A method and system for maintaining and updating urban traffic equipment

By analyzing the operating data of subway gates, estimating faults and handling them in a timely manner, the problem of insufficient prediction of subway gate failures in the existing technology is solved, and travel efficiency and operational stability are improved.

CN118552187BActive Publication Date: 2024-11-19HANGZHOU HUANGSHI DIGITAL CHAINSTORE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411020128.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-19
Estimated Expiration
2044-07-29

AI Technical Summary

Technical Problem

The existing technology lacks in advance estimates of subway gate failures, resulting in prone to failures when passenger flow is large, reducing travel efficiency.

Method used

By obtaining the number of operation times, environmental noise, prompt audio, switching rate and response time of the subway gate, analyzing the audio and door leaf abnormal coefficients, filtering and estimating the faults, and then sorting them to the maintenance manager for processing in a timely manner.

Benefits of technology

It realizes the advance prediction and handling of subway gate failures, improves travel efficiency, and reduces operational instability caused by failures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118552187B_ABST
    Figure CN118552187B_ABST
Patent Text Reader

Abstract

The present invention discloses a maintenance and updating method and system for urban traffic equipment, and relates to the technical field of equipment maintenance. The present invention comprises: subway gate information acquisition, audio analysis, door leaf analysis, fault prediction and subway gate fault processing. The present invention performs audio monitoring and door leaf monitoring on each running subway gate at each subway station during use, so as to predict in advance possible software faults and door leaf faults of the subway gate, and sort each subway station according to the emergency coefficient of the gate inspection, so as to facilitate the person in charge of the maintenance of the subway gate to make relevant arrangements for maintenance inspection, so as to timely maintain the subway gate, reduce the failure of the subway gate to be unusable, and improve people's travel efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of equipment maintenance, and in particular to a method and system for maintaining and updating urban traffic equipment. Background Art

[0002] With the expansion of cities, rail transit has become the first choice of more and more people due to its convenience. The smoothness of rail transit operation often determines people's travel efficiency. During the use of rail transit equipment, due to issues such as length of use, it is often prone to failure. The subway gates in rail transit equipment are related to whether people can enter and exit subway stations. Once a failure occurs, it will reduce people's travel efficiency. Therefore, it is necessary to update and repair subway gates in urban rail transit.

[0003] Prior art, such as the invention patent application with announcement number: CN112183775A, discloses a maintenance method for gates used in subway stations, which includes: step S1: the gate fails and sends a fault signal or performs regular maintenance; step S2: performs maintenance on the gate; step S3: records maintenance information and statistics, and configures maintenance resources. The present invention makes the maintenance process of the gate more scientific and reasonable, and is easy for the operation of the later maintenance and inspection personnel, greatly shortens the maintenance time, improves the maintenance efficiency, reduces the waste of resources caused by non-standard maintenance operations during the maintenance process, improves the convenience of later maintenance, and can predict faults, realize expected inspections, reduce the occurrence of sudden failures, and ensure the stability of subway operations.

[0004] Prior art, such as the invention patent application with announcement number: CN110647133B, discloses a rail transit equipment status detection and maintenance method and system, which method includes: obtaining the failure conditions of the equipment or each component and the factors affecting its life, establishing a dynamic model based on the full life cycle database, analyzing and collecting the main influencing factors and characteristics that affect the current equipment or each component failure, hidden dangers, and life, analyzing the operating status data and determining whether there is a potential fault, establishing a life database for the detection object and then monitoring the operating data, predicting faults based on the operating data and formulating a maintenance plan to ensure the normal operation of the transportation equipment.

[0005] From the above scheme, it can be seen that the current maintenance method of subway equipment lacks advance prediction of subway gate failures. Subway gates are prone to failures when the passenger flow is large, and these failures do not occur suddenly. Before the subway gate door fails to be used, there will be problems such as slow response time and disordered door switch rate. Before the subway gate software fails to be used, there will be problems such as audio disorder of the prompt tone. If these problems are not detected in advance, resulting in the subway gate failure to be used, it will reduce people's travel efficiency. Summary of the invention

[0006] The purpose of the present invention is to provide a method and system for maintaining and updating urban traffic equipment, which solves the problems existing in the background technology.

[0007] To solve the above technical problems, the present invention adopts the following technical solutions: The first aspect of the present invention provides a method for maintaining and updating urban traffic equipment, including: Step 1. Acquisition of subway gate information: within the target monitoring time period, obtain the number of operations of each operating subway gate belonging to each subway station, the decibel value of the ambient noise during each door operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time and the closing response time.

