Water Chiller Life Cycle Cost Analysis and Optimization System

Through the full life cost analysis and optimization system of the water-cooler, the problem of poor cost management during the full life cycle of the water-cooler unit is solved, and equipment selection optimization, energy management and maintenance strategies are optimized, which significantly reduces costs and improves the equipment. Economy and operational efficiency.

CN118569452BActive Publication Date: 2024-11-19WUXI GUANYA REFRIGERATION TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411047372.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-19
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

In terms of cost management and optimization of existing water-cooling units throughout their life cycle, there are unscientific equipment selection, imperfect operating status monitoring and energy consumption management, lack of effective fault prediction and preventive maintenance strategies for maintenance plans, and lack of systematic scrapping treatment. Planning problems lead to high initial costs, high operating costs, high maintenance costs and high scrap costs.

Method used

Provide a full-life cost analysis and optimization system for water cooling machines, including data acquisition module, data processing module, prediction analysis module and optimization decision-making module. By collecting and analyzing equipment operation data in real time, generating operation reports, and formulating equipment selection and optimization and energy management Optimize and maintain planning optimization strategies to reduce life cycle costs.

Benefits of technology

Through scientific equipment selection and energy management, the initial procurement and operation costs are significantly reduced, the equipment service life is extended, maintenance and scrapping costs are reduced, and the equipment economy and operational efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118569452B_ABST
    Figure CN118569452B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of air conditioning and refrigeration technology, and specifically to a full life cycle cost analysis and optimization system for a water-cooled machine, including a data acquisition module, a data processing module, a prediction and analysis module, an optimization decision module and a user interaction module. The data acquisition module collects data of the water-cooled unit during operation, the data processing module is connected to the data acquisition module for processing and analyzing the collected data, the prediction and analysis module predicts and analyzes the full life cycle cost, the optimization decision module formulates an optimization strategy, and the user interaction module provides an operation interface to the user, and displays an operation report and optimization suggestions. The present invention accurately predicts the full life cycle cost of different equipment specifications and models through the prediction and analysis module, conducts a comprehensive evaluation in combination with the equipment performance, and selects the equipment model with the lowest full life cycle cost and the best performance. Through this scientific equipment selection method, the initial procurement cost can be significantly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of air conditioning and refrigeration, and in particular to a full life cycle cost analysis and optimization system for a water chiller. Background Art

[0002] As industrial production and construction continue to expand, water-cooled chillers are increasingly used in air conditioning systems and industrial cooling. Water-cooled chillers provide efficient cooling solutions by removing heat from cooling water. However, as the size and complexity of equipment increases, how to effectively manage and optimize the life cycle cost of water-cooled chillers has become an important issue of concern to users and companies. The life cycle cost includes the initial purchase cost, energy consumption during operation, maintenance costs, and scrapping costs, which together determine the overall economic benefits and environmental impact of the equipment.

[0003] Existing water-cooled units have the following technical problems in cost management and optimization throughout their life cycle: First, there is a lack of scientific basis for equipment selection, resulting in high initial costs and equipment performance that cannot meet actual needs; second, operating status monitoring and energy consumption management are imperfect, making it difficult to achieve accurate energy management, resulting in high operating costs; third, maintenance plans lack effective fault prediction and preventive maintenance strategies, resulting in high maintenance costs and high equipment failure rates; finally, there is a lack of systematic planning for scrapping, which increases scrapping costs. Summary of the invention

[0004] Based on the above objectives, the present invention provides a life cycle cost analysis and optimization system for a water chiller.

[0005] The water-cooler life cycle cost analysis and optimization system includes a data acquisition module, a data processing module, a prediction analysis module, an optimization decision module and a user interaction module, among which;

[0006] The data acquisition module collects data of the water-cooling unit during operation, including temperature, humidity, energy consumption, equipment operation status and environmental parameters. The data acquisition module also collects equipment specification data, maintenance record data, market data and equipment life cycle end data. The equipment specification data includes the power and capacity of the equipment, the maintenance record data includes the regular maintenance cost and fault maintenance cost of the equipment, the market data includes material prices and labor costs, and the equipment life cycle end data includes the disposal cost, disassembly cost and transportation cost when the equipment is scrapped;

