A comprehensive evaluation system for transformer load
By designing a comprehensive evaluation system for transformer loads, real-time collection and analysis of transformer operating information and calculation of load conditions solve the problem of inaccurate load evaluation in the existing technology, achieve accurate and real-time monitoring of transformer loads, and improve the stability of the power system. .
Patent Information
- Application Number
- CN202411013831.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The existing transformer load monitoring method relies on manual inspection and regular testing, which is inefficient and cannot reflect the operating status of the transformer in real time. It lacks comprehensive evaluation indicators, resulting in inaccurate load evaluation.
A comprehensive transformer load evaluation system is designed, including an information collection module, a load adjustment module, a load analysis module, a load evaluation module and a feedback analysis module. Through real-time collection and analysis of transformer operating information, the primary input power and load conditions are calculated, and the adjustment Magnetic leakage rate and line resistance, evaluate the load abnormality index, and provide real-time evaluation and control solutions.
It improves the accuracy of transformer load judgment and the completeness of evaluation, realizes real-time and accurate monitoring and evaluation of transformer load, reduces the workload of manual inspection and the period of regular inspection, and enhances the operational stability of the power system.
Smart Images

Figure CN118566790B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power equipment monitoring, and in particular to a transformer load comprehensive evaluation system. Background Art
[0002] With the continuous development of the power system, the transformer, as one of the key equipment in the power system, its operating status is of great significance to the stable operation of the entire power system. However, the existing transformer load monitoring method mainly relies on manual inspection and regular inspection, which has the following problems: Manual inspection has a large workload and low efficiency; Regular inspection cycle is long and cannot reflect the operating status of the transformer in real time; There is a lack of comprehensive evaluation indicators for transformer load, and it is impossible to comprehensively evaluate the operating status of the transformer. Therefore, there is an urgent need for a comprehensive evaluation system that can monitor and evaluate transformer load in real time.
[0003] Chinese Patent Publication No.: CN112448479B discloses a comprehensive judgment method for transformer load status, which includes: step 1, collecting transformer operation information; step 2, collecting power grid operation information; step 3, establishing a historical transformer operation database, and obtaining related data related to the transformer load to form a historical sample set; step 4, the historical data sample set, using SVM training to obtain a transformer load prediction model; step 5, using the least squares method to analyze and obtain the actual load of the transformer at a certain moment; step 6, judging and correcting the transformer load status information data; step 7, calculating the judgment basis of the transformer load characteristics within the judgment period, and judging whether the transformer is overloaded or heavy loaded; solves the technical problems that the existing heavy overload judgment only relies on the current judgment, lacks a comprehensive judgment criterion, makes the heavy overload judgment inaccurate, and makes it impossible to adopt the corresponding level of equipment operation and maintenance and system operation risk strategies; it can be seen that the invention has the problem of not analyzing the transformer no-load loss and load loss, and there is an inaccurate evaluation of the transformer load. Summary of the invention
[0004] To this end, the present invention provides a transformer load comprehensive evaluation system to overcome the problem of inaccurate transformer load evaluation in the prior art.
[0005] To achieve the above object, the present invention provides a transformer comprehensive evaluation system, the system comprising:
[0006] An information collection module is used to collect transformer operation information and transformer parameter information, and also to obtain the total power of the transformer secondary load during the monitoring period;
[0007] A load adjustment module is used to calculate the primary input power according to the total power of the transformer secondary load during the monitoring period, and adjust the process of calculating the primary input power according to the transformer turns ratio, the transformer secondary rated current and the transformer line resistance;
[0008] A load analysis module, used to analyze the transformer load condition according to the primary input power of the transformer;
[0009] An analysis and adjustment module is used to adjust the analysis process of the transformer load condition according to the transformer primary current, and is also used to optimize the adjustment process of the transformer load condition according to the transformer temperature;
[0010] A load evaluation module is used to evaluate the transformer load according to the analysis results of the transformer load condition within the monitoring period, and record the transformer load evaluation results within the monitoring period;
[0011] An output module, used for analyzing the current frequency of the AC generator and the output power of the AC generator according to the transformer load evaluation result, and outputting the analysis result as an output scheme;
[0012] The feedback analysis module is used to correct the output scheme of the next monitoring cycle according to the transformer load evaluation of each historical monitoring cycle.
[0013] Furthermore, the load adjustment module is provided with a calculation unit, which is used to calculate the total power P of the secondary load of the transformer during the monitoring period. 副 Calculate the transformer primary input power P using the hysteresis loss coefficient kh 原 , transformer primary input power P 原 The calculation formula is as follows:
[0014] Ph=B 1.6 ×f×S×L×kh
[0015] P 原 =P 副 +Ph
[0016] Among them, Ph is the transformer hysteresis loss power, B is the magnetic field strength in the transformer core, f is the magnetic flux density, S is the cross-sectional area of the transformer core, and L is the length of the transformer core.
