Method and system for preventing misdiagnosis of transmission line fault test and maintenance

By verifying voltage, current, and switching parameters, the test and maintenance probability of the waveform recording file is determined, which solves the problem of misjudgment in power system fault waveform recording devices during testing or maintenance, and improves the diagnostic accuracy and efficiency of the fault waveform recording master station.

CN118642029BActive Publication Date: 2024-11-05WUHAN SHUNCHENG TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411111562.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-05
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

Existing technologies cannot effectively distinguish between the waveform data generated by power system fault recording devices during testing or maintenance and the actual power grid fault data, leading to misjudgments and false alarms, increasing manpower costs and interfering with power grid dispatching.

Method used

By verifying voltage, current, and switching parameters to prevent false diagnostics, the probability of testing and repairing the waveform recordings is determined, enabling accurate diagnosis of the waveform recordings and avoiding misjudgments and false alarms.

Benefits of technology

It improves the diagnostic accuracy of the fault recording master station, reduces manual intervention and system interaction time, is applicable to power grid systems with voltage levels of 110kV and above, and supports online and offline analysis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118642029B_ABST
    Figure CN118642029B_ABST
Patent Text Reader

Abstract

The present invention provides a transmission line fault test and maintenance anti-misdiagnosis method and system, which relates to the field of power system relay protection. The method includes: extracting and verifying voltage anti-misdiagnosis parameters, current anti-misdiagnosis parameters and switch quantity anti-misdiagnosis parameters; obtaining three-phase initial voltage test and maintenance probability, fault phase voltage ratio test and maintenance probability and fault zero-sequence voltage difference test and maintenance probability, fault duration test and maintenance probability, three-phase initial current and fault distance test and maintenance probability, before / after fault phase current test and maintenance probability, no protection action outlet position change test and maintenance probability, no circuit breaker position change test and maintenance probability, change switch quantity channel number test and maintenance probability and first change point time difference test and maintenance probability, and determining the diagnosis result corresponding to the current recording file according to the total test and maintenance probability. The present invention improves the fault diagnosis accuracy of the dispatch fault recording master station and avoids fault misjudgment and false alarm.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of relay protection of electric power systems, and in particular to a method and system for preventing misdiagnosis of transmission line fault testing and maintenance. Background Art

[0002] According to the industry standard "DL / T 553-2013 General Technical Conditions for Dynamic Recording Devices of Power Systems", the fault recording device has the characteristics of high sensitivity and rich starting elements, and can accurately record the status change information of the busbar, line, switch / circuit breaker, protection device and other equipment in the interval where the fault recording device is located. However, since the fault recording device does not have the "maintenance pressure plate" function, that is, when the fault recording device itself and other equipment in the interval where it is located are tested or repaired, the "trigger recording" and "recording data output" functions are locked, so the recording data generated during the test or maintenance will be indiscriminately retrieved by the dispatching fault recording master station.

[0003] Since the general method of testing or maintenance is to input simulated fault parameters through the relay protection tester to simulate the test, such as the protection action reliability test of the relay protection device, the circuit breaker performance test, the fault recording device sampling channel test, or through the real line test, such as the commissioning power transmission test, etc. Therefore, the test and maintenance data are highly similar to the real power grid fault data. The fault voltage / current threshold judgment method and the switch state change judgment method widely used in the current dispatch fault recording master station cannot effectively identify such data, resulting in misjudgment and false alarm. The dispatching personnel need to manually identify and verify from multiple parties to eliminate the fault alarm, which not only consumes a lot of unnecessary manpower costs, but also interferes with the normal operation of the power grid dispatching.

[0004] However, there is currently no technical solution that can solve the above technical problems, and there is no method and system for preventing misdiagnosis in transmission line fault testing and maintenance. Summary of the invention

[0005] The present invention provides a method and system for preventing misdiagnosis of transmission line fault test and maintenance. By verifying the voltage misdiagnosis prevention parameters, the current misdiagnosis prevention parameters and the switch misdiagnosis prevention parameters, the total probability of test and maintenance corresponding to the current recording file is determined, and finally the diagnosis of the diagnosis result corresponding to the current recording file is realized.

[0006] In a first aspect, the present invention provides a method for preventing misdiagnosis of a transmission line fault test and maintenance, comprising:

[0007] Parse the current recording file, and when it is determined that the current recording file is a preliminary fault file, extract voltage misdiagnosis prevention parameters, current misdiagnosis prevention parameters, and switch misdiagnosis prevention parameters from the recording file configuration information comparison table and the recording file fault information comparison table corresponding to the current recording file;

[0008] Verify the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, and the fault zero-sequence voltage difference test maintenance probability; verify the current misdiagnosis prevention parameters to obtain the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability, and the phase current test maintenance probability before / after the fault; verify the switch quantity misdiagnosis prevention parameters to obtain the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the number of position change switch quantity channels, and the test maintenance probability of the first point change time difference;

[0009] Determine the total probability of test and maintenance corresponding to the current recording file according to the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability, the fault zero-sequence voltage difference test and maintenance probability, the fault duration test and maintenance probability, the three-phase initial current and fault distance measurement test and maintenance probability, the phase current test and maintenance probability before / after the fault, the position change test and maintenance probability of no protection action outlet, the position change test and maintenance probability of no circuit breaker position, the position change switch quantity channel number test and maintenance probability and the first position change point time difference test and maintenance probability;

[0010] When the total probability of the test and maintenance is greater than or equal to a preset threshold, it is determined that the diagnosis result corresponding to the current recording file is a test and maintenance.

[0011] According to the transmission line fault test and maintenance anti-misdiagnosis method provided by the present invention, after parsing the current recording file, the method further includes: determining a first preset probability according to the number of historical test and maintenance files and the total number of historical files containing the three-phase initial voltage test and maintenance probability; determining a second preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault phase voltage ratio test and maintenance probability; determining a third preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault zero-sequence voltage difference test and maintenance probability; determining a fourth preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault duration test and maintenance probability; determining a fourth preset probability according to the number of historical test and maintenance files and the total number of historical files containing the three-phase initial current and fault distance test and maintenance probability. The fifth preset probability is determined by the total number of historical files when the probability of fault repair is reached; the sixth preset probability is determined by the number of historical test and maintenance files and the total number of historical files when the probability of fault repair is reached; the seventh preset probability is determined by the number of historical test and maintenance files and the total number of historical files when the probability of fault repair is reached; the eighth preset probability is determined by the number of historical test and maintenance files and the total number of historical files when the probability of fault repair is reached; the ninth preset probability is determined by the number of historical test and maintenance files and the total number of historical files when the probability of fault repair is reached; the tenth preset probability is determined by the number of historical test and maintenance files and the total number of historical files when the probability of first fault time difference test and maintenance is reached.

