Grounding grid corrosion status assessment method and device based on digital twin
By comprehensively analyzing the historical and real-time usage status data of the grounding network, and combining with the digital twin model, the corrosion status of the grounding network is evaluated, the problems of insufficient evaluation error and comprehensiveness in the existing technology are solved, and more accurate and efficient corrosion status management is achieved. .
Patent Information
- Application Number
- CN202411070112.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-08-06
AI Technical Summary
The prior art ignores the comprehensive consideration of historical use status and real-time use status when evaluating the corrosion state of the grounding net, resulting in insufficient accuracy and comprehensiveness of the evaluation results, and fails to fully consider factors such as induced current and current leakage, resulting in corrosion rate. The evaluation error is serious.
By obtaining the historical usage status of the grounding network and the real-time usage status data set, various evaluation values were obtained, combined with the digital twin model, and the corrosion status of the grounding network was comprehensively compared to obtain the corrosion status threshold, and the corrosion status of the grounding network was monitored and evaluated in real time.
It improves the accuracy and comprehensiveness of the corrosion status evaluation of the grounding grid, reduces evaluation errors, helps managers formulate accurate maintenance strategies, extends the service life of the grounding grid, reduces operation and maintenance costs, and ensures the safe and stable operation of the power system.
Smart Images

Figure CN118585775B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of measuring electrical variables, and specifically to a method, device and electronic equipment for evaluating the corrosion state of a grounding grid based on digital twins. Background Art
[0002] The grounding grid is a basic device for high-voltage power equipment to prevent lightning strikes and overvoltage. It avoids lightning and system grounding short-circuit currents that endanger the safety of people and power equipment, and is of great significance to the safe and stable operation of the power system. For a long time, the grounding grid made of metal materials has inevitably corroded, which has reduced the cross-section of the grounding body or even broken it, resulting in poor grounding performance of the grounding grid, and the thermal stability does not meet the requirements. The short-circuit current will burn the grounding grid, causing high potential differences in the adjacent areas of the grounding grid, causing damage to other major equipment and endangering personal safety. Therefore, it is necessary to conduct regular corrosion inspections on the metal grounding grid. When most metal grounding grids are inspected for corrosion, it is usually necessary to dig up the metal grounding grid and then conduct manual inspections. Traditional grounding grid corrosion status assessment methods usually require manual inspection and maintenance, which is inefficient and prone to missed inspections. There are also problems such as accidentally touching underground cables, damaging the grounding grid structure, and high construction difficulty. Therefore, the grounding grid corrosion status assessment method based on digital twin technology can realize real-time monitoring and prediction of the grounding grid status, improve the accuracy and efficiency of the assessment, and establish a digital model of the grounding grid through digital twin technology. It can realize real-time monitoring and analysis of various parameters and states of the grounding grid, provide a scientific basis for the management and maintenance of the grounding grid corrosion status, help improve the management level of the grounding grid corrosion status, reduce operating risks, and ensure the safe and stable operation of the power system.
[0003] For example, the invention patent with the announcement number CN104833898B discloses a method for evaluating the corrosion state of the substation grounding grid using an M-sequence signal current, including: 1) generating a field M-sequence signal current to act on the input grounding down conductor of the substation grounding grid; 2) collecting the field M-sequence signal current waveform generated on site, the response voltage waveform of the input grounding down conductor, and the response voltage waveform of the output grounding down conductor at different positions; 3) processing the current and voltage waveform data provided by the grounding down conductor response voltage recording module to obtain the grounding state parameters and identification process curves of the grounding down conductors at different positions of the grounding grid; 4) using current data and historical data, performing trend analysis on the grounding state parameters of the grounding down conductors at different positions of the grounding grid and performing correlation coefficient analysis on the identification process curve, thereby evaluating the corrosion state of the substation grounding grid. Compared with the prior art, the present invention has the advantages of being simple, accurate, and not limited by field operating conditions.
[0004] For example, the invention patent with announcement number CN104678246B discloses a method and system for evaluating the corrosion state of a substation grounding grid, including an on-site impulse current generation module, a transient current and voltage recording module for each grounding down conductor, an impulse grounding impedance calculation and impulse response curve drawing module, a test result storage and recording module, and a grounding grid state evaluation and analysis module; the on-site impulse current generation module generates impulse current, and each grounding down conductor transient current and voltage recording module collects impulse current, transient response voltage waveform of the input grounding down conductor, and impulse response voltage waveform of the output grounding down conductor at different positions; the impulse grounding impedance calculation and impulse response curve drawing module processes each current and voltage data to obtain the grounding grid impulse impedance and impulse response curves at different positions; the grounding grid state evaluation and analysis module evaluates the corrosion state of the substation grounding grid. Compared with the prior art, the present invention has the advantages of being simple, accurate, and not limited by on-site operating conditions.
[0005] At present, there are still some shortcomings in the research on the corrosion state assessment method of grounding grid based on digital twin. Specifically, the influence of different historical usage states of grounding grid on the corrosion state assessment of grounding grid is ignored, and the different historical usage states of grounding grid, different real-time usage states of grounding grid and different real-time corrosion states of grounding grid are not comprehensively considered. The influencing factors of the corrosion state assessment of grounding grid are not considered comprehensively. The historical usage state of grounding grid has an important influence on its corrosion condition. Some studies may ignore the influence of these historical usage states when assessing the corrosion state of grounding grid, resulting in insufficient accuracy and comprehensiveness of the assessment results. The grounding grid may be in different usage states in actual operation. For example, load changes, temperature changes, etc. will affect the corrosion state of the grounding grid. Some studies may not fully consider the influence of these real-time usage states on the corrosion state assessment, resulting in the accuracy of the assessment results being affected and the practicality of the grounding grid being limited. Since the corrosion effects of induced current, current leakage, etc. on materials are not considered, the experimental data are seriously deviated from the actual corrosion rate of the grounding grid. Summary of the invention
[0006] In view of the shortcomings of the prior art, the present invention provides a grounding grid corrosion status assessment method, device and electronic equipment based on digital twin, which can effectively solve the above-mentioned problem of serious errors in the assessment of the corrosion status of the grounding grid.
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a grounding grid corrosion status assessment method based on digital twins, comprising the following steps: obtaining a grounding grid historical usage status data set, and analyzing and obtaining a grounding grid historical usage status assessment value based on the obtained grounding grid historical usage status data set; obtaining a grounding grid real-time usage status data set, and analyzing and obtaining a grounding grid real-time usage status assessment value based on the obtained grounding grid real-time usage status data set; analyzing and obtaining a grounding grid usage status characteristic value based on the obtained grounding grid historical usage status assessment value and the grounding grid real-time usage status assessment value, and comparing and obtaining a grounding grid corrosion status assessment threshold based on the grounding grid usage status characteristic value; obtaining a grounding grid real-time corrosion status data set, and analyzing and obtaining a grounding grid real-time corrosion status assessment value based on the obtained grounding grid real-time corrosion status data set, and evaluating the grounding grid corrosion status in combination with the grounding grid clothing status assessment threshold.