[0017] Furthermore, the load adjustment module is further provided with a first adjustment unit, which is used to adjust the load according to the transformer turns ratio N and the rated current I of the transformer secondary side. 额 Calculate the magnetic leakage rate μ in the transformer core. The calculation formula of the magnetic leakage rate μ is as follows:
[0018] μ=B / [(N×I 额 ) / L]
[0019] Where N is the transformer turns ratio, I 额 is the rated current of the transformer secondary side;
[0020] The first adjustment unit compares the magnetic leakage rate μ with the magnetic leakage rate threshold F, and adjusts the process of calculating the primary input power of the transformer according to the comparison result, wherein:
[0021] When μ>F, the first adjustment unit determines that the transformer core leakage rate is high, and sets the adjustment coefficient α, setting α=[(μ-F) / F];
[0022] When μ≤F, the first adjustment unit determines that the transformer core leakage rate is normal and does not make any adjustment;
[0023] The first adjustment unit adjusts the transformer primary input power P according to the adjustment coefficient α. 原 Adjust to P 原 ', set P 原 =P 原 ×α.
[0024] Furthermore, the load adjustment module is further provided with a first optimization unit, which is used to compare the transformer line resistance r with the line resistance threshold R, and optimize the adjustment process of the transformer primary input power according to the comparison result, wherein:
[0025] When r<R, the first optimization unit determines that the transformer line resistance is normal, and optimizes the magnetic leakage rate threshold F to F', setting F'=F×[2-1 / (Rr)];
[0026] When r≥R, the first optimization unit determines that the transformer line resistance is higher than the threshold value, and the magnetic leakage rate threshold F is optimized to F", and F"=F×[2-1 / (Rr) 2 ].
[0027] Furthermore, the load analysis module monitors the transformer primary input power P during the period 原 Compare with each preset primary input power, and calculate the load abnormality index based on the comparison result, where:
[0028] When P 原 When <P1, the load analysis module determines that the primary input power is small during the monitoring period, and sets the first load abnormality index β1, setting β1=P 原 / (P1+P2);
[0029] When P1≤P 原 ≤P2, the load analysis module determines that the primary input power is normal within the monitoring period;
[0030] When P 原 >P2, the load analysis module determines that the primary input power is large during the monitoring period, and sets the second load abnormality index β2, setting β2=2×P 原 / (P1+P2).
[0031] Furthermore, the analysis and adjustment module is provided with a second adjustment unit, and the second adjustment unit is used to calculate the transformer primary current Iin according to the transformer secondary current Iout, and the calculation formula of the transformer primary current Iin is as follows:
[0032] Iin=Iout×N
[0033] The second adjustment unit compares the transformer primary current Iin with each preset current, and adjusts the process of calculating the load abnormality index according to the comparison result, wherein:
[0034] When Iin<I1, the second adjustment unit determines that the transformer primary winding current is small, and adjusts the first preset primary input power P1 to P1', setting P1'=P1×[2-1 / (I1-Iin)];
[0035] When I1≤Iin≤I2, the second adjustment unit determines that the primary winding current of the transformer is normal and does not make any adjustment;
[0036] When Iin>I2, the second adjustment unit determines that the transformer primary winding current is large, and adjusts the first preset primary input power P1 to P1', setting P1'=P1×[2-1 / (Iin-I2)];
[0037] Wherein, I1 is a first preset input current, I2 is a second preset input current, and I1<I2.
[0038] Furthermore, the analysis and adjustment module is further provided with a second optimization unit, which is used to calculate the transformer environment index ρ according to the transformer temperature t, the transformer external magnetic field strength B1 and the transformer humidity SD, wherein the calculation process of the transformer environment index ρ is as follows:
[0039] ρ=t×a1+B1×a2+SD×a3
[0040] Among them, a1 is the transformer temperature weight, a2 is the transformer external magnetic field strength weight, a3 is the transformer humidity weight, a1+a2+a3=1 and a1>a2>a3;
[0041] The second optimization unit compares the transformer environmental index ρ with the environmental index threshold E, and optimizes the process of adjusting the load abnormality index according to the comparison result, wherein:
[0042] When ρ<E, the second optimization unit determines that the transformer environment is normal and does not perform optimization;
[0043] When ρ≥E, the second optimization unit determines that the transformer environment index is high, and optimizes the first preset input current I1 to I1', where I1'=I1×[1+π / 2arctan(ρ-E)].
