A regional vehicle-grid interaction V2G project value analysis system

Through the regional vehicle network interactive V2G project value analysis system, the value network framework module and boundary constraint module are used to solve the inaccuracy problem of energy service providers' value assessment of V2G project value, quantitative analysis is realized, and the accuracy of analysis is improved. Reliability to ensure the safe and stable operation of the power grid and electric vehicles.

CN118586778BActive Publication Date: 2024-11-26GUANGZHOU INST OF ENERGY CONVERSION CHINESE ACAD OF SCI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411034573.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-26
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

At present, energy service providers and related investors find it difficult to accurately analyze and evaluate the potential value of V2G projects, and V2G projects involve multi-party interactive cooperation, with complex models and lack clear understanding.

Method used

Provide a regional vehicle network interactive V2G project value analysis system, including input module, value network framework module, boundary and constraint module, by inputting key element data of target area V2G project, and using the objective function V's of the value network framework module =V′u+V′g+V′AG=Bu+Bg+BAG for quantitative analysis, set boundaries and constraints such as the actual dispatch of power of the aggregator, grid demand, unit cost, electricity price threshold, vehicle battery safety constraints, etc. Ensure safe and stable operation of the power grid and the safety of charging and discharging of electric vehicles.

Benefits of technology

The V2G project value assessment has been transformed from qualitative judgment to quantitative calculation, which has greatly improved the accuracy and reliability of project value analysis, taking into account economic benefits, system security and reliability, and providing strong technical support for related decisions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118586778B_ABST
    Figure CN118586778B_ABST
Patent Text Reader

Abstract

The present invention discloses a regional vehicle-grid interactive V2G project value analysis system, including an input module, a value network framework module, and a boundary and constraint condition module; the input module is used to input key element data of the V2G project in the target area as input of the value network framework module, and the value network framework module outputs the project value result; the boundary and constraint condition module is used to set boundaries and constraints for the value network framework module, so that the value network framework module can accurately analyze and calculate the value of the V2G project under the premise of ensuring the safe and stable operation of the power grid and the safety of charging and discharging of electric vehicles. The present invention uses the input module to input key element data of the V2G project in the target area as input of the value network framework module to analyze and calculate the value of the V2G project, realizing the transformation of the V2G project from qualitative judgment to quantitative calculation, so that the value of the V2G project can be accurately analyzed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of vehicle network interaction, and in particular to a regional vehicle network interaction V2G project value analysis system. Background Art

[0002] V2G (Vehicle-to-Grid) is a new energy transmission mode in which electric vehicles transmit electricity to the power grid through charging piles and other energy conversion facilities with bidirectional charging and discharging. By controlling the orderly access of electric vehicles to the power grid, they can participate in power auxiliary services as a direct power supply or backup power supply, effectively shaving peaks and filling valleys, smoothing fluctuations, and ensuring the smooth and safe operation of the power grid. At the same time, it can absorb new energy and reduce the fixed investment and power generation costs of the power grid.

[0003] V2G projects involve many participants and involve interactive cooperation among multiple parties, and the model is relatively complex. Currently, energy service providers and related investors often lack a clear understanding of V2G projects and find it difficult to accurately analyze and evaluate the potential value of V2G projects. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies of the above-mentioned prior art and provide a regional vehicle-grid interactive V2G project value analysis system to accurately analyze and calculate the V2G project value under the premise of ensuring the safe and stable operation of the power grid and the safety of electric vehicle charging and discharging.

[0005] To achieve the above object, the technical solution of the present invention is:

[0006] A regional vehicle-to-grid interactive V2G project value analysis system, comprising an input module, a value network framework module, and a boundary and constraint condition module;

[0007] The input module is used to input key element data of the V2G project in the target area as input to the value network framework module, and the value network framework module outputs the project value result;

[0008] The value network framework module includes an electric vehicle submodule, a power grid submodule and an aggregator submodule. The objective function of the value network framework module is:

[0009] V′ s =V′ u +V′ g +V′ AG =B u +B g +B AG

[0010]

[0011] Among them, V' sis the daily value increment of the V2G project, V s is the total value generated by the system during a project cycle, V' u 、V' g and V' AG are the daily value increments of the electric vehicle submodule, the power grid submodule, and the aggregator submodule, respectively. u , B g and B AG are the daily net benefits of EVs, grids, and aggregators, respectively;

[0012] The boundary and constraint condition module is used to set the boundary and constraint conditions for the value network framework module, including:

