Full-link temperature control method and platform for aquatic product production

By obtaining temperature control requirements, generating standard temperature time series, dynamically monitoring and analyzing deviations, and generating temperature control fitness visual views, full-link visual temperature control is realized, which solves the problem of inflexible temperature control in aquatic product production and improves temperature control. Accuracy and product safety.

CN118625876BActive Publication Date: 2024-10-25DALIAN SHUIYIFANG FOOD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411110620.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-10-25
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

Temperature control during the production process of aquatic products is inflexible and difficult to adapt to the needs of different production stages and characteristics of aquatic products, resulting in large temperature fluctuations and affecting quality and safety.

Method used

By obtaining the temperature control requirements, the standard temperature time series is generated, the actual temperature is dynamically monitored, the deviation is analyzed, and the temperature control fitness visual diagram is generated to achieve full-link visual temperature control.

Benefits of technology

It improves the temperature control accuracy during the production of aquatic products and ensures product quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118625876B_ABST
    Figure CN118625876B_ABST
Patent Text Reader

Abstract

The present invention discloses a full-link temperature control method and platform for aquatic product production, and relates to the technical field of aquatic product production control. The method includes: obtaining a first temperature control requirement; obtaining a first initial temperature, and generating a first standard temperature sequence in combination with the first temperature control requirement; performing dynamic temperature monitoring to obtain a first actual temperature sequence, and comparing it with the first standard temperature sequence to obtain a first sequence deviation; analyzing the first sequence deviation to obtain a first temperature control fitness, and generating a temperature control fitness visualization diagram in combination with the first position information; performing full-link visualized temperature control according to the temperature control fitness visualization diagram. The technical problem that the temperature control is inflexible and difficult to adapt to the requirements of different production stages and aquatic product characteristics in the aquatic product production process, resulting in large temperature fluctuations and affecting the quality and safety of aquatic products is solved, so as to achieve the effect of improving the temperature control accuracy in the aquatic product production process and ensuring the quality and safety of the product by dynamically monitoring and regulating the actual temperature.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field related to aquatic product production control, and specifically to a full-link temperature control method and platform for aquatic product production. Background Art

[0002] With the rapid development of aquaculture and cold chain logistics, temperature control of the entire chain of aquatic products from breeding to consumption has become a core element to ensure product quality and safety. However, in the existing aquatic product production process, temperature control often faces the challenges of being inflexible and difficult to adapt to the different production stages and the characteristics of aquatic products. This directly leads to technical problems such as large temperature fluctuations, damaged aquatic product quality, and increased safety hazards. Specifically, different types of aquatic products have different temperature requirements at different growth stages, and traditional temperature control methods often lack flexibility and cannot be accurately adjusted according to actual needs. In addition, temperature control in processing, storage, and transportation is often difficult to maintain a stable temperature environment due to the lack of real-time monitoring and intelligent control methods, further exacerbating the decline in the quality of aquatic products. Summary of the invention

[0003] This application provides a full-link temperature control method and platform for aquatic product production to solve the technical problems in the production process of aquatic products, such as large temperature fluctuations and impact on the quality and safety of aquatic products due to inflexible temperature control and difficulty in adapting to the needs of different production stages and aquatic product characteristics. The application achieves the effect of improving the temperature control accuracy in the production process of aquatic products and ensuring product quality and safety by dynamically monitoring and regulating the actual temperature.

[0004] The present application provides a full-link temperature control method for aquatic product production, the method comprising: obtaining a first temperature control requirement, the first temperature control requirement refers to the temperature control requirement of a target aquatic product in a first production segment, the first temperature control requirement includes a first temperature threshold requirement and a first modulation time requirement; obtaining a first initial temperature, and generating a first standard temperature time series in combination with the first temperature threshold requirement and the first modulation time requirement, the first initial temperature refers to the temperature before temperature control of a first monitoring point in a first production space of the first production segment; performing dynamic temperature monitoring on the first monitoring point to obtain a first actual temperature time series, and comparing it with the first standard temperature time series to obtain a first time series deviation; analyzing the first time series deviation to obtain a first temperature control fitness, and generating a temperature control fitness visual graph in combination with the first position information of the first monitoring point; performing full-link visual temperature control on the target aquatic product according to the temperature control fitness visual graph.

[0005] The present application also provides a full-link temperature control platform for aquatic product production, including: a demand acquisition module, the demand acquisition module is used to acquire a first temperature control demand, the first temperature control demand refers to the temperature control demand of the target aquatic product in the first production segment, and the first temperature control demand includes a first temperature threshold demand and a first modulation time demand; a temperature timing generation module, the temperature timing generation module is used to acquire a first initial temperature, and generate a first standard temperature timing in combination with the first temperature threshold demand and the first modulation time demand, the first initial temperature refers to the temperature before temperature control of the first monitoring point in the first production space of the first production segment; a temperature timing comparison module, the temperature timing comparison module is used to perform dynamic temperature monitoring on the first monitoring point to obtain a first actual temperature timing, and compare it with the first standard temperature timing to obtain a first timing deviation; a fitness visual graph generation module, the fitness visual graph generation module is used to analyze the first timing deviation to obtain a first temperature control fitness, and generate a temperature control fitness visual graph in combination with the first position information of the first monitoring point; a full-link visual temperature control module, the full-link visual temperature control module is used to perform full-link visual temperature control on the target aquatic product according to the temperature control fitness visual graph.