[0012] According to the transmission line fault test and maintenance error diagnosis prevention method provided by the present invention, the voltage error diagnosis prevention parameter is verified to obtain the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability and the fault zero-sequence voltage difference test and maintenance probability, including:

[0013] According to the line and bus corresponding to the fault interval, determine the sampling period corresponding to the A-phase voltage channel, the B-phase voltage channel, the C-phase voltage channel, the zero-sequence voltage channel and the rated frequency;

[0014] According to the start time of the recording file, calculate the secondary effective value of the phase A voltage corresponding to the phase A voltage channel, the secondary effective value of the phase B voltage corresponding to the phase B voltage channel, and the secondary effective value of the phase C voltage corresponding to the phase C voltage channel in the first cycle corresponding to the sampling period;

[0015] When the secondary effective value of any phase voltage is less than or equal to 60% of the secondary rated voltage effective value, the probability of outputting the three-phase initial voltage test and maintenance is the first preset probability, otherwise, the probability of outputting the three-phase initial voltage test and maintenance is 0;

[0016] According to the fault start time, calculate a first ratio of the secondary effective value of the A phase voltage within a cycle after the start of the fault and the cycle before the fault, and a second ratio of the secondary effective value of the A phase voltage within a cycle before the end of the fault and the cycle before the fault; calculate a third ratio of the secondary effective value of the B phase voltage within a cycle after the start of the fault and the cycle before the fault, and a fourth ratio of the secondary effective value of the B phase voltage within a cycle before the end of the fault and the cycle before the fault; calculate a fifth ratio of the secondary effective value of the C phase voltage within a cycle after the start of the fault and the cycle before the fault, and a sixth ratio of the secondary effective value of the C phase voltage within a cycle before the end of the fault and the cycle before the fault;

[0017] When any ratio is less than or equal to 2.5%, the probability of the output fault phase voltage ratio test and maintenance is the second preset probability; otherwise, the probability of the output fault phase voltage ratio test and maintenance is 0;

[0018] According to the fault start time, a first difference between the voltage secondary effective values ​​corresponding to the zero-sequence voltage channel in a cycle after the fault starts and a cycle before the fault is calculated, and a second difference between the voltage secondary effective values ​​corresponding to the zero-sequence voltage channel in a cycle before the fault ends and a cycle before the fault is calculated;

[0019] When any difference is less than or equal to 1% of the effective value of the secondary rated voltage, the probability of the output fault zero-sequence voltage difference test and repair is the third preset probability; otherwise, the probability of the output fault zero-sequence voltage difference test and repair is 0.

[0020] According to the transmission line fault test and maintenance error diagnosis prevention method provided by the present invention, the verification current error diagnosis prevention parameter is used to obtain the fault duration test and maintenance probability, the three-phase initial current and fault distance measurement test and maintenance probability, and the phase current test and maintenance probability before / after the fault, including:

[0021] According to the line and bus corresponding to the fault interval, determine the sampling period corresponding to the A-phase current channel, the B-phase current channel, the C-phase current channel, the zero-sequence current channel and the rated frequency;

[0022] When the primary rated voltage of the line is greater than or equal to 220 kV and the fault duration exceeds 200 ms, and when the primary rated voltage of the line is less than 220 kV and the fault duration exceeds 2000 ms, the output fault duration test maintenance probability is the fourth preset probability, otherwise, the output fault duration test maintenance probability is 0;

[0023] According to the start time of the recording file, the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in the first cycle corresponding to the period are calculated;

[0024] When the secondary effective value of the A-phase current, the B-phase current and the C-phase current are all less than 0.003A, and the ratio of the fault distance measurement to the line length exceeds 10 times the line length, the output three-phase initial current and the fault distance measurement test maintenance probability are the fifth preset probability, otherwise, the output three-phase initial current and the fault distance measurement test maintenance probability are 0;

[0025] According to the fault start time, the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in one cycle before the fault are calculated; the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in one cycle after the fault are calculated;

[0026] When the secondary effective value of phase A current corresponding to phase A current channel within one cycle before the fault, the secondary effective value of phase B current corresponding to phase B current channel, the secondary effective value of phase C current corresponding to phase C current channel, the secondary effective value of phase A current channel corresponding to phase A current channel within one cycle after the fault, the secondary effective value of phase B current corresponding to phase B current channel, and the secondary effective value of phase C current corresponding to phase C current channel are all greater than or equal to 0.1A, the probability of outputting the phase current test and maintenance before / after the fault is the sixth preset probability; otherwise, the probability of outputting the phase current test and maintenance before / after the fault is 0.

[0027] According to the transmission line fault test and maintenance error diagnosis prevention method provided by the present invention, the verification switch value error diagnosis prevention parameter is used to obtain the test and maintenance probability of no protection action outlet position change, the test and maintenance probability of no circuit breaker position change, the test and maintenance probability of the number of position change switch value channels and the test and maintenance probability of the first position change time difference, including:

[0028] When it is determined that the switch quantity channel contains a protection action or a reclosing type, and there is no protection action or reclosing switch quantity channel change, the output no protection action output change test and maintenance probability is the seventh preset probability, otherwise, the output no protection action output change test and maintenance probability is 0;

[0029] When it is determined that the switch quantity channel includes the circuit breaker trip type and no circuit breaker trip switch quantity channel changes position, the output test and maintenance probability of no circuit breaker position change is the eighth preset probability; otherwise, the output test and maintenance probability of no circuit breaker position change is 0;

[0030] When it is determined that the number of switch channels that have been displaced is greater than or equal to 40, and it is determined that the number of switch channels that have been displaced is greater than or equal to 60% of the total number of switch channels, the probability of testing and repairing the number of output displaced switch channels is the ninth preset probability, otherwise, the probability of testing and repairing the number of output displaced switch channels is 0;

[0031] When it is determined that the number of switch channels that have changed position is greater than or equal to 40, and the time difference of the first change point corresponding to more than 80% of the switch channels that have changed position does not exceed 3ms, the output first change point time difference test maintenance probability is the tenth preset probability, otherwise, the output first change point time difference test maintenance probability is 0.

[0032] According to the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention, the determination of the total probability of test and maintenance corresponding to the current recording file includes:

[0033] ;

[0034] in, is the total probability of test maintenance, and are the first test maintenance probability and the corresponding weight of the first test maintenance probability, respectively. The first test maintenance probability includes the three-phase initial voltage, fault phase voltage ratio, fault zero-sequence voltage difference, fault duration, three-phase initial current and fault distance, phase current before / after the fault, no protection action outlet position change, and no circuit breaker position change test maintenance probability, where i∈[1,8]; , are respectively the second test maintenance probability and the corresponding weight of the second test maintenance probability, wherein the second test maintenance probability includes the test maintenance probability of the number of position change switch quantity channels and the test maintenance probability of the first position change time difference, wherein j∈[9,10].

[0035] According to the method for preventing misdiagnosis of transmission line fault test and maintenance provided by the present invention, after determining the diagnosis result corresponding to the current recording file, or after determining that the current recording file is a non-initial fault file, the method further includes:

[0036] The next wave recording file is parsed to determine the diagnosis result corresponding to the next wave recording file, until the diagnosis results of all the wave recording files in the target wave recording file list are determined.

[0037] According to the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention, before parsing the current recording file, the method further includes:

[0038] The recording system is queried at preset intervals, and when it is found that a recording file has been generated, the recording file list is locked;

[0039] The target recording file list is determined according to the locked recording file list.

[0040] According to the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention, after determining the diagnosis results of all the recording files in the target recording file list, the method further includes:

[0041] The lock of the recording file list is released, and the recording system is queried again to determine the target recording file list again.

[0042] In a second aspect, a transmission line fault test and maintenance error-prevention diagnosis system is provided, comprising:

[0043] The parsing unit is used to parse the current recording file, and when it is determined that the current recording file is a preliminary fault file, extract the voltage misdiagnosis prevention parameter, the current misdiagnosis prevention parameter and the switch misdiagnosis prevention parameter from the recording file configuration information comparison table and the recording file fault information comparison table corresponding to the current recording file;

[0044] A verification unit is used to verify the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, and the fault zero-sequence voltage difference test maintenance probability; verify the current misdiagnosis prevention parameters to obtain the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability, and the phase current test maintenance probability before / after the fault; verify the switch quantity misdiagnosis prevention parameters to obtain the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the number of position change switch quantity channels, and the test maintenance probability of the first change point time difference;

[0045] A determination unit is used to determine the total test and maintenance probability corresponding to the current recording file according to the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability, the fault zero-sequence voltage difference test and maintenance probability, the fault duration test and maintenance probability, the three-phase initial current and fault distance measurement test and maintenance probability, the phase current test and maintenance probability before / after the fault, the test and maintenance probability of no protection action outlet position change, the test and maintenance probability of no circuit breaker position change, the test and maintenance probability of the number of position change switch quantity channels and the test and maintenance probability of the first change point time difference;

[0046] The diagnosis unit is used to determine that the diagnosis result corresponding to the current recording file is a test maintenance when the total probability of the test maintenance is greater than or equal to a preset threshold.

