Asphalt fume purification treatment equipment for asphalt concrete

By combining various methods of combustion, liquid filtration and chemical reagent neutralization, an asphalt flue gas purification equipment was designed, which solved the problem that existing equipment could not effectively deal with a variety of harmful substances and achieved a more efficient purification effect.

CN118577074BActive Publication Date: 2024-12-24HANGZHOU BAY GREEN MAINTENANCE (JIAXING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411080777.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-12-24
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Existing asphalt flue gas purification equipment cannot effectively deal with a variety of harmful substances with different physical and chemical properties, resulting in a low purification effect.

Method used

A bituminous flue gas purification equipment including a combustion mechanism, a water storage mechanism and a heating mechanism is designed to treat harmful substances in the bituminous flue gas through sufficient combustion, liquid filtration and chemical reagent neutralization, and combine various purification methods. The combustion mechanism uses a twisted dragon plate and a heating wire for full combustion, the water storage mechanism uses water for filtering and precipitation, the heating mechanism is preheated by high-temperature water vapor and heating of chemical reagents, and the cutting mechanism promotes full contact between the flue gas and the reagents.

Benefits of technology

It significantly improves the purification effect of asphalt flue gas, reduces the emission of harmful substances, and improves the heat utilization rate and purification effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118577074B_ABST
    Figure CN118577074B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of purification equipment, and specifically to an asphalt fume purification equipment for asphalt concrete, comprising a combustion mechanism, wherein the combustion mechanism comprises a combustion tank, and the combustion mechanism is used to fully burn the fume, and also comprises a water storage mechanism and a heating mechanism arranged on one side of the combustion tank; the water storage mechanism is configured to filter and neutralize the fume after combustion in the combustion tank through a water storage chamber, a chemical chamber one and a chemical chamber two arranged on the inner side of the water storage tank, and the heating mechanism preheats the fume on the inner side of the air intake pipe, and can heat the chemical reagent on the inner side of the chemical chamber one or the chemical chamber two to promote chemical purification; the present invention fully purifies harmful substances in asphalt fume by combining multiple methods such as combustion, liquid filtration and chemical reagents, thereby greatly reducing the harmful substances in the fume.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of purification treatment equipment, in particular to asphalt fume purification treatment equipment for asphalt concrete. Background Art

[0002] Asphalt fume is generated during the production and use of asphalt concrete. The fume contains a variety of harmful substances, including hydrocarbon compounds, phenolic compounds, asphalt particles, sulfides, nitrogen oxides, volatile organic compounds, etc. Direct emissions will have a significant impact on the environment and human health. Therefore, it is necessary to treat the flue gas through purification equipment to reduce the impact on the environment. The flue gas treatment methods include combustion, electrostatic capture, adsorption, induced draft dust removal and UV photo-oxidation catalytic activated carbon adsorption.

[0003] A Chinese patent with publication number CN105289164B discloses asphalt flue gas purification equipment, including a flue gas washing area, a first spraying device, a filler area and a second spraying device. When the asphalt flue gas comes into contact with a large amount of washing solvent, the temperature is greatly reduced, the flue gas diffusion rate is slowed down, and the tar and particulate matter in the asphalt flue gas can be effectively retained, and the purification effect of the asphalt flue gas is obvious.

[0004] The Chinese patent with publication number CN114917612B discloses an asphalt waterproofing membrane smoke treatment system, including an insulated batching tank, an environmental protection pipeline, a pressure cover plate and an asphalt smoke condensation tank. The asphalt smoke is passively discharged through the pressure cover plate connected to the opening of the environmental protection pipeline in the insulated batching tank, which reduces the asphalt smoke emission by 90%, greatly reduces pollutant emissions, and protects the environment.

[0005] The above-mentioned and similar prior arts can solve the problem of the degree of purification of asphalt fume to a certain extent. However, there are many kinds of harmful substances in asphalt fume, and their physical and chemical properties are different. The purification equipment in the prior art can purify harmful substances with certain specific physical and chemical properties in the fume. It is highly targeted and has a single effect. Moreover, most harmful substances in asphalt fume cannot be purified by only one purification method. The exhaust gas after purification still contains a large amount of harmful substances, which reduces the purification effect.

[0006] Therefore, the present invention provides an asphalt fume purification treatment device for asphalt concrete that can purify harmful substances with different physical and chemical properties. Summary of the invention

[0007] Aiming at the problems in the prior art that harmful substances are of various types, have different physical and chemical properties, and have low purification effects, an asphalt fume purification treatment equipment for asphalt concrete is designed.