[0008] As a further method, a data set of historical usage status of the grounding grid is obtained, and based on the obtained data set of historical usage status of the grounding grid, an evaluation value of the historical usage status of the grounding grid is obtained through analysis. The specific analysis process is: obtaining a data set of historical usage status of the grounding grid, the data set of historical usage status of the grounding grid specifically includes the historical service life of the grounding grid, the total effective time of the historical use of the grounding grid, the average pH value of the soil in the historical use of the grounding grid, and the porosity of the soil in the historical use of the grounding grid; based on the obtained data set of historical usage status of the grounding grid, a comprehensive analysis is performed to obtain an evaluation value of the historical usage status of the grounding grid, and the evaluation value of the historical usage status of the grounding grid is used as an analysis basis for comparing to obtain the evaluation threshold of the grounding grid clothing status.
[0009] As a further method, a grounding grid real-time usage status data set is obtained, and based on the obtained grounding grid real-time usage status data set, an evaluation value of the grounding grid real-time usage status is obtained by analysis. The specific analysis process is: obtaining a grounding grid real-time usage status data set, the grounding grid real-time usage status data set specifically includes the grounding grid real-time access voltage, the grounding grid real-time access current, and the grounding grid real-time current leakage; based on the obtained grounding grid real-time usage status data set, an evaluation value of the grounding grid real-time usage status is obtained by analysis, and the grounding grid real-time usage status evaluation value is used as an analysis basis for comparing to obtain the grounding grid clothing status evaluation threshold.
[0010] As a further method, based on the acquired historical usage status evaluation values and real-time usage status evaluation values of the grounding grid, the grounding grid usage status characteristic values are analyzed. The specific analysis process is: the historical usage status evaluation values and real-time usage status evaluation values of the grounding grid are acquired, and the acquired historical usage status evaluation values and real-time usage status evaluation values of the grounding grid are imported into the digital twin model of the grounding grid corrosion status, and the grounding grid usage status characteristic values are obtained through comprehensive analysis; the grounding grid usage status characteristic values are used as the analysis basis for comparing the grounding grid corrosion status evaluation thresholds.
[0011] As a further method, based on the grounding grid usage status characteristic value, the grounding grid corrosion status assessment threshold is obtained by comparison. The specific analysis process is: obtain the grounding grid usage status characteristic value, compare the grounding grid usage status characteristic value with the grounding grid corrosion status assessment threshold corresponding to each grounding grid usage status characteristic value stored in the database, and obtain the grounding grid corrosion status assessment threshold corresponding to the grounding grid usage status characteristic value.
[0012] As a further method, a real-time corrosion status data set of the grounding grid is obtained, and based on the obtained real-time corrosion status data set of the grounding grid, an evaluation value of the real-time corrosion status of the grounding grid is obtained by analysis. The specific analysis process is: obtaining a real-time corrosion status data set of the grounding grid, the real-time corrosion status data set of the grounding grid specifically includes the real-time corrosion rate of the grounding grid, the real-time grounding resistance of the grounding grid, and the real-time corrosion number of conductors of the grounding grid; based on the obtained real-time corrosion status data set of the grounding grid, an evaluation value of the real-time corrosion status of the grounding grid is obtained by analysis, and the real-time corrosion status evaluation value of the grounding grid is used as an analysis basis for evaluating the corrosion status of the grounding grid.
[0013] As a further method, the real-time corrosion status evaluation value of the grounding grid is analyzed as follows:
[0014]
[0015] In the formula, is the real-time corrosion status assessment value of the grounding grid, is the real-time corrosion rate of the grounding grid, is the real-time grounding resistance of the grounding grid, is the real-time corrosion number of the grounding grid conductor, Reference corrosion rates for grounding grids stored in the database, The reference ground resistance of the ground grid stored in the database, Define the number of corrosions for the grounding grid conductors stored in the database, is the compensation factor of the set grounding grid real-time corrosion rate, is the compensation factor of the real-time grounding resistance of the set grounding grid, It is the compensation factor for the real-time corrosion number of the set grounding grid conductor.
[0016] As a further method, the corrosion state of the grounding grid is evaluated in combination with the grounding grid clothing state evaluation threshold. The specific analysis process is: obtain the real-time corrosion state evaluation value of the grounding grid, and compare the real-time corrosion state evaluation value of the grounding grid with the grounding grid clothing state evaluation threshold; if the real-time corrosion state evaluation value of the grounding grid is lower than the grounding grid clothing state evaluation threshold, the grounding grid is marked as a bad corrosion state grounding grid, and a bad corrosion state evaluation prompt is issued to the grounding grid; if the real-time corrosion state evaluation value of the grounding grid is equal to the grounding grid clothing state evaluation threshold, the grounding grid is marked as a poor corrosion state grounding grid, and a poor corrosion state evaluation prompt is issued to the grounding grid; if the real-time corrosion state evaluation value of the grounding grid is higher than the grounding grid clothing state evaluation threshold, the grounding grid is marked as a good corrosion state grounding grid, and a good corrosion state evaluation prompt is issued to the grounding grid.
[0017] As a further method, a grounding grid corrosion state assessment device based on digital twins includes a historical usage state assessment value acquisition module, a real-time usage state assessment value acquisition module, a corrosion state assessment threshold acquisition module and a grounding grid corrosion state assessment module, wherein: the historical usage state assessment value acquisition module is used to acquire a grounding grid historical usage state data set, and analyze and obtain a grounding grid historical usage state assessment value based on the acquired grounding grid historical usage state data set; the real-time usage state assessment value acquisition module is used to acquire a grounding grid real-time usage state data set, and analyze and obtain a grounding grid real-time usage state assessment value based on the acquired grounding grid real-time usage state data set; the corrosion state assessment threshold acquisition module is used to analyze and obtain a grounding grid usage state characteristic value based on the acquired grounding grid historical usage state assessment value and the grounding grid real-time usage state assessment value, and compare and obtain a grounding grid corrosion state assessment threshold based on the grounding grid usage state characteristic value; the grounding grid corrosion state assessment module is used to acquire a grounding grid real-time corrosion state data set, and analyze and obtain a grounding grid real-time corrosion state assessment value based on the acquired grounding grid real-time corrosion state data set, and evaluate the grounding grid corrosion state in combination with the grounding grid corrosion state assessment threshold.
[0018] As a further method, an electronic device for evaluating the corrosion status of a grounding grid based on digital twins includes a processor and a memory and a network interface connected to the processor. The network interface is connected to a non-volatile memory in a server. When the processor is running, it retrieves a computer program from the non-volatile memory through the network interface and runs the computer program through the memory.
