A mechanical device scheduling system and scheduling method thereof
By obtaining environmental and demand data in the mechanical device scheduling system, matching the most suitable mechanical device and evaluating the scheduling status, the problems of idle mechanical device and energy waste caused by unreasonable scheduling are solved, and production efficiency and device utilization are improved.
Patent Information
- Application Number
- CN202411083824.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-08
AI Technical Summary
In pavement engineering construction, traditional mechanical device scheduling methods lead to unreasonable scheduling, resulting in idle or overuse of mechanical devices, affecting production processes, increasing energy consumption and accident risks, and it is difficult to quickly adjust production plans according to actual conditions and reduce production efficiency.
A mechanical device scheduling system is designed, including the most suitable mechanical device acquisition module, the to-do task requirement solution acquisition module, the mechanical device scheduling process status evaluation module and the backup mechanical device one-click convening module. By obtaining environmental and demand data, match The best adapts to mechanical devices, evaluates the scheduling status, and calls up backup devices with one click to ensure the smooth completion of the task.
It improves the utilization rate and efficiency of mechanical devices, avoids waste of resources, extends the service life of mechanical devices, reduces maintenance costs, promptly discovers and solves mechanical device problems, and ensures task completion efficiency.
Smart Images

Figure CN118627850B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mechanical device scheduling, and in particular to a mechanical device scheduling system and a scheduling method thereof. Background Art
[0002] In the process of pavement construction, many mechanical devices are needed, such as tower cranes, concrete mixers, excavators, rollers, pile drivers, road finishing machines, ballast cleaning machines, arc welding machines, etc. In the traditional scheduling method of mechanical devices, there are problems such as unreasonable scheduling and untimely information transmission, which leads to idle or overuse of mechanical devices, thus affecting the overall production process. Idle mechanical devices will cause waste of resources. It may also cause delays in task allocation on the production line, and the production plan cannot be adjusted quickly according to the actual production situation, thereby reducing production efficiency. Unreasonable scheduling causes mechanical devices to frequently switch on and off or run in non-optimal conditions for a long time, which will increase energy consumption. Unreasonable scheduling may cause mechanical devices to run at inappropriate times or without proper maintenance, increasing the risk of accidents.
[0003] In order to meet the demand, it is necessary to establish an efficient mechanical device scheduling system to improve the utilization and efficiency of mechanical devices. Summary of the invention
[0004] In view of the deficiencies of the prior art, the present invention provides a mechanical device scheduling system and a scheduling method thereof, so as to establish an efficient mechanical device scheduling system and improve the utilization and efficiency of the mechanical devices.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0006] A mechanical device scheduling system includes a most suitable mechanical device acquisition module, a pending task demand solution acquisition module, a mechanical device scheduling process status evaluation module and a spare mechanical device one-key call module, wherein:
[0007] The most suitable mechanical device acquisition module is used to acquire the environmental data set of the pending task, and compare the most suitable mechanical device type for the pending task based on the acquired environmental data set of the pending task. The comparison process is as follows:
[0008] Obtaining an environmental data set of the pending tasks, the environmental data set specifically includes the ambient temperature of the pending tasks, the ambient humidity of the pending tasks, and the height of the pending tasks from the ground;
[0009] Based on the acquired environmental data set of the pending tasks, the environmental characteristic values are obtained through comprehensive analysis, and the environmental characteristic values are used as the analysis basis for comparing and obtaining the most suitable mechanical device type for the pending tasks;
[0010] The specific analysis process of the environmental characteristic value is as follows:
[0011] ;
[0012] In the formula, is the environmental characteristic value, is the ambient temperature of the task to be done. is the humidity of the environment where the task is located. is the height of the location of the to-do task from the ground, The reference temperature of the environment where the pending tasks stored in the database are located. The reference humidity of the environment where the to-do tasks stored in the database are located. The reference height of the location of the to-do tasks stored in the database from the ground. is the compensation factor for the ambient temperature of the task to be done. is the compensation factor for the humidity of the environment where the to-do task is located. The compensation factor for the height of the location of the set to-do task from the ground;
[0013] Compare the environmental characteristic value with the mechanical device types corresponding to each environmental characteristic value interval stored in the database to obtain the mechanical device type corresponding to the environmental characteristic value, and mark the mechanical device type as the most suitable mechanical device type for the to-be-done task;
[0014] The pending task demand solution acquisition module is used to acquire a demand dataset of pending tasks, and based on the acquired demand dataset of pending tasks, compare and obtain the most suitable mechanical device type for the pending tasks to complete the demand solution of the pending tasks;
[0015] The mechanical device scheduling process state evaluation module is used to obtain the most suitable mechanical device state data set when performing the most suitable mechanical device scheduling process under the demand plan of completing the to-be-done task by comparing the most suitable mechanical device type to the to-be-done task, and analyze and obtain the mechanical device scheduling process state evaluation value based on the obtained most suitable mechanical device state data set;
[0016] The one-key call module for backup mechanical devices is used to evaluate the mechanical device scheduling process based on the mechanical device scheduling process status evaluation value, and to recall unqualified most suitable mechanical devices with one key, and at the same time to summon the backup mechanical devices corresponding to each recalled most suitable mechanical device with one key to complete the pending tasks.
[0017] As a further solution, the demand data set specifically includes the total power consumption of the mechanical devices required for the pending tasks, the total number of pending tasks, the allowed completion time of the pending tasks, and the manpower demand for the pending tasks.