[0008] The technical solution adopted by the present invention to solve its technical problems is: an asphalt flue gas purification and treatment equipment for asphalt concrete, including a combustion mechanism, wherein the combustion mechanism includes a combustion tank, and the combustion mechanism is used to fully burn the flue gas, and also includes a water storage mechanism and a heating mechanism arranged on one side of the combustion tank; the water storage mechanism is equipped to filter and neutralize the flue gas after combustion in the combustion tank through a water storage chamber, a chemical chamber one and a chemical chamber two arranged on the inner side of the water storage tank, thereby achieving the purpose of purifying the flue gas; the heating mechanism is equipped to discharge the superheated water vapor generated in the combustion tank through an outlet pipe, so that the superheated water vapor flows on the surface of the intake pipe to preheat the flue gas inside the intake pipe, and at the same time, the superheated water vapor can be controlled to flow into the inner side of the honeycomb box through control valve one or control valve two, so that the honeycomb box heats the chemical reagent inside the chemical chamber one or the chemical chamber two to promote chemical purification.

[0009] Furthermore, the combustion mechanism also includes a center tube, and the center tube is installed at the center position of the inner side of the combustion tank, a protective tube is installed through the top of the combustion tank, and the protective tube is located on the inner side of the center tube, a conductive rod is installed through the top of the protective tube, an auger plate is fixedly installed on the inner side of the combustion tank, and the auger plate is located on the outer side of the center tube, a spiral groove is opened on the inner side of the auger plate, a through hole is opened through one side of the combustion tank, and the through hole is communicated with the spiral groove, a plurality of heating plates are installed through the inside of the center tube and the protective tube, and the heating plate is located on the inner side of the spiral groove, one end of the heating plate is connected to the conductive rod, a plurality of heating wires are installed through the inside of the heating plate, and the heating wires pass through the inside of the auger plate.

[0010] Furthermore, the water tank is fixedly installed on one side of the combustion tank, a partition is fixedly installed on the inner side of the water tank, chemical chamber one and chemical chamber two are respectively located on both sides of the partition, there is a protrusion on the inner side of the water tank, the water storage chamber is located on one side of the protrusion, and chemical chamber one is located on the other side of the protrusion, an air outlet pipe is installed through the side of the water tank away from the combustion tank, a plurality of water inlets are installed through the top of the water tank, a plurality of water level pipes are installed through the front of the water tank, the water inlets and the water level pipes correspond one to one with the positions of the water storage chamber, chemical chamber one and chemical chamber two respectively, a transition pipe is installed through the top of the water tank, and one end of the transition pipe is installed through one side of the combustion tank.

[0011] Furthermore, the air intake pipe is installed through one side of the combustion tank and communicates with the inner side of the combustion tank. Square plates are fixedly installed on the top and bottom of the air intake pipe respectively. Ventilation holes are opened through the inside of the square plates. A heating pipe is fixedly installed on the outer side of the square plate. One end of the outlet pipe is installed through one side of the combustion tank and communicates with the inner side of the spiral groove. The other end of the outlet pipe is installed through the top of the heating pipe and is located on one side of the square plate. An inlet pipe is installed through the top of the heating pipe, and the inlet pipe is located on the other side of the square plate.

[0012] Furthermore, two side tubes are installed through the side of the heating tube close to the water tank, and the other end of the side tube is installed through the side of the water tank. The two side tubes are respectively located on the inner side of chemical chamber one and chemical chamber two, and a honeycomb box is fixedly installed on the other end of the side tube, and a return pipe is installed through the side of the honeycomb box away from the side tube. A group of control valves 1 are fixedly installed on the outside of the side tube and the return pipe connected to the chemical chamber one, and each group has two control valves 1. A group of control valves 2 are fixedly installed on the outside of the side tube and the return pipe connected to the chemical chamber two, and each group has two control valves 2.

[0013] Furthermore, a cooling assembly is provided on the inner side of the water tank, and the cooling assembly is configured to cool the flue gas through a condenser to prevent the high temperature of the flue gas from affecting the chemical purification; a cutting mechanism is provided on the inner side of the water tank, and the cutting mechanism is configured to cut the flue gas bubbles by rotating the cutting plate to allow the flue gas to fully contact with the chemical reagent.

[0014] Furthermore, the cooling assembly includes an insulation plate, which is fixedly installed on the top of the inner protrusion of the water tank, a perforated plate is fixedly installed on the top of the inner protrusion of the water tank, and the perforated plate is located on one side of the insulation plate, and a water flow hole is opened at the bottom of the perforated plate, a guide block is fixedly installed on the top of the protrusion of the water tank, and the guide block is located between the insulation plate and the perforated plate, a condenser is fixedly installed on the top of the water tank, condensing tubes are installed through both sides of the condenser, the condensing tubes penetrate the top of the water tank, a hollow block is fixedly installed on one end of the condensing tube, and the hollow block is located on the top of the guide block.