[0019] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:
[0020] (1) The present invention provides a method, device and electronic equipment for evaluating the corrosion status of a grounding grid based on digital twins. By considering the impact of different historical usage conditions of the grounding grid on the evaluation of the corrosion status of the grounding grid, the historical situation of the grounding grid can be more comprehensively understood, thereby more accurately evaluating the corrosion status of the grounding grid. This helps to improve the accuracy of the evaluation results, provide a more reliable basis for the management and maintenance of the grounding grid, and better predict the future corrosion trend and development of the grounding grid. It helps to discover potential problems in advance and take corresponding preventive measures to avoid further deterioration of corrosion problems, reduce operating risks, and ensure the safe and stable operation of the power system. By real-time monitoring, evaluation and prediction of the corrosion status of the grounding grid, problems can be discovered in a timely manner and measures can be taken, thereby realizing refined and intelligent management of the grounding grid.
[0021] (2) The present invention comprehensively analyzes the historical usage status evaluation value and the real-time usage status evaluation value of the grounding grid, and compares them to obtain the corrosion status evaluation threshold of the grounding grid, so as to have a more comprehensive understanding of the corrosion situation of the grounding grid. By comparing the evaluation threshold, the corrosion status of the grounding grid can be determined more accurately, avoiding the subjectivity and limitations of a single evaluation value, improving the accuracy of the evaluation, and helping managers to formulate more accurate maintenance strategies. According to different corrosion status evaluation values and thresholds, maintenance and repair work can be carried out in a targeted manner, thereby extending the service life of the grounding grid and reducing operation and maintenance costs. This helps managers to have a more comprehensive understanding of the status of the grounding grid, take timely measures, and improve management efficiency. Through dynamic monitoring and early warning, the possibility of failures can be effectively reduced, and the reliability and stability of the power system can be improved.
[0022] (3) The present invention evaluates the corrosion state of the grounding grid by comprehensively considering the different historical usage states, different real-time usage states and different real-time corrosion states of the grounding grid, so as to have a more comprehensive understanding of the overall situation of the grounding grid. This comprehensive consideration can help identify potential corrosion problems and take timely measures to repair and prevent them, thereby improving the comprehensiveness of the evaluation, reducing the interference of subjective factors and improving the accuracy of the evaluation. By real-time monitoring, evaluation and prediction of the corrosion state of the grounding grid, problems can be discovered and measures can be taken in a timely manner, thereby realizing intelligent management of the grounding grid. According to the degree of influence of different states, targeted maintenance and repair work can be carried out to extend the service life of the grounding grid and reduce operation and maintenance costs. The influence of factors such as current and current leakage on the corrosion state of the material is considered to reduce the error in evaluating the corrosion state of the grounding grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0024] Figure 1 A flow chart of a method for evaluating grounding grid corrosion status based on digital twins according to an embodiment of the present invention;
[0025] Figure 2 A schematic diagram showing how the real-time corrosion state evaluation value of a grounding grid changes with the number of real-time corrosion of the grounding grid conductors according to an embodiment of the present invention;
[0026] Figure 3 is a schematic diagram of a grounding grid corrosion status assessment device based on digital twin according to an embodiment of the present invention. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0028] Figure 1 The flowchart of the method for evaluating the corrosion status of a grounding grid based on digital twin according to an embodiment of the present invention is shown in FIG. Figure 1 As shown, an embodiment of the present invention provides a grounding grid corrosion state assessment method based on digital twin, comprising:
[0029] Step S102, obtaining a grounding grid historical usage status data set, and analyzing the obtained grounding grid historical usage status data set to obtain a grounding grid historical usage status evaluation value.
[0030] Specifically, a data set of historical usage status of the grounding grid is obtained, and based on the obtained data set of historical usage status of the grounding grid, an evaluation value of the historical usage status of the grounding grid is obtained through analysis. The specific analysis process is: obtaining a data set of historical usage status of the grounding grid, the data set of historical usage status of the grounding grid specifically includes the historical usage years of the grounding grid, the total effective duration of the historical use of the grounding grid, the average pH value of the soil in the historical use of the grounding grid, and the porosity of the soil in the historical use of the grounding grid; based on the obtained data set of historical usage status of the grounding grid, a comprehensive analysis is performed to obtain an evaluation value of the historical usage status of the grounding grid, and the evaluation value of the historical usage status of the grounding grid is used as an analysis basis for comparing to obtain an evaluation threshold value of the grounding grid clothing status.
[0031] In this embodiment, the above-mentioned historical service life of the grounding grid refers to the length of time the grounding grid has experienced during its use, that is, the total time from the beginning of the use of the grounding grid to the present. This indicator can be used to evaluate the aging degree and service life of the grounding grid, which helps to determine the replacement cycle or maintenance plan of the grounding grid; the above-mentioned total effective historical use time of the grounding grid refers to the total length of time the grounding grid is in an effective state in actual use. This indicator takes into account the possible deactivation, maintenance or other non-effective use status of the grounding grid, so as to more accurately evaluate the actual working time of the grounding grid, thereby determining its service life and maintenance requirements; the above-mentioned soil pH value refers to the acidity and alkalinity in the soil, which is an indicator to measure the acidity and alkalinity of the soil. For the grounding grid, the pH value of the soil can affect the relationship between the grounding grid and the soil. The electrochemical reaction between the soil and the ground grid will affect the corrosion of the grounding grid. Generally speaking, the lower the pH value of the soil, the more acidic the soil is, which may lead to aggravated metal corrosion of the grounding grid. The higher the pH value of the soil, the more alkaline the soil is, which may slow down the corrosion rate of the grounding grid. The porosity of the soil refers to the proportion of the pores in the soil to the total volume of the soil, which can also be understood as the density of the soil. For the grounding grid, the porosity of the soil can affect the air permeability and drainage of the soil, and then affect the humidity and oxygen content of the soil around the grounding grid, thereby affecting the corrosion of the grounding grid. Generally speaking, moderate soil porosity can help slow down the corrosion rate of the grounding grid, but if the porosity is too high or too low, it may lead to uneven distribution of moisture and oxygen in the soil, increasing the corrosion risk of the grounding grid.
[0032] In a specific embodiment, by considering the impact of different historical usage conditions of the grounding grid on the corrosion status assessment of the grounding grid, a more comprehensive understanding of the historical situation of the grounding grid can be achieved, thereby more accurately assessing the corrosion status of the grounding grid, which helps to improve the accuracy of the assessment results and provide a more reliable basis for grounding grid management and maintenance. It can better predict the future corrosion trend and development of the grounding grid, help to discover potential problems in advance, take corresponding preventive measures, avoid further deterioration of corrosion problems, reduce operating risks, and ensure the safe and stable operation of the power system. By real-time monitoring, evaluation and prediction of the corrosion status of the grounding grid, problems can be discovered in a timely manner and measures can be taken to achieve refined and intelligent management of the grounding grid.