[0044] Furthermore, the load evaluation module compares the load abnormality index βi with each preset load abnormality index, sets i=1, 2, and evaluates the transformer load condition according to the comparison result, wherein:
[0045] When 0≤βi<YC1, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to normal;
[0046] When YC1≤βi≤YC2, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to risk;
[0047] When βi>YC2, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to dangerous;
[0048] Wherein, YC1 is a first preset load abnormality index, YC2 is a second preset load abnormality index, and YC1<YC2.
[0049] Furthermore, the output module is provided with a load control unit, which is used to analyze the current frequency v of the AC generator according to the load evaluation level within the monitoring period, wherein:
[0050] When the load evaluation level is normal, the load control unit does not analyze the current frequency of the AC generator;
[0051] When the load evaluation level is risk, the load control unit adjusts the frequency v of the AC generator to v', setting v'=v×ln(1+βi);
[0052] When the load evaluation level is dangerous, the load control unit adjusts the frequency v of the AC generator to v", setting v"=v×[ln(3-βi)], and at the same time, the load control unit adjusts the output power P of the AC generator to 机 Adjust to P 机 ', set P 机 =P 机 ×(1+βi).
[0053] Further, the feedback analysis module calculates the proportion m of the evaluation levels with the evaluation level of risk or danger according to the load evaluation level of each historical monitoring period, sets m=m1 / n, wherein m1 is the number of the evaluation level of risk or danger, and n is the number of historical monitoring periods, and corrects the output scheme according to the proportion m of the evaluation level of risk or danger;
[0054] The feedback analysis module converts the output power P of the AC generator into 机 Corrected to P 机 ”, set P 机 =P 机 ×sinm.
[0055] Compared with the prior art, the beneficial effects of the present invention are that, by acquiring the information required by the system through the information acquisition module, the integrity of information acquisition is improved, and at the same time, the accuracy of the primary input power of the transformer is improved, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation; by calculating and adjusting the transformer load through the load adjustment module to calculate the loss power and load power of the primary load of the transformer, the accuracy of the primary input power of the transformer is improved, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation; by analyzing the primary input power through the load analysis module to conduct a comprehensive analysis of the transformer load, the integrity of the transformer load judgment is improved, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation; The adjustment module analyzes the primary current and the ambient parameters of the transformer to improve the accuracy of calculating the load anomaly index, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. The load evaluation module evaluates the load conditions of the transformer in a monitoring period by grades, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. The output module provides different control schemes for transformer load conditions of different evaluation levels, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. The feedback analysis module adjusts the output scheme in the next monitoring period according to the evaluation level of each historical monitoring, thereby improving the accuracy of load judgment in the next monitoring period, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] Figure 1 Schematic diagram of the structure of the transformer load comprehensive evaluation system of this embodiment;
[0057] Figure 2 A schematic diagram of the structure of the load adjustment module of this embodiment;
[0058] Figure 3 A schematic diagram of the structure of the analysis and adjustment module of this embodiment;
[0059] Figure 4 A schematic diagram of the structure of the output module of this embodiment. DETAILED DESCRIPTION
[0060] In order to make the objects and advantages of the present invention more clearly understood, the present invention is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0061] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0062] It should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0063] See also Figure 1 As shown, it is a schematic diagram of the structure of the transformer load comprehensive evaluation system of this embodiment, including:
[0064] The information acquisition module is used to collect transformer operation information and transformer parameter information, and is also used to obtain the total power of the transformer secondary load during the monitoring period, wherein the operation information includes the transformer primary voltage, the transformer secondary voltage, and the transformer frequency, wherein the transformer primary is the input end of the transformer, the transformer secondary is the output end of the transformer, and the transformer frequency is the frequency of the transformer input alternating current. The parameter information includes the transformer flux density, the transformer hysteresis loss coefficient, the transformer primary rated current, the transformer secondary rated current, and the transformer turns ratio. The transformer flux density is the magnetic flux density in the transformer core under the transformer primary voltage, the transformer secondary voltage, and the transformer frequency. The transformer hysteresis loss coefficient is the hysteresis characteristic parameter of the transformer core. The transformer turns ratio is the ratio of the number of turns of the transformer primary winding to the number of turns of the secondary winding. In this embodiment, The method for obtaining the transformer operation information and the transformer parameter information is specifically limited, and those skilled in the art can freely set it as long as the method for obtaining the transformer operation information and the transformer parameter information is satisfied, such as obtaining the transformer parameter information through the transformer parameter table, obtaining the transformer operation information through the generator parameter table, and obtaining the transformer hysteresis loss coefficient through the material manual, etc.; In this embodiment, the method for obtaining the total power of the secondary load of the transformer is not specifically limited, and those skilled in the art can freely set it as long as the acquisition requirements of the total power of the secondary load of the transformer are satisfied, such as it can be measured by professional instruments such as a load box or a load-voltage-current tester; In this embodiment, the value of the monitoring period is not specifically limited, and those skilled in the art can freely set it as long as the value requirements of the monitoring period are satisfied, such as the monitoring period can be set to 10 minutes, 20 minutes, 30 minutes, etc.;
