A test system for testing and analyzing the desorption gas pressure of in-situ reservoir cores
By introducing variable volume diffusion units into the test system, the coal sample space expansion process is simulated, and the problem of inaccurate gas pressure measurement in the prior art is solved, and the accurate measurement and regular analysis of gas pressure in the in-situ reservoir are achieved.
Patent Information
- Application Number
- CN202411116929.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-15
AI Technical Summary
The existing test system ignores that the expansion of the space volume of the coal sample will lead to inaccurate gas pressure measurement, affecting the accuracy of gas pressure in the in-situ reservoir.
A test system including variable volume diffusion unit is designed. By driving the plunger to move up and down in the diffusion chamber and the center cylinder, the coal sample space expansion process is simulated to ensure the accuracy of gas adsorption and desorption.
By simulating the space expansion process of coal sample, the accuracy of gas pressure measurement is improved, and the change law of gas pressure in the in-situ reservoir can be explored.
Smart Images

Figure CN118655048B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a test system, in particular to a test system for testing and analyzing the desorption gas pressure of an in-situ reservoir rock core. Background Art
[0002] With the rapid development of the world economy, resource development is gradually moving towards the deep earth. At present, the depth of in-situ reservoir mining, such as coal mining, has reached 1,500 meters, the depth of non-ferrous metal mining has exceeded 4,350 meters, and the depth of oil and gas resource mining has reached 7,500 meters. Deep mining will become the norm in resource development. Exploring and developing deep in-situ rock mechanics theory and testing technology is an important basis for achieving deep mining. Taking coal mining as an example, a test system is generally established to simulate the process of placing coal samples in the in-situ coal seam into the corer during coal mining. The coal samples are subjected to adsorption and desorption experiments through experimental methods to determine the desorption amount of the coal samples. The measured desorption amount data is then analyzed and based on the in-situ reservoir gas pressure calculation method, the in-situ coal seam gas pressure can be determined. By measuring the in-situ coal seam gas pressure, it is possible to effectively prevent and control gas accidents, thereby ensuring the safety of coal mining.
[0003] The existing test system generally includes an adsorption and desorption device, a gas injection device, a vacuum device and a desorption measurement device, wherein the adsorption and desorption device generally includes a coal sample tank. The volume of the coal sample tank is generally constant and cannot be changed. The process that the volume of the space where the coal sample is located increases when the coal sample is placed in the corer during the coring process is not taken into account. The fact that the expansion of the volume of the space where the coal sample is located will cause the gas pressure of the coal sample to change, and thus the impact on the desorption of the coal sample gas is ignored, resulting in the adsorption and desorption amounts obtained being unable to restore the actual gas desorption situation, thereby affecting the accurate measurement of the in-situ coal seam gas pressure. Summary of the invention
[0004] In order to overcome the shortcomings of the prior art, the present invention provides a test system for testing and analyzing the desorption gas pressure of in-situ reservoir cores, which can simulate the process of expansion of the space in which the coal sample is placed when the coal sample is placed in a corer during the coring process, thereby ensuring the accuracy of the in-situ reservoir gas pressure measurement.
[0005] The technical solution adopted by the present invention to solve its technical problem is:
[0006] A test system for testing and analyzing the desorption gas pressure of an in-situ reservoir core, comprising an adsorption and desorption device, a gas injection device, a vacuum device and a desorption measurement device, wherein the adsorption and desorption device comprises a coal sample tank, and the adsorption and desorption device also comprises a variable volume diffusion unit, wherein the variable volume diffusion unit comprises a diffusion tank, a hollow straightening cylinder and a driving mechanism arranged at the bottom end of the straightening cylinder, wherein a diffusion chamber is arranged in the diffusion tank, and the diffusion chamber is communicated with the interior of the straightening cylinder, wherein a plunger is arranged in the straightening cylinder, and the top end of the plunger extends into the diffusion chamber, and the driving mechanism is used to drive the plunger to move up and down in the straightening cylinder and the diffusion chamber; the diffusion tank is connected to a first connecting pipeline, a second connecting pipeline and a third connecting pipeline, wherein the first connecting pipeline is connected to the second connecting pipeline and the ... The first connecting pipeline, the second connecting pipeline and the third connecting pipeline are all connected to the diffusion chamber, the first connecting pipeline is connected to the gas injection device, the second connecting pipeline is connected to the vacuum extraction device, the third connecting pipeline is connected to the coal sample tank, the coal sample tank is connected to the fourth connecting pipeline, the third connecting pipeline and the fourth connecting pipeline are both connected to the interior of the coal sample tank, the fourth connecting pipeline is used to connect to the desorption measurement device, the first connecting pipeline is provided with a first switch valve and a first pressure sensor in sequence on the upper edge of the first connecting pipeline in the direction close to the diffusion tank, the second connecting pipeline is provided with a second switch valve, and the third connecting pipeline is provided with a third switch valve and a second pressure sensor in sequence on the upper edge of the third connecting pipeline in the direction close to the coal sample tank.
[0007] As a preferred technical solution, the driving mechanism includes a driving motor, a reducer and a connecting seat, the connecting seat is arranged at the bottom end of the straightening cylinder, the reducer is arranged at the bottom end of the connecting seat, the driving motor is arranged at the bottom end of the reducer, the output shaft of the driving motor is connected to the input end of the reducer, a connecting shaft is provided in the connecting seat, the bottom end of the connecting shaft is connected to the output end of the reducer, a receiving cavity is provided in the plunger, and a plunger opening connected to the receiving cavity is provided at the bottom end of the plunger, a screw rod is provided in the straightening cylinder, the bottom end of the screw rod is connected to the top end of the connecting shaft, the top end of the screw rod passes through the plunger opening and extends into the receiving cavity, the screw rod thread is matched with a nut, the nut is located between the connecting seat and the plunger, and the top end of the nut is provided in the plunger opening.
[0008] As a preferred technical solution, the outside of the diffusion tank is sequentially jacketed with a first water jacket and a first insulation jacket, a first insulation chamber is formed between the inner wall of the first water jacket and the diffusion tank, the outer wall of the first water jacket is provided with a first water inlet joint and a first water outlet joint, the first water inlet joint and the first water outlet joint are both connected to the first insulation chamber, the outer wall of the first insulation jacket is provided with a first avoidance hole for avoiding the first water inlet joint and a second avoidance hole for avoiding the first water outlet joint, the first water inlet joint and the first water outlet joint are respectively used to connect to the constant temperature water bath system.
[0009] As a preferred technical solution, the gas injection device includes: a carbon dioxide gas cylinder, the carbon dioxide gas cylinder is connected to a first gas injection pipeline, the first gas injection pipeline is connected to the first connecting pipeline, and the upper edge of the first gas injection pipeline in the direction close to the diffusion tank is provided with a fourth switch valve, a first pressure reducing valve, a first pressure gauge, a fifth switch valve, a first flow controller, a first check valve and a sixth switch valve in sequence; a methane gas cylinder, the methane gas cylinder is connected to a second gas injection pipeline, the second gas injection pipeline is connected to the first connecting pipeline, and the upper edge of the second gas injection pipeline in the direction close to the diffusion tank is provided with a seventh switch valve, a first pressure reducing valve, a first pressure gauge, a fifth switch valve, a first flow controller, a first check valve and a sixth switch valve in sequence. a second pressure reducing valve, a second pressure gauge, an eighth switch valve, a second flow controller, a second non-return valve and a ninth switch valve; a nitrogen gas cylinder, the nitrogen gas cylinder is connected to a third gas injection pipeline, the third gas injection pipeline is connected to the first connecting pipeline, and the third gas injection pipeline is provided with a tenth switch valve, a third pressure reducing valve, a third pressure gauge, an eleventh switch valve, a third flow controller, a third non-return valve and a twelfth switch valve in sequence along the upper edge of the third gas injection pipeline close to the diffusion tank; a helium gas cylinder, the helium gas cylinder is connected to a fourth gas injection pipeline, the fourth gas injection pipeline is connected to the first connecting pipeline, and the fourth gas injection pipeline is provided with a thirteenth switch valve.
[0010] As a preferred technical solution, the vacuum pump includes a vacuum pump and a vacuum tank, the vacuum pump is connected to a first vacuum pipeline, the first vacuum pipeline is connected to the vacuum tank, the vacuum tank is connected to a second vacuum pipeline, and the second vacuum pipeline is connected to the second connecting pipeline.
[0011] As a preferred technical solution, the test system also includes a gas and water drainage measuring device, a water injection device and a boosting device. The fourth connecting pipeline is used to connect to the gas and water drainage measuring device. The coal sample tank is connected to a first water inlet pipeline, and the first water inlet pipeline is connected to the interior of the coal sample tank. The first water inlet pipeline is connected to the water injection device, and the boosting device is connected to the first connecting pipeline.