[0015] Furthermore, the cutting mechanism includes two ventilation pipes, one ventilation pipe is installed through the inside of the insulation board, and the other ventilation pipe is installed through the inside of the partition. An exhaust box is fixedly installed at one end of the ventilation pipe, and a plurality of air outlets are opened through the top of the exhaust box. The air outlets are distributed in a circular array, and an inner ring is installed on the top of the exhaust box through a bearing sleeve, a cutting plate is fixedly installed on the outer side of the inner ring, and a bevel gear ring is fixedly installed on the outer side of the cutting plate.

[0016] Furthermore, a protective box is installed through the interior of the partition, a double-headed motor is fixedly installed on the inner side of the protective box, two output ends of the double-headed motor pass through the interior of the protective box through bearings respectively, bevel gears are fixedly mounted on the outer sides of the two output ends of the double-headed motor respectively, and the two bevel gears are meshed with two bevel gear rings respectively.

[0017] Beneficial effects of the present invention:

[0018] (1) The asphalt fume purification treatment equipment for asphalt concrete described in the present invention adopts a combustion mechanism design. The asphalt fume rotates and moves upward along the spiral direction of the auger, so that the fume passes through the vicinity of the high-temperature heating wire many times, which can fully burn the combustible substances in the asphalt fume and improve the purification effect.

[0019] (2) The asphalt flue gas purification treatment equipment for asphalt concrete described in the present invention adopts the design of a water storage mechanism, which allows the flue gas after combustion to be introduced into water and chemical reagents in sequence, so that the liquid adsorbs and precipitates the solid particles in the flue gas, and different types of chemical reagents can neutralize and purify other harmful gases in the flue gas, thereby improving the purification effect.

[0020] (3) The asphalt fume purification treatment equipment for asphalt concrete described in the present invention adopts a heating mechanism to link the combustion mechanism with the water storage mechanism. The heating plate vaporizes the water in the spiral groove into high-temperature water vapor, and introduces the high-temperature water vapor into the surface of the intake pipe through the outlet pipe and the heating pipe. The high-temperature water vapor preheats the flue gas that is about to enter the inner side of the combustion tank through the intake pipe, thereby improving the heat utilization rate.

[0021] (4) The asphalt fume purification treatment equipment for asphalt concrete described in the present invention adopts a side pipe design. By opening control valve one or control valve two, high-temperature water vapor in the heating pipe is introduced into the honeycomb box, so that the honeycomb box heats the chemical reagent in chemical chamber one or chemical chamber two. At the same time, the cutting mechanism can fully contact the fume and the chemical reagent. Both can promote the reaction between the fume and the chemical reagent, further improving the purification effect.

[0022] (5) The asphalt fume purification treatment equipment for asphalt concrete described in the present invention adopts a combination of combustion, liquid filtration, and chemical reagents to fully purify the harmful substances in the asphalt fume, thereby greatly reducing the harmful substances in the fume. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the purification device body of the present invention;

[0025] Figure 2 It is a schematic diagram of a three-dimensional cross-sectional structure of the purification device of the present invention;

[0026] Figure 3 It is a schematic diagram of the three-dimensional structure of the auger plate of the present invention;

[0027] Figure 4 It is a schematic diagram of the three-dimensional structure of the cooling assembly of the present invention;

[0028] Figure 5 It is a three-dimensional structural schematic diagram of the cutting assembly of the present invention;

[0029] Figure 6 It is a three-dimensional structural schematic diagram of the heating mechanism of the present invention;

[0030] Figure 7 It is a schematic diagram of the three-dimensional structure of the square plate of the present invention.

[0031] In the figure: 1. combustion mechanism; 11. combustion tank; 12. center tube; 13. protection tube; 14. conductive rod; 15. auger plate; 16. spiral groove; 17. through hole; 18. heating plate; 19. heating wire; 2. water storage mechanism; 21. water storage tank; 22. water storage chamber; 23. partition; 24. chemical chamber 1; 25. chemical chamber 2; 26. air outlet pipe; 27. water inlet; 28. water level pipe; 29. ​​transition pipe; 3. cooling assembly; 31. heat insulation board; 32. orifice plate; 33. water flow hole; 34. guide block; 35. Condenser; 36. Condenser tube; 37. Hollow block; 4. Cutting mechanism; 41. Ventilation pipe; 42. Exhaust box; 43. Air outlet; 44. Inner ring; 45. Cutting plate; 46. Bevel gear ring; 47. Protective box; 48. Double-head motor; 49. Bevel gear; 5. Heating mechanism; 51. Inlet pipe; 52. Square plate; 53. Ventilation hole; 54. Heating pipe; 55. Export pipe; 56. Import pipe; 57. Side pipe; 58. Honeycomb box; 59. Reflux pipe; 510. Control valve one; 511. Control valve two. DETAILED DESCRIPTION