[0006] The full-link temperature control method and platform for aquatic product production proposed in this application is intended to obtain the first temperature control demand, which refers to the temperature control demand of the target aquatic product in the first production segment, and the first temperature control demand includes the first temperature threshold demand and the first modulation time demand; obtain the first initial temperature, and generate the first standard temperature sequence in combination with the first temperature threshold demand and the first modulation time demand, the first initial temperature refers to the temperature before the temperature control of the first monitoring point in the first production space of the first production segment; perform dynamic temperature monitoring on the first monitoring point to obtain the first actual temperature sequence, and compare it with the first standard temperature sequence to obtain the first sequence deviation; analyze the first sequence deviation to obtain the first temperature control fitness, and generate a temperature control fitness visual graph in combination with the first position information of the first monitoring point; perform full-link visual temperature control on the target aquatic product according to the temperature control fitness visual graph. It solves the technical problem that the temperature control is inflexible and difficult to adapt to the requirements of different production stages and aquatic product characteristics in the production process of aquatic products, resulting in large temperature fluctuations and affecting the quality and safety of aquatic products, and achieves the effect of improving the temperature control accuracy in the production process of aquatic products and ensuring product quality and safety by dynamically monitoring and regulating the actual temperature. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] In order to more clearly illustrate the technical solution of the embodiment of the present disclosure, the accompanying drawings of the embodiment of the present disclosure are briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the platform according to the embodiment of the present application. It should be understood that the previous or following operations are not necessarily performed precisely in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0008] Figure 1 A schematic diagram of a full-link temperature control method for aquatic product production provided in an embodiment of the present application;

[0009] Figure 2 A schematic diagram of the structure of a full-link temperature control platform for aquatic product production provided in an embodiment of the present application.

[0010] Explanation of the accompanying drawings: demand acquisition module 1, temperature time series generation module 2, temperature time series comparison module 3, fitness visual graph generation module 4, full-link visual temperature control module 5. DETAILED DESCRIPTION

[0011] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.

[0012] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0013] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations are intended to cover non-exclusive inclusions, for example, a process, method, platform, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.

[0014] The present application embodiment provides a full-link temperature control method for aquatic product production, such as Figure 1 As shown, the method includes:

[0015] A first temperature control requirement is obtained, where the first temperature control requirement refers to the temperature control requirement of the target aquatic product in the first production segment, and the first temperature control requirement includes a first temperature threshold requirement and a first modulation time requirement.

[0016] In one embodiment, the system terminal obtains the first temperature control demand for aquatic product production. This first temperature control demand refers to the temperature control demand of the target aquatic product in the first production segment, including the first temperature threshold demand and the first modulation time demand. The first temperature threshold demand is the temperature threshold setting performed by the system terminal for the temperature control demand of the target aquatic product in the first production segment (such as breeding, preliminary processing, etc.). This demand stems from the analysis of the uniformity of the temperature control space, because uneven temperature distribution will bring many problems. First, if there is a significant difference in temperature in the refrigerated or frozen space, some aquatic products may be exposed to an environment higher than the ideal threshold, accelerating bacterial growth, causing food deterioration, and seriously threatening product quality and consumer health. Secondly, during the freezing process, uneven temperature may also cause local over-freezing of aquatic products, causing frostbite or cracking, damaging the appearance and taste of the product, and reducing the market value. In addition, the excessive refrigeration measures taken to compensate for this unevenness will directly lead to unnecessary waste of energy and increase production costs. Finally, the uneven temperature distribution also increases the difficulty of temperature monitoring and adjustment, requiring more intensive monitoring points and more complex control systems, thereby increasing management costs. The first modulation time requirement refers to the rationality of the modulation time that needs to be paid attention to during temperature control in the first production segment, which is derived from the analysis of the uniformity of the temperature control process. In different stages of processing, storage or transportation, if the temperature control cannot maintain sufficient uniformity, it will lead to quality differences in the product at different time periods or locations, such as loss of taste, color or nutrients. This quality inconsistency not only affects the consumer experience, but may also increase food safety risks due to failure to fully kill harmful microorganisms. Uneven product quality will damage the brand image, trigger returns, claims and even product recalls, and bring economic losses to the company. At the same time, temperature control practices that do not comply with food safety regulations and standards may also expose companies to compliance issues.