[0047] The present invention refines the fault diagnosis criteria of the power grid transmission line by identifying the difference characteristics between the test and maintenance data and the fault data, adds a test and maintenance anti-misdiagnosis algorithm to the traditional fault diagnosis algorithm of the dispatching fault recording master station, effectively improves the fault diagnosis accuracy of the dispatching fault recording master station, realizes the test and maintenance anti-misdiagnosis and fault alarm locking, and avoids fault misjudgment and false alarm to a great extent.

[0048] The beneficial effects of the present invention also include:

[0049] (1) High accuracy: The fault diagnosis criteria and weights are set based on a large amount of real operation data mining and statistical analysis, covering common test and maintenance methods of power systems, and meeting the needs of preventing misdiagnosis of transmission line fault tests and maintenance in power grid systems with voltage levels of 110 kV and above;

[0050] (2) Strong autonomy: Based entirely on single-source fault recording data, the system can independently complete test and maintenance to prevent misdiagnosis, without relying on dual-end data or primary system data, thus reducing the time consumption of third-party system interaction, data call waiting, and manual intervention, and greatly improving fault diagnosis efficiency;

[0051] (3) Wide application scope: Fault recording data input and fault diagnosis report output comply with the Common Format For Transient Data Exchange (COMTRADE) file standard for power system transient data exchange. It can be deployed independently and supports online and offline analysis; it can also be deployed as a fault diagnosis module to other devices or platforms, and is suitable for power system dispatching agencies, substations, centralized control stations, power plants and other units to improve the level of scientific decision-making in power grid dispatching. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0053] Figure 1 This is one of the flow diagrams of the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention;

[0054] Figure 2 This is the second flow chart of the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention;

[0055] Figure 3 It is a schematic diagram of the combination of switch channel information provided by the present invention;

[0056] Figure 4 This is the third flow chart of the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention;

[0057] Figure 5 This is the fourth flow chart of the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention;

[0058] Figure 6 This is the fifth flow chart of the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention;

[0059] Figure 7 It is a structural schematic diagram of the transmission line fault test and maintenance anti-misdiagnosis system provided by the present invention. DETAILED DESCRIPTION

[0060] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] Figure 1 This is one of the flow charts of the transmission line fault test and maintenance anti-misdiagnosis method provided by the present invention, and the transmission line fault test and maintenance anti-misdiagnosis method comprises:

[0062] Step 101, parsing the current recording file, and when determining that the current recording file is a preliminary fault file, extracting voltage misdiagnosis prevention parameters, current misdiagnosis prevention parameters, and switch misdiagnosis prevention parameters from a recording file configuration information comparison table and a recording file fault information comparison table corresponding to the current recording file;

[0063] Step 102, verify the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability and the fault zero-sequence voltage difference test maintenance probability; verify the current misdiagnosis prevention parameters to obtain the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability and the phase current test maintenance probability before / after the fault; verify the switch quantity misdiagnosis prevention parameters to obtain the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the number of position change switch quantity channels and the test maintenance probability of the first position change time difference;

[0064] Step 103, according to the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, the fault zero-sequence voltage difference test maintenance probability, the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability, the phase current test maintenance probability before / after the fault, the no protection action outlet position change test maintenance probability, the no circuit breaker position change test maintenance probability, the change switch channel number test maintenance probability and the first change point time difference test maintenance probability, determine the total test maintenance probability corresponding to the current recording file;

[0065] Step 104: When the total probability of the test and maintenance is greater than or equal to a preset threshold, determine that the diagnosis result corresponding to the current recording file is a test and maintenance.

[0066] In step 101, the fault recording data is one of the main data sources for the dispatch fault recording master station to carry out power grid fault analysis, and is also an important basis for the dispatching agency to handle accidents. The fault recording data is recorded and output by the power system dynamic recording device. According to the current industry standard "DL / T 553-2013 General Technical Conditions for Power System Dynamic Recording Devices", the start criteria for triggering recording of fault recording devices include: voltage / current sudden change start, voltage / current over-limit start, negative sequence voltage / current over-limit start, zero sequence voltage / current over-limit start, harmonic voltage start, frequency over-limit start, DC voltage / current sudden change start, switch quantity change start, etc.; the output mode of recording file is: when the circuit breaker trips due to a fault, it should be able to generate a fault information summary table, which should at least include: fault component and phase, trip phase, fault distance (line fault), action time of each protection from the start of the fault to the giving of the trip signal, circuit breaker trip time, fault current effective value and bus voltage effective value of the first cycle after the fault; for line faults, it should also include: circuit breaker reclosing time, fault phase and trip again, action time of each protection, trip again, fault current effective value and bus voltage effective value of the first cycle after the fault again; the transmission format of recording file complies with "GB / T 22386-2008 General format for transient data exchange in power systems" standard COMTRADE file format; the recording file naming method is: device name_logical device name_fault number_fault time_recording nature, where recording nature: F means fault recording; S means start recording. The dispatch fault recording master station retrieves the COMTRADE file from the fault recording device through the dispatch data network for fault analysis and alarm.

[0067] According to the standards of "DL / T 553-2013 General Technical Requirements for Power System Dynamic Recording Devices" and "GB / T 22386-2008 General Format for Transient Data Exchange in Power Systems", the .CFG and .DMF files in the COMTRADE format files contain the configuration information of the fault recording device, and the .HDR file contains the fault information recorded by the fault recording device. To simplify the presentation process, the information nodes involved in the method proposed in the present invention and their expressions in the COMTRADE format and the corresponding relationship between the parameter codes in the present invention are listed as follows:

[0068] Table 1 Recording file configuration information comparison table

[0069] ;

[0070]

[0071] Table 2 Recording file fault information comparison table

[0072]

[0073] In addition, the method proposed in the present invention also involves the following parameters, as shown in Table 3. Since these parameters are not directly given in the recording file configuration information and fault information, they need to be obtained by analyzing and calculating the sampling data of the recording file.

[0074] Table 3 Parameters obtained by analyzing and calculating the sampling data of the recording file

[0075]

[0076] In step 102, the present invention performs verification based on the voltage misdiagnosis prevention parameters, current misdiagnosis prevention parameters and switch misdiagnosis prevention parameters obtained above, and obtains the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, the fault zero-sequence voltage difference test maintenance probability, the fault duration test maintenance probability, the three-phase initial current and fault ranging test maintenance probability, the phase current test maintenance probability before / after the fault, the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the change switch channel number and the first change point time difference test maintenance probability, and determines the total test maintenance probability corresponding to the current recording file.

[0077] In step 103, the present invention combines all the above test and maintenance probabilities, assigns weights to each test and maintenance probability, comprehensively considers all diagnostic factors, and determines the total test and maintenance probability corresponding to the current recording file.