[0008] Step 2. Audio analysis: Analyze the audio anomaly coefficients of each operating subway gate belonging to each subway station.

[0009] Step 3. Door leaf analysis: Analyze the mechanical abnormality coefficient of the door leaves of each subway station's operating gate machines.

[0010] Step 4. Fault prediction: Filter the audio maintenance and operating subway gates, door maintenance and operating subway gates and normally operating subway gates belonging to each subway station, and analyze the estimated fault coefficients of the normally operating subway gates belonging to each subway station.

[0011] Step 5. Subway gate fault handling: Analyze the gate fault emergency coefficient of each subway station, and sort the subway stations according to the fault emergency coefficient, and send the estimated fault coefficients of each audio maintenance and operation subway gate, each door maintenance and operation subway gate, and each normal operation subway gate belonging to each subway station to the person in charge of subway gate maintenance.

[0012] Preferably, the analysis of the audio anomaly coefficient of each operating subway gate belonging to each subway station is specifically performed by: obtaining the prompt sound audio of the normal subway gate when operating in a noise-free environment from the local database, and performing an audio comparison with the noise-reduced audio of the prompt sound of each operating subway gate belonging to each subway station when the door leaf is operated each time, so as to obtain the audio similarity of the prompt sound of each operating subway gate belonging to each subway station when the door leaf is operated each time. , where x represents the number of each subway station, , y is a positive integer greater than 2, n is the number of each subway gate in operation, , m is a positive integer greater than 2, i is the number of each door leaf operation, , j is a positive integer greater than 2.

[0013] Calculate the audio similarity compensation value of each subway gate machine in operation at each subway station during each door operation .

[0014] Calculate the audio anomaly coefficient of each subway gate in operation at each subway station , where e is represented by a natural constant.

[0015] Preferably, the audio similarity compensation value of each operating subway gate belonging to each subway station during each door leaf operation is calculated by a specific calculation method: a noise reduction coefficient A of a noise reduction function of an audio recording device is obtained from a local database.

[0016] According to the noise reduction frequency of the prompt sound of each subway gate machine in operation at each subway station, the decibel value of the noise reduction frequency of the prompt sound of each subway gate machine in operation at each subway station is obtained. .

[0017] Based on the decibel value of the ambient noise of each subway gate machine in operation at each subway station , calculate the audio noise reduction compensation coefficient of each subway gate machine in each subway station during each door operation .

[0018] The audio similarity compensation value corresponding to each audio noise reduction compensation coefficient interval is obtained from the local database, and the audio similarity compensation value of each operating subway gate belonging to each subway station during each door operation is mapped.

[0019] Preferably, the mechanical abnormality coefficient of the door leaf of each subway gate machine in operation at each subway station is analyzed by a specific analysis method as follows: the application time of the door leaf of each subway gate machine in operation at each subway station is obtained from a local database. .

[0020] Calculate the abnormal coefficient of door leaf speed of each subway gate machine in each subway station during each door leaf operation .

[0021] Calculate the abnormal coefficient of door leaf response time of each subway gate machine in each subway station during each door leaf operation .

[0022] Analyze the mechanical abnormality coefficient of the door leaf of each subway station , where y is the number of subway stations and m is the number of operating subway gates.

[0023] Preferably, the door leaf speed abnormality coefficient of each operating subway gate belonging to each subway station during each door leaf operation is calculated by: obtaining the normal speed B when the door leaf is opened and closed from the local database.

[0024] According to the average opening and closing rate of each subway gate machine in each subway station during each door operation , calculate the door leaf speed abnormality coefficient of each subway gate machine in each subway station during each door leaf operation .

[0025] Preferably, the specific calculation method for calculating the door leaf response time abnormality coefficient of each operating subway gate belonging to each subway station during each door leaf operation is: obtaining the door leaf normal opening response time C and the door leaf normal closing response time D from the local database.

[0026] According to the opening response time of each subway gate machine in each subway station during each door operation and closing response time , calculate the abnormal coefficient of door leaf response time of each subway gate machine in each subway station during each door leaf operation .

[0027] Preferably, the estimated failure coefficient of each normally operating subway gate belonging to each subway station is analyzed, and the specific analysis method is: calculating the historical damage coefficient of each normally operating subway gate belonging to each subway station , where r represents the number of each subway gate in normal operation, , s is a positive integer greater than 2.

