Dynamic evaluation method of equipment in-service status and fault warning software robot

By dividing functional units and integrating data of the equipment, calculating parameters of fault hazards, optimizing maintenance sorting and preventive maintenance strategies, the problem of incomplete equipment status reflection is solved, maintenance efficiency and effect are improved, and the stable operation of the equipment is ensured.

CN118605360BActive Publication Date: 2024-11-22INNOVATION CENTER OF YANGTZE RIVER DELTA ZHEJIANG UNIVERSITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411082778.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-22
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

In the prior art, equipment file data, equipment operation data, point inspection data, maintenance and renovation information have not been effectively integrated, resulting in incomplete and inaccurate reflection of equipment status, and it is difficult to timely evaluate the degree of damage of fault hazards, resulting in maintenance work efficiency. Low.

Method used

Divide the equipment into multiple functional units, calculate the initial and current defect rate of each defect type through historical and current monitoring data, assign severity scores based on the defect consequences, calculate the parameters of fault hazards, prioritize maintenance according to their size, and set prevention Sexual maintenance objects and frequency, using the failure cause knowledge base and severity score table to support maintenance decisions.

Benefits of technology

It realizes timely and accurate assessment of equipment status, improves the efficiency and effectiveness of preventive maintenance, significantly reduces the maintenance workload and operation surface, and improves the continuous and stable operation ability of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118605360B_ABST
    Figure CN118605360B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for dynamically evaluating the in-service status of equipment and a fault warning software robot, which relates to the field of pharmaceutical industry. The key points of the technical solution are to divide the equipment into multiple functional units and determine all defect types. A severity score S of each defect type is given based on the degree of harm or loss caused by the defect consequences of each defect type, and a current defect rate P of each defect type is given based on the current possibility of occurrence of each defect type. The fault potential parameter R obtained by multiplying S and P can timely and accurately reflect the current fault potential size of a single defect type. On this basis, based on the fault potential parameter R of all defect types, maintenance personnel can timely, accurately and comprehensively grasp the working status of the equipment, and carry out preventive maintenance of each functional unit of the equipment in an orderly manner according to the size of the fault potential parameter R, so as to significantly improve the efficiency and effect of preventive maintenance work.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of pharmaceutical industry, and more specifically, to a method for dynamically evaluating the in-service status of equipment and a fault warning software robot. Background Art

[0002] At present, the pharmaceutical industry has entered the era of automation, informatization and digitalization from mechanization. The drug production process is highly dependent on the performance and sustainable operation of production equipment and facilities. However, in actual production, problems such as equipment failure, downtime and performance degradation are common, which not only affect production efficiency, but also bring great risks to drug quality. According to the 300:29:1 rule proposed by Heinrich, when an enterprise has 300 hidden dangers or defects, it will cause about 29 mechanical failures, and among these 29 failures, at least one will cause serious consequences. In order to ensure drug quality and production efficiency, pharmaceutical companies should carry out the operation and maintenance management of production equipment with the goal of "zero failure", establish a comprehensive, accurate and timely mechanism for fault hidden danger discovery, severity ranking and early warning, ensure the continuous and stable operation of equipment through active preventive measures, and minimize the losses and harm caused by failures.

[0003] At present, some pharmaceutical companies have introduced management measures such as initial equipment management, equipment and facility inspection system, equipment preventive maintenance, and individual equipment improvement. However, in practice, equipment archive data, equipment operation data, inspection data, maintenance and renovation information have not been effectively integrated, and cannot fully, accurately, and timely reflect the equipment status, and cannot timely assess the degree of harm of hidden faults. It is difficult to distinguish the priorities of equipment maintenance and management work, resulting in a large workload and a wide range of operations but poor results. Summary of the invention

[0004] In view of the fact that the equipment archive data, equipment operation data, point inspection data, maintenance and renovation information in the prior art have not been effectively integrated, and the equipment status cannot be fully, accurately and timely reflected, and the degree of harm of hidden faults cannot be timely assessed, and the equipment maintenance and management work is difficult to distinguish the primary and secondary priorities, resulting in a large workload, a wide range of operations but poor results, the purpose of the present invention is to provide a method for dynamically evaluating the in-service status of equipment and a fault warning software robot, which includes the following steps:

[0005] S1. Divide the equipment into multiple functional units, determine all defect types of the equipment, and each defect type corresponds to only one functional unit.