[0078] In step 104, the present invention determines that the diagnostic result corresponding to the current recording file is a test maintenance when the total probability of the test maintenance is greater than or equal to the preset threshold, and determines that the diagnostic result corresponding to the current recording file is a non-test maintenance when the total probability of the test maintenance is less than the preset threshold. Optionally, the preset probability corresponding to the test maintenance probability of each characteristic quantity is obtained from statistical historical data, specifically, it can be obtained by dividing the number of historical test maintenance files by the number of files containing any characteristic quantity, and the weight is the weight of the parameter corresponding to each characteristic quantity in the current system fault diagnosis algorithm. In the present invention, the set values ​​of the preset probability and weight are shown in Table 4.

[0079] Table 4 Preset probability and weight setting values

[0080]

[0081] Optionally, determining the total probability of the test and maintenance corresponding to the current recording file includes:

[0082] ;

[0083] in, is the total probability of test maintenance, and are the first test maintenance probability and the corresponding weight of the first test maintenance probability, respectively. The first test maintenance probability includes the three-phase initial voltage, fault phase voltage ratio, fault zero-sequence voltage difference, fault duration, three-phase initial current and fault distance, phase current before / after the fault, no protection action outlet position change, and no circuit breaker position change test maintenance probability, where i∈[1,8]; , are respectively the second test maintenance probability and the corresponding weight of the second test maintenance probability, wherein the second test maintenance probability includes the test maintenance probability of the number of position change switch quantity channels and the test maintenance probability of the first position change time difference, wherein j∈[9,10].

[0084] Optionally, the above-mentioned characteristic quantities 1 to 8 are a whole group of tests, which belong to principle tests. There is a logical relationship between voltage, current and switching quantity, so a set of weight allocation rules is adopted (the sum of the weights is 1); characteristic quantities 9 and 10 are switching quantity tests, which belong to physical tests and are only for switching quantity physical channels, and then another set of weight allocation rules is adopted.

[0085] Optionally, after determining the diagnostic result corresponding to the current recording file, or after determining that the current recording file is a non-initially judged fault file, the method also includes: parsing the next recording file to determine the diagnostic result corresponding to the next recording file, until the diagnostic results of all recording files in the target recording file list are determined.

[0086] Optionally, before parsing the current recording file, the method further includes: querying the recording system at preset time intervals, and locking the recording file list when it is found that a recording file has been generated; and determining the target recording file list based on the locked recording file list.

[0087] Optionally, after determining the diagnosis results of all the recording files in the target recording file list, the method further includes: unlocking the recording file list, and querying the recording system again to determine the target recording file list again.

[0088] The present invention refines the fault diagnosis criteria of the power grid transmission line by identifying the difference characteristics between the test and maintenance data and the fault data, adds a test and maintenance anti-misdiagnosis algorithm to the traditional fault diagnosis algorithm of the dispatching fault recording master station, effectively improves the fault diagnosis accuracy of the dispatching fault recording master station, realizes the test and maintenance anti-misdiagnosis and fault alarm locking, and avoids fault misjudgment and false alarm to a great extent.

[0089] Figure 2 This is the second flow chart of the method for preventing misdiagnosis of transmission line fault test and maintenance provided by the present invention.

[0090] Specifically, the steps include:

[0091] Step 1: Query new recording files, query the storage path of the recording files in the current system, and number the new recording files when new recording files are generated. If j new recording files are queried, they are numbered 1~j, where j≥1, and the initial parsing order i=1.

[0092] Step 2: Lock the recording file list. When a new recording file is generated, lock the recording file list of the current system so that the new recording file is not updated to the recording file list temporarily to prevent the recording file that has not been prevented from misdiagnosis from triggering the current system alarm or being called up by the superior system.

[0093] Step 3: Parse the new recording file. Parse the i-th new recording file. The parsing process is divided into two steps:

[0094] Step 3.1: Filter fault files. The standard recording file naming method is: device name_logical device name_fault sequence number_fault time_recording nature. Determine the value of the "recording nature" bit: if "recording nature" = "F", it means that the recording file is a preliminary fault file and needs to be prevented from misdiagnosis, and go to step 3.2; otherwise, it means that the recording file is a preliminary non-fault file and does not need to be prevented from misdiagnosis; the significance of this step is that the fault recording device has the characteristics of high sensitivity and rich starting elements. At least 90% of the recording files it generates are non-fault files. Through screening in this step, the efficiency of preventing misdiagnosis can be improved, while reducing system resource overhead;

[0095] Step 3.2: Extract the parameters for preventing misdiagnosis. By parsing the waveform recording file, extract the parameters in Tables 1 to 3 for preventing misdiagnosis.

[0096] Figure 3 It is a schematic diagram of the combination of switch channel information provided by the present invention, combining the switch channel information contained in the .HDR, .CFG, and .DMF files in the recording file, wherein the method for obtaining the protection action time tTr, the circuit breaker trip time tTWJ, and the reclosing time tRec is as follows:

[0097] In the .HDR file: <digitalevent>Indicates a switch channel with position change; <time>Indicates the time of displacement; <name>Indicates the channel name; <value>Indicates the sample value;

[0098] In the .CFG file: Dn represents the switch channel number; ch_id represents the channel name; ph represents the phase difference; cccm represents the monitored circuit element (bus or line); y represents the normal state of the channel (0 or 1);

[0099] In the .DMF file: "scl:StatusChannel" indicates the switch channel node in the XML Schema structure; "idx_cfg" indicates the channel number; "idx_org" indicates the terminal number; "type" indicates the channel type (see Table 1); "flag" indicates the channel tag (see Table 1); "contact" indicates the contact type (normally open or normally closed). "Dn" is the same as "idx_cfg". <name>Same as "ch_id", by combining the above three files, you can get, for example:

[0100] Protection action time tTr is <digitalevent>Type, the channel type is "type=relay", the channel number is idx_cfg (Dn), and the channel name is <name>(ch_id) <time>;

[0101] By combining, the number of protection action switch channels that have changed position, ETr, the number of circuit breaker trip switch channels, ETWJ, and the number of reclosing switch channels, ERec, are counted. The number of protection action output channels of all "type=relay" under the "scl:StatusChannel" node is CSR; the number of circuit breaker position channels of all "type=Breaker" is CSB. In addition, the number of <digitalevent>The number of switch quantities ES for all positions under the type is based on <time>They are sorted in order of tS1~tSn.

[0102] Step 4: Characteristic quantity verification, verify the anti-misdiagnosis parameters extracted in step 3.2 according to the test and maintenance characteristics, and calculate the probability that the recording file is a test and maintenance under each characteristic quantity type. Characteristic quantity verification is divided into: voltage characteristic quantity verification, current characteristic quantity verification and switch characteristic quantity verification.

[0103] Step 5: Weight calculation: According to the test and maintenance probabilities P1~P10 of the characteristic quantities 1~10 output in step 4 and the weights corresponding to the characteristic quantities, calculate the total test and maintenance probability PM of the recording file.

[0104] Step 6: Diagnosis result: determine whether the total probability of test maintenance of the recording file reaches the set threshold value. The threshold value set in the present invention is 60%, expressed as "PM ≥ 60%?" If so, reset the value of the "recording property" bit in the recording file name from "F" to "M", and add a mark "***" before the fault interval in the .HDR file; otherwise, go directly to step 7.

[0105] Step 7: diagnose the next new recording file, add 1 to the parsing order of the new recording file, expressed as "i=i+1", and prepare to parse the new recording file with the next sequence number. Determine whether the diagnosis of all new recording files has been completed, expressed as "i+1>j?". If yes, go to step 8; otherwise, return to step 3.

[0106] Step 8: Generate a new recording file list, unlock the recording file list, and generate a new recording file list based on the latest recording file name. At this point, the new recording file list can be queried by the current system user or retrieved by the superior system. The current system and the superior system can shield the alarm through the "recording nature" or "fault interval" mark.

