A risk area management and control system for construction site

Through the risk area management and control system at the construction site, the visual module and the image analysis and voice prompt module of the data center are used to solve the problems of difficult safety management and high personnel demand at the construction site, achieve efficient safety supervision and risk management, and improve Improve the efficiency of safety supervision and execution at construction sites.

CN118590624BActive Publication Date: 2024-10-11SICHUAN ZHIHAO ENG TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411069823.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-10-11
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

During the construction process, the complexity of the construction site and various stacked objects make safety management difficult, and the manpower requirements for supervisors are high, making it difficult to effectively supervise the safety of the construction site.

Method used

A risk area management and control system for engineering construction sites is designed, including a visual module and a data center. It can screen and mark risk areas by acquiring panoramic images, provide marking options, build a site model, obtain each worker's work picture and location information, and determine The position and distance of the risk area relative to the worker is determined, and risk information is sent to the worker through the voice prompt module to optimize the display priority of the monitoring screen.

Benefits of technology

It effectively reduces the difficulty of safety supervision at the construction site, reduces the number of safety supervision personnel required, greatly improves the efficiency of safety supervision execution, and ensures the accuracy and timeliness of safety management at the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118590624B_ABST
    Figure CN118590624B_ABST
Patent Text Reader

Abstract

This invention relates to the field of construction safety, specifically to a risk area control system for construction sites, comprising a vision module and a data center. The vision module acquires panoramic images of the construction site. The data center identifies risk areas within the construction site. The data center also constructs a site model based on the panoramic images and marks the risk areas within the model. The data center determines the position and orientation of each worker within the site model based on the work screen, and determines the orientation and distance of each risk area relative to the worker based on the relative position of the worker's position and the relative position of each risk area. The orientation and distance of each risk area are then marked on the work screen, forming a monitoring display. This monitoring display is then shown to management personnel. This system reduces the difficulty of comprehensive safety supervision at construction sites, lowers the required number of safety supervisors, and improves the efficiency of safety supervision.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of engineering construction safety, and in particular to a risk area management and control system for an engineering construction site. Background Art

[0002] During the construction process, the construction site is usually complicated, and there are inevitably various stacked objects on site. During the construction process, various safety situations may occur. For on-site safety officers, it is difficult to achieve comprehensive supervision of safety management, and the supervisory staff has high requirements.

[0003] In view of this, this application is hereby filed. Summary of the invention

[0004] The purpose of the present invention is to provide a risk area management and control system for a construction site, which can effectively reduce the difficulty of comprehensive safety supervision of the construction site and at the same time reduce the number of safety supervision personnel required, thereby greatly improving the efficiency of safety supervision execution.

[0005] The embodiment of the present invention is achieved as follows:

[0006] A risk area management and control system for a construction site, comprising: a visual module and a data center.

[0007] The vision module is used to obtain panoramic images of the construction site.

[0008] The data center is used to analyze the panoramic images to screen out the risk areas in the construction site and display the images of the risk areas to the managers. The data center provides the managers with a marking option for them to mark the types of risk areas.

[0009] The data center is also used to build a site model of the construction project based on panoramic images and to mark risk areas in the site model.

[0010] The visual module is also used to obtain the working picture of each worker, the area of ​​the area in the working picture is equal to the preset area, and the worker is kept in the center of the working picture.

[0011] The data center is used to determine the position and orientation of each worker in the on-site model based on the work screen, and determine the direction and distance of each risk area relative to the worker based on the relative position relationship between the position point and each risk area, and mark the direction and distance of each risk area in the work screen to form a monitoring screen. The monitoring screen is displayed to the management personnel.

[0012] Furthermore, the marking options include: safety marking, fixed risk object marking and movable risk object marking.

[0013] The data center is also used to construct a search circle with workers as the center according to a preset search radius. When a risk area enters a worker's search circle, the monitoring screen of the worker will be displayed to the management personnel. The more risk areas with movable risk object marks within the search circle, the higher their display priority.

[0014] Furthermore, the data center is also used to determine the construction movement path of each worker according to the change of the worker's position point, and determine the construction travel speed of each worker according to the change rate of the worker's position point.

[0015] The data center is used to determine whether the workers' search circles will intersect based on the construction movement path and construction speed. If the search circles of two workers intersect, and the directions of the two workers are opposite to the construction direction, when the search circles of the two workers just intersect, the monitoring images of the two workers will be displayed to the management personnel, and a reference line will be constructed.