[0028] According to the door leaf mechanical abnormality coefficient of each subway gate machine in operation at each subway station, the door leaf mechanical abnormality coefficient of each subway gate machine in normal operation at each subway station is extracted. .

[0029] According to the mechanical abnormality coefficient of the door leaf of each subway gate in operation at each subway station, the audio abnormality coefficient of each subway gate in normal operation at each subway station is extracted. .

[0030] Analyze the estimated failure coefficient of each subway station's normally operating subway gate .

[0031] Preferably, the historical damage coefficient of each operating subway gate belonging to each subway station is calculated by: obtaining the number of historical audio failures of each normally operating subway gate belonging to each subway station from the local database 、Number of door leaf failures in history and passenger flow in each historical target time period , where p represents the number of each historical target time period, , q is a positive integer greater than 2.

[0032] According to the operation times of each subway gate machine in operation at each subway station, extract the operation times of each subway gate machine in normal operation at each subway station , calculate the historical damage coefficient of each subway gate in operation at each subway station , where s represents the number of operating subway gates and q represents the number of historical target time periods.

[0033] Preferably, the analysis of the gate failure emergency coefficient of each subway station is carried out by obtaining from the local database the emergency coefficient adjustment parameter value G of the subway gate operated for audio maintenance, the emergency coefficient adjustment parameter value H of the subway gate operated for door leaf maintenance, and the emergency coefficient adjustment parameter value J of the subway gate operated normally.

[0034] According to the audio maintenance and operation of subway gates belonging to each subway station, the number of audio maintenance and operation subway gates belonging to each subway station is counted .

[0035] According to the maintenance and operation of subway gates of each subway station, the number of subway gates maintained and operated by each door leaf of each subway station is counted. .

[0036] Based on the estimated failure coefficient of each subway station's normally operating subway gate , analyze the emergency coefficient of gate failure at each subway station .

[0037] The second aspect of the present invention provides an urban traffic equipment maintenance and update system of the urban traffic equipment maintenance and update method, characterized in that it includes: a subway gate information acquisition module, which is used to obtain the operation times of each operating subway gate belonging to each subway station, the decibel value of the ambient noise during each door operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time and the closing response time within the target monitoring time period.

[0038] The audio analysis module is used to analyze the audio anomaly coefficients of each operating subway gate belonging to each subway station.

[0039] The door leaf analysis module is used to analyze the mechanical abnormality coefficient of the door leaves of each operating subway gate belonging to each subway station.

[0040] The fault prediction module is used to screen the audio maintenance and operation subway gates, door maintenance and operation subway gates and normal operation subway gates belonging to each subway station, and analyze the estimated fault coefficients of the normal operation subway gates belonging to each subway station.

[0041] The subway gate fault processing module is used to analyze the gate fault emergency coefficient of each subway station, and sort the subway stations according to the fault emergency coefficient, and send the estimated fault coefficients of each audio maintenance and operation subway gate, each door maintenance and operation subway gate and each normal operation subway gate belonging to each subway station to the person in charge of subway gate maintenance.

[0042] The beneficial effects of the present invention are as follows: (1) Step 1 of the present invention is to obtain information of subway gates, which is used to obtain information of each operating subway gate belonging to each subway station during operation, so as to facilitate subsequent analysis.

[0043] (2) Step 2 of the present invention: audio analysis, by monitoring whether there are any audio anomalies in the subway gates in operation at each subway station, it is possible to estimate whether there are any failures in the software of the subway gates in operation at each subway station that cannot be used normally.

[0044] (3) Step 3 of the present invention is door leaf analysis. By monitoring whether the operating subway gates at each subway station have door leaf anomalies, it is possible to estimate whether the operating subway gates at each subway station have door leaf mechanical structure failures that prevent them from functioning properly.

[0045] (4) Step 4 of the present invention is to predict the faults, screen and differentiate the operating subway gates belonging to each subway station, and analyze the predicted fault coefficients of the normally operating subway gates belonging to each subway station to facilitate subsequent processing.

[0046] (5) Step 5 of the present invention is to handle subway gate failures, and to sort subway stations according to the failure emergency coefficient, so that the subway gate maintenance person in charge can dispatch maintenance personnel to perform maintenance according to the actual situation, and can timely prevent subway gate failures that make them unusable, thereby improving people's travel efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0048] Figure 1 It is a schematic diagram of the method flow of the present invention.