[0006] S2. Assign an initial defect rate Pinitial to each defect type, where Pinitial = historical defect count / MTBD1. The historical defect count is the historical occurrence count of this defect type, and the MTBD1 is the historical average defect-free working time of this defect type. The defect count and MTBD1 are obtained based on the historical monitoring data of the same type of equipment that has been put into use. If there is no record of this defect type in the historical monitoring data, the defect count is recorded as 1, and the MTBD1 is obtained based on the performance description or reliability test of the functional unit corresponding to the defect type.

[0007] S3. Since the equipment is put into use, each functional unit shall be monitored regularly or in real time to obtain the current monitoring data.

[0008] If a defect type occurs multiple times in the current monitoring data, the current average defect-free working time MTBD2 of the defect type is obtained based on the current monitoring data. If a defect type occurs once in the current monitoring data, the monitoring time before the occurrence of this defect type in the current monitoring data is used as MTBD2. Calculate the current defect rate P of the defect type, P = current number of defects / MTBD2. The current number of defects is obtained based on the current monitoring data.

[0009] If a defect type has never occurred in the current monitoring data, the working time Tr of the functional unit corresponding to the defect type is obtained according to the current monitoring data, and the current defect rate Pnow of the defect type is calculated, where Pnow=1 / (MTBD1-Tr).

[0010] S4. Assign a severity score S to each defect type based on the defect consequences caused by each defect type. The defect consequences include the degree of product quality degradation, the degree of personal safety hazard, and the degree of equipment work efficiency degradation. The more serious the defect consequence, the greater S.

[0011] S5. Calculate the fault potential parameter R of each defect type, R=S×P. Sort and number all defect types from large to small according to R. The defect type with the higher number has the higher maintenance priority. The P after the component corresponding to the defect type is replaced is expressed as P=1 / (MTBD1-Tr), Tr is calculated from the time the component is replaced.

[0012] S6. Repeat S3-S5.

[0013] The present invention is further configured as follows: selecting the defect types numbered as the first A items in S5 or the defect types numbered as the first B% in S5 as the maintenance objects of the next preventive maintenance operation, and A and B are both given values.

[0014] The present invention is further configured as follows: A is 10, and B is 20.

[0015] The present invention is further configured as follows: selecting at least one performance indicator of the equipment as a main performance indicator, giving an initial value to each main performance indicator, and monitoring all the main performance indicators regularly or in real time; when the difference between the initial value and the current value of any main performance indicator is greater than a given value C, or when any main performance indicator shows a continuous downward trend within a given time range D, performing preventive maintenance operations.

[0016] The present invention is further configured as follows: in step S4, the degree of product quality degradation is divided into multiple intervals from light to heavy, each interval corresponds to a local severity score value S', and the greater the degree of product quality degradation, the greater the S'.

[0017] The degree of personal safety hazard is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S'. The greater the degree of personal safety hazard, the greater the S'.

[0018] The degree of equipment work efficiency decline is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S'. The greater the degree of equipment work efficiency decline, the greater the S'.

[0019] The sum of the degree of product quality decline, personal safety hazard and equipment efficiency decline S' for each defect is equal to the S of the defect.

[0020] The present invention is further configured as follows: the degree of product quality decline has five intervals, and the five intervals are as follows from light to heavy: 1. All products in the same batch are qualified, but there are quality defects. 2. The unqualified rate H of products in the same batch is 0≤H<5%. 3. The unqualified rate H of products in the same batch is 5%≤H<20%. 4. The unqualified rate H of products in the same batch is 20%≤H<50%. 5. The unqualified rate H of products in the same batch is 50%≤H.

[0021] The personal safety hazard level has five intervals, and the five intervals are from light to heavy: 1. The worker is physically unwell and can recover within a given time range E. 2. The worker is injured but does not require medical treatment. 3. The worker is injured but recovers his ability to work after simple medical treatment on the spot. 4. The worker's injury does not reach the standard of industrial accident but must be sent to the hospital for treatment. 5. The worker's injury reaches the standard of industrial accident.