[0007] The data processing module is connected to the data acquisition module and is used to process and analyze the collected data and generate corresponding operation reports;

[0008] The prediction and analysis module is connected to the data processing module and is used to predict and analyze the full life cycle cost based on the processed data, including the estimation of initial cost, operating cost, maintenance cost and scrapping cost;

[0009] The optimization decision module is connected to the prediction analysis module and is used to formulate corresponding optimization strategies according to the prediction analysis results, including equipment selection optimization, energy management optimization and maintenance plan optimization;

[0010] The user interaction module is connected to the optimization decision module, and is used to provide an operation interface to the user and display operation reports and optimization suggestions.

[0011] Furthermore, the data acquisition module specifically includes:

[0012] Temperature sensor: installed at the cooling water inlet and outlet, condenser and evaporator of the water-cooled unit to measure the temperature of cooling water and refrigerant;

[0013] Humidity sensor: installed in the environmental monitoring area to measure the humidity of the environment around the water cooling unit;

[0014] Energy consumption sensor: including energy meter and flow meter, used to measure the power consumption of the water-cooled unit and the flow of cooling water. The energy meter is installed at the power input end to record the real-time power consumption of the equipment, and the flow meter is installed on the cooling water pipeline to record the water flow data;

[0015] Equipment operation status sensor: including vibration sensor, pressure sensor and speed sensor, which are used to monitor the operation status of the water-cooled unit. The vibration sensor is installed on the rotating parts of the compressor and fan to detect the vibration of the equipment. The pressure sensor is installed at the condenser and evaporator to monitor the pressure of the refrigerant. The speed sensor is installed on the fan and compressor to monitor the speed of the fan and compressor.

[0016] Environmental parameter sensors: including air quality sensors and noise sensors, used to monitor the air quality and noise level of the environment around the water-cooled unit;

[0017] Data acquisition equipment: The data acquisition equipment uses a PLC industrial controller to collect data from various sensors and transmit the data to the data processing module.

[0018] Furthermore, the data processing module specifically includes:

[0019] Data reception: Receive real-time data from the data acquisition module, including temperature, humidity, energy consumption, equipment operating status and environmental parameters;

[0020] Data preprocessing: clean the received data, remove noise and outliers, ensure data accuracy, normalize different types of data to make the data have a unified dimension for subsequent analysis, and store the preprocessed data in the database for further analysis;

[0021] Data analysis: Statistical analysis is performed on the preprocessed data to calculate the average, maximum, minimum, and standard deviation. The trend of data changes is analyzed through time series analysis methods to identify potential operating problems and abnormal conditions. The correlation between different data is analyzed, such as the relationship between temperature and energy consumption, to identify the key factors affecting equipment performance.

[0022] Report generation: Generate real-time monitoring reports to display the current operating status of the equipment, including temperature, humidity and energy consumption; generate periodic analysis reports (such as daily, weekly and monthly reports) to summarize the equipment's operating conditions and performance indicators during the period; generate abnormal alarm reports to record abnormal conditions that occur during equipment operation.

[0023] Furthermore, the time series analysis method is used to analyze the changing trend of data and identify potential operating problems and abnormal situations, including:

[0024] Data processing: Store the preprocessed data in time series format;

[0025] Trend analysis: Use exponential smoothing method to analyze the changing trend of data;

[0026] Initialization: Select smoothing coefficients (between 0 and 1), used to control data weight;

[0027] Calculate the smoothed value: ,in, For time The smoothed value of For time The actual value of For time The smoothing value of

[0028] Update smoothing value: gradually calculate the smoothing value at each time point to form a smoothing value sequence;

[0029] Anomaly detection: Calculate the mean and standard deviation of the smoothed value sequence and determine the anomaly range. The anomaly point is the point that is more than twice the standard deviation from the mean. The anomaly range is expressed as: ,in, is the mean of the smoothed value series, is the standard deviation of the smoothed value sequence;

[0030] The mean value of the smoothed value series is calculated as: ,in, is the mean of the smoothed value series, is the number of data points in the smoothed value sequence, It is Smoothing value;

[0031] The formula for calculating the standard deviation of a smoothed value series is: ,in, is the standard deviation of the smoothed value sequence, is the mean of the smoothed value series, It is Smoothing value, is the number of data points in the smoothed value series.