[0032] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods. Example

[0033] like Figure 1-Figure 7 As shown, the asphalt fume purification treatment equipment of asphalt concrete described in the present invention includes a combustion mechanism 1, the combustion mechanism 1 includes a combustion tank 11, the combustion mechanism 1 is used to fully burn the fume, and also includes a water storage mechanism 2 and a heating mechanism 5 arranged on one side of the combustion tank 11; the combustion mechanism 1 also includes a central tube 12, and the central tube 12 is installed at the central position of the inner side of the combustion tank 11, a protective tube 13 is installed through the top of the combustion tank 11, and the protective tube 13 is located on the inner side of the central tube 12, and a conductive rod 14 is installed through the top of the protective tube 13, An auger plate 15 is fixedly installed on the inner side of the combustion tank 11, and the auger plate 15 is located on the outer side of the central tube 12. A spiral groove 16 is opened on the inner side of the auger plate 15. A through hole 17 is opened through one side of the combustion tank 11, and the through hole 17 is communicated with the spiral groove 16. A plurality of heating plates 18 are installed through the interior of the central tube 12 and the protective tube 13, and the heating plate 18 is located on the inner side of the spiral groove 16. One end of the heating plate 18 is connected to the conductive rod 14. A plurality of heating wires 19 are installed through the interior of the heating plate 18, and the heating wires 19 pass through the interior of the auger plate 15.

[0034] Specifically, the combustion tank 11 can provide a placement space for the central tube 12, and the central tube 12 can provide protection for the protective tube 13 and the conductive tube. Insulating fillers can be added between the central tube 12 and the protective tube 13 to provide protection for the conductive rod 14, thereby ensuring that the conductive rod 14 can work stably. The combustion tank 11 can provide a placement space for the auger plate 15, and the auger plate 15 can increase the travel of the flue gas in the combustion tank 11, thereby increasing the time that the flue gas stays in the combustion tank 11. The auger plate 15 can provide an opening space for the spiral groove 16. The combustion tank 11 can provide a penetrating opening space for the through hole 17, so that the water inside the water storage chamber 22 can enter the inner side of the spiral groove 16 through the through hole 17. The spiral groove 16 can provide a placement space for water, so that the heating plate 18 can vaporize the water in the spiral groove 16 during heating. The heating plate 18 can provide stable support and conductivity for the heating wire 19, so that the heating wire 19 can be continuously heated.

[0035] In this embodiment, the water storage mechanism 2 is equipped to filter and neutralize the smoke after the combustion of the combustion pot 11 through the water storage chamber 22, chemical chamber 1 24 and chemical chamber 2 25 arranged on the inner side of the water storage tank 21, thereby achieving the purpose of purifying the smoke; the water storage tank 21 is fixedly installed on one side of the combustion pot 11, and a partition 23 is fixedly installed on the inner side of the water storage tank 21. The chemical chamber 1 24 and the chemical chamber 25 are respectively located on both sides of the partition 23. There is a protrusion on the inner side of the water storage tank 21, and the water storage chamber 22 is located on the protrusion. On one side, chemical chamber 1 24 is located on the other side of the protrusion, an air outlet pipe 26 is installed through the side of the water tank 21 away from the combustion tank 11, a plurality of water inlets 27 are installed through the top of the water tank 21, and a plurality of water level pipes 28 are installed through the front of the water tank 21. The water inlets 27 and the water level pipes 28 correspond to the positions of the water chamber 22, chemical chamber 1 24, and chemical chamber 2 25 respectively. A transition pipe 29 is installed through the top of the water tank 21, and one end of the transition pipe 29 is installed through one side of the combustion tank 11.

[0036] Specifically, the water tank 21 can provide an opening space for the water storage chamber 22, the chemical chamber 1 24 and the chemical chamber 2 25. The water storage chamber 22 can provide storage space for external water. The chemical chamber 1 24 and the chemical chamber 2 25 can provide storage space for chemical reagents. The water inside the water storage chamber 22 can provide water for the spiral groove 16. At the same time, the adsorption property of water is used to adsorb and precipitate solid particles in the flue gas. The chemical reagents can react chemically with harmful gases in the flue gas to neutralize the harmful gases. The water inlet 27 can provide an external channel for the water storage chamber 22, the chemical chamber 1 24 and the chemical chamber 2 25, so that the external liquid can enter the water tank 21. The water level pipe 28 is made of transparent material, which is convenient for the staff to grasp the amount of liquid in the water tank 21. The transition pipe 29 can guide the flue gas in the combustion tank 11 into the water tank 21.