[0012] As a preferred technical solution, the coal sample tank includes a tank body, a T-shaped sealed upper cover and a T-shaped sealed lower cover, the top and bottom ends of the tank body are respectively provided with a first opening and a second opening, the first opening and the second opening are both connected to the interior of the tank body, the transverse portion of the sealed upper cover is detachably arranged at the top end of the tank body, the vertical portion of the sealed upper cover is inserted into the first opening, the third connecting pipeline is connected to the transverse portion of the sealed upper cover, and the transverse and vertical portions of the sealed upper cover are provided with a first flow channel, the first flow channel is respectively connected to the third connecting pipeline, The interior of the tank body is connected, the transverse portion of the sealed upper cover is connected to the fourth connecting pipeline, the transverse portion and the vertical portion of the sealed upper cover are provided with a second flow channel, the second flow channel is respectively connected to the fourth connecting pipeline and the interior of the tank body, the transverse portion of the sealed lower cover is detachably arranged at the bottom end of the tank body, the vertical portion of the sealed lower cover is inserted into the second opening, the transverse portion of the sealed lower cover is connected to the first water inlet pipeline, the transverse portion and the vertical portion of the sealed lower cover are provided with a third flow channel, the third flow channel is respectively connected to the first water inlet pipeline and the interior of the tank body.
[0013] As a preferred technical solution, the outside of the tank body is sequentially jacketed with a second water jacket and a second insulation jacket, a second insulation chamber is formed between the inner wall of the second water jacket and the tank body, the outer wall of the second water jacket is provided with a second water inlet joint and a second water outlet joint, the second water inlet joint and the second water outlet joint are both connected to the second insulation chamber, the outer wall of the second insulation jacket is provided with a first through hole for avoiding the second water inlet joint and a second through hole for avoiding the second water outlet joint, the first water inlet joint and the first water outlet joint are respectively used to connect to the constant temperature water bath system.
[0014] As a preferred technical solution, the desorption measurement device includes a gas chromatograph, at least three collection bags and a diverter, the diverter is connected to a fifth connecting pipeline, the fourth connecting pipeline is connected to a first conversion joint, the fifth connecting pipeline is connected to a second conversion joint, the first conversion joint is used to connect to the second conversion joint, the collecting bag is respectively connected to a sixth connecting pipeline and a seventh connecting pipeline, the sixth connecting pipeline is connected to the diverter, the seventh connecting pipeline is connected to the gas chromatograph, the fourth connecting pipeline is provided with a back pressure valve, and the upper edge of the fifth connecting pipeline is close to the diverter. A regulating valve, a fixed container and a fourteenth switch valve are provided in sequence; the air and water drainage measuring device includes a first container, a second container and a weighing device, a sealing head is inserted into the opening at the top of the first container, one end of the exhaust pipe is connected to a third conversion joint, the first conversion joint is used to connect with the third conversion joint, the other end of the exhaust pipe passes through the first through hole of the sealing head and extends into the first container, one end of the drainage pipe passes through the second through hole of the sealing head and extends into the first container, the other end of the drainage pipe is used to be inserted into the second container, and the second container is placed on the weighing device.
[0015] As a preferred technical solution, the water injection device includes a first constant speed and constant pressure pump, the first constant speed and constant pressure pump is connected to a second water inlet pipeline, the second water inlet pipeline is connected to the first water inlet pipeline, and the second water inlet pipeline is provided with a water inlet valve; the boosting device includes a second constant speed and constant pressure pump, the second constant speed and constant pressure pump is connected to the first connecting pipeline through a connecting pipeline, the connecting pipeline is located between the gas injection device and the first switch valve, and the connecting pipeline is provided with a fifteenth switch valve.
[0016] The beneficial effects of the present invention are as follows: the present invention uses a variable volume diffusion unit to drive the plunger to move downward to different positions in the diffusion chamber and the straightening cylinder through the driving mechanism of the variable volume diffusion unit, thereby realizing the expansion of the volume of the diffusion chamber, thereby simulating the process of the expansion of the space where the coal sample is located when the raw coal sample is placed in the coring device during the coring process, further restoring the actual situation of gas adsorption and desorption by the coal sample during the on-site coring process, ensuring the accuracy of the adsorption and desorption amounts obtained, thereby ensuring the accuracy of the in-situ reservoir gas pressure measurement. In addition, the measured in-situ reservoir gas pressure data is analyzed, thereby realizing the exploration of the in-situ reservoir gas pressure change law. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of a test system for testing and analyzing the desorption gas pressure of an in-situ reservoir core provided by an embodiment of the present invention;
[0018] Figure 2 yes Figure 1A schematic diagram of the structure of a variable volume diffusion unit of an adsorption and desorption device of the test system shown;
[0019] Figure 3 yes Figure 2 A schematic top view of a variable volume diffusion unit is shown;
[0020] Figure 4 yes Figure 3 A schematic cross-sectional view of the variable volume diffusion unit at AA shown;
[0021] Figure 5 yes Figure 3 A schematic cross-sectional view of the variable volume diffusion unit at position BB is shown;
[0022] Figure 6 yes Figure 1 A schematic diagram of the structure of the coal sample tank of the adsorption and desorption device of the test system shown;
[0023] Figure 7 yes Figure 6 A schematic cross-sectional view of the coal sample tank is shown. DETAILED DESCRIPTION
[0024] The following will clearly and completely describe the concept, specific structure and technical effects of the present invention in combination with the embodiments and drawings, so as to fully understand the purpose, characteristics and effects of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, other embodiments obtained by technicians in this field without creative work are all within the scope of protection of the present invention. In addition, all the connection / connection relationships involved in the patent do not refer to the direct connection of components, but refer to the formation of a better connection structure by adding or reducing connection accessories according to the specific implementation situation. The various technical features in the invention can be combined interchangeably without conflicting with each other.
[0025] Please refer to Figure 1 An embodiment of the present invention provides a test system for testing and analyzing the desorption gas pressure of an in-situ reservoir core, comprising an adsorption and desorption device, a gas injection device, a vacuum device, a desorption measurement device, a gas drainage measurement device, a water injection device and a pressurization device.
[0026] The adsorption-desorption device comprises a variable volume diffusion unit 10 and a coal sample tank 20 .
[0027] Combination Figures 2 to 5 As shown, the variable volume diffusion unit 10 includes a diffusion tank 14 , a hollow uprighting cylinder 15 , and a driving mechanism 17 disposed at the bottom end of the uprighting cylinder 15 .
[0028] A diffusion chamber 141 is provided in the diffusion tank 14, and the diffusion chamber 141 is connected to the interior of the straightening tube 15. A plunger 16 is provided in the straightening tube 15, and the top end of the plunger 16 extends into the diffusion chamber 141. The driving mechanism 17 is used to drive the plunger 16 to move up and down in the straightening tube 15 and the diffusion chamber 141. By moving the plunger 16 up and down, the volume of the diffusion chamber 141 can be reduced or expanded. By expanding the volume of the diffusion chamber 141, the process of simulating the expansion of the space when the coal sample is placed in the corer during the coring process can be realized. The diffusion tank 14 is connected to the first connecting pipeline 11, the second connecting pipeline 12 and the third connecting pipeline 13. The first connecting pipeline 11, the second connecting pipeline 12 and the third connecting pipeline 13 are all connected to the diffusion chamber 141. The first connecting pipeline 11 is connected to the gas injection device, the second connecting pipeline 12 is connected to the vacuum device, and the third connecting pipeline 13 is connected to the coal sample tank 20. The third connecting pipeline 13 is connected to the interior of the coal sample tank 20. The first connecting pipeline 11 is provided with a first switch valve 111 and a first pressure sensor 112 in sequence along the direction close to the diffusion tank 14. The first pressure sensor 112 is used to detect the pressure in the diffusion chamber 141. The second connecting pipeline 12 is provided with a second switch valve 121. The third connecting pipeline 13 is provided with a third switch valve 131 and a second pressure sensor 132 in sequence along the direction close to the coal sample tank 20. The second pressure sensor 132 is used to detect the pressure inside the coal sample tank 20.
[0029] In this embodiment, the outside of the diffusion tank 14 is sequentially covered with a first water jacket 144 and a first insulation jacket 145 for insulation. A first insulation chamber 146 is formed between the inner wall of the first water jacket 144 and the diffusion tank 14. A first water inlet joint 1441 and a first water outlet joint 1442 are provided on the outer wall of the first water jacket 144. Both the first water inlet joint 1441 and the first water outlet joint 1442 are connected to the first insulation chamber 146. A first avoidance hole 1451 for avoiding the first water inlet joint 1441 and a second avoidance hole 1452 for avoiding the first water outlet joint 1442 are provided on the outer wall of the first insulation jacket 145. The first water inlet joint 1441 and the first water outlet joint 1442 are respectively used to connect to the constant temperature water bath system. In actual application, hot water can be transported to the first insulation chamber 146 through the constant temperature water bath system through the first water inlet joint 1441, and then returned to the constant temperature water bath system through the first water outlet joint 1442, and the cycle is repeated. This can provide a water bath constant temperature environment for the diffusion tank 14 to simulate the ambient temperature of the coal sample as the temperature of the in-situ reservoir, and the in-situ reservoir temperature is, for example, 26°C.