[0017] A first initial temperature is obtained, and a first standard temperature sequence is generated in combination with the first temperature threshold requirement and the first modulation duration requirement. The first initial temperature refers to the temperature before temperature control at the first monitoring point in the first production space of the first production segment.

[0018] In one embodiment, in the first production segment in which the target aquatic product is to be temperature controlled, the system terminal first measures and records the temperature of the first monitoring point (first monitoring point) in the first production space (first production space) of the first production segment, which is the first initial temperature. This initial temperature reflects the temperature condition in the first production space before the temperature control starts. Subsequently, the system terminal determines the specific requirements for temperature in the production process based on the first temperature threshold requirement, including the target temperature range and specific temperature value to be reached and maintained. Based on the first modulation time requirement, the time requirement required to reach the target temperature threshold and maintain the target temperature from the initial temperature is understood. Afterwards, according to the determined target temperature range and specific temperature value, combined with the temperature change requirements of the first initial temperature and the first modulation time requirement, a reasonable temperature modulation path is planned. This path clarifies the temperature value at each time point and the rate of temperature change, aiming to ensure that the aquatic product can reach the required temperature conditions within the specified time in a manner that best suits its quality and safety. Then, the system terminal plans a reasonable temperature maintenance path in the same way based on the target temperature and the temperature maintenance requirements of the first modulation time requirement. This temperature maintenance path clarifies the temperature range that needs to be maintained. Finally, the system terminal generates the first standard temperature sequence by summarizing the two paths. By determining the first standard temperature sequence, it can be ensured that in the first production segment, the aquatic products are not only properly temperature controlled, but also the entire control process is efficient, orderly and predictable, thereby maximizing the quality and safety of the aquatic products.

[0019] Dynamic temperature monitoring is performed on the first monitoring point to obtain a first actual temperature time sequence, and the first actual temperature time sequence is compared with the first standard temperature time sequence to obtain a first time sequence deviation.

[0020] In one embodiment, during the temperature control process, in order to ensure that the temperature in the production environment changes according to a predetermined plan, the system terminal performs continuous and dynamic temperature monitoring of the first monitoring point. This process records the temperature data in real time to form a time series of actual temperature changes over time, which is used as the first actual temperature time series. Subsequently, the first actual temperature time series is compared with the set first standard temperature time series. By comparing the difference between the two in the modulation temperature and the maintenance temperature, the difference between the first actual temperature time series and the first standard temperature time series is obtained, that is, the first time series deviation. The first time series deviation not only reveals the accuracy and stability of temperature control in the actual production environment, but also helps the system terminal to promptly discover possible problems, such as equipment failure, ambient temperature fluctuations, etc., thereby ensuring the quality and safety of aquatic products.

[0021] Further, the present application provides obtaining a first timing deviation, including:

[0022] The first standard temperature timing includes a first standard modulation temperature timing and a first standard maintenance temperature timing; the first actual modulation temperature timing in the first actual temperature timing is compared with the first standard modulation temperature timing to obtain a first comparison deviation; the first actual maintenance temperature timing in the first actual temperature timing is compared with the first standard maintenance temperature timing to obtain a second comparison deviation; the first comparison deviation and the second comparison deviation constitute the first timing deviation.

[0023] Preferably, in the temperature control process, it is very important to accurately evaluate the accuracy and stability of temperature changes. The system terminal first obtains a pre-generated first standard temperature sequence, which includes a first standard modulation temperature sequence and a first standard maintenance temperature sequence. The first standard modulation temperature sequence is determined based on the temperature modulation path, and the first standard maintenance temperature sequence is determined based on the temperature maintenance path. Subsequently, the system terminal compares the first actual modulation temperature sequence in the first actual temperature sequence with the first standard modulation temperature sequence. Specifically, the system terminal first selects one or more time windows in the modulation stage for calculating the slope. These time windows are determined based on historical experience and expert advice, and can capture the details of temperature changes and avoid being seriously affected by noise. Subsequently, for the first actual modulation temperature sequence, in each selected time window, linear regression is used to fit the actual modulation temperature data to obtain the slope of the actual modulation temperature change in the time window. Similarly, for the first standard modulation temperature sequence, the standard modulation temperature slope is also calculated in the same time window. Afterwards, the slope difference between the first actual modulation temperature sequence and the first standard modulation temperature sequence in each time window is calculated. This difference is expressed as the difference between the actual slope and the standard slope. The slope differences of all time windows are then counted, i.e., the first timing deviation. If the first actual temperature maintenance timing in the first actual temperature timing is within the first temperature threshold requirement, the system terminal uses the same method to compare the first actual temperature maintenance timing in the first actual temperature timing with the first standard temperature maintenance timing to obtain a second comparison deviation. After obtaining the first comparison deviation and the second comparison deviation, the system terminal integrates the first comparison deviation and the second comparison deviation to form the first timing deviation.