[0018] As a further solution, based on the acquired demand data set of pending tasks, the demand plan for completing the pending tasks with the most suitable type of mechanical device is compared. The specific analysis process is: based on the acquired demand data set of pending tasks, a comprehensive analysis is performed to obtain a demand characteristic value, and the demand characteristic value is used as an analysis basis for comparing and obtaining the demand plan for completing the pending tasks with the most suitable type of mechanical device; the demand characteristic value is compared with the demand plan for completing the pending tasks with the most suitable type of mechanical device corresponding to each pending task demand characteristic interval stored in the database, and the demand plan for completing the pending tasks with the most suitable type of mechanical device corresponding to the pending task with the demand characteristic value is obtained.
[0019] As a further solution, the characteristic value of demand, the specific analysis process is:
[0020] ;
[0021] In the formula, is the characteristic value of demand, is the total power consumption of the mechanical devices required for the tasks to be performed, is the total number of pending tasks, Allow time for to-do tasks to complete. The manpower demand for pending tasks, Define the power consumption of the mechanical devices required for the pending tasks stored in the database, Define the number of to-do tasks stored in the database, Define completion time for to-do tasks stored in the database, Define the manpower requirements for the pending tasks stored in the database, is the compensation factor for the total mechanical device power consumption required for the set to-be-done tasks, is the compensation factor for the total number of tasks to be done. The compensation factor for the completion time allowed for the set to-do tasks, is the compensation factor for the manpower demand of the set tasks to be done, and e is a natural constant.
[0022] As a further solution, the most suitable mechanical device status data set specifically includes the average operating speed of the mechanical device during the mechanical device scheduling process, the mechanical device temperature during the mechanical device scheduling process, and the load weight during the mechanical device scheduling process.
[0023] As a further solution, based on the acquired most suitable mechanical device state data set, a comprehensive analysis is performed to obtain the mechanical device scheduling process state evaluation value. The specific analysis process is: based on the acquired most suitable mechanical device state data set, a comprehensive analysis is performed to obtain the mechanical device scheduling process state evaluation value. The mechanical device scheduling process state evaluation value is used as the analysis basis for evaluating the mechanical device scheduling process.
[0024] As a further solution, based on the evaluation value of the mechanical device scheduling process state, the mechanical device scheduling process is evaluated, and the unqualified most suitable mechanical device is recalled with one click, and at the same time, the backup mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks. The specific analysis process is: based on the evaluation value of the mechanical device scheduling process state, the mechanical device scheduling process is evaluated; the mechanical device scheduling process state evaluation value is compared with the mechanical device scheduling process state reference evaluation value stored in the database; if the mechanical device scheduling process state evaluation value is higher than the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is excellent; if the mechanical device scheduling process state evaluation value is equal to the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is qualified; if the mechanical device scheduling process state evaluation value is lower than the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is unqualified, the unqualified most suitable mechanical device is recalled with one click, and at the same time, the backup mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks.
[0025] Based on the same inventive concept, the present invention provides a mechanical device scheduling method, comprising the following steps: obtaining an environmental data set of pending tasks, and obtaining the most suitable mechanical device type for the pending tasks based on the obtained environmental data set of the pending tasks; obtaining a demand data set of the pending tasks, and obtaining the most suitable mechanical device type for the pending tasks based on the obtained demand data set of the pending tasks to complete the demand plan for the pending tasks; when performing the most suitable mechanical device scheduling process under the demand plan for completing the pending tasks by comparing the most suitable mechanical device type for the pending tasks, obtaining the most suitable mechanical device state data set, and analyzing the obtained most suitable mechanical device state data set to obtain a mechanical device scheduling process state evaluation value; based on the mechanical device scheduling process state evaluation value, evaluating the mechanical device scheduling process, and recalling unqualified most suitable mechanical devices with one click, and at the same time summoning the standby mechanical devices corresponding to each recalled most suitable mechanical device with one click to complete the pending tasks.
[0026] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:
[0027] (1) The present invention obtains the environmental data set of the pending tasks, compares the most suitable mechanical device type for the pending tasks, and accurately matches the task requirements with the mechanical device capabilities. This can ensure that the most suitable mechanical device is used to perform specific tasks, thereby maximizing the efficiency and output of the mechanical device. The most suitable mechanical devices usually process tasks faster because they have the optimal configuration and performance required to process specific tasks. The correct use of mechanical devices can prevent excessive wear and potential damage, thereby extending the service life of the mechanical devices. Reasonable use of mechanical devices reduces unnecessary maintenance and emergency repairs, helping enterprises save maintenance costs.
[0028] (2) The present invention obtains a data set of demand for pending tasks, compares the most suitable type of mechanical device for the pending tasks, and selects the most suitable type of mechanical device to complete the demand plan for the pending tasks, which can avoid unnecessary waste of resources and thus reduce costs. By selecting the most suitable type of mechanical device to complete the demand plan for the pending tasks based on the data set of demand for the pending tasks, the user experience when completing the task can be improved, unnecessary troubles and obstacles can be reduced, and existing resources can be better utilized to improve resource utilization efficiency.
[0029] (3) The present invention evaluates the mechanical device scheduling process through the state evaluation value of the mechanical device scheduling process, and recalls the unqualified most suitable mechanical devices with one click, and at the same time summons the spare mechanical devices corresponding to each recalled most suitable mechanical device to complete the pending tasks with one click. The unqualified most suitable mechanical devices are discovered and recalled in time, and the spare mechanical devices are summoned to complete the tasks. This can maximize the utilization rate of the mechanical devices and avoid waste of resources caused by idle mechanical devices. The spare mechanical devices are used to replace unqualified mechanical devices to complete the tasks, which can ensure the smooth progress of the tasks and avoid task delays and failures due to mechanical device problems, thereby improving the efficiency of task completion, simplifying the scheduling management process, reducing human intervention and misoperation, and improving scheduling efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.