[0030] In this embodiment, the diffusion tank 14 includes a diffusion tank body 142 and a plug 143. The diffusion tank body 142 is provided with the above-mentioned diffusion chamber 141, the top end of the diffusion tank body 142 is provided with a top opening, and the bottom end of the diffusion tank body 142 is provided with a bottom opening, and the top opening and the bottom opening are both connected to the diffusion chamber 141. The bottom opening is connected to the interior of the straightening cylinder 15, so that the diffusion chamber 141 is connected to the interior of the straightening cylinder 15 through the bottom opening. The cross-sectional shape of the plug 143 is T-shaped, and the horizontal portion 143a of the plug 143 is arranged at the top end of the diffusion tank body 142 by a plug fastener such as a screw, and the vertical portion 143b of the plug 143 is inserted into the top opening. The top of the transverse portion 143a of the plug 143 is provided with a first interface 1431 and a second interface 1432. The transverse portion 143a and the vertical portion 143b of the plug 143 are provided with a first channel 1434 communicating with the first interface 1431 and a second channel 1435 communicating with the second interface 1432. The first channel 1434 and the second channel 1435 are both communicated with the diffusion chamber 141. A first joint (not shown in the figure) is provided in the first interface 1431. The first joint is connected to a branch pipe. The branch pipe is connected to the first connecting pipeline 11 and the second connecting pipeline 12. The first joint is respectively connected to the first channel 1434 and the branch pipe. The branch pipe is respectively connected to the first connecting pipeline 11 and the second connecting pipeline 12. A second joint (not shown in the figure) is provided in the second interface 1432. The second joint is connected to the third connecting pipeline 13. The second joint is respectively connected to the second channel 1435 and the third connecting pipeline 13. The first water jacket 144 and the first insulation jacket 145 are sequentially sleeved on the outside of the diffusion tank body 142 .
[0031] A first sealing ring 1436 is provided between the vertical portion 143 b of the plug 143 and the inner wall of the diffusion chamber 141 . The first sealing ring 1436 plays a sealing role to prevent air leakage.
[0032] The inner wall at the bottom end of the diffusion chamber 141 and the inner wall of the bottom end opening are provided with a second sealing ring 1411. There are multiple second sealing rings 1411, which are arranged in sequence from top to bottom. The number of second sealing rings 1411 can be set according to actual conditions. The second sealing ring 1411 is sleeved on the outer periphery of the plunger 16. The second sealing ring 1411 plays a sealing role to prevent air leakage.
[0033] The driving mechanism 17 includes a driving motor 171, a speed reducer 172 and a connecting seat 173. The connecting seat 173 is arranged at the bottom end of the straightening cylinder 15. In this embodiment, the top end of the connecting seat 173 is inserted into the straightening cylinder 15. The outer periphery of the connecting seat 173 is formed with an annular mounting platform 1731, and the mounting platform 1731 is arranged at the bottom end of the straightening cylinder 15 by means of mounting platform fasteners such as screws. The speed reducer 172 is arranged at the bottom end of the connecting seat 173. The driving motor 171 is arranged at the bottom end of the speed reducer 172. The output shaft of the driving motor 171 is connected to the input end of the speed reducer 172. A connecting shaft 1721 is arranged in the connecting seat 173, and the bottom end of the connecting shaft 1721 is connected to the output end of the speed reducer 172. A receiving cavity 161 is arranged in the plunger 16, and a plunger opening communicating with the receiving cavity 161 is arranged at the bottom end of the plunger 16. A screw rod 18 is provided in the straightening cylinder 15, the bottom end of the screw rod 18 is connected to the top end of the connecting shaft 1721, the top end of the screw rod 18 passes through the plunger opening and extends into the receiving chamber 161, the screw rod 18 is threadedly matched with a nut 19, the nut 19 is located between the connecting seat 173 and the plunger 16, and the top end of the nut 19 is set in the plunger opening. The driving motor 171 is used to drive the connecting shaft 1721 to rotate through the reducer 172, thereby driving the screw rod 18 to rotate, and the rotation of the screw rod 18 can drive the nut 19 to move up and down, thereby driving the plunger 16 to move up and down.
[0034] In this embodiment, a groove is provided at the top of the connecting shaft 1721, and the bottom end of the screw rod 18 cooperates with the groove. An annular mounting portion 181 is formed on the outer periphery of the screw rod 18, and the mounting portion 181 is arranged on the top of the connecting shaft 1721 through a mounting portion fastener such as a screw.
[0035] A rotating bearing 1722 is disposed in the connecting seat 173 . The rotating bearing 1722 is sleeved on the outer periphery of the top end of the connecting shaft 1721 . The rotating bearing 1722 provides support for the rotation of the connecting shaft 1721 .
[0036] An annular boss 191 is formed on the outer periphery of the nut 19. Two mounting members 192 are provided on the outer periphery of the boss 191. The two mounting members 192 are symmetrical about the center of the boss 191. The outer wall of the straightening cylinder 15 is provided with two through grooves 151 corresponding to the two mounting members 192 respectively. The two through grooves 151 are both connected to the interior of the straightening cylinder 15. The length direction of the through grooves 151 is the same as the height direction of the straightening cylinder 15. The two mounting members 192 are partially accommodated in the two through grooves 151 respectively. The outer periphery of the mounting members 192 is sleeved with bearings 193. The bearings 193 match the corresponding through grooves 151. The up and down movement of the nut 19 can drive the two mounting members 192 and the bearings 193 on the outer periphery of the mounting members 192 to move up and down. The mounting members 192 and the bearings 193 provided guide the up and down movement of the nut 19, thereby guiding the up and down movement of the plunger 16 to improve the stability of the movement of the plunger 16. The mounting member 192 is, for example, a screw.
[0037] It is understandable that in other embodiments, the number of mounting members 192 may be, for example, three, four, etc., and may be set according to actual conditions.
[0038] The rotating bearing 1722 and the bearing 193 are both deep groove ball bearings.
[0039] The coal sample tank 20 is connected to a fourth connecting pipeline 21 and a first water inlet pipeline 22. The fourth connecting pipeline 21 and the first water inlet pipeline 22 are both connected to the interior of the coal sample tank 20. The fourth connecting pipeline 21 is used to connect to a desorption measuring device or a gas-water discharge measuring device. A back pressure valve 211 is provided on the fourth connecting pipeline 21, and the back pressure valve 211 is used to control the flow of gas.
[0040] Combination Figure 6 and Figure 7 As shown, in this embodiment, the coal sample tank 20 is used to contain the coal sample. The coal sample tank 20 includes a hollow tank body 23, a sealed upper cover 24 and a sealed lower cover 25. The sealed upper cover 24 and the sealed lower cover 25 are detachably arranged at the top and bottom of the tank body 23, respectively.
[0041] Specifically, the cross-sectional shape of the sealing upper cover 24 is T-shaped, the vertical portion 24b of the sealing upper cover 24 is inserted into the tank body 23, the top of the tank body 23 is provided with a first mounting hole, the horizontal portion 24a of the sealing upper cover 24 is provided with a second mounting hole corresponding to the first mounting hole, and the first fasteners 241 such as screws are installed in the first mounting hole and the second mounting hole, and the sealing upper cover 24 can be disassembled and assembled by disassembling the first fasteners 241. The number of the first mounting holes, the second mounting holes and the first fasteners 241 can be set according to actual conditions. The cross-sectional shape of the sealing lower cover 25 is T-shaped. The vertical portion 25b of the sealing lower cover 25 is inserted into the tank body 23. A third mounting hole is provided at the bottom end of the tank body 23. The horizontal portion 25a of the sealing lower cover 25 is provided with a fourth mounting hole corresponding to the third mounting hole. Second fasteners 251 such as screws are installed in the third mounting hole and the fourth mounting hole. The sealing lower cover 25 can be disassembled and assembled by disassembling and assembling the second fasteners 251. The number of the third mounting hole, the fourth mounting hole and the second fasteners 251 can be set according to actual conditions.
