endpoints passing through the first monitoring point, obtain the average value of water consumption change of the water supply endpoints passing through the first monitoring point, and obtain the water consumption change value AB after superposition; Correlation function based on monitoring range The monitoring range value AF of the first monitoring point is calculated, where , , , is the scale factor and is greater than 0; Set a monitoring range value threshold, and select the first monitoring point whose monitoring range value reaches the monitoring range value threshold as the initial monitoring point.

5. The online monitoring and management system for smart water services according to claim 4 is characterized in that: The steps of starting the monitoring equipment at the initial monitoring point, monitoring and obtaining hydraulic monitoring data, determining effective data of the hydraulic monitoring data according to the population distribution to obtain a determination result, and processing the data according to the determination result to obtain effective data are specifically as follows: Control the monitoring equipment at the initial monitoring point to start, collect the hydraulic monitoring data at the initial monitoring point, perform edge computing on the hydraulic monitoring data, and obtain the hydraulic change value of the hydraulic monitoring data; Obtain the population distribution, obtain the predicted water consumption according to the population distribution, set the hydraulic change value range according to the predicted water consumption, and when the hydraulic change value does not exceed the hydraulic change value range, judge the hydraulic monitoring data as invalid data and store it locally; Set a standard time period, calculate the invalid data within the standard time period through edge computing to obtain the hydraulic average value and upload it to the cloud; When the hydraulic change value exceeds the hydraulic change value range, the hydraulic monitoring data is considered to be valid data and the valid data is transmitted to the cloud; The monitoring time point with valid data is obtained, and the invalid data of the nearest standard time period within the monitoring time point is synchronously transmitted to the cloud.

6. The online monitoring and management system for smart water services according to claim 5 is characterized in that: The step of obtaining the population distribution and obtaining the predicted water consumption according to the population distribution is specifically as follows: Obtain a water supply coverage area according to the layout diagram, divide the water supply coverage area, and obtain multiple water supply areas; The number of vehicles in the water supply area is counted by edge cameras in the area, and the first number of personnel flows is predicted based on the number of vehicles; Combined with edge cameras to count the flow of people in the area, the second flow of people is obtained; According to the flow data of people in the water supply area where the flow of people is counted, the third flow of people is obtained; The total flow quantity is obtained by adding the first flow quantity, the second flow quantity and the third flow quantity; The per capita water consumption in the water supply coverage area is obtained, and the predicted water consumption in the water supply area is calculated by combining the total flow quantity and per capita water consumption.

7. The online monitoring and management system for smart water services according to claim 6 is characterized in that: The fault confirmation module (4) is connected to the effective monitoring module (3) by signal, obtains the real-time water consumption, and confirms the fault point of the water supply pipeline network according to the real-time water consumption, which is specifically: Obtain real-time water consumption, calculate the difference between real-time water consumption and predicted water consumption, set a water difference threshold, and if the water difference does not reach the water difference threshold, compare the valid data with the corresponding data of real-time water consumption to obtain the fault point; If the water volume difference reaches the water volume difference threshold, the monitoring device at the water volume counting device is turned on, and the corresponding monitoring point is recorded as the primary monitoring point, and the hydraulic monitoring data around the water volume counting device is obtained and recorded as the primary monitoring data; Determine whether the primary monitoring point is faulty according to the primary monitoring data. If the primary monitoring point is faulty, record the primary monitoring point as a faulty point. If the primary monitoring point is not faulty, the real-time water consumption is sent to the effective monitoring module (3), the predicted water consumption is updated to the real-time water consumption, and the effective data is received again.

8. The online monitoring and management system for smart water services according to claim 7 is characterized in that: The step of controlling the hydraulic equipment to adjust the hydraulic data and outputting the pipeline fault result after verifying the primary fault result is specifically: Control the hydraulic equipment to adjust the hydraulic data, and obtain the theoretical adjustment value of the actual fault location according to the hydraulic equipment adjusting hydraulic data; Obtain the changes in hydraulic monitoring data at the actual fault location and record them as actual adjustment values; Calculate the adjustment difference between the theoretical adjustment value and the actual adjustment value, set a positive correlation curve between the adjustment difference and the fault degree, find the fault degree corresponding to the adjustment difference and record it as the verification fault degree; Compare and verify whether the difference between the fault degree and the actual fault degree is within the preset standard range. If it is within the preset standard range, the verification is successful, and the primary fault result is output as the pipeline fault result; If it is not within the preset standard range, the verification fails, and a monitoring fault is output as a pipeline fault result, and is fed back to the effective monitoring module (3), controlling the effective monitoring module (3) to reprocess the data.