Device and method for testing vibration stress waves of underground mining drilling rig rock drill body

By setting up multiple vibration stress wave acquisition mechanisms and spacing adjustment mechanisms on the underground mining drilling drilling machine body, multi-point vibration stress wave testing is realized, which solves the problems of low single-point testing efficiency and inconsistency of traditional testing devices, and improves the test Efficiency and accuracy.

CN118565614BActive Publication Date: 2024-11-08SHANDONG UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411035115.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-08
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

Traditional stress wave testing devices can only collect vibration stress wave signals at a specific position of the object. There are problems such as single-point testing, low efficiency and great limitations. They cannot truly reflect the changes in the stress waves inside the object, and the test results are inconsistent.

Method used

A vibration stress wave testing device for rock drilling drilling machine body is designed, including multiple vibration stress wave acquisition mechanisms, spacing adjustment mechanisms and data transmission lines. The spacing adjustment mechanism is used to realize the acquisition and transmission of multi-point vibration stress wave signals, combined with The signal conditioner and signal collector perform signal processing to generate a test report.

Benefits of technology

Vibration stress wave tests of different heights and different orientations of the underground mining drilling drilling rig body during one test, saving test time, improving testing efficiency and accuracy, and avoiding inconsistencies in the results caused by changes in the test conditions. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118565614B_ABST
    Figure CN118565614B_ABST
Patent Text Reader

Abstract

The present invention discloses a vibration stress wave testing device and method for an underground mining drill rig rock drill body, and the present invention relates to the field of stress wave testing technology. By arranging a plurality of vibration stress wave collecting mechanisms in the longitudinal direction, the vibration stress wave collecting mechanisms can be sequentially distributed along the outer wall of the underground mining drill rig rock drill body, so that the vibration stress wave signals at different height positions of the underground mining drill rig rock drill body can be collected; a plurality of vibration stress wave collecting components are arranged in a ring shape in each vibration stress wave collecting mechanism, and the plurality of vibration stress wave collecting components can be distributed around the outer wall of the underground mining drill rig rock drill body at the same horizontal height, so that the vibration stress wave signals at different positions at the same horizontal height can be collected, and the vibration stress wave test at multiple points can be carried out simultaneously, without the need to repeatedly test the surface of the underground mining drill rig rock drill body at multiple points, thereby saving the test steps and test time, and greatly improving the test efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of stress wave testing, in particular to a device and method for testing the vibration stress wave of a rock drill body of an underground mining rig. Background Art

[0002] The rock drill body vibration stress wave test device is mainly used to measure the vibration stress wave generated by the rock drill during operation to evaluate its performance, durability and impact on the working environment.

[0003] A stress wave testing device for geotechnical engineering investigation disclosed in the patent application with reference publication number CN215065888U can effectively connect the sensor with the stress wave propagation rod and the stress wave detector, and can effectively and accurately measure the force-time curve of each hammer blow during in-situ test hammer blows. Through effective contact and connection of various parts, when the in-situ test hammer is dropped, the gravitational potential energy is converted into kinetic energy, and then the energy is transmitted to the standard penetrator or standard probe through the stress wave propagation rod and the probe rod. The in-situ strength index of the rock and soil body is reflected by the number of hammer blows of the specified penetration. By measuring the hammer force-time curve and finally measuring the hammer stress wave energy, the N value of different hammer energies can be reasonably corrected to obtain more accurate test data that can better reflect the in-situ strength of the rock and soil body.

[0004] A comprehensive analysis of the above patents reveals the following defects: the traditional stress wave testing device can only collect vibration stress wave signals at a specific position of the object in each test, and has the problems of single-point testing, low efficiency and great limitations. If it is necessary to understand the conditions of multiple positions inside the object, multiple tests must be performed, which is not only time-consuming and labor-intensive, but may also lead to inconsistent test results due to changes in test conditions, and cannot truly reflect the changes in stress waves inside the test piece.

[0005] Therefore, the present invention proposes an underground mining drilling vehicle rock drill body vibration stress wave testing device and method to solve the above problems. Summary of the invention