[0049] Figure 2 It is a schematic diagram of the system module of the present invention. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] Reference Figure 1As shown, the first aspect of the present invention provides a method for maintaining and updating urban traffic equipment, including: Step 1. Acquisition of subway gate information: within the target monitoring time period, obtain the number of operations of each operating subway gate belonging to each subway station, the decibel value of the ambient noise during each door operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time and the closing response time.

[0052] In a specific embodiment, the number of operations of each operating subway gate belonging to each subway station, the decibel value of the ambient noise during each door leaf operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time and the closing response time are obtained. The specific acquisition method is: the number of operations of each operating subway gate belonging to each subway station is obtained through a subway gate management platform, the decibel value of the ambient noise during each door leaf operation of each operating subway gate belonging to each subway station is obtained through a decibel meter, the noise reduction frequency of the prompt sound during each door leaf operation of each operating subway gate belonging to each subway station is obtained through a noise-reducing recording device installed at the subway gate broadcasting port, and the average switching rate, the opening response time and the closing response time of each operating subway gate belonging to each subway station during each door leaf operation are obtained through the subway gate management platform.

[0053] It should be noted that the time between the time when the running subway gate machine recognizes that a user enters and the time when the door leaf of the running subway gate machine opens is marked as the opening response time of each running subway gate machine belonging to each subway station when the door leaf operates each time; the time between the time when the running subway gate machine recognizes that the user leaves and the time when the door leaf of the running subway gate machine closes is marked as the closing response time of each running subway gate machine belonging to each subway station when the door leaf operates each time.

[0054] Step 1 of the present invention is to obtain information about subway gates, which is used to obtain information about each subway gate in operation at each subway station, so as to facilitate subsequent analysis.

[0055] Step 2. Audio analysis: Analyze the audio anomaly coefficients of each operating subway gate belonging to each subway station.

[0056] In a specific embodiment of the present invention, the audio anomaly coefficient of each operating subway gate belonging to each subway station is analyzed, and the specific analysis method is: obtain the prompt sound audio of the normal subway gate when operating in a noise-free environment from the local database, and compare it with the noise-reduced audio of the prompt sound of each operating subway gate belonging to each subway station when the door leaf is running each time, so as to obtain the audio similarity of the prompt sound of each operating subway gate belonging to each subway station when the door leaf is running each time , where x represents the number of each subway station, , y is a positive integer greater than 2, n is the number of each subway gate in operation, , m is a positive integer greater than 2, i is the number of each door leaf operation, , j is a positive integer greater than 2.

[0057] Calculate the audio similarity compensation value of each subway gate machine in operation at each subway station during each door operation .

[0058] Calculate the audio anomaly coefficient of each subway gate in operation at each subway station , where e is represented by a natural constant.

[0059] It should be noted that the local database is used to store the prompt sound audio of normal subway gates when operating in a noise-free environment, the noise reduction coefficient of the noise reduction function of the audio recording equipment, the audio similarity compensation value corresponding to each audio noise reduction compensation coefficient interval, the door leaf application time of each operating subway gate belonging to each subway station, the normal rate when the door leaf is opened and closed, the normal opening response time of the door leaf, the normal closing response time of the door leaf, the audio abnormality coefficient threshold, the door leaf mechanical abnormality coefficient threshold, the historical number of audio failures of each normally operating subway gate belonging to each subway station, the historical number of door leaf failures and the passenger flow in each historical target time period, the emergency coefficient adjustment parameter value of the subway gates operating under audio maintenance, the emergency coefficient adjustment parameter value of the subway gates operating under door maintenance, and the emergency coefficient adjustment parameter value of the normally operating subway gates.

[0060] In a specific embodiment, the audio similarity of the prompt sound of each operating subway gate belonging to each subway station when the door leaf runs each time is obtained, and the specific obtaining method is: the existing audio comparison technology is relatively mature, and the audio similarity of the prompt sound of each operating subway gate belonging to each subway station when the door leaf runs each time can be obtained through the existing audio comparison technology.

[0061] In a specific embodiment of the present invention, the audio similarity compensation value of each operating subway gate belonging to each subway station during each door operation is calculated by: obtaining the noise reduction coefficient A of the noise reduction function of the audio recording device from the local database.