[0032] Furthermore, the analysis of the correlation between different data to find out the factors affecting the performance of the equipment specifically includes:

[0033] The Spearman rank correlation coefficient was used to analyze the correlation between different data, which was calculated as:

[0034] ,in, It is The rank difference of two variables for data points, is the number of data points;

[0035] Correlation coefficient range: indicates a completely positive correlation. indicates a completely negative correlation. Indicates wireless linearity;

[0036] Interpreting the correlation coefficient: Indicates a strong correlation, indicates a moderate correlation, Indicates weak correlation;

[0037] By calculating the Spearman rank correlation coefficient between different data, variables with strong correlation with equipment performance (such as energy consumption) are identified. Variables with strong correlation are the key factors affecting equipment performance.

[0038] Furthermore, the prediction analysis module specifically includes:

[0039] Data reception and integration: Receive pre-processed data from the data processing module, including equipment specifications, operating status, energy consumption, maintenance records and market data, and integrate data from different sources to form a comprehensive data set;

[0040] Feature extraction: Extract characteristic variables that affect the life cycle cost from comprehensive data sets, including equipment power, capacity, temperature, environmental parameters, maintenance frequency, material prices, disassembly costs, and transportation costs;

[0041] Model selection and training: Use the random forest model to predict the life cycle cost. Divide the comprehensive data set into a training set and a test set. Use the training set to train the random forest model, build multiple decision trees, and use the test set to evaluate the prediction accuracy of the model to ensure that the model can accurately predict the life cycle cost.

[0042] Initial cost prediction: Based on equipment specifications and market conditions, the trained random forest model is used to predict initial costs;

[0043] Operation cost prediction: Based on energy consumption and operating status, the trained random forest model is used to predict future operation costs;

[0044] Maintenance cost prediction: Based on maintenance records and operating status, the trained random forest model is used to predict future maintenance costs;

[0045] Scrap cost prediction: Based on historical equipment life cycle end data, the trained random forest model is used to predict the scrap cost;

[0046] Comprehensive cost analysis: Integrate initial cost, operating cost, maintenance cost and scrapping cost to establish a full life cycle cost model.

[0047] Furthermore, the comprehensive cost analysis specifically includes:

[0048] Initial cost forecast: ,in, The equipment purchase cost is Cost of equipment installation;

[0049] Operating cost forecast: ,in, For the Annual energy consumption costs, For the Annual daily operating expenses;

[0050] Maintenance cost forecast: ,in, For the Annual regular maintenance costs, For the Annual failure maintenance costs;

[0051] Scrap cost forecast: ,in, is the equipment disassembly cost, is the equipment transportation cost, The cost of waste disposal;

[0052] The life cycle cost model is expressed as:

[0053] , Where T is the service life of the equipment.

[0054] Furthermore, the optimization decision module specifically includes:

[0055] Equipment selection optimization: collect data on different equipment models and their specifications, performance and cost on the market, use the prediction analysis module to predict the life cycle cost of different equipment, and conduct a comprehensive evaluation of different equipment based on equipment performance (such as energy efficiency ratio, failure rate, etc.). According to the comprehensive evaluation results, select the equipment model with the lowest life cycle cost and the best performance;

[0056] Energy management optimization: Use the predictive analysis module to analyze the energy consumption pattern of the equipment, identify the high energy consumption period and the main energy consumption source, adjust the operating parameters of the equipment (such as temperature setting value, load distribution, etc.), and improve energy utilization efficiency;

[0057] Maintenance plan optimization: Collect historical maintenance records, failure data and maintenance costs of equipment, use predictive analysis modules to predict the failure probability and maintenance needs of equipment, identify high failure risk components, and formulate preventive maintenance plans based on failure prediction results, focusing on maintaining high-risk components.

[0058] Furthermore, the user interaction module specifically includes:

[0059] User interface design: Design the user interface so that users can easily view operation reports, receive optimization suggestions and perform operations;

[0060] Data presentation: clearly present operation reports and optimization suggestions to users through charts, tables and text descriptions;

[0061] Interactive features: Provide user interactive features that enable users to perform operations, view detailed information, and receive real-time notifications.