[0013] 1) The actual amount of electricity dispatched by the aggregator Q AG No greater than the power auxiliary demand of the grid

[0014]

[0015] 2) Power auxiliary demand Not greater than the upper limit of the amount of electricity that can be absorbed by the grid demand side

[0016]

[0017] 3) The unit cost that the V2G project needs to pay when the grid obtains the same amount of power auxiliary demand Should be less than the unit cost of the power grid under traditional power production methods k3 times:

[0018]

[0019] 4) The power grid's external bidding price Pr dis The upper and lower thresholds that exist are as follows:

[0020]

[0021] 5) As a vehicle battery safety constraint, the actual discharge capacity of the electric vehicle Not exceeding available power k2 times; taking into account the economic efficiency of vehicle services, the actual discharge power of electric vehicles Not less than the battery available power Cap a k1 times:

[0022]

[0023] 6) Charging power of electric vehicles c and discharge power r dIt must be within the safety rated range, and the maximum charge and discharge power should be able to ensure that the electric vehicle can complete charging and discharging within m hours:

[0024]

[0025] 7) When the aggregator dispatches V2G vehicles to provide power-assisted services, the service vehicle range is divided, and the distance between the service site and the service site is limited to no more than L max :

[0026] L d ≤L max .

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] The present invention provides a regional vehicle-to-grid (V2G) project value analysis system. The system collects key parameter data of the V2G project in the target area through an input module, takes it as the input of the value network framework module, and then performs quantitative analysis of the economic value of the V2G project. This method realizes the transformation of V2G project evaluation from qualitative judgment to quantitative calculation, thereby greatly improving the accuracy and reliability of project value analysis.

[0029] In addition, by setting boundary conditions and constraint parameters for the value network framework module, this system ensures accurate calculation and analysis of the value of V2G projects while ensuring safe and stable operation of the power grid and safe charging and discharging of electric vehicles. This method not only takes into account economic benefits, but also takes into account system safety and reliability, providing a scientific basis for the comprehensive evaluation of V2G projects.

[0030] Through this systematic and quantitative analysis method, the present invention significantly improves the accuracy and credibility of V2G project value assessment and provides strong technical support for related decision-making. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic diagram of the composition of a regional vehicle-grid interaction V2G project value analysis system provided by an embodiment of the present invention;

[0032] Figure 2 This is a schematic diagram of the composition of the value network framework module. DETAILED DESCRIPTION

[0033] Example:

[0034] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0035] See also Figure 1As shown, the regional vehicle-grid interaction V2G project value analysis system provided in this embodiment mainly includes an input module, a value network framework module, and a boundary and constraint condition module.

[0036] The input module is used to input key element data of the V2G project in the target area as input to the value network framework module, and the value network framework module outputs the project value result;

[0037] The value network framework module includes an electric vehicle submodule, a power grid submodule, and an aggregator submodule. The objective function of the value network framework module is:

[0038] V′ s =V′ u +V′ g +V′ AG =B u +B g +B AG

[0039]

[0040] V' s is the daily value increment of the V2G project, V s is the total value generated by the system during a project cycle, V' u 、V' g and V' AG are the daily value increments of the electric vehicle submodule, the power grid submodule, and the aggregator submodule, respectively. u , B g and B AG are the daily net benefits of EVs, grids, and aggregators, respectively;

[0041] The boundary and constraint condition module is used to set the boundary and constraint conditions for the value network framework module, including:

[0042] 1) The actual amount of electricity dispatched by the aggregator Q AG No greater than the power auxiliary demand of the grid

[0043]

[0044] 2) Power auxiliary demand Not greater than the upper limit of the amount of electricity that can be absorbed by the grid demand side

[0045]

[0046] 3) When the power grid obtains the same amount of auxiliary power demand, the unit cost that the V2G project needs to pay Should be less than the unit cost of the power grid under traditional power production methods k3 times:

[0047]

[0048] 4) The power grid's external bidding price Pr dis The upper and lower thresholds that exist are as follows:

[0049]

[0050] 5) As a vehicle battery safety constraint, the actual discharge capacity of the electric vehicle Not exceeding available power k2 times; taking into account the economic efficiency of vehicle services, the actual discharge power of electric vehicles Not less than the battery available power Cap a k1 times:

[0051]

[0052] 6) Charging power of electric vehicles c and discharge power r d It must be within the safety rated range, and the maximum charging and discharging power should be able to ensure that the electric vehicle owner can complete charging and discharging within m hours:

[0053]

[0054] 7) When the aggregator dispatches V2G vehicles to provide power-assisted services, the service vehicle range is divided, and the distance between the service site and the service site is limited to no more than L max :

[0055] L d ≤L max .

