A method and system for intelligently compiling mining schedule for open-pit sand and gravel mines
Through intelligent mine construction, optimization algorithms and three-dimensional model data are used to solve the problem of optimization speed and accuracy in the preparation of mining and stripping schedules for open-pit sand and gravel mines, and achieve rapid and accurate preparation of mining and stripping schedules, improving the quality of open-pit sand and gravel mines. Mining efficiency and reliability of mines.
Patent Information
- Application Number
- CN202411146791.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-08-21
AI Technical Summary
In the preparation of mining and stripping schedules for open-pit sand and gravel mines, the existing methods have slow optimization speeds, small optimization quantities, cumbersome data processing and are error-prone, making it difficult to meet the efficient preparation needs of large-scale mines.
Using a method based on intelligent mine construction, by obtaining sand and gravel data and three-dimensional model centroid point data, the net present value objective function of the open-pit sand and gravel mine block was constructed, a production planning model was established, and the optimized Sparrow algorithm and particle swarm algorithm were used to solve the problem, and the Optimize the mining and stripping plan, and finally prepare the mining and stripping progress plan.
It significantly improves the optimization speed and quantity of the sand and gravel block mining sequence, accurately and quickly prepares the mining and stripping schedule, reduces the complexity and error rate of data processing, and improves the accuracy and efficiency of the preparation.
Smart Images

Figure CN118657263B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to a method and system for intelligently compiling a mining schedule for an open-pit sand and gravel mine. Background Art
[0002] As a pillar industry of modern industry, mining is accelerating its transformation towards digitalization and intelligence. Building smart mines is not only a strategic choice to seize the scientific and technological revolution and the transformation of the way mineral resources are developed and utilized, but also an important way to meet the needs of stable national economic growth and ensure the safe supply of mineral resources. The construction of smart mines has become the mainstream trend of global mining development.
[0003] The preparation of a mining schedule is an important part of mining and intelligent construction, an important part of open-pit mine design, and a necessary technical measure to ensure rapid and orderly construction of open-pit mines, continuous balanced production, and economical and efficient operation. During open-pit mining, the amount of ore and rock within the boundary gradually disappears, the working space position keeps moving, the ore deposit conditions, ore varieties, and ore and rock properties keep changing, and the content and requirements of each work link also keep changing with the passage of time. In order to make production predictable and reliable, a mining schedule must be prepared.
[0004] In the past, dynamic programming was used to optimize the mining sequence of sand and gravel blocks in the mining schedule. However, the optimization speed was slow when optimizing large-scale mines, and sometimes the optimization time could even reach more than ten hours. Even when the number of blocks reached a certain number, such as hundreds of thousands to millions of blocks, it would be difficult to optimize. Therefore, it is urgent to adopt an improved optimization algorithm to greatly improve the optimization speed and quantity. In addition, since the amount of data required for editing the mining schedule is huge, including the x, y, and z coordinates of the blocks, as well as the length, width, and height of the blocks, the mining year, and the weathering type, small mines can reach hundreds of thousands of data. It is very troublesome to perform statistics using previous methods. Therefore, it is particularly important to find a method based on intelligent mine construction that can accurately and quickly compile a mining schedule. Summary of the invention
[0005] In view of the shortcomings of existing methods and the needs of practical applications, in order to improve the ability to optimize the mining sequence of sand and gravel blocks, a mining schedule is accurately and quickly compiled to solve the problems of slow optimization speed, small optimization quantity, and cumbersome and error-prone data processing in editing the mining schedule in open-pit sand and gravel mining. On the one hand, the present invention provides an intelligent compilation method for an open-pit sand and gravel mine mining schedule, and the intelligent compilation method for an open-pit sand and gravel mine mining schedule comprises the following steps: obtaining sand and gravel data and three-dimensional model centroid data of an open-pit sand and gravel mine; using the sand and gravel data to construct a net present value objective function of the open-pit sand and gravel mine blocks, and establishing an open-pit sand and gravel mine production plan model according to the production constraints of the open-pit sand and gravel mine and the net present value objective function of the open-pit sand and gravel mine blocks; solving the open-pit sand and gravel mine production plan model to obtain an optimization scheme for sand and gravel mining and stripping plans; obtaining an open-pit sand and gravel mine mining and stripping schedule based on the three-dimensional model centroid data and the optimization scheme for sand and gravel mining and stripping plans. The present invention establishes an open-pit sand and gravel mine production plan model through the net present value objective function of the open-pit sand and gravel mine blocks and the production constraints of the open-pit sand and gravel mine, and then obtains the sand and gravel mining plan optimization scheme by solving the open-pit sand and gravel mine production plan model. Finally, the sand and gravel mining plan optimization scheme is used to obtain the open-pit sand and gravel mine mining schedule. While improving the speed and quantity of optimizing the mining sequence of sand and gravel blocks, the present invention also counts the amount of data required for editing the mining schedule, thus solving the problem of accurately and quickly compiling the mining schedule.