[0024] Further, the present application provides that before obtaining the second contrast deviation, the method includes:

[0025] Randomly extract the first actual maintained temperature at the first time in the first actual maintained temperature sequence; when the first actual maintained temperature is not within the first temperature threshold requirement, issue a control warning instruction, and perform control maintenance on the first monitoring point based on the control warning instruction.

[0026] Optionally, before calculating the second comparison deviation, the system terminal needs to ensure that the first actual maintenance temperature sequence meets the first temperature threshold requirement. First, the system terminal randomly extracts the actual maintenance temperature value at a time point from the first actual maintenance temperature sequence, and this time point is recorded as the first time, and the actual maintenance temperature value corresponding to this time point is recorded as the first actual maintenance temperature. Subsequently, the extracted first actual maintenance temperature is compared with the first temperature threshold requirement. If the first actual maintenance temperature is not within the first temperature threshold requirement, that is, the temperature value is too high or too low, the system terminal will immediately issue a control warning instruction. The purpose of this instruction is to instruct the system terminal to control and maintain the first monitoring point. This includes but is not limited to checking the accuracy of the temperature sensor, adjusting the parameters of the temperature control device, and performing maintenance on the equipment to ensure that the temperature can be restored to the normal threshold range, so that subsequent temperature control fitness analysis can be performed.

[0027] The first timing deviation is analyzed to obtain a first temperature control fitness, and a temperature control fitness visual graph is generated in combination with the first position information of the first monitoring point.

[0028] In one embodiment, the system terminal analyzes the first timing deviation, that is, the first temperature control fitness is obtained by summing the squares of the first timing deviation, averaging and then taking the inverse. This step is intended to quantify the fluctuation and deviation degree in the temperature control process. Subsequently, the system terminal combines the first position information of the first monitoring point to convert the temperature control fitness into an intuitive visual chart, that is, a temperature control fitness visual chart. This visual chart not only shows the numerical value of the temperature control fitness, but also reflects the temperature control status of different positions in the entire temperature control area through the fusion of position information. The temperature control fitness visual chart intuitively shows the distribution of temperature control fitness at each point in the temperature control area through the depth of color, thereby helping to identify hot spots and cold spots in temperature control, that is, areas with high or low temperatures. Through the temperature control fitness visual chart, the changes in temperature control fitness at different horizontal and vertical positions can be clearly understood, which helps to discover temperature gradients or uneven phenomena to ensure that the temperature control in the entire space is balanced and stable. In the production process of aquatic products, temperature control is closely linked to multiple links. The temperature control adaptability visualization chart not only focuses on the temperature control status of a single monitoring point, but also integrates data from multiple monitoring points to show the uniformity and consistency of temperature control in the entire production chain. This is of great significance for improving product quality, ensuring production efficiency and safety.

[0029] Further, the present application provides a method for obtaining the temperature control adaptability visual graph, including:

[0030] An initial visible graph is constructed according to a first mapping relationship between the first position information and the first temperature control fitness; a first point to be inserted in the initial visible graph is randomly obtained; and a first search neighborhood of the first point to be inserted is obtained based on a predetermined neighborhood scheme, wherein the first search neighborhood includes position information of multiple identifiers having temperature control fitness.

[0031] Preferably, the system terminal constructs an initial visualization chart based on the mapping relationship between the first position information and the first temperature control fitness, combined with the position information and temperature control fitness of other monitoring points. This chart intuitively shows the temperature control fitness at different positions, so that the effect of temperature control becomes visible in spatial distribution. Subsequently, a point is randomly selected in the constructed initial visual graph, which is called the first point to be inserted. This step is to prepare for possible subsequent data interpolation, and to improve the accuracy of the visual graph by adding additional data points. For the selected first point to be inserted, the system terminal obtains a predetermined neighborhood scheme, which determines how to determine other points in its neighborhood around a given point to be inserted, including a neighborhood distance predetermined based on the actual layout of the temperature monitoring points and the spatial distribution characteristics of the temperature control fitness. The system terminal calculates the distance from the first point to be inserted to the neighboring point according to the Euclidean distance, and selects the neighboring points that are less than or equal to the neighborhood distance. After that, the area formed by the selected neighboring points is used as the first search neighborhood. These neighboring points all exist in the initial visual graph and have the location information of the temperature control fitness mark. The purpose of this step is to use the information of these known points to estimate or infer the temperature control fitness of the points to be inserted.

[0032] Obtain the first neighborhood position information from the position information of the multiple identifiers with temperature control adaptability, and perform spatial calculation and analysis with the first to-be-inserted position information of the first to-be-inserted point to obtain a first distance; use the first distance as a weighting coefficient, and perform weighted calculation with the first neighborhood temperature control adaptability corresponding to the first neighborhood position information to obtain a first weighted temperature control adaptability.