[0033] It should be explained that the above-mentioned historical usage status evaluation value of the grounding grid can not only be obtained by further analysis through a machine learning integrated model, using an integrated method such as GradientBoostingMachine or random forest to combine the prediction results of multiple basic models to obtain a more accurate historical usage status evaluation value of the grounding grid, but can also be calculated in the following way. The calculation formula for the historical usage status evaluation value of the grounding grid is:
[0034]
[0035] In the formula, is the historical usage status evaluation value of the grounding grid, is the historical service life of the grounding grid, The total effective time of the grounding grid in history. Use the average soil pH value for the grounding grid. Use soil porosity for grounding grid history, The reference service life of the grounding grid stored in the database. The total effective time of the grounding grid reference stored in the database. Use the average soil pH value for the grounding grid reference stored in the database, Use soil porosity for grounding grid references stored in the database, is the compensation factor for the historical service life of the grounding grid. The compensation factor for the total effective time of the set grounding grid history, A compensation factor for the average soil pH value used for the given grounding grid history, Use a compensation factor for soil porosity for a given grounding grid history.
[0036] It should be explained that the above-mentioned evaluation value of the historical usage status of the grounding grid is calculated through the historical service life of the grounding grid, the total effective time of the grounding grid in history, the average pH value of the soil in history, and the porosity of the soil in history. Taking into account factors such as the historical service life of the grounding grid, the total effective time of the grounding grid in history, the average pH value of the soil in history, and the porosity of the soil in history, the usage status of the grounding grid can be more comprehensively evaluated instead of relying on a single indicator. Considering multiple factors of the historical usage status of the grounding grid can provide better traceability. By recording and analyzing multiple factors, the historical usage of the grounding grid can be better understood, providing a reference for subsequent maintenance and improvement. Comprehensive consideration of multiple factors can also improve the ability to predict the future development trend of the grounding grid. By analyzing the historical usage status, it can be better It is necessary to better predict the problems and challenges that the grounding grid may face, take targeted measures for prevention and repair, and conduct field investigation and monitoring of the grounding grid to obtain relevant data on the historical service life, usage time, and soil environment of the grounding grid. By collecting samples of soil and grounding grid and conducting laboratory analysis, information such as the pH value and porosity of the soil can be obtained. The reference service life, usage time, average pH value and porosity of the grounding grid can be obtained by querying the database. The compensation factors for the historical service life of the grounding grid, the compensation factors for the historical total effective usage time of the grounding grid, the compensation factors for the historical average pH value of the soil used by the grounding grid, and the compensation factors for the historical porosity of the soil used by the grounding grid are usually set based on practical experience, standards and specifications and other considerations. The specific values of these compensation factors can be determined based on actual conditions and expert opinions.
[0037] Step S104, obtaining a grounding grid real-time usage status data set, and analyzing and obtaining a grounding grid real-time usage status evaluation value based on the obtained grounding grid real-time usage status data set.
[0038] Specifically, a grounding grid real-time usage status data set is obtained, and based on the obtained grounding grid real-time usage status data set, an evaluation value of the grounding grid real-time usage status is obtained through analysis. The specific analysis process is: obtaining a grounding grid real-time usage status data set, the grounding grid real-time usage status data set specifically includes the grounding grid real-time access voltage, the grounding grid real-time access current, and the grounding grid real-time current leakage; based on the obtained grounding grid real-time usage status data set, an evaluation value of the grounding grid real-time usage status is obtained through analysis, and the grounding grid real-time usage status evaluation value is used as an analysis basis for comparing the grounding grid clothing status evaluation threshold.
[0039] In this embodiment, the above-mentioned grounding grid real-time access voltage refers to the voltage value connected when the grounding grid is currently operating normally, that is, the voltage provided by the electrical equipment or system connected to the grounding grid. This parameter can be used to monitor the electrical working state of the grounding grid to ensure the normal operation of the grounding grid; the above-mentioned grounding grid real-time access current refers to the current value connected when the grounding grid is currently operating normally, that is, the current consumed by the electrical equipment or system connected to the grounding grid. Monitoring the real-time current value of the grounding grid can help evaluate the load condition of the grounding grid and ensure that the grounding grid operates within a safe range; the above-mentioned grounding grid real-time current leakage refers to the current flowing out of the grounding grid in the grounding grid system in real time. Under normal circumstances, the grounding grid should be a closed system and should not have a large amount of current flowing in or out. Therefore, real-time monitoring of the grounding grid leakage can help determine whether there is a fault or abnormality in the grounding grid system.
[0040] It should be explained that the above-mentioned grounding grid real-time status evaluation value can not only be further analyzed by the machine learning integrated model, using random forest or LightGBM to combine the prediction results of multiple basic models to obtain a more accurate grounding grid real-time status evaluation value, but also can be calculated in the following way. The specific analysis process of the grounding grid real-time status evaluation value is as follows:
[0041]
[0042] In the formula, Use condition assessment values for grounding grids in real time, Provide real-time voltage access to the grounding grid. Real-time access to current for the grounding grid, Real-time current discharge for grounding grid The reference access voltage of the grounding grid stored in the database, The reference access current for the grounding grid stored in the database, Define the leakage current for the grounding grids stored in the database, is the compensation factor of the set grounding grid real-time access voltage, is the compensation factor of the set grounding grid real-time access current, It is the compensation factor of the set grounding grid real-time current leakage.
[0043] It needs to be explained that the above-mentioned real-time usage status evaluation value of the grounding grid is calculated through the real-time access voltage of the grounding grid, the real-time access current of the grounding grid, and the real-time current leakage of the grounding grid. Taking into account the real-time access voltage of the grounding grid, the real-time access current of the grounding grid, the real-time current leakage of the grounding grid and other factors, the usage status of the grounding grid can be evaluated in real time, so that possible problems with the grounding grid can be discovered in time, and corresponding measures can be taken to repair or prevent them. Real-time consideration of factors such as the voltage, current and current leakage of the grounding grid can improve the accuracy of the evaluation results. Real-time data can more realistically reflect the operation of the grounding grid and help to more accurately evaluate the actual status of the grounding grid. By real-time monitoring of the voltage, current, current leakage and other data of the grounding grid, the fault situation of the grounding grid can be discovered in time. According to the real-time data analysis, the possible problems with the grounding grid can be quickly determined, and corresponding maintenance measures can be taken. To reduce the impact of faults on system safety and reliability, the method for obtaining the real-time access voltage, real-time access current and real-time current leakage of the grounding grid is usually to collect data in real time through grounding grid monitoring equipment or sensors. These devices are usually connected to the grounding grid, and real-time data is obtained by measuring the voltage, current and leakage current of the grounding grid. The reference access voltage, reference access current and defined current leakage of the grounding grid stored in the database are usually set in advance when installing and debugging the grounding grid monitoring system. These parameters can be viewed and modified through the setting interface or configuration file of the monitoring system. The compensation factors of the real-time access voltage, real-time access current and real-time current leakage of the grounding grid are usually set according to the specific situation and needs of the grounding grid. These compensation factors can be adjusted according to actual measurement data and experience to ensure that the monitoring system can accurately reflect the actual status of the grounding grid.