[0006] Optionally, the sand and gravel data of the open-pit sand and gravel mine is obtained, including obtaining the spatial coordinate value and edge length of the sand and gravel block, the specific gravity of the sand and gravel, the price of sand and gravel of different weathering types, the sand and gravel weathering type, the unit cost of mining and stripping, the comprehensive selling price of sand and gravel, the recovery rate of finished sand and gravel, and the mixing rate of waste rock. The sand and gravel data of the open-pit sand and gravel mine obtained by the present invention takes into account many factors, which is conducive to improving the accuracy of the preparation of the mining and stripping schedule.
[0007] Optionally, the open-pit sand and gravel mine block net present value objective function is constructed by using the sand and gravel data, and an open-pit sand and gravel mine production planning model is established according to the open-pit sand and gravel mine production constraints and the open-pit sand and gravel mine block net present value objective function, satisfying the following formula: , , ,in, represents the net present value of the sandstone block, represents the maximum service time of the mine, Indicates the number of sandstone blocks. Indicates the number of different weathering types of sand and gravel, Indicates Sand and gravel block mining variables, Indicates The sand and gravel blocks have not been mined. Indicates Sand and gravel blocks are mined, represents the discount rate, Indicates the mining time year, Indicates The amount of available sand and gravel contained in the total annual sand and gravel mining volume, Indicates the recovery rate of finished sand and gravel, For the Annual sand and gravel price, Indicates the waste rock mixing rate, Indicates The amount of sand and gravel per block, represents the unit mining cost of sand and gravel, is the soil stripping amount, Represents topsoil, Indicates highly weathered soil. Indicates medium weathered soil, represents the unit cost of soil stripping, Represents the comprehensive cost of sand and gravel processing, Indicates the minimum annual sand and gravel mining volume, Indicates the maximum annual sand and gravel mining volume, The open-pit gravel mine production planning model constructed by the present invention determines the maximum service life of the mine by considering the net present value of the open-pit gravel mine block, thereby further improving the reliability of the present invention.
[0008] Optionally, the solution of the production plan model of the open-pit sand and gravel mine to obtain the optimization plan of the sand and gravel mining plan includes the following steps: introducing the sand and gravel mining inertia factor to optimize the finder position update strategy in the sparrow algorithm, and obtaining the first production plan influencing factor according to the optimized finder position update strategy; optimizing the particle swarm algorithm according to the first production plan influencing factor to obtain the improved particle swarm algorithm; using the improved particle swarm algorithm to iteratively optimize the production plan model of the open-pit sand and gravel mine to obtain the optimization plan of the sand and gravel mining plan. The present invention optimizes the finder position update strategy in the sparrow algorithm by introducing the mining inertia factor, and then obtains the first production plan influencing factor through the optimized finder position update strategy, and finally improves the particle swarm algorithm through the first production plan influencing factor, and uses the improved particle swarm algorithm to iteratively solve the production plan model of the open-pit sand and gravel mine, thereby balancing the ability and accuracy of global optimization and local optimization in the solution process, and improving the solution efficiency and the accuracy of the final result.
[0009] Optionally, the introduction of the sand and gravel mining inertia factor to optimize the discoverer position update strategy in the sparrow algorithm satisfies the following formula: , ,in, Indicated in The iteration Only the sparrow found The coordinates in dimension, Indicated in The iteration Only the sparrow found The coordinates in dimension, represents the inertia factor of sand and gravel mining, express A random number, The sand and gravel mining inertia factor introduced by the present invention effectively improves the optimization ability of the finder sparrow in the sparrow algorithm, and further improves the solution efficiency of the present invention.
[0010] Optionally, according to the optimized finder position update strategy, the first production plan influencing factor is obtained, satisfying the following formula: ,in, represents the first production planning influencing factor, represents the inertia factor of sand and gravel mining, represents a random number in [0,1], represents the maximum number of iterations, The first production plan influencing factor constructed by the present invention further balances the search capabilities of the local optimum and the global optimum in the particle algorithm, which is beneficial to improving the robustness of the present invention.