[0042] The third connecting pipeline 13 is connected to the sealing upper cover 24, and the sealing upper cover 24 is connected to the fourth connecting pipeline 21. Specifically, the side wall of the horizontal portion 24a of the sealing upper cover 24 is provided with a first connecting port 242 and a second connecting port 244. The horizontal portion 24a and the vertical portion 24b of the sealing upper cover 24 are provided with a first flow channel 243 communicating with the first connecting port 242 and a second flow channel 245 communicating with the second connecting port 244. The first flow channel 243 and the second flow channel 245 are both communicated with the interior of the tank body 23. A third joint (not shown in the figure) is provided in the first connecting port 242, and the third connecting pipeline 13 is connected to the third joint, and the third joint is respectively communicated with the third connecting pipeline 13 and the first flow channel 243. A fourth joint (not shown in the figure) is provided in the second connecting port 244, and the fourth joint is connected to the fourth connecting pipeline 21, and the fourth joint is respectively communicated with the fourth connecting pipeline 21 and the second flow channel 245.
[0043] The sealing lower cover 25 is connected to the first water inlet pipeline 22. Specifically, the side wall of the transverse portion 25a of the sealing lower cover 25 is provided with a third connection port 252. The transverse portion 25a and the vertical portion 25b of the sealing lower cover 25 are provided with a third flow channel 253 communicating with the third connection port 252. The third flow channel 253 is communicated with the interior of the tank body 23. A fifth joint (not shown in the figure) is provided in the third connection port 252. The fifth joint is connected to the first water inlet pipeline 22. The fifth joint is communicated with the third flow channel 253 and the first water inlet pipeline 22 respectively.
[0044] A third sealing ring 246 is provided between the vertical portion 24b of the sealing upper cover 24 and the inner wall of the tank body 23, and a fourth sealing ring 254 is provided between the vertical portion 25b of the sealing lower cover 25 and the inner wall of the tank body 23. The third sealing ring 246 and the fourth sealing ring 254 play a sealing role to prevent air leakage.
[0045] The exterior of the tank body 23 is sequentially covered with a second water jacket 232 and a second insulation jacket 233 for insulation. A second insulation chamber 234 is formed between the inner wall of the second water jacket 232 and the tank body 23. A second water inlet joint 2321 and a second water outlet joint 2322 are provided on the outer wall of the second water jacket 232. The second water inlet joint 2321 and the second water outlet joint 2322 are both connected to the second insulation chamber 234. A first through hole 2331 for avoiding the second water inlet joint 2321 and a second through hole for avoiding the second water outlet joint 2322 are provided on the outer wall of the second insulation jacket 233. The second water inlet joint 2321 and the second water outlet joint 2322 are respectively used to connect to the constant temperature water bath system. In actual application, hot water can be transported to the second insulation chamber 234 through the constant temperature water bath system through the second water inlet joint 2321, and then returned to the constant temperature water bath system through the second water outlet joint 2322, and the cycle is repeated. This can provide a water bath constant temperature environment for the coal sample tank 20 to simulate the ambient temperature of the coal sample as the temperature of the in-situ reservoir.
[0046] The gas injection device includes a carbon dioxide gas cylinder 32 , a methane gas cylinder 33 , a nitrogen gas cylinder 34 and a helium gas cylinder 31 .
[0047] The carbon dioxide cylinder 32 is connected to a first gas injection pipeline 321, and the first gas injection pipeline 321 is connected to the first connecting pipeline 11. Carbon dioxide gas can be injected into the tank body 23 of the coal sample tank 20 through the carbon dioxide cylinder 32 through the diffusion chamber 141, that is, the carbon dioxide gas first enters the diffusion chamber 141 through the first gas injection pipeline 321 and the first connecting pipeline 11, and then enters the tank body 23 through the third connecting pipeline 13. The first gas injection pipeline 321 is provided with a fourth switch valve 322, a first pressure reducing valve 323, a first pressure gauge 324, a fifth switch valve 325, a first flow controller 326, a first check valve 327 and a sixth switch valve 328 in sequence along the direction close to the diffusion tank 14. The first pressure reducing valve 323 is used to reduce the pressure of carbon dioxide gas. The first pressure gauge 324 is used to detect the pressure in the first gas injection pipeline 321. The first flow controller 326 is used to control the flow of carbon dioxide gas. The first check valve 327 is used to prevent gas from flowing back into the carbon dioxide cylinder 32.
[0048] The methane gas cylinder 33 is connected to a second gas injection pipeline 331, and the second gas injection pipeline 331 is connected to the first connecting pipeline 11. Methane gas can be injected into the tank body 23 of the coal sample tank 20 through the methane gas cylinder 33 through the diffusion chamber 141, that is, the methane gas first enters the diffusion chamber 141 through the second gas injection pipeline 331 and the first connecting pipeline 11, and then enters the tank body 23 through the third connecting pipeline 13. The second gas injection pipeline 331 is provided with a seventh switch valve 332, a second pressure reducing valve 333, a second pressure gauge 334, an eighth switch valve 335, a second flow controller 336, a second check valve 337 and a ninth switch valve 338 in sequence along the direction close to the diffusion tank 14. The second pressure reducing valve 333 is used to reduce the pressure of the methane gas. The second pressure gauge 334 is used to detect the pressure in the second gas injection pipeline 331. The second flow controller 336 is used to control the flow of the methane gas. The second one-way valve 337 is used to prevent the gas from flowing back into the methane cylinder 33 .
[0049] The nitrogen cylinder 34 is connected to a third gas injection pipeline 341, and the third gas injection pipeline 341 is connected to the first connecting pipeline 11. Nitrogen can be injected into the tank body 23 of the coal sample tank 20 through the nitrogen cylinder 34 through the diffusion chamber 141, that is, the nitrogen first enters the diffusion chamber 141 through the third gas injection pipeline 341 and the first connecting pipeline 11, and then enters the tank body 23 through the third connecting pipeline 13. The third gas injection pipeline 341 is provided with a tenth switch valve 342, a third pressure reducing valve 343, a third pressure gauge 344, an eleventh switch valve 345, a third flow controller 346, a third check valve 347 and a twelfth switch valve 348 in sequence along the direction close to the diffusion tank 14. The third pressure reducing valve 343 is used to reduce the pressure of nitrogen. The third pressure gauge 344 is used to detect the pressure in the third gas injection pipeline 341. The third flow controller 346 is used to control the flow of nitrogen. The third one-way valve 347 is used to prevent the gas from flowing back into the nitrogen cylinder 34 .
[0050] The helium cylinder 31 is connected to a fourth gas injection pipeline 311, and the fourth gas injection pipeline 311 is connected to the first connecting pipeline 11. Helium can be injected into the diffusion chamber 141 and the tank body 23 of the coal sample tank 20 through the helium cylinder 31, so that the air tightness of the diffusion tank 14 and the coal sample tank 20 can be detected. The fourth gas injection pipeline 311 is provided with a thirteenth switch valve 312. That is, the helium first enters the diffusion chamber 141 through the fourth gas injection pipeline 311 and the first connecting pipeline 11, so that the air tightness of the diffusion tank 14 can be detected, and then after the third switch valve 131 is opened, the helium can enter the tank body 23 through the third connecting pipeline 13, so that the air tightness of the coal sample tank 20 can be detected.
[0051] The vacuum pumping device includes a vacuum pump 41 and a vacuum tank 42. The vacuum pump 41 is connected to a first vacuum pipeline 411, and the first vacuum pipeline 411 is connected to the vacuum tank 42. The vacuum tank 42 is connected to a second vacuum pipeline 421, and the second vacuum pipeline 421 is connected to the second connecting pipeline 12.
[0052] The desorption measurement device includes a gas chromatograph 51, three collection bags 52 and a diverter 53. The diverter 53 is connected to a fifth connecting pipeline 531. The fourth connecting pipeline 21 is connected to a first conversion joint, the fifth connecting pipeline 531 is connected to a second conversion joint, and the first conversion joint is used to connect to the second conversion joint. The collecting bag 52 is respectively connected to a sixth connecting pipeline 521 and a seventh connecting pipeline 522, the sixth connecting pipeline 521 is connected to the diverter 53, and the seventh connecting pipeline 522 is connected to the gas chromatograph 51. A regulating valve 511, a fixed container 512, and a fourteenth switch valve 513 are sequentially provided on the fifth connecting pipeline 531 in the direction close to the diverter 53. The regulating valve 511 is used to adjust the pressure of the gas. The flow divider 53 is an existing structure, and is used to divide the gas into three collection bags 52 in sequence. The three collection bags 52 are respectively used to output the gas to the gas chromatograph 51, so that the relative volume fraction of each gas component can be calculated by the gas chromatograph 51. The fixed container 512 is used to buffer a fixed volume of gas.
[0053] It is understandable that the number of the collection bags 52 can be other numbers, such as four, five, etc., which can be set according to actual conditions.
[0054] The air and water drainage measuring device includes a first container 61, a second container 62 and a weighing device 63. A sealing head is inserted into the opening at the top of the first container 61, and one end of the exhaust pipe 64 is connected to a third conversion joint, and the first conversion joint is used to connect with the third conversion joint. The other end of the exhaust pipe 64 passes through the first through hole of the sealing head and extends into the first container 61, and one end of the drainage pipe 65 passes through the second through hole of the sealing head and extends into the first container 61, and the other end of the drainage pipe 65 is used to be inserted into the second container 62, and the second container 62 is placed on the weighing device 63. In actual application, the first container 61 is used to hold liquid such as water, the other end of the exhaust pipe 64 is located above the liquid surface, and one end of the drainage pipe 65 is located below the liquid surface. The second container 62 is first weighed by the weighing device 63 to obtain the original weight of the second container 62. After the gas enters the first container 61 through the exhaust pipe 64, the pressure in the first container 61 increases, so that the water in the first container 61 can be discharged into the second container 62 through the drainage pipe 65. At this time, the second container 62 can be weighed again by the weighing device 63, and the weight obtained by this weighing is subtracted from the original weight of the second container 62 to obtain the weight of the water discharged into the second container 62. The weight of the water is the volume of the gas entering the first container 61.
[0055] In this embodiment, the first conversion connector is a male connector, and the second conversion connector and the third conversion connector are both female connectors. In actual application, the first conversion connector is used to be plugged and matched with the second conversion connector or the third conversion connector.
[0056] The water injection device includes a first constant speed constant pressure pump 71, the first constant speed constant pressure pump 71 is connected to a second water inlet pipeline 711, and the second water inlet pipeline 711 is connected to the first water inlet pipeline 22. A water inlet valve (not shown in the figure) is provided on the second water inlet pipeline 711. The first constant speed constant pressure pump 71 is used to inject water into the tank body 23 of the coal sample tank 20 by a constant speed and constant pressure method, so as to simulate the in-situ reservoir environment and ensure the accuracy of gas pressure measurement.
[0057] The pressurizing device includes a second constant speed and constant pressure pump 81, which is connected to the first connecting pipeline 11 through a connecting pipeline 811, and the connecting pipeline 811 is located between the gas injection device and the first switch valve 111. A fifteenth switch valve 812 is provided on the connecting pipeline 811. The second constant speed and constant pressure pump 81 is used to compress the gas to achieve pressurization of the gas.
[0058] All the switch valves in the present invention are ball valves.
[0059] Through the above structure, the experimental steps of the present invention using single-component gas to measure the in-situ reservoir gas pressure are as follows:
[0060] In the initial state, the distance between the top end of the plunger 16 and the bottom end of the vertical portion 143b of the plug 143 is, for example, 14.6 mm. Figure 4 and Figure 5 The plunger 16 is shown to be in the lowest position, at which the distance between the top of the plunger 16 and the bottom of the vertical portion 143b of the plug 143 is, for example, 100 mm, the height inside the tank 23 is also 100 mm, the inner diameter of the diffusion chamber 141 and the inner diameter of the tank 23 are, for example, 30 mm, and the first conversion joint is not connected to the second conversion joint and the third conversion joint:
[0061] S1, air tightness test: close the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327, the sixth switch valve 328, the seventh switch valve 332, the second pressure reducing valve 333, the eighth switch valve 335, the second flow controller 336, the second check valve 337, the ninth switch valve 338, the tenth switch valve 342, the third pressure reducing valve 343, the eleventh switch valve 345, the third flow controller 346, the third check valve 347, the twelfth switch valve Valve 348, back pressure valve 211, second switch valve 121, water inlet valve, third switch valve 131 and fifteenth switch valve 812, open the thirteenth switch valve 312 and the first switch valve 111, so that helium gas of, for example, 1MPa (megapascal) or more can be injected into the diffusion chamber 141 through the helium gas cylinder 31, and then close the thirteenth switch valve 312 and the first switch valve 111, and detect the pressure in the diffusion chamber 141 through the first pressure sensor 112. If the pressure does not change within 12 hours, it indicates that the air tightness of the diffusion tank 14 is good. Then open the third switch valve 131, and the helium in the diffusion chamber 141 can enter the tank body 23 of the coal sample tank 20. The pressure in the tank body 23 is detected by the second pressure sensor 132. If the pressure does not change within 12 hours, it indicates that the air tightness of the coal sample tank 20 is good.
[0062] S2, vacuuming: remove the sealing upper cover 24 from the tank body 23, put the coal sample into the tank body 23, and then reinstall the sealing upper cover 24 on the tank body 23. Then open the second switch valve 121, start the vacuum pump 41 to vacuum the vacuum tank 42, so as to realize vacuuming the diffusion chamber 141 and the interior of the tank body 23. The vacuuming time is, for example, 8 hours. After completion, close the second switch valve 121 and the third switch valve 131.
[0063] S3, empty volume calibration: open the thirteenth switch valve 312 and the first switch valve 111, so that helium can be injected into the diffusion chamber 141 through the helium cylinder 31, and the pressure in the diffusion chamber 141 is detected by the first pressure sensor 112. If the pressure does not change within 20 minutes, it indicates that the pressure in the diffusion chamber 141 is stable. At this time, the stable pressure in the diffusion chamber 141 is recorded as P1, and then the thirteenth switch valve 312 and the first switch valve 111 are closed and the third switch valve 131 is opened, so that the helium in the diffusion chamber 141 can enter the tank body 2. 3, at this time, the coal sample adsorbs helium, and the pressure in the tank body 23 is detected by the second pressure sensor 132. If there is no pressure change within 20 minutes, it means that the coal sample no longer adsorbs helium. At this time, the pressure in the tank body 23 is stable, and the stable pressure in the tank body 23 is P2, and then the third switch valve 131 is closed. According to the ideal gas state equation PV=nRT (P is pressure, V is volume, T is temperature, n is the amount of gas, and R is the molar gas constant), the empty volume in the tank body 23 can be calculated. The specific calculation is as follows:
[0064] Since the total amount of helium remains unchanged, the calculation formula of the empty volume in the tank body 23 can be obtained according to the ideal gas state equation: P1V1=P2(V1+V2), V1 is the volume of the diffusion cavity 141, V2 is the empty volume in the tank body 23, and V1=π(r 2 )*h, and r=30 / 2 mm, h is 14.6 mm, so the volume V1 of the diffusion chamber 141 can be calculated, and then the empty volume V2 in the tank body 23 can be calculated according to the calculation formula.
[0065] S4, gas adsorption: open the back pressure valve 211, the helium in the tank body 23 can be discharged through the first conversion joint, then close the back pressure valve 211 and open the second switch valve 121 and the third switch valve 131, start the vacuum pump 41 to evacuate the vacuum tank 42, so that the diffusion chamber 141 and the interior of the tank body 23 can be evacuated, and the evacuation time is, for example, 8 hours. After completion, close the second switch valve 121. Then open the first switch valve 111, the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327 and the sixth switch valve 328, so that a certain amount of carbon dioxide gas can be injected into the tank body 23 through the carbon dioxide cylinder 32 through the diffusion chamber 141, and the amount of carbon dioxide gas injected can be set according to actual conditions. Then, the first switch valve 111, the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327 and the sixth switch valve 328 are closed, and the coal sample in the tank body 23 begins to adsorb carbon dioxide. The pressure in the tank body 23 is detected by the second pressure sensor 132. If the pressure does not change for 3 consecutive hours and the adsorption time reaches 8 hours, for example, it is considered that the tank body 23 has reached adsorption equilibrium. At this time, the pressure in the tank body 23 is recorded as P3. The adsorption amount of carbon dioxide can be calculated based on the pressure P3 and the empty volume V2 in the tank body 23. The specific calculation is as follows:
[0066] Adsorption amount = injection amount - free amount, adsorption amount is expressed by V 吸附 Indicates the injection volume by V 注入 The free amount is expressed as V 游离 Indicates that V 游离 It can be calculated using the following calculation formula (I):
[0067]
[0068] Where n is the amount of carbon dioxide gas in moles (mol); V M is the molar volume, which is a fixed value, for example, 22.4L / mol (liter / mole); Z is the gas compressibility factor, R is a constant 8.314; T is the temperature, which is 26°C, P is the pressure P3, V 自由 That is the empty volume V2.
[0069] The injection amount is the amount of carbon dioxide gas injected. The injection amount is known, so the adsorption amount of carbon dioxide can be calculated.
[0070] S5, expansion, to simulate the process of expanding the space where the coal sample is placed when the coal sample is placed in the corer during the coring process: first, the plunger 16 is driven downward by the driving mechanism 17 to make the plunger 16 drop by, for example, 5 mm. At this time, the volume in the diffusion chamber 141 expands, the pressure in the tank body 23 drops, and the coal sample begins to desorb. The pressure in the tank body 23 at this time is recorded by the second pressure sensor 132. If the pressure does not change for 3 consecutive hours and the desorption time reaches, for example, 8 hours, it is considered that the tank body 23 has reached desorption equilibrium. At this time, the pressure in the tank body 23 is P4. The desorption amount of carbon dioxide can be calculated based on the pressure P4, the empty volume V2 of the tank body 23 and the carbon dioxide adsorption amount calculated in step S4. The specific calculation is as follows:
[0071] Desorption amount = adsorption amount - adsorption amount after expansion, desorption amount is expressed as V 解吸 The adsorption capacity is the aforementioned V 吸附 , the adsorption capacity after expansion is V 扩容吸附 express.