[0033] Preferably, the system terminal randomly selects a piece of position information adjacent to the first point to be plugged in from a plurality of position information with temperature control fitness identifiers in the first search neighborhood as the first neighborhood position information. Subsequently, spatial calculation and analysis are performed on the first position information to be plugged in and the first neighborhood position information, that is, the first distance between the first position information to be plugged in and the first neighborhood position information is calculated by Euclidean distance. Afterwards, the system terminal uses the calculated first distance as a weighting coefficient, performs weighted calculation on the first neighborhood temperature control fitness corresponding to the first neighborhood position information, and obtains the first weighted temperature control fitness. Then, the above steps of obtaining the first neighborhood position information, spatial calculation and analysis, etc. are repeated to obtain a plurality of first weighted temperature control fitnesses for estimating the temperature control fitness of the first point to be plugged in.

[0034] The mean value of the first weighted temperature control fitness is used as the first interpolated temperature control fitness of the first to-be-inserted point; and the second mapping relationship between the first to-be-inserted position information and the first interpolated temperature control fitness is added to the initial visible graph to obtain the temperature control fitness visual graph.

[0035] Preferably, after obtaining multiple first weighted temperature control fitness corresponding to multiple first neighborhood position information, the system terminal calculates the mean of these first weighted temperature control fitness, and estimates the temperature control fitness of the first point to be inserted, that is, the first interpolated temperature control fitness. Subsequently, a second mapping relationship is established between the first position information to be inserted and the calculated first interpolated temperature control fitness. This second mapping relationship represents the estimated value of the temperature control fitness at this position point. Afterwards, the system terminal adds this second mapping relationship to the initial visible graph. By adding the second mapping relationship, the initial visible graph can contain more information about the distribution of temperature control fitness, thereby obtaining an accurate temperature control fitness visual graph, which shows the distribution of temperature control fitness in space in an intuitive way, providing support for subsequent decision-making.

[0036] The target aquatic product is subjected to full-link visual temperature control according to the temperature control adaptability visual graph.

[0037] In one embodiment, after generating a temperature control fitness visual graph, the system terminal compares the temperature control fitness of each position in the temperature control fitness visual graph according to the fitness limit, and filters out the position information that does not reach the fitness limit. Subsequently, the system terminal traverses the distributed temperature control devices for the filtered position information to obtain a list of temperature control ports, and then performs full-link visual temperature control on the target aquatic product based on this list of temperature control ports to improve the temperature control fitness of the filtered position information until the fitness limit requirement is met.

[0038] Furthermore, the present application provides a method for obtaining a visual marking result of temperature control fitness, including:

[0039] Read the fitness limit; when the first temperature control fitness does not reach the fitness limit, issue a first marking instruction; based on the first marking instruction, mark the first position information as abnormal in the temperature control fitness visual graph to obtain a temperature control fitness visual graph marking result.

[0040] Preferably, the system terminal first reads a preset fitness limit. This fitness limit is determined based on historical experience and expert advice, and is used to determine whether the temperature control fitness of a certain position meets the standard. Subsequently, the system terminal compares the first temperature control fitness of the first position information with the read fitness limit. If the comparison result shows that the first temperature control fitness does not reach the fitness limit, it means that the temperature control effect of the position does not meet the standard, and the system terminal issues a first marking instruction. This first marking instruction will instruct the system terminal to mark the first position information as abnormal in the temperature control fitness visual graph, that is, to highlight the first position information so that it can be intuitively identified which positions have temperature control problems. After the above steps, the system terminal obtains a marking result of the temperature control fitness visual graph that has been abnormally marked. This marking result not only shows the temperature control situation of each position, but also particularly highlights those positions that need improvement, providing strong support for subsequent decision-making.

[0041] Further, the present application provides temperature control, including:

[0042] According to the temperature control fitness visual graph marking result, any abnormal mark is obtained, and the arbitrary abnormal mark corresponds to any temperature control fitness, and the arbitrary abnormal mark has arbitrary position information; according to the arbitrary position information, the distributed temperature control devices are traversed to obtain a first temperature control port list, and the first temperature control port list includes multiple temperature control ports with temperature control influence identifiers.

[0043] Optionally, the system terminal obtains any point marked as abnormal based on the generated temperature control fitness visual graph marking results. This abnormal mark represents the location where the temperature control effect is not good, and each abnormal mark corresponds to a specific temperature control fitness and location information. Subsequently, the system terminal traverses the distributed temperature control devices according to the obtained location information. Distributed temperature control devices refer to temperature control devices that are installed in multiple locations and can work independently, such as air coolers, heaters, etc. During the traversal process, the system terminal calculates the temperature control distance between each temperature control port and the location information, and uses this to quantify the temperature control influence, and then matches the calculated temperature control influence with the corresponding temperature control port to obtain a first temperature control port list. This first temperature control port list contains multiple temperature control ports with temperature control influence identifiers.