[0037] In this embodiment, the heating mechanism 5 is equipped to guide the superheated water vapor generated in the combustion pot 11 through the guide pipe 55, so that the superheated water vapor flows on the surface of the intake pipe 51, and the smoke inside the intake pipe 51 is preheated. At the same time, the superheated water vapor can be controlled to flow into the inner side of the honeycomb box 58 through the control valve 1 510 or the control valve 2 511, so that the honeycomb box 58 heats the chemical reagent inside the chemical chamber 1 24 or the chemical chamber 2 25, and promotes chemical purification. The intake pipe 51 is installed through one side of the combustion pot 11 and communicates with the inner side of the combustion pot 11. The top and bottom of the intake pipe 51 are fixedly installed with square plates 52 respectively. The interior of the square plate 52 is penetrated by a ventilation hole 53. The outer side of the square plate 52 is fixedly installed with a heating pipe 54. One end of the guide pipe 55 is installed through one side of the combustion pot 11 and communicates with the inner side of the spiral groove 16. The other end of the tube 55 is installed through the top of the heating tube 54 and is located on one side of the square plate 52. An inlet tube 56 is installed through the top of the heating tube 54 and is located on the other side of the square plate 52. Two side tubes 57 are installed through the side of the heating tube 54 close to the water tank 21. The other end of the side tube 57 is installed through one side of the water tank 21. The two side tubes 57 are respectively located on the inner sides of the chemical chamber 1 24 and the chemical chamber 2 25. A honeycomb box 58 is fixedly installed on the other end of the side tube 57. A return pipe 59 is installed through the side of the honeycomb box 58 away from the side tube 57. A group of control valves 1 510 are fixedly installed on the outside of the side tube 57 and the return pipe 59 connected to the chemical chamber 1 24, and each group has two control valves 1 510. A group of control valves 2 511 are fixedly installed on the outside of the side tube 57 and the return pipe 59 connected to the chemical chamber 2 25, and each group has two control valves 2 511.

[0038] Specifically, the air inlet pipe 51 can provide a channel for the asphalt smoke to enter the combustion tank 11, the air inlet pipe 51 can provide a stable support for the square plate 52, the square plate 52 can provide a through space for the ventilation hole 53, the square plate 52 can provide a stable support for the heating tube 54, the heating tube 54 can provide a flow channel for water vapor, the square plate 52 divides the heating tube 54 into two parts, the front and back parts, so that the water vapor flows from the front of the square plate 52, passes through the ventilation hole 53, and then flows in the opposite direction from the back of the square plate 52, the outlet pipe 55 can export the high-temperature water vapor in the spiral groove 16 to the heating tube 54, and at the same time can balance the pressure in the spiral groove 16, so that the spiral groove 1 6 is the same as the water level in the water storage chamber 22. The side pipe 57 can provide a communication channel for the honeycomb box 58 and the heating pipe 54, so that the high-temperature water vapor in the heating pipe 54 can enter the honeycomb box 58. The honeycomb box 58 can increase the contact area with the chemical reagent, which is convenient for heating the chemical reagent. The reflux pipe 59 can recover the high-temperature water vapor to the water storage chamber 22. Through the control valve 1 510 and the control valve 2 511, it can be selected whether to heat the two chemical reagents. At the same time, the opening degree of the control valve 1 510 and the control valve 2 511 can determine the heating temperature of the chemical reagent. The smaller the opening degree, the lower the heating temperature, and vice versa.

[0039] In this embodiment, a cooling assembly 3 is provided on the inner side of the water tank 21, and the cooling assembly 3 is equipped to cool the flue gas through a condenser 35 to prevent the high temperature of the flue gas from affecting the chemical purification; the cooling assembly 3 includes a heat insulation plate 31, and the heat insulation plate 31 is fixedly installed on the top of the inner protrusion of the water tank 21, and a perforated plate 32 is fixedly installed on the top of the inner protrusion of the water tank 21, and the perforated plate 32 is located on one side of the heat insulation plate 31, and a water flow hole 33 is opened at the bottom of the perforated plate 32, and a guide block 34 is fixedly installed on the top of the protrusion of the water tank 21, and the guide block 34 is located between the heat insulation plate 31 and the perforated plate 32, and a condenser 35 is fixedly installed on the top of the water tank 21, and condensing pipes 36 are installed through both sides of the condenser 35, and the condensing pipes 36 penetrate the top of the water tank 21, and a hollow block 37 is fixedly installed on one end of the condensing pipe 36, and the hollow block 37 is located on the top of the guide block 34.

[0040] Specifically, the condenser 35 and the condenser tube 36 can provide cold air for the hollow block 37, so that the hollow block 37 cools the space at the protruding position of the water tank 21. Cooperating with the heat insulation plate 31, it can prevent the temperature in the water storage chamber 22 from affecting the temperature of the chemical chamber 24. At the same time, it can cool the high-temperature water vapor into small water droplets. Under the guidance of the guide block 34, the small water droplets pass through the water flow hole 33 and enter the water storage chamber 22, thereby reducing the effect of the reduction of water volume in the water storage chamber 22 due to the high-temperature vaporization of water in the spiral groove 16.