[0022] The degree of decline in the equipment's working efficiency has five intervals, given the equipment's standard working efficiency X and a production plan. The five intervals are, from light to heavy, 1. The equipment's current working efficiency L is 90%X≤L<X, and the equipment meets the production plan requirements. 2. The equipment's current working efficiency L<90%X, and the equipment meets the production plan requirements. 3. The equipment is shut down for maintenance due to a defect, but the shutdown for maintenance does not affect the equipment's completion of the production plan. 4. The equipment is shut down for maintenance due to a defect, resulting in the equipment having to adjust the production plan in order to complete delivery within the delivery period. 5. The equipment is shut down for maintenance due to a defect, resulting in the equipment being unable to complete delivery within the delivery period.

[0023] The present invention is further configured as follows: Tr and the main performance indicators are obtained through a manufacturing management system MES or a data acquisition and monitoring control system SCADA.

[0024] The present invention is further configured to: establish a fault cause knowledge base based on the experience of maintenance operations, wherein the fault cause knowledge base includes defect types and defect causes corresponding to the defect types.

[0025] The present invention is further configured to: establish a defect hazard severity score table based on the experience of maintenance operations, wherein the defect hazard severity score table includes defect types and defect consequences caused by the defect types.

[0026] The present invention also provides a fault warning software robot, which includes a storage medium and a processor, wherein the storage medium stores a computer program. The processor is used to implement the above-mentioned equipment in-service status dynamic evaluation method when executing the computer program.

[0027] In summary, the present invention has the following beneficial effects compared to the prior art: the severity score S in the present invention represents the degree of harm or loss caused by the defect type, and the current defect rate P represents the possibility of the defect type currently occurring. Therefore, the fault potential parameter R obtained by multiplying S and P can timely and accurately reflect the size of the fault potential of the defect type. On this basis, based on the fault potential parameter R of all defect types, maintenance personnel can timely, accurately and comprehensively grasp the working status of the equipment, and carry out preventive maintenance of each functional unit of the equipment in an orderly manner according to the size of the fault potential parameter R, so as to significantly improve the efficiency and effect of preventive maintenance work. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the process of Example 1;

[0029] Figure 2 This is a schematic diagram of the data source and data output of the robot in Example 2;

[0030] Figure 3The device function unit table in Example 2;

[0031] Figure 4 The fault cause knowledge base in Example 2;

[0032] Figure 5 is the severity scoring standard in Example 2;

[0033] Figure 6 Schematic diagram of defect hazard severity score, P initial, R value and R ranking in Example 2. DETAILED DESCRIPTION

[0034] The technical solution of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention, and all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the invention.

[0035] It should be noted that the directions or positional relationships indicated by terms such as “center”, “up”, “down”, “horizontal”, “left”, “right”, “front”, “back”, “lateral” and “longitudinal” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0036] Example 1

[0037] like Figure 1 As shown, this embodiment provides a method for dynamically evaluating the in-service status of equipment, which includes the following steps:

[0038] S1. Divide the equipment into multiple functional units, determine all defect types of the equipment, and each defect type corresponds to only one functional unit.

[0039] In this embodiment, a defect in a functional unit means that the functional unit does not conform to the daily state or predetermined standards, which can be clearly defined or described. The defect may slightly affect the accuracy of the equipment but will not affect the operation of the equipment, or it may cause equipment failure. The failure includes two situations: equipment shutdown and equipment performance degradation. Equipment shutdown refers to the situation where the equipment loses its predetermined function during operation or endangers the safety of equipment and personnel and must be shut down. Equipment performance degradation refers to the situation where the equipment can still maintain an operating state, but the key performance indicators of the equipment such as efficiency, production capacity, accuracy, and product quality are significantly lower or continue to decline compared with the normal level of the equipment.

[0040] S2. Assign an initial defect rate Pinitial to each defect type, where Pinitial = historical defect count / MTBD1. The historical defect count is the historical number of occurrences of this defect type. In this embodiment, Mean time between defects represents the average defect-free working time, which is referred to as MTBD. The MTBD1 is the historical average defect-free working time of this defect type. The defect count and MTBD1 are obtained based on the historical monitoring data of the same type of equipment that has been put into use. If there is no record of this defect type in the historical monitoring data, the defect count is recorded as 1, and the MTBD1 is obtained based on the performance description or reliability test of the functional unit corresponding to the defect type.