[0031] Figure 1 It is a schematic diagram of system module connection of the present invention.
[0032] Figure 2 The figure is a schematic flow chart of the method steps of the present invention. DETAILED DESCRIPTION
[0033] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0034] Reference Figure 1 As shown, the present invention provides a mechanical device scheduling system, including a most suitable mechanical device acquisition module, a pending task demand solution acquisition module, a mechanical device scheduling process status evaluation module and a spare mechanical device one-key summoning module.
[0035] The most suitable mechanical device acquisition module is used to acquire the environmental data set of the pending tasks, and compare and obtain the most suitable mechanical device type for the pending tasks based on the acquired environmental data set of the pending tasks.
[0036] Specifically, based on the environmental data set of the tasks to be done, the most suitable type of mechanical device for the tasks to be done is obtained by comparison. The specific analysis process is: obtain the environmental data set of the tasks to be done, and the environmental data set specifically includes the ambient temperature of the tasks to be done, the ambient humidity of the tasks to be done, and the height of the tasks to be done from the ground. The ambient temperature indicates the temperature level of the environment in which the tasks to be done are located. It has an important impact on the work and operation status of some mechanical devices, personnel or materials. In a high temperature environment, it may cause problems such as overheating of the mechanical device and fatigue of the personnel. In a low temperature environment, it may cause freezing of the mechanical device and hardening of the materials. The ambient temperature needs to be considered and adjusted according to the specific situation to ensure the smooth completion of the task. The ambient humidity indicates the humidity level of the environment in which the tasks to be done are located. The humidity will affect the stability of the mechanical device, the performance of the materials, and the comfort of the personnel. In a high humidity environment, the mechanical device may become damp, the materials may absorb moisture, and the personnel may become uncomfortable. Physical discomfort and reasonable control of environmental humidity are important factors to ensure the normal progress of tasks. The height from the ground indicates the height of the location of the pending task relative to the ground. It is generally used to describe the suspended height of mechanical devices or personnel or the height of the working position. It has an important impact on safety and work efficiency. When working at heights, it is necessary to strengthen safety protection measures to prevent accidents such as falling. It will also affect the comfort and efficiency of the work. When considering the position height during the task completion process, it is necessary to comprehensively consider multiple factors such as safety, comfort and efficiency; based on the environmental data set of the pending tasks obtained, the environmental characteristic values are comprehensively analyzed to obtain the environmental characteristic values, and the environmental characteristic values are used as the analysis basis for comparing the most suitable mechanical device type for the pending tasks; the environmental characteristic values are compared with the mechanical device types corresponding to each environmental characteristic value interval stored in the database to obtain the mechanical device type corresponding to the environmental characteristic value, and the mechanical device type is marked as the most suitable mechanical device type for the pending task.
[0037] The humidity of the air depends to a large extent on the temperature of the environment. The higher the temperature, the higher the humidity in the air. In a high temperature and high humidity environment, the water vapor content in the air is large, which may cause problems such as overheating of mechanical devices and moisture absorption of materials. In a low temperature and low humidity environment, mechanical devices may freeze and materials may dry out. The temperature at high altitudes will be lower than that on the ground. The higher the altitude, the more likely the ambient temperature will change. For high-altitude operations or tasks at high locations, extra attention needs to be paid when considering the ambient temperature. Some additional protective measures may need to be taken. The air humidity at high altitudes may be relatively low. In high-altitude operations or tasks at high locations, the humidity of the environment may be relatively low, which may cause the materials to dry out, and extra attention needs to be paid to protective measures.
[0038] The air humidity at high altitudes may be relatively low. During high-altitude operations or tasks at high locations, the humidity of the environment may be relatively low, which may cause the materials to dry out. Extra attention should be paid to protective measures. Selecting the most suitable type of mechanical device can improve work efficiency and quality and reduce the waste of manpower and material resources. Selecting appropriate mechanical devices based on environmental characteristic values can also improve work safety and reduce accident risks. Selecting the most suitable type of mechanical device based on specific environmental characteristic values can avoid the use of unnecessary mechanical devices, reduce resource waste, and improve the utilization rate and economic benefits of mechanical devices. Establishing an automated decision-making system based on environmental data sets can more quickly and accurately select the most suitable type of mechanical device, reduce people's subjective judgment factors, and improve the scientificity and accuracy of decision-making.
[0039] It should be explained that by obtaining the environmental data set of the tasks to be done, comparing the most suitable types of mechanical devices for the tasks to be done, and accurately matching the task requirements with the capabilities of the mechanical devices, it can be ensured that the most suitable mechanical devices are used to perform specific tasks, thereby maximizing the efficiency and output of the mechanical devices. The most suitable mechanical devices usually process tasks faster because they have the optimal configuration and performance required to process specific tasks. Correct use of mechanical devices can prevent excessive wear and potential damage, thereby extending the service life of the mechanical devices. Reasonable use of mechanical devices reduces unnecessary maintenance and emergency repairs, helping companies save maintenance costs.
[0040] Specifically, the environmental characteristic value, the specific analysis process is:
[0041] ;
[0042] In the formula, is the environmental characteristic value, is the ambient temperature of the task to be done. is the humidity of the environment where the task is located. is the height of the location of the to-do task from the ground, The reference temperature of the environment where the pending tasks stored in the database are located. The reference humidity of the environment where the to-do tasks stored in the database are located. The reference height of the location of the to-do tasks stored in the database from the ground. is the compensation factor for the ambient temperature of the task to be done. is the compensation factor for the humidity of the environment where the to-do task is located. The compensation factor for the height of the to-do task from the ground.
