Device and method for testing the stain resistance of water-based inorganic energy storage tunnel luminous paint coating

By designing a water-based inorganic energy storage tunnel luminous paint coating testing device that automatically drops and wipes, the problems of low testing efficiency and easy soiling in the existing technology are solved, and efficient and accurate testing and cleaning of contaminated media are achieved.

CN118566476BActive Publication Date: 2024-10-22JILIN JIANZHU UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411046433.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-22
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The existing contamination resistance testing device for water-based inorganic energy-storage tunnel luminous paint coatings requires manual operation, is time-consuming, labor-intensive and easy to get dirty, and is difficult to efficiently test multiple pollution media.

Method used

A test device is designed that includes a workbench, a switching body, a storage chamber and a wiping assembly. Through the cooperation of the switching body and the moving stage, it can automatically place and wipe the contaminated medium, and use solenoid valves and wiping strips to automatically clean the contamination on the sample. , combined with a colorimeter and a gloss meter to measure the color and gloss changes of the coating.

Benefits of technology

It improves the testing efficiency, saves time, avoids manual contact with contaminated media, ensures the accuracy and cleanliness of the test, and reduces subsequent cleaning work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118566476B_ABST
    Figure CN118566476B_ABST
Patent Text Reader

Abstract

The present invention discloses a device and method for testing the contamination resistance of a water-based inorganic energy storage tunnel luminous paint coating, which relates to the technical field of material testing, and includes a workbench, a switching body, a switching component, a blocking component, and a wiping component. The switching body is evenly provided with storage cavities, and the top of the switching body is evenly provided with feeding ports corresponding to the positions of the storage cavities. The switching body is driven to move to the left by the switching component, and different discharge ports can be moved to the middle of the workbench during the movement of the switching body. The wiping component can automatically wipe off the contaminated medium on the sample. Because the contaminated medium in each storage cavity is different, different contaminated media are added by switching, so as to realize the contamination resistance test of different substances on the water-based inorganic energy storage tunnel luminous paint and improve the test efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of material testing, and in particular to a device and method for testing the contamination resistance of a water-based inorganic energy storage tunnel luminous paint coating. Background Art

[0002] In modern transportation construction, the safety and aesthetics of tunnels are of vital importance. Water-based inorganic energy storage tunnel luminous paint has been increasingly widely used in the field of tunnel lighting due to its unique luminous properties and environmental advantages. However, this coating will inevitably be invaded by various polluting media during actual use. Its stain resistance will directly affect the luminous effect, service life and appearance quality of the coating, so it is necessary to conduct stain resistance testing.

[0003] When the existing testing device conducts a stain resistance test on the water-based inorganic energy storage tunnel luminous paint coating, it is necessary to manually apply the contamination medium on the test sample, let the sample stand for a period of time, and then manually wipe off the contamination medium on the sample, and then observe the residual contamination medium on the sample and the changes in the color and gloss of the sample. Since multiple contamination media need to be tested, the manual method is time-consuming and laborious, and it will come into contact with the contamination medium, which is easy to get dirty. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a device and method for testing the contamination resistance of a water-based inorganic energy storage tunnel luminous paint coating.

[0005] The solution is as follows:

[0006] A device for testing the stain resistance of a water-based inorganic energy storage tunnel luminous paint coating, comprising a workbench and legs, wherein the legs are fixedly connected to the lower surface of the workbench, a fixing frame is fixedly connected to the upper surface of the workbench, a rectangular window is provided on the top surface of the fixing frame, a switching body is inserted between the workbench and the fixing frame, a plurality of storage cavities are evenly provided in the switching body, the storage cavities are located below the rectangular window of the fixing frame, the storage cavities are funnel-shaped, a feeding port corresponding to the position of the storage cavity is evenly provided on the top of the switching body, a discharge port corresponding to the position of the storage cavity is evenly provided on the bottom of the switching body, an opening is provided in the middle of the workbench, a moving platform is slidably connected in the opening, a sample is placed on the moving platform, and a switching component is provided between the workbench and the switching body;

[0007] The switching assembly includes a switching plate fixedly connected to the bottom of the switching body, a plurality of switching ports are evenly opened on the switching plate, a guide bar is fixedly connected to the workbench, a guide bar is provided with a guide groove, a torsion spring hinge is fixedly connected to the side of the moving platform close to the switching plate, a switching rod is hinged on the torsion spring hinge, and an end of the switching rod away from the torsion spring hinge can slide along the guide groove and drive the switching body to move when sliding;

[0008] A blocking assembly is provided at the bottom of the switching body, and the blocking assembly includes two sliding grooves symmetrically opened at the bottom of the switching body, each of the sliding grooves is slidably connected with a sliding rod inside, a pressing plate is fixedly connected between the two sliding rods, a spring is fixedly connected between the pressing plate and the switching body, a blocking plate is fixedly connected between the sliding rods, the blocking plate is located below the discharge port, and the upper surface of the middle part of the blocking plate is in contact with the bottom of the discharge port.