[0062] The present invention uses a prediction and analysis module to accurately predict the life cycle cost of different equipment specifications and models, and conducts a comprehensive evaluation based on equipment performance (such as energy efficiency ratio, failure rate, etc.) to select the equipment model with the lowest life cycle cost and the best performance. This scientific equipment selection method can significantly reduce the initial procurement cost, while ensuring the efficient operation of the equipment in actual applications, and avoiding resource waste and economic losses caused by improper selection.

[0063] The present invention uses environmental parameter sensors to monitor the equipment operating environment in real time, such as temperature, humidity, and air quality data, and combines the equipment operating status and energy consumption data to use a random forest model to predict and analyze energy consumption. By optimizing the equipment's operating parameters (such as temperature setting values, load distribution, etc.), accurate energy management is achieved, which significantly reduces operating costs and improves energy efficiency.

[0064] The present invention also accurately estimates the scrapping cost, including disassembly, transportation and waste disposal costs, by analyzing relevant data at the end of the equipment life cycle. By optimizing maintenance strategies and scrapping cost estimates, it not only extends the service life of the equipment, but also significantly reduces maintenance costs and unplanned downtime, while reducing scrapping costs and improving the overall economy and operational efficiency of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only for the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0066] Figure 1 A schematic diagram of a system flow of an embodiment of the present invention;

[0067] Figure 2 The figure is a flowchart of a data processing module according to an embodiment of the present invention. DETAILED DESCRIPTION

[0068] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.

[0069] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0070] like Figure 1-Figure 2 As shown, the life cycle cost analysis and optimization system of the water chiller includes a data acquisition module, a data processing module, a prediction analysis module, an optimization decision module and a user interaction module, wherein;

[0071] The data collection module collects data of the water-cooling unit during operation, including temperature, humidity, energy consumption, equipment operation status and environmental parameters. The data collection module also collects equipment specification data, maintenance record data, market data and equipment life cycle end data. Equipment specification data includes the power and capacity of the equipment, which are obtained through the equipment manual. Maintenance record data includes the regular maintenance cost and failure maintenance cost of the equipment, which are obtained through the maintenance report provided by the equipment supplier or third-party maintenance service. Market data includes material prices and labor costs, which are obtained through market surveys and third-party data providers. Equipment life cycle end data includes disposal costs, disassembly costs and transportation costs when the equipment is scrapped, which are obtained through historical scrapping records and quotations of similar equipment provided by scrapping service providers.

[0072] The data processing module is connected to the data acquisition module to process and analyze the collected data and generate corresponding operation reports;

[0073] The prediction and analysis module is connected to the data processing module to predict and analyze the life cycle cost based on the processed data, including the estimation of initial cost, operating cost, maintenance cost and scrapping cost;

[0074] The optimization decision module is connected to the prediction analysis module to formulate corresponding optimization strategies according to the prediction analysis results, including equipment selection optimization, energy management optimization and maintenance plan optimization;

[0075] The user interaction module is connected to the optimization decision module to provide an operation interface to the user and display operation reports and optimization suggestions.

[0076] The data acquisition module specifically includes:

[0077] Temperature sensor: installed at the cooling water inlet and outlet, condenser and evaporator of the water-cooled unit to measure the temperature of cooling water and refrigerant;

[0078] Humidity sensor: installed in the environmental monitoring area to measure the humidity of the environment around the water cooling unit;

[0079] Energy consumption sensor: including energy meter and flow meter, used to measure the power consumption of the water-cooled unit and the flow of cooling water. The energy meter is installed at the power input end to record the real-time power consumption of the equipment, and the flow meter is installed on the cooling water pipeline to record the water flow data;

[0080] Equipment operation status sensor: including vibration sensor, pressure sensor and speed sensor, which are used to monitor the operation status of the water-cooled unit. The vibration sensor is installed on the rotating parts of the compressor and fan to detect the vibration of the equipment. The pressure sensor is installed at the condenser and evaporator to monitor the pressure of the refrigerant. The speed sensor is installed on the fan and compressor to monitor the speed of the fan and compressor.