[0043] It needs to be explained that the above-mentioned environmental characteristic values are calculated through the ambient temperature of the pending tasks, the ambient humidity of the pending tasks, and the height of the pending tasks from the ground. They can reflect factors such as the temperature and humidity of the environment in which the pending tasks are located. These factors have an important impact on the operating efficiency and stability of the mechanical device. By considering the environmental characteristic values, the operating parameters of the mechanical device can be adjusted to improve the efficiency and stability of the mechanical device under different environmental conditions. It can help evaluate the suitability of the execution environment of the pending tasks. By monitoring the ambient temperature and humidity and other data, it can ensure that the tasks are performed under appropriate environmental conditions, thereby improving the quality and effect of task execution. The environmental characteristic values can provide an important reference basis for the scheduling of mechanical devices and the execution of tasks. According to the characteristic values under different environmental conditions, more reasonable decisions on the scheduling of mechanical devices and the allocation of tasks can be made, so that the tasks are executed under the most suitable environmental conditions, improving efficiency and accuracy. Reasonable consideration of environmental characteristic values can help optimize the operation plan of the mechanical device, reduce energy consumption, and extend the duration. The life of mechanical devices can be prolonged, resource waste can be reduced, and it is beneficial to save energy and resources. It can also provide safety information about the execution environment of pending tasks. For example, monitoring the ambient temperature and humidity can warn of potential dangers in advance and ensure the safety of personnel. Mechanical devices such as temperature sensors, humidity sensors and height sensors can be installed to monitor the temperature, humidity and location height data of the environment in which the pending tasks are located in real time. With reference to relevant industry standards, the reference temperature of the environment in which the pending tasks are located, the reference humidity of the environment in which the pending tasks are located, and the reference height of the location of the pending tasks from the ground can be obtained. The compensation factors of the ambient temperature, humidity and location height of the pending tasks are obtained from the database. According to historical data, a mapping set of the historically measured ambient temperature, humidity and location height of the pending tasks and the compensation factors of the ambient temperature, humidity and location height of the pending tasks are established to obtain the compensation factors of the ambient temperature, humidity and location height of the pending tasks corresponding to the ambient temperature, humidity and location height of the current pending tasks.
[0044] The module for acquiring the demand solution for pending tasks is used to acquire the demand data set of pending tasks, and based on the acquired demand data set of pending tasks, compare and obtain the most suitable mechanical device type for the pending tasks to complete the demand solution for the pending tasks.
[0045] Specifically, the demand data set includes the total power consumption of mechanical devices required for pending tasks, the total number of pending tasks, the allowed completion time of pending tasks, and the manpower demand of pending tasks. The total power consumption of mechanical devices required for pending tasks: This refers to the total amount of power consumed by mechanical devices required to complete all pending tasks. Understanding this data can help evaluate the energy consumption during task execution, and then consider issues such as energy conservation and emission reduction, and optimizing the use of mechanical devices. The total number of pending tasks represents the total number of pending tasks, that is, the number of tasks that need to be completed. Understanding the total number of tasks can help plan resources, arrange work processes, evaluate workload, etc., and help to effectively organize and manage task execution. The allowed completion time of pending tasks represents the time range in which each pending task is allowed to be completed. Understanding the completion time limit of the task can help reasonably arrange work progress, avoid delays, and improve work efficiency. The manpower demand of pending tasks represents the total human resources required to complete all pending tasks. Understanding the manpower demand can help determine staffing, work allocation, recruitment needs, etc., so as to ensure the smooth completion of tasks.
[0046] It needs to be explained that the increase in the total number of the above-mentioned tasks may lead to an increase in the total electrical energy consumption of mechanical devices, because more tasks require more mechanical devices to operate and consume more electrical energy. The increase in the total number of tasks will usually lead to an increase in manpower requirements, because more tasks require more human resources to complete. The increase in the total number of tasks will usually lead to an increase in manpower requirements, because more tasks require more human resources to complete. The increase in manpower requirements may affect the total electrical energy consumption of mechanical devices, because more human resources may require more mechanical devices to operate, thereby increasing electrical energy consumption. The increase in manpower requirements may affect the allowable completion time of the task, because more human resources may speed up the completion of the task, or require more time to allocate and coordinate human resources.
[0047] Furthermore, based on the acquired demand data set of pending tasks, the demand plan for completing the pending tasks with the most suitable type of mechanical device is compared. The specific analysis process is as follows: based on the acquired demand data set of pending tasks, a comprehensive analysis is performed to obtain a demand characteristic value, and the demand characteristic value is used as an analysis basis for comparing and obtaining the demand plan for completing the pending tasks with the most suitable type of mechanical device; the demand characteristic value is compared with the demand plan for completing the pending tasks with the most suitable type of mechanical device corresponding to each pending task demand characteristic interval stored in the database, so as to obtain the demand plan for completing the pending tasks with the most suitable type of mechanical device corresponding to the demand characteristic value.
[0048] By comparing the demand characteristic value with the demand characteristic interval of pending tasks corresponding to the types of mechanical devices stored in the database, the type of mechanical device suitable for performing the task can be determined more accurately, thereby improving the utilization rate and efficiency of the mechanical device and avoiding unnecessary waste. By comparing the demand characteristic value with the demand characteristic interval of pending tasks corresponding to the types of mechanical devices stored in the database, the type of mechanical device suitable for performing the task can be determined more accurately, thereby improving the utilization rate and efficiency of the mechanical device and avoiding unnecessary waste. The most suitable type of mechanical device that matches the demand characteristic value can be matched according to the actual needs of the task, thereby reducing delays and waste caused by mismatched mechanical devices and improving work efficiency. By accurately selecting the most suitable type of mechanical device, unnecessary mechanical device replacement and maintenance costs can be reduced, and cost expenditures in the production or work process can be reduced. By accurately selecting the most suitable type of mechanical device, unnecessary mechanical device replacement and maintenance costs can be reduced, and cost expenditures in the production or work process can be reduced.
[0049] It should be explained that the above method of obtaining the demand data set of the to-do tasks, comparing the most suitable type of mechanical device for the to-do tasks to complete the demand plan for the to-do tasks, and selecting the most suitable type of mechanical device to complete the demand plan for the to-do tasks can avoid unnecessary waste of resources, thereby reducing costs. Selecting the most suitable type of mechanical device to complete the demand plan for the to-do tasks based on the demand data set of the to-do tasks can enhance the user experience when completing tasks, reduce unnecessary troubles and obstacles, make better use of existing resources, and improve resource utilization efficiency.
[0050] Specifically, the specific analysis process of the demand characteristic value is as follows:
[0051] ;
[0052] In the formula, is the characteristic value of demand, is the total power consumption of the mechanical devices required for the tasks to be performed, is the total number of pending tasks, Allow time for to-do tasks to complete. The manpower demand for pending tasks, Define the power consumption of the mechanical devices required for the pending tasks stored in the database, Define the number of to-do tasks stored in the database, Define completion time for to-do tasks stored in the database, Define the manpower requirements for the pending tasks stored in the database, is the compensation factor for the total mechanical device power consumption required for the set to-be-done tasks, is the compensation factor for the total number of tasks to be done. The compensation factor for the completion time allowed for the set to-do tasks, is the compensation factor for the manpower demand of the set tasks to be done, and e is a natural constant.
[0053] It should be explained that the above-mentioned demand characteristic value is calculated by the total power consumption of the mechanical devices required for the pending tasks, the total number of pending tasks, the allowed completion time of the pending tasks, and the manpower demand of the pending tasks. It can better evaluate the amount of resources required for task execution, including power, manpower, etc., so as to optimize resource allocation in a targeted manner, avoid resource waste and unnecessary cost expenditure. According to the demand characteristic value of the pending tasks, the priority of the tasks can be better set, and the tasks with large resource requirements and urgent time can be given priority to improve the overall task execution efficiency. The demand characteristic value can be used as an important basis for task scheduling decisions, helping to formulate a reasonable task execution plan to ensure that the task is completed within the specified time and fully consider the resource utilization efficiency. Reasonable calculation of the demand characteristic value can better plan the task execution process, improve production efficiency, reduce task execution time, reduce costs, and improve overall production benefits. The calculation results of the demand characteristic value can provide decision support for managers, helping them to better formulate strategies and plans to adapt to different task requirements and resource constraints. The average power consumption of each mechanical device when executing the task is calculated through the specifications and technical parameters of the mechanical device. The completion time of the task is usually set when the task is created, which can be obtained from the task The management system or database obtains the allowed completion time of each task, and determines the number of human resources required for each task based on the complexity and execution steps of the task. This can be obtained through the task description or requirement specification. The mechanical device information and task requirements are stored in the database, including the defined power consumption of the mechanical device required for the pending tasks, the defined number of pending tasks, the defined completion time of the pending tasks, and the defined manpower requirements of the pending tasks. The compensation factors for the total mechanical device power consumption required for the pending tasks, the total number of pending tasks, the allowed completion time of the pending tasks, and the manpower requirements of the pending tasks are obtained from the database. Based on the mapping set of historically measured total mechanical energy consumption required for pending tasks, the total number of pending tasks, the allowed completion time for pending tasks, the manpower demand for pending tasks and the compensation factors of the total mechanical energy consumption required for pending tasks, the total number of pending tasks, the allowed completion time for pending tasks and the manpower demand for pending tasks, the compensation factors of the total mechanical energy consumption required for pending tasks, the total number of pending tasks, the allowed completion time for pending tasks and the manpower demand for pending tasks corresponding to the current total mechanical energy consumption required for pending tasks, the total number of pending tasks, the allowed completion time for pending tasks and the manpower demand for pending tasks are obtained.
[0054] The state evaluation module of the mechanical device scheduling process is used to obtain the most suitable mechanical device state data set when performing the most suitable mechanical device scheduling process under the demand plan of completing the pending tasks by comparing the most suitable mechanical device type for the pending tasks. Based on the obtained most suitable mechanical device state data set, the state evaluation value of the mechanical device scheduling process is analyzed.
[0055] Specifically, the most suitable mechanical device status data set includes the average speed of the mechanical device during the mechanical device scheduling process, the mechanical device temperature during the mechanical device scheduling process, and the load weight during the mechanical device scheduling process. The average speed of the mechanical device refers to the average speed of the mechanical device during the work or production process, which is usually measured by the amount of tasks or output processed per unit time. The higher the average speed of the mechanical device, the more work the mechanical device completes per unit time, otherwise it means low efficiency. Monitoring the average speed of the mechanical device can help evaluate the production efficiency and work quality of the mechanical device. The temperature of the mechanical device refers to the temperature state of the mechanical device during the work or production process. The increase in the temperature of the mechanical device may be caused by the long-term operation of the mechanical device or excessive load. Excessive mechanical device temperature may damage the components of the mechanical device and affect the normal operation of the mechanical device. Monitoring the temperature of the mechanical device can effectively prevent problems caused by overheating of the mechanical device and take corresponding measures to protect the mechanical device. The load weight of the mechanical device refers to the weight or load currently carried by the mechanical device. Excessive load weight of the mechanical device may cause the mechanical device to run slower, consume more energy, and increase the wear of the mechanical device. Monitoring the load weight of the mechanical device can help dispatchers arrange work tasks reasonably and avoid the adverse effects of overload on the mechanical device and production efficiency.
[0056] It needs to be explained that the increase in temperature of the above-mentioned mechanical device will affect the performance and operating speed of the mechanical device. Excessive temperature may cause thermal expansion of the internal components of the mechanical device, increase friction resistance, and thus slow down or make the operating speed of the mechanical device unstable. The increase in the operating speed of the mechanical device will also cause the mechanical device to generate more heat when working, thereby increasing the temperature of the mechanical device. There is a mutually influencing relationship between the average operating speed of the mechanical device and the temperature of the mechanical device. If the mechanical device carries too much load weight, it will cause the mechanical device to generate more heat when working, thereby increasing the temperature of the mechanical device. High temperature environment will aggravate the wear and load of the mechanical device, and the mechanical device will need to bear a larger load weight, thereby affecting the operating stability and life of the mechanical device. If the mechanical device carries too much load weight, it will affect the operating speed and efficiency of the mechanical device. Excessive load weight may cause the mechanical device to slow down or even cause problems such as shutdown. Appropriate load weight can ensure that the average operating speed of the mechanical device remains at a stable and efficient level, thereby improving the production efficiency of the mechanical device.
[0057] Furthermore, based on the acquired most suitable mechanical device state data set, a comprehensive analysis is performed to obtain a mechanical device scheduling process state evaluation value. The specific analysis process is: based on the acquired most suitable mechanical device state data set, a comprehensive analysis is performed to obtain a mechanical device scheduling process state evaluation value. The mechanical device scheduling process state evaluation value is used as an analysis basis for evaluating the mechanical device scheduling process.
[0058] It needs to be explained that the above-mentioned comprehensive consideration of multiple key indicators such as the average speed of the mechanical device, the mechanical device temperature, the load weight, etc., the obtained mechanical device scheduling process state evaluation value can comprehensively reflect the working status and performance of the mechanical device, and provide managers with a basis for comprehensively evaluating the mechanical device scheduling process. The mechanical device scheduling process state evaluation value can help managers quickly identify whether the operating status of the mechanical device is normal, whether there are abnormal conditions or potential problems. Once an abnormality is found, the manager can take corresponding measures in time to correct it to avoid further expansion of the problem. The mechanical device scheduling process state evaluation value obtained based on comprehensive analysis can provide managers with a scientific basis to help them make more accurate and reasonable mechanical device scheduling decisions. By comprehensively considering the influence of different indicators, the mechanical device scheduling plan can be optimized, and the production efficiency and mechanical device utilization rate can be improved. The mechanical device scheduling process state evaluation value can help managers predict possible failures or problems of mechanical devices, and perform preventive maintenance and maintenance work in time, extend the service life of mechanical devices, and reduce the impact of mechanical device failures on production.
[0059] It should be explained that the specific analysis process of the above mechanical device scheduling process state evaluation value is as follows:
[0060] ;
[0061] In the formula, The state evaluation value of the mechanical device scheduling process, The average speed of the mechanical device during the mechanical device scheduling process, Scheduling process for the mechanical device Mechanical device temperature, Scheduling process load weights for mechanical devices, The reference speed of the mechanical device operation for the mechanical device scheduling process stored in the database, The reference temperature of the mechanical device for the mechanical device scheduling process stored in the database, The mechanical device scheduling process stored in the database defines the load weight, The compensation factor for the average speed of the mechanical device during the mechanical device scheduling process. The compensation factor for the mechanical device temperature during the scheduled mechanical device. Compensation factor for the load weight of the scheduled process for the set mechanism.
[0062] It needs to be explained that the above-mentioned state evaluation value of the mechanical device scheduling process is calculated through the average speed of the mechanical device during the mechanical device scheduling process, the temperature of the mechanical device during the mechanical device scheduling process, and the load weight of the mechanical device scheduling process. Through the state evaluation value of the mechanical device scheduling process, the average speed, temperature and load weight of the mechanical device during operation can be understood, and then the performance of the mechanical device can be evaluated. The state evaluation value of the mechanical device scheduling process can help monitor the operation of the mechanical device, detect abnormal changes in the mechanical device in time, predict possible failures and take preventive maintenance measures to avoid production interruptions caused by sudden failures of the mechanical device. Understanding the average speed, temperature and load weight of the mechanical device can help formulate reasonable mechanical device scheduling strategies, optimize production plans, and improve the utilization rate and production efficiency of mechanical devices. By monitoring the temperature and load weight of the mechanical device, the operating parameters of the mechanical device can be adjusted in time, energy consumption can be reduced, production costs can be reduced, and energy utilization efficiency can be improved. Collecting the state evaluation values in the mechanical device scheduling process can form data accumulation and use In subsequent data analysis and mining, the law of mechanical device operation trend is discovered to provide a reference for future mechanical device maintenance and production scheduling. The average speed of the mechanical device, the mechanical device temperature and the load weight in the mechanical device scheduling process are obtained through speed sensors, temperature sensors and load sensors respectively. The system can obtain the reference speed, reference temperature and load weight of each mechanical device by querying the mechanical device scheduling information table in the database. The compensation factors of the set mechanical device average speed, mechanical device temperature and load weight in the mechanical device scheduling process are obtained from the database. According to historical data, a mapping set of the historically measured mechanical device scheduling process average speed, mechanical device temperature, load weight and the compensation factors of the mechanical device average speed, mechanical device temperature and load weight in the mechanical device scheduling process is established to obtain the compensation factors of the mechanical device average speed, mechanical device temperature and load weight in the mechanical device scheduling process corresponding to the current mechanical device scheduling process average speed, mechanical device temperature and load weight.