[0041] S3. Since the equipment is put into use, each functional unit shall be monitored regularly or in real time to obtain the current monitoring data regardless of whether the equipment is in the power-on state.

[0042] If a defect type occurs multiple times in the current monitoring data, the current average defect-free working time MTBD2 of the defect type is obtained based on the current monitoring data. If a defect type occurs once in the current monitoring data, the monitoring time before the occurrence of this defect type in the current monitoring data is used as MTBD2. Calculate the current defect rate P of the defect type, P = current number of defects / MTBD2. The current number of defects is obtained based on the current monitoring data.

[0043] If a defect type has never occurred in the current monitoring data, the working time Tr of the functional unit corresponding to the defect type is obtained according to the current monitoring data, and the current defect rate Pnow of the defect type is calculated, where Pnow=1 / (MTBD1-Tr).

[0044] S4. Assign a severity score S to each defect type based on the defect consequences caused by each defect type. The defect consequences include the degree of product quality degradation, the degree of personal safety hazard, and the degree of equipment work efficiency degradation. The more serious the defect consequence, the greater S.

[0045] S5. Calculate the fault potential parameter R of each defect type, R=S×P. Sort and number all defect types from large to small according to R. The defect type with the higher number has the higher maintenance priority. The P after the component corresponding to the defect type is replaced is expressed as P=1 / (MTBD1-Tr), Tr is calculated from the time the component is replaced.

[0046] S6. Repeat S3-S5.

[0047] In this embodiment, the severity score value S represents the degree of harm or loss caused by the defect type, and the current defect rate P now represents the possibility of the defect type currently occurring. Therefore, the fault potential parameter R obtained by multiplying S and P now can timely and accurately reflect the size of the fault potential of the defect type. On this basis, based on the fault potential parameter R of all defect types, maintenance personnel can timely, accurately and comprehensively grasp the working status of the equipment, and carry out preventive maintenance of each functional unit of the equipment in an orderly manner according to the size of the fault potential parameter R, so as to significantly improve the efficiency and effect of preventive maintenance work.

[0048] Specifically, this embodiment further proposes to select the defect types numbered in the first A items in S5 or the defect types numbered in the first B% in S5 as the maintenance objects of the next preventive maintenance operation, and A and B are both given values. This selection simplifies the scope of maintenance operations and significantly reduces the workload of maintenance personnel. In this embodiment, A is 10 and B is 20.

[0049] Select at least one performance indicator of the equipment as the main performance indicator, give an initial value to each main performance indicator, and monitor all the main performance indicators regularly or in real time; when the difference between the initial value and the current value of any main performance indicator is greater than a given value C, or when any main performance indicator shows a continuous downward trend within a given time range D, perform preventive maintenance operations to streamline the frequency of preventive maintenance operations and improve the cost-effectiveness of preventive maintenance operations.

[0050] In this embodiment, Tr and the main performance indicators are obtained through the manufacturing management system MES or the data acquisition and monitoring control system SCADA.

[0051] Specifically, the degree of product quality degradation is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S', and the greater the degree of product quality degradation, the larger the S'. The degree of personal safety hazard is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S', and the greater the degree of personal safety hazard, the larger the S'. The degree of equipment work efficiency degradation is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S', and the greater the degree of equipment work efficiency degradation, the larger the S'. The sum of the S' of the product quality degradation, personal safety hazard and equipment work efficiency degradation of each defect is equal to the S of the defect.

[0052] In this embodiment, the intervals of the degree of product quality decline, the degree of personal safety hazard, and the degree of equipment work efficiency decline are divided as follows:

[0053] The degree of product quality decline has five intervals, and the five intervals are from light to heavy: 1. All products in the same batch are qualified, but there are quality defects. 2. The unqualified rate H of products in the same batch is 0≤H<5%. 3. The unqualified rate H of products in the same batch is 5%≤H<20%. 4. The unqualified rate H of products in the same batch is 20%≤H<50%. 5. The unqualified rate H of products in the same batch is 50%≤H. It should be noted that all products that fail to meet the qualified standards include scrapped products and products that fail to meet the qualified standards but do not meet the scrap standards.