[0044] Step S106, based on the acquired historical usage status evaluation value of the grounding grid and the real-time usage status evaluation value of the grounding grid, the usage status characteristic value of the grounding grid is analyzed and the grounding grid corrosion status evaluation threshold is obtained by comparison based on the usage status characteristic value of the grounding grid.
[0045] Specifically, based on the acquired historical usage status evaluation values and real-time usage status evaluation values of the grounding grid, the grounding grid usage status characteristic values are analyzed and obtained. The specific analysis process is: acquire the historical usage status evaluation values and real-time usage status evaluation values of the grounding grid, import the acquired historical usage status evaluation values and real-time usage status evaluation values of the grounding grid into the grounding grid corrosion status digital twin model, and conduct comprehensive analysis to obtain the grounding grid usage status characteristic values; the grounding grid usage status characteristic values are used as the analysis basis for comparing the grounding grid corrosion status evaluation thresholds.
[0046] It should be explained that the above grounding grid usage status characteristic values can not only be further analyzed by the machine learning integrated model, using random forest or LightGBM to combine the prediction results of multiple basic models to obtain more accurate grounding grid usage status characteristic values, but also can be calculated in the following way. The digital twin model of the grounding grid corrosion status is:
[0047]
[0048] In the formula, Use state characteristic values for the grounding grid, is the historical usage status evaluation value of the grounding grid, Use condition assessment values for grounding grids in real time, is the compensation factor for the historical usage status evaluation value of the set grounding grid. is the compensation factor of the real-time status evaluation value of the set grounding grid, and e is a natural constant.
[0049] It should be explained that the above-mentioned grounding grid usage status characteristic values are obtained by comprehensive analysis of the grounding grid historical usage status evaluation values and the grounding grid real-time usage status evaluation values imported into the grounding grid corrosion status digital twin model. Combining the historical usage status and real-time usage status evaluation values, we can have a more comprehensive understanding of the overall situation of the grounding grid, including the long-term evolution trend and the current operating status. The digital twin model can simulate and predict based on historical data and real-time data, and further compare to obtain the grounding grid corrosion status evaluation threshold, which helps predict the future corrosion state of the grounding grid and take preventive measures in advance. Through the real-time usage status evaluation value, the operation of the grounding grid can be monitored in time, abnormalities can be found and handled in time, and the corrosion risk can be reduced. Risk, comprehensive analysis of historical and real-time data can be used to formulate more scientific maintenance strategies, carry out targeted maintenance and care based on the actual situation of the grounding grid, and extend the service life of the grounding grid. Through the comprehensive analysis of the digital twin model, we can better understand the safety status of the grounding grid, discover potential problems in time and take measures to improve the safety and reliability of the grounding grid. Combining the results of historical data analysis and real-time data analysis, we can conduct a comprehensive analysis based on experience and models to determine the appropriate compensation factors for the historical usage status evaluation values of the grounding grid and the real-time usage status evaluation values of the grounding grid. According to the actual situation and needs, the compensation factors can be adjusted and optimized to ensure the accuracy and applicability of the evaluation values.
[0050] Furthermore, based on the grounding grid usage status characteristic value, the grounding grid corrosion status assessment threshold is obtained by comparison. The specific analysis process is: obtain the grounding grid usage status characteristic value, compare the grounding grid usage status characteristic value with the grounding grid corrosion status assessment threshold corresponding to each grounding grid usage status characteristic value stored in the database, and obtain the grounding grid corrosion status assessment threshold corresponding to the grounding grid usage status characteristic value.
[0051] It needs to be explained that the above-mentioned comprehensive analysis of the historical usage status assessment value and the real-time usage status assessment value of the grounding grid and the comparison to obtain the grounding grid corrosion status assessment threshold can provide a more comprehensive understanding of the corrosion situation of the grounding grid. By comparing the assessment threshold, the corrosion status of the grounding grid can be determined more accurately, avoiding the subjectivity and limitations of a single assessment value, improving the accuracy of the assessment, and helping managers to formulate more precise maintenance strategies. According to different corrosion status assessment values and thresholds, maintenance and repair work can be carried out in a targeted manner, extending the service life of the grounding grid, and reducing operation and maintenance costs. It helps managers to have a more comprehensive understanding of the status of the grounding grid, take timely measures, and improve management efficiency. Through dynamic monitoring and early warning, the possibility of failures can be effectively reduced, and the reliability and stability of the power system can be improved.
[0052] Step S108, obtaining a grounding grid real-time corrosion status data set, analyzing and obtaining a grounding grid real-time corrosion status assessment value based on the obtained grounding grid real-time corrosion status data set, and evaluating the grounding grid corrosion status in combination with the grounding grid clothing status assessment threshold.
[0053] Specifically, a real-time corrosion status data set of the grounding grid is obtained, and based on the obtained real-time corrosion status data set of the grounding grid, an evaluation value of the real-time corrosion status of the grounding grid is obtained by analysis. The specific analysis process is: obtaining a real-time corrosion status data set of the grounding grid, the real-time corrosion status data set of the grounding grid specifically includes the real-time corrosion rate of the grounding grid, the real-time grounding resistance of the grounding grid, and the real-time corrosion number of conductors of the grounding grid; based on the obtained real-time corrosion status data set of the grounding grid, an evaluation value of the real-time corrosion status of the grounding grid is obtained by analysis, and the real-time corrosion status evaluation value of the grounding grid is used as an analysis basis for evaluating the corrosion status of the grounding grid.
[0054] In this embodiment, the real-time corrosion rate of the grounding grid refers to the corrosion rate of the grounding grid in actual operation, that is, the degree of corrosion on the surface of the metal parts of the grounding grid per unit time. Monitoring the real-time corrosion rate of the grounding grid can help evaluate the corrosion of the grounding grid and take timely measures to prevent or repair it. The real-time grounding resistance of the grounding grid refers to the grounding resistance value of the grounding grid in actual operation, that is, the grounding effect provided by the grounding grid. The corrosion of the grounding grid will increase the grounding resistance. Monitoring the real-time grounding resistance of the grounding grid can help evaluate whether the grounding effect of the grounding grid meets the requirements and ensure the safe operation of the grounding grid. The real-time corrosion number of the conductor of the grounding grid refers to the actual number of corrosion points on the conductor of the grounding grid. The existence of corrosion points will affect the conductivity and safety performance of the grounding grid. Therefore, monitoring the real-time corrosion number of the conductor of the grounding grid can help evaluate the corrosion condition of the grounding grid and perform maintenance and repair in time.