[0009] Further explanation, a locking assembly is arranged between the switching body and the fixed frame, and the locking assembly includes a card slot opened on the fixed frame, and a plurality of locking bodies are evenly and fixedly connected to the switching body, and a locking slot is opened inside each of the locking bodies, and a card block is slidably arranged in the locking slot, one end of the card block is located in the locking slot and a spring 2 is connected between the locking slot wall, and the other end of the card block passes through the slot wall outward and is engaged with the card slot.

[0010] Further explanation, a wiping assembly is provided at the bottom of the switching body, and the wiping assembly includes a motor fixedly connected to the side wall of the switching body, an eccentric disk is fixedly connected to the output shaft of the motor, an eccentric rod is eccentrically fixedly connected to one surface of the eccentric disk, a reciprocating rod is slidably connected to the bottom of the switching body, the reciprocating rod is slidably connected to the eccentric rod of the eccentric disk, a wiping strip is evenly and detachably connected to the reciprocating rod, a water storage chamber is provided on the switching body, water is stored in the water storage chamber, a water injection hole connected to the water storage chamber is provided on the switching body, a diversion water outlet head is fixedly connected to the bottom of the switching body, and the top of the diversion water outlet head is connected to the inside of the water storage chamber, an electromagnetic valve is provided between the diversion water outlet head and the water storage chamber, and the bottom of the diversion water outlet head is in contact with the top of the wiping strip.

[0011] Further description, a pushing plate is fixedly connected to the movable platform, a mounting groove frame is fixedly connected to the upper surface of the movable platform, the lower surface of the wiping strip is flush with the top of the mounting groove frame, a leakage groove is opened around the mounting groove frame on the movable platform, and the bottom of the leakage groove located on the left and right sides of the mounting groove frame is penetrated downward and the groove wall on one side is inclined toward the middle.

[0012] It is further explained that a fixed support is symmetrically fixedly connected to the bottom of the workbench, a collection box is slidably arranged on the fixed support, and the collection box is located below the movable platform.

[0013] A method for testing the stain resistance of a water-based inorganic energy storage tunnel luminous paint coating, the stain resistance testing method comprising the following steps:

[0014] Step 1: Prepare the sample to be tested. The surface of the sample is evenly and evenly coated with a water-based inorganic energy storage tunnel luminous paint coating, and the sample is placed in the installation slot frame;

[0015] Step 2: Insert the switching body between the workbench and the fixed frame, and the blocking plate will block the discharge port;

[0016] Step 3: Prepare polluted media, including muddy water with different proportions, fly ash solution with different proportions and oil pollution, and pour the prepared polluted media into each storage cavity respectively;

[0017] Step 4: Push the moving platform toward one side of the switching body. During the movement of the moving platform, the switching body is driven to move synchronously, so that the storage cavity moves to align with the sample on the moving platform, and then push the moving platform to continue to move toward the switching body. The pressing plate corresponding to the storage cavity opens the blocking plate, and the contaminated medium in the storage cavity falls downward onto the sample;

[0018] Step 5: After the sample is left to stand for a period of time, the solenoid valve corresponding to the storage chamber is opened, and the water stored in the water storage chamber soaks the wiping strip;

[0019] Step 6: Pull out the moving table. During the process of pulling out the moving table, the wiping strip wipes off the contaminated medium on the sample;

[0020] Step 7: Pull the moving platform out completely from the bottom of the switching body, observe the residual contaminated medium on the sample, use a colorimeter to measure the color change of the sample coating, and use a gloss meter to measure the gloss of the sample coating to calculate the gloss loss;

[0021] Step 8: Repeat steps 4 to 7 above to continue testing the contaminated medium in the next storage chamber until each contaminated medium has been tested.

[0022] To further explain, in step 4, when the switching body moves to align the material storage cavity with the template on the movable table, the card block is synchronously inserted into the card slot.