[0054] The personal safety hazard level has five intervals, and the five intervals are from light to heavy: 1. The worker is physically unwell and can recover within a given time range E. 2. The worker is injured but does not require medical treatment. 3. The worker is injured but recovers his ability to work after simple medical treatment on the spot. 4. The worker's injury does not reach the standard of industrial accident but must be sent to the hospital for treatment. 5. The worker's injury reaches the standard of industrial accident.

[0055] The degree of decline in the equipment's working efficiency has five intervals, given the equipment's standard working efficiency X and a production plan. The five intervals are from light to heavy: 1. The equipment's current working efficiency L is 90%X≤L<X, and the equipment meets the production plan requirements. 2. The equipment's current working efficiency L<90%X, and the equipment meets the production plan requirements. 3. The equipment is shut down for maintenance due to a defect, but the shutdown for maintenance does not affect the equipment's completion of the production plan. 4. The equipment is shut down for maintenance due to a defect, resulting in the equipment having to adjust the production plan in order to complete delivery within the delivery period. 5. The equipment is shut down for maintenance due to a defect, resulting in the equipment being unable to complete delivery within the delivery period. The production plan includes production volume targets, production schedules, raw material and accessories supply management, manpower arrangements, and quality control.

[0056] Specifically, this embodiment establishes a fault cause knowledge base for maintenance personnel to query based on the experience of maintenance operations. The fault cause knowledge base includes defect types and defect causes corresponding to defect types. The fault cause knowledge base is updated in real time or regularly based on maintenance experience. The defect types recorded in the fault cause knowledge base are all defect types that are more likely to cause faults found in maintenance operations. Therefore, the establishment of the fault cause knowledge base helps maintenance personnel to efficiently troubleshoot hidden faults and reduce the possibility of equipment failures.

[0057] Specifically, this embodiment establishes a defect hazard severity score table for maintenance personnel to query based on the experience of maintenance operations, and the defect hazard severity score table includes defect types and defect consequences caused by defect types. The defect types recorded in the defect hazard severity score table are all defect types that may cause failures found in maintenance operations. Therefore, the establishment of the defect hazard severity score table helps maintenance personnel to quickly determine the severity of the defect hazard, so as to quickly determine the size of the potential failure in combination with the operating time of the functional unit.

[0058] Specifically, this embodiment assigns different positioning numbers to all functional units, and assigns different defect numbers to all defect types that may occur in the corresponding functional units under each positioning number. The defect cause of the corresponding defect type in the fault cause knowledge base and the severity score value S of the corresponding defect type in the defect hazard severity score table are indexed through the defect number.

[0059] Specifically, this embodiment establishes an equipment function unit table based on the performance description of each function unit in the equipment data so that maintenance personnel can quickly determine the accessories required to replace the function unit. In this embodiment, the performance description of the corresponding function unit in the equipment function unit table is indexed by the positioning number.

[0060] In summary, the severity score S in this embodiment represents the degree of harm or loss caused by the defect type, and the current defect rate P represents the possibility of the defect type occurring at present. Therefore, the fault potential parameter R obtained by multiplying S and P can timely and accurately reflect the size of the fault potential of the defect type. On this basis, based on the fault potential parameter R of all defect types, maintenance personnel can timely, accurately and comprehensively grasp the working status of the equipment, and carry out preventive maintenance of each functional unit of the equipment in an orderly manner according to the size of the fault potential parameter R, so as to significantly improve the efficiency and effect of preventive maintenance work.

[0061] Example 2

[0062] This embodiment provides a fault warning software robot, which includes a storage medium and a processor, wherein the storage medium stores a computer program. The processor is used to implement the method for dynamically evaluating the equipment in-service state described in embodiment 1 when executing the computer program.

[0063] The following takes a column hopper mixer as an example. Figure 2 , explaining the application of fault warning software robot:

[0064] like Figure 3As shown, the equipment manager collects equipment information, divides the equipment into functional units, and establishes an equipment functional unit table for the fault warning software robot to read. The equipment information includes the equipment model, material, working condition, performance description and other information provided by the equipment supplier, or the reliability test results of each part of the equipment, equipment acceptance documents, equipment manuals, equipment drawings, etc.