[0072] Adsorption capacity after expansion (V 扩容吸附 ) = injection volume (V 注入 )-free amount (V 游离 ), V 游离 It can be obtained by the calculation method of the above step S4, wherein V in step S4 自由 = Empty volume V2 + Expanded volume V 扩容 , V 扩容 =π(r 2 )*h, and r=30 / 2 mm, h is 5 mm, so the expansion volume V can be calculated 扩容 The injection amount is the injection amount of carbon dioxide gas. The injection amount is known, so the adsorption amount after expansion can be calculated, and thus the desorption amount of carbon dioxide can be obtained.
[0073] S6. Exhaust gas collection: close the regulating valve 511, the fixed container 512, and the fourteenth switch valve 513, connect the first conversion joint with the second conversion joint, and then open the back pressure valve 211, the regulating valve 511, the fixed container 512 and the fourteenth switch valve 513, the gas in the tank body 23 first enters the fixed container 512 for buffering, and then the gas is diverted to the first collection bag 52 through the diverter 53, and then the gas in the tank body 23 continues to enter the fixed container 512 for buffering, and then the gas is continued to be diverted to the second collection bag 52 through the diverter 53, and then the gas in the tank body 23 continues to enter the fixed container 512 for buffering, and then the gas is continued to be diverted to the third collection bag 52 through the diverter 53, and then the gas is input into the gas chromatograph 51 through the three collection bags 52, and the relative volume fraction of each gas component can be calculated by the gas chromatograph 51.
[0074] S7, repeat the experimental process of step S1 to step S6 for four times, wherein the position of the plunger 16 in step S5 is changed in each repetition, for example, the plunger 16 is driven to drop by 10 mm by the driving mechanism 17 in the first repetition, the plunger 16 is driven to drop by 15 mm by the driving mechanism 17 in the second repetition, the plunger 16 is driven to drop by 20 mm by the driving mechanism 17 in the third repetition, and the plunger 16 is driven to drop by 25 mm by the driving mechanism 17 in the fourth repetition. In this way, the desorption amount of carbon dioxide under five different volumes can be obtained according to five experiments.
[0075] Then, methane is used to replace carbon dioxide and the test process of step S1 to step S7 is repeated, so that the desorption amount of methane under five different volumes can be obtained. Then, nitrogen is used to replace carbon dioxide and the test process of step S1 to step S7 is repeated, so that the desorption amount of nitrogen under five different volumes can be obtained.
[0076] Each desorption amount data obtained above is analyzed, and based on the in-situ reservoir gas pressure calculation method (this calculation method is existing and will not be repeated here), the in-situ reservoir gas pressure can be determined, and according to the determined in-situ reservoir gas pressure data, the change law of the in-situ reservoir gas pressure can be obtained.
[0077] In the above steps, step S6 can also be replaced by step S8, S7: exhaust collection: connect the first conversion joint with the third conversion joint, and then open the back pressure valve 211, the gas in the tank body 23 can enter the first container 61 through the exhaust pipe 64, the pressure in the first container 61 increases, so that the water in the first container 61 can be discharged into the second container 62 through the drainage pipe 65, and the second container 62 can be weighed by the weighing device 63 at this time, and the weight of the water discharged into the second container 62 can be subtracted from the original weight of the second container 62 to obtain the weight of the water discharged into the second container 62, and the weight of the water is the volume of the gas entering the first container 61.
[0078] In the above steps, in step S4, if it is necessary to pressurize the carbon dioxide gas injected into the tank body 23, the fifteenth switch valve 812, the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327 and the sixth switch valve 328 are first opened and the first switch valve 111 is closed, and the carbon dioxide gas of a predetermined pressure value can be injected into the second constant speed and constant pressure pump 81 through the carbon dioxide gas cylinder 32, so that the carbon dioxide gas can be pressurized by the second constant speed and constant pressure pump 81, and then the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327 and the sixth switch valve 328 are closed and the first switch valve 111 is opened, and the pressurized carbon dioxide gas can be injected into the tank body 23 through the second constant speed and constant pressure pump 81, and the fifteenth switch valve 812 is closed after completion, and the coal sample in the tank body 23 begins to adsorb carbon dioxide. If water needs to be injected into the tank body 23, after step S4, step S41 is performed: the water inlet valve is opened, and 3-6 ml of water, for example, is injected into the tank body 23 through the first constant speed constant pressure pump 71. After completion, the water inlet valve is closed, and then step S5 is performed. By pressurizing the gas injected into the tank body 23 and injecting water into the tank body 23, the in-situ reservoir environment can be simulated to ensure the accuracy of gas pressure measurement.
[0079] In the above steps, the coal sample may be a water-containing coal sample, and the water content of the coal sample is, for example, 2%, 4%, 6%, 8%, etc., so that adsorption and desorption experiments can be carried out on the water-containing coal sample.
[0080] The experimental steps of the present invention using multi-component gas to measure the in-situ reservoir gas pressure are as follows:
[0081] In the initial state, the distance between the top end of the plunger 16 and the bottom end of the vertical portion 143b of the plug 143 is, for example, 14.6 mm. Figure 4 and Figure 5 The plunger 16 is shown in the lowest position, at which time the distance between the top of the plunger 16 and the bottom of the vertical portion 143b of the plug 143 is, for example, 100 mm, the height inside the tank body 23 is also 100 mm, the inner diameter of the diffusion chamber 141 and the inner diameter of the tank body 23 are both, for example, 30 mm, and the first conversion joint is not connected to the second conversion joint and the third conversion joint.
[0082] S11, air tightness test: This step is the same as step S1.
[0083] S12, vacuuming: This step is the same as step S2.
[0084] S13, empty volume calibration: This step is the same as step S3.
[0085] S14, gas adsorption: open the back pressure valve 211, the helium in the tank body 23 can be discharged through the first conversion joint, then close the back pressure valve 211 and open the second switch valve 121 and the third switch valve 131, start the vacuum pump 41 to evacuate the vacuum tank 42, so that the diffusion chamber 141 and the interior of the tank body 23 can be evacuated, the evacuation time is, for example, 8 hours, and after completion, close the second switch valve 121. Then open the first switch valve 111, the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327 and the sixth switch valve 328, so that a certain amount of carbon dioxide gas can be injected into the tank body 23 through the carbon dioxide cylinder 32 through the diffusion chamber 141, and the carbon dioxide gas accounts for 10% of the total gas injection. Then, the fourth switch valve 322, the first pressure reducing valve 323, the fifth switch valve 325, the first flow controller 326, the first check valve 327 and the sixth switch valve 328 are closed, and the seventh switch valve 332, the second pressure reducing valve 333, the eighth switch valve 335, the second flow controller 336, the second check valve 337 and the ninth switch valve 338 are opened, so that a certain amount of methane gas can be injected into the tank body 23 through the diffusion chamber 141 through the methane gas cylinder 33, and the methane gas accounts for 70% of the total amount of the injected gas. Then, the seventh switch valve 332, the second pressure reducing valve 333, the eighth switch valve 335, the second flow controller 336, the second check valve 337 and the ninth switch valve 338 are closed, and the tenth switch valve 342, the third pressure reducing valve 343, the eleventh switch valve 345, the third flow controller 346, the third check valve 347 and the twelfth switch valve 348 are opened, so that the nitrogen cylinder 34 can inject a certain amount of nitrogen into the tank body 23 through the diffusion chamber 141, and the nitrogen accounts for 20% of the total amount of the injected gas. Then close the first switch valve 111, the tenth switch valve 342, the third pressure reducing valve 343, the eleventh switch valve 345, the third flow controller 346, the third one-way valve 347 and the twelfth switch valve 348, and the coal sample in the tank body 23 begins to adsorb carbon dioxide, methane and nitrogen. The pressure in the tank body 23 is detected by the second pressure sensor 132. If the pressure remains unchanged for three consecutive hours and the adsorption time reaches, for example, eight hours, it is considered that the tank body 23 has reached adsorption equilibrium, and the pressure in the tank body 23 at this time is recorded as P5.