[0056] It can be seen that the regional vehicle-grid interaction V2G project value analysis system provided in this embodiment uses the input module to input the key element data of the V2G project in the target area as the input of the value network framework module to analyze and calculate the value of the V2G project, realizing the transformation of the V2G project from qualitative judgment to quantitative calculation, so as to accurately analyze the value of the V2G project. At the same time, by setting boundaries and constraints for the value network framework module, the value network framework module can accurately analyze and calculate the value of the V2G project under the premise of ensuring the safe and stable operation of the power grid and the safety of electric vehicle charging and discharging.

[0057] In one embodiment, the electric vehicle submodule is used to determine the service potential of electric vehicle owners in a region. (kwh), service potential (kwh) is determined based on the electric vehicle owner's willingness to participate, the electric vehicle's power resources, and the electric vehicle owner's income to calculate the electric vehicle module value.

[0058] The service potential of electric vehicles in the region (kwh) represents the potential of electric vehicles in the region to participate in V2G services. The total amount of electricity that electric vehicles in the region can use for V2G dispatch is:

[0059]

[0060] in, is the average actual discharge power of regional electric vehicles (kwh), is the average amount of electricity available for V2G services by electric vehicles in the region (kWh), (km) is the average travel distance of electric vehicle owners in the target area, The power demand of electric car owners for travel (kwh), is the average battery capacity (kwh), is the mileage energy consumption (kwh / km); (kwh) and (kwh / km) can be approximated as a constant, and may vary slightly in different regions due to different car brand market shares.

[0061] The benefits of electric car owners are: Average service benefits of electric car owners (Yuan) is the difference between the car owner’s income and cost:

[0062]

[0063] Service income of electric car owners R u (Yuan) Mainly for discharge income and service subsidies:

[0064]

[0065] Among them, R u (Yuan) is the average service income of electric car owners, Pr dis (yuan / kwh) is the average electricity price of electric vehicle owners, μ is the dimensionless available power coefficient, Subsidies received by electric car owners (yuan / kwh)

[0066] Cost of electric vehicle owners participating in V2G services C u (RMB) Including charging cost Time Cost Battery loss Driving power consumption and fees paid to aggregators The units are (Yuan), as shown below:

[0067]

[0068] in,

[0069]

[0070] Where: Pr ch (yuan / kwh) is the charging price, ω is the dimensionless time coefficient, μ is the dimensionless discharge coefficient, V d (km / h) is the average driving speed, L d (km) is the dispatching distance, C b (Yuan) is the battery price, T b (times) is the number of battery cycles, r c (kw) is the charging power, η c is the dimensionless charging efficiency, r d (kw) is the discharge power, η d is the dimensionless discharge efficiency, (Yuan / kwh) is the unit price of the discharge fee paid by electric vehicle owners to aggregators.

[0071] In the V2G project value network, the electric vehicle value V' U The calculation method of (yuan) is:

[0072]

[0073] In a specific embodiment, the power grid submodule is used for power auxiliary demand assessment, V2G cost calculation and power grid bidding price simulation to realize power grid value calculation. The power grid introduces electric vehicles as external power through V2G to smooth fluctuations, reduce peak-to-valley differences, and reduce the investment in traditional regulation equipment for power grid operations, thereby saving investment and operating costs. The value-added of the power grid submodule is mainly cost saving and efficiency improvement.

[0074] 1) Electricity auxiliary demand assessment

[0075] Determine the auxiliary power demand based on the growth of the grid's own load, power supply fluctuations and load fluctuations (kwh):

[0076]

[0077] in, (kwh) is the total power auxiliary demand of the power grid, (kwh) is the peak-shaving and valley-filling demand. (kwh) is the power required to smooth load fluctuations. (kwh) is used to smooth out the fluctuation in power generation demand.

[0078] 2) V2G cost calculation

[0079] When the V2G model without electric vehicles participating in power auxiliary services is used, the power grid needs to invest in and operate large-scale generators and energy storage equipment to ensure the stable operation of the power system. At this time, the cost of maintaining stable operation of the power grid is:

[0080]

[0081] in, (Yuan) Total cost of fixed equipment investment and additional power generation to maintain a stable grid, (Yuan / kwh) is the cost required to generate unit electricity using traditional electricity methods.