[0044] The threshold ratio limit is read, and the multiple temperature control ports with temperature control influence identifiers are screened based on the threshold ratio limit to obtain a target temperature control port set; and the target temperature control port set is temperature controlled to improve the arbitrary temperature control adaptability.

[0045] Optionally, the system terminal reads a threshold ratio limit, which is also determined based on historical experience and expert advice, and is used to screen out temperature control ports that have sufficient influence on the location corresponding to any abnormal mark. This is because in the actual temperature control network, not all temperature control ports can have a significant impact on the temperature of the location corresponding to the abnormal mark. Some temperature control ports may have a small temperature control effect at the monitoring point due to the long distance. Subsequently, based on this threshold ratio limit, the system terminal screens the previous multiple temperature control ports with temperature control influence identification, and finds out the temperature control ports whose influence on the temperature control of the monitoring point reaches or exceeds the threshold ratio limit. These temperature control ports are considered to be key points that can effectively improve the temperature control effect of the monitoring point. After the screening is completed, the system terminal will obtain a target temperature control port set, which contains all temperature control ports that meet the conditions and can have a significant impact on the temperature of the monitoring point. Afterwards, in order to improve the temperature control adaptability of the monitoring point, that is, to improve its temperature control effect, the system terminal performs temperature control operations on each temperature control port in the target temperature control port set. These operations include adjusting the output temperature of the temperature control port, changing the working mode, optimizing the operating parameters, etc. The purpose is to indirectly or directly improve the temperature conditions of the monitoring points by adjusting the temperature control effects of these key temperature control ports, thereby achieving the purpose of improving the temperature control adaptability.

[0046] Furthermore, the present application provides a list of the first temperature control ports, including:

[0047] Extract the first temperature control port in the first temperature control port list; obtain the first temperature control position information of the first temperature control port, and calculate it with the arbitrary position information to obtain a first temperature control distance; normalize the first temperature control distance to obtain a first temperature control influence; and establish the first temperature control port list according to a first corresponding relationship between the first temperature control port and the first temperature control influence.

[0048] Optionally, the system terminal first randomly extracts a temperature control port from the first temperature control port list as the first temperature control port. Subsequently, the first temperature control position information of the first temperature control port is obtained. This position information is crucial for the subsequent calculation of the distance between the temperature control port and any position. After that, the first temperature control position information is spatially calculated with the position corresponding to any determined abnormal mark using the Euclidean distance to obtain the distance between the two, that is, the first temperature control distance. This distance reflects the distance between the temperature control port and the position where the temperature control effect needs to be improved. Repeat this process until the first temperature control distances with all temperature control ports in the first temperature control port list are calculated. Then, the system terminal extracts the maximum first temperature control distance and the minimum first temperature control distance from all the first temperature control distances, and uses the difference between each first temperature control distance and the minimum first temperature control distance to perform a ratio calculation with the difference between the maximum first temperature control distance and the minimum first temperature control distance to complete the normalization of each first temperature control distance. The normalized first temperature control distance is then used as the first temperature control influence, which represents the degree of influence of the temperature control port on the temperature control of any position. Finally, the system terminal reconstructs the first temperature control port list according to the correspondence between the first temperature control port and its normalized temperature control influence. The reconstructed first temperature control port list not only includes the information of the temperature control ports, but also includes the quantitative evaluation of their influence on the temperature control of the specific position.

[0049] In the above, refer to Figure 1 The full-link temperature control method for aquatic product production according to an embodiment of the present invention is described in detail. Figure 2 A full-link temperature control platform for aquatic product production according to an embodiment of the present invention is described.

[0050] The full-link temperature control platform for aquatic product production according to the embodiment of the present invention is used to solve the technical problem that the temperature control is inflexible and difficult to adapt to the requirements of different production stages and aquatic product characteristics during the production of aquatic products, resulting in large temperature fluctuations and affecting the quality and safety of aquatic products. It achieves the effect of improving the temperature control accuracy in the production of aquatic products and ensuring product quality and safety by dynamically monitoring and regulating the actual temperature. The full-link temperature control platform for aquatic product production includes: a demand acquisition module 1, a temperature time series generation module 2, a temperature time series comparison module 3, a fitness visual graph generation module 4, and a full-link visual temperature control module 5.

[0051] Demand acquisition module 1: The demand acquisition module 1 is used to acquire a first temperature control demand, which refers to the temperature control demand of the target aquatic product in the first production segment, and the first temperature control demand includes a first temperature threshold demand and a first modulation time demand; temperature timing generation module 2: The temperature timing generation module 2 is used to acquire a first initial temperature, and generate a first standard temperature timing in combination with the first temperature threshold demand and the first modulation time demand, and the first initial temperature refers to the temperature before the temperature control of the first monitoring point in the first production space of the first production segment; temperature timing comparison module 3: The temperature timing comparison module 3 is used to perform dynamic temperature monitoring on the first monitoring point to obtain a first actual temperature timing, and compare it with the first standard temperature timing to obtain a first timing deviation; fitness visual graph generation module 4: The fitness visual graph generation module 4 is used to analyze the first timing deviation to obtain a first temperature control fitness, and generate a temperature control fitness visual graph in combination with the first position information of the first monitoring point; full-link visual temperature control module 5: The full-link visual temperature control module 5 is used to perform full-link visual temperature control on the target aquatic product according to the temperature control fitness visual graph.