[0006] In view of the shortcomings of the prior art, the present invention provides a vibration stress wave testing device and method for an underground mining drilling rig and rock drill body, which solves the problem that traditional stress wave testing devices can only collect vibration stress wave signals at a specific position of an object in each test, and have the problems of single-point testing, low efficiency and great limitations. If it is necessary to understand the conditions of multiple positions inside the object, multiple tests must be performed, which is not only time-consuming and labor-intensive, but may also lead to inconsistency in test results due to changes in test conditions, and cannot truly reflect the stress wave changes inside the test piece.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: an underground mining drill vehicle rock drill body vibration stress wave testing device, including a signal conditioner, a signal acquisition instrument and a control system, the vibration stress wave testing device also includes: a vibration stress wave signal acquisition module, which includes a plurality of vibration stress wave acquisition mechanisms distributed in sequence from top to bottom, for collecting vibration stress wave signals at different positions of the underground mining drill vehicle rock drill body, and transmitting the collected multi-point vibration stress wave signals to the signal conditioner; a spacing adjustment mechanism, which is arranged on one side of the vibration stress wave acquisition mechanism, for simultaneously driving the plurality of vibration stress wave acquisition mechanisms in the longitudinal direction. The two vibration stress wave collection mechanisms can be moved away from or approached from each other in the same direction to complete the equidistant adjustment operation between two adjacent vibration stress wave collection mechanisms; an installation arm is fixedly arranged on the side wall of the spacing adjustment mechanism, and is used to connect with an external traction device. The traction device drives the overall component composed of the spacing adjustment mechanism, the vibration stress wave collection mechanism, and the installation arm to move, and multiple vibration stress wave collection mechanisms are simultaneously mounted on the outside of the underground mining drilling vehicle rock drill body, laying the foundation for vibration stress wave signal collection; a data transmission line is fixedly arranged on the outer wall of the signal conditioner, and is used to transmit the vibration stress wave signal preliminarily processed by the signal conditioner to the signal acquisition instrument.

[0008] Furthermore, the spacing adjustment mechanism includes a lifting sleeve, the interior of the lifting sleeve is a hollow structure, and a through groove connected to the interior is opened on its side wall. A variable pitch assembly is rotatably arranged inside the lifting sleeve, and a servo motor is fixedly arranged on the top of the lifting sleeve. The output shaft of the servo motor rotates and passes through the lifting sleeve and is connected to one end of the variable pitch assembly through a coupling.

[0009] Furthermore, the variable pitch assembly includes a transmission shaft rotatably arranged inside the lifting sleeve, and an annular groove, spiral groove one and spiral groove two are respectively opened on the outer wall of the transmission shaft. The annular groove is arranged in the middle position of the outer wall of the transmission shaft, and the spiral groove one and spiral groove two are symmetrically arranged on both sides of the annular groove.

[0010] Furthermore, the vibration stress wave collection mechanism includes a test component 1 and a test component 2 which are arranged opposite to each other on the left and right, a lifting sleeve is provided on one side of the test component 1 and the test component 2, and a bearing plate is fixedly provided on the upper and lower positions of the side walls of the lifting sleeve, one end of the test component 1 and the test component 2 is movably provided between the opposite side walls of the two bearing plates, and an electric push rod for pulling or pushing the test component 1 to rotate is provided between the two bearing plates through a support plate, a slider is fixedly provided on the inner wall of the lifting sleeve, and the slider is slidably provided inside the spiral groove 1 or the spiral groove 2, and the lifting sleeve is slidably sleeved on the outer wall of the transmission shaft.

[0011] Furthermore, the test component 1 includes an arc-shaped support arm and a plurality of through holes evenly arranged on the side wall of the arc-shaped support arm, a gear is fixedly arranged at one end of the arc-shaped support arm, and a driving arm is fixedly arranged on the side of the outer wall of the arc-shaped support arm close to the gear, guide sleeves and protective components are respectively arranged on both sides of the outer wall of the arc-shaped support arm and at positions opposite to the through holes, and a vibration stress wave collection component for abutting against the outer wall of an underground mining drilling vehicle and collecting vibration stress wave signals is commonly arranged inside the through holes, the guide sleeves and the protective components, a long strip through groove is arranged on the top of the guide sleeve, and a scale line groove for measuring the moving distance of the vibration stress wave collection component is arranged on the top of the guide sleeve and on one side of the long strip through groove.

[0012] Furthermore, except for the driving arm structure, the other structures between the test component 1 and the test component 2 are completely identical, and the gears in the test component 1 and the test component 2 are meshed and connected with each other.

[0013] Furthermore, the protection component includes a storage tube detachably arranged on the outer wall of the arc-shaped support arm, an annular frame is detachably arranged on the inner wall of the storage tube via bolts, and a plurality of bristles are evenly fixedly arranged on the inner wall of the annular frame.

[0014] Furthermore, the vibration stress wave collection component includes a telescopic rod slidably arranged in a guide sleeve and an extension arm fixedly arranged at one end of the telescopic rod, the end of the extension arm away from the telescopic rod is fixedly provided with a vibration stress wave sensor, and the other end of the telescopic rod is rotatably provided with a threaded rod, the threaded rod passes through the guide sleeve and is fixedly provided with a knob, the threaded rod and the guide sleeve are connected by a thread, and a pointer is fixedly provided on the top of the telescopic rod.