[0107] Figure 4 This is the third flow diagram of the method for preventing misdiagnosis of transmission line fault test and maintenance provided by the present invention. The voltage characteristic quantity verification is mainly carried out for the change process of the voltage analog quantity channel sampling value of the busbar related to the fault line. The relevant parameters are shown in Tables 1 to 3. The verification process is as follows Figure 4 As shown, the specific steps are as follows:

[0108] Set the default test and repair probabilities PC1 to PC3 of feature quantities 1 to 3. Feature quantities 1 to 3 are voltage feature quantities. The default test and repair probability indicates the probability that the recording file is a test and repair file rather than a fault file when the feature quantity meets certain conditions. The default test and repair probabilities of each feature quantity in this embodiment are shown in Table 4.

[0109] According to the value of the fault interval Bay, the bus_ID of the line Line and its related bus is determined, so as to determine the voltage analog channels of the bus related to the faulty line, the A phase voltage channel Ua, the B phase voltage channel Ub, the C phase voltage channel Uc, the zero sequence voltage channel Un, and the channel rated frequency lf and the sampling period T.

[0110] According to the start time ts of the recording file, the secondary effective values ​​of the voltages Ua, Ub, and Uc in the first cycle T1 corresponding to the sampling period are calculated and recorded as feature quantity 1: the secondary effective value of the voltage of phase A ST1_Ua, the secondary effective value of the voltage of phase B ST1_Ub, and the secondary effective value of the voltage of phase C ST1_Uc.

[0111] Determine whether any phase voltage secondary effective value is less than or equal to 60% of the secondary rated voltage effective value, expressed as "ST1_Ua or ST1_Ub or ST1_Uc ≤ 0.6VNS?". If so, the test maintenance probability P1 of feature quantity 1 is the first preset probability PC1; otherwise, P1=0.

[0112] According to the fault start time tf, the first ratio of the secondary effective value of the voltage Ua in the cycle Tf after the start of the fault and the cycle Tbf before the fault is calculated: R1_Ua=STf_Ua / STbf_Ua, the second ratio of the secondary effective value of the voltage Ua in the cycle Tef before the end of the fault and the cycle Tbf before the fault is calculated: R2_Ua=STef_Ua / STbf_Ua; similarly, the third ratio R1_Ub, the fourth ratio R2_Ub, the fifth ratio R1_Uc, and the sixth ratio R2_Uc are calculated, which are recorded as characteristic quantity 2: fault phase voltage ratios R1_Ua, R1_Ub, R1_Uc, R2_Ua, R2_Ub, and R2_Uc.

[0113] Determine whether the phase voltage ratio of any phase fault is less than or equal to 2.5%, expressed as "R1_Ua or R1_Ub or R1_Uc or R2_Ua or R2_Ub or R2_Uc ≤ 2.5%?". If so, the test maintenance probability P2 of the characteristic quantity 2 is the second preset probability PC2; otherwise, P2=0.

[0114] According to the fault start time tf, the first difference between the secondary effective values ​​of the voltage in the cycle Tf after the start of the fault and the cycle Tbf before the fault is calculated: △1_Un=STf_Un-STbf_Un, and the second difference between the secondary effective values ​​of the voltage in the cycle Tef before the end of the fault and the cycle Tbf before the fault is calculated: △2_Un=STef_Un-STbf_Un, which are recorded as characteristic quantity 3: fault zero-sequence voltage difference △1_Un, △2_Un.

[0115] Determine whether the fault zero-sequence voltage difference is less than or equal to 1% of the effective value of the secondary rated voltage, expressed as "△1_Un or △2_Un≤1%VNS?" If so, the test maintenance probability P3 of the characteristic quantity 3 is the third preset probability PC3; otherwise, P3=0.

[0116] Figure 5 This is the fourth flow chart of the method for preventing misdiagnosis of power transmission line fault test and maintenance provided by the present invention. The current characteristic quantity verification is mainly carried out for the change process of the current analog quantity channel sampling value of the fault line. The relevant parameters are shown in Tables 1 to 3. The verification process is as follows Figure 5 As shown, the specific steps are as follows:

[0117] Set the default test maintenance probabilities PC4~PC6 of characteristic quantities 4~6. Characteristic quantities 4~6 are current characteristic quantities, PC4, PC5, and PC6 are the fourth preset probability, the fifth preset probability, and the sixth preset probability, respectively, as shown in Table 4. According to the value of the fault interval Bay, the line Line is determined, and the current analog channels of the fault line are determined to be the A-phase current channel Ia, the B-phase current channel Ib, the C-phase current channel Ic, the zero-sequence current channel In, and the channel rated frequency lf and the sampling period T.

[0118] Determine whether the primary rated voltage VN of the line Line is greater than or equal to 220kV, expressed as "VN≥220kV?". If so, determine whether the fault duration tk exceeds 200ms. If so, the test maintenance probability P4 of the characteristic quantity 4 is the fourth preset probability PC4. If not, determine whether tk exceeds 2000ms. If so, the test maintenance probability P4 of the characteristic quantity 4 is the fourth preset probability PC4; otherwise, P4=0.

[0119] According to the start time ts of the recording file, the secondary effective values ​​of the currents Ia, Ib, and Ic in the first cycle T1 are calculated and recorded as the secondary effective value of the current of phase A ST1_Ia, the secondary effective value of the current of phase B ST1_Ib, and the secondary effective value of the current of phase C ST1_Ic, and together with the ratio of the fault distance to the line length Lf / L obtained in the fault report, they are used as the judgment parameters of the characteristic quantity 5.

[0120] Determine whether ST1_Ia, ST1_Ib, and ST1_Ic are all less than 0.003A, and the fault distance exceeds 10 times the line length, expressed as "ST1_Ia&ST1_Ib&ST1_Ic≤0.003A and Lf / L≥10?". If so, the test maintenance probability P5 of characteristic quantity 5 is the fifth preset probability PC5; otherwise, P5=0.

[0121] According to the fault start time tf, the secondary effective values ​​of the currents Ia, Ib, and Ic of the cycle Tbf before the fault and the cycle Taf after the fault are calculated and recorded as feature quantity 6: the secondary effective value of the A phase current within the cycle before the fault STbf_Ia, the secondary effective value of the B phase current within the cycle before the fault STbf_Ib, the secondary effective value of the C phase current within the cycle before the fault STbf_Ic, and the secondary effective value of the A phase current within the cycle after the fault STaf_Ia, the secondary effective value of the B phase current within the cycle after the fault STaf_Ib, and the secondary effective value of the C phase current within the cycle after the fault STaf_Ic.

[0122] It is determined whether the phase current before the fault and the phase current after the fault are both greater than or equal to 0.1A, expressed as "STbf_Ia&STbf_Ib&STbf_Ic&STaf_Ia&STaf_Ib&STaf_Ic≥0.1A?". If so, the test maintenance probability P6 of the characteristic quantity 6 is the sixth preset probability PC6; otherwise, P6=0.

[0123] Figure 6 This is the fifth flow chart of the transmission line fault test and maintenance anti-misdiagnosis method provided by the present invention. The switch characteristic quantity verification is mainly carried out for the change process of the sampling value of all switch channel. The relevant parameters are shown in Table 1 to Table 3. The verification process is as follows Figure 6 As shown, the specific steps are as follows:

[0124] The default test maintenance probabilities PC7~PC10 of characteristic quantities 7~10 are set, and characteristic quantities 7~10 are switch characteristic quantities. PC7~PC10 include the seventh preset probability, the eighth preset probability, the ninth preset probability and the tenth preset probability, as shown in Table 4.