[0062] According to the noise reduction frequency of the prompt sound of each subway gate machine in operation at each subway station, the decibel value of the noise reduction frequency of the prompt sound of each subway gate machine in operation at each subway station is obtained. .

[0063] Based on the decibel value of the ambient noise of each subway gate machine in operation at each subway station , calculate the audio noise reduction compensation coefficient of each subway gate machine in each subway station during each door operation .

[0064] It should be noted that the environmental noise also includes the prompt sound when the door leaf is in operation, so the decibel value of the environmental noise is always greater than or equal to the decibel value of the prompt sound when the door leaf is in operation.

[0065] The audio similarity compensation value corresponding to each audio noise reduction compensation coefficient interval is obtained from the local database, and the audio similarity compensation value of each operating subway gate belonging to each subway station during each door operation is mapped.

[0066] Step 2 of the present invention is audio analysis. By monitoring whether there are any audio anomalies in the operating subway gates at each subway station, it is possible to predict whether there will be any failure in the software of the operating subway gates at each subway station that cannot be used normally.

[0067] Step 3. Door leaf analysis: Analyze the mechanical abnormality coefficient of the door leaves of each subway station's operating gate machines.

[0068] In a specific embodiment of the present invention, the mechanical abnormality coefficient of the door leaf of each running subway gate belonging to each subway station is analyzed, and the specific analysis method is: obtaining the application time of the door leaf of each running subway gate belonging to each subway station from the local database .

[0069] Calculate the abnormal coefficient of door leaf speed of each subway gate machine in each subway station during each door leaf operation .

[0070] Calculate the abnormal coefficient of door leaf response time of each subway gate machine in each subway station during each door leaf operation .

[0071] Analyze the mechanical abnormality coefficient of the door leaf of each subway station , where y is the number of subway stations and m is the number of operating subway gates.

[0072] In a specific embodiment of the present invention, the door leaf rate abnormality coefficient of each operating subway gate belonging to each subway station during each door leaf operation is calculated by: obtaining the normal rate B when the door leaf is opened and closed from the local database.

[0073] According to the average opening and closing rate of each subway gate machine in each subway station during each door operation , calculate the door leaf speed abnormality coefficient of each subway gate machine in each subway station during each door leaf operation .

[0074] In a specific embodiment of the present invention, the abnormal coefficient of the door leaf response time of each operating subway gate belonging to each subway station during each door leaf operation is calculated by obtaining the normal door opening response time C and the normal door closing response time D from the local database.

[0075] According to the opening response time of each subway gate machine in each subway station during each door operation and closing response time , calculate the abnormal coefficient of door leaf response time of each subway gate machine in each subway station during each door leaf operation .

[0076] Step 3 of the present invention is door leaf analysis. By monitoring whether each operating subway gate belonging to each subway station has door leaf anomalies, it is possible to estimate whether each operating subway gate belonging to each subway station has a failure in the door leaf mechanical structure that cannot be used normally.

[0077] Step 4. Fault prediction: Filter the audio maintenance and operating subway gates, door maintenance and operating subway gates and normally operating subway gates belonging to each subway station, and analyze the estimated fault coefficients of the normally operating subway gates belonging to each subway station.

[0078] In a specific embodiment, the screening of each audio maintenance operating subway gate, each door leaf maintenance operating subway gate and each normally operating subway gate belonging to each subway station, the specific screening method is: obtain the audio abnormality coefficient threshold and the door leaf mechanical abnormality coefficient threshold from the local database, and compare the audio abnormality coefficient of each operating subway gate belonging to each subway station with the audio abnormality coefficient threshold; if the audio abnormality coefficient of a certain operating subway gate belonging to a certain subway station is greater than the audio abnormality coefficient threshold, then mark the operating subway gate as an audio maintenance operating subway gate.

[0079] The door leaf mechanical abnormality coefficient of each operating subway gate belonging to each subway station is compared with the door leaf mechanical abnormality coefficient threshold. If the door leaf mechanical abnormality coefficient of a certain operating subway gate belonging to a subway station is greater than the door leaf mechanical abnormality coefficient threshold, the operating subway gate is marked as a door leaf maintenance operating subway gate.

[0080] If the door leaf mechanical abnormality coefficient of a running subway gate belonging to a subway station is less than or equal to the door leaf mechanical abnormality coefficient threshold, and the audio abnormality coefficient is less than or equal to the audio abnormality coefficient threshold, the running subway gate is marked as a normally operating subway gate.