[0015] The present invention also discloses a testing method for a vibration stress wave testing device for a body of an underground mining drill rig and rock drill, which is applied to the vibration stress wave testing device for a body of an underground mining drill rig and rock drill, and the method comprises the following steps: step one, connecting a mounting arm and an external traction device, and the traction device is moved as a whole to one side of the body of the underground mining drill rig and rock drill consisting of a signal conditioner, a spacing adjustment mechanism, a vibration stress wave collection mechanism, a mounting arm, and a data transmission line, and the electrical equipment in the spacing adjustment mechanism and the vibration stress wave collection mechanism is connected to an external power supply through a wire, and a plurality of vibration stress wave collection mechanisms are sequentially sleeved on the outside of the body of the underground mining drill rig and rock drill, and then the spacing adjustment mechanism is used to adjust the plurality of vibration stress wave collection mechanisms to move away from or close to each other, so as to ensure that all vibration stress wave collection mechanisms are respectively sleeved on different positions of the outer wall of the body of the underground mining drill rig and rock drill. , and then the inner wall of the vibration stress wave collection mechanism is offset against the outer wall of the underground mining drill rig rock drill body; step two, collecting the vibration stress wave signal of the underground mining drill rig rock drill body when it is working, the vibration stress wave collection mechanism transmits the collected vibration stress wave analog signal to the signal conditioner through a cable, the vibration stress wave analog signal is amplified, filtered, and denoised by the signal conditioner, and then transmitted to the signal collector through the data transmission line, and then transmitted to the control system by the signal collector, the signal collector converts the conditioned analog signal into a digital signal, the control system receives the digital signal and analyzes it to generate a test report; step three, after the test is completed, release the lock on the underground mining drill rig rock drill body, and detach all vibration stress wave collection mechanisms from the outside of the underground mining drill rig rock drill body, and the vibration stress wave test of the underground mining drill rig rock drill body is completed.

[0016] The present invention provides a vibration stress wave testing device and method for an underground mining drill rig and rock drill body. Compared with the prior art, it has the following beneficial effects: 1. The vibration stress wave testing device and method for an underground mining drill rig and rock drill body, by arranging a plurality of vibration stress wave collecting mechanisms in the longitudinal direction, can be sequentially distributed along the outer wall of the underground mining drill rig and rock drill body, thereby being able to collect vibration stress wave signals at different height positions of the underground mining drill rig and rock drill body; secondly, a plurality of vibration stress wave collecting components are arranged in a ring shape in each vibration stress wave collecting mechanism, and the plurality of vibration stress wave collecting components can be distributed around the outer wall of the underground mining drill rig and rock drill body at the same horizontal height, thereby being able to collect vibration stress wave signals at different positions at the same horizontal height, thereby realizing simultaneous multi-point position measurement. Vibration stress wave test; therefore, the present invention can achieve the effect of vibration stress wave testing on different heights of the underground mining drill vehicle rock drill body and different directions at the same horizontal height during one vibration stress wave test, without the need to perform multiple points repeated tests on the surface of the underground mining drill vehicle rock drill body, thereby saving test steps and test time, and greatly improving the test efficiency of the underground mining drill vehicle rock drill body; furthermore, the vibration stress wave test process at different points of the underground mining drill vehicle rock drill body is at the same time node, avoiding the inconsistency of the results caused by changes in test conditions (such as temperature, humidity, etc.), thereby ensuring the accuracy of the vibration stress wave test results.

[0017] 2. The device and method for testing vibration stress waves of the body of an underground mining drill rig and rock drill, by setting a spacing adjustment mechanism, can use the spiral groove one, spiral groove two and annular groove to equidistantly adjust and control the positions of vibration stress wave collection mechanisms at multiple positions, so that the vibration stress wave collection mechanisms located on both sides of the middle position are equidistantly away from or equidistantly close to it, thereby changing the test position of the vibration stress wave of the body of the underground mining drill rig and rock drill, increasing the test range of the vibration stress wave, and then being able to obtain vibration stress wave signals at more positions in one test process, providing a large amount of data support for the subsequent analysis process, which is conducive to improving the accuracy of the test results.

[0018] 3. A vibration stress wave testing device and method for an underground mining drill rig and rock drill body. The vibration stress wave collecting mechanism is composed of a test component one and a test component two. The test component one and the test component two can be opened or closed in a "scissors" style with each other. When opened, the vibration stress wave collecting mechanism and the underground mining drill rig and rock drill body can be assembled and separated more conveniently, which is beneficial to saving testing time. Secondly, the vibration stress wave sensors in multiple vibration stress wave collecting assemblies can be close to or away from each other, so as to be adapted to underground mining drill rig and rock drill bodies with different contour shapes, thereby improving the practicality of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the vibration stress wave test state of the present invention.

[0020] Figure 2 It is a schematic diagram of the overall three-dimensional structure of the present invention.

[0021] Figure 3 It is a schematic diagram of the structure of the spacing adjustment mechanism of the present invention.

[0022] Figure 4 It is a schematic diagram of the structure of the variable pitch assembly of the present invention.

[0023] Figure 5 This is a schematic structural diagram of the vibration stress wave collection mechanism of the present invention with the top bearing plate removed.

[0024] Figure 6 For the present invention Figure 5 A schematic diagram of the enlarged structure of part A in the figure.