[0023] As described above, the beneficial effects of the water-based inorganic energy storage tunnel luminous paint coating contamination resistance testing device and method of the present invention are as follows:

[0024] The switching plate drives the switching body to move to the left between the workbench and the fixed frame. During the movement of the switching body, different discharge ports can be moved to the middle of the workbench. Since the polluted medium in each storage cavity is different, different polluted mediums can be added by switching, so as to realize the pollution resistance test of different substances for water-based inorganic energy storage tunnel luminous paint, improve the test efficiency, save the test time, and the staff does not need to touch the polluted medium to avoid getting dirty.

[0025] The switching body is fixed by the clamping connection between the clamping block and the clamping slot, which avoids the reverse movement of the switching body after switching, thus ensuring the accuracy of subsequent switching;

[0026] The collection box can be used to collect the contaminated medium, preventing the contaminated medium from falling to other places, thereby reducing unnecessary cleaning procedures. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the present invention;

[0028] Figure 2 It is a three-dimensional structural schematic diagram of the guide bar, the switching rod and other components of the present invention;

[0029] Figure 3 It is a schematic cross-sectional structure diagram of the storage chamber, the discharge port and other components shown in the present invention;

[0030] Figure 4 The present invention shows Figure 3 A magnified schematic diagram of the structure at B in the middle;

[0031] Figure 5 It is a sectional stereoscopic schematic diagram of the overall structure of the present invention;

[0032] Figure 6 The present invention shows Figure 5 A magnified schematic diagram of the structure at C in the middle;

[0033] Figure 7 It is a three-dimensional structural schematic diagram of the locking body and other components of the present invention;

[0034] Figure 8 The present invention shows Figure 7 A magnified schematic diagram of the structure at D in the middle;

[0035] Fig. 9 It is a structural schematic diagram of the eccentric disk, reciprocating rod and other components of the present invention;

[0036] Fig.10 It is a schematic diagram of the structure of the wiping assembly and other components shown in the present invention;

[0037] Fig.11 It is a cross-sectional view of the mobile station shown in the present invention.

[0038] Among them, the accompanying drawings in the present invention are:

[0039] 1. Workbench; 2. Legs; 3. Fixed frame;

[0040] 4. Switching body; 41. Storage chamber; 42. Feeding port; 43. Discharging port;

[0041] 5. Fixed support;

[0042] Blocking assembly: 61, slide groove; 62, slide rod; 63, pressing plate; 64, spring 1; 65, blocking plate;

[0043] Locking assembly: 71, card slot; 72, locking body; 73, locking slot; 74, spring 2; 75, card block;

[0044] Wiping assembly: 81, motor; 82, eccentric disc; 83, reciprocating rod; 84, wiping strip; 85, water storage chamber; 86, split water head;

[0045] 9. Moving table; 91. Pushing plate; 92. Installing slot frame; 93. Leakage slot;

[0046] Switching assembly: 101, switching plate; 102, switching port; 103, guide bar; 104, torsion spring hinge; 105, switching rod;

[0047] 12. Collection box. DETAILED DESCRIPTION

[0048] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0049] See also Figures 1 to 11 As shown, an embodiment provided by the present invention will be described in detail below:

[0050] like Figure 1 to Figure 3As shown, a water-based inorganic energy storage tunnel luminous paint coating stain resistance test device includes a workbench 1 and four legs 2, the four legs 2 are symmetrically fixedly connected to the lower surface of the workbench 1, the upper surface of the workbench 1 is fixedly connected to a fixing frame 3, the top surface of the fixing frame 3 is provided with a rectangular window, a switching body 4 is inserted between the workbench 1 and the fixing frame 3, and the switching body 4 can slide left and right on the workbench 1 and the fixing frame 3. A plurality of storage cavities 41 are evenly opened in the switching body 4. In this embodiment, a total of six storage cavities 41 are opened. The storage cavities 41 of the switching body 4 are located below the rectangular window of the fixing frame 3. The storage cavities 41 are funnel-shaped. The top of the switching body 4 is evenly opened with a feeding port 42 corresponding to the position of the storage cavity 41 and the same number, and the bottom of the switching body 4 is evenly opened with a discharge port 43 corresponding to the position of the storage cavity 41 and the same number. An opening is provided in the middle position of the workbench 1, and a moving platform 9 is slidably connected in the opening, and the moving platform 9 can slide back and forth on the workbench 1. A switching assembly for moving the switching body 4 is provided between the workbench 1 and the switching body 4;

[0051] The switching assembly includes a switching plate 101 fixedly connected to the bottom of the switching body 4, the switching plate 101 is embedded in the workbench 1 and can slide left and right in the workbench 1, and a plurality of switching ports 102 are evenly and equidistantly provided on the switching plate 101, and the distance between the centers of adjacent switching ports 102 is equal to the distance between the centers of adjacent material storage chambers 41. A guide bar 103 is fixedly connected to the workbench 1, and a guide groove is provided on the guide bar 103, and the distance between the rightmost end of the guide groove and the leftmost end of the guide groove is equal to the center distance between two adjacent switching ports 102. A torsion spring hinge 104 is fixedly connected to one side of the moving platform 9 close to the switching plate 101, and a switching rod 105 is hinged on the torsion spring hinge 104. A torsion spring is connected to the hinge between the switching rod 105 and the torsion spring hinge 104. The end of the switching rod 105 away from the torsion spring hinge 104 can be inserted into the inside of the switching port 102 and squeezed with the guide bar 103. Specifically, the end of the switching rod 105 away from the torsion spring hinge 104 can slide in the guide groove, and the guide groove is provided with an inclined surface. Therefore, when the switching rod 105 slides forward along the guide groove, the switching rod 105 will rotate, and at the same time push the switching plate 101 to move to the left.

[0052] like Figures 4 to 6As shown, a blocking component is provided at the bottom of the switching body 4, and the blocking component includes a plurality of groups of slide grooves 61 evenly opened at the bottom of the switching body 4, and each group of slide grooves 61 is composed of two slide grooves 61, and each slide groove 61 is internally slidably connected with a slide rod 62, and the number of slide rods 62 corresponds to that of the slide grooves 61, and a pressing plate 63 is fixedly connected between every two slide rods 62, and each storage cavity 41 corresponds to a pressing plate 63, and a spring 64 is fixedly connected between the pressing plate 63 and the switching body 4, and a blocking plate 65 is fixedly connected between the two slide rods 62, and the blocking plate 65 is located below the discharge port 43, and the blocking plate 65 can fit with the bottom of the discharge port 43, thereby blocking the discharge port 43.

[0053] like Figure 7 and Figure 8 As shown, a locking assembly for locking the switching position of the switching body 4 is provided between the switching body 4 and the fixing frame 3, and the locking assembly includes a card slot 71 provided on the fixing frame 3. A plurality of locking bodies 72 are evenly and fixedly connected to the top surface of the switching body 4, and a locking slot 73 is provided inside each locking body 72, and a card block 75 is slidably provided in the locking slot 73, one end of the card block 75 is located in the locking slot 73 and a spring 2 74 is connected between the card block 75 and the slot wall of the locking slot 73, and the other end of the card block 75 passes through the slot wall outward and can be carded with the card slot 71.

[0054] like Figure 6 , Fig. 9 and Fig.10 As shown, a wiping assembly is provided at the bottom of the switching body 4, and the wiping assembly includes a motor 81 fixedly connected to the side wall of the switching body 4, an eccentric disk 82 is fixedly connected to the output shaft of the motor 81, and an eccentric rod is fixedly connected at the eccentric position of the eccentric disk 82, and a reciprocating rod 83 is slidably connected to the bottom of the switching body 4, and the reciprocating rod 83 is slidably connected to the eccentric rod of the eccentric disk 82. Specifically, a strip hole is provided at one end of the reciprocating rod 83 close to the eccentric disk 82, and one end of the reciprocating rod 83 is embedded in the strip hole and can slide in the strip hole. The reciprocating rod 83 is evenly and detachably connected with the same number of wiping strips 84 as the pressing plate 63, and the wiping strips 84 are made of polyester fiber non-woven fabric, and each wiping strip 84 corresponds to the position of each pressing plate 63. A water storage chamber 85 corresponding to the position of the wiping strip 84 is provided on the switching body 4, and water is stored in the water storage chamber 85. A water injection hole connected to the water storage chamber 85 is provided on the switching body 4. A diverter water outlet head 86 corresponding to the position of the wiping strip 84 is fixedly connected to the bottom of the switching body 4, and the top of the diverter water outlet head 86 is connected to the inside of the water storage chamber 85. An electromagnetic valve is provided at the connection between the diverter water outlet head 86 and the water storage chamber 85, and the bottom of the diverter water outlet head 86 is in contact with the top of the wiping strip 84.