[0041] In this embodiment, a cutting mechanism 4 is provided inside the water storage tank 21. The cutting mechanism 4 is configured to cut the smoke bubbles by rotating the cutting plate 45 so that the smoke is fully in contact with the chemical reagent. The cutting mechanism 4 includes two ventilation pipes 41. One ventilation pipe 41 is installed through the inside of the insulation board 31, and the other ventilation pipe 41 is installed through the inside of the partition 23. An exhaust box 42 is fixedly installed at one end of the ventilation pipe 41. A plurality of air outlets 43 are opened on the top of the exhaust box 42. The air outlets 43 are distributed in a circular array. An inner ring 44 is installed on the top of the exhaust box 42 through a bearing sleeve, a cutting plate 45 is fixedly installed on the outer side of the inner ring 44, a bevel gear ring 46 is fixedly installed on the outer side of the cutting plate 45, a protective box 47 is installed through the inside of the partition 23, a double-headed motor 48 is fixedly installed on the inner side of the protective box 47, and the two output ends of the double-headed motor 48 pass through the interior of the protective box 47 through bearings respectively, and bevel gears 49 are fixedly installed on the outer sides of the two output ends of the double-headed motor 48, and the two bevel gears 49 are respectively meshed with the two bevel gear rings 46.

[0042] Specifically, the ventilation pipe 41 can guide the flow of flue gas so that the flue gas can enter the chemical reagent. The ventilation pipe 41 can provide stable support for the exhaust box 42. The exhaust box 42 can provide rotational support for the inner ring 44 through the bearing. The inner ring 44 can provide stable support for the cutting plate 45. The cutting plate 45 can provide stable support for the bevel gear ring 46. When the flue gas is discharged from the air outlet 43, the flue gas is easy to form continuous bubbles. The bevel gear 49 is driven to rotate by the double-headed motor 48. The cutting plate 45 is driven to rotate by the meshing action of the bevel gear 49 and the bevel gear ring 46, so that the cutting plate 45 cuts the continuous bubbles into multiple small bubbles, increasing the contact area between the flue gas and the chemical reagent, so that the flue gas can fully contact the chemical reagent. The protective box 47 can provide placement space and protection for the double-headed motor 48. The bearing between the output end of the double-headed motor 48 and the protective box 47 is a sealed bearing to prevent the chemical reagent from contacting the double-headed motor 48 and affecting the working performance of the double-headed motor 48.

[0043] Working principle: The staff places the device firmly at the designated work location, first opens the water inlet 27, and injects appropriate amounts of water and chemical reagents into the inner side of the water storage chamber 22, the chemical chamber 1 24, and the chemical chamber 2 25, respectively. The amount of water and chemical reagents is determined by observing the position of the liquid in the water level tube 28. The water inside the water storage chamber 22 enters the inner side of the spiral groove 16 from the through hole 17, so that the water levels inside the water storage chamber 22 and the spiral groove 16 are consistent, and the conductive rod 14 and the double-headed motor 48 are energized. The conductive rod 14 transmits electricity to the heating plate 18 and the heating wire 19, so that the heating plate 18 and the heating wire 19 generate heat, and the temperature of the heating wire 19 is controlled within 800 to 1000 degrees Celsius. Then the staff mixes the asphalt fume from the outside with oxygen and passes it into the inner side of the air intake pipe 51;

[0044] The asphalt fume and oxygen in the air intake pipe 51 enter the inner side of the combustion tank 11 through the air intake pipe 51, so that the asphalt fume rotates and moves upward along the spiral direction of the auger. When the asphalt fume passes near the heating wire 19, the combustible substances in the asphalt fume will burn under the action of oxygen and high temperature. Since the fume needs to pass through the heating wire 19 multiple times, the combustible substances in the asphalt fume are fully burned.

[0045] The smoke after combustion reaches the top of the combustion tank 11, and enters the inner side of the water storage chamber 22 under the guidance of the transition pipe 29, so that the smoke contacts the water inside the water storage chamber 22. The water can adhere to the surface of the solid particles, so that the water filters the solid particles in the smoke; the smoke passes through the inner side of the orifice plate 32 and the hollow block 37 and enters the ventilation pipe 41 inside the chemical chamber 24. The hollow block 37 cools the smoke under the action of the condenser 35, so that the cooled smoke passes through the ventilation pipe 41 and enters the inner side of the exhaust box 42, and moves upward through the air outlet 43 and enters the chemical reagent inside the chemical chamber 24. The smoke generates bubbles at the air outlet 43. At this time, the double-headed motor 48 drives the bevel gear The wheel 49 rotates, so that the bevel gear 49 drives the cutting plate 45 to rotate by meshing with the bevel gear ring 46. The cutting plate 45 rotates at the top of the air outlet 43, cutting the bubbles generated at the air outlet 43, so that the flue gas generates a large number of fine bubbles in the chemical reagent of the chemical chamber 1 24, so that the flue gas can fully contact with the chemical reagent, and some harmful gases in the flue gas are neutralized and purified. In the same principle, the flue gas in the chemical chamber 1 24 enters the inner side of the chemical chamber 2 25 through the ventilation pipe 41 on the partition 23, so that the flue gas is fully in contact with the chemical flue gas in the chemical chamber 2 25, and the other part of the harmful gases in the flue gas are neutralized and purified again, and the purified flue gas is discharged from the outlet pipe 26;