[0025] Figure 7 It is a schematic diagram of the structure of the vibration stress wave collection mechanism of the present invention in a decomposed state.

[0026] Figure 8 It is a schematic diagram of the internal structure of the lifting sleeve of the present invention.

[0027] Fig. 9 It is a structural schematic diagram of the slider and the spiral groove of the present invention in an assembled state.

[0028] Fig.10 For the present invention Fig. 9 Schematic diagram of the enlarged structure of part C in the figure.

[0029] Fig.11 It is a schematic diagram of the structure of the test component of the present invention in a disassembled state.

[0030] Fig.12 For the present invention Figure 5 Schematic diagram of the enlarged structure of part B in FIG.

[0031] Fig.13 It is a schematic diagram of the structure of the protective component of the present invention in a disassembled state.

[0032] Fig.14 It is a schematic diagram of the structure of the vibration stress wave acquisition component of the present invention.

[0033] In the figure: 1. signal conditioner; 2. spacing adjustment mechanism; 21. lifting sleeve; 22. through slot; 23. pitch change assembly; 24. servo motor; 25. transmission shaft; 26. annular slot; 27. spiral slot 1; 28. spiral slot 2; 3. vibration stress wave collection mechanism; 31. test assembly 1; 311. arc support arm; 312. gear; 313. drive arm; 314. guide sleeve; 315. protection assembly; 3151 , storage tube; 3152, ring frame; 3153, brush; 316, vibration stress wave acquisition component; 3161, telescopic rod; 3162, extension arm; 3163, vibration stress wave sensor; 3164, pointer; 317, long strip through groove; 318, scale line groove; 32, test component two; 33, lifting sleeve; 34, bearing plate; 35, electric push rod; 36, slider; 4, mounting arm; 5, data transmission line. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] like Figures 1 to 14 The present invention provides three technical solutions: a vibration stress wave testing device for an underground mining drill rig and rock drill body, specifically including the following embodiments: Embodiment 1: A vibration stress wave testing device for an underground mining drill rig and rock drill body, comprising a signal conditioner 1, a signal acquisition instrument and a control system, the vibration stress wave testing device also comprises: a vibration stress wave signal acquisition module, which comprises a plurality of vibration stress wave acquisition mechanisms 3 distributed sequentially from top to bottom, for collecting vibration stress wave signals at different positions of the underground mining drill rig and rock drill body, and transmitting the collected multi-point vibration stress wave signals to the signal conditioner 1; a spacing adjustment mechanism 2, which is arranged on one side of the vibration stress wave acquisition mechanism 3, for simultaneously driving Multiple vibration stress wave collection mechanisms 3 simultaneously move away from or approach each other in the longitudinal direction to complete the equidistant adjustment operation between two adjacent vibration stress wave collection mechanisms 3; the installation arm 4 is fixedly arranged on the side wall of the spacing adjustment mechanism 2, and is used to connect with the external traction equipment. The traction equipment drives the overall component composed of the spacing adjustment mechanism 2, the vibration stress wave collection mechanism 3, and the installation arm 4 to move, and simultaneously sets multiple vibration stress wave collection mechanisms 3 on the outside of the underground mining drilling vehicle rock drill body, laying the foundation for vibration stress wave signal collection; the part where the installation arm 4 and the lifting sleeve 21 are connected is fixedly provided with a shock-absorbing pad, which is used to reduce the energy transmitted to the installation arm 4 by the vibration stress wave.

[0036] The data transmission line 5 is fixedly arranged on the outer wall of the signal conditioner 1 and is used to transmit the vibration stress wave signal preliminarily processed by the signal conditioner 1 to the signal acquisition instrument.

[0037] The signal conditioner is used to pre-process the signal output by the sensor, including amplification, filtering, denoising and other operations to improve the signal-to-noise ratio and accuracy of the signal; the signal conditioner includes components such as charge amplifier, constant current source, anti-aliasing filter, and programmable amplifier; the signal acquisition instrument is used to convert the conditioned analog signal into a digital signal for subsequent data processing and analysis; the signal acquisition instrument includes components such as sample / holder and A / D analog-to-digital converter; the control system is the "brain" of the entire vibration test equipment, which is used to input test conditions, control the test process, receive and analyze data, and generate test reports; the control system includes computers, data processing software, etc.; the data processing software is used to process, analyze and visualize the collected data.

[0038] Embodiment 2: The main difference between this embodiment and the first technical solution is that: the underground mining drilling rig rock drill body vibration stress wave testing device, the spacing adjustment mechanism 2 includes a lifting sleeve 21, the interior of the lifting sleeve 21 is a hollow structure, and a through groove 22 connected to the interior thereof is opened on its side wall, and a variable pitch assembly 23 is rotatably arranged inside the lifting sleeve 21, and a servo motor 24 is fixedly arranged on the top of the lifting sleeve 21, and the output shaft of the servo motor 24 rotates and passes through the lifting sleeve 21 and is connected to one end of the variable pitch assembly 23 through a coupling.