[0082] When the V2G model in which electric vehicles participate in power auxiliary services is introduced, the power batteries of electric vehicles become an important power source for the power grid. The cost of the power grid mainly includes power auxiliary expenses, additional power generation costs and V2G supporting facilities construction and operation costs, as shown below:

[0083]

[0084] in, (Yuan) is the total cost of the power grid under the V2G mode, (yuan / kwh) is the unit cost that the grid needs to pay after introducing the V2G mode, Q AG (kwh) is the amount of electricity actually dispatched by the aggregator, (Yuan / kwh) corresponds to electricity auxiliary expenses (yuan / kwh), additional power generation cost (yuan / kwh) and V2G supporting facilities construction and maintenance costs (Yuan / kwh).

[0085] 3) Power grid bidding price simulation

[0086] After the introduction of V2G mode, the power auxiliary expenditure of the power grid (yuan / kwh) is mainly the service fee paid to V2G aggregators. The power grid will revise the bidding price Pr after the service period expires based on the V2G service effect. dis (yuan / kwh), the electricity price adjustment process is as follows:

[0087]

[0088] Among them, Pr dis (yuan / kwh) is the bidding price, t s (days) is the bidding service period, Prdis,0 (yuan / kwh) is the benchmark electricity price of the previous round, f delay1 (Q r ,B g ,t) represents the auxiliary power demand of the power grid during the service period (kwh), net profit of power grid B g There is a specific functional relationship between (yuan) and time t (days), which must be determined based on the operation of the power grid in different regions. dis (yuan / kwh) also has upper and lower thresholds, as shown below:

[0089]

[0090] in, (yuan / kwh) is the base electricity price, (yuan / kwh) is the upper limit of the bidding price. Combined with the actual operation of the power grid, the upper limit of the price and the power demand are related to the base number of electric vehicles.

[0091] 4) Calculation of power grid value

[0092] The grid is connected to the grid through V2G vehicle dispatching, and obtains the power and energy support provided by electric vehicles. By reducing peak loads and filling valleys, smoothing fluctuations, etc., the power supply capacity expansion, distribution network expansion costs and unit operation costs are reduced. The cost savings are recorded as Δc g (Yuan / kwh). The value of the power grid submodule is reflected in cost savings and efficiency improvements, and the calculation is as follows:

[0093]

[0094] Among them, Δc g (yuan / kwh) is the cost saving of the power grid, V' g (Yuan) is the added value of the power grid, B g (Yuan) Energy storage cost saved for the power grid.

[0095] In a specific embodiment, the aggregator submodule participates in power regulation in the form of electric vehicle clusters, provides auxiliary services to the power grid, integrates and quantifies demand-side resources to help the power grid manage flexible loads in an orderly manner, smooth out intermittent load fluctuations, and reduce system peak-to-valley differences, including supply-demand difference calculations and aggregator value calculations.

[0096] This supply and demand gap is calculated as:

[0097] The auxiliary power demand of the power grid Q r (kwh) and the actual dispatched electricity quantity Q of the aggregator AGThe difference between (kwh) and (kwh) is recorded as ΔQ (kwh). ΔQ reflects the market capacity (kwh) available for exploration in the region, which is the main driving force for aggregators to expand their operating scale, purchase EVs fleets and enhance service capabilities, thereby improving scheduling and efficiency. The calculation method of ΔQ (kwh) is as follows:

[0098]

[0099] The aggregator value is calculated as:

[0100] The value of the aggregator submodule is the profit obtained by electric vehicle aggregators from participating in the power auxiliary market, and the calculation method is:

[0101] V′ AG =B AG =R AG -C AG

[0102] in,

[0103] C AG =Q AG c AG

[0104]