[0016] The reference line extends along the construction movement path, and reference lines are constructed on both sides of each worker's search circle, and the reference lines are made tangent to the corresponding search circle. The area enclosed by the search circles of the two workers and the reference lines corresponding to the two workers is taken as the key monitoring area.

[0017] If there is a risk area in the key monitoring area, the display priority of the corresponding monitoring images of the two workers will be increased.

[0018] Furthermore, if the number of risk areas marked with movable risk objects in the key monitoring area is greater, the display priority of the corresponding monitoring images of the two workers will be higher.

[0019] Furthermore, the risk area management and control system at the construction site also includes a voice prompt module, and each worker is equipped with a voice prompt module.

[0020] When the risk area enters the search circle of a worker, a voice prompt message is sent to the corresponding worker through the voice prompt module. The voice prompt message includes the direction and distance of the corresponding risk area.

[0021] Furthermore, if the search circles of two workers just intersect, and the directions of the two workers are opposite to the construction direction, a voice prompt message is sent to the two workers through the voice prompt module. The voice prompt message includes the direction and distance of the corresponding risk area, and the direction and distance of the other worker.

[0022] The beneficial effects of the technical solution of the embodiment of the present invention include:

[0023] The engineering construction site risk area management and control system provided by the embodiment of the present invention can display the work screen of each worker through a rectangular window, so that the monitoring screens of all workers can be displayed on the display screen at the same time, so that the safety management personnel can uniformly control the construction safety situation of each worker. For workers with risk areas around them, safety reminders can be given directly according to the direction and distance of the risk area relative to the worker shown in the monitoring screen.

[0024] In general, the engineering construction site risk area management and control system provided by the embodiment of the present invention can effectively reduce the difficulty of comprehensive safety supervision of the construction site, and at the same time reduce the number of safety supervision personnel required, thereby greatly improving the efficiency of safety supervision execution. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0026] Figure 1 A schematic diagram of the worker's monitoring screen;

[0027] Figure 2 A schematic diagram of the construction status of two workers searching for circles that intersect;

[0028] Figure 3 This is a schematic diagram of the two workers' search circles just intersecting. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0030] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0032] It should be understood that the "system", "device", "unit" and / or "module" used in the present invention are a method for distinguishing different components, elements, parts, portions or assemblies at different levels. However, if other words can achieve the same purpose, the words can be replaced by other expressions.

[0033] As shown in this specification and claims, unless the context clearly provides an example, the words "a", "an", "the", etc. do not refer to the singular, but also include the plural. Generally speaking, the terms "include" and "comprise" only indicate the inclusion of the steps and elements that have been clearly identified, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.

[0034] The flowcharts used in this specification are used to illustrate the operations performed by the system according to the embodiments of this specification. It is understood that the operations of each step are not necessarily performed precisely in order. On the contrary, the steps can be processed in reverse order or simultaneously. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0035] This embodiment provides a construction site risk area management and control system, which includes: a visual module and a data center.

[0036] The vision module is used to obtain panoramic images of the construction site.

[0037] The data center is used to analyze the panoramic images to screen out the risk areas in the construction site and display the images of the risk areas to the managers. The data center provides the managers with a marking option for them to mark the types of risk areas.

[0038] The data center is also used to build a site model of the construction project based on panoramic images and to mark risk areas in the site model.

[0039] The visual module is also used to obtain the work screen of each worker. The area of ​​the work screen is equal to the preset area (the preset area can be flexibly adjusted according to actual needs), and the worker is kept in the center of the work screen. In this way, the field of view of each worker's work screen can be controlled according to actual needs to meet the monitoring needs in different construction environments.

[0040] The data center is used to determine the position and orientation of each worker in the on-site model based on the work screen, and determine the direction and distance of each risk area relative to the worker based on the relative position relationship between the position point and each risk area, and mark the direction and distance of each risk area in the work screen to form a monitoring screen. The monitoring screen is displayed to the management personnel.

[0041] The working picture of each worker can be displayed through a rectangular window, so that the monitoring pictures of all workers can be displayed on the display screen at the same time, so that the safety management personnel can uniformly control the construction safety situation of each worker. For workers with risk areas around them, safety reminders can be given directly according to the direction and distance of the risk area relative to the worker shown in the monitoring picture.

[0042] In general, the construction site risk area management and control system provided in this embodiment can effectively reduce the difficulty of comprehensive safety supervision of the construction site, and at the same time reduce the number of safety supervision personnel required, greatly improving the efficiency of safety supervision execution.