[0081] Filter the audio maintenance and operation subway gates, door maintenance and operation subway gates and normal operation subway gates belonging to each subway station.

[0082] In a specific embodiment of the present invention, the estimated failure coefficient of each normally operating subway gate belonging to each subway station is analyzed, and the specific analysis method is: calculating the historical damage coefficient of each normally operating subway gate belonging to each subway station , where r represents the number of each subway gate in normal operation, , s is a positive integer greater than 2.

[0083] According to the door leaf mechanical abnormality coefficient of each subway gate machine in operation at each subway station, the door leaf mechanical abnormality coefficient of each subway gate machine in normal operation at each subway station is extracted. .

[0084] According to the mechanical abnormality coefficient of the door leaf of each subway gate in operation at each subway station, the audio abnormality coefficient of each subway gate in normal operation at each subway station is extracted. .

[0085] Analyze the estimated failure coefficient of each subway station's normally operating subway gate .

[0086] In a specific embodiment of the present invention, the historical damage coefficient of each operating subway gate belonging to each subway station is calculated by: obtaining the number of historical audio failures of each normally operating subway gate belonging to each subway station from the local database 、Number of door leaf failures in history and passenger flow in each historical target time period , where p represents the number of each historical target time period, , q is a positive integer greater than 2.

[0087] According to the operation times of each subway gate machine in operation at each subway station, extract the operation times of each subway gate machine in normal operation at each subway station , calculate the historical damage coefficient of each subway gate in operation at each subway station , where s represents the number of operating subway gates and q represents the number of historical target time periods.

[0088] Step 4 of the present invention is to predict the faults, screen and differentiate the operating subway gates belonging to each subway station, and analyze the estimated fault coefficients of the normally operating subway gates belonging to each subway station to facilitate subsequent processing.

[0089] Step 5. Subway gate fault handling: Analyze the gate fault emergency coefficient of each subway station, and sort the subway stations according to the fault emergency coefficient, and send the estimated fault coefficients of each audio maintenance and operation subway gate, each door maintenance and operation subway gate, and each normal operation subway gate belonging to each subway station to the person in charge of subway gate maintenance.

[0090] In a specific embodiment of the present invention, the analysis of the gate failure emergency coefficient of each subway station is carried out by obtaining from a local database the emergency coefficient adjustment parameter value G of the subway gate operated under audio maintenance, the emergency coefficient adjustment parameter value H of the subway gate operated under door leaf maintenance, and the emergency coefficient adjustment parameter value J of the subway gate operated normally.

[0091] According to the audio maintenance and operation of subway gates belonging to each subway station, the number of audio maintenance and operation subway gates belonging to each subway station is counted .

[0092] According to the maintenance and operation of subway gates of each subway station, the number of subway gates maintained and operated by each door leaf of each subway station is counted. .

[0093] Based on the estimated failure coefficient of each subway station's normally operating subway gate , analyze the emergency coefficient of gate failure at each subway station .

[0094] It should be noted that the emergency coefficient adjustment parameter value of the subway gate machine operated with door leaf maintenance is greater than the emergency coefficient adjustment parameter value of the subway gate machine operated with audio maintenance, and the emergency coefficient adjustment parameter value of the subway gate machine operated with audio maintenance is greater than the emergency coefficient adjustment parameter value of the subway gate machine operated normally. For example, the emergency coefficient adjustment parameter value of the subway gate machine operated with door leaf maintenance is 4, the emergency coefficient adjustment parameter value of the subway gate machine operated with audio maintenance is 3, and the emergency coefficient adjustment parameter value of the subway gate machine operated normally is 2.

[0095] Step 5 of the present invention is to handle subway gate failures, and to sort subway stations according to the failure emergency coefficient, so that the person in charge of subway gate maintenance can dispatch maintenance personnel to perform maintenance according to actual conditions, and can timely prevent subway gate failures that make them unusable, thereby improving people's travel efficiency.

[0096] Reference Figure 2 As shown, the second aspect of the present invention provides an urban traffic equipment maintenance and update system of the urban traffic equipment maintenance and update method, characterized in that it includes: a subway gate information acquisition module, an audio analysis module, a door leaf analysis module, a fault prediction module, a subway gate fault processing module and a local database.