[0105] Among them, V' AG (Yuan) is the daily value increment of the aggregator, B AG (Yuan) is the profit of the aggregator, R AG (Yuan) is the aggregator income, C AG (Yuan) is the V2G dispatching cost of the aggregator (mainly including daily operations, dispatching software services, electric vehicle purchase and maintenance, etc.), C AG is the unit cost of V2G dispatching by the aggregator (yuan), Q AG is the actual integrated capacity of the aggregator (kwh), is the expected maximum income (yuan), is the power demanded by the grid (kwh), is the maximum capacity of the aggregator, W AG is the bidding willingness of the aggregator, that is, the possibility of participating in the bidding, expressed as a percentage. is the maximum dispatchable power of regional electric vehicles (kwh), is the electric vehicle power managed by the aggregator (kWh), k is the number of electric vehicles managed by the aggregator, is the maximum power of electric vehicles managed by the aggregator (kwh), λ AG The proportion of electric vehicle dischargeable power managed by the aggregator, δ kis the dimensionless dispatch capacity coefficient, which reflects the capacity of the aggregator to dispatch electricity. The capacity coefficient is positively correlated with the scale of the aggregator; δ e It is a dimensionless dispatch efficiency coefficient, which reflects the orderliness and effectiveness of the aggregator’s dispatch of electric vehicles.

[0106] The value added by the aggregator is:

[0107]

[0108] In a specific embodiment, the key element data involved in the V2G project in the target area include capacity element, resource element, competition element and capability element data. Among them, the capacity element includes: (kwh), demand for smoothing load-side power fluctuations (kwh), smoothing the fluctuating demand on the power supply side (kwh), estimate auxiliary power demand (kwh); Resource elements include: survey of the number of local electric vehicles n, vehicle battery capacity (kwh), average travel electricity demand of electric vehicle owners (kwh), the owner's sensitivity to mileage and revenue W u (expressed as a percentage) to obtain the total power resources available for local electric vehicles to provide V2G services (kwh). Competitive factors include: investigating the cost of V2G mode and traditional energy storage, estimating the cost advantage of V2G ΔC g (yuan / kwh); Capability factors include: assessing the service scale that aggregators and operators can achieve based on local V2G site facilities, policy environment, dispatching platform and other conditions (kwh), estimate investment cost.

[0109] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable ordinary technicians in the field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made based on the essence of the content of the present invention should be included in the protection scope of the present invention.