[0055] like Fig.11As shown, a pushing plate 91 is fixedly connected to the movable platform 9, a mounting groove frame 92 is fixedly connected to the upper surface of the movable platform 9, and the lower surface of the wiping strip 84 is flush with the top of the mounting groove frame 92. Figure 1 to Figure 3 As shown, the bottom of the workbench 1 is symmetrically fixedly connected with a fixed support 5, and a collection box 12 is slidably arranged on the fixed support 5. The collection box 12 is located below the movable platform 9. A material leakage groove 93 is provided around the mounting groove frame 92 on the movable platform 9. Fig.11 As shown, the bottom of the leakage groove 93 located on the left and right sides of the installation groove frame 92 is penetrated downward and the groove wall on one side thereof is inclined toward the middle, so as to facilitate the contaminated medium to flow downward into the collection box 12.

[0056] In combination with the above preferred embodiments, the following is the entire working process and working principle of the above embodiments:

[0057] The initial state is:

[0058] The pressing plate 63 is not pushed, the spring 1 64 is not compressed, the blocking plate 65 is directly below the discharge port 43, the movable platform 9 has not moved to the bottom of the switching body 4, the first block 75 is embedded in the slot 71, and at the same time, the end of the switching rod 105 just contacts the inner surface of the first switching port 102 and the switching rod 105 is in an inclined state.

[0059] The working status is:

[0060] The staff puts different polluted media into the storage chamber 41 from each feeding port 42 respectively, and the polluted media are all common substances encountered in the tunnel environment, such as mud water with different proportions, fly ash solution and oil pollution with different proportions, etc. The polluted media put into the storage chamber 41 enters the inside of the discharge port 43 under the action of gravity. The sealing plate 65 is located directly below the discharge port 43 to seal the bottom of the discharge port 43. The polluted medium is in the storage chamber 41. At this time, the staff puts the sample coated with water-based inorganic energy storage tunnel luminous paint into the interior of the installation slot frame 92. After the sample is placed in the installation slot frame 92, the top of the installation slot frame 92 is flush with the upper surface of the sample.

[0061] The switching component causes the switching body 4 to move:

[0062] like Figure 1-2 and Figure 5 As shown, the staff pushes the moving platform 9 to one side of the switching body 4. During the movement of the moving platform 9, the moving platform 9 will drive the switching rod 105 to move to the side close to the switching plate 101, and then during the movement of the switching rod 105, it will pass through the switching port 102. After passing through the switching port 102, the end of the switching rod 105 will contact the guide bar 103. Under the shape guidance of the guide bar 103, the switching rod 105 rotates with the torsion spring hinge 104 as the axis, and the torsion spring of the torsion spring hinge 104 is deformed. Figure 2 As shown, during the rotation of the switching rod 105, the switching plate 101 moves to the left through the switching port 102, and the switching plate 101 drives the switching body 4 to move to the left between the workbench 1 and the fixed frame 3. During the movement of the switching body 4, different discharge ports 43 can be moved to the middle of the workbench 1. Since the contaminated media in each storage cavity 41 are different, different contaminated media can be added later by translating the switching body 4.

[0063] The locking assembly locks the switching body 4 to prevent rebound:

[0064] like Figure 7 and Figure 8 When the locking nut 77 is in the unlocking state, the locking nut 77 is in the unlocking state, and the locking nut 77 is in the unlocking state.

[0065] The blocking component releases the discharge port 43 so that the polluted medium is automatically discharged:

[0066] like Figure 3 to Figure 6 As shown, as the moving platform 9 continues to move, the pushing plate 91 on the moving platform 9 contacts the pressing plate 63. At this time, the moving platform 9 moves to the bottom of the switching body 4, so that the sample in the mounting slot frame 92 is located under the switching body 4, and the moving platform 9 continues to move, pushing the pressing plate 63 toward the switching body 4. At this time, the pressing plate 63 compresses the spring 1 64, and then the pressing plate 63 continues to move, which will drive the slide bar 62 to move synchronously in the slide slot 61, and the slide bar 62 drives the blocking plate 65 to move, so that the blocking plate 65 no longer blocks the bottom of the discharge port 43. Under the action of gravity, the contaminated medium in the storage chamber 41 falls downward through the discharge port 43 onto the sample on the mounting slot frame 92, thereby realizing automatic delivery of the contaminated medium.

[0067] The blocking component blocks the discharge port 43:

[0068] like Figure 3 to Figure 6As shown, the staff releases the movable platform 9, and the elastic reset action of the spring 64 causes the pressing plate 63 to move toward the side away from the switching body 4, and the pressing plate 63 pushes the pushing plate 91 to cause the movable platform 9 to move a short distance toward the side away from the switching body 4, and the pressing plate 63 drives the sliding rod 62 to move, and the sliding rod 62 simultaneously drives the blocking plate 65 to move to the bottom of the discharge port 43, and then the blocking plate 65 blocks the bottom of the discharge port 43, preventing the contaminated medium remaining at the bottom of the discharge port 43 from continuing to fall, thereby ensuring that the amount of contaminated medium added each time is constant, thereby achieving the effect of quantitative addition.