[0065] A load adjustment module, used to calculate the primary input power according to the total power of the secondary load of the transformer during the monitoring period, and to adjust the process of calculating the primary input power according to the transformer turns ratio, the rated current of the secondary side of the transformer and the line resistance of the transformer, the load adjustment module being connected to the acquisition module;
[0066] A load analysis module, used for analyzing the transformer load condition according to the primary input power of the transformer, the load analysis module being connected to the load adjustment module;
[0067] An analysis and adjustment module, used to adjust the analysis process of the transformer load condition according to the transformer primary current, and also used to optimize the adjustment process of the transformer load condition according to the transformer temperature, the analysis and adjustment module being connected to the load analysis module;
[0068] A load evaluation module, used to evaluate the transformer load according to the analysis results of the transformer load condition within the monitoring period, and record the transformer load evaluation results within the monitoring period, the load evaluation module is connected to the analysis and adjustment module;
[0069] An output module, used for analyzing the current frequency of the AC generator and the output power of the AC generator according to the transformer load evaluation result, and outputting the analysis result as an output scheme, the output module being connected to the load evaluation module;
[0070] A feedback analysis module is used to correct the output scheme of the next monitoring cycle according to the transformer load evaluation in the historical monitoring cycle, and the feedback analysis module is connected to the output module; in this embodiment, no specific limitation is made on the value of the number of monitoring cycles included in the historical monitoring cycle, and technical personnel in this field can set it freely, as long as the requirement of the number of monitoring cycles included in the historical monitoring cycle is met, such as the number of monitoring cycles can be set to 10, 15, 20, etc.
[0071] See also Figure 2 As shown, it is a structural diagram of the load adjustment module of this embodiment, including:
[0072] A calculation unit, used for calculating the primary input power of the transformer according to the total secondary load power of the transformer and the hysteresis loss coefficient during the monitoring period;
[0073] a first adjustment unit, used for calculating the magnetic leakage rate in the transformer core according to the transformer turns ratio and the rated current of the transformer secondary side, and adjusting the process of calculating the transformer primary side input power according to the magnetic leakage rate, the first adjustment unit being connected to the calculation unit;
[0074] The first optimization unit is used to optimize the adjustment process of the primary input power of the transformer according to the transformer line resistance, and the first optimization unit is connected to the first adjustment unit.
[0075] See also Figure 3 As shown, it is a schematic diagram of the structure of the analysis and adjustment module of this embodiment, including:
[0076] The second adjustment unit is used to adjust the analysis process of the transformer load condition according to the transformer primary current.
[0077] The second optimization unit is used to optimize the adjustment process of the transformer load condition according to the transformer temperature.
[0078] See also Figure 4 As shown, it is a schematic diagram of the structure of the output module of this embodiment, including:
[0079] A load control unit for analyzing the current frequency of the AC generator and the output power of the AC generator according to the load evaluation result;
[0080] The scheme output unit is used to output the current frequency of the AC generator and the output power of the AC generator as a scheme, and the scheme output unit is connected to the load control unit.
[0081] Specifically, the transformer load comprehensive evaluation system described in this embodiment is applied to the comprehensive evaluation of the load of the step-down transformer of the AC generator. The system obtains the transformer load by analyzing the transformer input power, analyzes the transformer input power and evaluates the transformer load according to the analysis result, adjusts the output frequency and power of the AC generator according to the analysis result of the transformer input power, obtains the output plan, and corrects the output plan through historical evaluation.
[0082] Specifically, this embodiment acquires the information required by this system through the information acquisition module, thereby improving the integrity of information acquisition, and at the same time improves the accuracy of the primary input power of the transformer, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. The load adjustment module calculates and adjusts the transformer load to calculate the loss power and load power of the primary load of the transformer, thereby improving the accuracy of the primary input power of the transformer, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. The load analysis module analyzes the primary input power to conduct a comprehensive analysis of the transformer load, thereby improving the integrity of the transformer load judgment, thereby improving the accuracy of the load judgment, thereby improving the accuracy of the transformer load evaluation, and ultimately improving the accuracy of the transformer load evaluation. The analysis and adjustment module The primary current and the ambient parameters of the transformer are analyzed to improve the accuracy of calculating the load anomaly index, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation; the load evaluation module is used to evaluate the load conditions of the transformer in a graded manner during the monitoring period, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation; different control schemes are given to transformer load conditions of different evaluation levels through the output module, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation; the feedback analysis module is used to adjust the output scheme in the next monitoring period according to the evaluation level of each historical monitoring, thereby improving the accuracy of load judgment in the next monitoring period, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation.
[0083] Specifically, the calculation unit calculates the total power P of the secondary load of the transformer during the monitoring period. 副 Calculate the transformer primary input power P using the hysteresis loss coefficient kh 原 , transformer primary input power P 原 The calculation formula is as follows:
[0084] Ph=B 1.6 ×f×S×L×kh
[0085] P 原 =P 副 +Ph
[0086] Among them, Ph is the transformer hysteresis loss power, B is the magnetic field strength in the transformer core, f is the magnetic flux density, S is the cross-sectional area of the transformer core, and L is the length of the transformer core.
[0087] Specifically, the calculation unit calculates the primary voltage of the transformer by monitoring the secondary voltage of the monitoring period, and improves the accuracy of the primary input power of the transformer by calculating the no-load load of the transformer, thereby improving the accuracy of the load judgment, thereby improving the accuracy of the transformer load evaluation, and ultimately improving the accuracy of the transformer load evaluation. It can be understood that this embodiment does not specifically limit the method for obtaining the magnetic field strength in the transformer core, and technical personnel in this field can freely set it as long as the requirements for obtaining the magnetic field strength in the transformer core are met, such as it can be obtained through a magnetic field sensor.
[0088] Specifically, the first adjustment unit adjusts the transformer according to the transformer turns ratio N and the transformer secondary rated current I 额 Calculate the magnetic leakage rate μ in the transformer core. The calculation formula of the magnetic leakage rate μ is as follows:
[0089] μ=B / [(N×I 额 ) / L]
[0090] Where N is the transformer turns ratio, I 额 is the rated current of the transformer secondary side;
[0091] The first adjustment unit compares the magnetic leakage rate μ with the magnetic leakage rate threshold F, and adjusts the process of calculating the primary input power of the transformer according to the comparison result, wherein:
[0092] When μ>F, the first adjustment unit determines that the transformer core leakage rate is high, and sets the adjustment coefficient α, setting α=[(μ-F) / F];
[0093] When μ≤F, the first adjustment unit determines that the transformer core leakage rate is normal and does not make any adjustment;
[0094] The first adjustment unit adjusts the transformer primary input power P according to the adjustment coefficient α. 原 Adjust to P 原 ', set P 原 =P 原 ×α.
[0095] Specifically, the first adjustment unit calculates the leakage magnetic rate in the transformer core to improve the accuracy of the transformer primary input power calculation, thereby improving the accuracy of the load judgment, thereby improving the accuracy of the transformer load evaluation, and ultimately improving the accuracy of the transformer load evaluation. It can be understood that this embodiment does not specifically limit the value of the leakage magnetic rate threshold F, and those skilled in the art can set it freely, as long as the value requirements of the leakage magnetic rate threshold F are met. For example, the transformer leakage magnetic rate threshold F can be set to 2%.
[0096] Specifically, the first optimization unit compares the transformer line resistance r with the line resistance threshold R, and optimizes the adjustment process of the transformer primary input power according to the comparison result, wherein:
[0097] When r<R, the first optimization unit determines that the transformer line resistance is normal, and optimizes the magnetic leakage rate threshold F to F', setting F'=F×[2-1 / (Rr)];
[0098] When r≥R, the first optimization unit determines that the transformer line resistance is higher than the threshold value, and the magnetic leakage rate threshold F is optimized to F", and F"=F×[2-1 / (Rr) 2 ].
[0099] Specifically, the first optimization unit analyzes the load loss caused by the line resistance to improve the accuracy of the transformer load calculation, thereby improving the accuracy of the load judgment, thereby improving the accuracy of the transformer load evaluation, and ultimately improving the accuracy of the transformer load evaluation. It can be understood that the embodiment of this city does not make a specific limitation on the value of the line resistance threshold R, and technical personnel in this field can set it freely as long as the value requirement of the line resistance threshold R is met. For example, the line resistance threshold R can be set to 40mΩ.
[0100] Specifically, the load analysis module monitors the transformer primary input power P during the cycle. 原 Compare with each preset primary input power, and calculate the load abnormality index based on the comparison result, where:
[0101] When P 原 When <P1, the load analysis module determines that the primary input power is small during the monitoring period, and sets the first load abnormality index β1, setting β1=P 原 / (P1+P2);
[0102] When P1≤P 原 ≤P2, the load analysis module determines that the primary input power is normal within the monitoring period;
[0103] When P 原 >P2, the load analysis module determines that the primary input power is large during the monitoring period, and sets the second load abnormality index β2, setting β2=2×P 原 / (P1+P2);
[0104] Wherein, P1 is a first preset primary input power, P2 is a second preset primary input power, and P1<P2.