[0086] S15, volume fraction analysis of each gas component: close the regulating valve 511, the fixed container 512, and the fourteenth switch valve 513, connect the first conversion joint with the second conversion joint, and then open the back pressure valve 211, the regulating valve 511, the fixed container 512 and the fourteenth switch valve 513, the gas in the tank body 23 first enters the fixed container 512 for buffering, and then the gas is diverted to the first collection bag 52 through the diverter 53, and then the gas in the tank body 23 continues to enter the fixed container 512 for buffering , and then the gas is further diverted to the second collection bag 52 through the diverter 53, and then the gas in the tank body 23 continues to enter the fixed container 512 for buffering, and then the gas is further diverted to the third collection bag 52 through the diverter 53, and then the gas is input into the gas chromatograph 51 through the three collection bags 52, and the relative volume fraction of each gas component can be calculated through the gas chromatograph 51, and after completion, the regulating valve 511, the fixed container 512, the fourteenth switch valve 513 and the back pressure valve 211 are closed. According to the relative volume fraction of each component gas, the pressure data of each gas can be obtained. For example, if the relative volume fractions of methane gas, carbon dioxide gas and nitrogen gas are 50%, 30% and 20%, the pressure data of methane gas is 50%*P5, the pressure data of carbon dioxide gas is 30%*P5, and the pressure data of nitrogen gas is 20%*P5.
[0087] The adsorption amount of each gas component can be calculated according to the pressure of each gas, the empty volume V2 in the tank 23 and the relative volume fraction of each gas component. The specific calculation is as follows:
[0088] The amount of methane adsorption = the amount of methane injection - the amount of methane release, which can be calculated according to the calculation method in the aforementioned step S4. The amount of carbon dioxide adsorption = the amount of carbon dioxide injection - the amount of carbon dioxide release, which can be calculated according to the calculation method in the aforementioned step S4. The amount of nitrogen adsorption = the amount of nitrogen injection - the amount of nitrogen release, which can be calculated according to the calculation method in the aforementioned step S4.
[0089] S16, expansion, to simulate the process of expanding the space where the coal sample is placed in the corer during the coring process: first, the plunger 16 is driven downward by the driving mechanism 17 to make the plunger 16 drop by, for example, 5 mm. At this time, the volume in the diffusion chamber 141 expands, the pressure in the tank body 23 drops, and the coal sample begins to desorb. The pressure in the tank body 23 is detected by the second pressure sensor 132. If the pressure does not change for 3 consecutive hours and the adsorption time reaches, for example, 8 hours, it is considered that the tank body 23 has reached desorption equilibrium. The pressure in the tank body 23 at this time is recorded as P6. The total desorption amount of the coal sample can be calculated based on the pressure P6, the empty volume V2 in the tank body, and the methane adsorption amount, carbon dioxide adsorption amount, and nitrogen adsorption amount calculated in step 15. The specific calculation is as follows:
[0090] Total desorption amount = (methane adsorption amount + carbon dioxide adsorption amount + nitrogen adsorption amount) - (methane adsorption amount after expansion + carbon dioxide adsorption amount after expansion + nitrogen adsorption amount after expansion). The methane adsorption amount after expansion, the carbon dioxide adsorption amount after expansion, and the nitrogen adsorption amount after expansion can be calculated respectively according to the calculation method of the aforementioned step S5, so that the total desorption amount can be calculated.
[0091] The methane desorption amount can be obtained by subtracting the methane adsorption amount from the methane adsorption amount after expansion, the carbon dioxide desorption amount can be obtained by subtracting the carbon dioxide adsorption amount from the carbon dioxide adsorption amount after expansion, and the nitrogen desorption amount can be obtained by subtracting the nitrogen adsorption amount from the nitrogen adsorption amount after expansion.
[0092] S17, exhaust gas collection: connect the first conversion joint with the third conversion joint, then open the back pressure valve 211, the gas in the tank 23 can enter the first container 61 through the exhaust pipe 64, the pressure in the first container 61 increases, so that the water in the first container 61 can be discharged into the second container 62 through the drainage pipe 65, at this time, the second container 62 can be weighed by the weighing device 63, and the weight of the water discharged into the second container 62 can be obtained by subtracting the weight weighed this time from the original weight of the second container 62, and the weight of the water is the volume of the gas entering the first container 61. The exhaust gas collection in step S17 can also be performed by using a desorption measurement device, and the details can be seen in step S6.
[0093] S18, repeat the experimental process of the above steps S11 to S17 for 4 times, wherein the position of the plunger 16 is changed in each repetition, for example, the plunger 16 is driven to drop 10 mm by the driving mechanism 17 in the first repetition, 15 mm by the driving mechanism 17 in the second repetition, 20 mm by the driving mechanism 17 in the third repetition, and 25 mm by the driving mechanism 17 in the fourth repetition. In this way, the total desorption amount and the desorption amount of methane gas, the desorption amount of carbon dioxide gas and the desorption amount of nitrogen gas under five different volumes can be obtained according to five experiments.
[0094] Then, methane, carbon dioxide, and nitrogen with proportions of 80%, 10%, and 10% are used to replace the methane, carbon dioxide, and nitrogen with proportions of 70%, 10%, and 20%, respectively, and the experimental process of steps S11 to S18 is repeated. In this way, the total desorption amount and the desorption amount of methane gas, the desorption amount of carbon dioxide gas, and the desorption amount of nitrogen at five different volumes can be obtained. Then, methane, carbon dioxide, and nitrogen with proportions of 70%, 20%, and 10% are used to replace the methane, carbon dioxide, and nitrogen with proportions of 70%, 10%, and 20%, respectively, and the experimental process of steps S11 to S18 is repeated. In this way, the total desorption amount and the desorption amount of methane gas, the desorption amount of carbon dioxide gas, and the desorption amount of nitrogen at five different volumes can be obtained. Then, methane, carbon dioxide, and nitrogen with proportions of 60%, 10%, and 30% are used to replace the methane, carbon dioxide, and nitrogen with proportions of 70%, 10%, and 20%, respectively, and the experimental process of steps S11 to S18 is repeated. In this way, the total desorption amount of methane gas, the desorption amount of carbon dioxide gas, and the desorption amount of nitrogen at five different volumes can be obtained. Then, methane, carbon dioxide, and nitrogen with proportions of 60%, 30%, and 10% are used to replace the methane, carbon dioxide, and nitrogen with proportions of 70%, 10%, and 20%, respectively, and the experimental process of steps S11 to S18 is repeated. In this way, the total desorption amount of methane gas, the desorption amount of carbon dioxide gas, and the desorption amount of nitrogen at five different volumes can be obtained. The experimental process of steps S11 to S18 is repeated by using methane, carbon dioxide and nitrogen with proportions of 60%, 20% and 20% respectively instead of the methane, carbon dioxide and nitrogen with proportions of 70%, 10% and 20% respectively. In this way, the total desorption amounts at five different volumes as well as the desorption amounts of methane gas, carbon dioxide gas and nitrogen can be obtained.
[0095] Then, methane and carbon dioxide with a proportion of 80% and 20% are used to replace the methane, carbon dioxide and nitrogen with a proportion of 70%, 10% and 20% respectively, and the experimental process of steps S11 to S18 is repeated, so that the total desorption amount of methane gas and the desorption amount of carbon dioxide gas under five different volumes can be obtained. Then, methane and nitrogen with a proportion of 80% and 20% are used to replace the methane, carbon dioxide and nitrogen with a proportion of 70%, 10% and 20% respectively, and the experimental process of steps S11 to S18 is repeated, so that the total desorption amount of methane gas and the desorption amount of nitrogen under five different volumes can be obtained.
[0096] Each desorption amount data obtained above is analyzed, and based on the in-situ reservoir gas pressure calculation method (the calculation method is existing and will not be repeated here), the in-situ reservoir gas pressure can be determined, and the determined in-situ reservoir gas pressure data is analyzed (the analysis method is existing and will not be repeated here), so as to explore the change law of the in-situ reservoir gas pressure.
[0097] The present invention uses a variable volume diffusion unit 10, and drives the plunger 16 to move downward to different positions in the diffusion chamber 141 and the straightening cylinder 15 through the driving mechanism 17 of the variable volume diffusion unit 10, so as to expand the volume of the diffusion chamber 141, so as to simulate the process of expanding the space where the coal sample is located when the raw coal sample is placed in the corer during the coring process, further restore the actual situation of gas adsorption and desorption of the coal sample during the on-site coring process, ensure the accuracy of the adsorption and desorption amounts, and thus ensure the accuracy of the in-situ reservoir gas pressure measurement. And the measured in-situ reservoir gas pressure data is analyzed, so as to explore the law of in-situ reservoir gas pressure changes. At the same time, the water injection device can be used to inject water into the coal sample tank 20, and the gas to be injected into the coal sample tank 20 can be pressurized by the booster device, so as to simulate the in-situ reservoir environment, and further ensure the accuracy of the in-situ reservoir gas pressure measurement.