[0125] Determine whether there is no change in the switch quantity channel without any protection action or reclosing switch quantity channel under the premise of including the protection action or reclosing type in the switch quantity channel, expressed as "CSR>0 and ETr=0, ERec=0?". If so, then feature quantity 7: the test maintenance probability P7 of no protection action outlet change is the seventh preset probability PC7; otherwise, P7=0.

[0126] It is determined whether, under the premise that the circuit breaker trip type is included in the switch quantity channel, no circuit breaker trip switch quantity channel changes position, which is expressed as "CSB>0 and ETWJ=0?". If so, the characteristic quantity 8: the probability of test maintenance without circuit breaker position change P8 is the eighth preset probability PC8; otherwise, P8=0.

[0127] Determine whether the number of the switch channels that have been displaced is greater than or equal to 40, and greater than or equal to 60% of the total number of switch channels, expressed as "ES≥40 and ES≥0.6CS?". If so, then feature quantity 9: the test maintenance probability P9 of the number of displaced switch channels is the ninth preset probability PC9; otherwise, P9=0.

[0128] Determine whether the number of switch channels that have changed position is greater than or equal to 40, and more than 80% of the time differences of the first change points do not exceed 3ms, expressed as "ES≥40 and COUNTIF(tSn+1-tSn<3ms, n∈[1,ES]) / ES≥0.8?". If so, then feature quantity 10: the test maintenance probability P10 of the time difference of the first change point is the tenth preset probability PC10; otherwise, P10=0.

[0129] Figure 7 1 is a schematic diagram of the structure of the transmission line fault test and maintenance anti-misdiagnosis system provided by the present invention, the transmission line fault test and maintenance anti-misdiagnosis system comprises:

[0130] The analysis unit 1 is used to analyze the current recording file. When it is determined that the current recording file is a preliminary fault file, the voltage misdiagnosis prevention parameters, current misdiagnosis prevention parameters and switch misdiagnosis prevention parameters are extracted from the recording file configuration information comparison table and the recording file fault information comparison table corresponding to the current recording file. The working principle of the analysis unit 1 can refer to the aforementioned step 101 and will not be repeated here.

[0131] Verification unit 2 is used to verify the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability and the fault zero-sequence voltage difference test maintenance probability; verify the current misdiagnosis prevention parameters to obtain the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability and the phase current test maintenance probability before / after the fault; verify the switch quantity misdiagnosis prevention parameters to obtain the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the number of position change switch quantity channels and the test maintenance probability of the first change point time difference. The working principle of the verification unit 2 can refer to the aforementioned step 102 and will not be repeated here.

[0132] The determination unit 3 is used to determine the total test maintenance probability corresponding to the current recording file according to the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, the fault zero-sequence voltage difference test maintenance probability, the fault duration test maintenance probability, the three-phase initial current and fault ranging test maintenance probability, the phase current test maintenance probability before / after the fault, the test maintenance probability of no protection action output position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the change switch channel number and the first change point time difference test maintenance probability. The working principle of the determination unit 3 can refer to the aforementioned step 103 and will not be repeated here.

[0133] The diagnosis unit 4 is used to determine that the diagnosis result corresponding to the current recording file is a test maintenance when the total probability of the test maintenance is greater than or equal to a preset threshold. The working principle of the diagnosis unit 4 can refer to the aforementioned step 104 and will not be repeated here.

[0134] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0135] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0136] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.< / time> < / digitalevent> < / time> < / name> < / digitalevent> < / name> < / value> < / name> < / time> < / digitalevent>