[0069] The wiping component wipes the contaminated medium on the sample:

[0070] like Figure 5 , Fig. 9 and Fig.10 As shown, after the contaminated medium is placed on the sample, the sample is left to stand for a period of time. Then the staff starts the motor 81 and opens the solenoid valve corresponding to the position of the moving platform 9. After the motor 81 is started, it drives the eccentric disk 82 fixed on its output shaft to rotate. During the rotation of the eccentric disk 82, the eccentric rod can drive the reciprocating rod 83 to reciprocate at the bottom of the switching body 4. The reciprocating rod 83 drives the wiping strip 84 to reciprocate. After the solenoid valve is opened, the water stored in the water storage chamber 85 will flow into the diversion water head 86. Under the guidance of the diversion water head 86, the water will be immersed in the wiping strip 84 to wet the wiping strip 84. Then the staff pulls the movable platform 9 to the side away from the switching body 4, so that the movable platform 9 drives the sample inside the mounting groove frame 92 to move out from the bottom of the switching body 4. During this process, because the bottom of the wiping strip 84 fits with the top of the mounting groove frame 92, and because the placed sample is flush with the bottom of the mounting groove frame 92, the sample can fit with the bottom of the wiping strip 84 during the movement of the above-mentioned sample, and the contaminated medium placed on the surface of the sample can be wiped off when the wiping strip 84 reciprocates.

[0071] When wiping the contaminated medium, the wiping strip 84 will push the contaminated medium from the sample into the leakage groove 93, and the contaminated medium will fall from the leakage groove 93 to the inside of the collecting box 12. If the sample is not resistant to stains, some contaminated medium will adhere to the sample, making it impossible for the wiping strip 84 to wipe smoothly. The collecting box 12 can collect the contaminated medium, prevent the contaminated medium from falling to other places, and prevent other places from being contaminated by the contaminated medium, thereby reducing unnecessary cleaning processes.

[0072] Switching of the contaminated medium in the storage chamber 41:

[0073] like Figure 1 to Figure 4 , Fig.10As shown, when the switch rod 105 moves to the leftmost end of the guide groove, the switch rod 105 is in a straight state and will not tilt. Therefore, when the moving platform 9 moves to the side away from the switching body 4, the switch rod 105 can be smoothly pulled out from the switching port 102. After the switch rod 105 is pulled out from the switching port 102, the switch rod 105 rotates and resets under the torsion spring reset action of the torsion spring hinge 104, and the switch rod 105 will return to the initial tilted state. At this time, the switching body 4 cannot move in the reverse direction under the action of the clamping block 75 and the clamping groove 71, so that the switch plate 101 and the switching body 4 after moving to the left are positioned, and then the moving platform 9 is pulled out. At this time, the switching rod 105 can contact the inner surface of the next switching port 102 of the switching plate 101, and then repeat the above-mentioned step of moving the moving platform 9 inward close to the switching body 4, so that the switching rod 105 drives the switching plate 101 to move to the left again, and then drives the next storage cavity 41 to move to the top of the installation slot frame 92, so that the sample in the installation slot frame 92 is coated with the contaminated medium in different storage cavities 41, so as to realize the contamination resistance test of different substances on the water-based inorganic energy storage tunnel luminous paint sample.

[0074] After the contaminated medium in the last storage chamber 41 is tested, the switching body 4 can be manually pulled out from the left side of the workbench 1 and then put back in from the right side of the workbench 1 to achieve the effect of reuse.

[0075] Another embodiment provided by the present invention:

[0076] A method for testing the stain resistance of a water-based inorganic energy storage tunnel luminous paint coating, the stain resistance testing method comprising the following steps:

[0077] Step 1: Prepare a sample to be tested, the surface of the sample is evenly and evenly coated with a water-based inorganic energy storage tunnel luminous paint coating, and the sample is placed in the installation slot frame 92;

[0078] Step 2: Insert the switching body 4 from right to left between the workbench 1 and the fixing frame 3 until the first card block 75 is inserted into the card slot 71. At this time, the switching rod 105 is aligned with the first switching port 102, and the rightmost end of the guide groove on the guide bar 103 is aligned with the first switching port, and the blocking plate 65 blocks the discharge port 43.