[0098] The above is a specific description of the preferred implementation of the present invention, but the invention is not limited to the embodiments. Those skilled in the art can make various equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A test system for testing and analyzing the desorption gas pressure of an in-situ reservoir core, comprising an adsorption desorption device, a gas injection device, a vacuum device and a desorption measurement device, wherein the adsorption desorption device comprises a coal sample tank, characterized in that: The adsorption and desorption device also includes a variable volume diffusion unit, which includes a diffusion tank, a hollow righting cylinder and a driving mechanism arranged at the bottom end of the righting cylinder, a diffusion chamber is provided in the diffusion tank, and the diffusion chamber is connected to the interior of the righting cylinder, a plunger is provided in the righting cylinder, and the top of the plunger extends into the diffusion chamber, and the driving mechanism is used to drive the plunger to move up and down in the righting cylinder and the diffusion chamber; the diffusion tank is connected to a first connecting pipeline, a second connecting pipeline and a third connecting pipeline, the first connecting pipeline, the second connecting pipeline and the third connecting pipeline are all connected to the diffusion chamber, the first connecting pipeline is connected to the gas injection device, and the second connecting pipeline is connected to the gas injection device. The vacuum pump is connected, the third connecting pipeline is connected to the coal sample tank, the coal sample tank is connected to the fourth connecting pipeline, the third connecting pipeline and the fourth connecting pipeline are both communicated with the interior of the coal sample tank, the fourth connecting pipeline is used to connect with the desorption measuring device, the first connecting pipeline is provided with a first switch valve and a first pressure sensor in sequence on the upper side close to the diffusion tank, the second connecting pipeline is provided with a second switch valve, the third connecting pipeline is provided with a third switch valve and a second pressure sensor in sequence on the upper side close to the coal sample tank; the outside of the diffusion tank is provided with a first water jacket and a first insulation jacket in sequence, a first insulation chamber is formed between the inner wall of the first water jacket and the diffusion tank, the The outer wall of the first water jacket is provided with a first water inlet joint and a first water outlet joint, the first water inlet joint and the first water outlet joint are both connected to the first insulation chamber, the outer wall of the first insulation sleeve is provided with a first avoidance hole for avoiding the first water inlet joint and a second avoidance hole for avoiding the first water outlet joint, the first water inlet joint and the first water outlet joint are respectively used to connect with the constant temperature water bath system; the gas injection device comprises: a carbon dioxide gas cylinder, the carbon dioxide gas cylinder is connected to a first gas injection pipeline, the first gas injection pipeline is connected to the first connecting pipeline, and the upper edge of the first gas injection pipeline is provided with a fourth switch valve, a first pressure reducing valve, a first pressure gauge, a fifth switch valve, a first flow a methane gas cylinder, the methane gas cylinder being connected to a second gas injection pipeline, the second gas injection pipeline being connected to the first connecting pipeline, the upper edge of the second gas injection pipeline being provided with a seventh switch valve, a second pressure reducing valve, a second pressure gauge, an eighth switch valve, a second flow controller, a second check valve and a ninth switch valve in sequence in the direction close to the diffusion tank; a nitrogen gas cylinder, the nitrogen gas cylinder being connected to a third gas injection pipeline, the third gas injection pipeline being connected to the first connecting pipeline, the upper edge of the third gas injection pipeline being provided with a tenth switch valve, a third pressure reducing valve, a third pressure gauge, an eleventh switch valve, a third flow controller, a third check valve and a twelfth switch valve in sequence in the direction close to the diffusion tank;A helium gas cylinder, wherein the helium gas cylinder is connected to a fourth gas injection pipeline, the fourth gas injection pipeline is connected to the first connecting pipeline, and a thirteenth switch valve is arranged on the fourth gas injection pipeline; the coal sample tank comprises a tank body, a T-shaped sealed upper cover and a T-shaped sealed lower cover, the top and bottom ends of the tank body are respectively provided with a first opening and a second opening, the first opening and the second opening are both communicated with the interior of the tank body, the horizontal portion of the sealed upper cover is detachably arranged on the top end of the tank body, the vertical portion of the sealed upper cover is inserted into the first opening, the third connecting pipeline is connected to the horizontal portion of the sealed upper cover, and the horizontal and vertical portions of the sealed upper cover are connected to the third connecting pipeline. A first flow channel is provided, the first flow channel is communicated with the third connecting pipeline and the interior of the tank body respectively, the horizontal part of the sealed upper cover is connected with the fourth connecting pipeline, the horizontal part and the vertical part of the sealed upper cover are provided with a second flow channel, the second flow channel is communicated with the fourth connecting pipeline and the interior of the tank body respectively, the horizontal part of the sealed lower cover is detachably arranged at the bottom end of the tank body, the vertical part of the sealed lower cover is inserted into the second opening, the horizontal part of the sealed lower cover is connected with the first water inlet pipeline, the horizontal part and the vertical part of the sealed lower cover are provided with a third flow channel, the third flow channel is communicated with the first water inlet pipeline and the interior of the tank body respectively. ; 2. The test system according to claim 1, characterized in that: The driving mechanism includes a driving motor, a reducer and a connecting seat, the connecting seat is arranged at the bottom end of the straightening cylinder, the reducer is arranged at the bottom end of the connecting seat, the driving motor is arranged at the bottom end of the reducer, the output shaft of the driving motor is connected to the input end of the reducer, a connecting shaft is arranged in the connecting seat, the bottom end of the connecting shaft is connected to the output end of the reducer, a receiving cavity is arranged in the plunger, and a plunger opening communicating with the receiving cavity is arranged at the bottom end of the plunger, a screw rod is arranged in the straightening cylinder, the bottom end of the screw rod is connected to the top end of the connecting shaft, the top end of the screw rod passes through the plunger opening and extends into the receiving cavity, the screw rod thread is matched with a nut, the nut is located between the connecting seat and the plunger, and the top end of the nut is arranged in the plunger opening.
3. The test system according to claim 1, characterized in that: The vacuum pump comprises a vacuum pump and a vacuum tank, the vacuum pump is connected to a first vacuum pipeline, the first vacuum pipeline is connected to the vacuum tank, the vacuum tank is connected to a second vacuum pipeline, and the second vacuum pipeline is connected to the second connecting pipeline.
4. The test system according to claim 1, characterized in that: The test system also includes a gas and water drainage measuring device, a water injection device and a pressurizing device. The fourth connecting pipeline is used to connect with the gas and water drainage measuring device. The coal sample tank is connected to a first water inlet pipeline, and the first water inlet pipeline is connected to the interior of the coal sample tank. The first water inlet pipeline is connected to the water injection device, and the pressurizing device is connected to the first connecting pipeline.
5. The test system according to claim 1, characterized in that: The outside of the tank body is sequentially sleeved with a second water jacket and a second insulation jacket, a second insulation chamber is formed between the inner wall of the second water jacket and the tank body, a second water inlet joint and a second water outlet joint are provided on the outer wall of the second water jacket, the second water inlet joint and the second water outlet joint are both communicated with the second insulation chamber, the outer wall of the second insulation jacket is provided with a first through hole for avoiding the second water inlet joint and a second through hole for avoiding the second water outlet joint, the second water inlet joint and the second water outlet joint are respectively used to be connected to a constant temperature water bath system.
6. The test system according to claim 4, characterized in that: The desorption measurement device includes a gas chromatograph, at least three collection bags and a diverter, the diverter is connected to a fifth connecting pipeline, the fourth connecting pipeline is connected to a first conversion joint, the fifth connecting pipeline is connected to a second conversion joint, the first conversion joint is used to connect to the second conversion joint, the collecting bag is respectively connected to a sixth connecting pipeline and a seventh connecting pipeline, the sixth connecting pipeline is connected to the diverter, the seventh connecting pipeline is connected to the gas chromatograph, a back pressure valve is provided on the fourth connecting pipeline, and a regulating valve, a constant container and a fourteenth switch valve are sequentially provided on the upper direction of the fifth connecting pipeline close to the diverter; The air-water drainage measuring device includes a first container, a second container and a weighing device. A sealing head is inserted into the opening at the top of the first container. One end of the exhaust pipe is connected to a third conversion joint. The first conversion joint is used to connect to the third conversion joint. The other end of the exhaust pipe passes through the first through hole of the sealing head and extends into the first container. One end of the drainage pipe passes through the second through hole of the sealing head and extends into the first container. The other end of the drainage pipe is used to be inserted into the second container. The second container is placed on the weighing device.
7. The test system according to claim 4, characterized in that: The water injection device includes a first constant speed and constant pressure pump, the first constant speed and constant pressure pump is connected to a second water inlet pipeline, the second water inlet pipeline is connected to the first water inlet pipeline, and a water inlet valve is provided on the second water inlet pipeline; the boosting device includes a second constant speed and constant pressure pump, the second constant speed and constant pressure pump is connected to the first connecting pipeline through a connecting pipeline, the connecting pipeline is located between the gas injection device and the first switch valve, and a fifteenth switch valve is provided on the connecting pipeline.