[0052] The specific configuration of the temperature timing comparison module 3 will be described in detail below. The temperature timing comparison module 3 may further include: the first standard temperature timing includes a first standard modulation temperature timing and a first standard maintenance temperature timing; the first actual modulation temperature timing in the first actual temperature timing is compared with the first standard modulation temperature timing to obtain a first comparison deviation; the first actual maintenance temperature timing in the first actual temperature timing is compared with the first standard maintenance temperature timing to obtain a second comparison deviation; the first comparison deviation and the second comparison deviation constitute the first timing deviation.

[0053] The specific configuration of the temperature time series comparison module 3 will be described in detail below. The temperature time series comparison module 3 further includes: randomly extracting the first actual maintenance temperature at the first time in the first actual maintenance temperature time series; when the first actual maintenance temperature is not within the first temperature threshold requirement, issuing a control warning instruction, and performing control maintenance inspection on the first monitoring point based on the control warning instruction.

[0054] The specific configuration of the fitness visual graph generation module 4 will be described in detail below. The fitness visual graph generation module 4 may further include: constructing an initial visual graph according to a first mapping relationship between the first position information and the first temperature control fitness; randomly obtaining a first point to be inserted in the initial visual graph; obtaining a first search neighborhood of the first point to be inserted based on a predetermined neighborhood scheme, the first search neighborhood including location information of multiple identifiers with temperature control fitness; obtaining the first neighborhood location information in the location information of the multiple identifiers with temperature control fitness, and performing spatial calculation analysis with the first location information to be inserted of the first point to be inserted to obtain a first distance; using the first distance as a weighting coefficient, and performing weighted calculation with the first neighborhood temperature control fitness corresponding to the first neighborhood location information to obtain a first weighted temperature control fitness; using the mean of the first weighted temperature control fitness as the first interpolated temperature control fitness of the first point to be inserted; adding the second mapping relationship between the first location information to be inserted and the first interpolated temperature control fitness to the initial visual graph to obtain the temperature control fitness visual graph.

[0055] The specific configuration of the full-link visual temperature control module 5 will be described in detail below. The full-link visual temperature control module 5 may further include: reading the fitness limit; when the first temperature control fitness does not reach the fitness limit, issuing a first marking instruction; based on the first marking instruction, marking the first position information abnormally in the temperature control fitness visual graph, and obtaining the temperature control fitness visual graph marking result.

[0056] The specific configuration of the full-link visual temperature control module 5 will be described in detail below. The full-link visual temperature control module 5 may further include: obtaining any abnormal mark according to the visual marking result of the temperature control fitness, the arbitrary abnormal mark corresponds to any temperature control fitness, and the arbitrary abnormal mark has any position information; traversing the distributed temperature control devices according to the arbitrary position information to obtain a first temperature control port list, the first temperature control port list includes multiple temperature control ports with temperature control influence identification; reading the threshold ratio limit, and filtering the multiple temperature control ports with temperature control influence identification based on the threshold ratio limit to obtain a target temperature control port set; performing temperature control on the target temperature control port set to improve the arbitrary temperature control fitness.

[0057] The specific configuration of the full-link visual temperature control module 5 will be described in detail below. The full-link visual temperature control module 5 further includes: extracting the first temperature control port in the first temperature control port list; obtaining the first temperature control position information of the first temperature control port, and calculating with the arbitrary position information to obtain the first temperature control distance; normalizing the first temperature control distance to obtain the first temperature control influence; and forming the first temperature control port list according to the first corresponding relationship between the first temperature control port and the first temperature control influence.

[0058] The full-link temperature control platform for aquatic product production provided by an embodiment of the present invention can execute the full-link temperature control method for aquatic product production provided by any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.