[0105] Specifically, the load analysis module analyzes the primary input power to conduct a comprehensive analysis of the transformer load, thereby improving the integrity of the transformer load judgment, and further improving the accuracy of the load judgment, thereby improving the accuracy of the transformer load evaluation, and ultimately improving the accuracy of the transformer load evaluation. It can be understood that this embodiment does not specifically limit the values of the first preset primary input power P1 and the second preset primary input power P2. Technical personnel in this field can set them freely, and only need to meet the value requirements of the first preset primary input power P1 and the second preset primary input power P2, such as setting the first preset primary input power P1 to 70% of the rated power, and setting the second preset primary input power P2 to 100% of the rated power.
[0106] Specifically, the second adjustment unit calculates the transformer primary current Iin according to the transformer secondary current Iout. The calculation formula of the transformer primary current Iin is as follows:
[0107] Iin=Iout×N
[0108] The second adjustment unit compares the transformer primary current Iin with each preset current, and adjusts the process of calculating the load abnormality index according to the comparison result, wherein:
[0109] When Iin<I1, the second adjustment unit determines that the transformer primary winding current is small, and adjusts the first preset primary input power P1 to P1', setting P1'=P1×[2-1 / (I1-Iin)];
[0110] When I1≤Iin≤I2, the second adjustment unit determines that the primary winding current of the transformer is normal and does not make any adjustment;
[0111] When Iin>I2, the second adjustment unit determines that the transformer primary winding current is large, and adjusts the first preset primary input power P1 to P1', setting P1'=P1×[2-1 / (Iin-I2)];
[0112] Wherein, I1 is a first preset input current, I2 is a second preset input current, and I1<I2.
[0113] Specifically, the second adjustment unit analyzes the primary current to improve the accuracy of calculating the load anomaly index, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. It can be understood that in this embodiment, no specific limitation is made to the values of the first preset input current I1 and the second preset input current I2. Those skilled in the art can set them freely as long as the value requirements of the first preset input current I1 and the second preset input current I2 are met. For example, the first preset input current I1 can be set to 40% of the rated current, and the second preset input current I2 can be set to 70% of the rated current.
[0114] Specifically, the second optimization unit calculates the transformer environment index ρ according to the transformer temperature t, the transformer external magnetic field strength B1 and the transformer humidity SD, wherein the calculation process of the transformer environment index ρ is as follows:
[0115] ρ=t×a1+B1×a2+SD×a3
[0116] Among them, a1 is the transformer temperature weight, a2 is the transformer external magnetic field strength weight, a3 is the transformer humidity weight, a1+a2+a3=1 and a1>a2>a3;
[0117] The second optimization unit compares the transformer environmental index ρ with the environmental index threshold E, and optimizes the process of adjusting the load abnormality index according to the comparison result, wherein:
[0118] When ρ<E, the second optimization unit determines that the transformer environment is normal and does not perform optimization;
[0119] When ρ≥E, the second optimization unit determines that the transformer environment index is high, and optimizes the first preset input current I1 to I1', I1'=I1×[1+π / 2arctan(ρ-E)];
[0120] Specifically, the second optimization unit analyzes the environmental parameters surrounding the transformer to optimize the process of adjusting the load anomaly index, thereby improving the accuracy of load judgment, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. It can be understood that this embodiment does not specifically limit the method for obtaining the transformer temperature t, the transformer external magnetic field strength B1, and the transformer humidity SD. Those skilled in the art can set them freely, and only need to meet the requirements for obtaining the transformer temperature t, the transformer external magnetic field strength B1, and the transformer humidity SD, such as being able to obtain them from a monitoring sensor, etc. At the same time, this embodiment does not specifically limit the value of the environmental index threshold E. Those skilled in the art can set them freely, and only need to meet the value requirements of the environmental index threshold E, such as the environmental index threshold E can be set to 40.
[0121] Specifically, the load evaluation module compares the load abnormality index βi with each preset load abnormality index, sets i=1, 2, and evaluates the transformer load condition according to the comparison result, wherein:
[0122] When 0≤βi<YC1, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to normal;
[0123] When YC1≤βi≤YC2, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to risk;
[0124] When βi>YC2, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to dangerous;
[0125] Wherein, YC1 is a first preset load abnormality index, YC2 is a second preset load abnormality index, and YC1<YC2.
[0126] Specifically, the load evaluation module improves the accuracy of load judgment by evaluating the load condition of the transformer within the monitoring period in a graded manner, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation. It can be understood that this embodiment does not specifically limit the values of the first preset load abnormality index YC1 and the second preset load abnormality index YC2. Those skilled in the art can set them freely as long as the value requirements of the first preset load abnormality index YC1 and the second preset load abnormality index YC2 are met. For example, the first preset load abnormality index YC1 can be set to 0.1, and the second preset load abnormality index YC2 can be set to 0.4.