[0046] When the heating plate 18 heats to a high temperature, the heating plate contacts the water inside the spiral groove 16, so that the heating plate 18 vaporizes the water into high-temperature steam. The steam moves upward along the inner side of the spiral groove 16 under the action of atmospheric pressure. When the steam moves to the top of the inner side of the spiral groove 16, the steam enters the inner side of the outlet pipe 55, and the steam passes through the outlet pipe 55 and enters the inner side of the heating pipe 54. The steam moves along the front side of the square plate 52 and the surface of the intake pipe 51 in a direction away from the combustion tank 11, and then the steam passes through the passage 54. The air hole 53 comes to the back of the square plate 52, and moves along the back of the square plate 52 and the surface of the air inlet pipe 51 toward the direction of the combustion pot 11, so that the high-temperature water vapor passes through the air inlet pipe 51 to preheat the flue gas that is about to enter the inner side of the combustion pot 11, and finally the water vapor passes through the inlet pipe 56 and enters the raised position inside the water storage tank 21, so that the water vapor contacts the hollow block 37 to cool and condense into small water droplets, and the small water droplets fall on the top of the guide block 34, and under the guidance of the guide block 34, pass through the water flow hole 33 and enter the inner side of the water storage chamber 22;

[0047] When the staff needs to heat the chemical reagents inside the chemical chamber 24, the staff opens the two control valves 510 at the same time, so that part of the high-temperature water vapor in the heating tube 54 enters the inner side of the honeycomb box 58 under the drainage action of the side tube 57. The honeycomb box 58 heats up to heat the chemical reagents and promotes the chemical reaction. Then, the water vapor inside the honeycomb box 58 enters the raised part inside the water tank 21 from the back side of the water tank 21 through the reflux pipe 59 to be condensed and recovered. Similarly, the chemical reagents in the chemical chamber 25 can be heated through the two control valves 511 to improve the purification effect of the chemical reagents.

[0048] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. An asphalt fume purification treatment device for asphalt concrete, comprising a combustion mechanism (1), characterized in that: The combustion mechanism (1) comprises a combustion tank (11), the combustion mechanism (1) is used to fully burn the smoke, and also comprises a water storage mechanism (2) and a heating mechanism (5) arranged on one side of the combustion tank (11); The water storage mechanism (2) is configured to filter and neutralize the smoke after combustion in the combustion tank (11) through a water storage chamber (22), a chemical chamber 1 (24) and a chemical chamber 2 (25) arranged inside the water storage tank (21), thereby achieving the purpose of purifying the smoke; The heating mechanism (5) is configured to discharge the superheated water vapor generated in the combustion tank (11) through the discharge pipe (55), so that the superheated water vapor flows on the surface of the intake pipe (51) to preheat the flue gas inside the intake pipe (51), and at the same time, the superheated water vapor can be controlled to flow into the inside of the honeycomb box (58) through the control valve 1 (510) or the control valve 2 (511), so that the honeycomb box (58) heats the chemical reagent inside the chemical chamber 1 (24) or the chemical chamber 2 (25), thereby promoting chemical purification; The combustion mechanism (1) further comprises a central tube (12), and the central tube (12) is installed at the central position of the inner side of the combustion tank (11), a protective tube (13) is installed through the top of the combustion tank (11), and the protective tube (13) is located on the inner side of the central tube (12), a conductive rod (14) is installed through the top of the protective tube (13), an auger plate (15) is fixedly installed on the inner side of the combustion tank (11), and the auger plate (15) is located on the outer side of the central tube (12), and a groove is formed on the inner side of the auger plate (15) A spiral groove (16) is provided, a through hole (17) is provided on one side of the combustion pot (11), and the through hole (17) is communicated with the spiral groove (16), a plurality of heating plates (18) are installed through the interior of the central tube (12) and the protective tube (13), and the heating plates (18) are located on the inner side of the spiral groove (16), one end of the heating plate (18) is connected to the conductive rod (14), a plurality of heating wires (19) are installed through the interior of the heating plate (18), and the heating wires (19) pass through the interior of the auger plate (15).

2. The asphalt fume purification treatment equipment for asphalt concrete according to claim 1 is characterized by: The water storage tank (21) is fixedly mounted on one side of the combustion pot (11), a partition (23) is fixedly mounted on the inner side of the water storage tank (21), chemical chamber 1 (24) and chemical chamber 2 (25) are respectively located on both sides of the partition (23), a bulge is formed on the inner side of the water storage tank (21), the water storage chamber (22) is located on one side of the bulge, and chemical chamber 1 (24) is located on the other side of the bulge, and an air outlet pipe (25) is installed through the side of the water storage tank (21) away from the combustion pot (11) 26), a plurality of water inlets (27) are installed through the top of the water storage tank (21), a plurality of water level pipes (28) are installed through the front of the water storage tank (21), the water inlets (27) and the water level pipes (28) correspond to the positions of the water storage chamber (22), the chemical chamber 1 (24), and the chemical chamber 2 (25) respectively, a transition pipe (29) is installed through the top of the water storage tank (21), and one end of the transition pipe (29) is installed through one side of the combustion tank (11).