Claims

1. A method for preventing misdiagnosis of transmission line fault testing and maintenance, characterized in that: include: Parse the current recording file, and when it is determined that the current recording file is a preliminary fault file, extract voltage misdiagnosis prevention parameters, current misdiagnosis prevention parameters, and switch misdiagnosis prevention parameters from the recording file configuration information comparison table and the recording file fault information comparison table corresponding to the current recording file; Verify the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, and the fault zero-sequence voltage difference test maintenance probability; verify the current misdiagnosis prevention parameters to obtain the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability, and the phase current test maintenance probability before / after the fault; verify the switch quantity misdiagnosis prevention parameters to obtain the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the number of position change switch quantity channels, and the test maintenance probability of the first point change time difference; Determine the total probability of test and maintenance corresponding to the current recording file according to the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability, the fault zero-sequence voltage difference test and maintenance probability, the fault duration test and maintenance probability, the three-phase initial current and fault distance measurement test and maintenance probability, the phase current test and maintenance probability before / after the fault, the position change test and maintenance probability of no protection action outlet, the position change test and maintenance probability of no circuit breaker position, the position change switch quantity channel number test and maintenance probability and the first position change point time difference test and maintenance probability; When the total probability of the test and maintenance is greater than or equal to a preset threshold, determining that the diagnosis result corresponding to the current recording file is a test and maintenance; After parsing the current recording file, the method further includes: Determine a first preset probability according to the number of historical test and maintenance files and the total number of historical files including the three-phase initial voltage test and maintenance probability; Determine a second preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault phase voltage ratio test and maintenance probability; Determine a third preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault zero-sequence voltage difference test and maintenance probability; Determine a fourth preset probability according to the number of historical test and maintenance files and the total number of historical files including the fault duration test and maintenance probability; Determine a fifth preset probability according to the number of historical test and maintenance files and the total number of historical files including the three-phase initial current and the fault distance measurement test and maintenance probability; Determine a sixth preset probability according to the number of historical test and maintenance files and the total number of historical files containing the pre-fault / post-fault phase current test and maintenance probabilities; Determine the seventh preset probability according to the number of historical test and maintenance files and the total number of historical files including the probability of unprotected action outlet position change test and maintenance; Determine an eighth preset probability according to the number of historical test and maintenance files and the total number of historical files including the probability of test and maintenance without circuit breaker position change; Determine the ninth preset probability according to the number of historical test and maintenance files and the total number of historical files including the test and maintenance probability of the number of variable switch quantity channels; The tenth preset probability is determined according to the number of historical test and maintenance files and the total number of historical files including the first variable point time difference test and maintenance probability; The checking of the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability, and the fault zero-sequence voltage difference test and maintenance probability include: According to the line and bus corresponding to the fault interval, determine the sampling period corresponding to the A-phase voltage channel, the B-phase voltage channel, the C-phase voltage channel, the zero-sequence voltage channel and the rated frequency; According to the start time of the recording file, calculate the secondary effective value of the phase A voltage corresponding to the phase A voltage channel, the secondary effective value of the phase B voltage corresponding to the phase B voltage channel, and the secondary effective value of the phase C voltage corresponding to the phase C voltage channel in the first cycle corresponding to the sampling period; When the secondary effective value of any phase voltage is less than or equal to 60% of the secondary rated voltage effective value, the probability of outputting the three-phase initial voltage test and maintenance is the first preset probability, otherwise, the probability of outputting the three-phase initial voltage test and maintenance is 0; According to the fault start time, calculate a first ratio of the secondary effective value of the A phase voltage within a cycle after the start of the fault and the cycle before the fault, and a second ratio of the secondary effective value of the A phase voltage within a cycle before the end of the fault and the cycle before the fault; calculate a third ratio of the secondary effective value of the B phase voltage within a cycle after the start of the fault and the cycle before the fault, and a fourth ratio of the secondary effective value of the B phase voltage within a cycle before the end of the fault and the cycle before the fault; calculate a fifth ratio of the secondary effective value of the C phase voltage within a cycle after the start of the fault and the cycle before the fault, and a sixth ratio of the secondary effective value of the C phase voltage within a cycle before the end of the fault and the cycle before the fault; When any ratio is less than or equal to 2.5%, the probability of the output fault phase voltage ratio test and maintenance is the second preset probability; otherwise, the probability of the output fault phase voltage ratio test and maintenance is 0; According to the fault start time, a first difference between the voltage secondary effective values ​​corresponding to the zero-sequence voltage channel in a cycle after the fault starts and a cycle before the fault is calculated, and a second difference between the voltage secondary effective values ​​corresponding to the zero-sequence voltage channel in a cycle before the fault ends and a cycle before the fault is calculated; When any difference is less than or equal to 1% of the effective value of the secondary rated voltage, the probability of the output fault zero-sequence voltage difference test and repair is the third preset probability, otherwise, the probability of the output fault zero-sequence voltage difference test and repair is 0; The verification current anti-misdiagnosis parameter is used to obtain the fault duration test and maintenance probability, the three-phase initial current and fault distance test and maintenance probability, and the phase current test and maintenance probability before and after the fault, including: According to the line and bus corresponding to the fault interval, determine the sampling period corresponding to the A-phase current channel, the B-phase current channel, the C-phase current channel, the zero-sequence current channel and the rated frequency; When the primary rated voltage of the line is greater than or equal to 220 kV and the fault duration exceeds 200 ms, and when the primary rated voltage of the line is less than 220 kV and the fault duration exceeds 2000 ms, the output fault duration test maintenance probability is the fourth preset probability, otherwise, the output fault duration test maintenance probability is 0; According to the start time of the recording file, the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in the first cycle corresponding to the period are calculated; When the secondary effective value of the A-phase current, the B-phase current and the C-phase current are all less than 0.003A, and the ratio of the fault distance measurement to the line length exceeds 10 times the line length, the output three-phase initial current and the fault distance measurement test maintenance probability are the fifth preset probability, otherwise, the output three-phase initial current and the fault distance measurement test maintenance probability are 0; According to the fault start time, the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in one cycle before the fault are calculated; the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in one cycle after the fault are calculated; When the secondary effective value of the A-phase current corresponding to the A-phase current channel within one cycle before the fault, the secondary effective value of the B-phase current corresponding to the B-phase current channel, the secondary effective value of the C-phase current corresponding to the C-phase current channel, the secondary effective value of the A-phase current corresponding to the A-phase current channel within one cycle after the fault, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel are all greater than or equal to 0.1A, the probability of the phase current test and maintenance before / after the output fault is the sixth preset probability, otherwise, the probability of the phase current test and maintenance before / after the output fault is 0; The verification switch quantity anti-misdiagnosis parameters are used to obtain the probability of no protection action outlet position change test and maintenance, the probability of no circuit breaker position change test and maintenance, the probability of the number of position change switch quantity channels and the probability of the first position change time difference test and maintenance, including: When it is determined that the switch quantity channel contains a protection action or a reclosing type, and there is no protection action or reclosing switch quantity channel change, the output no protection action output change test and maintenance probability is the seventh preset probability, otherwise, the output no protection action output change test and maintenance probability is 0; When it is determined that the switch quantity channel includes the circuit breaker trip type and no circuit breaker trip switch quantity channel changes position, the output test and maintenance probability of no circuit breaker position change is the eighth preset probability; otherwise, the output test and maintenance probability of no circuit breaker position change is 0; When it is determined that the number of switch channels that have been displaced is greater than or equal to 40, and it is determined that the number of switch channels that have been displaced is greater than or equal to 60% of the total number of switch channels, the probability of testing and repairing the number of output displaced switch channels is the ninth preset probability, otherwise, the probability of testing and repairing the number of output displaced switch channels is 0; When it is determined that the number of switch channels that have changed position is greater than or equal to 40, and the time difference of the first change point corresponding to more than 80% of the switch channels that have changed position does not exceed 3ms, the probability of outputting the first change point time difference test maintenance is the tenth preset probability, otherwise, the probability of outputting the first change point time difference test maintenance is 0; Determining the total probability of test and maintenance corresponding to the current recording file includes: ; in, is the total probability of test maintenance, and are the first test maintenance probability and the corresponding weight of the first test maintenance probability, respectively. The first test maintenance probability includes the three-phase initial voltage, fault phase voltage ratio, fault zero-sequence voltage difference, fault duration, three-phase initial current and fault distance, phase current before / after the fault, no protection action outlet position change, and no circuit breaker position change test maintenance probability, where i∈[1,8]; , are respectively the second test maintenance probability and the corresponding weight of the second test maintenance probability, wherein the second test maintenance probability includes the test maintenance probability of the number of position change switch quantity channels and the test maintenance probability of the first position change time difference, wherein j∈[9,10].

2. The method for preventing misdiagnosis of transmission line fault testing and maintenance according to claim 1, characterized in that: After determining the diagnosis result corresponding to the current recording file, or after determining that the current recording file is a non-initial fault file, the method further includes: The next wave recording file is parsed to determine the diagnosis result corresponding to the next wave recording file, until the diagnosis results of all the wave recording files in the target wave recording file list are determined.

3. The method for preventing misdiagnosis of transmission line fault testing and maintenance according to claim 2, characterized in that: Before parsing the current recording file, the method further includes: The recording system is queried at preset intervals, and when it is found that a recording file has been generated, the recording file list is locked; The target recording file list is determined according to the locked recording file list.

4. The method for preventing misdiagnosis of transmission line fault testing and maintenance according to claim 3, characterized in that: After determining the diagnosis results of all the recording files in the target recording file list, the method further includes: The lock of the recording file list is released, and the recording system is queried again to determine the target recording file list again.