[0043] In this embodiment, the marking options include: a safety mark, a fixed risk object mark, and a movable risk object mark.

[0044] "Safety mark" means that the identified risk area is actually a safe area; "Fixed risk object mark" means that the identified risk area is indeed a risk area, and the risk objects in the risk area are of the type that are not easily moved, such as construction equipment parked somewhere (mixers, etc.); "Movable risk object mark" means that the identified risk area is indeed a risk area, and the risk objects in the risk area are of the type that are easily moved, such as material piles (pipe piles, stone piles, etc.).

[0045] like Figure 1 As shown in the figure, in the monitoring screen of worker P1, the direction of the risk area relative to worker P1 is marked by an arrow, and the distance to the corresponding risk area is marked by the distance value marked near the corresponding arrow. According to the different types of risk areas (fixed risk object markers or movable risk object markers), the arrows are distinguished by different colors. In this way, the construction safety of all workers can be monitored intuitively at the same time.

[0046] The data center is also used to construct a search circle with the worker as the center according to a preset search radius (the search radius can be flexibly adjusted according to actual needs), and the search circle is located within the worker's work screen.

[0047] When a risk area enters a worker's search circle, the monitoring screen of the worker will be displayed to the management personnel. The more risk areas with movable risk object marks in the search circle, the higher their display priority.

[0048] This design can help safety managers to monitor workers who may face safety hazards in a timely manner, thereby improving the management accuracy of safety managers.

[0049] Furthermore, the data center is also used to determine the construction movement path of each worker according to the change of the worker's position point, and determine the construction travel speed of each worker according to the change rate of the worker's position point.

[0050] The data center is used to determine whether the workers' search circles will intersect based on the construction movement path and construction speed. If the search circles of two workers intersect, and the directions of the two workers are opposite to the construction direction, when the search circles of the two workers just intersect, the monitoring images of the two workers will be displayed to the management personnel, and a reference line will be constructed.

[0051] like Figure 2 As shown, the orientation of worker P1 is direction K1, the field of view of worker P1 is α1, the construction direction of worker P1 is direction K'1, and the search circle of worker P1 is O1; the orientation of worker P2 is direction K2, the field of view of worker P2 is α2, the construction direction of worker P2 is direction K'2, and the search circle of worker P2 is O2.

[0052] The reference line extends along the construction movement path, and reference lines are constructed on both sides of each worker's search circle, and the reference lines are made tangent to the corresponding search circle. The area enclosed by the search circles of the two workers and the reference lines corresponding to the two workers is taken as the key monitoring area.

[0053] like Figure 3 As shown, when the search circles O1 and O2 of the two workers just intersect, a reference line S1 is constructed for the worker P1. There are two reference lines S1, and the two reference lines S1 are respectively on both sides of the search circle O1. The reference line S1 is parallel to the construction direction of the worker P1, and the reference line S1 is tangent to the search circle O1, and the reference line S1 extends along its construction direction.

[0054] A reference line S2 is constructed for worker P2. There are two reference lines S2. The two reference lines S2 are on both sides of the search circle O2. The reference lines S2 are parallel to the construction direction of worker P2, and the reference lines S2 are tangent to the search circle O2. The reference lines S2 extend along the construction direction.

[0055] The area enclosed by the search circles O1, O2, reference lines S1 and S2 of workers P1 and P2 is taken as the key monitoring area Z. The key monitoring area Z is the area that the search circles of both workers P1 and P2 will pass through.

[0056] If there are risk areas in the key monitoring area Z, the display priority of the corresponding monitoring images of the two workers is increased; the more risk areas there are in the key monitoring area Z, the higher the display priority of the corresponding monitoring images of the two workers.

[0057] In particular, if the number of risk areas marked with movable risk objects in the key monitoring area Z is greater, the display priority of the corresponding monitoring screens of the two workers will be higher. This is because if there is a risk area marked with movable risk objects in the key monitoring area Z (assuming it is a pipe pile), then if a worker accidentally causes the pipes in the pipe pile to slip, the slipped pipes may cause harm to another worker. Therefore, the more risk areas marked with movable risk objects in the key monitoring area Z, the higher the priority of their processing, so as to eliminate risks in a timely manner.

[0058] Through the above methods, safety issues between workers who will have an impact on each other during the construction process can be dealt with in a timely and effective manner, avoiding danger to workers during construction intersections.