[0011] Optionally, the particle swarm algorithm is optimized according to the first production plan influencing factor to obtain an improved particle swarm algorithm that satisfies the following formula: , ,in, Represents particles exist The position in dimension, Represents particles exist The position in dimension, Represents particles exist The speed in dimension, represents the first production planning influencing factor, represents the inertia weight, Represents particles exist The speed in dimension, represents the acceleration factor, and represents a random number in [0,1], represents the individual optimal value, The improved particle swarm algorithm of the present invention is suitable for optimizing the mining plan of a sandstone mine with a huge number of sandstone blocks, and further ensures the reliability and speed of the obtained sandstone mining plan optimization scheme.
[0012] Optionally, the stripping schedule of an open-pit sand and gravel mine is obtained based on the centroid data of the three-dimensional model and the sand and gravel stripping plan optimization scheme, including the following steps: combining the centroid data of the three-dimensional model and the sand and gravel stripping plan optimization scheme to obtain an optimal mining sequence centroid database; determining the row and column names of the stripping schedule bar chart according to the optimal mining sequence centroid database; calculating the sand and gravel mining volume of each weathering type and the total sand and gravel mining volume at each mining time at the same step height, and filling the corresponding horizontal lines of the stripping schedule bar chart; calculating the mining volume and stripping ratio of each weathering type of sand and gravel at the same mining time, and generating a sand and gravel mining volume and stripping ratio double axis-column chart according to the mining volume and the stripping ratio; combining the mining volume and the stripping ratio and the stripping schedule bar chart to obtain the stripping schedule of the open-pit sand and gravel mine. The present invention is conducive to quickly and accurately obtaining the stripping schedule of an open-pit sand and gravel mine by statistically editing the amount of data required for the stripping schedule.
[0013] Optionally, the mining volume of each weathering type of sand and gravel is calculated to satisfy the following formula: ,in, Indicates The volume of sandstone blocks, Indicates The length, width and height dimensions of the sandstone block. The amount of sand and gravel mined, Indicates the number of sandstone blocks; calculate the stripping ratio of each weathering type of sandstone to meet the following formula: ,in, represents the stripping ratio, Indicates The amount of available sand and gravel contained in the total annual sand and gravel mining volume, Indicates the amount of slightly weathered sand and gravel mined, Indicates The amount of waste rock stripped per year; the amount of waste rock is obtained to satisfy the following formula: ,in, represents the amount of topsoil extracted, Indicates the amount of medium-weathered sand and gravel mined, The mining volume and stripping ratio statistical method designed by the present invention has a simple formula, is easy to calculate, and is conducive to improving the accuracy and efficiency of statistical data.
[0014] In the second aspect, in order to be able to efficiently execute the method for intelligently compiling a mining schedule for an open-pit sand and gravel mine provided by the present invention, the present invention also provides a system for intelligently compiling a mining schedule for an open-pit sand and gravel mine, comprising a processor, an input device, an output device and a memory, wherein the processor, the input device, the output device and the memory are interconnected, wherein the memory is used to store a computer program, and the computer program includes program instructions, and the processor is configured to call the program instructions to execute the method for intelligently compiling a mining schedule for an open-pit sand and gravel mine as described in the first aspect of the present invention. The system for intelligently compiling a mining schedule for an open-pit sand and gravel mine of the present invention has a compact structure and stable performance, and can stably execute the method for intelligently compiling a mining schedule for an open-pit sand and gravel mine provided by the present invention, further improving the overall applicability and practical application capabilities of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 A flow chart of an intelligent preparation method for an open-pit sand and gravel mine stripping schedule of the present invention;
[0016] Figure 2 A comparison chart of the results of solving the open-pit sand and gravel mine production plan model by using the particle swarm optimization algorithm, the sparrow search algorithm and the improved particle swarm algorithm of the present invention;
[0017] Figure 3 A double axis-column chart of sand and gravel mining volume and stripping ratio of a large open-pit sand and gravel mine in an embodiment of the present invention;
[0018] Figure 4 It is a mining schedule diagram of a large open-pit sand and gravel mine in an embodiment of the present invention;
[0019] Figure 5 This is a framework diagram of an intelligent compilation system for an open-pit sand and gravel mine stripping schedule of the present invention;
[0020] Figure 6 A schematic diagram of the structure of an intelligent equipment for preparing a mining schedule for an open-pit sand and gravel mine is provided as an embodiment. DETAILED DESCRIPTION
[0021] The specific embodiments of the present invention will be described in detail below. It should be noted that the embodiments described herein are only for illustration and are not intended to limit the present invention. In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is obvious to those of ordinary skill in the art that these specific details do not need to be adopted to implement the present invention. In other examples, in order to avoid confusing the present invention, known circuits, software or methods are not specifically described.