[0065] like Figure 4 As shown, the fault warning software robot reads the equipment point inspection records and maintenance and repair records of the same model equipment that has been put into use, and establishes a knowledge base of fault causes.

[0066] like Figure 5 As shown, facility managers establish severity scoring criteria.

[0067] like Figure 6 As shown in the figure, the equipment manager establishes the defect hazard severity score based on the severity scoring standard for the fault warning software robot to read. The defect hazard severity score is updated and optimized based on production experience. Figure 6 In the table, quality degradation S' is the abbreviation of the degree of degradation of product quality, safety hazard S' is the abbreviation of the degree of hazard to personal safety, efficiency degradation S' is the abbreviation of the degree of degradation of equipment working efficiency. The situation where there is no record of quality degradation S', safety hazard S' and efficiency degradation S' means that the defect type has no such consequences.

[0068] like Figure 6 As shown, the fault warning software robot reads the historical equipment point inspection records and historical maintenance and repair records of the same model equipment that has been put into use as historical monitoring data, obtains the performance description of the functional unit through the equipment data, and gives the initial value of each defect type by combining the historical monitoring data and the performance description.

[0069] like Figure 6 As shown, the fault warning software robot regularly reads equipment point inspection records, maintenance and repair records, and equipment operation data in the manufacturing management system MES or the data acquisition and monitoring control system SCADA, and updates the P present of each defect type.

[0070] like Figure 6 As shown in the figure, the fault potential parameter R of each defect type is calculated according to the updated P and defect hazard severity score, and all defect types are sorted and numbered from large to small according to R. The top 10 defect types or the top 20% defect types are included in the maintenance list of the next preventive maintenance operation.

[0071] The fault warning software robot regularly reads the equipment operation data in the manufacturing management system MES or the data acquisition and monitoring control system SCADA. If the difference between any main performance indicator and the initial value is greater than a given value C, it is considered that the main performance indicator has dropped significantly; if any main performance indicator shows a continuous downward trend within a given time range D, it is considered that the main performance indicator has a continuous downward trend; when any main performance indicator of the equipment drops significantly or shows a continuous downward trend, the fault warning software robot gives a fault alarm, and the equipment management personnel can issue equipment preventive maintenance operation instructions based on this.

[0072] After the preventive maintenance work is completed, the P related to this preventive maintenance work is updated.

[0073] The fault warning software robot updates the fault cause knowledge base according to updated equipment point inspection records and maintenance and repair records.

[0074] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for dynamically evaluating the in-service status of equipment, characterized by: The steps include: S1. Divide the equipment into multiple functional units, determine all defect types of the equipment, and each defect type corresponds to only one functional unit; S2. Assign an initial defect rate Pinitial to each defect type, where Pinitial = historical defect count / MTBD1; the historical defect count is the historical number of occurrences of this defect type, and the MTBD1 is the historical average defect-free working time of this defect type. The defect count and MTBD1 are obtained based on historical monitoring data of the same type of equipment that has been put into use; if there is no record of this defect type in the historical monitoring data, the defect count is recorded as 1, and the MTBD1 is obtained based on the performance description or reliability test of the functional unit corresponding to the defect type; S3. Since the equipment is put into use, each functional unit is monitored regularly or in real time to obtain current monitoring data; If a certain defect type occurs multiple times in the current monitoring data, the current mean defect-free working time MTBD2 of the defect type is obtained based on the current monitoring data; If a defect type occurs once in the current monitoring data, the monitoring time before the defect type occurs in the current monitoring data is used as MTBD2; Calculate the current defect rate P of the defect type, P = current number of defects / MTBD2; The current number of defects is obtained based on the current monitoring data; If a defect type has never occurred in the current monitoring data, the working time Tr of the functional unit corresponding to the defect type is obtained according to the current monitoring data, and the current defect rate P of the defect type is calculated, where P = 1 / (MTBD1-Tr); S4. Assign a severity score value S to each defect type based on the defect consequences caused by each defect type; The defect consequences include the degree of product quality decline, the degree of personal safety hazard, and the degree of equipment efficiency decline. The more serious the defect consequences are, the greater S is; S5. Calculate the fault potential parameter R of each defect type, R=S×P; sort and number all defect types from large to small according to R, and the defect type with a higher number has a higher maintenance priority; the P after the component corresponding to the defect type is replaced is expressed as P=1 / (MTBD1-Tr), Tr is calculated from the time when the component is replaced; S6. Repeat S3-S5.