3. The asphalt fume purification treatment equipment for asphalt concrete according to claim 1 is characterized by: The air inlet pipe (51) is installed through one side of the combustion pot (11) and communicates with the inner side of the combustion pot (11); square plates (52) are fixedly installed on the top and bottom of the air inlet pipe (51) respectively; a ventilation hole (53) is opened through the inside of the square plate (52); a heating pipe (54) is fixedly installed on the outer side of the square plate (52); one end of the outlet pipe (55) is installed through one side of the combustion pot (11) and communicates with the inner side of the spiral groove (16); the other end of the outlet pipe (55) is installed through the top of the heating pipe (54) and is located on one side of the square plate (52); an inlet pipe (56) is installed through the top of the heating pipe (54), and the inlet pipe (56) is located on the other side of the square plate (52).

4. The asphalt fume purification treatment equipment for asphalt concrete according to claim 3 is characterized by: Two side tubes (57) are installed through the side of the heating tube (54) close to the water tank (21), and the other end of the side tube (57) is installed through the side of the water tank (21). The two side tubes (57) are respectively located inside the chemical chamber 1 (24) and the chemical chamber 2 (25). A honeycomb box (58) is fixedly installed on the other end of the side tube (57), and a return pipe (59) is installed through the side of the honeycomb box (58) away from the side tube (57). A group of control valves (510) are fixedly installed outside the side tubes (57) and the return pipe (59) connected to the chemical chamber 1 (24), and each group has two control valves (510). A group of control valves (511) are fixedly installed outside the side tubes (57) and the return pipe (59) connected to the chemical chamber 2 (25), and each group has two control valves (511).

5. The asphalt fume purification treatment equipment for asphalt concrete according to claim 2 is characterized by: A cooling assembly (3) is provided on the inner side of the water storage tank (21), and the cooling assembly (3) is configured to cool the flue gas through a condenser (35) to prevent the high temperature of the flue gas from affecting the chemical purification; a cutting mechanism (4) is provided on the inner side of the water storage tank (21), and the cutting mechanism (4) is configured to cut the flue gas bubbles through the rotation of a cutting plate (45), so that the flue gas is fully in contact with the chemical reagent.

6. The asphalt fume purification treatment equipment for asphalt concrete according to claim 5, characterized in that: The cooling assembly (3) comprises a heat insulating plate (31), the heat insulating plate (31) is fixedly mounted on the top of the inner protrusion of the water tank (21), a perforated plate (32) is fixedly mounted on the top of the inner protrusion of the water tank (21), and the perforated plate (32) is located on one side of the heat insulating plate (31), a water flow hole (33) is opened at the bottom of the perforated plate (32), a guide block (34) is fixedly mounted on the top of the protrusion of the water tank (21), the guide block (34) is located between the heat insulating plate (31) and the perforated plate (32), a condenser (35) is fixedly mounted on the top of the water tank (21), condensing pipes (36) are installed through both sides of the condenser (35), the condensing pipes (36) penetrate the top of the water tank (21), a hollow block (37) is fixedly mounted on one end of the condensing pipe (36), and the hollow block (37) is located on the top of the guide block (34).

7. The asphalt fume purification treatment equipment for asphalt concrete according to claim 6 is characterized by: The cutting mechanism (4) comprises two ventilation pipes (41), one ventilation pipe (41) is installed through the interior of the heat insulation board (31), and the other ventilation pipe (41) is installed through the interior of the partition (23), an exhaust box (42) is fixedly installed at one end of the ventilation pipe (41), a plurality of air outlets (43) are opened through the top of the exhaust box (42), and the air outlets (43) are distributed in a circular array, an inner ring (44) is installed on the top of the exhaust box (42) through a bearing sleeve, a cutting plate (45) is fixedly installed on the outer side of the inner ring (44), and a bevel gear ring (46) is fixedly installed on the outer side of the cutting plate (45).

8. The asphalt fume purification treatment equipment for asphalt concrete according to claim 7, characterized in that: A protection box (47) is installed through the interior of the partition (23), a double-headed motor (48) is fixedly installed on the inner side of the protection box (47), two output ends of the double-headed motor (48) respectively pass through the interior of the protection box (47) through bearings, and bevel gears (49) are fixedly installed on the outer sides of the two output ends of the double-headed motor (48), and the two bevel gears (49) are respectively meshed with two bevel gear rings (46).