[0022] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "in one embodiment," "in an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or subcombination. In addition, it should be understood by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale.
[0023] See also Figure 1 In order to improve the ability to optimize the mining sequence of sand and gravel blocks, accurately and quickly compile a mining schedule, and solve the problems of slow optimization speed, small optimization quantity, and cumbersome and error-prone data processing in open-pit sand and gravel mining, the present invention provides an intelligent compilation method for the mining schedule of an open-pit sand and gravel mine, such as Figure 1 As shown, the method comprises the following steps:
[0024] S1. Obtain the sand and gravel data of the open-pit sand and gravel mine and the centroid point data of the three-dimensional model.
[0025] Specifically, the sand and gravel data of the open-pit sand and gravel mine described in step S1 include obtaining the spatial coordinate value and edge length of the sand and gravel block, the specific gravity of the sand and gravel, the price of sand and gravel of different weathering types, the sand and gravel weathering type, the unit cost of mining and stripping, the comprehensive selling price of sand and gravel, the recovery rate of finished sand and gravel, and the mixing rate of waste rock; in one embodiment, the sand and gravel data of a large open-pit sand and gravel mine are as follows: the maximum service time of the mine is 20 years, the selling price of sand and gravel is 70 yuan / ton, the unit mining cost is 9.54 yuan / ton, and the comprehensive processing cost is 45.65 yuan / ton; the unit cost of stripping is 13.5 yuan / ton, the recovery rate of finished sand and gravel is 95%, the mixing rate of waste rock is 0%, the discount rate is 15%, and the annual maximum mining volume is 12 million. 、Minimum annual mining volume 9.6 million , the maximum annual mining volume is 11.5 million , Minimum annual mining volume 11 million .
[0026] Furthermore, the three-dimensional model centroid data includes the spatial coordinates, topography, geological structure and other three-dimensional model information of the mine, which can be obtained through technical means such as lidar scanning and drone photogrammetry; the centroid data includes the three-dimensional coordinates (X, Y, Z) of the centroid, as well as other possibly related information, such as mass and density.
[0027] S2. Use the sand and gravel data to construct an open-pit sand and gravel mine block net present value objective function, and establish an open-pit sand and gravel mine production planning model based on the open-pit sand and gravel mine production constraints and the open-pit sand and gravel mine block net present value objective function.
[0028] In this embodiment, the open-pit sand and gravel mine block net present value objective function is constructed by using the sand and gravel data in step S2, and an open-pit sand and gravel mine production planning model is established according to the open-pit sand and gravel mine production constraints and the open-pit sand and gravel mine block net present value objective function, which satisfies the following formula: , , ,in, represents the net present value of the sandstone block, represents the maximum service time of the mine, Indicates the number of sandstone blocks. Indicates the number of different weathering types of sand and gravel, Indicates Sand and gravel block mining variables, Indicates The sand and gravel blocks have not been mined. Indicates Sand and gravel blocks are mined, represents the discount rate, Indicates the mining time year, Indicates The amount of available sand and gravel contained in the total annual sand and gravel mining volume, Indicates the recovery rate of finished sand and gravel, For the Annual sand and gravel price, Indicates the waste rock mixing rate, Indicates The amount of sand and gravel per block, represents the unit mining cost of sand and gravel, is the soil stripping amount, Represents topsoil, Indicates highly weathered soil. Indicates medium weathered soil, represents the unit cost of soil stripping, Represents the comprehensive cost of sand and gravel processing, Indicates the minimum annual sand and gravel mining volume, Indicates the maximum annual sand and gravel mining volume, Indicates the maximum annual mining volume.
[0029] S3. Solve the production planning model of the open-pit sand and gravel mine to obtain an optimization plan for sand and gravel mining and stripping.
[0030] In the embodiment, the step S3 of solving the open-pit sand and gravel mine production plan model to obtain the sand and gravel mining plan optimization scheme includes the following steps:
[0031] S31. Introduce the inertia factor of sand and gravel mining to optimize the finder position update strategy in the sparrow algorithm, and obtain the first production plan influencing factor based on the optimized finder position update strategy.
[0032] Specifically, the sand and gravel mining inertia factor is introduced to optimize the discoverer position update strategy in the sparrow algorithm to satisfy the following formula: , ,in, Indicated in The iteration Only the sparrow found The coordinates in dimension, Indicated in The iteration Only the sparrow found The coordinates in dimension, represents the inertia factor of sand and gravel mining, express A random number, Indicates the maximum number of iterations.
[0033] Furthermore, according to the optimized finder position update strategy, the first production plan influencing factor is obtained, which satisfies the following formula: ,in, represents the first production planning influencing factor, represents the inertia factor of sand and gravel mining, express A random number, represents the maximum number of iterations, Indicates the number of the discoverer sparrow.
[0034] S32. Optimize the particle swarm algorithm according to the first production plan influencing factor to obtain an improved particle swarm algorithm.
[0035] Specifically, the particle swarm algorithm is optimized according to the first production plan influencing factor to obtain an improved particle swarm algorithm that satisfies the following formula: , ,in, Represents particles exist The position in dimension, Represents particles exist The position in dimension, Represents particles exist The speed in dimension, represents the first production planning influencing factor, represents the inertia weight, Represents particles exist The speed in dimension, represents the acceleration factor, and represents a random number in [0,1], represents the individual optimal value, represents the global optimal value.
[0036] See also Figure 2 From the comparison results, it can be seen that the optimization results of the particle swarm optimization algorithm and the sparrow optimization algorithm are basically consistent, wherein the iterative calculation time of the particle swarm optimization algorithm is 16 minutes and 50 seconds; the iterative calculation time of the sparrow optimization algorithm is 13.06 seconds; and the iterative calculation time of the improved particle swarm algorithm of the present invention is 12.68 seconds, indicating that the improved particle swarm algorithm of the present invention has outstanding performance in the convergence calculation of the maximum net present value of the mining schedule.
[0037] S33. Utilize the improved particle swarm algorithm to iteratively optimize the production plan model of the open-pit sand and gravel mine to obtain an optimized solution for the sand and gravel mining plan.
[0038] Specifically, in step S33, the improved particle swarm algorithm is used to iteratively optimize the open-pit sand and gravel mine production plan model to obtain the sand and gravel mining plan optimization scheme, including the following steps: initializing the improved particle swarm algorithm parameters, setting the particle swarm size to 300, the dimension d=100, and the number of iterations =300, inertia weight , acceleration factor , define the fitness function, perform iterative optimization to obtain the optimal sand and gravel mining plan. Please refer to Table 1, which is the optimal sand and gravel mining plan for a large open-pit sand and gravel mine.
[0039]
[0040] Table 1 Optimization scheme of sand and gravel stripping plan for a large open-pit sand and gravel mine
[0041] S4. Based on the centroid data of the three-dimensional model and the sand and gravel mining plan optimization scheme, a mining schedule for an open-pit sand and gravel mine is obtained.
[0042] In an embodiment, the step S4 described in which the mining schedule of an open-pit sand and gravel mine is obtained based on the centroid data of the three-dimensional model and the optimization scheme of the sand and gravel mining plan includes the following steps: combining the centroid data of the three-dimensional model and the optimization scheme of the sand and gravel mining plan to obtain the optimal mining sequence centroid database; determining the row and column names of the mining schedule bar chart according to the optimal mining sequence centroid database; calculating the mining volume of each weathering type of sand and gravel at the same step height and the total mining volume of sand and gravel at each mining time, and filling the corresponding bar chart of the mining schedule bar chart; calculating the mining volume and stripping ratio of each weathering type of sand and gravel at the same mining time, and generating a double axis-column chart of sand and gravel mining volume and stripping ratio according to the mining volume and the stripping ratio; combining the mining volume and the stripping ratio and the mining schedule bar chart to obtain the mining schedule of the open-pit sand and gravel mine. Please refer to Table 2, which is the optimal mining sequence centroid database of a large open-pit sand and gravel mine.
[0043]
[0044] Table 2 The optimal mining sequence centroid database of a large open-pit gravel mine
[0045] In the embodiment, the double axis-column graph of sandstone production volume and stripping ratio generated according to the production volume and stripping ratio is as follows: Figure 3 As shown; combined with the mining volume and stripping ratio and the stripping schedule bar chart, the stripping schedule of the open-pit sand and gravel mine is obtained as follows Figure 4 shown.