Claims

1. A regional vehicle-to-grid interaction V2G project value analysis system, characterized in that: It includes input module, value network framework module and boundary and constraint condition module; The input module is used to input key element data of the V2G project in the target area as input to the value network framework module, and the value network framework module outputs the value result of the V2G project; The value network framework module includes an electric vehicle submodule, a power grid submodule and an aggregator submodule. The objective function of the value network framework module is: V′ s =V′ u +V′ g +V′ AG =B u +B g +B AG V' s is the daily value increment of the V2G project, V s is the total value generated by the system during a project cycle, V' u 、V' g and V' AG are the daily value increments of the electric vehicle submodule, the power grid submodule, and the aggregator submodule, respectively. u , B g and B AG are the daily net benefits of EVs, grids, and aggregators, respectively; The boundary and constraint condition module is used to set the boundary and constraint conditions for the value network framework module, including: 1) The actual amount of electricity dispatched by the aggregator Q AG Not more than the auxiliary power demand of the power grid 2) Power auxiliary demand Not greater than the upper limit of the amount of electricity that can be absorbed by the grid demand side 3) The unit cost that the V2G project needs to pay when the grid obtains the same amount of power auxiliary demand Should be less than the unit cost of the power grid under traditional power production methods k3 times: 4) The power grid's external bidding price Pr dis The upper and lower thresholds that exist are as follows: 5) As a vehicle battery safety constraint, the average actual discharge power of regional electric vehicles No more than the average amount of electricity used by electric vehicle owners in the region for V2G services k2 times; taking into account the economic efficiency of vehicle services, the average actual discharge power of regional electric vehicles No less than k1 times: 6) Charging power of electric vehicles c and discharge power r d It must be within the safety rated range, and the maximum charge and discharge power should be able to ensure that the electric vehicle can complete charging and discharging within m hours: 7) When the aggregator dispatches V2G vehicles to provide power-assisted services, the service vehicle range is divided, and the distance between the service site and the service site is limited to no more than L max : L d ≤L max ; The electric vehicle submodule is used to determine the service potential of regional electric vehicles Regional electric vehicle service potential The value of the electric vehicle submodule is calculated based on the electric vehicle owner's willingness to participate, the electric vehicle power resources, and the electric vehicle owner's income; The service potential of electric vehicles in the region in, is the average actual discharge power of electric vehicle owners in the region, W is the average amount of electricity used by electric vehicle owners in the region for V2G services; u for the sensitivity of car owners to mileage and revenue; Travel distance Battery capacity and energy consumption per mile The following relations are satisfied: in, is the average travel distance of electric vehicle owners in the target area, To provide electric car owners with the required electricity for travel. is the average battery capacity, is the energy consumption per unit mileage; The benefits to electric vehicle owners include: Average service revenue for electric vehicle owners The difference between the income and cost of electric car owners is: Service income of electric car owners R u Mainly discharge income and service subsidies: Among them, R u is the average service income of electric vehicle owners, Pr dis is the power grid's external bidding price, μ is the dimensionless discharge coefficient, subsidies received for electric vehicles; Cost of electric vehicle owners participating in V2G services C u Including charging costs Time Cost Battery loss Driving power consumption and fees paid to aggregators As shown below: in, Where: Pr ch is the charging price, ω is the dimensionless time coefficient, μ is the dimensionless discharge coefficient, V d is the average driving speed, L d is the dispatching distance, C b is the battery price, T b is the number of battery cycles, r c is the charging power, η c is the dimensionless charging efficiency, r d is the discharge power, η d is the dimensionless discharge efficiency, The unit price of the discharge fee paid by EV owners to aggregators; The calculation method of the electric vehicle value is: The grid submodule is used for power auxiliary demand assessment, V2G project cost calculation and grid bidding price simulation to realize grid value calculation; The power auxiliary demand assessment is: Determine the auxiliary power demand of the power grid based on the growth of the power grid's own load, power supply fluctuations and load fluctuations in, The auxiliary power demand for the power grid, To reduce the peak demand and fill the valley demand, In order to smooth out the load fluctuation demand, To smooth out the fluctuating demand for power generation; The V2G project cost is calculated as: When the V2G mode of electric vehicles participating in power auxiliary services is not introduced, the cost of the power grid to maintain stable operation is: in, Total cost of capital equipment and additional generation to maintain grid stability, The cost of generating a unit of electricity using conventional electricity methods; When the V2G model in which electric vehicles participate in power auxiliary services is introduced, the power batteries of electric vehicles become an important power source for the power grid. The cost of the power grid mainly includes power auxiliary expenses, additional power generation costs and V2G supporting facilities construction and operation costs, as shown below: in, is the total cost of the power grid under the V2G mode, Q is the unit cost that the grid needs to pay after introducing the V2G mode. AG The amount of electricity actually dispatched by the aggregator, mainly including power auxiliary expenses Additional power generation costs and V2G supporting facilities construction and maintenance costs The power grid bidding price simulation is: After the introduction of V2G mode, the power auxiliary expenditure of the power grid Mainly for the service fee paid to the V2G aggregator; the power grid will revise the bidding price Pr after the service period expires according to the V2G service effect. dis , the electricity price adjustment process is as follows: Among them, Pr dis The bidding price for the power grid, t s For the bidding service period, is the benchmark electricity price of the previous round, Indicates the auxiliary power demand of the power grid during the service period Net profit of power grid B g and the functional relationship of existence with time t; The grid value is calculated as: Where Δc g Cost savings for the power grid; The aggregator submodule participates in power regulation in the form of electric vehicle clusters, provides auxiliary services for the power grid, integrates and quantifies demand-side resources to help the power grid manage flexible loads in an orderly manner, smooths intermittent load fluctuations, and reduces system peak-to-valley differences, including supply-demand difference calculation and aggregator value calculation; The supply-demand gap is calculated as: Grid power auxiliary demand The actual dispatched electricity quantity Q AG The difference is recorded as ΔQ, and the calculation method of ΔQ is as follows: The aggregator value is calculated as: V′ AG =B AG =R AG -C AG in, C AG =Q AG c AG Among them, R AG is the aggregator income, C AG is the V2G dispatching cost of the aggregator, c AG is the unit cost of V2G dispatching by the aggregator, Q AG To actually dispatch electricity for aggregators, is the expected maximum income, is the amount of electricity required by the grid, is the maximum amount of electricity that the aggregator can dispatch, W AG is the bidding willingness of the aggregator, expressed as a percentage, is the maximum dispatchable power of regional electric vehicles, is the electric vehicle power managed by the aggregator, k is the number of electric vehicles managed by the aggregator, is the maximum amount of electric vehicles managed by the aggregator, λ la The proportion of dischargeable electricity of electric vehicles managed by aggregators, δ k is the dimensionless dispatch capacity factor, δ e is the dimensionless scheduling efficiency coefficient; The value added by the aggregator is: