A pipeline rapid prototyping device and process

The pipeline rapid prototyping device addresses water vapor escape issues by using a central suction system and quantitative feeding to improve plastic pipeline quality and efficiency.

CN118636424BActive Publication Date: 2024-12-03SHANDONG DONGDA NEW MATERIAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411106917.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-12-03
Estimated Expiration
2044-08-13

AI Technical Summary

Technical Problem

Water vapor is difficult to effectively escape from molten plastic during high-speed rotation of the screw in the plastic pipeline molding process, leading to pores in the final plastic pipeline.

Method used

A pipeline rapid prototyping device with a hollow screw, exhaust pipes, and a piston-driven negative pressure suction system to extract water vapor, combined with a pneumatic vibrator and quantitative feeding mechanism to ensure consistent feeding.

Benefits of technology

Reduces the probability of pores in the final plastic pipeline by effectively separating water vapor, preheats plastic particles for improved quality, and maintains consistent feeding speed, enhancing molding efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118636424B_ABST
    Figure CN118636424B_ABST
Patent Text Reader

Abstract

The present application provides a pipeline rapid prototyping device and process, belonging to the field of plastic molding technology, including a frame, an extrusion bin, a feeding hopper, a screw, a driving source, a heating chamber and a cooling chamber; an exhaust pipe is arranged inside the feeding hopper, and the exhaust pipe is connected with a plurality of exhaust pipes penetrating the feeding hopper, the bottom of the exhaust pipe is connected with a hollow ring sleeved on the output shaft of the screw and the driving source, a piston is axially slidably connected inside the exhaust pipe, and a one-way valve is arranged in the air guide hole provided on the piston; the screw is hollow and connected with the hollow ring, and a plurality of exhaust holes connected with the inner cavity of the screw are provided on the surface of the screw, an offset shaft located inside the hollow ring is arranged between the output shaft of the screw and the driving source, and a linkage rod is hinged between the piston and the offset shaft; the present application can separate water vapor from the molten plastic as much as possible, thereby reducing the possibility of pores on the finally formed plastic pipeline.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of plastic molding, and in particular to a pipeline rapid molding device and process. Background Art

[0002] The molding of plastic pipes is usually completed by plastic extruders. When the plastic extruder is working, solid plastic particles are first fed into the screw chamber of the extruder through a feeding device, and then the screw rotates and cooperates with the heating system to heat the plastic to a molten state. When the molten plastic is pushed by the screw to be squeezed into the mold to complete the initial molding, the plastic pipe is cooled and solidified under the action of the cooling system to finally be formed.

[0003] Referring to the Chinese patent application document with publication number CN117245889A and publication date December 19, 2023, entitled "A Polyethylene Pipe Extruder", the cooling speed and pulling speed of the polyethylene pipe can be correlated, and at the same time, the raw materials with high humidity can be effectively dehumidified to ensure the quality of the polyethylene pipe.

[0004] Referring to the above technical solution, in order to speed up the production speed of the pipeline, a transmission is usually installed at the driving end of the screw when the plastic extruder is working, so that the speed and thrust of the screw are increased to improve the extrusion molding rate of the plastic. In this case, the moisture that may exist inside the plastic particles will be heated in the screw chamber to form water vapor, but due to the fast screw speed, the flow speed of the plastic and water vapor in the screw chamber is also accelerated, and it is difficult for the water vapor to effectively escape from the molten plastic, which may cause pores in the final plastic pipeline, thereby affecting the final molding quality of the plastic pipeline. Summary of the invention

[0005] In view of this, the present application provides a pipeline rapid prototyping device and process, which are mainly used to solve the problem that water vapor is difficult to effectively escape from the molten plastic due to the high-speed rotation of the screw during the plastic pipeline molding process.

[0006] In order to solve the above technical problems, the present application provides a pipeline rapid prototyping device and process.

[0007] In the first aspect, the present application provides a pipeline rapid prototyping device, including a frame, an extrusion bin, a feeding hopper, a screw, a driving source, a heating chamber and a cooling chamber; an exhaust pipe is arranged inside the feeding hopper, and the exhaust pipe is connected to a plurality of exhaust pipes that penetrate the feeding hopper, and the bottom of the exhaust pipe is connected to a hollow ring that is sleeved on the output shaft of the screw and the driving source, and a piston is axially slidably connected inside the exhaust pipe, and a one-way valve is arranged in the air guide hole opened on the piston; the screw is hollow and connected to the hollow ring, and a plurality of exhaust holes connected to the inner cavity of the screw are opened on the surface of the screw, and an offset shaft located inside the hollow ring is arranged between the screw and the output shaft of the driving source, and a linkage rod is hinged between the piston and the offset shaft.

[0008] By adopting the above technical solution, the piston is driven by the offset shaft and the linkage rod to generate negative pressure suction during the rotation of the screw, thereby extracting the water vapor inside the extrusion bin and reducing the probability of pores in the final formed plastic pipeline due to the influence of water vapor.

[0009] Optionally, the exhaust pipes are all copper heat-conducting pipes, the outside of the feeding hopper is provided with an insulation tube that can communicate with the external environment, and the exhaust ends of the exhaust pipes are located in the interlayer between the insulation tube and the feeding hopper.

[0010] By adopting the above technical solution, the plastic particles can be preheated when the subsequent plastic particles enter the feeding hopper, thereby removing moisture and water in the plastic particles.

[0011] Optionally, a pneumatic vibrator is connected in series inside the exhaust pipe.

[0012] By adopting the above technical solution, the plastic particles in the feeding hopper are accelerated to fall by virtue of the vibration effect generated by the pneumatic vibrator, so as to prevent the plastic particles from being blocked and accumulated in the feeding hopper.

[0013] Optionally, a barrier plate is sleeved on the bottom of the exhaust pipe in an axially sliding connection via an elastic member, and the outer edge of the barrier plate is in fit and abutment with the inner wall of the feeding hopper, and a pressing plate is sleeved on the outside of the exhaust pipe in an axially sliding connection, and a transmission member is provided between the exhaust pipe, the piston and the pressing plate, for moving the pressing plate downward when the piston rises or moving the pressing plate upward when the piston descends.

[0014] By adopting the above technical solution, quantitative feeding is achieved through the cooperation of the barrier disk and the pressure disk, so that the plastic particles fed each time are kept consistent and the feeding speed is matched with the pushing speed of the screw.

[0015] Optionally, the transmission member includes an active rack arranged on the piston and a driven rack arranged on the pressing plate, and a reversing gear capable of simultaneously meshing with the active rack and the driven rack is rotatably connected inside the air suction pipe.

[0016] By adopting the above technical solution and utilizing the cooperation of the active rack, the driven rack and the reversing gear, the pressing plate can be displaced along with the movement of the piston.

[0017] In a second aspect, the present application provides a pipeline rapid prototyping process, which is applied to a pipeline rapid prototyping device described in the first aspect, and the prototyping process includes:

[0018] S1, firstly, the plastic particles are fed into the feeding hopper, and then the plastic particles pass through the feeding hopper and enter the interior of the extrusion bin;

[0019] S2, the screw is rotated by the cooperation of the driving source, so that the plastic particles are pushed by the screw to the position corresponding to the heating chamber for heating. The screw is driven to rotate by the cooperation of the driving source, so that the plastic particles are gradually pushed by the screw to the position corresponding to the heating chamber for heating;

[0020] S3, the screw pushes the heated and molten plastic toward the pipe mold installed at the discharge end of the extrusion bin for preliminary molding. After the initially molded plastic pipe enters the cooling chamber, the plastic pipe will be cooled and solidified to form.

[0021] By adopting the above technical solution, the molding work of the plastic pipeline can be completed.

[0022] Optionally, in S2, when the screw rotates, the piston, driven by the offset shaft and the linkage rod, moves back and forth inside the exhaust pipe to form a negative pressure suction force, so that the water vapor inside the extrusion bin is extracted.

[0023] By adopting the above technical solution, water vapor can be separated from the molten plastic as much as possible, thereby reducing the possibility of pores in the final formed plastic pipeline.

[0024] Optionally, in S2, after the water vapor inside the extrusion bin is extracted, the water vapor will enter the interlayer between the insulation cylinder and the feeding hopper through the guiding action of the exhaust pipe, so that the plastic particles subsequently fed into the feeding hopper are preheated.

[0025] By adopting the above technical solution, the extracted water vapor is used as a preheating medium, so that the plastic particles that subsequently enter the feeding hopper are preheated, thereby achieving secondary utilization of resources while removing moisture and water from the plastic particles.

[0026] In summary, compared with the prior art, the present application includes at least one of the following beneficial technical effects:

[0027] 1. The water vapor inside the extrusion bin is extracted by central suction, so that the water vapor is separated from the molten plastic as much as possible, reducing the possibility of pores in the final plastic pipeline. Compared with the suction method in the circumferential direction, the negative pressure suction work in the central suction method can reduce the probability of the molten plastic being blocked due to the local negative pressure in the circumferential direction when being pushed by the screw, so that the plastic extrusion work can be carried out efficiently.

[0028] 2. The extracted water vapor is used as the preheating medium to preheat the plastic particles entering the feeding hopper from both inside and outside, thereby achieving the secondary utilization of resources and removing moisture and water from the plastic particles, thus improving the quality of subsequent plastic pipe molding work.

[0029] 3. During the process of the screw rotating to push the plastic and the negative pressure suction, quantitative feeding is achieved through the cooperation of the barrier plate and the pressure plate, so that the plastic particles fed each time remain consistent and the feeding speed matches the pushing speed of the screw, reducing the probability of affecting the molding quality of the plastic pipeline due to fluctuations in the feeding amount. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 This is a schematic diagram of the structure of a pipeline rapid prototyping device for this application;

[0031] Figure 2 This is a schematic diagram of the structure of the squeezing silo for this application;

[0032] Figure 3 A cross-sectional view of the feeding hopper for this application;

[0033] Figure 4 This is a cross-sectional view of the screw and the exhaust pipe of this application;

[0034] Figure 5 A cross-sectional view of the screw and hollow ring of the present application;

[0035] Figure 6 For this application Figure 4 A partial enlarged view of area A in the middle.

[0036] Explanation of the reference numerals in the accompanying drawings: 1. Frame; 11. Extrusion bin; 12. Feed hopper; 13. Screw; 14. Driving source; 15. Heating chamber; 16. Cooling chamber; 2. Exhaust pipe; 21. Exhaust pipe; 211. Pneumatic vibrator; 3. Hollow ring; 4. Piston; 41. One-way valve; 5. Exhaust hole; 6. Offset shaft; 61. Linkage rod; 7. Insulation cylinder; 8. Blocking disk; 81. Elastic member; 82. Pressing disk; 9. Transmission member; 91. Driving rack; 92. Driven rack; 93. Reversing gear. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the following will be combined with the embodiments of the present application. Figure 1-Figure 6 , the technical scheme of the embodiment of the present application is clearly and completely described. Obviously, the described embodiment is a part of the embodiment of the present application, not all of the embodiments. Based on the described embodiment of the present application, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of this application.

[0038] In a first aspect, the present application provides a pipeline rapid prototyping device, which adopts the following technical solution:

[0039] Reference Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 The present embodiment provides a pipeline rapid prototyping device, including a frame 1, on which is disposed an extrusion bin 11, a feeding end of the extrusion bin 11 is connected to a feeding hopper 12, a screw 13 is rotatably connected inside the extrusion bin 11, an output shaft is provided on the frame 1 and extends to the inside of the extrusion bin 11 and is used to drive a driving source 14 for rotating the screw 13, a heating chamber 15 corresponding to the middle of the extrusion bin 11 and a cooling chamber 16 corresponding to the discharge end of the extrusion bin 11 are provided on the frame 1.

[0040] An exhaust pipe 2 is provided inside the feeding hopper 12, and the exhaust pipe 2 is connected to a plurality of exhaust pipes 21 that penetrate the feeding hopper 12, and the bottom of the exhaust pipe 2 is connected to a hollow ring 3 that is sleeved on the screw 13 and the output shaft of the driving source 14, and a piston 4 is axially slidably connected inside the exhaust pipe 2, and a one-way valve 41 is provided in the air guide hole opened on the piston 4, and the air inlet end of the one-way valve 41 is located at the bottom, and the air outlet end of the one-way valve 41 is located at the top.

[0041] The screw 13 is hollow and connected to the hollow ring 3, and a plurality of exhaust holes 5 connected to its own inner cavity are opened on the surface of the screw 13. An offset shaft 6 located inside the hollow ring 3 is provided between the screw 13 and the output shaft of the driving source 14, and a linkage rod 61 is hinged between the piston 4 and the offset shaft 6.

[0042] The personnel first feed the plastic particles from the feeding hopper 12 into the extrusion bin 11, and then the driving source 14 drives the screw 13 to rotate to push the plastic particles. In this process, the offset shaft 6, the connecting rod 61 and the piston 4 cooperate to present the form of a crank-connecting rod assembly, and the piston 4 as the linear output end of the crank-connecting rod assembly will slide back and forth inside the exhaust pipe 2. At this time, through the cooperation of the one-way valve 41, the inner cavity of the screw 13 and the hollow ring 3 will generate negative pressure suction, so that the water vapor inside the extrusion bin 11 is gradually extracted from the exhaust hole 5 and discharged through the exhaust pipe 21.

[0043] As the plastic particles get closer to the location of the heating chamber 15, the plastic particles will gradually melt due to the high temperature inside the heating chamber 15. After the molten plastic is extruded from the pipeline mold installed at the discharge end of the extrusion bin 11, the initially formed plastic pipeline will be cooled and solidified under the low temperature of the cooling chamber 16, thereby completing the molding of the plastic pipeline.

[0044] The water vapor inside the extrusion bin 11 is extracted by central suction, so that the water vapor is separated from the molten plastic as much as possible, reducing the possibility of pores in the final formed plastic pipeline. Compared with the suction method in the circumferential direction, when the negative pressure suction work is carried out in the central suction method, the probability of the molten plastic being obstructed due to the local negative pressure in the circumferential direction when being pushed by the screw 13 can be reduced, so that the plastic extrusion work can be carried out efficiently.

[0045] Reference Figure 3 and Figure 4 The exhaust pipes 21 are all copper heat-conducting pipes. The feeding hopper 12 is externally sheathed with a heat-insulating tube 7 that can communicate with the external environment, and the exhaust ends of the exhaust pipes 21 are located in the interlayer between the heat-insulating tube 7 and the feeding hopper 12.

[0046] The extracted water vapor will enter the interlayer between the heat preservation tube 7 and the feeding hopper 12 when being discharged from the exhaust pipe 21. Since the exhaust pipe 21 is a copper heat conducting pipe with a high thermal conductivity, the subsequent plastic particles will be preheated both internally and externally when entering the feeding hopper 12, thereby removing moisture and water from the plastic particles and improving the quality of subsequent plastic pipeline molding work.

[0047] Reference Figure 3 and Figure 4 , a pneumatic vibrator 211 is connected in series inside the exhaust pipe 21.

[0048] When the water vapor passes through the exhaust pipe 21 , the pneumatic vibrator 211 will operate through its own water vapor power source. Under the vibration generated by the pneumatic vibrator 211 , the plastic particles inside the feeding hopper 12 will fall faster to prevent the plastic particles from clogging and accumulating inside the feeding hopper 12 .

[0049] Reference Figure 3 , Figure 4 and Figure 5 A blocking plate 8 is sleeved on the bottom of the exhaust pipe 2 in an axially sliding connection manner through an elastic member 81, and the outer edge of the blocking plate 8 is in contact with the inner wall of the feeding hopper 12, and a pressing plate 82 is sleeved on the outside of the exhaust pipe 2 in an axially sliding connection manner. A transmission member 9 is provided between the exhaust pipe 2, the piston 4 and the pressing plate 82, which is used to move the pressing plate 82 downward when the piston 4 rises or to move the pressing plate 82 upward when the piston 4 descends.

[0050] Reference Figure 4 , Figure 5 and Figure 6 The transmission member 9 includes an active rack 91, a driven rack 92 and a reversing gear 93. The active rack 91 is arranged on the piston 4, the driven rack 92 is arranged on the pressing plate 82, and the reversing gear 93 which can mesh with the active rack 91 and the driven rack 92 at the same time is rotatably connected inside the air extraction pipe 2.

[0051] When the piston 4 rises inside the exhaust pipe 2, the pressing plate 82 will move downward due to the meshing connection relationship among the active rack 91, the driven rack 92 and the reversing gear 93, thereby pressing part of the plastic particles into the outlet of the feeding hopper 12 where the blocking plate 8 is located, until the blocking plate 8 overcomes the elastic potential energy of the elastic member 81 and enters the extrusion bin 11, thereby allowing the plastic particles to enter the extrusion bin 11; conversely, when the piston 4 descends inside the exhaust pipe 2, the pressing plate 82 will move up and reset under the step-by-step transmission of the active rack 91, the driven rack 92 and the reversing gear 93, while the blocking plate 8 will move up and reset under the action of the elastic member 81.

[0052] During the process of the screw 13 rotating to push the plastic and perform negative pressure suction, quantitative feeding is achieved through the cooperation of the barrier plate 8 and the pressure plate 82, so that the plastic particles fed each time remain consistent and the feeding speed matches the pushing speed of the screw 13, thereby reducing the probability of affecting the molding quality of the plastic pipe due to fluctuations in the feeding amount.

[0053] The implementation principle of a pipeline rapid prototyping device in the embodiment of the present application is:

[0054] The personnel first feed the plastic particles from the feeding hopper 12 into the extrusion bin 11, and then the driving source 14 drives the screw 13 to rotate to push the plastic particles. In this process, the offset shaft 6, the connecting rod 61 and the piston 4 cooperate to present the form of a crank-connecting rod assembly, and the piston 4 as the linear output end of the crank-connecting rod assembly will slide back and forth inside the exhaust pipe 2. At this time, through the cooperation of the one-way valve 41, the inner cavity of the screw 13 and the hollow ring 3 will generate negative pressure suction, so that the water vapor inside the extrusion bin 11 is gradually extracted from the exhaust hole 5 and discharged through the exhaust pipe 21.

[0055] The extracted water vapor will enter the interlayer between the heat preservation tube 7 and the feeding hopper 12 when being discharged from the exhaust pipe 21. Since the exhaust pipe 21 is a copper heat conducting pipe with a high thermal conductivity, the subsequent plastic particles will be preheated both internally and externally when entering the feeding hopper 12, thereby removing moisture and water from the plastic particles and improving the quality of subsequent plastic pipeline molding work.

[0056] As the plastic particles get closer to the location of the heating chamber 15, the plastic particles will gradually melt due to the high temperature inside the heating chamber 15. After the molten plastic is extruded from the pipeline mold installed at the discharge end of the extrusion bin 11, the initially formed plastic pipeline will be cooled and solidified under the low temperature of the cooling chamber 16, thereby completing the molding of the plastic pipeline.

[0057] In a second aspect, the present application provides a pipeline rapid prototyping process, which is applied to a pipeline rapid prototyping device in the first aspect, and the prototyping process includes:

[0058] S1, firstly, plastic particles are fed into the feeding hopper 12, and then the plastic particles pass through the feeding hopper 12 and enter the interior of the extrusion bin 11;

[0059] S2, the screw 13 is rotated by the cooperation of the driving source 14, so that the plastic particles are pushed by the screw 13 to the position corresponding to the heating chamber 15 for heating. The screw 13 is driven to rotate by the cooperation of the driving source 14, so that the plastic particles are gradually pushed by the screw 13 to the position corresponding to the heating chamber 15 for heating;

[0060] S3, the screw 13 pushes the heated and molten plastic toward the pipeline mold installed at the discharge end of the extrusion bin 11 for preliminary molding. After the preliminary molded plastic pipeline enters the cooling chamber 16, the plastic pipeline will be cooled and solidified to be molded.

[0061] In S2, when the screw 13 rotates, the piston 4, driven by the offset shaft 6 and the linkage rod 61, reciprocates inside the exhaust pipe 2 to form a negative pressure suction force, so that the water vapor inside the extrusion bin 11 is extracted.

[0062] In S2, after the water vapor inside the extrusion bin 11 is extracted, the water vapor will enter the interlayer between the heat preservation tube 7 and the feeding hopper 12 through the guiding action of the exhaust pipe 21, so that the plastic particles subsequently fed into the feeding hopper 12 are preheated.

[0063] In addition, it should be noted that in the description of this application, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0064] The above is a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles described in the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. A pipeline rapid prototyping device, comprising a frame (1), an extrusion bin (11), a feeding hopper (12), a screw (13), a driving source (14), a heating chamber (15) and a cooling chamber (16), characterized in that: The feeding hopper (12) is provided with an air extraction pipe (2) inside, and the air extraction pipe (2) is connected to a plurality of exhaust pipes (21) penetrating the feeding hopper (12); the bottom of the air extraction pipe (2) is connected to a hollow ring (3) sleeved on the screw (13) and the output shaft of the driving source (14); a piston (4) is axially slidably connected inside the air extraction pipe (2); and a one-way valve (41) is provided in an air guide hole provided on the piston (4); The screw rod (13) is hollow and connected to the hollow ring (3), and a plurality of air extraction holes (5) connected to the inner cavity of the screw rod (13) are provided on the surface of the screw rod (13). An offset shaft (6) located inside the hollow ring (3) is provided between the screw rod (13) and the output shaft of the driving source (14), and a linkage rod (61) is hingedly connected between the piston (4) and the offset shaft (6). The bottom of the air extraction pipe (2) is sleeved with a blocking plate (8) by means of an elastic member (81) in an axially sliding connection, and the outer edge of the blocking plate (8) is in abutment with the inner wall of the feeding hopper (12), and a pressing plate (82) is sleeved with an axially sliding connection on the outside of the air extraction pipe (2). A transmission member (9) is provided between the air extraction pipe (2), the piston (4) and the pressing plate (82) for moving the pressing plate (82) downward when the piston (4) rises or moving the pressing plate (82) upward when the piston (4) descends.

2. A pipeline rapid prototyping device according to claim 1, characterized in that: The exhaust pipes (21) are all copper heat-conducting pipes, the feeding hopper (12) is externally sleeved with a heat-insulating cylinder (7) that can communicate with the external environment, and the exhaust ends of the exhaust pipes (21) are located in the interlayer between the heat-insulating cylinder (7) and the feeding hopper (12).

3. A pipeline rapid prototyping device according to claim 1, characterized in that: A pneumatic vibrator (211) is connected in series inside each of the exhaust pipes (21).

4. A pipeline rapid prototyping device according to claim 1, characterized in that: The transmission member (9) comprises a driving rack (91) arranged on the piston (4) and a driven rack (92) arranged on the pressing plate (82); a reversing gear (93) capable of simultaneously meshing with the driving rack (91) and the driven rack (92) is rotatably connected inside the air extraction pipe (2).

5. A pipeline rapid prototyping process, using the pipeline rapid prototyping device according to claim 2, wherein the prototyping process comprises: S1, firstly, plastic particles are fed into a feeding hopper (12), and then the plastic particles pass through the feeding hopper (12) and enter the interior of an extrusion bin (11); S2, the screw (13) is rotated by the cooperation of the driving source (14), so that the plastic particles are pushed by the screw (13) to a position corresponding to the heating chamber (15) for heating. The screw (13) is rotated by the cooperation of the driving source (14), so that the plastic particles are gradually pushed by the screw (13) to a position corresponding to the heating chamber (15) for heating; S3, the screw (13) pushes the heated and molten plastic toward the pipeline mold installed at the discharge end of the extrusion bin (11) for preliminary molding. After the preliminarily molded plastic pipeline enters the cooling chamber (16), the plastic pipeline is cooled and solidified to be molded.

6. A pipeline rapid prototyping process according to claim 5, characterized in that: In S2, when the screw (13) rotates, the piston (4) moves back and forth inside the exhaust pipe (2) driven by the offset shaft (6) and the linkage rod (61), thereby forming a negative pressure suction force, so that the water vapor inside the extrusion bin (11) is extracted.

7. A pipeline rapid prototyping process according to claim 6, characterized in that: In the above-mentioned S2, after the water vapor inside the extrusion bin (11) is extracted, the water vapor will enter the interlayer between the heat preservation cylinder (7) and the feeding hopper (12) through the guiding action of the exhaust pipe (21), so that the plastic particles subsequently fed into the feeding hopper (12) are preheated.