[0055] It should be explained that the above-mentioned grounding grid real-time corrosion status assessment value can not only be obtained by further analysis through the machine learning integrated model, using the K-means clustering model to combine the prediction results of multiple basic models to obtain a more accurate grounding grid real-time corrosion status assessment value, but also can be calculated in the following way. The calculation formula of the grounding grid real-time corrosion status assessment value is:
[0056]
[0057] In the formula, It is the real-time corrosion status assessment value of the grounding grid. is the real-time corrosion rate of the grounding grid, is the real-time grounding resistance of the grounding grid, is the real-time corrosion number of the grounding grid conductor, Reference corrosion rates for grounding grids stored in the database, The reference ground resistance of the ground grid stored in the database, Define the number of corrosions for the grounding grid conductors stored in the database, is the compensation factor of the set grounding grid real-time corrosion rate, is the compensation factor of the real-time grounding resistance of the set grounding grid, It is the compensation factor for the real-time corrosion number of the set grounding grid conductor.
[0058] In a specific embodiment, the real-time corrosion status evaluation value of the grounding grid is calculated by the real-time corrosion rate of the grounding grid, the real-time grounding resistance of the grounding grid, and the real-time number of corroded conductors of the grounding grid. By comprehensively considering factors such as the real-time corrosion rate of the grounding grid, the real-time grounding resistance of the grounding grid, and the real-time number of corroded conductors of the grounding grid, the corrosion status of the grounding grid can be more comprehensively evaluated. Comprehensive consideration of different factors can provide more accurate evaluation results, which is helpful to fully understand the corrosion situation of the grounding grid. There may be mutual influences and correlations between different factors. Comprehensive consideration of these factors can more accurately evaluate the corrosion status of the grounding grid. By comprehensively considering multiple factors, the one-sidedness and shortcomings brought about by single-factor evaluation can be avoided, and the accuracy and reliability of the evaluation can be improved. By comprehensively considering factors such as the real-time corrosion rate of the grounding grid, the grounding resistance and the number of corroded conductors, more comprehensive information can be provided, which is helpful for managers to better understand the corrosion situation of the grounding grid and formulate more effective maintenance plans and measures. Comprehensive consideration of multiple factors can help determine the grounding grid. The priority maintenance objects of the grounding grid are helpful to optimize the maintenance strategy, improve the maintenance efficiency and reduce the maintenance cost. According to the comprehensive evaluation results, the grounding grid can be maintained and repaired in a targeted manner to extend the service life of the grounding grid. The real-time corrosion rate of the grounding grid, the real-time grounding resistance and the real-time number of conductor corrosion can be collected in real time by corrosion rate monitor, grounding resistance tester and corrosion monitoring sensor. The reference corrosion rate of the grounding grid, the reference grounding resistance and the defined number of conductor corrosion stored in the database are obtained based on historical data and experimental results and stored in the database for system use. They can be used as a comparison benchmark to evaluate the difference between real-time data and reference data. The compensation factor of the real-time corrosion rate of the grounding grid, the compensation factor of the real-time grounding resistance and the compensation factor of the real-time number of conductor corrosion are set according to system requirements and actual conditions and can be obtained through system settings or configurations. The compensation factor can be used to adjust the real-time data to take into account the impact of different factors on the corrosion state of the grounding grid and improve the accuracy of the evaluation.
[0059] As can be seen from the above, in an embodiment of the present invention, a historical usage status data set of the grounding grid can be first obtained, and based on the obtained historical usage status data set of the grounding grid, an evaluation value of the historical usage status of the grounding grid can be obtained by analysis; then a real-time usage status data set of the grounding grid can be obtained, and based on the obtained real-time usage status data set of the grounding grid, an evaluation value of the real-time usage status of the grounding grid can be obtained by analysis; then, based on the obtained historical usage status evaluation value of the grounding grid and the real-time usage status evaluation value of the grounding grid, a usage status characteristic value of the grounding grid can be obtained by analysis, and based on the usage status characteristic value of the grounding grid, a grounding grid corrosion status evaluation threshold can be obtained by comparison; and a real-time corrosion status data set of the grounding grid can be obtained, and based on the obtained real-time corrosion status data set of the grounding grid , the real-time corrosion status assessment value of the grounding grid is obtained by analysis, and the corrosion status of the grounding grid is evaluated in combination with the grounding grid clothing status assessment threshold, which realizes the comprehensive analysis of the historical usage status assessment value of the grounding grid and the real-time usage status assessment value of the grounding grid. By comparing the grounding grid corrosion status assessment threshold, we can have a more comprehensive understanding of the corrosion situation of the grounding grid. By comparing the assessment threshold, we can more accurately determine the corrosion status of the grounding grid, thereby achieving the purpose of improving the accuracy of the assessment, which can help managers formulate more accurate maintenance strategies. According to different corrosion status assessment values and thresholds, we can carry out targeted maintenance and repair work, extend the service life of the grounding grid, and reduce the technical effect of operation and maintenance costs.
[0060] Therefore, the technical solution provided by the embodiment of the present invention solves the technical problem of serious errors in the evaluation of the corrosion state of the grounding grid in the related art.
[0061] Figure 2 FIG. 4 is a schematic diagram showing that the real-time corrosion state evaluation value of the grounding grid changes with the real-time corrosion number of the grounding grid conductors according to an embodiment of the present invention. Figure 2 As shown, the x-axis is the real-time corrosion number of the grounding grid conductors, and the y-axis is the real-time corrosion status assessment value of the grounding grid. The greater the real-time corrosion number of the grounding grid conductors, the smaller the real-time corrosion status assessment value of the grounding grid. The example values of the real-time corrosion number of the grounding grid conductors are as follows:
[0062] Table 1: Example values of the number of real-time corrosion of grounding grid conductors in the real-time corrosion status assessment value of the grounding grid
[0063]
[0064] Specifically, the corrosion state of the grounding grid is evaluated in combination with the grounding grid clothing state evaluation threshold. The specific analysis process is: obtain the real-time corrosion state evaluation value of the grounding grid, and compare the real-time corrosion state evaluation value of the grounding grid with the grounding grid clothing state evaluation threshold; if the real-time corrosion state evaluation value of the grounding grid is lower than the grounding grid clothing state evaluation threshold, the grounding grid is marked as a bad corrosion state grounding grid, and a bad corrosion state evaluation prompt is issued to the grounding grid; if the real-time corrosion state evaluation value of the grounding grid is equal to the grounding grid clothing state evaluation threshold, the grounding grid is marked as a poor corrosion state grounding grid, and a poor corrosion state evaluation prompt is issued to the grounding grid; if the real-time corrosion state evaluation value of the grounding grid is higher than the grounding grid clothing state evaluation threshold, the grounding grid is marked as a good corrosion state grounding grid, and a good corrosion state evaluation prompt is issued to the grounding grid.
[0065] It should be explained that by real-time monitoring of the corrosion state of the grounding grid and comparing it with the preset evaluation threshold, it is possible to promptly detect whether the corrosion of the grounding grid exceeds the expected range, which helps to detect potential problems in advance and take corresponding maintenance measures. Marking the grounding grid and issuing evaluation prompts based on the evaluation results helps to classify and prioritize the corrosion state of the grounding grid, thereby improving the efficiency of maintenance work, giving priority to grounding grids in poor and unfavorable conditions, reducing maintenance costs and reducing the risk of failures. By evaluating and prompting the corrosion state of the grounding grid, it can help managers better understand the actual situation of the grounding grid, take timely measures to ensure the safety performance of the grounding grid, reduce the risk of accidents, and improve the stability and reliability of equipment operation.