[0046] Furthermore, the mining volume of each weathering type of sand and gravel is calculated to meet the following formula: ,in, Indicates The volume of sandstone blocks, Indicates The length, width and height dimensions of the sandstone block. The amount of sand and gravel mined, Indicates the number of sandstone blocks; calculate the stripping ratio of each weathering type of sandstone to meet the following formula: ,in, represents the stripping ratio, Indicates The amount of available sand and gravel contained in the total annual sand and gravel mining volume, Indicates the amount of slightly weathered sand and gravel mined, Indicates The amount of waste rock stripped per year; the amount of waste rock is obtained to satisfy the following formula: ,in, represents the amount of topsoil extracted, Indicates the amount of medium-weathered sand and gravel mined, Indicates the mining volume of highly weathered sand and gravel.
[0047] In this embodiment, the step S4 described in which the open-pit sand and gravel mine mining schedule is obtained based on the three-dimensional model centroid data and the sand and gravel mining plan optimization scheme, and also includes digital processing of weathering types, specifically, [topsoil, fully strongly weathered, moderately weathered, slightly weathered] = [1, 2, 3, 4]; according to the optimal mining sequence centroid database, the row and column names of the mining schedule bar chart are determined, and the column names are automatically identified and obtained based on the second row of the optimal mining sequence centroid database. The row name is determined by the open-pit mine step height range, with a step height of 10m for a step greater than 260m and a step height of 15m for a step less than 260m.
[0048] See also Figure 5 , Figure 5 This is a framework diagram of an open-pit sand and gravel mine mining schedule intelligent compilation system of the present invention. In an embodiment, in order to be able to efficiently execute an open-pit sand and gravel mine mining schedule intelligent compilation method provided by the present invention, the present invention also provides an open-pit sand and gravel mine mining schedule intelligent compilation system, including: an input device, an output device, a processor, and a memory. The input device, the output device, the processor, and the memory are interconnected. The memory contains program instructions, and the program instructions are used for the steps of the open-pit sand and gravel mine mining schedule intelligent compilation method. The open-pit sand and gravel mine mining schedule intelligent compilation system of the present invention has a compact structure and stable performance. It can stably execute an open-pit sand and gravel mine mining schedule intelligent compilation method of the present invention, further improving the overall applicability and practical application capabilities of the present invention.
[0049] In an optional embodiment, the processor may be a central processing unit (CPU), which may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc. An input device may be used to obtain data information. An output device may be used to output the results obtained by storing program instructions contained in a computer program in a memory provided by the present invention. The memory may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory. For example, the memory may also store information about the type of device.
[0050] In yet another alternative embodiment, see Figure 6 , Figure 6 The present invention provides a schematic diagram of the structure of an open-pit sand and gravel mine stripping schedule intelligent preparation device. In order to be able to efficiently execute the open-pit sand and gravel mine stripping schedule intelligent preparation method provided by the present invention, this embodiment also provides an open-pit sand and gravel mine stripping schedule intelligent preparation device, such as Figure 6 As shown, including:
[0051] The memory 10 is used to store computer programs; the processor 20 is used to execute the computer programs to implement the above-mentioned method for intelligently compiling the mining schedule of an open-pit sand and gravel mine.
[0052] Memory 10 , processor 20 , communication interface 31 and communication bus 32 . Memory 10 , processor 20 , communication interface 31 all communicate with each other via communication bus 32 .
[0053] In an embodiment, the memory 10 is used to store one or more program instructions, and the memory 10 may store program instructions for implementing the following functions: obtaining sand and gravel data and three-dimensional model centroid data of an open-pit sand and gravel mine; using the sand and gravel data to construct a net present value objective function of an open-pit sand and gravel mine block, and establishing an open-pit sand and gravel mine production plan model based on the production constraints of the open-pit sand and gravel mine and the net present value objective function of the open-pit sand and gravel mine block; solving the open-pit sand and gravel mine production plan model to obtain an optimization plan for sand and gravel mining and stripping; obtaining an open-pit sand and gravel mine mining and stripping schedule based on the three-dimensional model centroid data and the optimization plan for sand and gravel mining and stripping.
[0054] In a possible implementation, the memory 10 may include a program storage area and a data storage area, wherein the program storage area may store an operating system and an application required for at least one function, etc.; the data storage area may store data created during use.