[0063] The one-key call module for backup mechanical devices is used to evaluate the mechanical device scheduling process based on the state evaluation value of the mechanical device scheduling process, and to recall the unqualified most suitable mechanical devices with one key, and at the same time, to summon the backup mechanical devices corresponding to each recalled most suitable mechanical device with one key to complete the pending tasks.
[0064] Specifically, based on the evaluation value of the mechanical device scheduling process state, the mechanical device scheduling process is evaluated, and the unqualified most suitable mechanical device is recalled with one click, and at the same time, the backup mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks. The specific analysis process is: based on the evaluation value of the mechanical device scheduling process state, the mechanical device scheduling process is evaluated; the mechanical device scheduling process state evaluation value is compared with the mechanical device scheduling process state reference evaluation value stored in the database; if the mechanical device scheduling process state evaluation value is higher than the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is excellent; if the mechanical device scheduling process state evaluation value is equal to the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is qualified; if the mechanical device scheduling process state evaluation value is lower than the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is unqualified, the unqualified most suitable mechanical device is recalled with one click, and at the same time, the backup mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks.
[0065] Evaluating the status of the mechanical device scheduling process can timely discover the situation where the mechanical device is in an unqualified operating state. By recalling the unqualified mechanical device with one click, its operation can be stopped in time to prevent the problem from continuing to expand. By summoning the corresponding spare mechanical device to complete the pending task with one click, the production task can be completed in time without affecting the production progress, ensuring the smooth progress of the production plan and improving production efficiency. Timely evaluation of the status of the mechanical device scheduling process can ensure that the mechanical device is in a good operating state and avoid the impact of poor operation of the mechanical device on the quality of the product and the stability of production. Timely recall of unqualified mechanical devices and summoning spare mechanical devices to complete the task can avoid unqualified mechanical devices being in an unsuitable operating state for a long time, reduce mechanical device losses and extend the service life of the mechanical device. By ensuring the timely completion of production tasks, timely delivery of customers' products can be guaranteed, customer satisfaction can be improved, and optimization of mechanical device scheduling and rational use of spare mechanical devices can reduce the idleness of mechanical devices and the excessive purchase of spare parts, saving costs for the enterprise.
[0066] It needs to be explained that the above-mentioned mechanical device scheduling process is evaluated through the state evaluation value of the mechanical device scheduling process, and the unqualified most suitable mechanical device is recalled with one click, and the spare mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks. The unqualified most suitable mechanical devices are discovered and recalled in time, and the spare mechanical devices are summoned to complete the tasks. This can maximize the utilization rate of the mechanical devices and avoid waste of resources caused by idle mechanical devices. Using spare mechanical devices to replace unqualified mechanical devices to complete tasks can ensure the smooth progress of tasks and avoid task delays and failures due to mechanical device problems, thereby improving the efficiency of task completion, simplifying the scheduling management process, reducing human intervention and misoperation, and improving scheduling efficiency.
[0067] Reference Figure 2 As shown, based on the same inventive concept, a mechanical device scheduling method is also provided, comprising the following steps:
[0068] Acquire an environmental data set of the task to be done, and compare and obtain the most suitable mechanical device type for the task to be done based on the acquired environmental data set of the task to be done;
[0069] Obtaining a demand data set of the pending tasks, and based on the acquired demand data set of the pending tasks, obtaining the most suitable mechanical device type for the pending tasks to complete the demand plan for the pending tasks;
[0070] Under the demand plan of completing the to-be-done task by comparing the most suitable mechanical device type, when performing the most suitable mechanical device scheduling process, the most suitable mechanical device state data set is obtained, and the state evaluation value of the mechanical device scheduling process is analyzed based on the obtained most suitable mechanical device state data set;
[0071] Based on the status evaluation value of the mechanical device scheduling process, the mechanical device scheduling process is evaluated, and the unqualified most suitable mechanical devices are recalled with one click. At the same time, the spare mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks.