[0081] Environmental parameter sensors: including air quality sensors and noise sensors, used to monitor the air quality and noise level of the environment around the water-cooled unit;

[0082] Data acquisition equipment: The data acquisition equipment uses a PLC industrial controller to collect data from various sensors and transmit the data to the data processing module.

[0083] The data processing module specifically includes:

[0084] Data reception: Receive real-time data from the data acquisition module, including temperature, humidity, energy consumption, equipment operating status and environmental parameters;

[0085] Data preprocessing: clean the received data, remove noise and outliers, ensure data accuracy, normalize different types of data to make the data have a unified dimension for subsequent analysis, and store the preprocessed data in the database for further analysis;

[0086] Data analysis: Statistical analysis is performed on the preprocessed data to calculate the average, maximum, minimum, and standard deviation. The trend of data changes is analyzed through time series analysis methods to identify potential operating problems and abnormal conditions. The correlation between different data is analyzed, such as the relationship between temperature and energy consumption, to identify the key factors affecting equipment performance.

[0087] The mean is calculated as: ,in, Indicates data points, Represents the total number of data points;

[0088] Maximum and Minimum: the maximum and minimum values ​​in the data set;

[0089] The standard deviation is calculated as: ,in, Indicates data points, represents the average value of the data, Represents the total number of data points;

[0090] Report generation: Generate real-time monitoring reports to display the current operating status of the equipment, including temperature, humidity and energy consumption; generate periodic analysis reports (such as daily, weekly and monthly reports) to summarize the equipment's operating conditions and performance indicators during the period; generate abnormal alarm reports to record abnormal conditions that occur during equipment operation.

[0091] Through time series analysis methods, we analyze the changing trends of data and identify potential operational problems and abnormal situations, including:

[0092] Data processing: Store the preprocessed data in time series format;

[0093] Trend analysis: Use exponential smoothing method to analyze the changing trend of data;

[0094] Initialization: Select smoothing coefficients (between 0 and 1), used to control data weight;

[0095] Calculate the smoothed value: ,in, For time The smoothed value of For time The actual value of For time The smoothing value of

[0096] Update smoothing value: gradually calculate the smoothing value at each time point to form a smoothing value sequence;

[0097] Anomaly detection: Calculate the mean and standard deviation of the smoothed value sequence and determine the anomaly range. The anomaly point is the point that is more than twice the standard deviation from the mean. The anomaly range is expressed as: ,in, is the mean of the smoothed value series, is the standard deviation of the smoothed value sequence;

[0098] The mean value of the smoothed value series is calculated as: ,in, is the mean of the smoothed value series, is the number of data points in the smoothed value sequence, It is Smoothing value;

[0099] The formula for calculating the standard deviation of a smoothed value series is: ,in, is the standard deviation of the smoothed value sequence, is the mean of the smoothed value series, It is Smoothing value, is the number of data points in the smoothed value series.

[0100] Analyze the correlation between different data to find out the factors that affect equipment performance, including:

[0101] The Spearman rank correlation coefficient was used to analyze the correlation between different data, which was calculated as:

[0102] ,in, It is The rank difference of two variables for data points, is the number of data points;

[0103] Correlation coefficient range: indicates a completely positive correlation. indicates a completely negative correlation. Indicates wireless linearity;

[0104] Interpreting the correlation coefficient: Indicates a strong correlation, indicates a moderate correlation, Indicates weak correlation;

[0105] By calculating the Spearman rank correlation coefficient between different data, variables with strong correlation with equipment performance (such as energy consumption) are identified. Variables with strong correlation are the key factors affecting equipment performance.

[0106] The predictive analysis module specifically includes:

[0107] Data reception and integration: Receive pre-processed data from the data processing module, including equipment specifications, operating status, energy consumption, maintenance records and market data, and integrate data from different sources to form a comprehensive data set;

[0108] Feature extraction: Extract characteristic variables that affect the life cycle cost from comprehensive data sets, including equipment power, capacity, temperature, environmental parameters, maintenance frequency, material prices, disassembly costs, and transportation costs;

[0109] Model selection and training: Use the random forest model to predict the life cycle cost. Divide the comprehensive data set into a training set and a test set. Use the training set to train the random forest model, build multiple decision trees, and use the test set to evaluate the prediction accuracy of the model to ensure that the model can accurately predict the life cycle cost.