[0055] In addition, the memory 10 may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include an NVRAM. The memory stores an operating system and operating instructions, executable modules or data structures, or a subset thereof, or an extended set thereof, wherein the operating instructions may include various operating instructions for implementing various operations. The operating system may include various system programs for implementing various basic tasks and processing hardware-based tasks.
[0056] The processor 20 may be a central processing unit (CPU), an application specific integrated circuit, a digital signal processor, a field programmable gate array or other programmable logic device, a microprocessor or any conventional processor, etc. The processor 20 may call a program stored in the memory 10 .
[0057] The communication interface 31 may be an interface of a communication module, and is used to connect to other devices or systems.
[0058] Of course, it should be noted that Figure 6 The structure shown does not constitute a limitation on the intelligent preparation device for the mining schedule of an open-pit sand and gravel mine in this embodiment. In actual applications, the intelligent preparation device for the mining schedule of an open-pit sand and gravel mine may include Figure 6 More or fewer components than shown, or combinations of certain components.
[0059] The embodiment also provides a storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned method for intelligently compiling a mining schedule for an open-pit sand and gravel mine are implemented.
[0060] The storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.
[0061] In summary, the present invention establishes an open-pit sand and gravel mine production plan model through the net present value objective function of the open-pit sand and gravel mine block and the production constraint conditions of the open-pit sand and gravel mine, and then obtains the sand and gravel mining plan optimization plan by solving the open-pit sand and gravel mine production plan model, and finally obtains the open-pit sand and gravel mine mining schedule plan using the sand and gravel mining plan optimization plan, while improving the optimization of the sand and gravel block mining sequence speed and quantity, and statistics the amount of data required for editing the mining schedule plan, solving the problem of accurately and quickly compiling the mining schedule plan. Therefore, the present invention effectively overcomes the various shortcomings of the prior art and has a high industrial utilization value.
[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. An intelligent method for compiling an open-pit sand and gravel mine stripping schedule, characterized in that: The method for intelligently compiling an open-pit sand and gravel mine stripping schedule comprises the following steps: Obtain the sand and gravel data and 3D model centroid data of the open-pit sand and gravel mine; Using the sand and gravel data to construct an open-pit sand and gravel mine block net present value objective function, and according to the open-pit sand and gravel mine production constraint conditions and the open-pit sand and gravel mine block net present value objective function, establish an open-pit sand and gravel mine production planning model; Solving the open-pit sand and gravel mine production planning model to obtain an optimization plan for sand and gravel mining and stripping; Based on the centroid data of the three-dimensional model and the sand and gravel mining plan optimization scheme, a mining schedule for an open-pit sand and gravel mine is obtained; The method of solving the open-pit sand and gravel mine production plan model to obtain the sand and gravel mining plan optimization scheme includes the following steps: The sand and gravel mining inertia factor is introduced to optimize the discoverer position update strategy in the sparrow algorithm. According to the optimized discoverer position update strategy, the first production plan influencing factor is obtained. Optimizing the particle swarm algorithm according to the first production plan influencing factor to obtain an improved particle swarm algorithm; Using the improved particle swarm algorithm to iteratively optimize the open-pit sand and gravel mine production plan model to obtain the sand and gravel mining plan optimization solution; The introduction of the sand and gravel mining inertia factor to optimize the discoverer position update strategy in the sparrow algorithm satisfies the following formula: in, Indicated in The first iteration Only the sparrow found The coordinates in dimension, Indicated in The first iteration Only the sparrow found The coordinates in dimension, represents the inertia factor of sand and gravel mining, express A random number, Indicates the maximum number of iterations; According to the optimized finder position update strategy, the first production plan influencing factor is obtained, which satisfies the following formula: in, represents the first production planning influencing factor, represents the inertia factor of sand and gravel mining, express A random number, represents the maximum number of iterations, Indicates the number of the discoverer sparrow; The particle swarm algorithm is optimized according to the first production plan influencing factor to obtain an improved particle swarm algorithm that satisfies the following formula: in, Represents particles exist The position in dimension, Represents particles exist The position in dimension, Represents particles exist The speed in dimension, represents the first production planning influencing factor, represents the inertia weight, Represents particles exist The speed in dimension, represents the acceleration factor, and represents a random number in [0,1], represents the individual optimal value, represents the global optimal value.