[0059] Although the present application makes various references to certain modules in the platform according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be implemented; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0060] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. A full-link temperature control method for aquatic product production, characterized in that: include: Acquire a first temperature control requirement, where the first temperature control requirement refers to the temperature control requirement of the target aquatic product in the first production segment, and the first temperature control requirement includes a first temperature threshold requirement and a first modulation time requirement; Acquire a first initial temperature, and generate a first standard temperature sequence in combination with the first temperature threshold requirement and the first modulation duration requirement, wherein the first initial temperature refers to the temperature of a first monitoring point in a first production space of the first production segment before temperature control; Performing dynamic temperature monitoring on the first monitoring point to obtain a first actual temperature time sequence, and comparing the first actual temperature time sequence with the first standard temperature time sequence to obtain a first time sequence deviation; Analyze the first timing deviation to obtain a first temperature control fitness, and generate a temperature control fitness visual graph in combination with the first position information of the first monitoring point; Performing full-link visualized temperature control on the target aquatic product according to the temperature control adaptability visualized graph; Also includes: The first standard temperature sequence includes a first standard modulation temperature sequence and a first standard maintenance temperature sequence; Comparing a first actual modulation temperature sequence in the first actual temperature sequence with the first standard modulation temperature sequence to obtain a first comparison deviation, wherein the first actual temperature sequence includes a first actual modulation temperature sequence and a first actual maintenance temperature sequence; Comparing a first actual temperature maintenance time sequence in the first actual temperature time sequence with the first standard temperature maintenance time sequence to obtain a second comparison deviation; The first contrast deviation and the second contrast deviation constitute the first timing deviation; Constructing an initial visible graph according to a first mapping relationship between the first position information and the first temperature control adaptability; Randomly obtain a first to-be-inserted point in the initial visible graph; Acquire a first search neighborhood of the first to-be-inserted point based on a predetermined neighborhood scheme, wherein the first search neighborhood includes location information of a plurality of identifiers having temperature control adaptability; Acquire first neighborhood position information from the position information of the plurality of identifiers having temperature control adaptability, and perform spatial calculation and analysis with the first to-be-inserted position information of the first to-be-inserted point to obtain a first distance; The first distance is used as a weighting coefficient, and a first neighborhood temperature control fitness corresponding to the first neighborhood position information is weightedly calculated to obtain a first weighted temperature control fitness; Using the average of the first weighted temperature control fitness as the first interpolation temperature control fitness of the first to-be-interpolated point; A second mapping relationship between the first to-be-interpolated position information and the first interpolated temperature control fitness is added to the initial visible graph to obtain the temperature control fitness visual graph.

2. The full-link temperature control method for aquatic product production according to claim 1 is characterized in that: Before obtaining the second contrast deviation, the method further includes: Randomly extracting a first actual maintained temperature at a first time in the first actual maintained temperature time series; When the first actual maintained temperature is not within the first temperature threshold requirement, a control warning instruction is issued, and a control maintenance inspection is performed on the first monitoring point based on the control warning instruction.

3. The full-link temperature control method for aquatic product production according to claim 1 is characterized in that: Also includes: Read the fitness limit; When the first temperature control adaptability does not reach the adaptability limit, issuing a first marking instruction; Based on the first marking instruction, the first position information is marked abnormally in the temperature control fitness visual graph to obtain a temperature control fitness visual graph marking result.

4. The full-link temperature control method for aquatic product production according to claim 3 is characterized in that: include: Obtaining any abnormal mark according to the temperature control fitness visual graph marking result, wherein the any abnormal mark corresponds to any temperature control fitness, and the any abnormal mark has any position information; Traversing the distributed temperature control devices according to the arbitrary location information to obtain a first temperature control port list, wherein the first temperature control port list includes a plurality of temperature control ports having temperature control influence identifiers; Reading a threshold ratio limit value, and screening the plurality of temperature control ports having temperature control influence identifiers based on the threshold ratio limit value to obtain a target temperature control port set; The target temperature control port set is temperature controlled to improve the arbitrary temperature control adaptability.

5. The full-link temperature control method for aquatic product production according to claim 4 is characterized in that: include: Extract the first temperature control port in the first temperature control port list; Acquire first temperature control position information of the first temperature control port, and calculate with the arbitrary position information to obtain a first temperature control distance; Normalizing the first temperature control distance to obtain a first temperature control influence; The first temperature control port list is established according to a first correspondence between the first temperature control port and the first temperature control influence.

6. A full-link temperature control platform for aquatic product production, characterized by: The platform is used to implement the full-link temperature control method for aquatic product production according to any one of claims 1 to 5, and the platform includes: Demand acquisition module: acquires a first temperature control demand, where the first temperature control demand refers to the temperature control demand of the target aquatic product in the first production segment, and the first temperature control demand includes a first temperature threshold demand and a first modulation time demand; Temperature timing generation module: obtains a first initial temperature, and generates a first standard temperature timing in combination with the first temperature threshold requirement and the first modulation duration requirement, wherein the first initial temperature refers to the temperature before temperature control at the first monitoring point in the first production space of the first production segment; Temperature timing comparison module: dynamically monitors the temperature of the first monitoring point to obtain a first actual temperature timing, and compares it with the first standard temperature timing to obtain a first timing deviation; A fitness visual graph generating module: analyzing the first timing deviation to obtain a first temperature control fitness, and generating a temperature control fitness visual graph in combination with the first position information of the first monitoring point; Full-link visualized temperature control module: performs full-link visualized temperature control on the target aquatic product according to the temperature control adaptability visualized graph.