[0110] Initial cost prediction: Based on equipment specifications and market conditions, the trained random forest model is used to predict initial costs;

[0111] Operation cost prediction: Based on energy consumption and operating status, the trained random forest model is used to predict future operation costs;

[0112] Maintenance cost prediction: Based on maintenance records and operating status, the trained random forest model is used to predict future maintenance costs;

[0113] Scrap cost prediction: Based on historical equipment life cycle end data, the trained random forest model is used to predict the scrap cost;

[0114] Comprehensive cost analysis: Integrate initial cost, operating cost, maintenance cost and scrapping cost to establish a full life cycle cost model.

[0115] Comprehensive cost analysis specifically includes:

[0116] Initial cost forecast: ,in, The equipment purchase cost is Cost of equipment installation;

[0117] Operating cost forecast: ,in, For the Annual energy consumption costs, For the Annual daily operating expenses;

[0118] Maintenance cost forecast: ,in, For the Annual regular maintenance costs, For the Annual failure maintenance costs;

[0119] Scrap cost forecast: ,in, is the equipment disassembly cost, is the equipment transportation cost, The cost of waste disposal;

[0120] The life cycle cost model is expressed as:

[0121] , Where T is the service life of the equipment;

[0122] Through the above method, the predictive analysis module can use the random forest model to accurately predict and analyze the full life cycle cost of the water-cooled unit based on the processed data, provide effective cost optimization suggestions, and help users minimize costs and maximize benefits.

[0123] The optimization decision module specifically includes:

[0124] Equipment selection optimization: collect data on different equipment models and their specifications, performance and cost on the market, use the prediction analysis module to predict the life cycle cost of different equipment, and conduct a comprehensive evaluation of different equipment based on equipment performance (such as energy efficiency ratio, failure rate, etc.). According to the comprehensive evaluation results, select the equipment model with the lowest life cycle cost and the best performance;

[0125] Energy management optimization: Use the predictive analysis module to analyze the energy consumption pattern of the equipment, identify the high energy consumption period and the main energy consumption source, adjust the operating parameters of the equipment (such as temperature setting value, load distribution, etc.), and improve energy utilization efficiency;

[0126] Maintenance plan optimization: collect historical maintenance records, failure data and maintenance costs of equipment, use the predictive analysis module to predict the failure probability and maintenance needs of equipment, identify high-failure risk components, and formulate preventive maintenance plans based on failure prediction results, focusing on maintaining high-risk components;

[0127] By optimizing the decision-making module and based on the prediction and analysis results, we formulate strategies such as equipment selection optimization, energy management optimization, and maintenance plan optimization to reduce the total life cycle cost and improve equipment operation efficiency.

[0128] The user interaction module specifically includes:

[0129] User interface design: Design the user interface so that users can easily view operation reports, receive optimization suggestions and perform operations;

[0130] Data presentation: clearly present operation reports and optimization suggestions to users through charts, tables and text descriptions;

[0131] Interactive functions: Provide user interactive functions to enable users to perform operations, view detailed information and receive real-time notifications;

[0132] Interactive features include the following:

[0133] Parameter adjustment: Users can adjust equipment operating parameters (such as temperature setting value, operating mode, etc.) through the operation interface;

[0134] Report generation: Users can generate and download detailed operation reports, including life cycle cost analysis, energy consumption reports, maintenance records, etc.

[0135] Receiving optimization suggestions: Users can view optimization suggestions based on predictive analysis results and choose whether to adopt them;

[0136] Alarm notification: Receive alarm information and fault notifications during equipment operation in real time to facilitate timely problem handling;

[0137] Through the user interaction module, users can easily view the equipment's operation reports, receive optimization suggestions, and perform equipment operations and parameter adjustments, thereby achieving comprehensive management and optimization of the equipment.

[0138] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.