2. The method for intelligently compiling an open-pit sand and gravel mine stripping schedule according to claim 1 is characterized in that: The sand and gravel data of the open-pit sand and gravel mine are obtained, including obtaining the spatial coordinate values and edge lengths of sand and gravel blocks, sand and gravel specific gravity, sand and gravel prices of different weathering types, sand and gravel weathering types, mining and stripping unit costs, sand and gravel comprehensive selling prices, finished sand and gravel recovery rates, and waste rock mixing rates.
3. The method for intelligently compiling an open-pit sand and gravel mine stripping schedule according to claim 1 is characterized in that: The open-pit sand and gravel mine block net present value objective function is constructed by using the sand and gravel data, and the open-pit sand and gravel mine production planning model is established according to the open-pit sand and gravel mine production constraints and the open-pit sand and gravel mine block net present value objective function, which satisfies the following formula: in, represents the net present value of the sandstone block, represents the maximum service time of the mine, Indicates the number of sandstone blocks. Indicates the number of different weathering types of sand and gravel, Indicates Sand and gravel block mining variables, Indicates The sand and gravel blocks have not been mined. Indicates Sand and gravel blocks are mined, represents the discount rate, Indicates the mining time year, Indicates The amount of available sand and gravel contained in the total annual sand and gravel mining volume, Indicates the recovery rate of finished sand and gravel, For the Annual sand and gravel price, Indicates the waste rock mixing rate, Indicates The amount of sand and gravel per block, represents the unit mining cost of sand and gravel, is the soil stripping amount, Represents topsoil, Indicates highly weathered soil. Indicates medium weathered soil, represents the unit cost of soil stripping, Represents the comprehensive cost of sand and gravel processing, Indicates the minimum annual sand and gravel mining volume, Indicates the maximum annual sand and gravel mining volume, Indicates the maximum annual mining volume.
4. The method for intelligently compiling an open-pit sand and gravel mine stripping schedule according to claim 1 is characterized in that: The step of obtaining the open-pit sand and gravel mine stripping schedule based on the centroid data of the three-dimensional model and the sand and gravel stripping plan optimization scheme comprises the following steps: Combining the centroid data of the three-dimensional model with the sand and gravel mining plan optimization scheme, obtaining an optimal mining sequence centroid database; Determine the row and column names of the mining schedule bar chart according to the optimal mining sequence centroid database; Calculate the sand and gravel mining volume of each weathering type and the total sand and gravel mining volume at each mining time under the same step height, and fill in the corresponding horizontal line of the mining schedule bar chart; Calculate the mining volume and stripping ratio of each weathering type of sand and gravel at the same mining time, and generate a double axis-column chart of sand and gravel mining volume and stripping ratio according to the mining volume and stripping ratio; The mining schedule of the open-pit sand and gravel mine is obtained by combining the mining volume, the stripping ratio and the bar chart of the mining schedule.
5. The method for intelligently compiling an open-pit sand and gravel mine stripping schedule according to claim 4 is characterized in that: Calculate the mining volume of each weathering type of sand and gravel to meet the following formula: in, Indicates The volume of sandstone blocks, Indicates The length, width and height dimensions of the sandstone block. The amount of sand and gravel mined, Indicates the number of sandstone blocks; Calculate the stripping ratio of each weathering type of sand and gravel to meet the following formula: in, represents the stripping ratio, Indicates The amount of available sand and gravel contained in the total annual sand and gravel mining volume, Indicates the amount of slightly weathered sand and gravel mined, Indicates The amount of waste rock stripped annually; The waste rock amount is obtained to satisfy the following formula: in, represents the amount of topsoil extracted, Indicates the amount of medium-weathered sand and gravel mined, Indicates the mining volume of highly weathered sand and gravel.
6. An open-pit sand and gravel mine stripping schedule intelligent compilation system, characterized in that: The intelligent preparation system for the mining schedule of an open-pit sand and gravel mine comprises: an input device, an output device, a processor, and a memory. The input device, the output device, the processor, and the memory are interconnected. The memory comprises program instructions, and the program instructions are used to execute the steps of the intelligent preparation method for the mining schedule of an open-pit sand and gravel mine as described in any one of claims 1 to 5.
Citation Information
Patent Citations
Blasting fragmentation prediction method based on ore rock crushing mechanism
CN115455804A
Mine production planning method and system based on improved particle swarm optimization algorithm
CN116029475A
Strip mine yield prediction method based on limit gradient lifting algorithm
CN117764239A
Cited By
Controlling mining operations
WO2026008354A1