[0039] The pitch-changing assembly 23 includes a transmission shaft 25 rotatably arranged inside the lifting sleeve 21, and an annular groove 26, a spiral groove 1 27 and a spiral groove 28 are respectively provided on the outer wall of the transmission shaft 25, the annular groove 26 is arranged at the middle position of the outer wall of the transmission shaft 25, and the spiral groove 1 27 and the spiral groove 28 are symmetrically arranged on both sides of the annular groove 26. Except for the different spiral directions, the spiral groove 1 27 and the spiral groove 28 have the same pitch, length and groove depth.

[0040] Embodiment 3: The main difference between this embodiment and the second technical solution is that: the vibration stress wave testing device for the rock drill body of an underground mining drilling vehicle, the vibration stress wave collecting mechanism 3 includes a test assembly 1 31 and a test assembly 2 32 arranged opposite to each other on the left and right sides, a lifting sleeve 33 is arranged on one side of the test assembly 1 31 and the test assembly 2 32, a bearing plate 34 is fixedly arranged on the upper and lower positions of the side wall of the lifting sleeve 33, one end of the test assembly 1 31 and the test assembly 2 32 is movably arranged between the opposite side walls of the two bearing plates 34, an electric push rod 35 for pulling or pushing the test assembly 1 31 to rotate is arranged between the two bearing plates 34 through a support plate, a slider 36 is fixedly arranged on the inner wall of the lifting sleeve 33, the slider 36 is slidably arranged inside the spiral groove 1 27 or the spiral groove 28, and the lifting sleeve 33 is slidably sleeved on the outer wall of the transmission shaft 25. The output end of the electric push rod 35 is rotatably arranged inside the driving arm 313, and the other end of the electric push rod 35 is rotatably arranged on the support plate. The electric push rods 35 are electrically connected to an external power source through a wire, and the plurality of electric push rods 35 are all controlled to be turned on or off by an external controller. The plurality of vibration stress wave sensors 3163 are all connected to the signal conditioner 1 through cables.

[0041] The test component 1 31 includes an arc-shaped support arm 311 and a plurality of through holes evenly arranged on the side wall of the arc-shaped support arm 311, a gear 312 is fixedly arranged at one end of the arc-shaped support arm 311, and a driving arm 313 is fixedly arranged on the side of the outer wall of the arc-shaped support arm 311 close to the gear 312, a guide sleeve 314 and a protective component 315 are respectively arranged on both sides of the outer wall of the arc-shaped support arm 311 and at positions opposite to the through holes, a vibration stress wave collection component 316 for abutting against the outer wall of the underground mining drilling vehicle and collecting vibration stress wave signals is commonly arranged inside the through hole, the guide sleeve 314 and the protective component 315, a long strip through groove 317 is arranged on the top of the guide sleeve 314, and a scale line groove 318 for measuring the moving distance of the vibration stress wave collection component 316 is arranged on the top of the guide sleeve 314 and on one side of the long strip through groove 317. The pointer 3164 slides through the long strip through slot 317 and extends to the outside. When the pointer 3164 slides along the surface of the scale line slot 318, it can indicate the position of the telescopic rod 3161 in real time.

[0042] The test assembly 1 31 and the test assembly 2 32 have the same structure except the driving arm 313. The gears 312 in the test assembly 1 31 and the test assembly 2 32 are meshed and connected. The arc-shaped support arm 311 is a half-circle structure.

[0043] The protective component 315 includes a storage tube 3151 detachably arranged on the outer wall of the arc-shaped support arm 311, and an annular frame 3152 is detachably arranged on the inner wall of the storage tube 3151 by bolts, and a plurality of bristles 3153 are evenly fixedly arranged on the inner wall of the annular frame 3152. The ends of the plurality of bristles 3153 away from the annular frame 3152 are close to each other, and a small circular gap is formed, and a small gap is formed between two adjacent bristles 3153, which is used to prevent external dust from entering the interior of the storage tube 3151.

[0044] The vibration stress wave collection component 316 includes a telescopic rod 3161 slidably arranged in the guide sleeve 314 and an extension arm 3162 fixedly arranged at one end of the telescopic rod 3161. A vibration stress wave sensor 3163 is fixedly arranged at the end of the extension arm 3162 away from the telescopic rod 3161. A threaded rod is rotatably arranged at the other end of the telescopic rod 3161. The threaded rod passes through the guide sleeve 314 and is fixedly arranged with a knob. The threaded rod and the guide sleeve 314 are connected by threads. A pointer 3164 is fixedly arranged on the top of the telescopic rod 3161.