[0139] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. The water chiller life cycle cost analysis and optimization system is characterized by: It includes data collection module, data processing module, prediction analysis module, optimization decision module and user interaction module, among which; The data acquisition module collects data of the water-cooling unit during operation, including temperature, humidity, energy consumption, equipment operation status and environmental parameters. The data acquisition module also collects equipment specification data, maintenance record data, market data and equipment life cycle end data. The equipment specification data includes the power and capacity of the equipment, the maintenance record data includes the regular maintenance cost and fault maintenance cost of the equipment, the market data includes material prices and labor costs, and the equipment life cycle end data includes the disposal cost, disassembly cost and transportation cost when the equipment is scrapped; The data processing module is connected to the data acquisition module and is used to process and analyze the collected data and generate corresponding operation reports; The prediction and analysis module is connected to the data processing module and is used to predict and analyze the life cycle cost based on the processed data, including the estimation of initial cost, operating cost, maintenance cost and scrapping cost, specifically including: Data reception and integration: Receive pre-processed data from the data processing module, including equipment specifications, operating status, energy consumption, maintenance records and market data, and integrate data from different sources to form a comprehensive data set; Feature extraction: Extract characteristic variables that affect the life cycle cost from comprehensive data sets, including equipment power, capacity, temperature, environmental parameters, maintenance frequency, material prices, disassembly costs, and transportation costs; Model selection and training: Use the random forest model to predict the life cycle cost. Divide the comprehensive data set into a training set and a test set. Use the training set to train the random forest model, build multiple decision trees, and use the test set to evaluate the prediction accuracy of the model to ensure that the model can accurately predict the life cycle cost. Initial cost prediction: Based on equipment specifications and market conditions, the trained random forest model is used to predict initial costs; Operation cost prediction: Based on energy consumption and operating status, the trained random forest model is used to predict future operation costs; Maintenance cost prediction: Based on maintenance records and operating status, the trained random forest model is used to predict future maintenance costs; Scrap cost prediction: Based on historical equipment life cycle end data, the trained random forest model is used to predict the scrap cost; Comprehensive cost analysis: Integrate initial cost, operating cost, maintenance cost and scrapping cost to establish a full life cycle cost model; Comprehensive cost analysis specifically includes: Initial cost forecast: ,in, The equipment purchase cost is Cost of equipment installation; Operating cost forecast: ,in, For the Annual energy consumption costs, For the Annual daily operating expenses; Maintenance cost forecast: ,in, For the Annual regular maintenance costs, For the Annual failure maintenance costs; Scrap cost forecast: ,in, is the equipment disassembly cost, is the equipment transportation cost, The cost of waste disposal; The life cycle cost model is expressed as: , where T is the service life of the equipment; The optimization decision module is connected to the prediction analysis module and is used to formulate corresponding optimization strategies according to the prediction analysis results, including equipment selection optimization, energy management optimization and maintenance plan optimization, specifically including: Equipment selection optimization: collect data on different equipment models and their specifications, performance and cost on the market, use the prediction analysis module to predict the life cycle cost of different equipment, and conduct a comprehensive evaluation of different equipment based on equipment performance. Based on the comprehensive evaluation results, select the equipment model with the lowest life cycle cost and the best performance; Energy management optimization: Use the predictive analysis module to analyze the energy consumption pattern of the equipment, identify the high energy consumption period and the main energy consumption source, adjust the operating parameters of the equipment, and improve energy utilization efficiency; Maintenance plan optimization: collect historical maintenance records, failure data and maintenance costs of equipment, use the predictive analysis module to predict the failure probability and maintenance needs of equipment, identify high-failure risk components, and formulate preventive maintenance plans based on failure prediction results, focusing on maintaining high-risk components; The user interaction module is connected to the optimization decision module, and is used to provide an operation interface to the user and display operation reports and optimization suggestions.