[0097] It should be noted that the subway gate information acquisition module is connected to the audio analysis module and the door leaf analysis module, the fault prediction module is connected to the audio analysis module and the door leaf analysis module, the fault prediction module is connected to the subway gate fault processing module, and the local database is connected to the audio analysis module, the door leaf analysis module, the fault prediction module, and the subway gate fault processing module.

[0098] The subway gate information acquisition module is used to obtain the operation times of each operating subway gate belonging to each subway station, the decibel value of the ambient noise during each door operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time and the closing response time within the target monitoring time period.

[0099] The audio analysis module is used to analyze the audio anomaly coefficient of each operating subway gate belonging to each subway station.

[0100] The door leaf analysis module is used to analyze the mechanical abnormality coefficient of the door leaves of each operating subway gate belonging to each subway station.

[0101] The fault prediction module is used to screen the audio maintenance and operating subway gates, the door maintenance and operating subway gates and the normally operating subway gates belonging to each subway station, and analyze the estimated fault coefficients of the normally operating subway gates belonging to each subway station.

[0102] The subway gate fault processing module is used to analyze the gate fault emergency coefficient of each subway station, and sort the subway stations according to the fault emergency coefficient, and send the estimated fault coefficients of each audio maintenance and operation subway gate, each door maintenance and operation subway gate and each normal operation subway gate belonging to each subway station to the person in charge of subway gate maintenance.

[0103] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. A method for maintaining and updating urban traffic equipment, characterized in that: include: Step 1. Obtaining information about subway gates: During the target monitoring period, obtain the number of operations of each subway gate belonging to each subway station, the decibel value of the ambient noise during each door operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time, and the closing response time; Step 2. Audio analysis: Analyze the audio anomaly coefficients of each subway gate in operation at each subway station; Step 3. Door leaf analysis: Analyze the mechanical abnormality coefficient of the door leaf of each subway gate in operation at each subway station; Step 4. Fault prediction: Screen the audio maintenance and operation subway gates, door maintenance and operation subway gates and normal operation subway gates belonging to each subway station, and analyze the estimated fault coefficient of the normal operation subway gates belonging to each subway station; Step 5. Subway gate fault handling: Analyze the gate fault emergency coefficient of each subway station, and sort the subway stations according to the fault emergency coefficient, and send the estimated fault coefficients of each audio maintenance and operation subway gate, each door maintenance and operation subway gate, and each normal operation subway gate belonging to each subway station to the person in charge of subway gate maintenance; The specific analysis method of analyzing the audio anomaly coefficient of each operating subway gate belonging to each subway station is as follows: The audio of the prompt sound of the normal subway gate machine when operating in a noise-free environment is obtained from the local database, and the audio is compared with the noise-reduced audio of the prompt sound of each subway gate machine in operation at each subway station, so as to obtain the audio similarity of the prompt sound of each subway gate machine in operation at each subway station , where x represents the number of each subway station, , y is a positive integer greater than 2, n is the number of each subway gate in operation, , m is a positive integer greater than 2, i is the number of each door leaf operation, , j is a positive integer greater than 2; Calculate the audio similarity compensation value of each subway gate machine in operation at each subway station during each door operation ; Calculate the audio anomaly coefficient of each subway gate in operation at each subway station , where e is represented as a natural constant; The specific calculation method of calculating the audio similarity compensation value of each subway gate machine in operation at each subway station during each door operation is as follows: Obtain the noise reduction coefficient A of the noise reduction function of the audio recording device from the local database; According to the noise reduction frequency of the prompt sound of each subway gate machine in operation at each subway station, the decibel value of the noise reduction frequency of the prompt sound of each subway gate machine in operation at each subway station is obtained. ; Based on the decibel value of the ambient noise of each subway gate machine in operation at each subway station , calculate the audio noise reduction compensation coefficient of each subway gate machine in each subway station during each door operation ; The audio similarity compensation value corresponding to each audio noise reduction compensation coefficient interval is obtained from the local database, and the audio similarity compensation value of each operating subway gate belonging to each subway station during each door operation is obtained by mapping; The specific analysis method of analyzing the mechanical abnormality coefficient of the door leaf of each subway gate machine in operation at each subway station is as follows: Obtain the door leaf application time of each subway gate machine in operation at each subway station from the local database ; Calculate the abnormal coefficient of door leaf speed of each subway gate machine in each subway station during each door leaf operation ; Calculate the abnormal coefficient of door leaf response time of each subway gate machine in each subway station during each door leaf operation ; Analyze the mechanical abnormality coefficient of the door leaf of each subway station , where y is the number of subway stations and m is the number of operating subway gates; The specific analysis method for analyzing the estimated failure coefficient of each normally operating subway gate belonging to each subway station is as follows: Calculate the historical damage coefficient of each subway gate that operates normally at each subway station , where r represents the number of each subway gate in normal operation, , s is a positive integer greater than 2; According to the door leaf mechanical abnormality coefficient of each subway gate machine in operation at each subway station, the door leaf mechanical abnormality coefficient of each subway gate machine in normal operation at each subway station is extracted. ; According to the mechanical abnormality coefficient of the door leaf of each subway gate in operation at each subway station, the audio abnormality coefficient of each subway gate in normal operation at each subway station is extracted. ; Analyze the estimated failure coefficient of each subway station's normally operating subway gate .