[0066] In a specific embodiment, by comprehensively considering the different historical usage states, different real-time usage states and different real-time corrosion states of the grounding grid, and then evaluating the corrosion state of the grounding grid, the overall situation of the grounding grid can be more comprehensively understood. This comprehensive consideration can help identify potential corrosion problems and take timely measures to repair and prevent them, thereby improving the comprehensiveness of the evaluation, reducing the interference of subjective factors, and improving the accuracy of the evaluation. By real-time monitoring, evaluation and prediction of the corrosion state of the grounding grid, problems can be discovered and measures can be taken in a timely manner to realize intelligent management of the grounding grid. According to the degree of impact of different states, targeted maintenance and repair work can be carried out to extend the service life of the grounding grid and reduce operation and maintenance costs. The corrosion state of materials affected by factors such as current and current leakage can be considered to reduce the error in evaluating the corrosion state of the grounding grid.
[0067] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0068] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods described in each embodiment of the present application.
[0069] According to an embodiment of the present invention, a grounding grid corrosion state assessment device based on digital twin is further provided for implementing the above-mentioned grounding grid corrosion state assessment method based on digital twin. Figure 3 is a schematic diagram of a grounding grid corrosion status assessment device based on digital twin according to an embodiment of the present invention, such as Figure 3 As shown, the grounding grid corrosion state assessment device based on digital twin includes: a historical use state assessment value acquisition module 301, a real-time use state assessment value acquisition module 303, a corrosion state assessment threshold acquisition module 305 and a grounding grid corrosion state assessment module 307.
[0070] Wherein: the historical usage status evaluation value acquisition module 301 is used to acquire a grounding grid historical usage status data set, and analyze and obtain a grounding grid historical usage status evaluation value based on the acquired grounding grid historical usage status data set.
[0071] The real-time usage status evaluation value acquisition module 303 is used to acquire a grounding grid real-time usage status data set, and analyze and obtain a grounding grid real-time usage status evaluation value based on the acquired grounding grid real-time usage status data set.
[0072] The corrosion state assessment threshold acquisition module 305 is used to analyze and obtain the grounding grid usage state characteristic value based on the acquired grounding grid historical usage state assessment value and the grounding grid real-time usage state assessment value, and compare and obtain the grounding grid corrosion state assessment threshold based on the grounding grid usage state characteristic value.
[0073] The grounding grid corrosion state assessment module 307 is used to obtain a grounding grid real-time corrosion state data set, analyze and obtain a grounding grid real-time corrosion state assessment value based on the acquired grounding grid real-time corrosion state data set, and assess the grounding grid corrosion state in combination with the grounding grid corrosion state assessment threshold.
[0074] It should be noted here that the above-mentioned historical usage status evaluation value acquisition module 301, real-time usage status evaluation value acquisition module 303, corrosion status evaluation threshold acquisition module 305 and grounding grid corrosion status evaluation module 307 correspond to steps S102 to S108 in the above-mentioned embodiments, and the four modules are the same as the instances and application scenarios implemented by the corresponding steps, but are not limited to the contents disclosed in the above-mentioned embodiments.
[0075] As can be seen from the above, in the scheme recorded in the above-mentioned embodiment of the present invention, a historical usage status evaluation value acquisition module can be used to acquire a grounding grid historical usage status data set, and based on the acquired grounding grid historical usage status data set, a grounding grid historical usage status evaluation value can be analyzed to obtain a grounding grid real-time usage status data set; based on the acquired grounding grid real-time usage status data set, a grounding grid real-time usage status evaluation value can be analyzed to obtain a grounding grid usage status characteristic value by using a corrosion status evaluation threshold acquisition module based on the acquired grounding grid historical usage status evaluation value and the grounding grid real-time usage status evaluation value, and based on the grounding grid usage status characteristic value, a grounding grid corrosion status evaluation threshold can be obtained by comparison; and a grounding grid corrosion status evaluation module can be used to acquire a grounding grid real-time usage status data set. The real-time corrosion status dataset of the grounding grid is based on the acquired real-time corrosion status dataset of the grounding grid. The real-time corrosion status assessment value of the grounding grid is analyzed. Combined with the grounding grid clothing status assessment threshold, the corrosion status of the grounding grid is evaluated, and a comprehensive analysis of the historical usage status assessment value of the grounding grid and the real-time usage status assessment value of the grounding grid is achieved. By comparing the grounding grid corrosion status assessment threshold, a more comprehensive understanding of the corrosion situation of the grounding grid can be obtained. By comparing the assessment threshold, the corrosion status of the grounding grid can be determined more accurately, achieving the purpose of improving the accuracy of the assessment, which can help managers formulate more accurate maintenance strategies. According to different corrosion status assessment values and thresholds, targeted maintenance and repair work can be carried out, thereby extending the service life of the grounding grid and reducing the technical effect of operation and maintenance costs.
[0076] Therefore, the technical solution provided by the embodiment of the present invention solves the technical problem of serious errors in the evaluation of the corrosion state of the grounding grid in the related art.
[0077] According to another aspect of an embodiment of the present invention, there is also provided an electronic device for assessing the corrosion status of a grounding grid based on digital twins, comprising a processor and a memory and a network interface connected to the processor, wherein the network interface is connected to a non-volatile memory in a server, and the processor retrieves a computer program from the non-volatile memory through the network interface during operation, and runs the computer program through the memory.
[0078] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A method for evaluating the corrosion status of a grounding grid based on digital twins, characterized in that: The following steps are involved: Acquire a grounding grid historical usage status data set, and analyze and obtain a grounding grid historical usage status evaluation value based on the acquired grounding grid historical usage status data set; Acquire a grounding grid real-time usage status data set, and analyze and obtain a grounding grid real-time usage status evaluation value based on the acquired grounding grid real-time usage status data set; Based on the acquired historical usage status evaluation value of the grounding grid and the real-time usage status evaluation value of the grounding grid, a usage status characteristic value of the grounding grid is analyzed and obtained, and based on the usage status characteristic value of the grounding grid, a corrosion status evaluation threshold of the grounding grid is obtained by comparison; A real-time corrosion status data set of the grounding grid is obtained, and based on the obtained real-time corrosion status data set of the grounding grid, a real-time corrosion status evaluation value of the grounding grid is obtained by analysis, and the corrosion status of the grounding grid is evaluated in combination with the grounding grid corrosion status evaluation threshold.
2. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 1 is characterized in that: The acquiring of the grounding grid historical usage status data set, and analyzing the acquired grounding grid historical usage status data set to obtain the grounding grid historical usage status evaluation value, includes: Acquire the historical usage status data set of the grounding grid, wherein the historical usage status data set of the grounding grid includes: the historical usage years of the grounding grid, the historical effective total usage time of the grounding grid, the historical average pH value of the soil used by the grounding grid, and the historical porosity of the soil used by the grounding grid; Based on the acquired data set of historical usage status of the grounding grid, a comprehensive analysis is performed to obtain an evaluation value of the historical usage status of the grounding grid, wherein the evaluation value of the historical usage status of the grounding grid is used as an analysis basis for comparing and obtaining an evaluation threshold value of the corrosion status of the grounding grid.
3. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 1 is characterized in that: The step of acquiring a grounding grid real-time usage status data set and analyzing and obtaining a grounding grid real-time usage status evaluation value based on the acquired grounding grid real-time usage status data set includes: Acquire the real-time use status data set of the grounding grid, wherein the real-time use status data set of the grounding grid includes: the real-time access voltage of the grounding grid, the real-time access current of the grounding grid, and the real-time current leakage of the grounding grid; Based on the acquired data set of the real-time usage status of the grounding grid, an evaluation value of the real-time usage status of the grounding grid is analyzed and obtained, wherein the evaluation value of the real-time usage status of the grounding grid is used as an analysis basis for comparing and obtaining an evaluation threshold value of the corrosion status of the grounding grid.
4. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 1 is characterized in that: The method of analyzing and obtaining the grounding grid usage status characteristic value based on the acquired grounding grid historical usage status evaluation value and the grounding grid real-time usage status evaluation value includes: Obtain a historical usage status evaluation value of the grounding grid and a real-time usage status evaluation value of the grounding grid, import the acquired historical usage status evaluation value of the grounding grid and the real-time usage status evaluation value of the grounding grid into a digital twin model of the grounding grid corrosion status, so as to use the digital twin model of the grounding grid corrosion status to comprehensively analyze and obtain characteristic values of the grounding grid usage status, wherein the characteristic values of the grounding grid usage status are used as an analysis basis for comparing and obtaining a threshold value for evaluating the corrosion status of the grounding grid.
5. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 4 is characterized in that: Based on the grounding grid usage status characteristic value, the grounding grid corrosion status assessment threshold is obtained by comparison, including: Obtain the grounding grid usage status characteristic value, compare the grounding grid usage status characteristic value with the grounding grid corrosion status assessment threshold corresponding to each grounding grid usage status characteristic value stored in the database, and obtain the grounding grid corrosion status assessment threshold corresponding to the grounding grid usage status characteristic value.
6. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 1 is characterized in that: The method of obtaining a real-time corrosion state data set of the grounding grid and analyzing and obtaining a real-time corrosion state evaluation value of the grounding grid based on the obtained real-time corrosion state data set of the grounding grid includes: Acquire the real-time corrosion status data set of the grounding grid, wherein the real-time corrosion status data set of the grounding grid includes: the real-time corrosion rate of the grounding grid, the real-time grounding resistance of the grounding grid, and the real-time corrosion number of the conductors of the grounding grid; Based on the acquired data set of the real-time corrosion status of the grounding grid, an evaluation value of the real-time corrosion status of the grounding grid is analyzed and obtained, wherein the evaluation value of the real-time corrosion status of the grounding grid serves as an analysis basis for evaluating the corrosion status of the grounding grid.
7. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 6 is characterized in that: The real-time corrosion status assessment value of the grounding grid is obtained by the following formula: , In the formula, is the real-time corrosion status assessment value of the grounding grid, is the real-time corrosion rate of the grounding grid, is the real-time grounding resistance of the grounding grid, is the real-time corrosion number of the grounding grid conductor, Reference corrosion rates for grounding grids stored in the database, The reference ground resistance of the ground grid stored in the database, Define the number of corrosions for the grounding grid conductors stored in the database, is the compensation factor of the set grounding grid real-time corrosion rate, is the compensation factor of the real-time grounding resistance of the set grounding grid, It is the compensation factor for the real-time corrosion number of the set grounding grid conductor.
8. The method for evaluating the corrosion status of a grounding grid based on digital twin according to claim 7 is characterized in that: Combined with the grounding grid corrosion state assessment threshold, the grounding grid corrosion state is assessed, including: Obtaining a real-time corrosion state assessment value of the grounding grid, and comparing the real-time corrosion state assessment value of the grounding grid with a grounding grid corrosion state assessment threshold; If the real-time corrosion state evaluation value of the grounding grid is lower than the grounding grid corrosion state evaluation threshold, the grounding grid is marked as a grounding grid with a bad corrosion state, and a bad corrosion state evaluation prompt is issued to the grounding grid; If the real-time corrosion state evaluation value of the grounding grid is equal to the corrosion state evaluation threshold of the grounding grid, the grounding grid is marked as a grounding grid with poor corrosion state, and a poor corrosion state evaluation prompt is issued to the grounding grid; If the real-time corrosion state assessment value of the grounding grid is higher than the grounding grid corrosion state assessment threshold, the grounding grid is marked as a grounding grid with good corrosion state, and a good corrosion state assessment prompt is issued to the grounding grid.
9. A grounding grid corrosion state assessment device based on digital twin, applied to the grounding grid corrosion state assessment method based on digital twin as described in any one of claims 1 to 8, characterized in that: include: A historical usage status evaluation value acquisition module, a real-time usage status evaluation value acquisition module, a corrosion status evaluation threshold acquisition module and a grounding grid corrosion status evaluation module, wherein: The historical usage status evaluation value acquisition module is used to acquire a grounding grid historical usage status data set, and analyze and obtain a grounding grid historical usage status evaluation value based on the acquired grounding grid historical usage status data set; The real-time usage status evaluation value acquisition module is used to acquire a grounding grid real-time usage status data set, and analyze and obtain a grounding grid real-time usage status evaluation value based on the acquired grounding grid real-time usage status data set; The corrosion state assessment threshold acquisition module is used to analyze and obtain a grounding grid usage state characteristic value based on the acquired historical usage state assessment value of the grounding grid and the real-time usage state assessment value of the grounding grid, and compare and obtain a grounding grid corrosion state assessment threshold based on the grounding grid usage state characteristic value; The grounding grid corrosion state assessment module is used to obtain a real-time corrosion state data set of the grounding grid, analyze and obtain a real-time corrosion state assessment value of the grounding grid based on the acquired real-time corrosion state data set of the grounding grid, and evaluate the corrosion state of the grounding grid in combination with the grounding grid corrosion state assessment threshold.
10. An electronic device for evaluating the corrosion state of a grounding grid based on digital twins, applied to the method for evaluating the corrosion state of a grounding grid based on digital twins as claimed in any one of claims 1 to 8, characterized in that: It includes a processor, a memory and a network interface connected to the processor, wherein the network interface is connected to a non-volatile memory in a server, and when the processor is running, it retrieves a computer program from the non-volatile memory through the network interface and runs the computer program through the memory.