[0079] Step 3: preparing polluted media, which include muddy water with different proportions, fly ash solution with different proportions, and oil pollution, and pouring the prepared polluted media into each storage cavity 41;

[0080] Step 4: Push the moving platform 9 toward one side of the switching body 4. During the movement of the moving platform 9, the switching body 4 is driven to move synchronously, so that the first storage cavity 41 moves to align with the sample on the moving platform 9. When the first storage cavity 41 moves to align with the sample on the moving platform 9, the second card block 75 is just inserted into the card slot 71, and then the moving platform 9 is pushed to continue to move toward the switching body 4. The pressing plate 63 corresponding to the first storage cavity 41 opens the blocking plate 65, and the contaminated medium in the storage cavity 41 falls downward onto the sample.

[0081] Step 5: After the sample is left to stand for a period of time, the solenoid valve corresponding to the first storage chamber 41 is opened, and the water stored in the water storage chamber 85 soaks the wiping strip 84;

[0082] Step 6: Pull out the movable table 9. During the process of pulling out the movable table 9, the wiping strip 84 wipes off the contaminated medium on the sample;

[0083] Step 7: Pull the moving platform 9 out completely from the bottom of the switching body 4, observe the residual contamination medium on the sample, use a colorimeter to measure the color change of the sample coating, and use a gloss meter to measure the gloss of the sample coating to calculate the gloss loss. If the color difference and gloss loss are within the qualified range, it means that the stain resistance meets the requirements;

[0084] Specifically, the calculation method of gloss loss is as follows: before the test, use a gloss meter to measure the initial gloss of multiple locations on the sample coating, and calculate its initial average gloss B1; after the test is completed, use a gloss meter to measure the final gloss of multiple locations on the sample coating, and calculate its final average gloss B2; finally, calculate the gloss loss ΔB=B1-B2.

[0085] Step 8: Repeat the above steps 4 to 7 to continue testing the contaminated medium in the next storage chamber 41 until each contaminated medium has been tested.

[0086] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A water-based inorganic energy storage tunnel luminous paint coating stain resistance testing device, comprising a workbench (1) and a support leg (2), wherein the support leg (2) is fixedly connected to the lower surface of the workbench (1), characterized in that: The upper surface of the workbench (1) is fixedly connected to a fixing frame (3), the top surface of the fixing frame (3) is provided with a rectangular window, a switching body (4) is inserted between the workbench (1) and the fixing frame (3), a plurality of material storage cavities (41) are evenly provided in the switching body (4), the material storage cavities (41) are located below the rectangular window of the fixing frame (3), the material storage cavities (41) are funnel-shaped, a feeding port (42) corresponding to the position of the material storage cavities (41) is evenly provided on the top of the switching body (4), a discharging port (43) corresponding to the position of the material storage cavities (41) is evenly provided on the bottom of the switching body (4), an opening is provided in the middle of the workbench (1), a moving platform (9) is slidably connected in the opening, a sample is placed on the moving platform (9), and a switching component is provided between the workbench (1) and the switching body (4); The switching assembly comprises a switching plate (101) fixedly connected to the bottom of the switching body (4), the switching plate (101) being evenly provided with a plurality of switching openings (102), a guide bar (103) being fixedly connected to the workbench (1), the guide bar (103) being provided with a guide groove, a torsion spring hinge (104) being fixedly connected to a side of the moving platform (9) close to the switching plate (101), a switching rod (105) being hinged to the torsion spring hinge (104), an end of the switching rod (105) away from the torsion spring hinge (104) being able to slide along the guide groove and driving the switching body (4) to move when sliding; A blocking component is provided at the bottom of the switching body (4), and the blocking component includes two slide grooves (61) symmetrically opened at the bottom of the switching body (4), each of the slide grooves (61) is slidably connected to a slide rod (62), a pressing plate (63) is fixedly connected between the two slide rods (62), a spring (64) is fixedly connected between the pressing plate (63) and the switching body (4), a blocking plate (65) is fixedly connected between the slide rods (62), the blocking plate (65) is located below the discharge port (43), and the upper surface of the middle portion of the blocking plate (65) is in contact with the bottom of the discharge port (43); A locking assembly is provided between the switching body (4) and the fixing frame (3), the locking assembly comprising a clamping groove (71) provided on the fixing frame (3), a plurality of locking bodies (72) are evenly and fixedly connected to the switching body (4), a locking groove (73) is provided inside each of the locking bodies (72), a clamping block (75) is slidably provided in the locking groove (73), one end of the clamping block (75) is located in the locking groove (73) and a spring 2 (74) is connected between the locking groove (73) and the groove wall, and the other end of the clamping block (75) passes through the groove wall outwards and is clamped with the clamping groove (71); A wiping assembly is provided at the bottom of the switching body (4), the wiping assembly comprising a motor (81) fixedly connected to the side wall of the switching body (4), an eccentric disk (82) fixedly connected to the output shaft of the motor (81), an eccentric rod eccentrically fixedly connected to one surface of the eccentric disk (82), a reciprocating rod (83) slidably connected to the bottom of the switching body (4), the reciprocating rod (83) being slidably connected to the eccentric rod of the eccentric disk (82), a wiping strip (84) being evenly and detachably connected to the reciprocating rod (83), The switching body (4) is provided with a water storage chamber (85), the interior of which stores water; the switching body (4) is provided with a water injection hole which is in communication with the water storage chamber (85); a diverter water outlet head (86) is fixedly connected to the bottom of the switching body (4); the top of the diverter water outlet head (86) is in communication with the interior of the water storage chamber (85); an electromagnetic valve is provided between the diverter water outlet head (86) and the water storage chamber (85); and the bottom of the diverter water outlet head (86) is in contact with the top of the wiping strip (84).