[0072] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A mechanical device scheduling system, characterized in that: It includes the most suitable mechanical device acquisition module, the pending task demand solution acquisition module, the mechanical device scheduling process status evaluation module and the spare mechanical device one-key call module, among which: The most suitable mechanical device acquisition module is used to acquire the environmental data set of the pending task, and compare the most suitable mechanical device type for the pending task based on the acquired environmental data set of the pending task. The comparison process is as follows: Obtaining an environmental data set of the pending tasks, the environmental data set specifically includes the ambient temperature of the pending tasks, the ambient humidity of the pending tasks, and the height of the pending tasks from the ground; Based on the acquired environmental data set of the pending tasks, the environmental characteristic values are obtained through comprehensive analysis, and the environmental characteristic values are used as the analysis basis for comparing and obtaining the most suitable mechanical device type for the pending tasks; The specific analysis process of the environmental characteristic value is as follows: Wherein, γ is the environmental characteristic value, RW is the ambient temperature of the pending task, RS is the ambient humidity of the pending task, RH is the height of the pending task from the ground, RW0 is the reference temperature of the pending task stored in the database, RS0 is the reference humidity of the pending task stored in the database, RH0 is the reference height of the pending task from the ground stored in the database, σ1 is the compensation factor of the ambient temperature of the pending task, σ2 is the compensation factor of the ambient humidity of the pending task, and σ3 is the compensation factor of the height of the pending task from the ground; Compare the environmental characteristic value with the mechanical device types corresponding to each environmental characteristic value interval stored in the database to obtain the mechanical device type corresponding to the environmental characteristic value, and mark the mechanical device type as the most suitable mechanical device type for the to-be-done task; The pending task demand solution acquisition module is used to acquire a demand dataset of pending tasks, and based on the acquired demand dataset of pending tasks, compare and obtain the most suitable mechanical device type for the pending tasks to complete the demand solution of the pending tasks; The mechanical device scheduling process state evaluation module is used to obtain the most suitable mechanical device state data set when performing the most suitable mechanical device scheduling process under the demand plan of completing the to-be-done task by comparing the most suitable mechanical device type to the to-be-done task, and analyze and obtain the mechanical device scheduling process state evaluation value based on the obtained most suitable mechanical device state data set; The one-key call module for standby mechanical devices is used to evaluate the mechanical device scheduling process based on the mechanical device scheduling process status evaluation value, and to recall the unqualified most suitable mechanical devices with one key, and to summon the standby mechanical devices corresponding to each recalled most suitable mechanical device with one key to complete the pending tasks; The demand data set specifically includes the total power consumption of mechanical devices required for pending tasks, the total number of pending tasks, the allowed completion time of pending tasks, and the manpower demand of pending tasks; Based on the acquired demand data set of pending tasks, the most suitable mechanical device type for the pending tasks is compared to obtain the demand solution for completing the pending tasks. The specific analysis process is as follows: Based on the acquired demand data set of the pending tasks, a demand characteristic value is obtained through comprehensive analysis, and the demand characteristic value is used as an analysis basis for comparing the most suitable mechanical device type for the pending tasks to complete the demand plan for the pending tasks; Compare the demand characteristic value with the most suitable mechanical device type corresponding to each pending task demand characteristic interval stored in the database to complete the pending task demand solution, and obtain the most suitable mechanical device type corresponding to the pending task demand value to complete the pending task demand solution; The specific analysis process of the demand characteristic value is as follows: Wherein, δ is the characteristic value of demand, HQ is the total power consumption of mechanical devices required for pending tasks, ZN is the total number of pending tasks, T is the allowed completion time of pending tasks, RN is the manpower demand of pending tasks, HQ0 is the defined power consumption of mechanical devices required for pending tasks stored in the database, ZN0 is the defined number of pending tasks stored in the database, T0 is the defined completion time of pending tasks stored in the database, RN0 is the defined manpower demand of pending tasks stored in the database, τ1 is the compensation factor of the set total power consumption of mechanical devices required for pending tasks, τ2 is the compensation factor of the set total number of pending tasks, τ3 is the compensation factor of the set allowed completion time of pending tasks, τ4 is the compensation factor of the set manpower demand of pending tasks, and e is a natural constant.
2. A mechanical device scheduling system according to claim 1, characterized in that: The most suitable mechanical device state data set specifically includes the average operating speed of the mechanical device during the mechanical device scheduling process, the mechanical device temperature during the mechanical device scheduling process, and the load weight during the mechanical device scheduling process.
3. A mechanical device scheduling system according to claim 2, characterized in that: Based on the acquired most suitable mechanical device state data set, a comprehensive analysis is performed to obtain a mechanical device scheduling process state evaluation value. The specific analysis process is as follows: Based on the acquired most suitable mechanical device state data set, a comprehensive analysis is performed to obtain the mechanical device scheduling process state evaluation value, which serves as the analysis basis for evaluating the mechanical device scheduling process.
4. A mechanical device scheduling system according to claim 1, characterized in that: Based on the state evaluation value of the mechanical device scheduling process, the mechanical device scheduling process is evaluated, and the unqualified most suitable mechanical devices are recalled with one click. At the same time, the spare mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks. The specific analysis process is as follows: Based on the state evaluation value of the mechanical device scheduling process, the mechanical device scheduling process is evaluated; comparing the mechanical device scheduling process state evaluation value with the mechanical device scheduling process state reference evaluation value stored in the database; If the mechanical device scheduling process state evaluation value is higher than the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is excellent; If the mechanical device scheduling process state evaluation value is equal to the mechanical device scheduling process state reference evaluation value, then the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is qualified; If the mechanical device scheduling process state evaluation value is lower than the mechanical device scheduling process state reference evaluation value, the mechanical device scheduling process state corresponding to the mechanical device scheduling process state evaluation value is unqualified, and the unqualified most suitable mechanical device is recalled with one click, and at the same time, the backup mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks.
5. A mechanical device scheduling method, characterized in that: A mechanical device scheduling system for use in any one of claims 1 to 4, comprising the following steps: Acquire an environmental data set of the task to be done, and compare and obtain the most suitable mechanical device type for the task to be done based on the acquired environmental data set of the task to be done; Obtaining a demand data set of the pending tasks, and based on the acquired demand data set of the pending tasks, obtaining the most suitable mechanical device type for the pending tasks to complete the demand plan for the pending tasks; Under the demand plan of completing the to-be-done task by comparing the most suitable mechanical device type, when performing the most suitable mechanical device scheduling process, the most suitable mechanical device state data set is obtained, and the state evaluation value of the mechanical device scheduling process is analyzed based on the obtained most suitable mechanical device state data set; Based on the status evaluation value of the mechanical device scheduling process, the mechanical device scheduling process is evaluated, and the unqualified most suitable mechanical devices are recalled with one click. At the same time, the spare mechanical devices corresponding to each recalled most suitable mechanical device are summoned with one click to complete the pending tasks.