[0127] Specifically, the load control unit analyzes the current frequency v of the AC generator according to the load evaluation level within the monitoring period, wherein:
[0128] When the load evaluation level is normal, the load control unit does not analyze the current frequency of the AC generator;
[0129] When the load evaluation level is risk, the load control unit adjusts the frequency v of the AC generator to v', setting v'=v×ln(1+βi);
[0130] When the load evaluation level is dangerous, the load control unit adjusts the frequency v of the AC generator to v", setting v"=v×[ln(3-βi)], and at the same time, the load control unit adjusts the output power P of the AC generator to 机 Adjust to P 机 ', set P 机 =P 机 ×(1+βi).
[0131] Specifically, the load control unit improves the accuracy of load judgment by providing different control schemes for transformer load conditions of different evaluation levels, thereby improving the accuracy of transformer load evaluation and ultimately improving the accuracy of transformer load evaluation.
[0132] Specifically, the feedback analysis module counts the proportion m of the evaluation levels with risk or danger according to the load evaluation levels of each historical monitoring period, sets m=m1 / n, where m1 is the number of evaluation levels with risk or danger, and n is the number of historical monitoring periods, and corrects the output scheme according to the proportion m of the evaluation level of risk or danger;
[0133] The feedback analysis module converts the output power P of the AC generator into 机 Corrected to P 机 ”, set P 机 =P 机 ×sinm.
[0134] Specifically, the feedback analysis module adjusts the output scheme in the next monitoring cycle by the evaluation level of each historical monitoring, thereby improving the accuracy of load judgment in the next monitoring cycle, thereby improving the accuracy of transformer load evaluation, and ultimately improving the accuracy of transformer load evaluation.
[0135] So far, the technical solutions of the present invention have been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present invention is obviously not limited to these specific embodiments. Without departing from the principle of the present invention, those skilled in the art can make equivalent changes or substitutions to the relevant technical features, and the technical solutions after these changes or substitutions will fall within the protection scope of the present invention.
Claims
1. A transformer load comprehensive evaluation system, characterized in that: include, An information collection module is used to collect transformer operation information and transformer parameter information, and also to obtain the total power of the transformer secondary load during the monitoring period; A load adjustment module is used to calculate the primary input power according to the total power of the transformer secondary load during the monitoring period, and adjust the process of calculating the primary input power according to the transformer turns ratio, the transformer secondary rated current and the transformer line resistance; A load analysis module, used to analyze the transformer load condition according to the primary input power of the transformer; An analysis and adjustment module is used to adjust the analysis process of the transformer load condition according to the transformer primary current, and is also used to optimize the adjustment process of the transformer load condition according to the transformer temperature; A load evaluation module is used to evaluate the transformer load according to the analysis results of the transformer load condition within the monitoring period, and record the transformer load evaluation results within the monitoring period; An output module, used for analyzing the current frequency of the AC generator and the output power of the AC generator according to the transformer load evaluation result, and outputting the analysis result as an output scheme; Feedback analysis module, used to correct the output scheme of the next monitoring cycle according to the transformer load evaluation of each historical monitoring cycle; The load adjustment module is provided with a calculation unit, which is used to calculate the total power P of the secondary load of the transformer during the monitoring period. 副 Calculate the transformer primary input power P using the hysteresis loss coefficient kh 原 , transformer primary input power P 原 The calculation formula is as follows: Ph=B 1.6 ×f×S×L×kh P 原 =P 副 +Ph Among them, Ph is the transformer hysteresis loss power, B is the magnetic field strength in the transformer core, f is the magnetic flux density, S is the cross-sectional area of the transformer core, and L is the length of the transformer core; The load adjustment module is further provided with a first adjustment unit, which is used to adjust the load according to the transformer turns ratio N and the rated current I of the transformer secondary side. 额 Calculate the magnetic leakage rate μ in the transformer core. The calculation formula of the magnetic leakage rate μ is as follows: μ=B / [(N×I 额 ) / L] Where N is the transformer turns ratio, I 额 is the rated current of the transformer secondary side; The first adjustment unit compares the magnetic leakage rate μ with the magnetic leakage rate threshold F, and adjusts the process of calculating the primary input power of the transformer according to the comparison result, wherein: When μ>F, the first adjustment unit determines that the transformer core leakage rate is high, and sets the adjustment coefficient α, setting α=[(μ-F) / F]; When μ≤F, the first adjustment unit determines that the transformer core leakage rate is normal and does not make any adjustment; The first adjustment unit adjusts the transformer primary input power P according to the adjustment coefficient α. 