[0045] The present invention also provides a testing method for a vibration stress wave testing device for a rock drill body of an underground mining drill, which is applied to the vibration stress wave testing device for a rock drill body of an underground mining drill. The method comprises the following steps: Step 1, connecting the mounting arm 4 to an external traction device, wherein the traction device is composed of a signal conditioner 1, a spacing adjustment mechanism 2, a vibration stress wave collection mechanism 3, the mounting arm 4, and a data transmission line 5, and is moved as a whole to one side of the body of the underground mining drill, and the electrical equipment in the spacing adjustment mechanism 2 and the vibration stress wave collection mechanism 3 is connected to an external power supply through a wire, and a plurality of vibration stress wave collection mechanisms 3 are sequentially mounted on the body of the underground mining drill. The outside of the apparatus is then adjusted by using the spacing adjustment mechanism 2 to move the multiple vibration stress wave collection mechanisms 3 away from or close to each other, ensuring that all vibration stress wave collection mechanisms 3 are respectively sleeved at different positions on the outer wall of the underground mining drill vehicle rock drill body, and then the inner wall of the vibration stress wave collection mechanism 3 and the outer wall of the underground mining drill vehicle rock drill body are abutted against each other; the specific process is: the end of the mounting arm 4 away from the lifting sleeve 21 is connected to the traction device through a flange, and the traction device has the ability to drive the spacing adjustment mechanism 2 to move and lift it, so all traction devices with this ability can be used here; when the mounting arm 4 and the lifting sleeve 21 are installed and connected, A shock-absorbing pad needs to be set between the mounting arm 4 and the outer wall of the lifting sleeve 21; then, the traction equipment drives the whole consisting of the signal conditioner 1, the spacing adjustment mechanism 2, the vibration stress wave collection mechanism 3, the mounting arm 4 and the data transmission line 5 to move to one side of the underground mining drilling vehicle rock drill body. When the vibration stress wave collection mechanism 3 is in the initial position, the multiple vibration stress wave collection components 316 inside it are at the maximum distance from the center of the arc support arm 311; because the gear 312 is rotatably set on the inner wall of the bearing plate 34 through the rotating shaft, and the gears 312 in the test component 1 31 and the test component 2 32 are meshed and connected with each other, the electric push rod 35 is started at this time to pull the drive arm 313, the arc-shaped support arm 311 rotates around the rotating shaft, and the gear 312 in the test component 1 31 drives the gear 312 in the test component 2 32 to rotate in the opposite direction, so that the test component 1 31 and the test component 2 32 are opened in a "scissors" style, and the traction equipment continues to drive the multiple vibration stress wave collection mechanisms 3 to approach the underground mining drilling vehicle rock drill body, and is sleeved on the outside of the underground mining drilling vehicle rock drill body through the gap opened between the two ends of the test component 1 31 and the test component 2 32. Then, the electric push rod 35 pushes the drive arm 313 to move in the opposite direction, and the ends of the test component 1 31 and the test component 2 32 approach each other until the gap opened at the ends is closed again;Next, the servo motor 24 is started to drive the pitch-changing assembly 23 to rotate at a low and uniform speed. The slider 36 in the vibration stress wave collection mechanism 3 at the middle position is slidably set in the annular groove 26, and the sliders 36 in the two vibration stress wave collection mechanisms 3 at the top and the bottom are slidably set in the spiral groove 28 and the spiral groove 1 27 respectively. When the transmission shaft 25 rotates, the sliders 36 in the multiple vibration stress wave collection mechanisms 3 slide along the annular groove 26 or the spiral groove 1 27 or the spiral groove 28 at the corresponding positions. The position of the vibration stress wave collection mechanism 3 at the middle position remains unchanged, while the vibration stress wave collection mechanisms 3 at the top and the bottom are close to each other. The positions of the plurality of vibration stress wave collecting mechanisms 3 are changed at equal distances relative to the vibration stress wave collecting mechanism 3 at the middle position. At this time, the positions of the plurality of vibration stress wave collecting mechanisms 3 are adjusted according to the length of the underground mining drill vehicle rock drill body, so that the plurality of vibration stress wave collecting mechanisms 3 are evenly distributed in the longitudinal direction of the outer wall of the underground mining drill vehicle rock drill body; then, the knob at one end of the telescopic rod 3161 is turned in turn to drive the screw to rotate. Since the screw and the guide sleeve 314 are threadedly connected and are rotatably connected to the telescopic rod 3161, when the screw is turned, the pointer 3164 is pushed or pulled to move toward or away from the protective component 315. When the outer contour of the underground mining drill vehicle rock drill body When it is in a "cylindrical" shape, refer to the scale line groove 318 set on the top of the guide sleeve 314, so that the values ​​of the scale line groove 318 corresponding to the position of the pointer 3164 of each vibration stress wave collection component 316 are the same, until each vibration stress wave sensor 3163 can be tightly pressed against the outer wall of the underground mining drill vehicle rock drill body in a ring shape. If the outer contour of the underground mining drill vehicle rock drill body is not in a "cylindrical" shape, the vibration stress wave sensor 3163 in each vibration stress wave collection mechanism 3 can be pressed against the outer wall of the underground mining drill vehicle rock drill body in turn; step two, collect the vibration stress wave signal of the underground mining drill vehicle rock drill body when it is working, the vibration stress wave The collection mechanism 3 transmits the collected vibration stress wave analog signal to the signal conditioner 1 through a cable. The vibration stress wave analog signal is amplified, filtered, and denoised by the signal conditioner 1, and then transmitted to the signal acquisition instrument through the data transmission line 5, and then transmitted to the control system by the signal acquisition instrument. The signal acquisition instrument converts the conditioned analog signal into a digital signal. After the control system receives the digital signal, it analyzes it and generates a test report; the signal conditioner 1, the signal acquisition instrument and the control system process the vibration stress wave processing and analysis process are existing known technologies, and the internal structure of the signal conditioner 1, the signal acquisition instrument and the control system and the vibration stress wave processing and analysis process are not repeated here;Step three, after the test is completed, release the lock on the underground mining drill rig rock drill body, and detach all vibration stress wave collection mechanisms 3 from the outside of the underground mining drill rig rock drill body, and the vibration stress wave test on the underground mining drill rig rock drill body is completed. The specific process is: start the electric push rod 35 again to pull the drive arm 313, the arc-shaped support arm 311 rotates around the shaft, and the gear 312 in the test component 1 31 drives the gear 312 in the test component 2 32 to rotate in the opposite direction. Therefore, the test component 1 31 and the test component 2 32 are opened in a "scissors" style, and the traction equipment continues to drive multiple vibration stress wave collection mechanisms 3 away from the underground mining drill rig rock drill body, and detach from the underground mining drill rig rock drill body through the gap opened between the two ends of the test component 1 31 and the test component 2 32, and then, manually The screw at one end of the telescopic rod 3161 is twisted in the opposite direction to pull the vibration stress wave sensor 3163 to move into the storage tube 3151 until the vibration stress wave sensor 3163 is completely moved into the storage tube 3151 and the bristles 3153 shield the end of the vibration stress wave sensor 3163. During the movement of the vibration stress wave sensor 3163 relative to the bristles 3153, the dust attached to the surface of the vibration stress wave sensor 3163 during the test is cleaned, so that the surface can be kept clean and the detection accuracy of the vibration stress wave sensor 3163 is ensured. ;