5. A transmission line fault test and maintenance anti-misdiagnosis system, characterized in that: include: The parsing unit is used to parse the current recording file, and when it is determined that the current recording file is a preliminary fault file, extract the voltage misdiagnosis prevention parameter, the current misdiagnosis prevention parameter and the switch misdiagnosis prevention parameter from the recording file configuration information comparison table and the recording file fault information comparison table corresponding to the current recording file; A verification unit is used to verify the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test maintenance probability, the fault phase voltage ratio test maintenance probability, and the fault zero-sequence voltage difference test maintenance probability; verify the current misdiagnosis prevention parameters to obtain the fault duration test maintenance probability, the three-phase initial current and fault distance measurement test maintenance probability, and the phase current test maintenance probability before / after the fault; verify the switch quantity misdiagnosis prevention parameters to obtain the test maintenance probability of no protection action outlet position change, the test maintenance probability of no circuit breaker position change, the test maintenance probability of the number of position change switch quantity channels, and the test maintenance probability of the first change point time difference; A determination unit is used to determine the total test and maintenance probability corresponding to the current recording file according to the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability, the fault zero-sequence voltage difference test and maintenance probability, the fault duration test and maintenance probability, the three-phase initial current and fault distance measurement test and maintenance probability, the phase current test and maintenance probability before / after the fault, the test and maintenance probability of no protection action outlet position change, the test and maintenance probability of no circuit breaker position change, the test and maintenance probability of the number of position change switch quantity channels and the test and maintenance probability of the first change point time difference; A diagnosis unit, configured to determine that the diagnosis result corresponding to the current recording file is a test maintenance when the total probability of the test maintenance is greater than or equal to a preset threshold; When the total probability of the test and maintenance is greater than or equal to a preset threshold, determining that the diagnosis result corresponding to the current recording file is a test and maintenance; After parsing the current recording file, it also includes: Determine a first preset probability according to the number of historical test and maintenance files and the total number of historical files including the three-phase initial voltage test and maintenance probability; Determine a second preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault phase voltage ratio test and maintenance probability; Determine a third preset probability according to the number of historical test and maintenance files and the total number of historical files containing the fault zero-sequence voltage difference test and maintenance probability; Determine a fourth preset probability according to the number of historical test and maintenance files and the total number of historical files including the fault duration test and maintenance probability; Determine a fifth preset probability according to the number of historical test and maintenance files and the total number of historical files including the three-phase initial current and the fault distance measurement test and maintenance probability; Determine a sixth preset probability according to the number of historical test and maintenance files and the total number of historical files containing the pre-fault / post-fault phase current test and maintenance probabilities; Determine the seventh preset probability according to the number of historical test and maintenance files and the total number of historical files including the probability of unprotected action outlet position change test and maintenance; Determine an eighth preset probability according to the number of historical test and maintenance files and the total number of historical files including the probability of test and maintenance without circuit breaker position change; Determine the ninth preset probability according to the number of historical test and maintenance files and the total number of historical files including the test and maintenance probability of the number of variable switch quantity channels; The tenth preset probability is determined according to the number of historical test and maintenance files and the total number of historical files including the first variable point time difference test and maintenance probability; The checking of the voltage misdiagnosis prevention parameters to obtain the three-phase initial voltage test and maintenance probability, the fault phase voltage ratio test and maintenance probability, and the fault zero-sequence voltage difference test and maintenance probability include: According to the line and bus corresponding to the fault interval, determine the sampling period corresponding to the A-phase voltage channel, the B-phase voltage channel, the C-phase voltage channel, the zero-sequence voltage channel and the rated frequency; According to the start time of the recording file, calculate the secondary effective value of the phase A voltage corresponding to the phase A voltage channel, the secondary effective value of the phase B voltage corresponding to the phase B voltage channel, and the secondary effective value of the phase C voltage corresponding to the phase C voltage channel in the first cycle corresponding to the sampling period; When the secondary effective value of any phase voltage is less than or equal to 60% of the secondary rated voltage effective value, the probability of outputting the three-phase initial voltage test and maintenance is the first preset probability, otherwise, the probability of outputting the three-phase initial voltage test and maintenance is 0; According to the fault start time, calculate a first ratio of the secondary effective value of the A phase voltage within a cycle after the start of the fault and the cycle before the fault, and a second ratio of the secondary effective value of the A phase voltage within a cycle before the end of the fault and the cycle before the fault; calculate a third ratio of the secondary effective value of the B phase voltage within a cycle after the start of the fault and the cycle before the fault, and a fourth ratio of the secondary effective value of the B phase voltage within a cycle before the end of the fault and the cycle before the fault; calculate a fifth ratio of the secondary effective value of the C phase voltage within a cycle after the start of the fault and the cycle before the fault, and a sixth ratio of the secondary effective value of the C phase voltage within a cycle before the end of the fault and the cycle before the fault; When any ratio is less than or equal to 2.5%, the probability of the output fault phase voltage ratio test and maintenance is the second preset probability; otherwise, the probability of the output fault phase voltage ratio test and maintenance is 0; According to the fault start time, a first difference between the voltage secondary effective values ​​corresponding to the zero-sequence voltage channel in a cycle after the fault starts and a cycle before the fault is calculated, and a second difference between the voltage secondary effective values ​​corresponding to the zero-sequence voltage channel in a cycle before the fault ends and a cycle before the fault is calculated; When any difference is less than or equal to 1% of the effective value of the secondary rated voltage, the probability of the output fault zero-sequence voltage difference test and repair is the third preset probability, otherwise, the probability of the output fault zero-sequence voltage difference test and repair is 0; The verification current anti-misdiagnosis parameter is used to obtain the fault duration test and maintenance probability, the three-phase initial current and fault distance test and maintenance probability, and the phase current test and maintenance probability before and after the fault, including: According to the line and bus corresponding to the fault interval, determine the sampling period corresponding to the A-phase current channel, the B-phase current channel, the C-phase current channel, the zero-sequence current channel and the rated frequency; When the primary rated voltage of the line is greater than or equal to 220 kV and the fault duration exceeds 200 ms, and when the primary rated voltage of the line is less than 220 kV and the fault duration exceeds 2000 ms, the output fault duration test maintenance probability is the fourth preset probability, otherwise, the output fault duration test maintenance probability is 0; According to the start time of the recording file, the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in the first cycle corresponding to the period are calculated; When the secondary effective value of the A-phase current, the B-phase current and the C-phase current are all less than 0.003A, and the ratio of the fault distance measurement to the line length exceeds 10 times the line length, the output three-phase initial current and the fault distance measurement test maintenance probability are the fifth preset probability, otherwise, the output three-phase initial current and the fault distance measurement test maintenance probability are 0; According to the fault start time, the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in one cycle before the fault are calculated; the secondary effective value of the A-phase current corresponding to the A-phase current channel, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel in one cycle after the fault are calculated; When the secondary effective value of the A-phase current corresponding to the A-phase current channel within one cycle before the fault, the secondary effective value of the B-phase current corresponding to the B-phase current channel, the secondary effective value of the C-phase current corresponding to the C-phase current channel, the secondary effective value of the A-phase current corresponding to the A-phase current channel within one cycle after the fault, the secondary effective value of the B-phase current corresponding to the B-phase current channel, and the secondary effective value of the C-phase current corresponding to the C-phase current channel are all greater than or equal to 0.1A, the probability of the phase current test and maintenance before / after the output fault is the sixth preset probability, otherwise, the probability of the phase current test and maintenance before / after the output fault is 0; The verification switch quantity anti-misdiagnosis parameters are used to obtain the probability of no protection action outlet position change test and maintenance, the probability of no circuit breaker position change test and maintenance, the probability of the number of position change switch quantity channels and the probability of the first position change time difference test and maintenance, including: When it is determined that the switch quantity channel contains a protection action or a reclosing type, and there is no protection action or reclosing switch quantity channel change, the output no protection action output change test and maintenance probability is the seventh preset probability, otherwise, the output no protection action output change test and maintenance probability is 0; When it is determined that the switch quantity channel includes the circuit breaker trip type and no circuit breaker trip switch quantity channel changes position, the output test and maintenance probability of no circuit breaker position change is the eighth preset probability; otherwise, the output test and maintenance probability of no circuit breaker position change is 0; When it is determined that the number of switch channels that have been displaced is greater than or equal to 40, and it is determined that the number of switch channels that have been displaced is greater than or equal to 60% of the total number of switch channels, the probability of testing and repairing the number of output displaced switch channels is the ninth preset probability, otherwise, the probability of testing and repairing the number of output displaced switch channels is 0; When it is determined that the number of switch channels that have changed position is greater than or equal to 40, and the time difference of the first change point corresponding to more than 80% of the switch channels that have changed position does not exceed 3ms, the probability of outputting the first change point time difference test maintenance is the tenth preset probability, otherwise, the probability of outputting the first change point time difference test maintenance is 0; Determining the total probability of test and maintenance corresponding to the current recording file includes: ; in, is the total probability of test maintenance, and are the first test maintenance probability and the corresponding weight of the first test maintenance probability, respectively. The first test maintenance probability includes the three-phase initial voltage, fault phase voltage ratio, fault zero-sequence voltage difference, fault duration, three-phase initial current and fault distance, phase current before / after the fault, no protection action outlet position change, and no circuit breaker position change test maintenance probability, where i∈[1,8]; , are respectively the second test maintenance probability and the corresponding weight of the second test maintenance probability, wherein the second test maintenance probability includes the test maintenance probability of the number of position change switch quantity channels and the test maintenance probability of the first position change time difference, wherein j∈[9,10].