2. The method for dynamically evaluating the equipment in-service status according to claim 1 is characterized in that: Select the defect types numbered in the top A items in S5 or the defect types numbered in the top B% in S5 as the maintenance objects for the next preventive maintenance operation, where A and B are both given values.

3. The method for dynamically evaluating the equipment in-service status according to claim 2, characterized in that: A is 10 and B is 20.

4. The method for dynamically evaluating the equipment in-service status according to claim 2, characterized in that: Select at least one performance indicator of the equipment as the main performance indicator, give an initial value to each main performance indicator, and monitor all the main performance indicators regularly or in real time; when the difference between the initial value and the current value of any main performance indicator is greater than a given value C, or when any main performance indicator shows a continuous downward trend within a given time range D, perform preventive maintenance operations.

5. The method for dynamically evaluating the equipment in-service status according to claim 4 is characterized in that: Tr and key performance indicators are obtained through the manufacturing management system MES or the data acquisition and monitoring control system SCADA.

6. The method for dynamically evaluating the equipment in-service status according to claim 1, characterized in that: In step S4, The degree of product quality degradation is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S', and the greater the degree of product quality degradation, the greater the S'; The degree of personal safety hazard is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S', and the greater the degree of personal safety hazard, the greater the S'; The degree of equipment work efficiency decline is divided into multiple intervals from light to heavy, and each interval corresponds to a local severity score value S', and the greater the degree of equipment work efficiency decline, the greater the S'; The sum of the degree of product quality decline, personal safety hazard and equipment efficiency decline S' for each defect is equal to the S of the defect.

7. The method for dynamically evaluating the equipment in-service status according to claim 6, characterized in that: The degree of product quality decline has five intervals, and the five intervals are from light to heavy:

1. All products in the same batch are qualified, but there are quality defects; 2. The unqualified rate H of products in the same batch is 0≤H<5%; 3. The unqualified rate H of products in the same batch is 5%≤H<20%; 4. The unqualified rate H of products in the same batch is 20%≤H<50%; 5. The unqualified rate H of products in the same batch is 50%≤H; The personal safety hazard level has five intervals, and the five intervals are from light to heavy:

1. The worker is physically unwell and can recover within a given time range E; 2. The worker is injured but does not need medical treatment; 3. The worker is injured but can recover his ability to work after simple medical treatment on the spot; 4. The worker's injury does not reach the standard of industrial accident but must be sent to the hospital for treatment; 5. The worker's injury reaches the standard of industrial accident; The degree of decline in the equipment's working efficiency has five intervals, given the equipment's standard working efficiency X, given a production plan; the five intervals are from light to heavy:

1. The equipment's current working efficiency L is 90%X≤L<X, and the equipment meets the production plan requirements; 2. The equipment's current working efficiency L<90%X, and the equipment meets the production plan requirements; 3. The equipment is shut down for maintenance due to a defect, but the shutdown for maintenance does not affect the equipment's completion of the production plan; 4. The equipment is shut down for maintenance due to a defect, resulting in the equipment having to adjust the production plan to complete delivery within the delivery period; 5. The equipment is shut down for repairs due to defects, resulting in the equipment being unable to be delivered within the delivery period.

8. The method for dynamically evaluating the equipment in-service status according to any one of claims 1 to 7, characterized in that: Based on the experience of maintenance operations, a fault cause knowledge base is established, and the fault cause knowledge base includes defect types and defect causes corresponding to the defect types.

9. The method for dynamically evaluating the equipment in-service status according to any one of claims 1 to 7, characterized in that: Based on the experience of maintenance operations, a defect hazard severity scoring table is established, which includes defect types and defect consequences caused by the defect types.

10. Fault warning software robot, characterized by: It comprises a storage medium and a processor, wherein the storage medium stores a computer program; the processor is used to implement the method for dynamically evaluating the in-service status of equipment as described in any one of claims 1 to 9 when executing the computer program.