2. The water chiller life cycle cost analysis and optimization system according to claim 1, characterized in that: The data acquisition module specifically includes: Temperature sensor: installed at the cooling water inlet and outlet, condenser and evaporator of the water-cooled unit to measure the temperature of cooling water and refrigerant; Humidity sensor: installed in the environmental monitoring area to measure the humidity of the environment around the water cooling unit; Energy consumption sensor: including energy meter and flow meter, used to measure the power consumption of the water-cooled unit and the flow of cooling water. The energy meter is installed at the power input end to record the real-time power consumption of the equipment, and the flow meter is installed on the cooling water pipeline to record the water flow data; Equipment operation status sensor: including vibration sensor, pressure sensor and speed sensor, which are used to monitor the operation status of the water-cooled unit. The vibration sensor is installed on the rotating parts of the compressor and fan to detect the vibration of the equipment. The pressure sensor is installed at the condenser and evaporator to monitor the pressure of the refrigerant. The speed sensor is installed on the fan and compressor to monitor the speed of the fan and compressor. Environmental parameter sensors: including air quality sensors and noise sensors, used to monitor the air quality and noise level of the environment around the water-cooled unit; Data acquisition equipment: The data acquisition equipment uses a PLC industrial controller to collect data from various sensors and transmit the data to the data processing module.

3. The water chiller life cycle cost analysis and optimization system according to claim 2 is characterized in that: The data processing module specifically includes: Data reception: Receive real-time data from the data acquisition module, including temperature, humidity, energy consumption, equipment operating status and environmental parameters; Data preprocessing: clean the received data, remove noise and outliers, normalize different types of data to make the data have a unified dimension, and store the preprocessed data in the database for further analysis; Data analysis: Statistical analysis is performed on the preprocessed data to calculate the average, maximum, minimum and standard deviation. The trend of data changes is analyzed through time series analysis methods to identify potential operating problems and abnormal conditions, analyze the correlation between different data, and find out the key factors affecting equipment performance. Report generation: Generate real-time monitoring reports to display the current operating status of the equipment, including temperature, humidity and energy consumption; generate periodic analysis reports to summarize the equipment's operating conditions and performance indicators during the period; generate abnormal alarm reports to record abnormal conditions that occur during equipment operation.

4. The water chiller life cycle cost analysis and optimization system according to claim 3 is characterized in that: The time series analysis method is used to analyze the trend of data changes and identify potential operational problems and abnormal situations, including: Data processing: Store the preprocessed data in time series format; Trend analysis: Use exponential smoothing method to analyze the changing trend of data; Initialization: Select smoothing coefficients , used to control data weight; Calculate the smoothed value: ,in, For time The smoothed value of For time The actual value of For time The smoothing value of Update smoothing value: gradually calculate the smoothing value at each time point to form a smoothing value sequence; Anomaly detection: Calculate the mean and standard deviation of the smoothed value sequence and determine the anomaly range. The anomaly point is the point that is more than twice the standard deviation from the mean. The anomaly range is expressed as: ,in, is the mean of the smoothed value series, is the standard deviation of the smoothed value sequence; The mean value of the smoothed value series is calculated as: ,in, is the mean of the smoothed value series, is the number of data points in the smoothed value sequence, It is Smoothing value; The formula for calculating the standard deviation of a smoothed value series is: ,in, is the standard deviation of the smoothed value sequence, is the mean of the smoothed value series, It is Smoothing value, is the number of data points in the smoothed value series.

5. The water chiller life cycle cost analysis and optimization system according to claim 3 is characterized in that: The analysis of the correlation between different data to find out the factors affecting the performance of the equipment specifically includes: The Spearman rank correlation coefficient was used to analyze the correlation between different data, which was calculated as: ,in, It is The rank difference of two variables for data points, is the number of data points; Correlation coefficient range: indicates a completely positive correlation. indicates a completely negative correlation. Indicates wireless linearity; Interpreting the correlation coefficient: Indicates a strong correlation, indicates a moderate correlation, Indicates weak correlation; By calculating the Spearman rank correlation coefficient between different data, the variables with strong correlation with equipment performance are identified. The variables with strong correlation are the key factors affecting equipment performance.

6. The water chiller life cycle cost analysis and optimization system according to claim 1, characterized in that: The user interaction module specifically includes: User interface design: Design the user interface so that users can easily view operation reports, receive optimization suggestions and perform operations; Data presentation: Display operation reports and optimization suggestions to users through charts, tables and text descriptions; Interactive functions: Provide user interactive functions to enable users to perform operations, view information and receive real-time notifications.