原 Adjust to P 原 ', set P 原 =P 原 ×α; The load adjustment module is further provided with a first optimization unit, which is used to compare the transformer line resistance r with the line resistance threshold R, and optimize the adjustment process of the transformer primary input power according to the comparison result, wherein: When r<R, the first optimization unit determines that the transformer line resistance is normal, and optimizes the magnetic leakage rate threshold F to F', setting F'=F×[2-1 / (Rr)]; When r≥R, the first optimization unit determines that the transformer line resistance is higher than the threshold value, and the magnetic leakage rate threshold F is optimized to F", and F"=F×[2-1 / (Rr) 2 ]; The load analysis module monitors the transformer primary input power P during the cycle. 原 Compare with each preset primary input power, and calculate the load abnormality index based on the comparison result, where: When P 原 When <P1, the load analysis module determines that the primary input power is small during the monitoring period, and sets the first load abnormality index β1, setting β1=P 原 / (P1+P2); When P1≤P 原 ≤P2, the load analysis module determines that the primary input power is normal within the monitoring period; When P 原 >P2, the load analysis module determines that the primary input power is large during the monitoring period, and sets the second load abnormality index β2, setting β2=2×P 原 / (P1+P2); The analysis and adjustment module is provided with a second adjustment unit, and the second adjustment unit is used to calculate the transformer primary current Iin according to the transformer secondary current Iout. The calculation formula of the transformer primary current Iin is as follows: Iin=Iout×N The second adjustment unit compares the transformer primary current Iin with each preset current, and adjusts the process of calculating the load abnormality index according to the comparison result, wherein: When Iin<I1, the second adjustment unit determines that the transformer primary winding current is small, and adjusts the first preset primary input power P1 to P1', setting P1'=P1×[2-1 / (I1-Iin)]; When I1≤Iin≤I2, the second adjustment unit determines that the primary winding current of the transformer is normal and does not make any adjustment; When Iin>I2, the second adjustment unit determines that the transformer primary winding current is large, and adjusts the first preset primary input power P1 to P1″, setting P1″=P1×[2-1 / (Iin-I2)]; Wherein, I1 is a first preset input current, I2 is a second preset input current, and I1<I2; The analysis and adjustment module is further provided with a second optimization unit, which is used to calculate the transformer environment index ρ according to the transformer temperature t, the transformer external magnetic field strength B1 and the transformer humidity SD, wherein the calculation process of the transformer environment index ρ is as follows: ρ=t×a1+B1×a2+SD×a3 Among them, a1 is the transformer temperature weight, a2 is the transformer external magnetic field strength weight, a3 is the transformer humidity weight, a1+a2+a3=1 and a1>a2>a3; The second optimization unit compares the transformer environmental index ρ with the environmental index threshold E, and optimizes the process of adjusting the load abnormality index according to the comparison result, wherein: When ρ<E, the second optimization unit determines that the transformer environment is normal and does not perform optimization; When ρ≥E, the second optimization unit determines that the transformer environment index is high, and optimizes the first preset input current I1 to I1', where I1'=I1×[1+π / 2arctan(ρ-E)].
2. The transformer load comprehensive evaluation system according to claim 1, characterized in that: The load evaluation module compares the load abnormality index βi with each preset load abnormality index, sets i=1, 2, and evaluates the transformer load condition according to the comparison result, wherein: When 0≤βi<YC1, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to normal; When YC1≤βi≤YC2, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to risk; When βi>YC2, the load evaluation module determines that the transformer load evaluation level in the current monitoring period is set to dangerous; Wherein, YC1 is a first preset load abnormality index, YC2 is a second preset load abnormality index, and YC1<YC2.
3. The transformer load comprehensive evaluation system according to claim 2, characterized in that: The output module is provided with a load control unit, which is used to analyze the current frequency v of the AC generator according to the load evaluation level within the monitoring period, wherein: When the load evaluation level is normal, the load control unit does not analyze the current frequency of the AC generator; When the load evaluation level is risk, the load control unit adjusts the frequency v of the AC generator to v', setting v'=v×ln(1+βi); When the load evaluation level is dangerous, the load control unit adjusts the frequency v of the AC generator to v", setting v"=v×[ln(3-βi)], and at the same time, the load control unit adjusts the output power P of the AC generator to 机 Adjust to P 机 ', set P 机 =P 机 ×(1+βi).
4. The transformer load comprehensive evaluation system according to claim 3, characterized in that: The feedback analysis module calculates the proportion m of the evaluation level with the evaluation level of risk or danger according to the load evaluation level of each historical monitoring period, sets m=m1 / n, where m1 is the number of evaluation levels of risk or danger, and n is the number of historical monitoring periods, and corrects the output scheme according to the proportion m of the evaluation level of risk or danger; The feedback analysis module converts the output power P of the AC generator into 机 Corrected to P 机 ”, set P 机 =P 机 ×sinm.