[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A vibration stress wave testing device for an underground mining drilling vehicle rock drill, comprising a signal conditioner (1), a signal acquisition device and a control system, characterized in that: The vibration stress wave testing device also includes: A vibration stress wave signal acquisition module, comprising a plurality of vibration stress wave acquisition mechanisms (3) distributed in sequence from top to bottom, for acquiring vibration stress wave signals at different positions of a rock drill body of an underground mining drilling vehicle, and transmitting the acquired multi-point vibration stress wave signals to a signal conditioner (1); A spacing adjustment mechanism (2) is arranged on one side of the vibration stress wave collection mechanism (3) and is used to simultaneously drive the plurality of vibration stress wave collection mechanisms (3) to simultaneously move away from each other or simultaneously move toward each other in a longitudinal direction, thereby completing an equidistant adjustment operation between two adjacent vibration stress wave collection mechanisms (3); The mounting arm (4) is fixedly mounted on the side wall of the spacing adjustment mechanism (2) and is used to connect to an external traction device. The traction device drives the integral component composed of the spacing adjustment mechanism (2), the vibration stress wave collection mechanism (3) and the mounting arm (4) to move, and a plurality of vibration stress wave collection mechanisms (3) are simultaneously mounted on the outside of the rock drill body of the underground mining drilling vehicle, thereby laying a foundation for vibration stress wave signal collection; A data transmission line (5) is fixedly arranged on the outer wall of the signal conditioner (1) and is used to transmit the vibration stress wave signal preliminarily processed by the signal conditioner (1) to a signal acquisition instrument; The spacing adjustment mechanism (2) comprises a lifting sleeve (21), the interior of the lifting sleeve (21) is a hollow structure, a through slot (22) communicating with the interior of the lifting sleeve (21) is provided on a side wall thereof, a pitch-changing assembly (23) is rotatably arranged inside the lifting sleeve (21), a servo motor (24) is fixedly arranged on the top of the lifting sleeve (21), an output shaft of the servo motor (24) rotatably passes through the lifting sleeve (21) and is connected to one end of the pitch-changing assembly (23) via a coupling; The pitch-changing assembly (23) comprises a transmission shaft (25) rotatably arranged inside the lifting sleeve (21), an annular groove (26), a spiral groove 1 (27) and a spiral groove 2 (28) are respectively provided on the outer wall of the transmission shaft (25), the annular groove (26) is arranged at a middle position of the outer wall of the transmission shaft (25), and the spiral groove 1 (27) and the spiral groove 2 (28) are symmetrically arranged on both sides of the annular groove (26); The vibration stress wave collection mechanism (3) comprises a test component 1 (31) and a test component 2 (32) which are arranged opposite to each other on the left and right sides; a lifting sleeve (33) is arranged on one side of the test component 1 (31) and the test component 2 (32); a bearing plate (34) is fixedly arranged at the upper and lower positions of the side walls of the lifting sleeve (33); one end of the test component 1 (31) and the test component 2 (32) is movably arranged between the opposite side walls of the two bearing plates (34); an electric push rod (35) for pulling or pushing the test component 1 (31) to rotate is arranged between the two bearing plates (34) via a support plate; a slider (36) is fixedly arranged on the inner wall of the lifting sleeve (33); the slider (36) is slidably arranged inside the spiral groove 1 (27) or the spiral groove 2 (28); and the lifting sleeve (33) is slidably sleeved on the outer wall of the transmission shaft (25); The test component 1 (31) comprises an arc-shaped support arm (311) and a plurality of through holes evenly arranged on the side wall of the arc-shaped support arm (311); a gear (312) is fixedly arranged at one end of the arc-shaped support arm (311); a driving arm (313) is fixedly arranged on a side of the outer wall of the arc-shaped support arm (311) close to the gear (312); guide sleeves (314) and protective components (315) are respectively arranged on both sides of the outer wall of the arc-shaped support arm (311) and at positions opposite to the through holes. A vibration stress wave collection component (316) for abutting against the outer wall of the underground mining drilling vehicle rock drill body and collecting vibration stress wave signals is disposed inside the through hole, the guide sleeve (314) and the protection component (315); a long strip through slot (317) is disposed on the top of the guide sleeve (314); and a scale line slot (318) for measuring the moving distance of the vibration stress wave collection component (316) is disposed on the top of the guide sleeve (314) and on one side of the long strip through slot (317); The test component 1 (31) and the test component 2 (32) are identical in structure except for the driving arm (313), and the gears (312) in the test component 1 (31) and the test component 2 (32) are meshed and connected with each other; The vibration stress wave collection component (316) comprises a telescopic rod (3161) slidably arranged in a guide sleeve (314) and an extension arm (3162) fixedly arranged at one end of the telescopic rod (3161); a vibration stress wave sensor (3163) is fixedly arranged at one end of the extension arm (3162) away from the telescopic rod (3161); a threaded rod is rotatably arranged at the other end of the telescopic rod (3161); the threaded rod passes through the guide sleeve (314) and is fixedly arranged with a knob; the threaded rod and the guide sleeve (314) are connected by threads; and a pointer (3164) is fixedly arranged at the top of the telescopic rod (3161).