2. A method for maintaining and updating urban traffic equipment according to claim 1, characterized in that: The specific calculation method for calculating the abnormal coefficient of the door leaf speed of each running subway gate belonging to each subway station during each door leaf operation is as follows: Get the normal rate B of the door leaf opening and closing from the local database; According to the average opening and closing rate of each subway gate machine in each subway station during each door operation , calculate the door leaf speed abnormality coefficient of each subway gate machine in each subway station during each door leaf operation .

3. A method for maintaining and updating urban traffic equipment according to claim 1, characterized in that: The specific calculation method for calculating the abnormal coefficient of the door leaf response time length of each operating subway gate belonging to each subway station during each door leaf operation is as follows: Obtain the door leaf normal opening response time C and the door leaf normal closing response time D from the local database; According to the opening response time of each subway gate machine in each subway station during each door operation and closing response time , calculate the abnormal coefficient of door leaf response time of each subway gate machine in each subway station during each door leaf operation .

4. A method for maintaining and updating urban traffic equipment according to claim 1, characterized in that: The specific calculation method for calculating the historical damage coefficient of each operating subway gate belonging to each subway station is as follows: Obtain the historical audio failure counts of each normally operating subway gate at each subway station from the local database 、Number of door leaf failures in history and passenger flow in each historical target time period , where p represents the number of each historical target time period, , q is a positive integer greater than 2; According to the operation times of each subway gate machine in operation at each subway station, extract the operation times of each subway gate machine in normal operation at each subway station , calculate the historical damage coefficient of each subway gate in operation at each subway station , where s represents the number of operating subway gates and q represents the number of historical target time periods.

5. The urban traffic equipment maintenance and updating method according to claim 1 is characterized in that: Analyze the emergency coefficient of gate failure at each subway station. The specific analysis method is as follows: Obtain from the local database the emergency coefficient adjustment parameter value G of the subway gate machine under audio maintenance, the emergency coefficient adjustment parameter value H of the subway gate machine under door leaf maintenance, and the emergency coefficient adjustment parameter value J of the subway gate machine under normal operation; According to the audio maintenance and operation of subway gates belonging to each subway station, the number of audio maintenance and operation subway gates belonging to each subway station is counted ; According to the maintenance and operation of subway gates of each subway station, the number of subway gates maintained and operated by each subway station is counted. ; Based on the estimated failure coefficient of each subway station's normally operating subway gate , analyze the emergency coefficient of gate failure at each subway station .

6. An urban traffic equipment maintenance and updating system for executing the urban traffic equipment maintenance and updating method according to any one of claims 1 to 5, characterized in that: include: The subway gate information acquisition module is used to obtain the operation times of each subway gate in operation at each subway station, the decibel value of the ambient noise during each door operation, the noise reduction frequency of the prompt sound, the average switching rate, the opening response time and the closing response time within the target monitoring time period; The audio analysis module is used to analyze the audio anomaly coefficients of each subway gate in operation at each subway station; The door leaf analysis module is used to analyze the mechanical abnormality coefficient of the door leaves of each subway station; The fault prediction module is used to screen the audio maintenance and operation subway gates, door maintenance and operation subway gates and normal operation subway gates belonging to each subway station, and analyze the estimated fault coefficients of the normal operation subway gates belonging to each subway station; The subway gate fault processing module is used to analyze the gate fault emergency coefficient of each subway station, and sort the subway stations according to the fault emergency coefficient, and send the estimated fault coefficients of each audio maintenance and operation subway gate, each door maintenance and operation subway gate and each normal operation subway gate belonging to each subway station to the person in charge of subway gate maintenance.