2. The water-based inorganic energy storage tunnel luminous paint coating anti-fouling testing device according to claim 1 is characterized in that: A pushing plate (91) is fixedly connected to the movable platform (9), a mounting groove frame (92) is fixedly connected to the upper surface of the movable platform (9), the lower surface of the wiping strip (84) is flush with the top of the mounting groove frame (92), and a material leakage groove (93) is provided on the movable platform (9) around the mounting groove frame (92), and the bottoms of the material leakage grooves (93) located on the left and right sides of the mounting groove frame (92) are connected downwardly and the groove wall on one side is inclined toward the middle.

3. The water-based inorganic energy storage tunnel luminous paint coating anti-fouling testing device according to claim 2 is characterized in that: A fixed support (5) is symmetrically fixedly connected to the bottom of the workbench (1), a collection box (12) is slidably disposed on the fixed support (5), and the collection box (12) is located below the movable platform (9).

4. A method for testing the anti-fouling of water-based inorganic energy storage tunnel luminous paint coating, characterized in that: Using the water-based inorganic energy storage tunnel luminous paint coating anti-fouling test device as described in claim 3, the anti-fouling test method comprises the following steps: Step 1: Prepare a sample to be tested, the surface of the sample is evenly and evenly coated with a water-based inorganic energy storage tunnel luminous paint coating, and the sample is placed in the installation slot frame (92); Step 2: insert the switching body (4) between the workbench (1) and the fixing frame (3), and the blocking plate (65) blocks the discharge port (43); Step 3: preparing polluted media, the polluted media including muddy water with different proportions, fly ash solution with different proportions and oil pollution, and pouring the prepared polluted media into each storage cavity (41); Step 4: Push the moving platform (9) toward one side of the switching body (4), and during the movement of the moving platform (9), drive the switching body (4) to move synchronously, so that the storage cavity (41) moves to align with the sample on the moving platform (9), and then push the moving platform (9) to continue to move toward the switching body (4), and the pressing plate (63) corresponding to the storage cavity (41) opens the blocking plate (65), and the contaminated medium in the storage cavity (41) falls downward onto the sample; Step 5: After the sample is left to stand for a period of time, the electromagnetic valve corresponding to the material storage chamber (41) is opened, and the water stored in the water storage chamber (85) soaks the wiping strip (84); Step 6: Pull out the movable table (9), and during the process of pulling out the movable table (9), the wiping strip (84) wipes off the contaminated medium on the sample; Step 7: Pull the moving platform (9) completely out of the bottom of the switching body (4), observe the residual contamination medium on the sample, measure the color change of the sample coating with a colorimeter, and measure the glossiness of the sample coating with a gloss meter to calculate the glossiness loss; Step 8: Repeat the above steps 4 to 7 to continue testing the contaminated medium in the next storage chamber (41) until each contaminated medium has been tested.

5. The method for testing the anti-fouling of water-based inorganic energy storage tunnel luminous paint coating according to claim 4, characterized in that: In step 4, when the switching body (4) moves to the point where the material storage chamber (41) is aligned with the template on the movable platform (9), the card block (75) is synchronously inserted into the card slot (71).