2. The vibration stress wave testing device for underground mining drilling rig rock drill according to claim 1, characterized in that: The protection component (315) comprises a storage tube (3151) detachably arranged on the outer wall of the arc-shaped support arm (311); an annular frame (3152) is detachably arranged on the inner wall of the storage tube (3151) via bolts; and a plurality of bristles (3153) are evenly and fixedly arranged on the inner wall of the annular frame (3152).

3. A test method for a vibration stress wave test device for a rock drill of an underground mining rig, characterized in that: Applied to the underground mining drilling vehicle rock drill body vibration stress wave testing device as claimed in any one of claims 1 and 2, the method comprises the following steps: Step 1: Connect the mounting arm (4) to an external traction device. The traction device is moved as a whole, which is composed of a signal conditioner (1), a spacing adjustment mechanism (2), a vibration stress wave collection mechanism (3), a mounting arm (4), and a data transmission line (5), to one side of the underground mining drilling vehicle rock drill body. The electrical equipment in the spacing adjustment mechanism (2) and the vibration stress wave collection mechanism (3) is connected to an external power source through a wire. A plurality of vibration stress wave collection mechanisms (3) are sequentially mounted on the outside of the underground mining drilling vehicle rock drill body. The spacing adjustment mechanism (2) is then used to adjust the plurality of vibration stress wave collection mechanisms (3) to move away from or close to each other, so as to ensure that all the vibration stress wave collection mechanisms (3) are respectively mounted on different positions of the outer wall of the underground mining drilling vehicle rock drill body. Then, the inner wall of the vibration stress wave collection mechanism (3) is abutted against the outer wall of the underground mining drilling vehicle rock drill body. Step 2: collecting the vibration stress wave signal of the underground mining drilling vehicle rock drill body when it is working. The vibration stress wave collecting mechanism (3) transmits the collected vibration stress wave analog signal to the signal conditioner (1) through the cable. The vibration stress wave analog signal is amplified, filtered, and de-noised by the signal conditioner (1), and then transmitted to the signal collector through the data transmission line (5). The signal collector then transmits it to the control system. The signal collector converts the conditioned analog signal into a digital signal. The control system receives the digital signal and analyzes it to generate a test report. Step 3: After the test is completed, the lock on the underground mining drill rig rock drill body is released, and all vibration stress wave collection mechanisms (3) are detached from the outside of the underground mining drill rig rock drill body, and the vibration stress wave test on the underground mining drill rig rock drill body is completed.