[0059] In order to facilitate the timely elimination of safety risks during the management process, the risk area management and control system of the construction site also includes a voice prompt module, and each worker is equipped with a voice prompt module.

[0060] When the risk situation mentioned above occurs, for example, when the risk area enters the search circle of a worker, a voice prompt message is sent to the corresponding worker through the voice prompt module. The voice prompt message includes the direction and distance of the corresponding risk area, or the safety manager can directly send a safety prompt to the worker.

[0061] Furthermore, if the search circles of the two workers just intersect, and the directions of the two workers are opposite to the construction direction, a voice prompt message is sent to the two workers through the voice prompt module. The voice prompt message includes the direction and distance of the corresponding risk area, as well as the direction and distance of the other worker, and at the same time, the risk area with movable risk object marks in the key monitoring area Z is highlighted.

[0062] In summary, the engineering construction site risk area management and control system provided by the embodiment of the present invention can effectively reduce the difficulty of comprehensive safety supervision of the construction site, and at the same time reduce the number of safety supervision personnel required, thereby greatly improving the efficiency of safety supervision execution.

[0063] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A risk area management and control system for a construction site, characterized in that: include: Vision module and data center; The visual module is used to obtain a panoramic image of the construction site; The data center is used to perform image analysis on the panoramic image to screen out risk areas in the construction site, and display images of the risk areas to management personnel; the data center provides management personnel with a marking option for the management personnel to mark the type of the risk area; The data center is further used to construct a site model of the engineering construction according to the panoramic image, and mark the risk area in the site model; The visual module is also used to obtain a working picture of each worker, the area of ​​the region in the working picture is equal to a preset area, and the worker is kept in the center of the working picture; The data center is used to determine the position point and orientation of each worker in the site model according to the working picture, and determine the orientation and distance of each risk area relative to the worker according to the relative position relationship between the position point and each risk area, and mark the orientation and distance of each risk area in the working picture to form a monitoring picture; Displaying the monitoring screen to management personnel; The marking options include: safety marking, fixed risk object marking and movable risk object marking; The data center is further used to construct a search circle with the worker as the center according to a preset search radius. When the risk area enters the search circle of a worker, the monitoring screen of the worker is displayed to the management personnel. The more risk areas with the movable risk object mark in the search circle, the higher the display priority. The data center is further used to determine the construction movement path of each worker according to the change of the position point of the worker, and determine the construction travel speed of each worker according to the change rate of the position point of the worker; The data center is used to determine whether the search circles of the workers will intersect according to the construction movement path and the construction travel speed; if the search circles of the two workers will intersect, and the directions of the two workers are opposite to the construction travel direction, then when the search circles of the two workers just intersect, the monitoring images of the two workers are displayed to the management personnel, and a reference line is constructed; The reference line extends along the construction movement path, and the reference line is constructed on both sides of the search circle of each worker, and the reference line is made tangent to the corresponding search circle; the area enclosed by the search circles of the two workers and the reference lines corresponding to the two workers is used as the key monitoring area; If the risk area exists in the key monitoring area, the display priority of the corresponding monitoring images of the two workers is increased.

2. The construction site risk area management and control system according to claim 1 is characterized in that: If the number of risk areas marked with movable risk objects in the key monitoring area is greater, the display priority of the corresponding monitoring images of the two workers will be higher.

3. The construction site risk area management and control system according to claim 2 is characterized in that: The engineering construction site risk area management and control system also includes a voice prompt module, and each worker is equipped with the voice prompt module; When the risk area enters the search circle of a worker, a voice prompt message is sent to the corresponding worker through the voice prompt module; the voice prompt message includes the direction and distance of the corresponding risk area.

4. The construction site risk area management and control system according to claim 3 is characterized in that: If the search circles of two workers just intersect, and the directions of the two workers are opposite to the construction direction, a voice prompt message is sent to the two workers through the voice prompt module; the voice prompt message includes the direction and distance of the corresponding risk area, and the direction and distance of another worker.

Citation Information

Patent Citations

  • Building construction safety monitoring system

    CN115082864A

  • BIM (Building Information Modeling)-based real-time supervision system and method for safety management of constructional engineering

    CN116862428A

  • Intelligent construction site system for power transformation engineering

    CN117197343A

  • System for providing 360 degree panoramic video based safety education contents generating service

    KR102627538B1

  • Real size topography marking system

    WO2020044138A1